Abstract
• This Case Study deals with implementation of lean manufacturing
techniques in crankshaft manufacturing system at an automotive
manufacturing plant in South India.
• Lean Manufacturing was selected to meet the quality, cost and delivery
targets.
• After Implementing lean manufacturing, manufacturing lead time
reduced by 40%, defects were reduced, high process capability
achieved, quick response to customer demands.
Problems in existing system
• High Additional processing time
• More number of workers
• Consumes more resources
• More inventory
• More scrap
• High Cycle time
Earlier System Outline
• Earlier it was manufactured in
three different location
• Movement in zig-zag pattern
• Poor communication
• Unbalanced work content
New Outline after Implementation
• Zig-Zag flow eliminated
• Unidirectional
• Better communication
• Operator requirement less
• Well organized
Value Stream Mapping
• Method of lean manufacturing which uses symbols, metrics and
arrows to show and improve flow of inventory and information
required to produce a product or service.
• Value stream mapping allows one to determine where the waste
occurs.
• This helps in identifying various factors: Value added time, Non Value
added time, cycle time, changeover time.
• This helps in identifying and eliminating waste.
Current Value Stream Mapping State
Future State after implementation
• KAIZEN 1: Implement the Modified Process by eliminate and
combine operation.
• KAIZEN 2: Implement the modified process by optimizing the
process parameters.
• KAIZEN 3: Implement the modified process by tooling improvement
and introduce CNC lathe.
Results after Implementation
• Single piece flow for crankshaft manufacturing system was
established.
• The non- value adding activities were eliminated
• Quick response to customer demand to supply frequently in small lots
• Complete manufacturing was established to meet customer
requirements and quality.
Conclusion
• Implementation of Lean Manufacturing in crank shaft manufacturing
cell would eliminate the 8 non-value adding wastes like over
production, waiting, unnecessary transport movement, defects and
unused employee creativity.
• This would also improve the flexibility of the production process.
References
1. K. Venkataramana, B.Vijaya Ramnath, V.Muthu Kumar,
C.Elanchezhian, 2014 ‘Application of Value Stream Mapping for
Reduction of Cycle Time in a Machining Process’, 3rd International
Conference on Materials Processing and Characterisation.

Mais conteúdo relacionado

Mais procurados

Value stream mapping ppt
Value stream mapping pptValue stream mapping ppt
Value stream mapping pptNaik Devang
 
Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basicssarah bridge
 
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comLean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comNareshChawla
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mappingmahawar1987
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturingskchawla4
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL AttiMurugan
 
History of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalHistory of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalSumon Kumar Kundu
 
SMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping LineSMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping LineParth Patel
 
Kaizen forms xls
Kaizen forms xlsKaizen forms xls
Kaizen forms xlsbeskidek
 
SMED - Quick Change Over
SMED - Quick Change OverSMED - Quick Change Over
SMED - Quick Change OverOskar Olofsson
 

Mais procurados (20)

13. value stream mapping
13. value stream mapping13. value stream mapping
13. value stream mapping
 
13 smed methodology_v2
13 smed methodology_v213 smed methodology_v2
13 smed methodology_v2
 
Value stream mapping ppt
Value stream mapping pptValue stream mapping ppt
Value stream mapping ppt
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
Time study
Time studyTime study
Time study
 
Lean Tools
Lean ToolsLean Tools
Lean Tools
 
Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basics
 
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comLean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
 
TPM & OEE
TPM & OEETPM & OEE
TPM & OEE
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
History of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalHistory of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 Principal
 
8 Wastes of Lean
8 Wastes of Lean8 Wastes of Lean
8 Wastes of Lean
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
SMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping LineSMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping Line
 
Kaizen forms xls
Kaizen forms xlsKaizen forms xls
Kaizen forms xls
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
SMED - Quick Change Over
SMED - Quick Change OverSMED - Quick Change Over
SMED - Quick Change Over
 
13 pull system
13 pull system13 pull system
13 pull system
 

Destaque

How to Use VSM Correctly
How to Use VSM CorrectlyHow to Use VSM Correctly
How to Use VSM CorrectlyMike Rother
 
Value stream mapping training
Value stream mapping trainingValue stream mapping training
Value stream mapping trainingJusto Castellon
 
PALCO INDUSTRY USING VALUE STREAM MAPPING
PALCO INDUSTRY USING VALUE STREAM MAPPINGPALCO INDUSTRY USING VALUE STREAM MAPPING
PALCO INDUSTRY USING VALUE STREAM MAPPINGFuratAj
 
Medical Services Client Vsm 10 10 11
Medical Services Client Vsm 10 10 11Medical Services Client Vsm 10 10 11
Medical Services Client Vsm 10 10 11Jamie Voster
 
Value stream mapping and kaizen in agile retrospectives
Value stream mapping and kaizen in agile retrospectivesValue stream mapping and kaizen in agile retrospectives
Value stream mapping and kaizen in agile retrospectivesAngela Dugan
 
Value Stream Mapping Overview Update
Value Stream Mapping Overview UpdateValue Stream Mapping Overview Update
Value Stream Mapping Overview Updatejheaton418
 
Kanban For Software Engineering Apr 242
Kanban For Software Engineering Apr 242Kanban For Software Engineering Apr 242
Kanban For Software Engineering Apr 242Ross Lawley
 
Value stream mapping for service
Value stream mapping for serviceValue stream mapping for service
Value stream mapping for serviceLean Teams USA
 
Value stream mapping - Future State
Value stream mapping - Future StateValue stream mapping - Future State
Value stream mapping - Future Statekrishnaheda
 
Mini CNC (Router Machine)
Mini CNC (Router Machine)Mini CNC (Router Machine)
Mini CNC (Router Machine)Amir Dawa
 
"Lean IT practices, from theory to application" by Mike Orzen
"Lean IT practices, from theory to application" by Mike Orzen"Lean IT practices, from theory to application" by Mike Orzen
"Lean IT practices, from theory to application" by Mike OrzenOperae Partners
 
Lean IT Presentation
Lean IT PresentationLean IT Presentation
Lean IT Presentationbyunesiu
 
Value Stream Mapping -The Concept
Value Stream Mapping -The ConceptValue Stream Mapping -The Concept
Value Stream Mapping -The ConceptSubhrajyoti Parida
 
Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3TKMG, Inc.
 

Destaque (20)

Cycle time reduction
Cycle time reductionCycle time reduction
Cycle time reduction
 
How to Use VSM Correctly
How to Use VSM CorrectlyHow to Use VSM Correctly
How to Use VSM Correctly
 
Value stream mapping training
Value stream mapping trainingValue stream mapping training
Value stream mapping training
 
PALCO INDUSTRY USING VALUE STREAM MAPPING
PALCO INDUSTRY USING VALUE STREAM MAPPINGPALCO INDUSTRY USING VALUE STREAM MAPPING
PALCO INDUSTRY USING VALUE STREAM MAPPING
 
Medical Services Client Vsm 10 10 11
Medical Services Client Vsm 10 10 11Medical Services Client Vsm 10 10 11
Medical Services Client Vsm 10 10 11
 
Value stream mapping and kaizen in agile retrospectives
Value stream mapping and kaizen in agile retrospectivesValue stream mapping and kaizen in agile retrospectives
Value stream mapping and kaizen in agile retrospectives
 
Value Stream Mapping Overview Update
Value Stream Mapping Overview UpdateValue Stream Mapping Overview Update
Value Stream Mapping Overview Update
 
Kanban For Software Engineering Apr 242
Kanban For Software Engineering Apr 242Kanban For Software Engineering Apr 242
Kanban For Software Engineering Apr 242
 
Value Steam Mapping
Value Steam MappingValue Steam Mapping
Value Steam Mapping
 
Value stream mapping
Value stream mappingValue stream mapping
Value stream mapping
 
Value stream mapping for service
Value stream mapping for serviceValue stream mapping for service
Value stream mapping for service
 
Value stream mapping - Future State
Value stream mapping - Future StateValue stream mapping - Future State
Value stream mapping - Future State
 
Mini CNC (Router Machine)
Mini CNC (Router Machine)Mini CNC (Router Machine)
Mini CNC (Router Machine)
 
Lean management
Lean managementLean management
Lean management
 
Cycle time
Cycle timeCycle time
Cycle time
 
"Lean IT practices, from theory to application" by Mike Orzen
"Lean IT practices, from theory to application" by Mike Orzen"Lean IT practices, from theory to application" by Mike Orzen
"Lean IT practices, from theory to application" by Mike Orzen
 
Lean IT Presentation
Lean IT PresentationLean IT Presentation
Lean IT Presentation
 
Value Stream Mapping -The Concept
Value Stream Mapping -The ConceptValue Stream Mapping -The Concept
Value Stream Mapping -The Concept
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3
 

Semelhante a Application of value stream mapping for reduction of cycle time in machining process

Schneider Case Study Challenge
Schneider Case Study ChallengeSchneider Case Study Challenge
Schneider Case Study ChallengeNikhil Kejriwal
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Controlshrinivas kulkarni
 
Overview on Kanban Methodology and its Implementation
Overview on Kanban Methodology and its ImplementationOverview on Kanban Methodology and its Implementation
Overview on Kanban Methodology and its ImplementationLaukik Raut
 
PRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdf
PRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdfPRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdf
PRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdfPratikDalvi17
 
Ch11 introto business
Ch11 introto businessCh11 introto business
Ch11 introto businessAjit Kumar
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET Journal
 
ppt-project-final.ppt
ppt-project-final.pptppt-project-final.ppt
ppt-project-final.pptsteel14
 
Automated Assembly Systems
Automated Assembly SystemsAutomated Assembly Systems
Automated Assembly Systemschethan kumar
 
Agile Network India| Kanban Day @Chennai | Statik | Sreeanand Chandran and Sa...
Agile Network India| Kanban Day @Chennai | Statik | Sreeanand Chandran and Sa...Agile Network India| Kanban Day @Chennai | Statik | Sreeanand Chandran and Sa...
Agile Network India| Kanban Day @Chennai | Statik | Sreeanand Chandran and Sa...AgileNetwork
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & ControlKunalJagtap5
 
Cb12e basic ppt ch11
Cb12e basic ppt ch11Cb12e basic ppt ch11
Cb12e basic ppt ch11Eric
 
Application of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industryApplication of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industryijmech
 
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET Journal
 
Manufacturing Excellence Case Studies By Tetrahedron
Manufacturing Excellence Case Studies By Tetrahedron Manufacturing Excellence Case Studies By Tetrahedron
Manufacturing Excellence Case Studies By Tetrahedron Sagar Sangam Sahu
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1Dave Thompson
 
Experienced Sourcing professional with 10years Exp- Material/vendor Management
Experienced Sourcing professional with 10years Exp- Material/vendor ManagementExperienced Sourcing professional with 10years Exp- Material/vendor Management
Experienced Sourcing professional with 10years Exp- Material/vendor ManagementLakshminarasimman S
 

Semelhante a Application of value stream mapping for reduction of cycle time in machining process (20)

Schneider Case Study Challenge
Schneider Case Study ChallengeSchneider Case Study Challenge
Schneider Case Study Challenge
 
Ch9 Jit
Ch9 JitCh9 Jit
Ch9 Jit
 
Line Crew Optimisation Methodology
Line Crew Optimisation MethodologyLine Crew Optimisation Methodology
Line Crew Optimisation Methodology
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
Overview on Kanban Methodology and its Implementation
Overview on Kanban Methodology and its ImplementationOverview on Kanban Methodology and its Implementation
Overview on Kanban Methodology and its Implementation
 
PRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdf
PRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdfPRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdf
PRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdf
 
Ch11 introto business
Ch11 introto businessCh11 introto business
Ch11 introto business
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
 
ppt-project-final.ppt
ppt-project-final.pptppt-project-final.ppt
ppt-project-final.ppt
 
Motion and time study
Motion and time studyMotion and time study
Motion and time study
 
Automated Assembly Systems
Automated Assembly SystemsAutomated Assembly Systems
Automated Assembly Systems
 
Agile Network India| Kanban Day @Chennai | Statik | Sreeanand Chandran and Sa...
Agile Network India| Kanban Day @Chennai | Statik | Sreeanand Chandran and Sa...Agile Network India| Kanban Day @Chennai | Statik | Sreeanand Chandran and Sa...
Agile Network India| Kanban Day @Chennai | Statik | Sreeanand Chandran and Sa...
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
Cb12e basic ppt ch11
Cb12e basic ppt ch11Cb12e basic ppt ch11
Cb12e basic ppt ch11
 
Application of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industryApplication of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industry
 
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
 
Manufacturing Excellence Case Studies By Tetrahedron
Manufacturing Excellence Case Studies By Tetrahedron Manufacturing Excellence Case Studies By Tetrahedron
Manufacturing Excellence Case Studies By Tetrahedron
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1
 
Experienced Sourcing professional with 10years Exp- Material/vendor Management
Experienced Sourcing professional with 10years Exp- Material/vendor ManagementExperienced Sourcing professional with 10years Exp- Material/vendor Management
Experienced Sourcing professional with 10years Exp- Material/vendor Management
 
Lm
LmLm
Lm
 

Último

Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 

Último (20)

Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 

Application of value stream mapping for reduction of cycle time in machining process

  • 1. Application of Value Stream Mapping for Reduction of Cycle Time in a Machining Process Sumit Bhattacharya 851 Sathish Kumar 863
  • 2. Abstract • This Case Study deals with implementation of lean manufacturing techniques in crankshaft manufacturing system at an automotive manufacturing plant in South India. • Lean Manufacturing was selected to meet the quality, cost and delivery targets. • After Implementing lean manufacturing, manufacturing lead time reduced by 40%, defects were reduced, high process capability achieved, quick response to customer demands.
  • 3. Problems in existing system • High Additional processing time • More number of workers • Consumes more resources • More inventory • More scrap • High Cycle time
  • 4. Earlier System Outline • Earlier it was manufactured in three different location • Movement in zig-zag pattern • Poor communication • Unbalanced work content
  • 5. New Outline after Implementation • Zig-Zag flow eliminated • Unidirectional • Better communication • Operator requirement less • Well organized
  • 6. Value Stream Mapping • Method of lean manufacturing which uses symbols, metrics and arrows to show and improve flow of inventory and information required to produce a product or service. • Value stream mapping allows one to determine where the waste occurs. • This helps in identifying various factors: Value added time, Non Value added time, cycle time, changeover time. • This helps in identifying and eliminating waste.
  • 7. Current Value Stream Mapping State
  • 8. Future State after implementation
  • 9. • KAIZEN 1: Implement the Modified Process by eliminate and combine operation. • KAIZEN 2: Implement the modified process by optimizing the process parameters. • KAIZEN 3: Implement the modified process by tooling improvement and introduce CNC lathe.
  • 10. Results after Implementation • Single piece flow for crankshaft manufacturing system was established. • The non- value adding activities were eliminated • Quick response to customer demand to supply frequently in small lots • Complete manufacturing was established to meet customer requirements and quality.
  • 11.
  • 12. Conclusion • Implementation of Lean Manufacturing in crank shaft manufacturing cell would eliminate the 8 non-value adding wastes like over production, waiting, unnecessary transport movement, defects and unused employee creativity. • This would also improve the flexibility of the production process.