TOTAL PRODUCTIVE
MAINTENANCE
(TPM)
BY
SASIDHARAN M
INTRODUCTION
• Total productive maintenance (TPM) originated in Japan in 1971
as a method for improved machine availability through better
utilization of maintenance and production resources.
• TPM is a maintenance process developed for improving
productivity by making processes more reliable and less
wasteful.TPM is an extension of TQM(Total Quality
Management)
WHY TPM ?
• Avoid wastage in a quickly changing economic environment.
• Producing goods without reducing product quality.
• Reduce cost.
• Produce a low batch quantity at the earliest possible time.
• Goods send to the customers must be non defective.
WHAT IS TPM?
• Strategy of TPM is to change the attitude from “I use, You
maintain” to “I use, I maintain”.
• Think about how to Increase production and reduced cost by
reducing or eliminating loss, and this is the TPM.
OBJECTIVES OF TPM
• Improving the effectiveness of machines.
• Improving the efficiency, reliability and effectiveness of
maintenance of machine.
• Scheduling maintenance for avoiding early maintenance.
• Involving operation team also in smaller scale maintenance,
such as machine checklist inspection before starting and after
closing the machines.
• Arrangement of training for amending the skills of employees.
PILLARS OF TPM
PILLAR 1 – AUTONOMOUS MAINTENANCE
• A collaborative team activity involving production, maintenance, and
engineering.
• Maintaining Basic conditions on shop floor & in Machines.
• All over participation through TPM Circles.
• Example: 5 S’, JISHU HOZEN ( Autonomous maintenance ), etc.,
• An approach that
• Develops operating and maintenance skills
• Strengthens communication and cooperation
PILLAR 2 – FOCUSED IMPROVEMENT
• Improvement on every one’s activity.
• Improvement is to eliminate Production losses and cost
reduction.
• Improvement in Reliability, Maintainability, and cost.
PILLAR 3 – PLANNED MAINTENANCE
• Logical analysis “Real causes for real counter measures”.
• Focus on Prevention.
• It is aimed to have trouble free machines and equipments
producing defect free products for total customer satisfaction.
• Example: Preventive Maintenance, Breakdown Maintenance,
etc.,
PILLAR 4 – QUALITY MAINTENANCE
• Developing perfect machine for perfect Quality.
• Eliminating In – Process defects and custom complaints.
• Policy :
• Defect free conditions and control of equipments.
• QM activities to support quality assurance.
• Focus of prevention of defects at source
• Focus on POKA-YOKE. ( fool proof system )
• In-line detection and segregation of defects.
• Effective implementation of operator quality assurance.
PILLAR 5 – EDUCATION & TRAINING
• Skills development for uniformity of work practices on machines.
• Skills for Zero defects, Zero breakdowns & Zero accidents.
• Multi Skilled employees in all departments.
• Four Levels of Skills
• Level 1: Lack both theoretical and practical ability (needs to be taught)
• Level 2: Knows theory but not in practice
• Level 3: Has mastered practice but not theory
• Level 4: Mastered both practice and theory
PILLAR 6 – DEVELOPMENT MANAGEMENT
• Developing machines for “high equipment effectiveness”.
• Quick process for developing new products.
• Example: KAIZEN
• Kaizen Policy :
• Practice concepts of zero losses in every sphere of activity.
• Relentless pursuit to achieve cost reduction targets in all resources.
• Relentless pursuit to improve over all plant equipment effectiveness.
• Extensive use of PM analysis as a tool for eliminating losses.
• Focus of easy handling of operators.
PILLAR 7 – SAFETY, HEALTH &
ENVIRONMENT
• Zero accidents and Zero hazards at works.
• Zero Pollution at Plant and Environment.
PILLAR 8 – OFFICE TPM
• Office TPM must be followed to improve productivity, efficiency in the administrative
functions and identify and eliminate losses.
• This includes analyzing processes and procedures towards increased office automation.
• Plans & Guidelines:
• Providing awareness about office TPM to all support departments
• Helping them to identify P, Q, C, D, S, M in each function in relation to plant performance
• Identify the scope for improvement in each function
• Collect relevant data
• Help them to solve problems in their circles
AVAILABILITY
• Calculation: Availability = Available Time / Scheduled Time
• Example:
• A given Work Center is scheduled to run for an 8 hour (480 minute) shift.
• The normal shift includes a scheduled 30 minute break when the Work
Center is expected to be down.
• The Work Center experiences 60 minutes of unscheduled downtime.
• Scheduled Time = 480 min – 30 min break = 450 Min
• Available Time = 450 min Scheduled – 60 min Unscheduled Downtime =
390 Min
• Availability = 390 Avail Min / 450 Scheduled Min = 87%
PERFORMANCE
• Calculation: Performance = (Parts Produced * Ideal Cycle Time) / Available Time
• Example:
• A given Work Center is scheduled to run for an 8 hour (480 minute) shift with a 30
minute scheduled break.
• Available Time = 450 Min Sched – 60 Min Unsched Downtime = 390 Minutes
• The Standard Rate for the part being produced is 40 Units/Hour or 1.5 Minutes/Unit
• The Work Center produces 242 Total Units during the shift. Note: The basis is Total
Units, not Good Units. The Performance metric does not penalize for Quality.
• Time to Produce Parts = 242 Units * 1.5 Minutes/Unit = 363 Minutes
• Performance = 363 Minutes / 390 Minutes = 93.0%
QUALITY
• Calculation: Quality = Good Units / Units Started
• Example:
• A given Work Center produces 230 Good Units during a shift.
• 242 Units were started in order to produce the 230 Good Units.
• Quality = 230 Good Units / 242 Units Started = 95.0%
TOTAL EFFECTIVE EQUIPMENT
PERFORMANCE
• OEE = Availability x Performance x Quality
• Calculation: TEEP = Loading x OEE
• Example:
• A given Work Center experiences…
• OEE of 34.0%
• Work Center Loading is 71.4%
• TEEP = 71.4% Loading x 34.0% OEE = 24.3%
LOADING
• Loading = Scheduled Time / Calendar Time
• Example:
• A given Work Center is scheduled to run 5 Days per Week, 24
Hours per Day.
• For a given week, the Total Calendar Time is 7 Days at 24
Hours.
• Loading = (5 days x 24 hours) / (7 days x 24 hours) = 71.4%
DIRECT BENEFITS OF TPM
• Increase productivity and OPE ( Overall Plant Efficiency ) by 1.5
or 2 times.
• Rectify customer complaints.
• Reduce the manufacturing cost by 30%.
• Satisfy the customers needs by 100 % ( Delivering the right
quantity at the right time, in the required quality. )
• Reduce accidents.
• Follow pollution control measures.
INDIRECT BENEFITS OF TPM
• Higher confidence level among the employees.
• Keep the work place clean, neat and attractive.
• Favorable change in the attitude of the operators.
• Achieve goals by working as team.
• Horizontal deployment of a new concept in all areas of the
organization.
• Share knowledge and experience.
• The workers get a feeling of owning the machine.
DIFFICULTIES FACED IN TPM
IMPLEMENTATION
• Sufficient resources like people, money, time, etc. and assistance are not
provided.
• TPM is not a “quick fix” approach, it involve cultural change to the ways to
do the things.
• Incomplete understanding of the methodology and philosophy by middle
management.
• Many people treat it just another “program of the month” without paying any
focus and also doubt about its effectiveness.
• Workers show strong resistance to any change
• Many people considered TPM activities as additional work or threat.

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

TPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous MaintenanceTPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous Maintenance
 
TPM & OEE
TPM & OEETPM & OEE
TPM & OEE
 
Autonomous maintenance ppt
Autonomous maintenance pptAutonomous maintenance ppt
Autonomous maintenance ppt
 
Tpm basic
Tpm basicTpm basic
Tpm basic
 
Tpm basic
Tpm basicTpm basic
Tpm basic
 
Planned Maintenance
Planned MaintenancePlanned Maintenance
Planned Maintenance
 
010 bmw tpm management training
010 bmw tpm management training010 bmw tpm management training
010 bmw tpm management training
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
tpm presentation
tpm presentationtpm presentation
tpm presentation
 
TPM For lean manufacturing chp3 | kobetsu kaizen for production efficiency...
TPM For lean manufacturing  chp3 |   kobetsu kaizen for production efficiency...TPM For lean manufacturing  chp3 |   kobetsu kaizen for production efficiency...
TPM For lean manufacturing chp3 | kobetsu kaizen for production efficiency...
 
Top 25 lean tools
Top 25 lean toolsTop 25 lean tools
Top 25 lean tools
 
Tpm total productive maintenance
Tpm  total productive maintenanceTpm  total productive maintenance
Tpm total productive maintenance
 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
 
My machine camp
My machine campMy machine camp
My machine camp
 
TPM. DR. K. BARANIDHARAN
TPM. DR. K. BARANIDHARANTPM. DR. K. BARANIDHARAN
TPM. DR. K. BARANIDHARAN
 
TPM - tech talk
TPM - tech talk TPM - tech talk
TPM - tech talk
 
TPM 8 Pillars
TPM 8 PillarsTPM 8 Pillars
TPM 8 Pillars
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
TPM - Total Productive Maintenance
TPM - Total Productive MaintenanceTPM - Total Productive Maintenance
TPM - Total Productive Maintenance
 
Just In Time (JIT) Systems
Just In Time (JIT) SystemsJust In Time (JIT) Systems
Just In Time (JIT) Systems
 

Semelhante a Total productive maintenance

totalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptxtotalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptx
RichardMagbatoc1
 
Production and operation Unit_3.pptx
Production and operation Unit_3.pptxProduction and operation Unit_3.pptx
Production and operation Unit_3.pptx
Margi Shah
 
K10798 ashok opc me 6th sem
K10798 ashok opc me 6th semK10798 ashok opc me 6th sem
K10798 ashok opc me 6th sem
Guddu Ali
 
K10798 ashok opc me 6th sem
K10798 ashok opc me 6th semK10798 ashok opc me 6th sem
K10798 ashok opc me 6th sem
Chetan Kumar
 
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMM
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMMMaintenance Total Productive TPMMMMMMMMMMMMMMMMMMM
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMM
sshoaib1
 
lean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accountslean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accounts
SabaKhalid48
 
Ranveer yadav 2013 14
Ranveer yadav 2013 14Ranveer yadav 2013 14
Ranveer yadav 2013 14
ranviry49
 

Semelhante a Total productive maintenance (20)

Total Productive Maintenance_Magbatoc.pptx
Total Productive Maintenance_Magbatoc.pptxTotal Productive Maintenance_Magbatoc.pptx
Total Productive Maintenance_Magbatoc.pptx
 
totalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptxtotalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptx
 
Production and operation Unit_3.pptx
Production and operation Unit_3.pptxProduction and operation Unit_3.pptx
Production and operation Unit_3.pptx
 
Tpm
TpmTpm
Tpm
 
K10798 ashok opc me 6th sem
K10798 ashok opc me 6th semK10798 ashok opc me 6th sem
K10798 ashok opc me 6th sem
 
TPM.pptx
TPM.pptxTPM.pptx
TPM.pptx
 
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh AroraTotal Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
 
K10798 ashok opc me 6th sem
K10798 ashok opc me 6th semK10798 ashok opc me 6th sem
K10798 ashok opc me 6th sem
 
Method Study
Method Study Method Study
Method Study
 
Total Productive Maintenance (TPM).pdf
Total Productive Maintenance (TPM).pdfTotal Productive Maintenance (TPM).pdf
Total Productive Maintenance (TPM).pdf
 
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMM
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMMMaintenance Total Productive TPMMMMMMMMMMMMMMMMMMM
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMM
 
Motion and time study
Motion and time studyMotion and time study
Motion and time study
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
Quality 2.pptx
Quality 2.pptxQuality 2.pptx
Quality 2.pptx
 
lean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accountslean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accounts
 
Srj tpm
Srj tpmSrj tpm
Srj tpm
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
Production management
Production managementProduction management
Production management
 
Ranveer yadav 2013 14
Ranveer yadav 2013 14Ranveer yadav 2013 14
Ranveer yadav 2013 14
 
TPM-PPT-4.pptx
TPM-PPT-4.pptxTPM-PPT-4.pptx
TPM-PPT-4.pptx
 

Último

Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
Nimot Muili
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
SandaliGurusinghe2
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Riyadh +966572737505 get cytotec
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
AllTops
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
alinstan901
 

Último (16)

Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdf
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelGautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime SiliguriSiliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
 

Total productive maintenance

  • 2. INTRODUCTION • Total productive maintenance (TPM) originated in Japan in 1971 as a method for improved machine availability through better utilization of maintenance and production resources. • TPM is a maintenance process developed for improving productivity by making processes more reliable and less wasteful.TPM is an extension of TQM(Total Quality Management)
  • 3. WHY TPM ? • Avoid wastage in a quickly changing economic environment. • Producing goods without reducing product quality. • Reduce cost. • Produce a low batch quantity at the earliest possible time. • Goods send to the customers must be non defective.
  • 4. WHAT IS TPM? • Strategy of TPM is to change the attitude from “I use, You maintain” to “I use, I maintain”. • Think about how to Increase production and reduced cost by reducing or eliminating loss, and this is the TPM.
  • 5. OBJECTIVES OF TPM • Improving the effectiveness of machines. • Improving the efficiency, reliability and effectiveness of maintenance of machine. • Scheduling maintenance for avoiding early maintenance. • Involving operation team also in smaller scale maintenance, such as machine checklist inspection before starting and after closing the machines. • Arrangement of training for amending the skills of employees.
  • 7. PILLAR 1 – AUTONOMOUS MAINTENANCE • A collaborative team activity involving production, maintenance, and engineering. • Maintaining Basic conditions on shop floor & in Machines. • All over participation through TPM Circles. • Example: 5 S’, JISHU HOZEN ( Autonomous maintenance ), etc., • An approach that • Develops operating and maintenance skills • Strengthens communication and cooperation
  • 8. PILLAR 2 – FOCUSED IMPROVEMENT • Improvement on every one’s activity. • Improvement is to eliminate Production losses and cost reduction. • Improvement in Reliability, Maintainability, and cost.
  • 9. PILLAR 3 – PLANNED MAINTENANCE • Logical analysis “Real causes for real counter measures”. • Focus on Prevention. • It is aimed to have trouble free machines and equipments producing defect free products for total customer satisfaction. • Example: Preventive Maintenance, Breakdown Maintenance, etc.,
  • 10. PILLAR 4 – QUALITY MAINTENANCE • Developing perfect machine for perfect Quality. • Eliminating In – Process defects and custom complaints. • Policy : • Defect free conditions and control of equipments. • QM activities to support quality assurance. • Focus of prevention of defects at source • Focus on POKA-YOKE. ( fool proof system ) • In-line detection and segregation of defects. • Effective implementation of operator quality assurance.
  • 11. PILLAR 5 – EDUCATION & TRAINING • Skills development for uniformity of work practices on machines. • Skills for Zero defects, Zero breakdowns & Zero accidents. • Multi Skilled employees in all departments. • Four Levels of Skills • Level 1: Lack both theoretical and practical ability (needs to be taught) • Level 2: Knows theory but not in practice • Level 3: Has mastered practice but not theory • Level 4: Mastered both practice and theory
  • 12. PILLAR 6 – DEVELOPMENT MANAGEMENT • Developing machines for “high equipment effectiveness”. • Quick process for developing new products. • Example: KAIZEN • Kaizen Policy : • Practice concepts of zero losses in every sphere of activity. • Relentless pursuit to achieve cost reduction targets in all resources. • Relentless pursuit to improve over all plant equipment effectiveness. • Extensive use of PM analysis as a tool for eliminating losses. • Focus of easy handling of operators.
  • 13. PILLAR 7 – SAFETY, HEALTH & ENVIRONMENT • Zero accidents and Zero hazards at works. • Zero Pollution at Plant and Environment.
  • 14. PILLAR 8 – OFFICE TPM • Office TPM must be followed to improve productivity, efficiency in the administrative functions and identify and eliminate losses. • This includes analyzing processes and procedures towards increased office automation. • Plans & Guidelines: • Providing awareness about office TPM to all support departments • Helping them to identify P, Q, C, D, S, M in each function in relation to plant performance • Identify the scope for improvement in each function • Collect relevant data • Help them to solve problems in their circles
  • 15. AVAILABILITY • Calculation: Availability = Available Time / Scheduled Time • Example: • A given Work Center is scheduled to run for an 8 hour (480 minute) shift. • The normal shift includes a scheduled 30 minute break when the Work Center is expected to be down. • The Work Center experiences 60 minutes of unscheduled downtime. • Scheduled Time = 480 min – 30 min break = 450 Min • Available Time = 450 min Scheduled – 60 min Unscheduled Downtime = 390 Min • Availability = 390 Avail Min / 450 Scheduled Min = 87%
  • 16. PERFORMANCE • Calculation: Performance = (Parts Produced * Ideal Cycle Time) / Available Time • Example: • A given Work Center is scheduled to run for an 8 hour (480 minute) shift with a 30 minute scheduled break. • Available Time = 450 Min Sched – 60 Min Unsched Downtime = 390 Minutes • The Standard Rate for the part being produced is 40 Units/Hour or 1.5 Minutes/Unit • The Work Center produces 242 Total Units during the shift. Note: The basis is Total Units, not Good Units. The Performance metric does not penalize for Quality. • Time to Produce Parts = 242 Units * 1.5 Minutes/Unit = 363 Minutes • Performance = 363 Minutes / 390 Minutes = 93.0%
  • 17. QUALITY • Calculation: Quality = Good Units / Units Started • Example: • A given Work Center produces 230 Good Units during a shift. • 242 Units were started in order to produce the 230 Good Units. • Quality = 230 Good Units / 242 Units Started = 95.0%
  • 18. TOTAL EFFECTIVE EQUIPMENT PERFORMANCE • OEE = Availability x Performance x Quality • Calculation: TEEP = Loading x OEE • Example: • A given Work Center experiences… • OEE of 34.0% • Work Center Loading is 71.4% • TEEP = 71.4% Loading x 34.0% OEE = 24.3%
  • 19. LOADING • Loading = Scheduled Time / Calendar Time • Example: • A given Work Center is scheduled to run 5 Days per Week, 24 Hours per Day. • For a given week, the Total Calendar Time is 7 Days at 24 Hours. • Loading = (5 days x 24 hours) / (7 days x 24 hours) = 71.4%
  • 20. DIRECT BENEFITS OF TPM • Increase productivity and OPE ( Overall Plant Efficiency ) by 1.5 or 2 times. • Rectify customer complaints. • Reduce the manufacturing cost by 30%. • Satisfy the customers needs by 100 % ( Delivering the right quantity at the right time, in the required quality. ) • Reduce accidents. • Follow pollution control measures.
  • 21. INDIRECT BENEFITS OF TPM • Higher confidence level among the employees. • Keep the work place clean, neat and attractive. • Favorable change in the attitude of the operators. • Achieve goals by working as team. • Horizontal deployment of a new concept in all areas of the organization. • Share knowledge and experience. • The workers get a feeling of owning the machine.
  • 22. DIFFICULTIES FACED IN TPM IMPLEMENTATION • Sufficient resources like people, money, time, etc. and assistance are not provided. • TPM is not a “quick fix” approach, it involve cultural change to the ways to do the things. • Incomplete understanding of the methodology and philosophy by middle management. • Many people treat it just another “program of the month” without paying any focus and also doubt about its effectiveness. • Workers show strong resistance to any change • Many people considered TPM activities as additional work or threat.