Reza Rahman
Sub Assistance Manager
Training and Development
HRM PRAN
It is a quality
philosophy and
a management
technique.
It is a
methodology for
continuous
improvement
It is a methodology for
creating products
processes that perform
at high standards.
It is a set of
statistical and other
quality tools
arranged in unique
way.
It is a way of
knowing where you
are and where you
could be
History of Six Sigma
Bill Smith
Six Sigma at GE
Jack Welch (former CEO of General
Electric) launched six sigma at GE, in Jan,
1996.
1998-1999 green belt exam certification
became the criteria for management
promotions.
2002-2003 green belt certification become
the criteria for promotion to management
roles.
--- Saved $750 million by the end of 1998
--- Cut invoice defects and disputed by 98 percent, speeding
payment, and creating better productivity.
Definition – Six Sigma
Six Sigma is a disciplined , data-driven methodology
focused on eliminating defects. Defects mean anything
that falls outside of a customer’s Specification . It refers to
3.4 defects per million opportunities.
1.Ensuring all
outputs meet
customer
specification .
2.Understanding
customer needs.
1. Identifying
input, process
and output areas
for improvement.
1. A methodology for defect
definition ,
measurement , analysis,
improvement and
control must be utilized
to standardize
improvement processes
and maximize business
productivity.
Getting 6 Sigma through
eliminating defects
6 sigma process output
= 3.4 Defects per million
opportunities
Process output
(Variation)
Sigma DPMO Yield
1 691,462 30.8538%
2 308,538 69.1462%
3 66,807 93.3193%
4 6,210 99.3790%
5 233 99.976%
6 3.4 99.9997%
DPMO = Defects per million opportunity
Opportunities  Variation / Defects
Common Cause of Variation
Reasons behind
the variations in
a process
Level of Six Sigma Implementation
Overview of Six Sigma
It is a philosophy
1. Anything less than ideal is an
opportunity for improvement
2. Defects costs money
3.Understanding processes and
improving them is the most
efficient way to achieve lasting
result.
It is a Process
1. To achieve this level of
performance you need to :
Define, Measure, Analyze,
Improve and Control
It is Statistics
1. 6 Sigma processes will
produce less than 3.4
defects per million
opportunities.
Benefits of Six Sigma
Which business function needs it
As long as there is a
process that produces
an output, whether it
is a manufactured
product, data, an
invoice, etc…, we can
apply the six sigma
breakthrough
strategy.
What is Lean?
Lean is a structured approach focusing on
simplifying processes by eliminating the tasks
that do not bring value for the end customer.
This approach was mostly derived form the Toyota
Production System in the beginning of the 20th century and
identified as “Lean” only in the 1990s.
Principles of Lean
Specify value
by offering
Integrate the
value stream
Make the
offering flow
At the pull of
the customer
In pursuit of
perfection
Understanding and specify what adds value for the
perspective of the customer.
Identify steps in the whole value stream to
highlight waste.
Create a continuous flow of activities along
The value stream
Only carried out activities in response
t0 pull from the customer
Strive for perfection by continually
Creating value and removing
Successive layers of waste
Unnecessary movements
Of products and materials
Defects
Making more than is
Immediately required
Over Production
WaitingTransport Inventory Motion
Over processing Skills
Unnecessary movements
By People
Waiting for the previous
Step in the process to
complete
Storing parts, pieces,
Documentation ahead
Of requirements
Performing any activities
That is not necessary
Making mistakes that
Cause products to fail
Customer requirements
Not utilizing human
Talent within the
Workforce
Lean Manufacturing Eliminating the waste
Lean Six Sigma definition
Lean
• A structure approach
focusing on simplifying
processes
Six sigma
• A structured
approach focusing on
improving process
reliability in order to
eliminate the defects
in products and
services
Lean six sigma
• A performance
improvement
methodology
focusing on
simplifying
processes and
improving process
reliability.
=+
Simplifying and Perfecting
Lean
Six
Sigma
Lean
Six
Sigma
Business
imperatives
Customer
focused
result
Voice of
The
Customer
Project
Deployment
Simplify (efficient)
Perfect (quality)
Relationship between
Six Sigma and Lean
Approaches of Six Sigma
DMAIC APPROACH
This is organizational based
DMADV APPROCH
This is based on customer needs and
satisfactions
DMAIC APPROACH
It approach undertaken to improve existing business
process
Continue….
1. Define : high-level project goals and the current process.
2. Measure : Key aspects of the current process ad collect relevant data.
3. Analysis : the data to verify cause and effect relationships. Determine
what the relationships are, and attempt to ensure that all factors have
considered.
4. Improve : optimize the process based upon data analysis using
various tools.
5. Control : to ensure that any deviations from target are corrected
before they result in defects.
DMADV APPROACH
This approach is undertaken when there is a need to
create new design or product:
CONTINUE…
Define design goals that are consistent with customer demands and the
Enterprise strategy.
Measure and identify CTQs(characteristics that critical to quality),
Product capabilities, production process capability and risks.
Analysis to develop and design alternatives, create a high-level design and
evaluate design capability to select the best design.
Design details, optimize the design, and plan for design verification . This
phase may require simulations.
Verify the design, set up pilot runs, implement the production process and
hand it over to the process owners.
Lean Six Sigma
DMAIC Methodology
The best way to implement Lean Six Sigma in our
organization is to follow DMAIC methodology :
Why Define?
Define
Without define, we spin our wheels and waste time
and money.
Activities Tools and techniques
1. Identify the vital few
2. Bound the problem
3. Understand customer requirements
4. Prioritize customer requirements
5. Identify project stakeholders
6. Complete project charter.
1. Pareto analysis
2. A process view (SIPOC)
3. KANO model
4. Voice of the customer
5. Affinity diagram
6. Critical to quality path
7. Stakeholders analysis
8. Complete project
charter
Pareto Analysis
•Villferdo Pareto was an Italian engineer,
sociologist, economist and philosopher.
•Observed that 80% of the land in ITALY was owned
by 20% of the population.
1858-1923
Focus on the vital few
The vital few
The Trivial Many
Pareto Chart
0
5
10
15
20
25
30
35
40
45
ByCategory
Cause factors
Pareto Analysis
Bullying 9
Dress code 10
Not enough breaks 8
Number of tests 42
Online harassment 22
Scholl bus crowded 8
School bus 30
School start time 14
Things to work on
A Process View
A SIPOC diagram is a tool used by a team to identify all relevant elements of a
process improvement project before work begins.
Everything is a process.
The quality of a product or service is directly related to the quality
of the project .
As change agents, we must address the process as a whole in order
to deliver real change.
We start with SIOP - a higher level view of the process.
Suppliers Inputs Process Outputs Customers
SIPOC Diagram
Looking
for new
customer
Find
customer
needs
Identify
critical
needs
Develop
prototype
Test prototype
& go to
Production
Suppliers Inputs Process Outputs Customers Requirements
•Row materials
•Sources
•Manufacturers
•Suppliers
•Manpower
•Resources
•Equipment
•Product
•Timely delivery
•Increased
quality
•Young people
•Students
•Service
holders
•Customer
satisfaction
•Expected quality
•Reduced backlog
Understanding
Customers Need
KANO model for analyzing customer
needs and product requirements
because
1. We need to satisfy the customer and
2. Not all needs are equal
Developed by Noriaki Kano and
team in 1984 to :
-Categorize and prioritize customer
needs
-Guide product development
- enhance customer satisfaction
KANO Model
Delighted
Done
Very
Well
Disgusted
Done
poorly
Basic needs
“Must be”
Performance needs
Stated, more is better
Attractive needs
(delighters)
Unspoken , not
expected
Include these in your
product
requirements.
No choice
Choose the right set
at the right level to
ensure an attractive
competitive product.
Pick 1-2 for customer
delight and
competitive
differentiation
Voice Of Customer
The voice of the customer is a Six Sigma strategy used to capture
requirements and feedback from the customer and to meet their
requirements.
There are two approaches we gather Voice of Customer
Reactive Approach
• Looks at historical data to
determine issues, unmet
needs, problems and interests
of former customers.
oCustomer complaints
oCustomer service calls
oProduct return information
oWarranty claims
oWeb page activity
Proactive Approach
•Verify conclusions of reactive
research.
•Determine interests and
unmet needs of future
customers
oSurveys
oInterviews
oMarket research
oBenchmarking
oObserve customer
VOC Technique
Listen
LISTEN
To
Customer
Survey
Interview
Focus
Groups
OBSERVE
Customer
Behavior
Focus Groups
Go & See
Ethnography
Studies
Observe
Affinity Diagram
An affinity diagram is an analytical tool used to
organize many ideas into subgroups with common
themes or common relationships. This method was
developed by a noted Japanese anthropologist in the
1950s called Jiro Kawakita.
Step 1
First, write down the
problem. Then quietly
put ideas, data, etc. on
cards. This is not like a
typical brainstorming
session where people are
very vocal about their
ideas.
Affinity Diagram
Step 2
Quietly put into
homogeneous groupings
Step 3
Develop affinity heading
cards. For example, there
is a homogeneous
grouping for human
resources related items.
Step 4
Put the groupings into
the order of the process.
For example , employees
get hired, they first start
off with human
resources
Critical to quality
A Critical to quality is a specific measurable characteristic of a
product or service that fulfils the expressed requirement of the
customer. CTQ performance must exceed specifications to satisfy the
customer.
Taste
Rich 1.1<TDS>1.3
Not acidic Extractions> 18%
Not bitter Extractions<22%
Customer wants
"Good Coffee
Temperature
Optimum Drinking
Temperature
>140 *F
<176*F
Cost
Price tk.120
We need to Translate VOC to CTQs
Hard to Measure
Need
Drivers Easy to
Measure
Specific
ation
CTQ
Why Stakeholder Analysis?
Stakeholders : anyone impacted by our project.
Stakeholders can be inside and outside the
organization .
•Provide resources
•Give advice
•‘Lobby’ for your cause
•Break down barriers
•Accelerate and improve results.
•Withhold resources.
•Withhold expertise
•Create barriers
•Delay and sabotage
•Convince others to withhold
support
For
Against
Stakeholders Analysis
Stakeholders analysis is a critical because it influences: resources , solutions
and ultimately project success.
Project Charter
In the Define phases of DMAIC we need to have all the team
members are agreed to the project and the approval and sponsor
from the top management.
We do put all the
details of the project
and planning for the
project in the
project charter
which shows the
overall activities at a
glance.
Project Charter is a good executive communication tool
Measure
The goal of the measure phase of a Six Sigma DMAIC project is to get
as much information as possible on the current process so as to fully
Understand both how it works and how well it works. This entails three
key tasks: creating a detailed process map , gathering baseline data and
summarizing and analyzing the date .
Activities
1. Ensure good measurement
system
2. Measure current performance
3. Map the process and identify
all variables that can affect
performance .
4. Prioritize process inputs .
5. Basic statistics.
6. Determine current process
capability.
Tools and techniques
1. Process map
2. Value stream map
3. Defect per million
opportunity
4. Interrelation diagram
5. Activity network diagram
6. Matrix diagram
7. Tree diagram
8. DPU, DPMO,PPM and RYT.
Process Mapping
What is process mapping ?
Graphical illustration of the work process.
What does process map does ?
1. Listing activities in sequential order.
2. Assigning activities to people in the company.
What are benefits of process mapping?
Identify major tasks
Identify sequence of tasks
Identify accountability of task
Identify process inputs that affect process
output
SIPOC
Flow
chart
Process
map
How inputs turn outputs
Listing activities in sequential order
Allows us to see whether value is being added to the process
Example Manufacturing company that does furniture
Fabrication Assembly
Quality
Assurance
Raw
materials
pieces of
Furniture
Assembled
Furniture
Quality assured
assembled Furniture
Inputs
Outputs
Process Mapping
Assigning activities to people in the company
It is better to give people responsibilities for their work that’s how we
can find out the who is responsible for what
Fabrication
Assembly
Quality
Assurance
Raw
materials
pieces of
Furniture
Assembled
Furniture
Quality assured
assembled Furniture
Start
End
Fabrication
Team
Assembly
Team
Quality
Team
Value Stream Mapping
Value stream map is
1. Directed extension of a process map
2. Contains enough information to determine value and
waste.
Fabrication Assembly
Quality
Assurance
Fabrication
Cutting Drilling Sanding
Raw
Materials
Pieces of
Furniture
Raw
Materials
Cutting
Team
Drill
Team
Sanding
Team
Rough Pieces
Drilled Rough Pieces
Pieces of
Furniture
Cycle time and Lead time
Through Value Stream Mapping we get to know
1. How long does it take the responsible person to complete the activity is know as cycle time
2. How long for the responsible person starts the activity this is known as lead time or wait time
Lead time : total amount of
time between the previous
activity finishing and current
activity starting
Cycle time : total
amount of time current
Activity takes .
Cutting
Drilling
Sanding
Raw
Materials
Rough Pieces
Drilled Rough Pieces
Pieces of
Furniture
Start
End
Cutting
Team
Drill
Team
Sanding
Team
30 mint
30 mint
30 mint
180 mint
15 mint
Scaling Defects
Defects per Units (DPU), Defects per Opportunity(DPO) and
Defects per million Opportunity(DPMO) are metrics that express
how our products or process is performing , based on the number
of defects. Choosing the appropriate quality metric helps us
address performance against customer expectations..
Defects per Units(DPU) : Defects per unit(DPU) is the number of
defects in a sample divided by the number of units samples.
Defects per Opportunity (DPO) : Defects per opportunity is the
number of defects in a sample divided by the total number of
defect opportunity.
Defects per million Opportunity (DPMO) : Defects per million
opportunities is the number of defects in a sample divided by the
total number of defect opportunities multiplied by 1 million.
Defects Per Unit
How to calculate defects per Units
For example:
We are producing mango juice for customers. Lets say , each order is considered a unit.
Fifty orders are randomly selected and inspected and the following defects are found.
1. Two orders are incomplete.
2. One order is both damaged ad incorrect.
3. Three orders have wrong way labeled.
So , we get like , six of the orders have problems and there are a total of 7 defects our of
the 50 order sample.
Therefore ,
DPU= Number of Defects in a sample 7
Number of Units 50
= 0.14
Each unit of production on average contains this number of
defects.
Defects per Opportunity
How to calculate Defects per Opportunity
For example
For each number of mango juice there could have four defects – Damage,
incorrect, incomplete and wrong way labeled. Therefore , each order has
four opportunity . Fifty orders are randomly selected and inspected ad the
following are found .
1. Two orders are incomplete.
2. One order is both damaged ad incorrect.
3. Three orders have wrong way labeled.
Six of the orders have problems, and therefore there are a total of 7 defects out of
the 200 opportunities(50*4). Therefore
DPO = Total number of Defects 7
Total number of opportunities 200
= 0.035
Defects Per Million Opportunities
How to calculate Defects per Million Opportunity
For example
For each number of mango juice there could have four defects – Damage,
incorrect, incomplete and wrong way labeled. Therefore , each order has
four opportunity . Fifty orders are randomly selected and inspected ad the
following are found .
1. Two orders are incomplete.
2. One order is both damaged ad incorrect.
3. Three orders have wrong way labeled.
Six of the orders have problems, and therefore there are a total of 7 defects out of
the 200 opportunities(50*4). Therefore
DPMO= Total number of Defects 7
Total number of opportunities 200
= 35,000* 1 Million
For every 1 million production we will have 35,000 defects
Rolled Throughput Yield
Rolled throughput yield is the probability that a single unit can pass through
a series of process steps free of defects.
It is a traditional practice for organization to judge the effectiveness of their
processes by calculating rate at the end of the process .
For example : if 100 items and of those 100 items 99% pass inspection that
does not mean it is at a level of Six Sigma . Lets have a look at the processes
Step 1 Step 2 Step 3 Step 4 Step 5
Yield 97% Yield 82% Yield 91% Yield 82% Yield 99%
Now we have stage 5 has got 99% but this is not the real case , the rolled
throughput yield is not an average of the yields of steps 1 through
5.instead, to get the actual yield, we multiply all of the yields together.
0.97 * 0.82 * 0.91 * 0.82 * 0.99 = 0.57 * 100 = 57% RTY
How It Breaks Down
Step 1 : 97% yield. That means that 97 of the 100 move to step 2
Step 2 : of those 97, only 79 (82%) go to step 3
Step 3 : of those 79, only 71 (91%) go on to step 4
Step 4 : of those 71, only 58 (82%) go to step 5
Step 5 : of those 58, only 57 (99%) go to the shipping department .
The worker in the shipping department, who is not aware of the failures
upstream, is likely to report that the process is producing at 99% effectiveness;
when in reality, the rolled throughput yield is only 57% and as such
opportunities are missed.
0.97 * 0.82 * 0.91 * 0.82 * 0.99 = 0.57 * 100 = 57% RTY
Activity Network Diagram
An activity network diagram is a diagram of project activities that shows
the sequential relationships of activities using arrows and nodes.
Suppose the team is tasked with improving
the process of building a house . The team
lists the major steps involved- everything
from the excavation step through the
landscaping step
Now :
Define Activities
Excavate , Frame, Roof,
Exterior Interior,
Electricity Masonry
Landscape, Foundation
Sequence Activities
A. Excavate
B. Foundation
C. Frame
D. Electrical
E. Roof
F. Masonry
G. Interior
H. Exterior
I. Landscape
Estimate Activity
Duration
A. Excavate 5 days
B. Foundation 2 days
C. Frame 12 days
D. Electrical 9 days
E. Roof 5 days
F. Masonry 8 days
G. Interior 10 days
H. Exterior 7 days
I. Landscape 5 days
Estimate Activity
resources
1. What kind of effort
are we thinking
about
2. How man people do
we think we need
3. What skills level are
you looking for.
We can develop a Gantt Chat to develop schedule for
the project management where everyone will have
the visibility of total work progress.
The schedule pulls all of the
information together to measure the
expected project end date.
Interrelationship Diagram
An interrelationship diagram shows graphically the cause-and-effect
relationships that exist among a group of items , issues, problems or
opportunities .
A local physicians
group is
experiencing a
relatively high
number of patient
complaints regard
the lack of returned
phone calls .
“overly optimistic promise dates” for follow-up calls” is a key issue and would cause patient
to expect a phone call faster that the group believes it can deliver it.
Example of Interrelationship Diagram
The basic idea is to count the number of “in” and “out” arrows to and from a
particular issue and to use these counts to assist us in prioritizing the issues.
What factors contribute to student success?
Analyzing
In the analyze phase, data collected during the measure phase is reviewed.
Both the data and the process are analyzed , in a n effort to narrow down and
verify the root causes of waste and defects.
Activities
1. Define performance objectives
2. Identify value/non-value added
process steps
3. Identify source of variation
4. Determine root causes
5. Identify significant process
inputs.
Tools and techniques
1. Histogram
2. Root cause analysis (fishbone
diagram )
3. 5 whys
4. 5w’s and H method
5. Regression analysis
6. Hypothesis analysis
7. Run chart
8. ANOVA analysis
9. Fault tree diagram
Root Cause Analysis
Root cause analysis is a useful process for understanding and solving a problem,. Figure
out what negative events are occurring. Then, look at the complex systems around those
problems, and identify key points of failure. Finally, determine solution to address
those key points, or root causes.
Cause and Effect Diagram
A cause effect diagram is a graphical tool for displaying a list of
causes associated with a specific effect. It is also known as a
fishbone diagram or an Ishikawa diagram(created by Dr. Kaoru
Ishikawa, an influential quality management innovator).
Man Machine Material
Method Measurement
Mother
Nature
Causes Effect
Causes are usually grouped into major categories to identify these
sources of variation. The categories typically include:
1. Man 2. Machine 3. Material
4. Method 5. Measurement 6. Mother Nature
Fishbone Diagram
From the example we can
see that ,
There are many reasons
for missing the bus we did
the fishbone analysis to
find out the possible
reasons behind the effects
and we know the causes of
missing bus.
This is how we can find
out the reasons behind the
effects.
Fishbone Analysis
13.20%
Productivity
loss in
manufacturing
Method
Machine
Man
Operators
are not
following
work
instruction
Shortage of
Raw
material
Worn-out
parts of
capping
machine
Inaccurate
visual
detection of
vision
camera
sensor
Example
Pareto Chart Analysis
0%
20%
40%
60%
80%
100%
120%
0
200
400
600
800
1000
1200
1400
Amount
Cumulative Pct
Series2
Expense Amount Cumulativ
e pct
Rent 1200 47%
Car Payment 500 66%
Groceries 400 82%
Gas 300 93%
Mobile Phone 100 97%
Cable 70 100%
We are already know the history of Pareto chart. It helps to find
out the 20% factors that cause 80% problems. Through the Pareto
chart we can focus on that 20% factors and can improve the
process.
5 Whys Analysis
To solve a problem effectively , we need to drill down to identify
the underline cause so Sakichi Toyoda 5 why’s techniques is the
simple but very powerful tool for quickly uncovering the root of
a problem.
Sakichi Toyoda, one of the fathers of the Japanese
industrial revolution, developed the technique in
the 1930s. He was an industrialist, inventor and
founder of Toyota Industries. His technique
became popular in the 1970s and Toyota still
uses it to solve problems today.
Sakichi Toyoda
5 Why’s Example
To use it we start with the problem we are facing then keep
asking why until we discover the root cause .
Why ?
Forget to
replace
them
5WH Analysis
5WH Analysis is a problem definition technique which works by asking 6
questions about a defect or any other problem.
What : create adequate precise description.
Who : individuals associated with the problem?
When : at what moment, frequency?
Where : locations of the problem ?
Why : already known explanations contributing to the problem?
How : mode, situation , procedure of the problem?
What
Concept
Who
People
When
Situation
Where
Business
Practice
How
Method
Why
Objectives
Problem Statement
Improve Phase
The goal of the DMAIC improve Phase is to indentify a solution
to the problem that the project aims to address. In this phase we
will be trying to look for solution of the problem that was
identified in the analysis phase.
Activities
1. Consolidate our analysis.
2. Generate solutions
3. Create an implementation plan.
4. Implement the solutions.
Tools and Techniques
1. Brainstorming
2. Kaizen
3. 5s
4. Mistake proving Poke Yoke
5. Failure mood and effects
analysis (FEME).
Brainstorming
Brainstorming is group creativity technique by which
efforts are made to find a conclusion for a specific
problem by gathering a list of ideas spontaneously
contributed by its members.
Effective Brainstorming includes
Collect as many ideas as possible.
All ideas are welcome no matter how silly it is.
No Discussion during Brainstorming
Do not criticize or judge . Do not even groan, frown , or laugh
Do “Piggyback” or build on other ideas.
Go for quantity over quality- the ore creative ideas the better.
5S Improvement System
5s is the name of a workplace organization method that uses a list of
five Japanese words: seiri, seiton, seiso, seiketsu, and shitsuke.
Better visual management
Improved safety
Improved quality
Improved Productivity
Boosted Morale
Improved Company Image
5S Explanation
It is a system to reduce waste and optimize productivity through maintaining
an orderly workplace and using visual cues to achieve more consistent
operational results.
Sort Straighten Shine Standardize Sustain
Eliminate
Unnecess
ary
Items
from the
workplace
Arrange
items so
that they
are easy
to use,
find and
put away
Keep the
items and
work area
neat and
clean
Create a
consistent
approach
to tasks
and
procedures
Make a
habit of
maintainin
g the
correct
procedures
Kaizen (Continuous Improvement)
Kaizen is a Japanese philosophy that focuses on continual improvement
throughout all aspects of life. Kaizen aims to eliminate waste in all systems
of an organization through improving standardized activities and
processes.
The continuous cycle of Kaizen activities has seven phases
1. Identify an opportunity
2. Analyze the process
3. Develop an optimal
solution
4. Implement the solution
5. Study the results
6. Standardize the solution
7. Plan for the future
Kaizen Process
14 Rules of Kaizen
1. Keep an open mind to change
2. Maintain a positive attitude
3. Create a blameless environment
4. Encourage non judgmental thinking.
5. Be aware of multiple alternatives
6. Treat other as you would want to be treated.
7. Respect and involve all team members
8. one person, one vote.
9. Create a team environment
10.No such thing as a dumb question
11. Create a bias for action
12. Creativity before capital .
13. Never leave in silent agreement
14. Have fun doing it
Kaizen Example
Before Kaizen
After Kaizen
One office that processes expense reports for a company held a
day-long Kaizen event to analyze and improve the cycle time.
The analysis showed hat expense reports spent most of their tie in
“queue” just waiting for someone to sigh them . Then we apply
Kaizen .
Zero Defect Policy
The goal is to understand like concept and practice of zero
defects and how to develop Poke – Yoke to eliminate these
defects .
Typically defect rates are tracked by
1. The point at which defect is discovered
2. The point at which defect occurred.
Attitude toward defects should be
1. I do not accept defects
2. I do not make defects
3. I do not pass on defects.
Poka-yoke Technique
Poke-yoke is a technique for avoiding simple human error in the
workplace. It is also know as mistake-proofing and fail-safe work
methods. Poka-yoke helps preventing errors obviously improves
quality, but it also plays a major role in improving productivity with
no rework, and easier production, cycle times and lead times both
become much shorter. And, of course, faster production with fewer
defects means lower cost.
Potential Benefits for using Poka-yoke
1. Elimination of set-up errors and improved quality.
2. Simplified and improved housekeeping
3. Increased safety.
4. Lower costs
5. Lower skill requirements
6. Increased production flexibility .
7. Improved operator attitudes .
Example of Poka-yoke
Failure Modes and Effects Analysis
Goals :
1. Reduce risk of failure
2. Ensure failures are detectible
3. Prevent failure from happing
Failure Mode and Effects Analysis (FMEA) is a structured approach
to discovering potential failures that may exist within the design of
a product or process. Failure Mode and Effects Analysis is designed
to identify, prioritize and limit these failure modes.
Why?
Keep track of potential failure and
countermeasures to reduce the risk
Failure Mood and Effect Analysis Process
Identify modes of failure (Example car will not stop).
Identify consequences and related systems for each mode.
Rate the severity of each effect.
Identify potential root causes for each failure mode.
Rate the probability of occurrence of each root cause.
Identify process controls and indicators.
Rate detectability of each mode.
Calculate risk priority and criticality .
Design to mitigate high risk or highly critical failure and reassess to ensure
goals have been achieved.
p
r
o
c
e
s
s
Example of FMEA
Mode of
Failure
Cause Effects Frequency Severity Detection RPN
Card
Printed
incorrectly
Incorrect
informatio
n provided
Card must
be reissued
3 8 5 120
Informatio
n
incorrectly
entered in
database
Card must
be reissued
5 8 5 200
A professional association is concerned about he process it uses to issue
membership cards. They decide to conduct an FMEA of the process and
part of the FMEA is given below.
The frequency shows how likely this cause is to occur.
The severity value shows how significant the impact is.
The detection value measures how likely this mistake is to be detected.
The Risk
Priority
Number(R
PN)
indicates
which one
should be
given
priority for
action.
Control Phase
The control phase is the final phase of
lean six sigma. The team focuses on how
to sustain newly achieved improvements
by passing it onto other employees .
Activities Tools and techniques
•process control plan
•Monitoring and response plan
•Documentation and story board.
•Integrate and manage solutions in
daily work processes
•Integrate lessons learned
•Control chart
•Standard operating procedures
•Visual process control
•Total productive management
•Lean accounting
Standard Operating procedures
A standard operating procedure is a set of writing instructions that
document a routine activity that is to be followed by member of an
organization .standard operating procedures are essential parts of good
quality systems .
For example :
SOPs for
washing Hands
Inadequate SOP
1. Wet hand and forearms.
2. Thoroughly apply the soap
3. Lather the hands and forearms
4. Continue to lather and scrub
5. thoroughly rinse forearms and hands
6. Dry hands and forearms thoroughly
Better SOPs
1. Wet hands and forearms whit warm, running water (temperature should be 100
F)
2. Thoroughly apply the soap from the forearms to the hands
3. Lather the hands and forearms. Be sure to get soap under fingernails and between
fingers.
4. Continue to lather and scrub for at lease 10 seconds.
5. Thoroughly rinse forearms and hands with clean water. No remaining soap
should be visible on the forearms, hands or under nails .
6. Dry hands and forearms thoroughly with single-use paper towels
7. Use the paper towel to turn off the water and use the same paper towel to open
the door as you exits the restroom
This SOP provides more specification.
What is Run Chart
A run chart is used to monitor the behavior of a variable over time for a
process or system. Run charts graphically display cycles, trends, shifts, or
non-random patterns in behavior over time.
Date
What does a run chart do?
•Monitor processes
•Compare
•Focus attention
•Track information
Run charts can help identify problems and the time when a problem occurred, or
monitor progress when solutions are implemented.
Run Chart Example
Run Chart Example
Trend
Shift >= 6
Astronomical
Background of Control Chart
Control charts, also know as Shewhart Chart or process-behavior
charts , in statistical process control are tools used to determine if a
manufacturing or business process is in a state of statistical control
Walter A, Shewhatt
Walter Andrew Shewhart (1891-1967) was an Americal Physicist,
engineer and statistician, sometimes known as the father of
statistical quality control and also related to the Shewhart cycle.
Control chart
A control chart represents a picture of a process over time. To effectively use
control chart, we must be able to interpret the picture. Through the control
chart we will be able to find out whether our process is stable or out of
control.
Three characteristics of a process
that is in control are :
1. Most points are near the
average
2. A few points are near the
control limits
3. No points are beyond the
control limits
Control Chart interpret
Points beyond the control limits
A special cause is present in the process if
any points fall above the upper control
limit or below the lower control limit.
Settings the zone
The first steps is divide the control chart
into zones. this is done by dividing the
area between the average and the upper
control limit into three equally spaced
areas. This is then repeated for the area
between the average and the lower
control limit.
Continue
Setting the zone A
A special cause exists if two out of
three consecutive points fall in zone a
or beyond. The test is applied for the
zone a above the average and then for
the zone a below the average.
Setting the zone B
A special cause exist if four out five
consecutive points fall in zone B or beyond.
Setting the zone C
A special cause exists if seven consecutive
points fall in zone c or beyond.
Stratification test
Stratification (a special cause)
exists if fifteen or more
consecutive points fall in zone
C either above or below the
average. The points tend to hug
the centerline.
Test for Mixtures
A mixture (a special cause ) is present if
eight or more consecutive points lie on both
sides of the average with none of the points
in zone c.
Rule of Seven Test
The following test state that an out of control situation is present if
one of the following conditions is true.
1. Seven points in a
row above the
average
2. Seven points in a
row below the
average
3. Seven points in a
row trending up or
4. Seven points in a
row trending
down.
Common Cause and Special Cause
By interpreting the control chart we will be able to find out the
problem in the work process and able to look for the solution.
Summary of Control Chart
Common cause Variation
Special Cause
Variation
Upper control
Limit
Lower control
Limit
Average /
Mean
Total Quality Management
TQM is a comprehensive and structured approach to organizational
management that seeks to improve the quality of products and
service through refinements in response to continuous feedback.
Planning
and
organiza
tion
Team
work and
involvem
ent
Working
Together
Training,
tools and
techniqu
es
Measuri
ng and
feedback
Top
Manage
ment
support
TQM
Approach
TQM can be a powerful
technique for
unleashing employee
creativity and potential,
reducing bureaucracy
and costs, and
improving service to
clients and the
community.
Total Productive Maintenance
It is a company wide, team based effort to improve output
quality through equipment care and to improve overall
equipment effectiveness.
Total : All employees are involved
and it aims to eliminate all
accidents , defects and
breakdown.
Productive : actions
performed during production
and troubles for productions are
minimized .
Maintenance : keep in good condition and improve overall
equipment effectiveness.
Total Productive Maintenance
Goal
 Maximize overall equipment effectiveness (OEE) by
minimizing equipment related losses.
 Provide a system of comprehensive maintenance for
the life cycle of equipment.
 Involve departments that plan , design use, and
maintain the equipment
 TPM is proactive
1. preventive Maintenance
2. predictive Maintenance
House of Quality
(Quality Function Deployment)
The house of quality is the first matrix in four-phase Quality Function
Deployment(QFD) process. It is called the house of quality because if the
correlation matrix that is roof shaped and sits on top of the main body of
the matrix
Benefits of House of quality
1. Service offerings are built and
prioritized on objective
customer needs and
requirements
2. Increased customer
satisfactions and loyalty
3. Increased customer
utilization , sales and share of
wallet
Quality Function Deployment
Example
How to use
Step 1. determine
customer
requirements.
Step 5.
Complete the house
of quality with the
conflicts and
synergies matrix.
Step 4. complete the
correlation matrix.
Step 3. prioritize
customer requirements
using the following
point scale : high/strong,
medium/moderate and
low / weak .
Step 2. determine
the fictional
requirements.
A local bank is interested in improving the training
of its teller then we get data from critical-to-quality
tree and establish House of quality
Lean Accounting
Lean accounting is the general terms used for the change required
to a company’s accounting, control, measurement, and
management processes to support lean manufacturing and lean
thinking.
Lean accounting attempts
to provide opportunities
to correctly capture the
value of improvements
resulting from lean
activities and projects.
Summary
Six sigma

Mais conteúdo relacionado

Mais procurados

Process auditing as per VDA 6.3
Process auditing as per VDA 6.3Process auditing as per VDA 6.3
Process auditing as per VDA 6.3
Kiran Walimbe
 
Spc lecture presentation (bonnie corrror)
Spc lecture presentation (bonnie corrror)Spc lecture presentation (bonnie corrror)
Spc lecture presentation (bonnie corrror)
Jitesh Gaurav
 
CAPA - Corrective and Preventive Action Management Training
CAPA - Corrective and Preventive Action Management TrainingCAPA - Corrective and Preventive Action Management Training
CAPA - Corrective and Preventive Action Management Training
Tonex
 
Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate template
Steven Bonacorsi
 

Mais procurados (20)

Six sigma
Six sigmaSix sigma
Six sigma
 
Process auditing as per VDA 6.3
Process auditing as per VDA 6.3Process auditing as per VDA 6.3
Process auditing as per VDA 6.3
 
Spc lecture presentation (bonnie corrror)
Spc lecture presentation (bonnie corrror)Spc lecture presentation (bonnie corrror)
Spc lecture presentation (bonnie corrror)
 
APQP
APQP APQP
APQP
 
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
 
Design For Six Sigma
Design For Six SigmaDesign For Six Sigma
Design For Six Sigma
 
Lean six sigma tools and techniques
Lean six sigma tools and techniquesLean six sigma tools and techniques
Lean six sigma tools and techniques
 
CAPA - Corrective and Preventive Action Management Training
CAPA - Corrective and Preventive Action Management TrainingCAPA - Corrective and Preventive Action Management Training
CAPA - Corrective and Preventive Action Management Training
 
7 qc tools
7 qc tools7 qc tools
7 qc tools
 
Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate template
 
Error-Proofing in Office & Service Environments
Error-Proofing in Office & Service Environments Error-Proofing in Office & Service Environments
Error-Proofing in Office & Service Environments
 
7 qc toolsTraining pdf
7 qc toolsTraining pdf7 qc toolsTraining pdf
7 qc toolsTraining pdf
 
Basic understanding of lean six sigma approach for improvement
Basic understanding of lean six sigma approach for improvementBasic understanding of lean six sigma approach for improvement
Basic understanding of lean six sigma approach for improvement
 
Lean Six Sigma - Introduction
Lean Six Sigma - IntroductionLean Six Sigma - Introduction
Lean Six Sigma - Introduction
 
PPAP
PPAPPPAP
PPAP
 
Lean Six Sigma White Belt Webinar
Lean Six Sigma White Belt WebinarLean Six Sigma White Belt Webinar
Lean Six Sigma White Belt Webinar
 
Design & Process FMEA Manual
Design & Process FMEA ManualDesign & Process FMEA Manual
Design & Process FMEA Manual
 
Lean Thinking by Operational Excellence Consulting
Lean Thinking by Operational Excellence ConsultingLean Thinking by Operational Excellence Consulting
Lean Thinking by Operational Excellence Consulting
 
Spc training
Spc trainingSpc training
Spc training
 
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
 

Semelhante a Six sigma

Leading the way in six sigma
Leading the way in six sigmaLeading the way in six sigma
Leading the way in six sigma
Invensis Learning
 

Semelhante a Six sigma (20)

Lean Six Sigma- Internal Training Slides-2.pptx
Lean Six Sigma- Internal Training Slides-2.pptxLean Six Sigma- Internal Training Slides-2.pptx
Lean Six Sigma- Internal Training Slides-2.pptx
 
OM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhh
OM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhhOM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhh
OM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhh
 
6 sigma basic best ppt
6 sigma basic best ppt6 sigma basic best ppt
6 sigma basic best ppt
 
Learning Six Sigma
Learning Six SigmaLearning Six Sigma
Learning Six Sigma
 
Six sigma control in total quality management copy
Six sigma control in total quality management   copySix sigma control in total quality management   copy
Six sigma control in total quality management copy
 
Integrated Logistics Management
Integrated Logistics ManagementIntegrated Logistics Management
Integrated Logistics Management
 
6 Sigma and Kaizen.pptx
6 Sigma and Kaizen.pptx6 Sigma and Kaizen.pptx
6 Sigma and Kaizen.pptx
 
sixsigma-
sixsigma-sixsigma-
sixsigma-
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Six sigma vs kaizen
Six sigma vs kaizenSix sigma vs kaizen
Six sigma vs kaizen
 
Six Sigma Vs Kaizen
Six Sigma Vs KaizenSix Sigma Vs Kaizen
Six Sigma Vs Kaizen
 
Six sigma QMS
Six sigma QMS Six sigma QMS
Six sigma QMS
 
Six Sigma - The Journey of Quality and Management
Six Sigma - The Journey of Quality and Management Six Sigma - The Journey of Quality and Management
Six Sigma - The Journey of Quality and Management
 
Six Sigma .pdf
Six Sigma .pdfSix Sigma .pdf
Six Sigma .pdf
 
Leading the way in six sigma
Leading the way in six sigmaLeading the way in six sigma
Leading the way in six sigma
 
Six Sigma
Six Sigma Six Sigma
Six Sigma
 
Lean 6 sigma
Lean 6 sigmaLean 6 sigma
Lean 6 sigma
 
TQM - Six sigma - FINAL YEAR ECE - SRI SAIRAM INSTITUTE OF TECHNOLOGY, CHENNA...
TQM - Six sigma - FINAL YEAR ECE - SRI SAIRAM INSTITUTE OF TECHNOLOGY, CHENNA...TQM - Six sigma - FINAL YEAR ECE - SRI SAIRAM INSTITUTE OF TECHNOLOGY, CHENNA...
TQM - Six sigma - FINAL YEAR ECE - SRI SAIRAM INSTITUTE OF TECHNOLOGY, CHENNA...
 
Six sigma
Six sigmaSix sigma
Six sigma
 
SIX SIGMA AND INVENTORY CONTROL.pptx
SIX SIGMA AND INVENTORY CONTROL.pptxSIX SIGMA AND INVENTORY CONTROL.pptx
SIX SIGMA AND INVENTORY CONTROL.pptx
 

Último

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Victor Rentea
 

Último (20)

Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 

Six sigma

  • 1. Reza Rahman Sub Assistance Manager Training and Development HRM PRAN
  • 2. It is a quality philosophy and a management technique. It is a methodology for continuous improvement It is a methodology for creating products processes that perform at high standards. It is a set of statistical and other quality tools arranged in unique way. It is a way of knowing where you are and where you could be
  • 3. History of Six Sigma Bill Smith
  • 4. Six Sigma at GE Jack Welch (former CEO of General Electric) launched six sigma at GE, in Jan, 1996. 1998-1999 green belt exam certification became the criteria for management promotions. 2002-2003 green belt certification become the criteria for promotion to management roles. --- Saved $750 million by the end of 1998 --- Cut invoice defects and disputed by 98 percent, speeding payment, and creating better productivity.
  • 5. Definition – Six Sigma Six Sigma is a disciplined , data-driven methodology focused on eliminating defects. Defects mean anything that falls outside of a customer’s Specification . It refers to 3.4 defects per million opportunities.
  • 6. 1.Ensuring all outputs meet customer specification . 2.Understanding customer needs. 1. Identifying input, process and output areas for improvement. 1. A methodology for defect definition , measurement , analysis, improvement and control must be utilized to standardize improvement processes and maximize business productivity.
  • 7. Getting 6 Sigma through eliminating defects 6 sigma process output = 3.4 Defects per million opportunities Process output (Variation) Sigma DPMO Yield 1 691,462 30.8538% 2 308,538 69.1462% 3 66,807 93.3193% 4 6,210 99.3790% 5 233 99.976% 6 3.4 99.9997% DPMO = Defects per million opportunity Opportunities  Variation / Defects
  • 8. Common Cause of Variation Reasons behind the variations in a process
  • 9. Level of Six Sigma Implementation
  • 10. Overview of Six Sigma It is a philosophy 1. Anything less than ideal is an opportunity for improvement 2. Defects costs money 3.Understanding processes and improving them is the most efficient way to achieve lasting result. It is a Process 1. To achieve this level of performance you need to : Define, Measure, Analyze, Improve and Control It is Statistics 1. 6 Sigma processes will produce less than 3.4 defects per million opportunities.
  • 12. Which business function needs it As long as there is a process that produces an output, whether it is a manufactured product, data, an invoice, etc…, we can apply the six sigma breakthrough strategy.
  • 13. What is Lean? Lean is a structured approach focusing on simplifying processes by eliminating the tasks that do not bring value for the end customer. This approach was mostly derived form the Toyota Production System in the beginning of the 20th century and identified as “Lean” only in the 1990s.
  • 14. Principles of Lean Specify value by offering Integrate the value stream Make the offering flow At the pull of the customer In pursuit of perfection Understanding and specify what adds value for the perspective of the customer. Identify steps in the whole value stream to highlight waste. Create a continuous flow of activities along The value stream Only carried out activities in response t0 pull from the customer Strive for perfection by continually Creating value and removing Successive layers of waste
  • 15. Unnecessary movements Of products and materials Defects Making more than is Immediately required Over Production WaitingTransport Inventory Motion Over processing Skills Unnecessary movements By People Waiting for the previous Step in the process to complete Storing parts, pieces, Documentation ahead Of requirements Performing any activities That is not necessary Making mistakes that Cause products to fail Customer requirements Not utilizing human Talent within the Workforce Lean Manufacturing Eliminating the waste
  • 16. Lean Six Sigma definition Lean • A structure approach focusing on simplifying processes Six sigma • A structured approach focusing on improving process reliability in order to eliminate the defects in products and services Lean six sigma • A performance improvement methodology focusing on simplifying processes and improving process reliability. =+
  • 19. Approaches of Six Sigma DMAIC APPROACH This is organizational based DMADV APPROCH This is based on customer needs and satisfactions
  • 20. DMAIC APPROACH It approach undertaken to improve existing business process
  • 21. Continue…. 1. Define : high-level project goals and the current process. 2. Measure : Key aspects of the current process ad collect relevant data. 3. Analysis : the data to verify cause and effect relationships. Determine what the relationships are, and attempt to ensure that all factors have considered. 4. Improve : optimize the process based upon data analysis using various tools. 5. Control : to ensure that any deviations from target are corrected before they result in defects.
  • 22. DMADV APPROACH This approach is undertaken when there is a need to create new design or product:
  • 23. CONTINUE… Define design goals that are consistent with customer demands and the Enterprise strategy. Measure and identify CTQs(characteristics that critical to quality), Product capabilities, production process capability and risks. Analysis to develop and design alternatives, create a high-level design and evaluate design capability to select the best design. Design details, optimize the design, and plan for design verification . This phase may require simulations. Verify the design, set up pilot runs, implement the production process and hand it over to the process owners.
  • 24. Lean Six Sigma DMAIC Methodology The best way to implement Lean Six Sigma in our organization is to follow DMAIC methodology :
  • 26. Define Without define, we spin our wheels and waste time and money. Activities Tools and techniques 1. Identify the vital few 2. Bound the problem 3. Understand customer requirements 4. Prioritize customer requirements 5. Identify project stakeholders 6. Complete project charter. 1. Pareto analysis 2. A process view (SIPOC) 3. KANO model 4. Voice of the customer 5. Affinity diagram 6. Critical to quality path 7. Stakeholders analysis 8. Complete project charter
  • 27. Pareto Analysis •Villferdo Pareto was an Italian engineer, sociologist, economist and philosopher. •Observed that 80% of the land in ITALY was owned by 20% of the population. 1858-1923 Focus on the vital few The vital few The Trivial Many
  • 28. Pareto Chart 0 5 10 15 20 25 30 35 40 45 ByCategory Cause factors Pareto Analysis Bullying 9 Dress code 10 Not enough breaks 8 Number of tests 42 Online harassment 22 Scholl bus crowded 8 School bus 30 School start time 14 Things to work on
  • 29. A Process View A SIPOC diagram is a tool used by a team to identify all relevant elements of a process improvement project before work begins. Everything is a process. The quality of a product or service is directly related to the quality of the project . As change agents, we must address the process as a whole in order to deliver real change. We start with SIOP - a higher level view of the process. Suppliers Inputs Process Outputs Customers
  • 30. SIPOC Diagram Looking for new customer Find customer needs Identify critical needs Develop prototype Test prototype & go to Production Suppliers Inputs Process Outputs Customers Requirements •Row materials •Sources •Manufacturers •Suppliers •Manpower •Resources •Equipment •Product •Timely delivery •Increased quality •Young people •Students •Service holders •Customer satisfaction •Expected quality •Reduced backlog
  • 31. Understanding Customers Need KANO model for analyzing customer needs and product requirements because 1. We need to satisfy the customer and 2. Not all needs are equal Developed by Noriaki Kano and team in 1984 to : -Categorize and prioritize customer needs -Guide product development - enhance customer satisfaction
  • 32. KANO Model Delighted Done Very Well Disgusted Done poorly Basic needs “Must be” Performance needs Stated, more is better Attractive needs (delighters) Unspoken , not expected Include these in your product requirements. No choice Choose the right set at the right level to ensure an attractive competitive product. Pick 1-2 for customer delight and competitive differentiation
  • 33. Voice Of Customer The voice of the customer is a Six Sigma strategy used to capture requirements and feedback from the customer and to meet their requirements. There are two approaches we gather Voice of Customer Reactive Approach • Looks at historical data to determine issues, unmet needs, problems and interests of former customers. oCustomer complaints oCustomer service calls oProduct return information oWarranty claims oWeb page activity Proactive Approach •Verify conclusions of reactive research. •Determine interests and unmet needs of future customers oSurveys oInterviews oMarket research oBenchmarking oObserve customer
  • 35. Affinity Diagram An affinity diagram is an analytical tool used to organize many ideas into subgroups with common themes or common relationships. This method was developed by a noted Japanese anthropologist in the 1950s called Jiro Kawakita. Step 1 First, write down the problem. Then quietly put ideas, data, etc. on cards. This is not like a typical brainstorming session where people are very vocal about their ideas.
  • 36. Affinity Diagram Step 2 Quietly put into homogeneous groupings Step 3 Develop affinity heading cards. For example, there is a homogeneous grouping for human resources related items. Step 4 Put the groupings into the order of the process. For example , employees get hired, they first start off with human resources
  • 37. Critical to quality A Critical to quality is a specific measurable characteristic of a product or service that fulfils the expressed requirement of the customer. CTQ performance must exceed specifications to satisfy the customer. Taste Rich 1.1<TDS>1.3 Not acidic Extractions> 18% Not bitter Extractions<22% Customer wants "Good Coffee Temperature Optimum Drinking Temperature >140 *F <176*F Cost Price tk.120 We need to Translate VOC to CTQs Hard to Measure Need Drivers Easy to Measure Specific ation CTQ
  • 38. Why Stakeholder Analysis? Stakeholders : anyone impacted by our project. Stakeholders can be inside and outside the organization . •Provide resources •Give advice •‘Lobby’ for your cause •Break down barriers •Accelerate and improve results. •Withhold resources. •Withhold expertise •Create barriers •Delay and sabotage •Convince others to withhold support For Against
  • 39. Stakeholders Analysis Stakeholders analysis is a critical because it influences: resources , solutions and ultimately project success.
  • 40. Project Charter In the Define phases of DMAIC we need to have all the team members are agreed to the project and the approval and sponsor from the top management. We do put all the details of the project and planning for the project in the project charter which shows the overall activities at a glance. Project Charter is a good executive communication tool
  • 41. Measure The goal of the measure phase of a Six Sigma DMAIC project is to get as much information as possible on the current process so as to fully Understand both how it works and how well it works. This entails three key tasks: creating a detailed process map , gathering baseline data and summarizing and analyzing the date . Activities 1. Ensure good measurement system 2. Measure current performance 3. Map the process and identify all variables that can affect performance . 4. Prioritize process inputs . 5. Basic statistics. 6. Determine current process capability. Tools and techniques 1. Process map 2. Value stream map 3. Defect per million opportunity 4. Interrelation diagram 5. Activity network diagram 6. Matrix diagram 7. Tree diagram 8. DPU, DPMO,PPM and RYT.
  • 42. Process Mapping What is process mapping ? Graphical illustration of the work process. What does process map does ? 1. Listing activities in sequential order. 2. Assigning activities to people in the company. What are benefits of process mapping? Identify major tasks Identify sequence of tasks Identify accountability of task Identify process inputs that affect process output SIPOC Flow chart Process map
  • 43. How inputs turn outputs Listing activities in sequential order Allows us to see whether value is being added to the process Example Manufacturing company that does furniture Fabrication Assembly Quality Assurance Raw materials pieces of Furniture Assembled Furniture Quality assured assembled Furniture Inputs Outputs
  • 44. Process Mapping Assigning activities to people in the company It is better to give people responsibilities for their work that’s how we can find out the who is responsible for what Fabrication Assembly Quality Assurance Raw materials pieces of Furniture Assembled Furniture Quality assured assembled Furniture Start End Fabrication Team Assembly Team Quality Team
  • 45. Value Stream Mapping Value stream map is 1. Directed extension of a process map 2. Contains enough information to determine value and waste. Fabrication Assembly Quality Assurance Fabrication Cutting Drilling Sanding Raw Materials Pieces of Furniture Raw Materials Cutting Team Drill Team Sanding Team Rough Pieces Drilled Rough Pieces Pieces of Furniture
  • 46. Cycle time and Lead time Through Value Stream Mapping we get to know 1. How long does it take the responsible person to complete the activity is know as cycle time 2. How long for the responsible person starts the activity this is known as lead time or wait time Lead time : total amount of time between the previous activity finishing and current activity starting Cycle time : total amount of time current Activity takes . Cutting Drilling Sanding Raw Materials Rough Pieces Drilled Rough Pieces Pieces of Furniture Start End Cutting Team Drill Team Sanding Team 30 mint 30 mint 30 mint 180 mint 15 mint
  • 47. Scaling Defects Defects per Units (DPU), Defects per Opportunity(DPO) and Defects per million Opportunity(DPMO) are metrics that express how our products or process is performing , based on the number of defects. Choosing the appropriate quality metric helps us address performance against customer expectations.. Defects per Units(DPU) : Defects per unit(DPU) is the number of defects in a sample divided by the number of units samples. Defects per Opportunity (DPO) : Defects per opportunity is the number of defects in a sample divided by the total number of defect opportunity. Defects per million Opportunity (DPMO) : Defects per million opportunities is the number of defects in a sample divided by the total number of defect opportunities multiplied by 1 million.
  • 48. Defects Per Unit How to calculate defects per Units For example: We are producing mango juice for customers. Lets say , each order is considered a unit. Fifty orders are randomly selected and inspected and the following defects are found. 1. Two orders are incomplete. 2. One order is both damaged ad incorrect. 3. Three orders have wrong way labeled. So , we get like , six of the orders have problems and there are a total of 7 defects our of the 50 order sample. Therefore , DPU= Number of Defects in a sample 7 Number of Units 50 = 0.14 Each unit of production on average contains this number of defects.
  • 49. Defects per Opportunity How to calculate Defects per Opportunity For example For each number of mango juice there could have four defects – Damage, incorrect, incomplete and wrong way labeled. Therefore , each order has four opportunity . Fifty orders are randomly selected and inspected ad the following are found . 1. Two orders are incomplete. 2. One order is both damaged ad incorrect. 3. Three orders have wrong way labeled. Six of the orders have problems, and therefore there are a total of 7 defects out of the 200 opportunities(50*4). Therefore DPO = Total number of Defects 7 Total number of opportunities 200 = 0.035
  • 50. Defects Per Million Opportunities How to calculate Defects per Million Opportunity For example For each number of mango juice there could have four defects – Damage, incorrect, incomplete and wrong way labeled. Therefore , each order has four opportunity . Fifty orders are randomly selected and inspected ad the following are found . 1. Two orders are incomplete. 2. One order is both damaged ad incorrect. 3. Three orders have wrong way labeled. Six of the orders have problems, and therefore there are a total of 7 defects out of the 200 opportunities(50*4). Therefore DPMO= Total number of Defects 7 Total number of opportunities 200 = 35,000* 1 Million For every 1 million production we will have 35,000 defects
  • 51. Rolled Throughput Yield Rolled throughput yield is the probability that a single unit can pass through a series of process steps free of defects. It is a traditional practice for organization to judge the effectiveness of their processes by calculating rate at the end of the process . For example : if 100 items and of those 100 items 99% pass inspection that does not mean it is at a level of Six Sigma . Lets have a look at the processes Step 1 Step 2 Step 3 Step 4 Step 5 Yield 97% Yield 82% Yield 91% Yield 82% Yield 99% Now we have stage 5 has got 99% but this is not the real case , the rolled throughput yield is not an average of the yields of steps 1 through 5.instead, to get the actual yield, we multiply all of the yields together. 0.97 * 0.82 * 0.91 * 0.82 * 0.99 = 0.57 * 100 = 57% RTY
  • 52. How It Breaks Down Step 1 : 97% yield. That means that 97 of the 100 move to step 2 Step 2 : of those 97, only 79 (82%) go to step 3 Step 3 : of those 79, only 71 (91%) go on to step 4 Step 4 : of those 71, only 58 (82%) go to step 5 Step 5 : of those 58, only 57 (99%) go to the shipping department . The worker in the shipping department, who is not aware of the failures upstream, is likely to report that the process is producing at 99% effectiveness; when in reality, the rolled throughput yield is only 57% and as such opportunities are missed. 0.97 * 0.82 * 0.91 * 0.82 * 0.99 = 0.57 * 100 = 57% RTY
  • 53. Activity Network Diagram An activity network diagram is a diagram of project activities that shows the sequential relationships of activities using arrows and nodes. Suppose the team is tasked with improving the process of building a house . The team lists the major steps involved- everything from the excavation step through the landscaping step Now : Define Activities Excavate , Frame, Roof, Exterior Interior, Electricity Masonry Landscape, Foundation Sequence Activities A. Excavate B. Foundation C. Frame D. Electrical E. Roof F. Masonry G. Interior H. Exterior I. Landscape Estimate Activity Duration A. Excavate 5 days B. Foundation 2 days C. Frame 12 days D. Electrical 9 days E. Roof 5 days F. Masonry 8 days G. Interior 10 days H. Exterior 7 days I. Landscape 5 days Estimate Activity resources 1. What kind of effort are we thinking about 2. How man people do we think we need 3. What skills level are you looking for.
  • 54. We can develop a Gantt Chat to develop schedule for the project management where everyone will have the visibility of total work progress. The schedule pulls all of the information together to measure the expected project end date.
  • 55. Interrelationship Diagram An interrelationship diagram shows graphically the cause-and-effect relationships that exist among a group of items , issues, problems or opportunities . A local physicians group is experiencing a relatively high number of patient complaints regard the lack of returned phone calls . “overly optimistic promise dates” for follow-up calls” is a key issue and would cause patient to expect a phone call faster that the group believes it can deliver it.
  • 56. Example of Interrelationship Diagram The basic idea is to count the number of “in” and “out” arrows to and from a particular issue and to use these counts to assist us in prioritizing the issues. What factors contribute to student success?
  • 57. Analyzing In the analyze phase, data collected during the measure phase is reviewed. Both the data and the process are analyzed , in a n effort to narrow down and verify the root causes of waste and defects. Activities 1. Define performance objectives 2. Identify value/non-value added process steps 3. Identify source of variation 4. Determine root causes 5. Identify significant process inputs. Tools and techniques 1. Histogram 2. Root cause analysis (fishbone diagram ) 3. 5 whys 4. 5w’s and H method 5. Regression analysis 6. Hypothesis analysis 7. Run chart 8. ANOVA analysis 9. Fault tree diagram
  • 58. Root Cause Analysis Root cause analysis is a useful process for understanding and solving a problem,. Figure out what negative events are occurring. Then, look at the complex systems around those problems, and identify key points of failure. Finally, determine solution to address those key points, or root causes.
  • 59. Cause and Effect Diagram A cause effect diagram is a graphical tool for displaying a list of causes associated with a specific effect. It is also known as a fishbone diagram or an Ishikawa diagram(created by Dr. Kaoru Ishikawa, an influential quality management innovator). Man Machine Material Method Measurement Mother Nature Causes Effect Causes are usually grouped into major categories to identify these sources of variation. The categories typically include: 1. Man 2. Machine 3. Material 4. Method 5. Measurement 6. Mother Nature
  • 60. Fishbone Diagram From the example we can see that , There are many reasons for missing the bus we did the fishbone analysis to find out the possible reasons behind the effects and we know the causes of missing bus. This is how we can find out the reasons behind the effects.
  • 61. Fishbone Analysis 13.20% Productivity loss in manufacturing Method Machine Man Operators are not following work instruction Shortage of Raw material Worn-out parts of capping machine Inaccurate visual detection of vision camera sensor Example
  • 62. Pareto Chart Analysis 0% 20% 40% 60% 80% 100% 120% 0 200 400 600 800 1000 1200 1400 Amount Cumulative Pct Series2 Expense Amount Cumulativ e pct Rent 1200 47% Car Payment 500 66% Groceries 400 82% Gas 300 93% Mobile Phone 100 97% Cable 70 100% We are already know the history of Pareto chart. It helps to find out the 20% factors that cause 80% problems. Through the Pareto chart we can focus on that 20% factors and can improve the process.
  • 63. 5 Whys Analysis To solve a problem effectively , we need to drill down to identify the underline cause so Sakichi Toyoda 5 why’s techniques is the simple but very powerful tool for quickly uncovering the root of a problem. Sakichi Toyoda, one of the fathers of the Japanese industrial revolution, developed the technique in the 1930s. He was an industrialist, inventor and founder of Toyota Industries. His technique became popular in the 1970s and Toyota still uses it to solve problems today. Sakichi Toyoda
  • 64. 5 Why’s Example To use it we start with the problem we are facing then keep asking why until we discover the root cause . Why ? Forget to replace them
  • 65. 5WH Analysis 5WH Analysis is a problem definition technique which works by asking 6 questions about a defect or any other problem. What : create adequate precise description. Who : individuals associated with the problem? When : at what moment, frequency? Where : locations of the problem ? Why : already known explanations contributing to the problem? How : mode, situation , procedure of the problem? What Concept Who People When Situation Where Business Practice How Method Why Objectives Problem Statement
  • 66. Improve Phase The goal of the DMAIC improve Phase is to indentify a solution to the problem that the project aims to address. In this phase we will be trying to look for solution of the problem that was identified in the analysis phase. Activities 1. Consolidate our analysis. 2. Generate solutions 3. Create an implementation plan. 4. Implement the solutions. Tools and Techniques 1. Brainstorming 2. Kaizen 3. 5s 4. Mistake proving Poke Yoke 5. Failure mood and effects analysis (FEME).
  • 67. Brainstorming Brainstorming is group creativity technique by which efforts are made to find a conclusion for a specific problem by gathering a list of ideas spontaneously contributed by its members. Effective Brainstorming includes Collect as many ideas as possible. All ideas are welcome no matter how silly it is. No Discussion during Brainstorming Do not criticize or judge . Do not even groan, frown , or laugh Do “Piggyback” or build on other ideas. Go for quantity over quality- the ore creative ideas the better.
  • 68. 5S Improvement System 5s is the name of a workplace organization method that uses a list of five Japanese words: seiri, seiton, seiso, seiketsu, and shitsuke. Better visual management Improved safety Improved quality Improved Productivity Boosted Morale Improved Company Image
  • 69. 5S Explanation It is a system to reduce waste and optimize productivity through maintaining an orderly workplace and using visual cues to achieve more consistent operational results. Sort Straighten Shine Standardize Sustain Eliminate Unnecess ary Items from the workplace Arrange items so that they are easy to use, find and put away Keep the items and work area neat and clean Create a consistent approach to tasks and procedures Make a habit of maintainin g the correct procedures
  • 70. Kaizen (Continuous Improvement) Kaizen is a Japanese philosophy that focuses on continual improvement throughout all aspects of life. Kaizen aims to eliminate waste in all systems of an organization through improving standardized activities and processes. The continuous cycle of Kaizen activities has seven phases 1. Identify an opportunity 2. Analyze the process 3. Develop an optimal solution 4. Implement the solution 5. Study the results 6. Standardize the solution 7. Plan for the future
  • 72. 14 Rules of Kaizen 1. Keep an open mind to change 2. Maintain a positive attitude 3. Create a blameless environment 4. Encourage non judgmental thinking. 5. Be aware of multiple alternatives 6. Treat other as you would want to be treated. 7. Respect and involve all team members 8. one person, one vote. 9. Create a team environment 10.No such thing as a dumb question 11. Create a bias for action 12. Creativity before capital . 13. Never leave in silent agreement 14. Have fun doing it
  • 73. Kaizen Example Before Kaizen After Kaizen One office that processes expense reports for a company held a day-long Kaizen event to analyze and improve the cycle time. The analysis showed hat expense reports spent most of their tie in “queue” just waiting for someone to sigh them . Then we apply Kaizen .
  • 74. Zero Defect Policy The goal is to understand like concept and practice of zero defects and how to develop Poke – Yoke to eliminate these defects . Typically defect rates are tracked by 1. The point at which defect is discovered 2. The point at which defect occurred. Attitude toward defects should be 1. I do not accept defects 2. I do not make defects 3. I do not pass on defects.
  • 75. Poka-yoke Technique Poke-yoke is a technique for avoiding simple human error in the workplace. It is also know as mistake-proofing and fail-safe work methods. Poka-yoke helps preventing errors obviously improves quality, but it also plays a major role in improving productivity with no rework, and easier production, cycle times and lead times both become much shorter. And, of course, faster production with fewer defects means lower cost. Potential Benefits for using Poka-yoke 1. Elimination of set-up errors and improved quality. 2. Simplified and improved housekeeping 3. Increased safety. 4. Lower costs 5. Lower skill requirements 6. Increased production flexibility . 7. Improved operator attitudes .
  • 77. Failure Modes and Effects Analysis Goals : 1. Reduce risk of failure 2. Ensure failures are detectible 3. Prevent failure from happing Failure Mode and Effects Analysis (FMEA) is a structured approach to discovering potential failures that may exist within the design of a product or process. Failure Mode and Effects Analysis is designed to identify, prioritize and limit these failure modes. Why? Keep track of potential failure and countermeasures to reduce the risk
  • 78. Failure Mood and Effect Analysis Process Identify modes of failure (Example car will not stop). Identify consequences and related systems for each mode. Rate the severity of each effect. Identify potential root causes for each failure mode. Rate the probability of occurrence of each root cause. Identify process controls and indicators. Rate detectability of each mode. Calculate risk priority and criticality . Design to mitigate high risk or highly critical failure and reassess to ensure goals have been achieved. p r o c e s s
  • 79. Example of FMEA Mode of Failure Cause Effects Frequency Severity Detection RPN Card Printed incorrectly Incorrect informatio n provided Card must be reissued 3 8 5 120 Informatio n incorrectly entered in database Card must be reissued 5 8 5 200 A professional association is concerned about he process it uses to issue membership cards. They decide to conduct an FMEA of the process and part of the FMEA is given below. The frequency shows how likely this cause is to occur. The severity value shows how significant the impact is. The detection value measures how likely this mistake is to be detected. The Risk Priority Number(R PN) indicates which one should be given priority for action.
  • 80. Control Phase The control phase is the final phase of lean six sigma. The team focuses on how to sustain newly achieved improvements by passing it onto other employees . Activities Tools and techniques •process control plan •Monitoring and response plan •Documentation and story board. •Integrate and manage solutions in daily work processes •Integrate lessons learned •Control chart •Standard operating procedures •Visual process control •Total productive management •Lean accounting
  • 81. Standard Operating procedures A standard operating procedure is a set of writing instructions that document a routine activity that is to be followed by member of an organization .standard operating procedures are essential parts of good quality systems . For example : SOPs for washing Hands Inadequate SOP 1. Wet hand and forearms. 2. Thoroughly apply the soap 3. Lather the hands and forearms 4. Continue to lather and scrub 5. thoroughly rinse forearms and hands 6. Dry hands and forearms thoroughly
  • 82. Better SOPs 1. Wet hands and forearms whit warm, running water (temperature should be 100 F) 2. Thoroughly apply the soap from the forearms to the hands 3. Lather the hands and forearms. Be sure to get soap under fingernails and between fingers. 4. Continue to lather and scrub for at lease 10 seconds. 5. Thoroughly rinse forearms and hands with clean water. No remaining soap should be visible on the forearms, hands or under nails . 6. Dry hands and forearms thoroughly with single-use paper towels 7. Use the paper towel to turn off the water and use the same paper towel to open the door as you exits the restroom This SOP provides more specification.
  • 83. What is Run Chart A run chart is used to monitor the behavior of a variable over time for a process or system. Run charts graphically display cycles, trends, shifts, or non-random patterns in behavior over time. Date What does a run chart do? •Monitor processes •Compare •Focus attention •Track information Run charts can help identify problems and the time when a problem occurred, or monitor progress when solutions are implemented.
  • 85. Run Chart Example Trend Shift >= 6 Astronomical
  • 86. Background of Control Chart Control charts, also know as Shewhart Chart or process-behavior charts , in statistical process control are tools used to determine if a manufacturing or business process is in a state of statistical control Walter A, Shewhatt Walter Andrew Shewhart (1891-1967) was an Americal Physicist, engineer and statistician, sometimes known as the father of statistical quality control and also related to the Shewhart cycle.
  • 87. Control chart A control chart represents a picture of a process over time. To effectively use control chart, we must be able to interpret the picture. Through the control chart we will be able to find out whether our process is stable or out of control. Three characteristics of a process that is in control are : 1. Most points are near the average 2. A few points are near the control limits 3. No points are beyond the control limits
  • 88. Control Chart interpret Points beyond the control limits A special cause is present in the process if any points fall above the upper control limit or below the lower control limit. Settings the zone The first steps is divide the control chart into zones. this is done by dividing the area between the average and the upper control limit into three equally spaced areas. This is then repeated for the area between the average and the lower control limit.
  • 89. Continue Setting the zone A A special cause exists if two out of three consecutive points fall in zone a or beyond. The test is applied for the zone a above the average and then for the zone a below the average. Setting the zone B A special cause exist if four out five consecutive points fall in zone B or beyond. Setting the zone C A special cause exists if seven consecutive points fall in zone c or beyond.
  • 90. Stratification test Stratification (a special cause) exists if fifteen or more consecutive points fall in zone C either above or below the average. The points tend to hug the centerline. Test for Mixtures A mixture (a special cause ) is present if eight or more consecutive points lie on both sides of the average with none of the points in zone c.
  • 91. Rule of Seven Test The following test state that an out of control situation is present if one of the following conditions is true. 1. Seven points in a row above the average 2. Seven points in a row below the average 3. Seven points in a row trending up or 4. Seven points in a row trending down.
  • 92. Common Cause and Special Cause
  • 93. By interpreting the control chart we will be able to find out the problem in the work process and able to look for the solution. Summary of Control Chart Common cause Variation Special Cause Variation Upper control Limit Lower control Limit Average / Mean
  • 94. Total Quality Management TQM is a comprehensive and structured approach to organizational management that seeks to improve the quality of products and service through refinements in response to continuous feedback. Planning and organiza tion Team work and involvem ent Working Together Training, tools and techniqu es Measuri ng and feedback Top Manage ment support TQM Approach TQM can be a powerful technique for unleashing employee creativity and potential, reducing bureaucracy and costs, and improving service to clients and the community.
  • 95. Total Productive Maintenance It is a company wide, team based effort to improve output quality through equipment care and to improve overall equipment effectiveness. Total : All employees are involved and it aims to eliminate all accidents , defects and breakdown. Productive : actions performed during production and troubles for productions are minimized . Maintenance : keep in good condition and improve overall equipment effectiveness.
  • 96. Total Productive Maintenance Goal  Maximize overall equipment effectiveness (OEE) by minimizing equipment related losses.  Provide a system of comprehensive maintenance for the life cycle of equipment.  Involve departments that plan , design use, and maintain the equipment  TPM is proactive 1. preventive Maintenance 2. predictive Maintenance
  • 97. House of Quality (Quality Function Deployment) The house of quality is the first matrix in four-phase Quality Function Deployment(QFD) process. It is called the house of quality because if the correlation matrix that is roof shaped and sits on top of the main body of the matrix Benefits of House of quality 1. Service offerings are built and prioritized on objective customer needs and requirements 2. Increased customer satisfactions and loyalty 3. Increased customer utilization , sales and share of wallet
  • 98. Quality Function Deployment Example How to use Step 1. determine customer requirements. Step 5. Complete the house of quality with the conflicts and synergies matrix. Step 4. complete the correlation matrix. Step 3. prioritize customer requirements using the following point scale : high/strong, medium/moderate and low / weak . Step 2. determine the fictional requirements. A local bank is interested in improving the training of its teller then we get data from critical-to-quality tree and establish House of quality
  • 99. Lean Accounting Lean accounting is the general terms used for the change required to a company’s accounting, control, measurement, and management processes to support lean manufacturing and lean thinking. Lean accounting attempts to provide opportunities to correctly capture the value of improvements resulting from lean activities and projects.

Notas do Editor

  1. Rolled Throughput Yield (RTY) is the probability that a single unit can pass through a series of process steps free of defects. Next we will turn our attention to a Rolled Throughput Yield example. If you will remember, the First Time Yield calculation we did (FTY) considered only what went into a process step and what went out. Rolled Throughput Yield adds the consideration of rework. Using the previous example: Process A = 100 units in and 90 out Process B = 90 in and 80 out Process C = 80 in and 75 out Process D = 75 in and 70 out. If in order to get the yield out of each step we had to do some rework (which we probably did) then it really looks more like this: Process A = 100 units, 10 scrapped and 5 reworked to get the 90. The calculation becomes [100-(10+5)]/100 = 85/100 = .85 This is the true yield when you consider rework and scrap. Process B = 90 units in, 10 scrapped and 7 reworked to get the 80. [90-(10+7)]/90 = .81 Process C = 80 units in, 5 scrapped and 3 reworked to get the 75. [80-(5+3)]/80 = .9 Process D = 75 units in, 5 scrapped and 10 reworked to get the 70. [75-(5+10)]/75 = .8 Now to get the true Rolled Throughput Yield (Considering BOTH scrap and the rework necessary to attain what we thought was first time throughput yield) we find that the true yield has gone down significantly: .85*.81*.9*.8 = .49572 or Rounded to the nearest digit, 50% yield. A substantially worse and substantially truer measurement of the process capability. An Assumption is made in the preceeding example that there are no spilled opportunities after each process step.
  2. Failure Modes and Effects Analysis (FMEA) is a systematic, proactive method for evaluating a process to identify where and how it might fail and to assess the relative impact of different failures, in order to identify the parts of the process that are most in need of change. FMEA includes review of the following: Steps in the process Failure modes (What could go wrong?) Failure causes (Why would the failure happen?) Failure effects (What would be the consequences of each failure?) Teams use FMEA to evaluate processes for possible failures and to prevent them by correcting the processes proactively rather than reacting to adverse events after failures have occurred. This emphasis on prevention may reduce risk of harm to both patients and staff. FMEA is particularly useful in evaluating a new process prior to implementation and in assessing the impact of a proposed change to an existing process
  3. Process Steps: Identify modes of failure (Example car will not stop). Identify consequences and related systems for each mode. Rate the severity of each effect. Identify potential root causes for each failure mode. Rate the probability of occurrence of each root cause. Identify process controls and indicators. Rate detectability of each mode. Calculate risk priority and criticality . Design to mitigate high risk or highly critical failure and reassess to ensure goals have been achieved.
  4. A control chart represents a picture of a process over time. To effectively use control charts, one must be able to interpret the picture. What is this control chart telling me about my process? Is this picture telling me that everything is all right and I can relax? Is this picture telling me that something is wrong and I should get up and find out what has happened? A control chart tells you if your process is in statistical control. The chart above is an example of a stable (in statistical control) process. This pattern is typical of processes that are stable. Three characteristics of a process that is in control are: Most points are near the average A few points are near the control limits No points are beyond the control limits If a control chart does not look similar to the one above, there is probably a special cause present. Various tests for determining if a special cause is present are given below. Points Beyond the Control Limits A special cause is present in the process if any points fall above the upper control limit or below the lower control limit. Action should be taken to find the special cause and permanently remove it from the process. If there is a point beyond the control limits, there is no need to apply the other tests for out of control situations. Points on the control limits are not considered to be out of statistical control. Zone Tests: Setting the Zones and Zone A The zone tests are valuable tests for enhancing the ability of control charts to detect small shifts quickly. The first step in using these tests is to divide the control chart into zones. This is done by dividing the area between the average and the upper control limit into three equally spaced areas. This is then repeated for the area between the average and the lower control limit. The zones are called zones A, B, and C. There is a zone A for the top half of the chart and a zone A for the bottom half of the chart. The same is true for zones B and C. Control charts are based on 3 sigma limits of the variable being plotted. Thus, each zone is one standard deviation in width. For example, considering the top half of the chart, zone C is the region from the average to the average plus one standard deviation. Zone B is the region between the average plus one standard deviation and the average plus two standard deviations. Zone A is the region between the average plus two standard deviations and the average plus three standard deviations. A special cause exists if two out of three consecutive points fall in zone A or beyond. The figure below shows an example of this test. The test is applied for the zone A above the average and then for the zone A below the average. This test, like those below, is applied to both halves of the chart. However, only one half is considered at a time. For example, if one point falls in the zone A above the average and the next point falls in zone A below the average, this is not two out of three consecutive points in zone A or beyond. The two points in zone A must be on the same side of the average. Zone Tests: Zones B and C A special cause exists if four out five consecutive points fall in zone B or beyond. The figure below shows an example of this test. This test is applied for zone B above the average and then for zone B below the average.     A special cause exists if seven consecutive points fall in zone C or beyond. An example of this test is shown below. The test should be applied for the zone C above the average and then for the zone C below the average.     Test for Stratification  Stratification occurs if two or more processes (distributions) are being sampled systematically. For example, stratification can occur if samples are taken once a shift and a subgroup size of 3 is formed based on the results from three shifts. It is possible that the shifts are operating at a different average or variability. Stratification (a special cause) exists if fifteen or more consecutive points fall in zone C either above or below the average. The figure below is an example of this test. Note that the points tend to hug the centerline. This test involves the use of the zones but is applied to the entire chart and not one-half of the chart at a time. If stratification is occurring, a histogram of the individual measurements will probably be bimodal. Test for Mixtures  A mixture exists when there is more than one process present but sampling is done for each process separately. For example, suppose you take three samples per shift and form a subgroup based on these three samples. If different shifts are operating at different averages, a mixture can occur. A mixture (a special cause) is present if eight or more consecutive points lie on both sides of the average with none of the points in zone C. The figure below shows an example of this test. Note the absence of points in zone C. This test is applied to the entire chart. Rule of Seven Tests  These tests are often taught initially to employees as the method for interpreting control charts (along with points beyond the limits). The tests state that an out of control situation is present if one of the following conditions is true: 1) Seven points in a row above the average, 2) Seven points in a row below the average, 3) Seven points in a row trending up, or 4) Seven points in a row trending down. These four conditions are shown in the figure below.
  5. Quality function deployment (QFD) integrates customer requirements (voice of the customer, or VOC) into the design and delivery of a service offering. The primary tool used in QFD is known as the “house of quality,” which helps facilitate group decision-making.  In service industries, QFD is primarily used to determine the priorities of customer requirements in order to target the focus of service offerings and delivery. Since the scope of QFD is broad, this discussion will focus on explaining the house of quality. Benefits Service offerings are built and prioritized on objective customer needs and requirements Increased customer satisfaction and loyalty Increased customer utilization, sales, and share of wallet How to Use Step 1.    Determine customer requirements.  Step 2.    Determine the functional or “critical to customer” (CTC) requirements. CTCs must be measurable. Step 3.    Prioritize customer requirements using the following point scale: high/strong (9), medium/moderate (3), and low/weak (1). Step 4.    Complete the correlation matrix (see sample below). Step 5.    Complete the house of quality with the conflicts and synergies matrix. Relevant Definitions Voice of the customer (VOC): A method of gathering and incorporating the customer’s expectations, aversions, and preferences related to service delivery. Critical to customer: The requirements the customer must have for service to meet expectations.