Dry Stack
Tailings Storage Facility
Advantages of Dry Stack TSF




 §    Significant water conservation and minimizes water usage and
       consumption requirements

 §    Minimize disturbance area

 §    Facilitate concurrent reclamation and revegetation during
       operation

 §    Minimize visual impact from surrounding areas

 §    Eliminates construction of dam for retention of tailings
Dry Stack TSF Design Criteria

•    Production rate of 75,000 tpd or 27 MT per
     annum
•    Storage capacity of 587 MT
•    Mine life approximately 20 years
•    Average tailings in-place dry density of 109
     pcf
•    50-foot lifts with final bench width of 25 feet
     per lift
Dry Stack TSF
        Environmental Criteria
•    Compliance with all applicable regulations
     including ADEQ BADCT standards
•    Rock buttress at 3:1 side slopes, 3.5:1
     overall slopes
•    TSF will be constructed in two phases
•    Implement dust control suppression
     measures throughout the production period
•    Concurrent reclamation during operations
     to promote vegetation
Phase I Dry Stack TSF Characteristics
 •    Approximately 12 years of production
 •    Elevation 5250’ (surface 5237.5’)
 •    Capacity of 332 MT
 •    50’ lifts, final bench width of 25’ per lift
 •    3:1 side slope per lift
 •    3.5:1 Overall side slope
 •    Total footprint area of ~710 Acres
 •    Footprint outside of McCleary Canyon
Phase I Dry Stack TSF
Phase I Dry Stack TSF Filling Curve
                                        PHASE	
  I	
  DRY	
  STACK	
  TSF	
  FILLING	
  CURVE

            5300


            5200


            5100
                                                                                                                  YEAR	
  12
                                                                                                      YEAR	
  8
ELEVATION




            5000


            4900
                                                       YEAR	
  4

            4800
                            YEAR	
  1

            4700


            4600
                   0   50               100                  150                     200        250                    300     350
                                                                   MILLION	
  TONS
Phase II Dry Stack TSF Characteristics

  •    Approximately 8 years of production
  •    Crest elevation = 5250’
  •    Tailings surface elevation = 5237.5’
  •    Total capacity = 255 million tons (MT)
  •    50-foot lifts with final bench width of 25
       feet per lift
  •    3:1 side slope per lift
  •    3.5:1 Overall side slope
  •    Total footprint area of 400 Acres
Phase II Dry Stack TSF
Phase II Dry Stack TSF Filling Curve
                                      PHASE	
  II	
  DRY	
  STACK	
  TSF	
  FILLING	
  CURVE


            5300


            5200
                                                                                                           YEAR	
  21
            5100
ELEVATION




            5000
                                                                              YEAR	
  17

            4900


            4800
                       YEAR	
  13

            4700


            4600
                   0      50                100                       150                      200   250                300
                                                               MILLION	
  TONS
Ultimate Dry Stack TSF
Typical Rock Buttress Section
Dry Stack TSF
Stacking Progression
Production Year 0 to Year 1
  Tails capacity = 30 MT
Production Year 2 to Year 4
  Tails capacity = 110 MT
Production Year 5 to Year 8
  Tails capacity = 234 MT
Production Year 9 to Year 12
  Tails capacity = 332 MT
End of Phase I-Start of Phase II
      Production Year 13
    Tails capacity = 356 MT
Production Year 14 to Year 17
   Tails capacity = 475 MT
Production Year 18 to Year 20
   Ultimate Dry Stack TSF
   Tails capacity = 587 MT
Permanent Diversion Channel
Permanent Diversion Channel
                        Design Criteria
n    NOAA Atlas 14, Volume 1, Version 4 data were used for calculations

n    Channels are sized for the 200-yr, 24-hr storm event

n    Channels are assumed to be in rock for the majority of the length. Riprap
      will be provided in areas of fill

n    A 15-foot wide access road will be constructed adjacent to the channel on
      the downstream side to allow access for maintenance and repair
      purposes only
Permanent Diversion Channel
Permanent Channel Section A-A
Temporary Diversion Channel
Temporary Diversion Channel
                      Design Criteria

•    NOAA Atlas 14, Volume 1, Version 4 data were used for calculations

•    Channels are sized for the 25-yr, 24-hr storm event

•    Channel locations and alignments are preliminary. Final location and sizing will be
     determined as final design progresses (location dependant)
Temporary Diversion
 Channel Preliminary
Construction Schedule
● Temporary Channel #1
     To be constructed in Year 0
     and will be in service for up
     to Year 2

● Temporary Channel #2
     Construction is assumed to
     start in Year 0 and will be in
     service up to Year 5

● Temporary Channel #3
     Construction is assumed to
     start in Year 2 and will be in
     service up to Year 5

● Temporary Channel #4
     Construction is assumed to
     start at the end of Phase I
     and start of Phase II in Year
     12 and will be in service for
     up to Year 14
Permanent and Temporary Diversion Channel
             Typical Section
Process Water
Temporary Storage Pond
       (PWTS)
Process Water Temporary Storage Pond (PWTS)
                    Design Criteria
•     PWTS to be sized to fully contain the 100-yr, 24-hr storm event, plus 3-days of
      process flow during service interruption at the plant facilities

•     Requirements and design guidelines by the following agencies:
         •    Arizona Department of Water Resources (ADWR) dam safety requirements
         •    Arizona Department of Environmental Quality (ADEQ) Best Available Demonstrated
              Control Technology (BADCT) Standards

•     PWTS to be constructed in Year 0

•     Embankment to be rockfill/structural fill

•     Upstream face and basin to be lined with GCL and 80 mil HDPE

•     Stores contact water from plant site
Process Water Temporary Storage Pond (PWTS)
                 Design Criteria Cont’d.
•     Embankment upstream slope of 2.5:1

•     Embankment downstream slope of 2.5:1

•     Embankment crest elev. = 4945’

•     Provide 3-foot freeboard

•     Embankment height at maximum section = ~75’

•     Required Storage capacity = 243 Ac.-Ft.

•     Designed Storage Capacity = 252 Ac.-Ft.
PWTS Plan View
PWTS Embankment Volume                 227,384   cy (Fill)


Regrading at Pond Basin (Cut Volume)   237,225   cy (Cut)


PWTS Basin Volume @ El = 4942'             252   Ac.-Ft.

Mais conteúdo relacionado

Mais procurados

Measurement While Drilling (MWD)
Measurement While Drilling (MWD)Measurement While Drilling (MWD)
Measurement While Drilling (MWD)Himanshu Rajawat
 
Well design and construction i
Well design and construction iWell design and construction i
Well design and construction iYalçın Dalgıç
 
Groundwater Data Requirement and Analysis
Groundwater Data Requirement and AnalysisGroundwater Data Requirement and Analysis
Groundwater Data Requirement and AnalysisC. P. Kumar
 
Métodos de perfuração aula
Métodos de perfuração aulaMétodos de perfuração aula
Métodos de perfuração aulaPublicaTUDO
 
Eksplorasi sumber daya bahan galian
Eksplorasi sumber daya bahan galianEksplorasi sumber daya bahan galian
Eksplorasi sumber daya bahan galianIpung Noor
 
part+1+Fundamebtals+of+reservior+engineering-+Abbas+Radhi+2020-converted.pptx
part+1+Fundamebtals+of+reservior+engineering-+Abbas+Radhi+2020-converted.pptxpart+1+Fundamebtals+of+reservior+engineering-+Abbas+Radhi+2020-converted.pptx
part+1+Fundamebtals+of+reservior+engineering-+Abbas+Radhi+2020-converted.pptxMuhammadArslan672334
 
Cement bond log
Cement bond logCement bond log
Cement bond logSaad Raja
 
Ppt7 clasificaciondelosyacimientosminerales
Ppt7 clasificaciondelosyacimientosmineralesPpt7 clasificaciondelosyacimientosminerales
Ppt7 clasificaciondelosyacimientosmineralesLuissHuaman1
 
El criterio de rotura de hoek brown 2002
El criterio de rotura de hoek brown 2002El criterio de rotura de hoek brown 2002
El criterio de rotura de hoek brown 2002miguelaguirrecuellar
 
Dewatering for open pit mines and quarries
Dewatering for open pit mines and quarriesDewatering for open pit mines and quarries
Dewatering for open pit mines and quarriesMartin Preene
 
Rock quality determination, rock structure rating
Rock quality determination, rock structure ratingRock quality determination, rock structure rating
Rock quality determination, rock structure ratingPrashant Katti
 
Seismic stratigraphy
Seismic stratigraphySeismic stratigraphy
Seismic stratigraphyWajid09
 
Well log (The Bore Hole Image)
Well log (The Bore Hole Image)Well log (The Bore Hole Image)
Well log (The Bore Hole Image)Shayan Ahmad Yar
 
Drilling and core logging
Drilling and core loggingDrilling and core logging
Drilling and core loggingPramoda Raj
 

Mais procurados (20)

18 aula brocas
18 aula brocas18 aula brocas
18 aula brocas
 
Measurement While Drilling (MWD)
Measurement While Drilling (MWD)Measurement While Drilling (MWD)
Measurement While Drilling (MWD)
 
Laporan
LaporanLaporan
Laporan
 
Well design and construction i
Well design and construction iWell design and construction i
Well design and construction i
 
Groundwater Data Requirement and Analysis
Groundwater Data Requirement and AnalysisGroundwater Data Requirement and Analysis
Groundwater Data Requirement and Analysis
 
Métodos de perfuração aula
Métodos de perfuração aulaMétodos de perfuração aula
Métodos de perfuração aula
 
Eksplorasi sumber daya bahan galian
Eksplorasi sumber daya bahan galianEksplorasi sumber daya bahan galian
Eksplorasi sumber daya bahan galian
 
Shaft sinking 2
Shaft  sinking 2Shaft  sinking 2
Shaft sinking 2
 
part+1+Fundamebtals+of+reservior+engineering-+Abbas+Radhi+2020-converted.pptx
part+1+Fundamebtals+of+reservior+engineering-+Abbas+Radhi+2020-converted.pptxpart+1+Fundamebtals+of+reservior+engineering-+Abbas+Radhi+2020-converted.pptx
part+1+Fundamebtals+of+reservior+engineering-+Abbas+Radhi+2020-converted.pptx
 
Cement bond log
Cement bond logCement bond log
Cement bond log
 
Ppt7 clasificaciondelosyacimientosminerales
Ppt7 clasificaciondelosyacimientosmineralesPpt7 clasificaciondelosyacimientosminerales
Ppt7 clasificaciondelosyacimientosminerales
 
El criterio de rotura de hoek brown 2002
El criterio de rotura de hoek brown 2002El criterio de rotura de hoek brown 2002
El criterio de rotura de hoek brown 2002
 
Dewatering for open pit mines and quarries
Dewatering for open pit mines and quarriesDewatering for open pit mines and quarries
Dewatering for open pit mines and quarries
 
Shaft sinking 1
Shaft sinking 1Shaft sinking 1
Shaft sinking 1
 
Rock quality determination, rock structure rating
Rock quality determination, rock structure ratingRock quality determination, rock structure rating
Rock quality determination, rock structure rating
 
Seismic stratigraphy
Seismic stratigraphySeismic stratigraphy
Seismic stratigraphy
 
Well log (The Bore Hole Image)
Well log (The Bore Hole Image)Well log (The Bore Hole Image)
Well log (The Bore Hole Image)
 
RQD
RQDRQD
RQD
 
Trabalho concentração gravitica
Trabalho concentração graviticaTrabalho concentração gravitica
Trabalho concentração gravitica
 
Drilling and core logging
Drilling and core loggingDrilling and core logging
Drilling and core logging
 

Semelhante a Dry Stack Tailings Facility

Chapter 01 Drilling Fluids Functions (1).pdf
Chapter 01 Drilling Fluids Functions (1).pdfChapter 01 Drilling Fluids Functions (1).pdf
Chapter 01 Drilling Fluids Functions (1).pdfAbdallahTayea99
 
Nilex ec seminars 1 18-05
Nilex ec seminars 1 18-05Nilex ec seminars 1 18-05
Nilex ec seminars 1 18-05htrdano
 
Nilex ec seminars 1 18-05
Nilex ec seminars 1 18-05Nilex ec seminars 1 18-05
Nilex ec seminars 1 18-05htrdano
 
Offshore Drilling rigs (6) i
Offshore Drilling rigs (6) iOffshore Drilling rigs (6) i
Offshore Drilling rigs (6) iSolomon Okoro
 
Design of earth dam at gorukallu
Design of earth dam at gorukalluDesign of earth dam at gorukallu
Design of earth dam at gorukallurohinibjn
 
Facilities Oil Patch Orientation
Facilities Oil Patch OrientationFacilities Oil Patch Orientation
Facilities Oil Patch Orientationkarnold3
 
Extending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine PlanningExtending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine PlanningJasmeet Singh Saluja
 
Nrega Technical Aspects Of Execution Of Works By S.Anwar Hussain
Nrega Technical Aspects Of Execution Of Works  By S.Anwar HussainNrega Technical Aspects Of Execution Of Works  By S.Anwar Hussain
Nrega Technical Aspects Of Execution Of Works By S.Anwar HussainAnwar Hussain
 
PENNGLEN FIELD Development Plan (GULF of MEXICO)
PENNGLEN FIELD Development Plan (GULF of MEXICO)PENNGLEN FIELD Development Plan (GULF of MEXICO)
PENNGLEN FIELD Development Plan (GULF of MEXICO)PaulOkafor6
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)coderweb
 
07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagementimaduddin91
 
REPAIR OF THE SPILLWAY AT PANDOH DAM
REPAIR OF THE  SPILLWAY AT PANDOH DAM REPAIR OF THE  SPILLWAY AT PANDOH DAM
REPAIR OF THE SPILLWAY AT PANDOH DAM Hemant Thakur
 
Turga PSP_Lower Dam.pptx
Turga PSP_Lower Dam.pptxTurga PSP_Lower Dam.pptx
Turga PSP_Lower Dam.pptxssuserde6364
 
Horizontal drilling
Horizontal drillingHorizontal drilling
Horizontal drillingMubarik Rao
 
Hydraulics and hydraulic_machinery(1)
Hydraulics and hydraulic_machinery(1)Hydraulics and hydraulic_machinery(1)
Hydraulics and hydraulic_machinery(1)supriyasis
 
Design construction and behavior of bored cast in situ concrete
Design construction and behavior of bored cast in situ concreteDesign construction and behavior of bored cast in situ concrete
Design construction and behavior of bored cast in situ concreteLữ Phát
 

Semelhante a Dry Stack Tailings Facility (20)

Chapter 01 Drilling Fluids Functions (1).pdf
Chapter 01 Drilling Fluids Functions (1).pdfChapter 01 Drilling Fluids Functions (1).pdf
Chapter 01 Drilling Fluids Functions (1).pdf
 
Nilex ec seminars 1 18-05
Nilex ec seminars 1 18-05Nilex ec seminars 1 18-05
Nilex ec seminars 1 18-05
 
Nilex ec seminars 1 18-05
Nilex ec seminars 1 18-05Nilex ec seminars 1 18-05
Nilex ec seminars 1 18-05
 
Offshore Drilling rigs (6) i
Offshore Drilling rigs (6) iOffshore Drilling rigs (6) i
Offshore Drilling rigs (6) i
 
Design of earth dam at gorukallu
Design of earth dam at gorukalluDesign of earth dam at gorukallu
Design of earth dam at gorukallu
 
Partial Pit Backfill Alternative
Partial Pit Backfill AlternativePartial Pit Backfill Alternative
Partial Pit Backfill Alternative
 
Facilities Oil Patch Orientation
Facilities Oil Patch OrientationFacilities Oil Patch Orientation
Facilities Oil Patch Orientation
 
Extending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine PlanningExtending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine Planning
 
Nrega Technical Aspects Of Execution Of Works By S.Anwar Hussain
Nrega Technical Aspects Of Execution Of Works  By S.Anwar HussainNrega Technical Aspects Of Execution Of Works  By S.Anwar Hussain
Nrega Technical Aspects Of Execution Of Works By S.Anwar Hussain
 
PENNGLEN FIELD Development Plan (GULF of MEXICO)
PENNGLEN FIELD Development Plan (GULF of MEXICO)PENNGLEN FIELD Development Plan (GULF of MEXICO)
PENNGLEN FIELD Development Plan (GULF of MEXICO)
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
 
07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement
 
Prilling NP.PPTX
Prilling NP.PPTXPrilling NP.PPTX
Prilling NP.PPTX
 
REPAIR OF THE SPILLWAY AT PANDOH DAM
REPAIR OF THE  SPILLWAY AT PANDOH DAM REPAIR OF THE  SPILLWAY AT PANDOH DAM
REPAIR OF THE SPILLWAY AT PANDOH DAM
 
Turga PSP_Lower Dam.pptx
Turga PSP_Lower Dam.pptxTurga PSP_Lower Dam.pptx
Turga PSP_Lower Dam.pptx
 
Horizontal drilling
Horizontal drillingHorizontal drilling
Horizontal drilling
 
Distributed modelling simplified hydrological process models for humid areas
Distributed modelling simplified hydrological process models for humid areas Distributed modelling simplified hydrological process models for humid areas
Distributed modelling simplified hydrological process models for humid areas
 
Hydraulics and hydraulic_machinery(1)
Hydraulics and hydraulic_machinery(1)Hydraulics and hydraulic_machinery(1)
Hydraulics and hydraulic_machinery(1)
 
Design construction and behavior of bored cast in situ concrete
Design construction and behavior of bored cast in situ concreteDesign construction and behavior of bored cast in situ concrete
Design construction and behavior of bored cast in situ concrete
 
SMHB
SMHBSMHB
SMHB
 

Mais de Hudbay Minerals Inc.

Well Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling PresentationWell Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling PresentationHudbay Minerals Inc.
 
Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009Hudbay Minerals Inc.
 
Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872Hudbay Minerals Inc.
 
Rosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine RockRosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine RockHudbay Minerals Inc.
 
Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009Hudbay Minerals Inc.
 
Rosemont Reclamation Plan July 2007
Rosemont Reclamation Plan July 2007Rosemont Reclamation Plan July 2007
Rosemont Reclamation Plan July 2007Hudbay Minerals Inc.
 
Reclamation Examples - Before and After
Reclamation Examples - Before and AfterReclamation Examples - Before and After
Reclamation Examples - Before and AfterHudbay Minerals Inc.
 
Mine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake ModelMine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake ModelHudbay Minerals Inc.
 
Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"Hudbay Minerals Inc.
 
Rosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyRosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyHudbay Minerals Inc.
 
Facilities Engineering Presentation
Facilities Engineering PresentationFacilities Engineering Presentation
Facilities Engineering PresentationHudbay Minerals Inc.
 
Aquifer Protection Permitting: Rosemont Mine
Aquifer Protection Permitting:  Rosemont MineAquifer Protection Permitting:  Rosemont Mine
Aquifer Protection Permitting: Rosemont MineHudbay Minerals Inc.
 
Certificate of Environmental Compliance
Certificate of Environmental ComplianceCertificate of Environmental Compliance
Certificate of Environmental ComplianceHudbay Minerals Inc.
 

Mais de Hudbay Minerals Inc. (20)

Well Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling PresentationWell Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling Presentation
 
Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009
 
Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872
 
Rosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine RockRosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine Rock
 
Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009
 
Rosemont Reclamation Plan July 2007
Rosemont Reclamation Plan July 2007Rosemont Reclamation Plan July 2007
Rosemont Reclamation Plan July 2007
 
Reclamation Requirements
Reclamation RequirementsReclamation Requirements
Reclamation Requirements
 
Reclamation Examples - Before and After
Reclamation Examples - Before and AfterReclamation Examples - Before and After
Reclamation Examples - Before and After
 
Regional Groundwater Flow Models
Regional Groundwater Flow ModelsRegional Groundwater Flow Models
Regional Groundwater Flow Models
 
Baseline Traffic Study
Baseline Traffic StudyBaseline Traffic Study
Baseline Traffic Study
 
Baseline Noise Study
Baseline Noise StudyBaseline Noise Study
Baseline Noise Study
 
Heap Leach Facilities
Heap Leach FacilitiesHeap Leach Facilities
Heap Leach Facilities
 
Geotechnical Study
Geotechnical StudyGeotechnical Study
Geotechnical Study
 
Mine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake ModelMine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake Model
 
Rosemont Project Orientation
Rosemont Project OrientationRosemont Project Orientation
Rosemont Project Orientation
 
Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"
 
Rosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyRosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water Supply
 
Facilities Engineering Presentation
Facilities Engineering PresentationFacilities Engineering Presentation
Facilities Engineering Presentation
 
Aquifer Protection Permitting: Rosemont Mine
Aquifer Protection Permitting:  Rosemont MineAquifer Protection Permitting:  Rosemont Mine
Aquifer Protection Permitting: Rosemont Mine
 
Certificate of Environmental Compliance
Certificate of Environmental ComplianceCertificate of Environmental Compliance
Certificate of Environmental Compliance
 

Último

Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxAmanpreet Kaur
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the ClassroomPooky Knightsmith
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseAnaAcapella
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsKarakKing
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024Elizabeth Walsh
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfNirmal Dwivedi
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxcallscotland1987
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - Englishneillewis46
 

Último (20)

Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 

Dry Stack Tailings Facility

  • 2. Advantages of Dry Stack TSF §  Significant water conservation and minimizes water usage and consumption requirements §  Minimize disturbance area §  Facilitate concurrent reclamation and revegetation during operation §  Minimize visual impact from surrounding areas §  Eliminates construction of dam for retention of tailings
  • 3. Dry Stack TSF Design Criteria •  Production rate of 75,000 tpd or 27 MT per annum •  Storage capacity of 587 MT •  Mine life approximately 20 years •  Average tailings in-place dry density of 109 pcf •  50-foot lifts with final bench width of 25 feet per lift
  • 4. Dry Stack TSF Environmental Criteria •  Compliance with all applicable regulations including ADEQ BADCT standards •  Rock buttress at 3:1 side slopes, 3.5:1 overall slopes •  TSF will be constructed in two phases •  Implement dust control suppression measures throughout the production period •  Concurrent reclamation during operations to promote vegetation
  • 5. Phase I Dry Stack TSF Characteristics •  Approximately 12 years of production •  Elevation 5250’ (surface 5237.5’) •  Capacity of 332 MT •  50’ lifts, final bench width of 25’ per lift •  3:1 side slope per lift •  3.5:1 Overall side slope •  Total footprint area of ~710 Acres •  Footprint outside of McCleary Canyon
  • 6. Phase I Dry Stack TSF
  • 7. Phase I Dry Stack TSF Filling Curve PHASE  I  DRY  STACK  TSF  FILLING  CURVE 5300 5200 5100 YEAR  12 YEAR  8 ELEVATION 5000 4900 YEAR  4 4800 YEAR  1 4700 4600 0 50 100 150 200 250 300 350 MILLION  TONS
  • 8. Phase II Dry Stack TSF Characteristics •  Approximately 8 years of production •  Crest elevation = 5250’ •  Tailings surface elevation = 5237.5’ •  Total capacity = 255 million tons (MT) •  50-foot lifts with final bench width of 25 feet per lift •  3:1 side slope per lift •  3.5:1 Overall side slope •  Total footprint area of 400 Acres
  • 9. Phase II Dry Stack TSF
  • 10. Phase II Dry Stack TSF Filling Curve PHASE  II  DRY  STACK  TSF  FILLING  CURVE 5300 5200 YEAR  21 5100 ELEVATION 5000 YEAR  17 4900 4800 YEAR  13 4700 4600 0 50 100 150 200 250 300 MILLION  TONS
  • 13. Dry Stack TSF Stacking Progression
  • 14. Production Year 0 to Year 1 Tails capacity = 30 MT
  • 15. Production Year 2 to Year 4 Tails capacity = 110 MT
  • 16. Production Year 5 to Year 8 Tails capacity = 234 MT
  • 17. Production Year 9 to Year 12 Tails capacity = 332 MT
  • 18. End of Phase I-Start of Phase II Production Year 13 Tails capacity = 356 MT
  • 19. Production Year 14 to Year 17 Tails capacity = 475 MT
  • 20. Production Year 18 to Year 20 Ultimate Dry Stack TSF Tails capacity = 587 MT
  • 22. Permanent Diversion Channel Design Criteria n  NOAA Atlas 14, Volume 1, Version 4 data were used for calculations n  Channels are sized for the 200-yr, 24-hr storm event n  Channels are assumed to be in rock for the majority of the length. Riprap will be provided in areas of fill n  A 15-foot wide access road will be constructed adjacent to the channel on the downstream side to allow access for maintenance and repair purposes only
  • 26. Temporary Diversion Channel Design Criteria •  NOAA Atlas 14, Volume 1, Version 4 data were used for calculations •  Channels are sized for the 25-yr, 24-hr storm event •  Channel locations and alignments are preliminary. Final location and sizing will be determined as final design progresses (location dependant)
  • 27. Temporary Diversion Channel Preliminary Construction Schedule ● Temporary Channel #1 To be constructed in Year 0 and will be in service for up to Year 2 ● Temporary Channel #2 Construction is assumed to start in Year 0 and will be in service up to Year 5 ● Temporary Channel #3 Construction is assumed to start in Year 2 and will be in service up to Year 5 ● Temporary Channel #4 Construction is assumed to start at the end of Phase I and start of Phase II in Year 12 and will be in service for up to Year 14
  • 28. Permanent and Temporary Diversion Channel Typical Section
  • 30. Process Water Temporary Storage Pond (PWTS) Design Criteria •  PWTS to be sized to fully contain the 100-yr, 24-hr storm event, plus 3-days of process flow during service interruption at the plant facilities •  Requirements and design guidelines by the following agencies: •  Arizona Department of Water Resources (ADWR) dam safety requirements •  Arizona Department of Environmental Quality (ADEQ) Best Available Demonstrated Control Technology (BADCT) Standards •  PWTS to be constructed in Year 0 •  Embankment to be rockfill/structural fill •  Upstream face and basin to be lined with GCL and 80 mil HDPE •  Stores contact water from plant site
  • 31. Process Water Temporary Storage Pond (PWTS) Design Criteria Cont’d. •  Embankment upstream slope of 2.5:1 •  Embankment downstream slope of 2.5:1 •  Embankment crest elev. = 4945’ •  Provide 3-foot freeboard •  Embankment height at maximum section = ~75’ •  Required Storage capacity = 243 Ac.-Ft. •  Designed Storage Capacity = 252 Ac.-Ft.
  • 33. PWTS Embankment Volume 227,384 cy (Fill) Regrading at Pond Basin (Cut Volume) 237,225 cy (Cut) PWTS Basin Volume @ El = 4942' 252 Ac.-Ft.