APPENDIX A3
PRESENTATION ON ENERGY PERFORMANCE
OF THE OKHTA CENTER DOUBLE SKIN
FACADE
Presentation on Energy Performance and Requirements
Okhta Centre,Okhta Centre, St. PetersburgSt. Petersburg
Tower FacadeTower Facade-- October 2010October 2010
Presentation on Energy Performance and Requirements
PART IPART IPART IPART I
THE FOLLOWING ANALYSIS WERE DONE TOTHE FOLLOWING ANALYSIS WERE DONE TOTHE FOLLOWING ANALYSIS WERE DONE TOTHE FOLLOWING ANALYSIS WERE DONE TO
VERIFY THE FAÇADE ENERGY PERFORMANCEVERIFY THE FAÇADE ENERGY PERFORMANCEVERIFY THE FAÇADE ENERGY PERFORMANCEVERIFY THE FAÇADE ENERGY PERFORMANCE
BASED ON CURRENT PROEKT (PROJECTBASED ON CURRENT PROEKT (PROJECTBASED ON CURRENT PROEKT (PROJECTBASED ON CURRENT PROEKT (PROJECTBASED ON CURRENT PROEKT (PROJECTBASED ON CURRENT PROEKT (PROJECTBASED ON CURRENT PROEKT (PROJECTBASED ON CURRENT PROEKT (PROJECT
STAGE CONCEPT) DESIGN DOCUMENTS.STAGE CONCEPT) DESIGN DOCUMENTS.STAGE CONCEPT) DESIGN DOCUMENTS.STAGE CONCEPT) DESIGN DOCUMENTS.
TO PROVIDE ADDITIONAL INFORMATIONTO PROVIDE ADDITIONAL INFORMATIONTO PROVIDE ADDITIONAL INFORMATIONTO PROVIDE ADDITIONAL INFORMATION
AND ANSWERS TO SOME QUESTIONS WHICHAND ANSWERS TO SOME QUESTIONS WHICHAND ANSWERS TO SOME QUESTIONS WHICHAND ANSWERS TO SOME QUESTIONS WHICH
WERE NOT PREVIOUSLY CLEAR ORWERE NOT PREVIOUSLY CLEAR ORWERE NOT PREVIOUSLY CLEAR ORWERE NOT PREVIOUSLY CLEAR OR
ANSWERED DURING THE DESIGN REVIEW.ANSWERED DURING THE DESIGN REVIEW.ANSWERED DURING THE DESIGN REVIEW.ANSWERED DURING THE DESIGN REVIEW.
Presentation on Energy Performance and Requirements
ANALYSIS FOLLOWS WHAT WASANALYSIS FOLLOWS WHAT WASANALYSIS FOLLOWS WHAT WASANALYSIS FOLLOWS WHAT WAS
PREVIOUSLY ESTABLISHED AND YETPREVIOUSLY ESTABLISHED AND YETPREVIOUSLY ESTABLISHED AND YETPREVIOUSLY ESTABLISHED AND YET
WILL PROVIDE INFORMATION THATWILL PROVIDE INFORMATION THATWILL PROVIDE INFORMATION THATWILL PROVIDE INFORMATION THAT
WILL BE A GUIDE TO THE NEXT STAGEWILL BE A GUIDE TO THE NEXT STAGEWILL BE A GUIDE TO THE NEXT STAGEWILL BE A GUIDE TO THE NEXT STAGEWILL BE A GUIDE TO THE NEXT STAGEWILL BE A GUIDE TO THE NEXT STAGEWILL BE A GUIDE TO THE NEXT STAGEWILL BE A GUIDE TO THE NEXT STAGE
OF THE DESIGN WORKS.OF THE DESIGN WORKS.OF THE DESIGN WORKS.OF THE DESIGN WORKS.
Presentation on Energy Performance and Requirements
WHAT HAS BEEN CONSIDERED IN THISWHAT HAS BEEN CONSIDERED IN THISWHAT HAS BEEN CONSIDERED IN THISWHAT HAS BEEN CONSIDERED IN THIS
CURRENT CLIMATE ANALYSIS?CURRENT CLIMATE ANALYSIS?CURRENT CLIMATE ANALYSIS?CURRENT CLIMATE ANALYSIS?
Presentation on Energy Performance and Requirements
25 YEAR AVERAGE DAILY WIND SPEED25 YEAR AVERAGE DAILY WIND SPEED25 YEAR AVERAGE DAILY WIND SPEED25 YEAR AVERAGE DAILY WIND SPEED
Presentation on Energy Performance and Requirements
SUN EXPOSURE AND SHADESUN EXPOSURE AND SHADESUN EXPOSURE AND SHADESUN EXPOSURE AND SHADE
Presentation on Energy Performance and Requirements
25 YEAR AVERAGE TEMPERATURE, SOLAR HEAT25 YEAR AVERAGE TEMPERATURE, SOLAR HEAT25 YEAR AVERAGE TEMPERATURE, SOLAR HEAT25 YEAR AVERAGE TEMPERATURE, SOLAR HEAT
GAIN AND CLOUD COVERGAIN AND CLOUD COVERGAIN AND CLOUD COVERGAIN AND CLOUD COVER
Presentation on Energy Performance and Requirements
SUMMARIZING TH E ABOVE, SOME OF THESUMMARIZING TH E ABOVE, SOME OF THESUMMARIZING TH E ABOVE, SOME OF THESUMMARIZING TH E ABOVE, SOME OF THE
RESULTS OF THE ANALYSIS SPREADSHEETS WERERESULTS OF THE ANALYSIS SPREADSHEETS WERERESULTS OF THE ANALYSIS SPREADSHEETS WERERESULTS OF THE ANALYSIS SPREADSHEETS WERE
PROVIDED BELOWPROVIDED BELOWPROVIDED BELOWPROVIDED BELOW
Presentation on Energy Performance and Requirements
Presentation on Energy Performance and Requirements
Presentation on Energy Performance and Requirements
Presentation on Energy Performance and Requirements
SUMMARY OF HEATING REQUIREMENTS IN THESUMMARY OF HEATING REQUIREMENTS IN THESUMMARY OF HEATING REQUIREMENTS IN THESUMMARY OF HEATING REQUIREMENTS IN THE
BUFFER ZONES FROM L6 TO L72BUFFER ZONES FROM L6 TO L72BUFFER ZONES FROM L6 TO L72BUFFER ZONES FROM L6 TO L72
Presentation on Energy Performance and Requirements
SUMMARY OF HEATING REQUIREMENTS IN THESUMMARY OF HEATING REQUIREMENTS IN THESUMMARY OF HEATING REQUIREMENTS IN THESUMMARY OF HEATING REQUIREMENTS IN THE
BUFFER ZONES FROM L6 TO L72BUFFER ZONES FROM L6 TO L72BUFFER ZONES FROM L6 TO L72BUFFER ZONES FROM L6 TO L72
Presentation on Energy Performance and Requirements
SUMMARY OF COOLING REQUIREMENTS IN THESUMMARY OF COOLING REQUIREMENTS IN THESUMMARY OF COOLING REQUIREMENTS IN THESUMMARY OF COOLING REQUIREMENTS IN THE
OFFICES FROM L6 TO L72OFFICES FROM L6 TO L72OFFICES FROM L6 TO L72OFFICES FROM L6 TO L72
Presentation on Energy Performance and Requirements
TOTAL HEATING/COOLING REQUIREMENTS INTOTAL HEATING/COOLING REQUIREMENTS INTOTAL HEATING/COOLING REQUIREMENTS INTOTAL HEATING/COOLING REQUIREMENTS IN
THE OFFICES FROM L6 TO L72THE OFFICES FROM L6 TO L72THE OFFICES FROM L6 TO L72THE OFFICES FROM L6 TO L72
Presentation on Energy Performance and Requirements
SUMMARY OF HEATING/COOLING IN THESUMMARY OF HEATING/COOLING IN THESUMMARY OF HEATING/COOLING IN THESUMMARY OF HEATING/COOLING IN THE
ATRIUMS, L1 TO L5 AND L72 TO TOP OF TOWERATRIUMS, L1 TO L5 AND L72 TO TOP OF TOWERATRIUMS, L1 TO L5 AND L72 TO TOP OF TOWERATRIUMS, L1 TO L5 AND L72 TO TOP OF TOWER
Presentation on Energy Performance and Requirements
SUMMARY OF HEATING/COOLING IN THESUMMARY OF HEATING/COOLING IN THESUMMARY OF HEATING/COOLING IN THESUMMARY OF HEATING/COOLING IN THE
ATRIUMS, L1 TO L5 AND L72 TO TOP OF TOWERATRIUMS, L1 TO L5 AND L72 TO TOP OF TOWERATRIUMS, L1 TO L5 AND L72 TO TOP OF TOWERATRIUMS, L1 TO L5 AND L72 TO TOP OF TOWER
Presentation on Energy Performance and Requirements
TOTAL HEATING/COOLING REQUIREMENTS INTOTAL HEATING/COOLING REQUIREMENTS INTOTAL HEATING/COOLING REQUIREMENTS INTOTAL HEATING/COOLING REQUIREMENTS IN
THE ATRIUMS (INCLUDING BUFFER ZONES), L1THE ATRIUMS (INCLUDING BUFFER ZONES), L1THE ATRIUMS (INCLUDING BUFFER ZONES), L1THE ATRIUMS (INCLUDING BUFFER ZONES), L1
TO TOP OF THE TOWERTO TOP OF THE TOWERTO TOP OF THE TOWERTO TOP OF THE TOWER
CONVERSION TO STEAM UNITS 4.1868W PERCONVERSION TO STEAM UNITS 4.1868W PERCONVERSION TO STEAM UNITS 4.1868W PERCONVERSION TO STEAM UNITS 4.1868W PER
CALCALCALCALITITITIT/sec/sec/sec/sec
Presentation on Energy Performance and Requirements
OBSERVATIONS BASED ON THE CURRENTOBSERVATIONS BASED ON THE CURRENTOBSERVATIONS BASED ON THE CURRENTOBSERVATIONS BASED ON THE CURRENT
ANALYSIS:ANALYSIS:ANALYSIS:ANALYSIS:
CURRENT HEATING REQUIREMENTS FOR THECURRENT HEATING REQUIREMENTS FOR THECURRENT HEATING REQUIREMENTS FOR THECURRENT HEATING REQUIREMENTS FOR THE
WHOLE PROJECT WAS ESTIMATED ATWHOLE PROJECT WAS ESTIMATED ATWHOLE PROJECT WAS ESTIMATED ATWHOLE PROJECT WAS ESTIMATED AT 46.1846.1846.1846.18WHOLE PROJECT WAS ESTIMATED ATWHOLE PROJECT WAS ESTIMATED ATWHOLE PROJECT WAS ESTIMATED ATWHOLE PROJECT WAS ESTIMATED AT 46.1846.1846.1846.18
GCAL/hrGCAL/hrGCAL/hrGCAL/hr. (THE VALUE ABOVE WAS TAKEN FROM. (THE VALUE ABOVE WAS TAKEN FROM. (THE VALUE ABOVE WAS TAKEN FROM. (THE VALUE ABOVE WAS TAKEN FROM
OKHTA CENTER WEBSITE)OKHTA CENTER WEBSITE)OKHTA CENTER WEBSITE)OKHTA CENTER WEBSITE)
TO COMPARE WITH THE CURRENT ANALYSIS ATTO COMPARE WITH THE CURRENT ANALYSIS ATTO COMPARE WITH THE CURRENT ANALYSIS ATTO COMPARE WITH THE CURRENT ANALYSIS AT
32.122 MW/4.1868 W PER CAL/sec = 7.67232.122 MW/4.1868 W PER CAL/sec = 7.67232.122 MW/4.1868 W PER CAL/sec = 7.67232.122 MW/4.1868 W PER CAL/sec = 7.672
MCAL/sec or atMCAL/sec or atMCAL/sec or atMCAL/sec or at 27.62 GCAL/hr27.62 GCAL/hr27.62 GCAL/hr27.62 GCAL/hr IN ONE DAYIN ONE DAYIN ONE DAYIN ONE DAY
Presentation on Energy Performance and Requirements
THE DOUBLE SKIN FAÇADE PROVIDES ANTHE DOUBLE SKIN FAÇADE PROVIDES ANTHE DOUBLE SKIN FAÇADE PROVIDES ANTHE DOUBLE SKIN FAÇADE PROVIDES AN
OPTION FOR THE HEATING REQUIREMENTS TOOPTION FOR THE HEATING REQUIREMENTS TOOPTION FOR THE HEATING REQUIREMENTS TOOPTION FOR THE HEATING REQUIREMENTS TO
BE MANAGED IN ORDER TO OPTIMIZE THEBE MANAGED IN ORDER TO OPTIMIZE THEBE MANAGED IN ORDER TO OPTIMIZE THEBE MANAGED IN ORDER TO OPTIMIZE THE
ENERGY CONSUMPTION DURING COLD SEASON.ENERGY CONSUMPTION DURING COLD SEASON.ENERGY CONSUMPTION DURING COLD SEASON.ENERGY CONSUMPTION DURING COLD SEASON.ENERGY CONSUMPTION DURING COLD SEASON.ENERGY CONSUMPTION DURING COLD SEASON.ENERGY CONSUMPTION DURING COLD SEASON.ENERGY CONSUMPTION DURING COLD SEASON.
IF OPTIMIZED, THE TOWER WILL EXPERIENCE AIF OPTIMIZED, THE TOWER WILL EXPERIENCE AIF OPTIMIZED, THE TOWER WILL EXPERIENCE AIF OPTIMIZED, THE TOWER WILL EXPERIENCE A
MINIMUM OF 4 MONTHS OF COLD SEASONMINIMUM OF 4 MONTHS OF COLD SEASONMINIMUM OF 4 MONTHS OF COLD SEASONMINIMUM OF 4 MONTHS OF COLD SEASON
INSTEAD OF THE NORMAL 6 MOTNHS. LESSINSTEAD OF THE NORMAL 6 MOTNHS. LESSINSTEAD OF THE NORMAL 6 MOTNHS. LESSINSTEAD OF THE NORMAL 6 MOTNHS. LESS
MONTHS MEANS LESSER CONSUMPTION OFMONTHS MEANS LESSER CONSUMPTION OFMONTHS MEANS LESSER CONSUMPTION OFMONTHS MEANS LESSER CONSUMPTION OF
ENERGY FROM THE ONE PROVIDED IN THEENERGY FROM THE ONE PROVIDED IN THEENERGY FROM THE ONE PROVIDED IN THEENERGY FROM THE ONE PROVIDED IN THE
CURRENT ANALYSIS.CURRENT ANALYSIS.CURRENT ANALYSIS.CURRENT ANALYSIS.
Presentation on Energy Performance and Requirements
IF OPTIMIZED, THE TOWER WILL REQUIREIF OPTIMIZED, THE TOWER WILL REQUIREIF OPTIMIZED, THE TOWER WILL REQUIREIF OPTIMIZED, THE TOWER WILL REQUIRE
COOLING TO A MINIMUM OF 6 MONTHS PERCOOLING TO A MINIMUM OF 6 MONTHS PERCOOLING TO A MINIMUM OF 6 MONTHS PERCOOLING TO A MINIMUM OF 6 MONTHS PER
YEAR ON WHERE MINIMUM ENERGYYEAR ON WHERE MINIMUM ENERGYYEAR ON WHERE MINIMUM ENERGYYEAR ON WHERE MINIMUM ENERGY
CONSUMPTION WILL COME FROM THECONSUMPTION WILL COME FROM THECONSUMPTION WILL COME FROM THECONSUMPTION WILL COME FROM THE
CIRCULATION OF USED AND FRESH AIR IN THECIRCULATION OF USED AND FRESH AIR IN THECIRCULATION OF USED AND FRESH AIR IN THECIRCULATION OF USED AND FRESH AIR IN THECIRCULATION OF USED AND FRESH AIR IN THECIRCULATION OF USED AND FRESH AIR IN THECIRCULATION OF USED AND FRESH AIR IN THECIRCULATION OF USED AND FRESH AIR IN THE
OFFICES.OFFICES.OFFICES.OFFICES.
TO OPTIMIZE, THE NEED TO TRANSFER HEATTO OPTIMIZE, THE NEED TO TRANSFER HEATTO OPTIMIZE, THE NEED TO TRANSFER HEATTO OPTIMIZE, THE NEED TO TRANSFER HEAT
FROM SUN EXPOSURE (SOLAR GAIN) FROM THEFROM SUN EXPOSURE (SOLAR GAIN) FROM THEFROM SUN EXPOSURE (SOLAR GAIN) FROM THEFROM SUN EXPOSURE (SOLAR GAIN) FROM THE
SOUTHERN TO THE NORTHERN SIDES TOSOUTHERN TO THE NORTHERN SIDES TOSOUTHERN TO THE NORTHERN SIDES TOSOUTHERN TO THE NORTHERN SIDES TO
EQUALIZE THE TEMPERATURE IN THE BUFFEREQUALIZE THE TEMPERATURE IN THE BUFFEREQUALIZE THE TEMPERATURE IN THE BUFFEREQUALIZE THE TEMPERATURE IN THE BUFFER
ZONE DURING COLD MONTHS.ZONE DURING COLD MONTHS.ZONE DURING COLD MONTHS.ZONE DURING COLD MONTHS.
Presentation on Energy Performance and Requirements
BLINDS WILL BE REQUIRED TO CONTROLBLINDS WILL BE REQUIRED TO CONTROLBLINDS WILL BE REQUIRED TO CONTROLBLINDS WILL BE REQUIRED TO CONTROL
GLARE DUE TO LOW SUN ANGLE FROM THEGLARE DUE TO LOW SUN ANGLE FROM THEGLARE DUE TO LOW SUN ANGLE FROM THEGLARE DUE TO LOW SUN ANGLE FROM THE
HORIZON DURING COLD MONTHS.HORIZON DURING COLD MONTHS.HORIZON DURING COLD MONTHS.HORIZON DURING COLD MONTHS.
FURTHER ANALYSIS IS REQUIRED TO COOLFURTHER ANALYSIS IS REQUIRED TO COOLFURTHER ANALYSIS IS REQUIRED TO COOLFURTHER ANALYSIS IS REQUIRED TO COOLFURTHER ANALYSIS IS REQUIRED TO COOLFURTHER ANALYSIS IS REQUIRED TO COOLFURTHER ANALYSIS IS REQUIRED TO COOLFURTHER ANALYSIS IS REQUIRED TO COOL
DOWN THE BUFFER ZONES AT THE SEALEDDOWN THE BUFFER ZONES AT THE SEALEDDOWN THE BUFFER ZONES AT THE SEALEDDOWN THE BUFFER ZONES AT THE SEALED
BUFFER (BLAST) ZONE LEVELS OF THE TOWERBUFFER (BLAST) ZONE LEVELS OF THE TOWERBUFFER (BLAST) ZONE LEVELS OF THE TOWERBUFFER (BLAST) ZONE LEVELS OF THE TOWER
FAÇADE SINCE DURING WARM SEASON THEFAÇADE SINCE DURING WARM SEASON THEFAÇADE SINCE DURING WARM SEASON THEFAÇADE SINCE DURING WARM SEASON THE
ACCUMULATED TEMPERATURE IN THE BUFFERACCUMULATED TEMPERATURE IN THE BUFFERACCUMULATED TEMPERATURE IN THE BUFFERACCUMULATED TEMPERATURE IN THE BUFFER
ZONES WILL BE HIGH.ZONES WILL BE HIGH.ZONES WILL BE HIGH.ZONES WILL BE HIGH.
Presentation on Energy Performance and Requirements
THE AMOUNT OF AIR EXCHANGE AT SEALEDTHE AMOUNT OF AIR EXCHANGE AT SEALEDTHE AMOUNT OF AIR EXCHANGE AT SEALEDTHE AMOUNT OF AIR EXCHANGE AT SEALED
BUFFER ZONE LEVELS WILL DETERMINE THEBUFFER ZONE LEVELS WILL DETERMINE THEBUFFER ZONE LEVELS WILL DETERMINE THEBUFFER ZONE LEVELS WILL DETERMINE THE
SIZE/CAPACITY OF THE AIR HANDLING UNITS.SIZE/CAPACITY OF THE AIR HANDLING UNITS.SIZE/CAPACITY OF THE AIR HANDLING UNITS.SIZE/CAPACITY OF THE AIR HANDLING UNITS.SIZE/CAPACITY OF THE AIR HANDLING UNITS.SIZE/CAPACITY OF THE AIR HANDLING UNITS.SIZE/CAPACITY OF THE AIR HANDLING UNITS.SIZE/CAPACITY OF THE AIR HANDLING UNITS.
AT THE ATRIUM ZONES, THE ANALYSISAT THE ATRIUM ZONES, THE ANALYSISAT THE ATRIUM ZONES, THE ANALYSISAT THE ATRIUM ZONES, THE ANALYSIS
FOLLOWS REQUIREMENTS THAT THEFOLLOWS REQUIREMENTS THAT THEFOLLOWS REQUIREMENTS THAT THEFOLLOWS REQUIREMENTS THAT THE
TEMPERATURE IS MAINTAINED AT 18ºCTEMPERATURE IS MAINTAINED AT 18ºCTEMPERATURE IS MAINTAINED AT 18ºCTEMPERATURE IS MAINTAINED AT 18ºC
MINIMUM.MINIMUM.MINIMUM.MINIMUM.
Presentation on Energy Performance and Requirements
RECOMMENDATIONS:RECOMMENDATIONS:RECOMMENDATIONS:RECOMMENDATIONS:
THE ANALYSIS CONSIDERED HEATING THETHE ANALYSIS CONSIDERED HEATING THETHE ANALYSIS CONSIDERED HEATING THETHE ANALYSIS CONSIDERED HEATING THE
BUFFER ZONES ONLY TO AVOIDBUFFER ZONES ONLY TO AVOIDBUFFER ZONES ONLY TO AVOIDBUFFER ZONES ONLY TO AVOID
CONDENSATION AT THE INSIDE SURFACE OFCONDENSATION AT THE INSIDE SURFACE OFCONDENSATION AT THE INSIDE SURFACE OFCONDENSATION AT THE INSIDE SURFACE OFCONDENSATION AT THE INSIDE SURFACE OFCONDENSATION AT THE INSIDE SURFACE OFCONDENSATION AT THE INSIDE SURFACE OFCONDENSATION AT THE INSIDE SURFACE OF
THE EXTERNAL SKIN.THE EXTERNAL SKIN.THE EXTERNAL SKIN.THE EXTERNAL SKIN.
HEATING THE BUFFER ZONES AT A MAINTAINEDHEATING THE BUFFER ZONES AT A MAINTAINEDHEATING THE BUFFER ZONES AT A MAINTAINEDHEATING THE BUFFER ZONES AT A MAINTAINED
TEMPERATURES AS REQUIRED IN GOSTs ANDTEMPERATURES AS REQUIRED IN GOSTs ANDTEMPERATURES AS REQUIRED IN GOSTs ANDTEMPERATURES AS REQUIRED IN GOSTs AND
SNiPs WILL RESULT TO COOLING CONSUMPTIONSNiPs WILL RESULT TO COOLING CONSUMPTIONSNiPs WILL RESULT TO COOLING CONSUMPTIONSNiPs WILL RESULT TO COOLING CONSUMPTION
IN THE OFFICES DURING COLD SEASON.IN THE OFFICES DURING COLD SEASON.IN THE OFFICES DURING COLD SEASON.IN THE OFFICES DURING COLD SEASON.
Presentation on Energy Performance and Requirements
COMPARISON OF PERFORMANCE OF USINGCOMPARISON OF PERFORMANCE OF USINGCOMPARISON OF PERFORMANCE OF USINGCOMPARISON OF PERFORMANCE OF USING
DOUBLE GLAZING UNITS (DGU) OVER TRIPLEDOUBLE GLAZING UNITS (DGU) OVER TRIPLEDOUBLE GLAZING UNITS (DGU) OVER TRIPLEDOUBLE GLAZING UNITS (DGU) OVER TRIPLE
GLAZING UNITS (TGU).GLAZING UNITS (TGU).GLAZING UNITS (TGU).GLAZING UNITS (TGU).
THE ANALYSIS USE THE SAME INFORMATION ASTHE ANALYSIS USE THE SAME INFORMATION ASTHE ANALYSIS USE THE SAME INFORMATION ASTHE ANALYSIS USE THE SAME INFORMATION AS
APPLIED TO THE DGU ANALYSIS FOR THEAPPLIED TO THE DGU ANALYSIS FOR THEAPPLIED TO THE DGU ANALYSIS FOR THEAPPLIED TO THE DGU ANALYSIS FOR THE
DOUBLE SKIN FAÇADE SYSTEM ABOVE.DOUBLE SKIN FAÇADE SYSTEM ABOVE.DOUBLE SKIN FAÇADE SYSTEM ABOVE.DOUBLE SKIN FAÇADE SYSTEM ABOVE.
Presentation on Energy Performance and Requirements
IN USING TGU FOR THE EXTERNAL SKIN, THEIN USING TGU FOR THE EXTERNAL SKIN, THEIN USING TGU FOR THE EXTERNAL SKIN, THEIN USING TGU FOR THE EXTERNAL SKIN, THE
SECOND SKIN IS ASSUMED TO BE DELETED.SECOND SKIN IS ASSUMED TO BE DELETED.SECOND SKIN IS ASSUMED TO BE DELETED.SECOND SKIN IS ASSUMED TO BE DELETED.
THE TEMPERATURE IN THE INTERIOR WILL BETHE TEMPERATURE IN THE INTERIOR WILL BETHE TEMPERATURE IN THE INTERIOR WILL BETHE TEMPERATURE IN THE INTERIOR WILL BETHE TEMPERATURE IN THE INTERIOR WILL BETHE TEMPERATURE IN THE INTERIOR WILL BETHE TEMPERATURE IN THE INTERIOR WILL BETHE TEMPERATURE IN THE INTERIOR WILL BE
MAINTAINED AT 21ºC AS REQUIRED IN GOSTsMAINTAINED AT 21ºC AS REQUIRED IN GOSTsMAINTAINED AT 21ºC AS REQUIRED IN GOSTsMAINTAINED AT 21ºC AS REQUIRED IN GOSTs
AND SNiPsAND SNiPsAND SNiPsAND SNiPs
Presentation on Energy Performance and Requirements
PREVIOUS CONCEPTUAL WINTER OPERATIONPREVIOUS CONCEPTUAL WINTER OPERATIONPREVIOUS CONCEPTUAL WINTER OPERATIONPREVIOUS CONCEPTUAL WINTER OPERATION
Presentation on Energy Performance and Requirements
THE CURRENT ANALYSIS AGREES ON THETHE CURRENT ANALYSIS AGREES ON THETHE CURRENT ANALYSIS AGREES ON THETHE CURRENT ANALYSIS AGREES ON THE
WINTER OPERATION PREVIOUSLY PROVIDED INWINTER OPERATION PREVIOUSLY PROVIDED INWINTER OPERATION PREVIOUSLY PROVIDED INWINTER OPERATION PREVIOUSLY PROVIDED IN
THE CONCEPT DESIGN.THE CONCEPT DESIGN.THE CONCEPT DESIGN.THE CONCEPT DESIGN.
THE LOUVRES DISCHARGING AIR FROM THETHE LOUVRES DISCHARGING AIR FROM THETHE LOUVRES DISCHARGING AIR FROM THETHE LOUVRES DISCHARGING AIR FROM THE
OFFICES WILL BE REQUIRED BUT WILL BEOFFICES WILL BE REQUIRED BUT WILL BEOFFICES WILL BE REQUIRED BUT WILL BEOFFICES WILL BE REQUIRED BUT WILL BE
ATTACHED TO A DUCT FORCING HOT AIR FROMATTACHED TO A DUCT FORCING HOT AIR FROMATTACHED TO A DUCT FORCING HOT AIR FROMATTACHED TO A DUCT FORCING HOT AIR FROM
THE OFFICE TO THE BUFFER ZONE DURINGTHE OFFICE TO THE BUFFER ZONE DURINGTHE OFFICE TO THE BUFFER ZONE DURINGTHE OFFICE TO THE BUFFER ZONE DURING
COOL MONTHS. PROVIDING FULL LOUVREDCOOL MONTHS. PROVIDING FULL LOUVREDCOOL MONTHS. PROVIDING FULL LOUVREDCOOL MONTHS. PROVIDING FULL LOUVRED
OPENING ON THE SECOND SKIN WILL DEFEATOPENING ON THE SECOND SKIN WILL DEFEATOPENING ON THE SECOND SKIN WILL DEFEATOPENING ON THE SECOND SKIN WILL DEFEAT
THE THERMAL PERFORMANCE OF THE SECONDTHE THERMAL PERFORMANCE OF THE SECONDTHE THERMAL PERFORMANCE OF THE SECONDTHE THERMAL PERFORMANCE OF THE SECOND
SKIN.SKIN.SKIN.SKIN.

Mais conteúdo relacionado

Semelhante a Energy Performance Analysis of Okhta Centre's Double Skin Facade

What does wind really cost? Modeling Wind Resources In AURORAxmp.
What does wind really cost? Modeling Wind Resources In AURORAxmp. What does wind really cost? Modeling Wind Resources In AURORAxmp.
What does wind really cost? Modeling Wind Resources In AURORAxmp. EPIS Inc
 
PEG- Piezoelectric Electricity Generator
PEG- Piezoelectric Electricity GeneratorPEG- Piezoelectric Electricity Generator
PEG- Piezoelectric Electricity GeneratorIRJET Journal
 
Long-Duration Energy Storage and PV: Renewable Energy’s BFFs
Long-Duration Energy Storage and PV: Renewable Energy’s BFFsLong-Duration Energy Storage and PV: Renewable Energy’s BFFs
Long-Duration Energy Storage and PV: Renewable Energy’s BFFsCraig Horne
 
IRJET- Power Generation with the Application of Vortex Wind Turbine
IRJET- Power Generation with the Application of Vortex Wind TurbineIRJET- Power Generation with the Application of Vortex Wind Turbine
IRJET- Power Generation with the Application of Vortex Wind TurbineIRJET Journal
 
Combustion chamber
Combustion chamberCombustion chamber
Combustion chamberManish Nepal
 
Greening_IEW_2007
Greening_IEW_2007Greening_IEW_2007
Greening_IEW_2007LGDoone
 
Fatigue Analysis of Articulated Support for Offshore Wind Turbine
Fatigue Analysis of Articulated Support for Offshore Wind TurbineFatigue Analysis of Articulated Support for Offshore Wind Turbine
Fatigue Analysis of Articulated Support for Offshore Wind TurbineIRJET Journal
 
Blade design trade offs using low lifts airfoils aerodynamics
Blade design trade offs using low lifts airfoils aerodynamicsBlade design trade offs using low lifts airfoils aerodynamics
Blade design trade offs using low lifts airfoils aerodynamicsJuan Cruz Moreno
 
From Macroscopic to Microscopic Dynamics of Superconducting Cavities
From Macroscopic to Microscopic Dynamics of Superconducting CavitiesFrom Macroscopic to Microscopic Dynamics of Superconducting Cavities
From Macroscopic to Microscopic Dynamics of Superconducting CavitiesAnirban Krishna Bhattacharyya
 
A PAKISTAN GROWTH AND DEVELOPMENT COMPREHENSIVE ENERGY PLAN by A GENIUS SCHOL...
A PAKISTAN GROWTH AND DEVELOPMENT COMPREHENSIVE ENERGY PLAN by A GENIUS SCHOL...A PAKISTAN GROWTH AND DEVELOPMENT COMPREHENSIVE ENERGY PLAN by A GENIUS SCHOL...
A PAKISTAN GROWTH AND DEVELOPMENT COMPREHENSIVE ENERGY PLAN by A GENIUS SCHOL...Malik Tariq Sarwar Awan
 
U.S. Naval Submarine Base Fuel Cell Microgrid Project
U.S. Naval Submarine Base Fuel Cell Microgrid ProjectU.S. Naval Submarine Base Fuel Cell Microgrid Project
U.S. Naval Submarine Base Fuel Cell Microgrid ProjectFuelCellEnergy
 
Enhancing the Performance of 75mw Steam Power Plant with Second Law Efficienc...
Enhancing the Performance of 75mw Steam Power Plant with Second Law Efficienc...Enhancing the Performance of 75mw Steam Power Plant with Second Law Efficienc...
Enhancing the Performance of 75mw Steam Power Plant with Second Law Efficienc...theijes
 
Richard Blakeley - Options for managing safety with elderly switchgear
Richard Blakeley - Options for managing safety with elderly switchgearRichard Blakeley - Options for managing safety with elderly switchgear
Richard Blakeley - Options for managing safety with elderly switchgearNSW Environment and Planning
 
Letter from American Iron and Steel Institute 12.02
Letter from American Iron and Steel Institute 12.02Letter from American Iron and Steel Institute 12.02
Letter from American Iron and Steel Institute 12.02Obama White House
 
Study and Analysis on Bladeless Wind Turbine
Study and Analysis on Bladeless Wind TurbineStudy and Analysis on Bladeless Wind Turbine
Study and Analysis on Bladeless Wind TurbineIRJET Journal
 

Semelhante a Energy Performance Analysis of Okhta Centre's Double Skin Facade (20)

What does wind really cost? Modeling Wind Resources In AURORAxmp.
What does wind really cost? Modeling Wind Resources In AURORAxmp. What does wind really cost? Modeling Wind Resources In AURORAxmp.
What does wind really cost? Modeling Wind Resources In AURORAxmp.
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
PEG- Piezoelectric Electricity Generator
PEG- Piezoelectric Electricity GeneratorPEG- Piezoelectric Electricity Generator
PEG- Piezoelectric Electricity Generator
 
Long-Duration Energy Storage and PV: Renewable Energy’s BFFs
Long-Duration Energy Storage and PV: Renewable Energy’s BFFsLong-Duration Energy Storage and PV: Renewable Energy’s BFFs
Long-Duration Energy Storage and PV: Renewable Energy’s BFFs
 
IRJET- Power Generation with the Application of Vortex Wind Turbine
IRJET- Power Generation with the Application of Vortex Wind TurbineIRJET- Power Generation with the Application of Vortex Wind Turbine
IRJET- Power Generation with the Application of Vortex Wind Turbine
 
Ntpc training report
Ntpc training reportNtpc training report
Ntpc training report
 
Combustion chamber
Combustion chamberCombustion chamber
Combustion chamber
 
Greening_IEW_2007
Greening_IEW_2007Greening_IEW_2007
Greening_IEW_2007
 
Fatigue Analysis of Articulated Support for Offshore Wind Turbine
Fatigue Analysis of Articulated Support for Offshore Wind TurbineFatigue Analysis of Articulated Support for Offshore Wind Turbine
Fatigue Analysis of Articulated Support for Offshore Wind Turbine
 
Blade design trade offs using low lifts airfoils aerodynamics
Blade design trade offs using low lifts airfoils aerodynamicsBlade design trade offs using low lifts airfoils aerodynamics
Blade design trade offs using low lifts airfoils aerodynamics
 
From Macroscopic to Microscopic Dynamics of Superconducting Cavities
From Macroscopic to Microscopic Dynamics of Superconducting CavitiesFrom Macroscopic to Microscopic Dynamics of Superconducting Cavities
From Macroscopic to Microscopic Dynamics of Superconducting Cavities
 
A PAKISTAN GROWTH AND DEVELOPMENT COMPREHENSIVE ENERGY PLAN by A GENIUS SCHOL...
A PAKISTAN GROWTH AND DEVELOPMENT COMPREHENSIVE ENERGY PLAN by A GENIUS SCHOL...A PAKISTAN GROWTH AND DEVELOPMENT COMPREHENSIVE ENERGY PLAN by A GENIUS SCHOL...
A PAKISTAN GROWTH AND DEVELOPMENT COMPREHENSIVE ENERGY PLAN by A GENIUS SCHOL...
 
U.S. Naval Submarine Base Fuel Cell Microgrid Project
U.S. Naval Submarine Base Fuel Cell Microgrid ProjectU.S. Naval Submarine Base Fuel Cell Microgrid Project
U.S. Naval Submarine Base Fuel Cell Microgrid Project
 
Zero carbon britain 2030
Zero carbon britain 2030Zero carbon britain 2030
Zero carbon britain 2030
 
Enhancing the Performance of 75mw Steam Power Plant with Second Law Efficienc...
Enhancing the Performance of 75mw Steam Power Plant with Second Law Efficienc...Enhancing the Performance of 75mw Steam Power Plant with Second Law Efficienc...
Enhancing the Performance of 75mw Steam Power Plant with Second Law Efficienc...
 
Richard Blakeley - Options for managing safety with elderly switchgear
Richard Blakeley - Options for managing safety with elderly switchgearRichard Blakeley - Options for managing safety with elderly switchgear
Richard Blakeley - Options for managing safety with elderly switchgear
 
Green Environment
Green EnvironmentGreen Environment
Green Environment
 
Letter from American Iron and Steel Institute 12.02
Letter from American Iron and Steel Institute 12.02Letter from American Iron and Steel Institute 12.02
Letter from American Iron and Steel Institute 12.02
 
Study and Analysis on Bladeless Wind Turbine
Study and Analysis on Bladeless Wind TurbineStudy and Analysis on Bladeless Wind Turbine
Study and Analysis on Bladeless Wind Turbine
 
Sierra clean energy
Sierra clean energySierra clean energy
Sierra clean energy
 

Energy Performance Analysis of Okhta Centre's Double Skin Facade

  • 1. APPENDIX A3 PRESENTATION ON ENERGY PERFORMANCE OF THE OKHTA CENTER DOUBLE SKIN FACADE
  • 2. Presentation on Energy Performance and Requirements Okhta Centre,Okhta Centre, St. PetersburgSt. Petersburg Tower FacadeTower Facade-- October 2010October 2010
  • 3. Presentation on Energy Performance and Requirements PART IPART IPART IPART I THE FOLLOWING ANALYSIS WERE DONE TOTHE FOLLOWING ANALYSIS WERE DONE TOTHE FOLLOWING ANALYSIS WERE DONE TOTHE FOLLOWING ANALYSIS WERE DONE TO VERIFY THE FAÇADE ENERGY PERFORMANCEVERIFY THE FAÇADE ENERGY PERFORMANCEVERIFY THE FAÇADE ENERGY PERFORMANCEVERIFY THE FAÇADE ENERGY PERFORMANCE BASED ON CURRENT PROEKT (PROJECTBASED ON CURRENT PROEKT (PROJECTBASED ON CURRENT PROEKT (PROJECTBASED ON CURRENT PROEKT (PROJECTBASED ON CURRENT PROEKT (PROJECTBASED ON CURRENT PROEKT (PROJECTBASED ON CURRENT PROEKT (PROJECTBASED ON CURRENT PROEKT (PROJECT STAGE CONCEPT) DESIGN DOCUMENTS.STAGE CONCEPT) DESIGN DOCUMENTS.STAGE CONCEPT) DESIGN DOCUMENTS.STAGE CONCEPT) DESIGN DOCUMENTS. TO PROVIDE ADDITIONAL INFORMATIONTO PROVIDE ADDITIONAL INFORMATIONTO PROVIDE ADDITIONAL INFORMATIONTO PROVIDE ADDITIONAL INFORMATION AND ANSWERS TO SOME QUESTIONS WHICHAND ANSWERS TO SOME QUESTIONS WHICHAND ANSWERS TO SOME QUESTIONS WHICHAND ANSWERS TO SOME QUESTIONS WHICH WERE NOT PREVIOUSLY CLEAR ORWERE NOT PREVIOUSLY CLEAR ORWERE NOT PREVIOUSLY CLEAR ORWERE NOT PREVIOUSLY CLEAR OR ANSWERED DURING THE DESIGN REVIEW.ANSWERED DURING THE DESIGN REVIEW.ANSWERED DURING THE DESIGN REVIEW.ANSWERED DURING THE DESIGN REVIEW.
  • 4. Presentation on Energy Performance and Requirements ANALYSIS FOLLOWS WHAT WASANALYSIS FOLLOWS WHAT WASANALYSIS FOLLOWS WHAT WASANALYSIS FOLLOWS WHAT WAS PREVIOUSLY ESTABLISHED AND YETPREVIOUSLY ESTABLISHED AND YETPREVIOUSLY ESTABLISHED AND YETPREVIOUSLY ESTABLISHED AND YET WILL PROVIDE INFORMATION THATWILL PROVIDE INFORMATION THATWILL PROVIDE INFORMATION THATWILL PROVIDE INFORMATION THAT WILL BE A GUIDE TO THE NEXT STAGEWILL BE A GUIDE TO THE NEXT STAGEWILL BE A GUIDE TO THE NEXT STAGEWILL BE A GUIDE TO THE NEXT STAGEWILL BE A GUIDE TO THE NEXT STAGEWILL BE A GUIDE TO THE NEXT STAGEWILL BE A GUIDE TO THE NEXT STAGEWILL BE A GUIDE TO THE NEXT STAGE OF THE DESIGN WORKS.OF THE DESIGN WORKS.OF THE DESIGN WORKS.OF THE DESIGN WORKS.
  • 5. Presentation on Energy Performance and Requirements WHAT HAS BEEN CONSIDERED IN THISWHAT HAS BEEN CONSIDERED IN THISWHAT HAS BEEN CONSIDERED IN THISWHAT HAS BEEN CONSIDERED IN THIS CURRENT CLIMATE ANALYSIS?CURRENT CLIMATE ANALYSIS?CURRENT CLIMATE ANALYSIS?CURRENT CLIMATE ANALYSIS?
  • 6. Presentation on Energy Performance and Requirements 25 YEAR AVERAGE DAILY WIND SPEED25 YEAR AVERAGE DAILY WIND SPEED25 YEAR AVERAGE DAILY WIND SPEED25 YEAR AVERAGE DAILY WIND SPEED
  • 7. Presentation on Energy Performance and Requirements SUN EXPOSURE AND SHADESUN EXPOSURE AND SHADESUN EXPOSURE AND SHADESUN EXPOSURE AND SHADE
  • 8. Presentation on Energy Performance and Requirements 25 YEAR AVERAGE TEMPERATURE, SOLAR HEAT25 YEAR AVERAGE TEMPERATURE, SOLAR HEAT25 YEAR AVERAGE TEMPERATURE, SOLAR HEAT25 YEAR AVERAGE TEMPERATURE, SOLAR HEAT GAIN AND CLOUD COVERGAIN AND CLOUD COVERGAIN AND CLOUD COVERGAIN AND CLOUD COVER
  • 9. Presentation on Energy Performance and Requirements SUMMARIZING TH E ABOVE, SOME OF THESUMMARIZING TH E ABOVE, SOME OF THESUMMARIZING TH E ABOVE, SOME OF THESUMMARIZING TH E ABOVE, SOME OF THE RESULTS OF THE ANALYSIS SPREADSHEETS WERERESULTS OF THE ANALYSIS SPREADSHEETS WERERESULTS OF THE ANALYSIS SPREADSHEETS WERERESULTS OF THE ANALYSIS SPREADSHEETS WERE PROVIDED BELOWPROVIDED BELOWPROVIDED BELOWPROVIDED BELOW
  • 10. Presentation on Energy Performance and Requirements
  • 11. Presentation on Energy Performance and Requirements
  • 12. Presentation on Energy Performance and Requirements
  • 13. Presentation on Energy Performance and Requirements SUMMARY OF HEATING REQUIREMENTS IN THESUMMARY OF HEATING REQUIREMENTS IN THESUMMARY OF HEATING REQUIREMENTS IN THESUMMARY OF HEATING REQUIREMENTS IN THE BUFFER ZONES FROM L6 TO L72BUFFER ZONES FROM L6 TO L72BUFFER ZONES FROM L6 TO L72BUFFER ZONES FROM L6 TO L72
  • 14. Presentation on Energy Performance and Requirements SUMMARY OF HEATING REQUIREMENTS IN THESUMMARY OF HEATING REQUIREMENTS IN THESUMMARY OF HEATING REQUIREMENTS IN THESUMMARY OF HEATING REQUIREMENTS IN THE BUFFER ZONES FROM L6 TO L72BUFFER ZONES FROM L6 TO L72BUFFER ZONES FROM L6 TO L72BUFFER ZONES FROM L6 TO L72
  • 15. Presentation on Energy Performance and Requirements SUMMARY OF COOLING REQUIREMENTS IN THESUMMARY OF COOLING REQUIREMENTS IN THESUMMARY OF COOLING REQUIREMENTS IN THESUMMARY OF COOLING REQUIREMENTS IN THE OFFICES FROM L6 TO L72OFFICES FROM L6 TO L72OFFICES FROM L6 TO L72OFFICES FROM L6 TO L72
  • 16. Presentation on Energy Performance and Requirements TOTAL HEATING/COOLING REQUIREMENTS INTOTAL HEATING/COOLING REQUIREMENTS INTOTAL HEATING/COOLING REQUIREMENTS INTOTAL HEATING/COOLING REQUIREMENTS IN THE OFFICES FROM L6 TO L72THE OFFICES FROM L6 TO L72THE OFFICES FROM L6 TO L72THE OFFICES FROM L6 TO L72
  • 17. Presentation on Energy Performance and Requirements SUMMARY OF HEATING/COOLING IN THESUMMARY OF HEATING/COOLING IN THESUMMARY OF HEATING/COOLING IN THESUMMARY OF HEATING/COOLING IN THE ATRIUMS, L1 TO L5 AND L72 TO TOP OF TOWERATRIUMS, L1 TO L5 AND L72 TO TOP OF TOWERATRIUMS, L1 TO L5 AND L72 TO TOP OF TOWERATRIUMS, L1 TO L5 AND L72 TO TOP OF TOWER
  • 18. Presentation on Energy Performance and Requirements SUMMARY OF HEATING/COOLING IN THESUMMARY OF HEATING/COOLING IN THESUMMARY OF HEATING/COOLING IN THESUMMARY OF HEATING/COOLING IN THE ATRIUMS, L1 TO L5 AND L72 TO TOP OF TOWERATRIUMS, L1 TO L5 AND L72 TO TOP OF TOWERATRIUMS, L1 TO L5 AND L72 TO TOP OF TOWERATRIUMS, L1 TO L5 AND L72 TO TOP OF TOWER
  • 19. Presentation on Energy Performance and Requirements TOTAL HEATING/COOLING REQUIREMENTS INTOTAL HEATING/COOLING REQUIREMENTS INTOTAL HEATING/COOLING REQUIREMENTS INTOTAL HEATING/COOLING REQUIREMENTS IN THE ATRIUMS (INCLUDING BUFFER ZONES), L1THE ATRIUMS (INCLUDING BUFFER ZONES), L1THE ATRIUMS (INCLUDING BUFFER ZONES), L1THE ATRIUMS (INCLUDING BUFFER ZONES), L1 TO TOP OF THE TOWERTO TOP OF THE TOWERTO TOP OF THE TOWERTO TOP OF THE TOWER CONVERSION TO STEAM UNITS 4.1868W PERCONVERSION TO STEAM UNITS 4.1868W PERCONVERSION TO STEAM UNITS 4.1868W PERCONVERSION TO STEAM UNITS 4.1868W PER CALCALCALCALITITITIT/sec/sec/sec/sec
  • 20. Presentation on Energy Performance and Requirements OBSERVATIONS BASED ON THE CURRENTOBSERVATIONS BASED ON THE CURRENTOBSERVATIONS BASED ON THE CURRENTOBSERVATIONS BASED ON THE CURRENT ANALYSIS:ANALYSIS:ANALYSIS:ANALYSIS: CURRENT HEATING REQUIREMENTS FOR THECURRENT HEATING REQUIREMENTS FOR THECURRENT HEATING REQUIREMENTS FOR THECURRENT HEATING REQUIREMENTS FOR THE WHOLE PROJECT WAS ESTIMATED ATWHOLE PROJECT WAS ESTIMATED ATWHOLE PROJECT WAS ESTIMATED ATWHOLE PROJECT WAS ESTIMATED AT 46.1846.1846.1846.18WHOLE PROJECT WAS ESTIMATED ATWHOLE PROJECT WAS ESTIMATED ATWHOLE PROJECT WAS ESTIMATED ATWHOLE PROJECT WAS ESTIMATED AT 46.1846.1846.1846.18 GCAL/hrGCAL/hrGCAL/hrGCAL/hr. (THE VALUE ABOVE WAS TAKEN FROM. (THE VALUE ABOVE WAS TAKEN FROM. (THE VALUE ABOVE WAS TAKEN FROM. (THE VALUE ABOVE WAS TAKEN FROM OKHTA CENTER WEBSITE)OKHTA CENTER WEBSITE)OKHTA CENTER WEBSITE)OKHTA CENTER WEBSITE) TO COMPARE WITH THE CURRENT ANALYSIS ATTO COMPARE WITH THE CURRENT ANALYSIS ATTO COMPARE WITH THE CURRENT ANALYSIS ATTO COMPARE WITH THE CURRENT ANALYSIS AT 32.122 MW/4.1868 W PER CAL/sec = 7.67232.122 MW/4.1868 W PER CAL/sec = 7.67232.122 MW/4.1868 W PER CAL/sec = 7.67232.122 MW/4.1868 W PER CAL/sec = 7.672 MCAL/sec or atMCAL/sec or atMCAL/sec or atMCAL/sec or at 27.62 GCAL/hr27.62 GCAL/hr27.62 GCAL/hr27.62 GCAL/hr IN ONE DAYIN ONE DAYIN ONE DAYIN ONE DAY
  • 21. Presentation on Energy Performance and Requirements THE DOUBLE SKIN FAÇADE PROVIDES ANTHE DOUBLE SKIN FAÇADE PROVIDES ANTHE DOUBLE SKIN FAÇADE PROVIDES ANTHE DOUBLE SKIN FAÇADE PROVIDES AN OPTION FOR THE HEATING REQUIREMENTS TOOPTION FOR THE HEATING REQUIREMENTS TOOPTION FOR THE HEATING REQUIREMENTS TOOPTION FOR THE HEATING REQUIREMENTS TO BE MANAGED IN ORDER TO OPTIMIZE THEBE MANAGED IN ORDER TO OPTIMIZE THEBE MANAGED IN ORDER TO OPTIMIZE THEBE MANAGED IN ORDER TO OPTIMIZE THE ENERGY CONSUMPTION DURING COLD SEASON.ENERGY CONSUMPTION DURING COLD SEASON.ENERGY CONSUMPTION DURING COLD SEASON.ENERGY CONSUMPTION DURING COLD SEASON.ENERGY CONSUMPTION DURING COLD SEASON.ENERGY CONSUMPTION DURING COLD SEASON.ENERGY CONSUMPTION DURING COLD SEASON.ENERGY CONSUMPTION DURING COLD SEASON. IF OPTIMIZED, THE TOWER WILL EXPERIENCE AIF OPTIMIZED, THE TOWER WILL EXPERIENCE AIF OPTIMIZED, THE TOWER WILL EXPERIENCE AIF OPTIMIZED, THE TOWER WILL EXPERIENCE A MINIMUM OF 4 MONTHS OF COLD SEASONMINIMUM OF 4 MONTHS OF COLD SEASONMINIMUM OF 4 MONTHS OF COLD SEASONMINIMUM OF 4 MONTHS OF COLD SEASON INSTEAD OF THE NORMAL 6 MOTNHS. LESSINSTEAD OF THE NORMAL 6 MOTNHS. LESSINSTEAD OF THE NORMAL 6 MOTNHS. LESSINSTEAD OF THE NORMAL 6 MOTNHS. LESS MONTHS MEANS LESSER CONSUMPTION OFMONTHS MEANS LESSER CONSUMPTION OFMONTHS MEANS LESSER CONSUMPTION OFMONTHS MEANS LESSER CONSUMPTION OF ENERGY FROM THE ONE PROVIDED IN THEENERGY FROM THE ONE PROVIDED IN THEENERGY FROM THE ONE PROVIDED IN THEENERGY FROM THE ONE PROVIDED IN THE CURRENT ANALYSIS.CURRENT ANALYSIS.CURRENT ANALYSIS.CURRENT ANALYSIS.
  • 22. Presentation on Energy Performance and Requirements IF OPTIMIZED, THE TOWER WILL REQUIREIF OPTIMIZED, THE TOWER WILL REQUIREIF OPTIMIZED, THE TOWER WILL REQUIREIF OPTIMIZED, THE TOWER WILL REQUIRE COOLING TO A MINIMUM OF 6 MONTHS PERCOOLING TO A MINIMUM OF 6 MONTHS PERCOOLING TO A MINIMUM OF 6 MONTHS PERCOOLING TO A MINIMUM OF 6 MONTHS PER YEAR ON WHERE MINIMUM ENERGYYEAR ON WHERE MINIMUM ENERGYYEAR ON WHERE MINIMUM ENERGYYEAR ON WHERE MINIMUM ENERGY CONSUMPTION WILL COME FROM THECONSUMPTION WILL COME FROM THECONSUMPTION WILL COME FROM THECONSUMPTION WILL COME FROM THE CIRCULATION OF USED AND FRESH AIR IN THECIRCULATION OF USED AND FRESH AIR IN THECIRCULATION OF USED AND FRESH AIR IN THECIRCULATION OF USED AND FRESH AIR IN THECIRCULATION OF USED AND FRESH AIR IN THECIRCULATION OF USED AND FRESH AIR IN THECIRCULATION OF USED AND FRESH AIR IN THECIRCULATION OF USED AND FRESH AIR IN THE OFFICES.OFFICES.OFFICES.OFFICES. TO OPTIMIZE, THE NEED TO TRANSFER HEATTO OPTIMIZE, THE NEED TO TRANSFER HEATTO OPTIMIZE, THE NEED TO TRANSFER HEATTO OPTIMIZE, THE NEED TO TRANSFER HEAT FROM SUN EXPOSURE (SOLAR GAIN) FROM THEFROM SUN EXPOSURE (SOLAR GAIN) FROM THEFROM SUN EXPOSURE (SOLAR GAIN) FROM THEFROM SUN EXPOSURE (SOLAR GAIN) FROM THE SOUTHERN TO THE NORTHERN SIDES TOSOUTHERN TO THE NORTHERN SIDES TOSOUTHERN TO THE NORTHERN SIDES TOSOUTHERN TO THE NORTHERN SIDES TO EQUALIZE THE TEMPERATURE IN THE BUFFEREQUALIZE THE TEMPERATURE IN THE BUFFEREQUALIZE THE TEMPERATURE IN THE BUFFEREQUALIZE THE TEMPERATURE IN THE BUFFER ZONE DURING COLD MONTHS.ZONE DURING COLD MONTHS.ZONE DURING COLD MONTHS.ZONE DURING COLD MONTHS.
  • 23. Presentation on Energy Performance and Requirements BLINDS WILL BE REQUIRED TO CONTROLBLINDS WILL BE REQUIRED TO CONTROLBLINDS WILL BE REQUIRED TO CONTROLBLINDS WILL BE REQUIRED TO CONTROL GLARE DUE TO LOW SUN ANGLE FROM THEGLARE DUE TO LOW SUN ANGLE FROM THEGLARE DUE TO LOW SUN ANGLE FROM THEGLARE DUE TO LOW SUN ANGLE FROM THE HORIZON DURING COLD MONTHS.HORIZON DURING COLD MONTHS.HORIZON DURING COLD MONTHS.HORIZON DURING COLD MONTHS. FURTHER ANALYSIS IS REQUIRED TO COOLFURTHER ANALYSIS IS REQUIRED TO COOLFURTHER ANALYSIS IS REQUIRED TO COOLFURTHER ANALYSIS IS REQUIRED TO COOLFURTHER ANALYSIS IS REQUIRED TO COOLFURTHER ANALYSIS IS REQUIRED TO COOLFURTHER ANALYSIS IS REQUIRED TO COOLFURTHER ANALYSIS IS REQUIRED TO COOL DOWN THE BUFFER ZONES AT THE SEALEDDOWN THE BUFFER ZONES AT THE SEALEDDOWN THE BUFFER ZONES AT THE SEALEDDOWN THE BUFFER ZONES AT THE SEALED BUFFER (BLAST) ZONE LEVELS OF THE TOWERBUFFER (BLAST) ZONE LEVELS OF THE TOWERBUFFER (BLAST) ZONE LEVELS OF THE TOWERBUFFER (BLAST) ZONE LEVELS OF THE TOWER FAÇADE SINCE DURING WARM SEASON THEFAÇADE SINCE DURING WARM SEASON THEFAÇADE SINCE DURING WARM SEASON THEFAÇADE SINCE DURING WARM SEASON THE ACCUMULATED TEMPERATURE IN THE BUFFERACCUMULATED TEMPERATURE IN THE BUFFERACCUMULATED TEMPERATURE IN THE BUFFERACCUMULATED TEMPERATURE IN THE BUFFER ZONES WILL BE HIGH.ZONES WILL BE HIGH.ZONES WILL BE HIGH.ZONES WILL BE HIGH.
  • 24. Presentation on Energy Performance and Requirements THE AMOUNT OF AIR EXCHANGE AT SEALEDTHE AMOUNT OF AIR EXCHANGE AT SEALEDTHE AMOUNT OF AIR EXCHANGE AT SEALEDTHE AMOUNT OF AIR EXCHANGE AT SEALED BUFFER ZONE LEVELS WILL DETERMINE THEBUFFER ZONE LEVELS WILL DETERMINE THEBUFFER ZONE LEVELS WILL DETERMINE THEBUFFER ZONE LEVELS WILL DETERMINE THE SIZE/CAPACITY OF THE AIR HANDLING UNITS.SIZE/CAPACITY OF THE AIR HANDLING UNITS.SIZE/CAPACITY OF THE AIR HANDLING UNITS.SIZE/CAPACITY OF THE AIR HANDLING UNITS.SIZE/CAPACITY OF THE AIR HANDLING UNITS.SIZE/CAPACITY OF THE AIR HANDLING UNITS.SIZE/CAPACITY OF THE AIR HANDLING UNITS.SIZE/CAPACITY OF THE AIR HANDLING UNITS. AT THE ATRIUM ZONES, THE ANALYSISAT THE ATRIUM ZONES, THE ANALYSISAT THE ATRIUM ZONES, THE ANALYSISAT THE ATRIUM ZONES, THE ANALYSIS FOLLOWS REQUIREMENTS THAT THEFOLLOWS REQUIREMENTS THAT THEFOLLOWS REQUIREMENTS THAT THEFOLLOWS REQUIREMENTS THAT THE TEMPERATURE IS MAINTAINED AT 18ºCTEMPERATURE IS MAINTAINED AT 18ºCTEMPERATURE IS MAINTAINED AT 18ºCTEMPERATURE IS MAINTAINED AT 18ºC MINIMUM.MINIMUM.MINIMUM.MINIMUM.
  • 25. Presentation on Energy Performance and Requirements RECOMMENDATIONS:RECOMMENDATIONS:RECOMMENDATIONS:RECOMMENDATIONS: THE ANALYSIS CONSIDERED HEATING THETHE ANALYSIS CONSIDERED HEATING THETHE ANALYSIS CONSIDERED HEATING THETHE ANALYSIS CONSIDERED HEATING THE BUFFER ZONES ONLY TO AVOIDBUFFER ZONES ONLY TO AVOIDBUFFER ZONES ONLY TO AVOIDBUFFER ZONES ONLY TO AVOID CONDENSATION AT THE INSIDE SURFACE OFCONDENSATION AT THE INSIDE SURFACE OFCONDENSATION AT THE INSIDE SURFACE OFCONDENSATION AT THE INSIDE SURFACE OFCONDENSATION AT THE INSIDE SURFACE OFCONDENSATION AT THE INSIDE SURFACE OFCONDENSATION AT THE INSIDE SURFACE OFCONDENSATION AT THE INSIDE SURFACE OF THE EXTERNAL SKIN.THE EXTERNAL SKIN.THE EXTERNAL SKIN.THE EXTERNAL SKIN. HEATING THE BUFFER ZONES AT A MAINTAINEDHEATING THE BUFFER ZONES AT A MAINTAINEDHEATING THE BUFFER ZONES AT A MAINTAINEDHEATING THE BUFFER ZONES AT A MAINTAINED TEMPERATURES AS REQUIRED IN GOSTs ANDTEMPERATURES AS REQUIRED IN GOSTs ANDTEMPERATURES AS REQUIRED IN GOSTs ANDTEMPERATURES AS REQUIRED IN GOSTs AND SNiPs WILL RESULT TO COOLING CONSUMPTIONSNiPs WILL RESULT TO COOLING CONSUMPTIONSNiPs WILL RESULT TO COOLING CONSUMPTIONSNiPs WILL RESULT TO COOLING CONSUMPTION IN THE OFFICES DURING COLD SEASON.IN THE OFFICES DURING COLD SEASON.IN THE OFFICES DURING COLD SEASON.IN THE OFFICES DURING COLD SEASON.
  • 26. Presentation on Energy Performance and Requirements COMPARISON OF PERFORMANCE OF USINGCOMPARISON OF PERFORMANCE OF USINGCOMPARISON OF PERFORMANCE OF USINGCOMPARISON OF PERFORMANCE OF USING DOUBLE GLAZING UNITS (DGU) OVER TRIPLEDOUBLE GLAZING UNITS (DGU) OVER TRIPLEDOUBLE GLAZING UNITS (DGU) OVER TRIPLEDOUBLE GLAZING UNITS (DGU) OVER TRIPLE GLAZING UNITS (TGU).GLAZING UNITS (TGU).GLAZING UNITS (TGU).GLAZING UNITS (TGU). THE ANALYSIS USE THE SAME INFORMATION ASTHE ANALYSIS USE THE SAME INFORMATION ASTHE ANALYSIS USE THE SAME INFORMATION ASTHE ANALYSIS USE THE SAME INFORMATION AS APPLIED TO THE DGU ANALYSIS FOR THEAPPLIED TO THE DGU ANALYSIS FOR THEAPPLIED TO THE DGU ANALYSIS FOR THEAPPLIED TO THE DGU ANALYSIS FOR THE DOUBLE SKIN FAÇADE SYSTEM ABOVE.DOUBLE SKIN FAÇADE SYSTEM ABOVE.DOUBLE SKIN FAÇADE SYSTEM ABOVE.DOUBLE SKIN FAÇADE SYSTEM ABOVE.
  • 27. Presentation on Energy Performance and Requirements IN USING TGU FOR THE EXTERNAL SKIN, THEIN USING TGU FOR THE EXTERNAL SKIN, THEIN USING TGU FOR THE EXTERNAL SKIN, THEIN USING TGU FOR THE EXTERNAL SKIN, THE SECOND SKIN IS ASSUMED TO BE DELETED.SECOND SKIN IS ASSUMED TO BE DELETED.SECOND SKIN IS ASSUMED TO BE DELETED.SECOND SKIN IS ASSUMED TO BE DELETED. THE TEMPERATURE IN THE INTERIOR WILL BETHE TEMPERATURE IN THE INTERIOR WILL BETHE TEMPERATURE IN THE INTERIOR WILL BETHE TEMPERATURE IN THE INTERIOR WILL BETHE TEMPERATURE IN THE INTERIOR WILL BETHE TEMPERATURE IN THE INTERIOR WILL BETHE TEMPERATURE IN THE INTERIOR WILL BETHE TEMPERATURE IN THE INTERIOR WILL BE MAINTAINED AT 21ºC AS REQUIRED IN GOSTsMAINTAINED AT 21ºC AS REQUIRED IN GOSTsMAINTAINED AT 21ºC AS REQUIRED IN GOSTsMAINTAINED AT 21ºC AS REQUIRED IN GOSTs AND SNiPsAND SNiPsAND SNiPsAND SNiPs
  • 28. Presentation on Energy Performance and Requirements PREVIOUS CONCEPTUAL WINTER OPERATIONPREVIOUS CONCEPTUAL WINTER OPERATIONPREVIOUS CONCEPTUAL WINTER OPERATIONPREVIOUS CONCEPTUAL WINTER OPERATION
  • 29. Presentation on Energy Performance and Requirements THE CURRENT ANALYSIS AGREES ON THETHE CURRENT ANALYSIS AGREES ON THETHE CURRENT ANALYSIS AGREES ON THETHE CURRENT ANALYSIS AGREES ON THE WINTER OPERATION PREVIOUSLY PROVIDED INWINTER OPERATION PREVIOUSLY PROVIDED INWINTER OPERATION PREVIOUSLY PROVIDED INWINTER OPERATION PREVIOUSLY PROVIDED IN THE CONCEPT DESIGN.THE CONCEPT DESIGN.THE CONCEPT DESIGN.THE CONCEPT DESIGN. THE LOUVRES DISCHARGING AIR FROM THETHE LOUVRES DISCHARGING AIR FROM THETHE LOUVRES DISCHARGING AIR FROM THETHE LOUVRES DISCHARGING AIR FROM THE OFFICES WILL BE REQUIRED BUT WILL BEOFFICES WILL BE REQUIRED BUT WILL BEOFFICES WILL BE REQUIRED BUT WILL BEOFFICES WILL BE REQUIRED BUT WILL BE ATTACHED TO A DUCT FORCING HOT AIR FROMATTACHED TO A DUCT FORCING HOT AIR FROMATTACHED TO A DUCT FORCING HOT AIR FROMATTACHED TO A DUCT FORCING HOT AIR FROM THE OFFICE TO THE BUFFER ZONE DURINGTHE OFFICE TO THE BUFFER ZONE DURINGTHE OFFICE TO THE BUFFER ZONE DURINGTHE OFFICE TO THE BUFFER ZONE DURING COOL MONTHS. PROVIDING FULL LOUVREDCOOL MONTHS. PROVIDING FULL LOUVREDCOOL MONTHS. PROVIDING FULL LOUVREDCOOL MONTHS. PROVIDING FULL LOUVRED OPENING ON THE SECOND SKIN WILL DEFEATOPENING ON THE SECOND SKIN WILL DEFEATOPENING ON THE SECOND SKIN WILL DEFEATOPENING ON THE SECOND SKIN WILL DEFEAT THE THERMAL PERFORMANCE OF THE SECONDTHE THERMAL PERFORMANCE OF THE SECONDTHE THERMAL PERFORMANCE OF THE SECONDTHE THERMAL PERFORMANCE OF THE SECOND SKIN.SKIN.SKIN.SKIN.