POM Review for
Comprehensive
Examination
PRODUCTION &
OPERATIONS
MANAGEMENT
1. Introduction
2. Forecasting
3. Design of Goods & Services, Processes & Systems
4. Facilities & Capacity Planning
5. Inventory Planning and Supply Chain Management
6. Materials, Manufacturing & Enterprise Resource
Planning (MRP, ERP)
8. Quality Management, TQM, ISO
9. Quality Improvement, JIT, Lean, Six Sigma
10. Project Management
11. Service Operations Management
12. Operations Strategy, Sustainability, Social & Ethics
13. Plant Tour/Group Project
* 7. Midterm Exam and 14 Final Exam
REVIEW OUTLINE
POM
Syllabus
INTRODUCTION
ORGANIZATION
ORGANIZATION
Figure 1.1
ORGANIZATION
POM DEFINITION
WHAT IS OPERATIONS MANAGEMENT?
 Production is the creation of goods and
services
 Operations management (OM) is the set
of activities that create value in the form
of goods and services by transforming
inputs into outputs
Design of Goods & Services,
Processes & Systems
IPO Model
SIPOC Model
PRODUCTIVITY CHALLENGE
Productivity is the ratio of outputs (goods and
services) divided by the inputs (resources such
as labor and capital)
The objective is to improve productivity!
Important Note!
Production is a measure of output only
and not a measure of efficiency
▶ Measure of process improvement
▶ Represents output relative to input
▶ Only through productivity increases
can our standard of living improve
PRODUCTIVITY
Productivity =
Units produced
Input used
PRODUCTIVITY CALCULATIONS
Productivity =
Units produced
Labor-hours used
= = 4 units/labor-hour
1,000
250
Labor Productivity
One resource input  single-factor productivity
MULTI-FACTOR PRODUCTIVITY
Output
Labor + Material + Factory OH
Productivity =
► Also known as total factor productivity
► Output and inputs are often expressed in
dollars
Multiple resource inputs  multi-factor productivity
COLLINS TITLE PRODUCTIVITY
Staff of 4 workers 8 hrs/day 8 titles/day
Payroll cost = $640/day Overhead = $400/day
Old System:
14 titles/day Overhead = $800/day
New System:
8 titles/day
$640 + 400
14 titles/day
$640 + 800
=
Old multifactor
productivity
=
New multifactor
productivity
= .0077 titles/dollar
= .0097 titles/dollar
IMPROVING PRODUCTIVITY AT STARBUCKS
A team of 10 analysts
continually look for ways
to shave time. Some
improvements:
Stop requiring signatures
on credit card purchases
under $25
Saved 8 seconds
per transaction
Change the size of the ice
scoop
Saved 14 seconds
per drink
New espresso machines Saved 12 seconds
per shot
Operations improvements have
helped Starbucks increase yearly
revenue per outlet by $250,000 to
$1,000,000 in seven years.
Productivity has improved by 27%, or
about 4.5% per year.
Forecasting
FORECASTING METHODS
Copyright ©2013 Pearson Education
14 -
22
 Naïve Method
The forecast for the next period is the demand
for the current period
 Moving Average Method
 Weighted Moving Average Method
 Exponential Smoothing Method
 Linear Regression Method
MOVING AVERAGE METHOD
Compute a three-week moving average forecast for the
arrival of medical clinic patients in week 4. The numbers of
arrivals for the past 3 weeks were:
Week Patient Arrivals
1 400
2 380
3 411
14 -
23
WEIGHTED AVERAGE METHOD
Compute the forecast for the arrival of medical patients in
week 4 using the weighted average method. The numbers
of arrivals were as follows:
Week
Patient
Arrivals
Weight
1 400 20%
2 380 30%
3 411 50%
14 -
24
EXPONENTIAL SMOOTHING METHOD
Compute the forecast for the arrival of patients in week 4
using the exponential smoothing method. The smoothing
constant is α = 0.10:
Week
Patient
Arrivals
Previous
Forecast
1 400
2 380
3 411 415
FNew = FPrevious + α (Actual – FPrevious)
LINEAR REGRESSION METHOD
Compute forecast for week 7 using the linear regression
method.
Week Patient Arrivals
1 400
2 380
3 411
4 415
5 421
6 427
Y = A(X) + B
Where A = slope, B = Y-intercept
LINEAR REGRESSION METHOD
Formula Result
ΣX 21
ΣY 2,454
n 6
ΣX2 91
ΣY2 1,005,116
ΣXY 8,720
LINEAR REGRESSION METHOD
nΣXY – ΣXΣY 6(8720)-(21)(2,454) 786
A = ------------- = ---------------------- = ----- = 7.485714
nΣX2 – (ΣX)2 6(91) – (21)2 105
ΣY – AΣX 2,454 – (7.485714)(21) 2296.8
B = ---------- = --------------------------- = -------- = 382.8
n 6 6
Y7 = A(X7) + B = 7.485714 (7) + 382.8 = 435.2
LINEAR REGRESSION METHOD
nΣXY – ΣXΣY
R = -------------------------------------- = 0.828103
√(𝒏𝚺𝑿 𝟐 – (𝚺𝑿) 𝟐)(𝒏𝚺𝒀 𝟐 – (𝚺𝒀) 𝟐)
REGRESSION COEFFICIENT
0 < /r/ < 0.3 = Weak Correlation
.3 < /r/ < 0.7 = Moderate Correlation
/r/ > 0.7 = Strong Correlation
Facilities Planning
Copyright ©2013 Pearson Education
11- 030
 Proximity to the Market
 Location of the Plant, Warehouse and Office
 Size of the Plant, Warehouse and Office
 Construction and Renovation Costs
 Equipment, Furniture and Fixtures Required
 Organization and Manpower Requirements
 Purchasing of Equipment, Furniture & Fixtures
 Supply Chain for Raw Materials and Consumables
 Environmental Conditions
 Community and Social Responsibility
KEY DECISIONS IN FACILITIES PLANNING
Site Selection
Site Selection in Physical Distribution
Inventory Planning
Economic Order Quantity
A local company expects to sell 9000 tires of
a certain tire next year, Annual carrying cost
is P640 per tire and ordering cost is P3,000.
The distributor operates 288 days a year.
a. What is the EOQ?
b. How many times does the store have to re-
order per year?
c. What is the total annual cost, if the EOQ is
ordered?
EOQ
a. Economic Order Quantity
b. Optimal No. of Orders Per Year
N = D = 9,000
EOQ 290
N = 31 Orders/Year
Given:
K = Ordering Cost 3,000.00 Pesos
H = Carrying Cost 640.00 Pesos/Yr
D = Demand 9,000 Units/Yr
Working Days 288 Days
Daily Demand = Consumption 31.25 Units/Day
EOQ = 2 D K = 2(9,000)(3,000)
H 640
= 54,000,000 = 84,375
640
EOQ = 290 Units
√ √
√ √
EOQ
Given:
K = Ordering Cost 3,000.00 Pesos
H = Carrying Cost 640.00 Pesos/Yr
D = Demand 9,000 Units/Yr
Working Days 288 Days
Daily Demand = Consumption 31.25 Units/Day
c. Minimum Total Annual Inventory Cost
Total Cost = Ordering + Holding
Tc = To + Th
+ H Q/2
+ (640)(290)
2
+ 92,952
Pesos Per Year
92,952
D K/Q
(3000)(9000)
290
185,903.20
Quality Management
Quality Management
A time study in an assembly line
yielded the following observation
times and the performance rating
is 1.13 seconds.
a. Using an allowance of 20% on
job time, determine the
appropriate standard time for
the operation.
b. Develop a quality control chart
for the process, using six
sigma limits.
Observation Time (secs.)
1 1.12
2 1.15
3 1.16
4 1.12
5 1.15
6 1.18
7 1.14
8 1.14
9 1.19
Given allowance 20%
Assembly Line
Quality Management
a. Using an allowance of 20% on
job time, determine the
appropriate standard time for
the operation.
Observation Time (secs.)
1 1.12
2 1.15
3 1.16
4 1.12
5 1.15
6 1.18
7 1.14
8 1.14
9 1.19
Mean 1.15
Allowance (20%) 0.23
Standard Time
Lower limit = 0.92
Upper limit = 1.38
Six Sigma Limits
6 Sigma Limits
4 Sigma Limits
2 Sigma Limits
99.73%
95.45%
68.27%
Six Sigma Control Chart
Observation Time (secs.)
1 1.12
2 1.15
3 1.16
4 1.12
5 1.15
6 1.18
7 1.14
8 1.14
9 1.19
Mean 1.15
Standard Deviation 0.0240
Six-Sigma Limits
Lower limit = 1.08
Upper limit = 1.22
1.221.08 1.15
b. Develop a quality control chart for
the process, using six sigma limits.
Project Management
Garage
Bed
Room1
Master’s
Bedroom
Living
Room
Kitchen
Bed
Room2
3 – Bedroom Bungalow (One Storey) House
BUILDING
A HOUSE
Watch Video
BUILDING A HOUSE RECORD
4 Hours, 18 Minutes
700 People
Cement Mixer and Cranes
Skilled Workers w/ Power Tools
Pre-Fabricated Wood Framing
San Diego California Team A vs Team B will
attempt to break the world record.
FinishStart
A
B
C
D
E
F
G
H
I
J
K
A —
B —
C A
D B
E B
F A
G C
H D
I A
J E,G,H
K F,I,J
Immediate
Predecessor
02 -
47
CRITICAL PATH METHOD
Duration
(Days)
GANTT CHART
FinishStart
A
B
C
D
E
F
G
H
I
J
K
Path Time (days)
A-I-K 33
A-F-K 28
A-C-G-J-K 67
B-D-H-J-K 69
B-E-J-K 43
Paths are the sequence of activities
between a project’s start and finish.
02 -
49
CRITICAL PATH METHOD
02 -
50
Latest finish time
Latest start time
Activity
Duration
Earliest start time
Earliest finish time
0
2
12
14
A
12
CRITICAL PATH METHOD
K
6
C
10
G
35
J
4
H
40
B
9
D
10
E
24
I
15
FinishStart
A
12
F
10
0 9
9 33
9 19 19 59
22 5712 22
59 63
12 27
12 22 63 690 12
48 63
53 63
59 63
24 59
19 59
35 59
14 24
9 19
2 14
0 9
63 69
PERT/CPM
S = 0
S = 2
S = 26
S = 0
S = 36
S = 2
S = 2
S = 41
S = 0
S = 0 S = 0
The critical path is
B–D –H –J - K with
a project duration
of 69 days.
Production & Operarions Management Compre Review
Production & Operarions Management Compre Review

Mais conteúdo relacionado

Mais procurados

Methods and Techniques in Water Stations in the Philippines
Methods and Techniques in Water Stations in the PhilippinesMethods and Techniques in Water Stations in the Philippines
Methods and Techniques in Water Stations in the PhilippinesRalph Bawalan
 
Purchasing mangement - Puchasing Process - Make Or Buy Decisions - Supplier S...
Purchasing mangement - Puchasing Process - Make Or Buy Decisions - Supplier S...Purchasing mangement - Puchasing Process - Make Or Buy Decisions - Supplier S...
Purchasing mangement - Puchasing Process - Make Or Buy Decisions - Supplier S...FaHaD .H. NooR
 
Strategic capacity planning for products and services
Strategic capacity planning for products and servicesStrategic capacity planning for products and services
Strategic capacity planning for products and servicesgerlyn bonus
 
Production & operations management
Production & operations managementProduction & operations management
Production & operations managementHarold B. Duran, LCB
 
Feasibility Study (Water Refilling Station)
Feasibility Study (Water Refilling Station)Feasibility Study (Water Refilling Station)
Feasibility Study (Water Refilling Station)Darlene Enderez
 
Productivity and Quality Tools 1.pptx
Productivity and Quality Tools 1.pptxProductivity and Quality Tools 1.pptx
Productivity and Quality Tools 1.pptxIsaiahJacobCarolino
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planningAtif Ghayas
 
01 operations management_Operations Management
01 operations management_Operations Management01 operations management_Operations Management
01 operations management_Operations ManagementBrent Weeks
 
03 operations strategy_Operations Management
03 operations strategy_Operations Management03 operations strategy_Operations Management
03 operations strategy_Operations ManagementBrent Weeks
 
cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowancePratibha Khemchandani
 
Operations And Productivity
Operations And ProductivityOperations And Productivity
Operations And ProductivityJoanmaines
 
Chapter 4 Market feasibility study
Chapter 4 Market feasibility studyChapter 4 Market feasibility study
Chapter 4 Market feasibility studyAbd ELRahman ALFar
 
Basic EOQ Model, Quantity Discount, Economic Lot Size
Basic EOQ Model, Quantity Discount, Economic Lot SizeBasic EOQ Model, Quantity Discount, Economic Lot Size
Basic EOQ Model, Quantity Discount, Economic Lot SizePhillip Leonard Petate
 

Mais procurados (20)

Methods and Techniques in Water Stations in the Philippines
Methods and Techniques in Water Stations in the PhilippinesMethods and Techniques in Water Stations in the Philippines
Methods and Techniques in Water Stations in the Philippines
 
Purchasing mangement - Puchasing Process - Make Or Buy Decisions - Supplier S...
Purchasing mangement - Puchasing Process - Make Or Buy Decisions - Supplier S...Purchasing mangement - Puchasing Process - Make Or Buy Decisions - Supplier S...
Purchasing mangement - Puchasing Process - Make Or Buy Decisions - Supplier S...
 
Chapter 06
Chapter 06Chapter 06
Chapter 06
 
Capacity Management
Capacity ManagementCapacity Management
Capacity Management
 
Strategic capacity planning for products and services
Strategic capacity planning for products and servicesStrategic capacity planning for products and services
Strategic capacity planning for products and services
 
Production & operations management
Production & operations managementProduction & operations management
Production & operations management
 
Feasibility Study (Water Refilling Station)
Feasibility Study (Water Refilling Station)Feasibility Study (Water Refilling Station)
Feasibility Study (Water Refilling Station)
 
Productivity and Quality Tools 1.pptx
Productivity and Quality Tools 1.pptxProductivity and Quality Tools 1.pptx
Productivity and Quality Tools 1.pptx
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Operations management
Operations managementOperations management
Operations management
 
C10
C10C10
C10
 
Ch12pp
Ch12ppCh12pp
Ch12pp
 
01 operations management_Operations Management
01 operations management_Operations Management01 operations management_Operations Management
01 operations management_Operations Management
 
03 operations strategy_Operations Management
03 operations strategy_Operations Management03 operations strategy_Operations Management
03 operations strategy_Operations Management
 
MRP and ERP
MRP and ERPMRP and ERP
MRP and ERP
 
cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowance
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity Planning
 
Operations And Productivity
Operations And ProductivityOperations And Productivity
Operations And Productivity
 
Chapter 4 Market feasibility study
Chapter 4 Market feasibility studyChapter 4 Market feasibility study
Chapter 4 Market feasibility study
 
Basic EOQ Model, Quantity Discount, Economic Lot Size
Basic EOQ Model, Quantity Discount, Economic Lot SizeBasic EOQ Model, Quantity Discount, Economic Lot Size
Basic EOQ Model, Quantity Discount, Economic Lot Size
 

Destaque

Production and Operations Management
Production and Operations ManagementProduction and Operations Management
Production and Operations Managementshayanahmed
 
Production and Operation Management Lecture Notes
Production and Operation Management Lecture NotesProduction and Operation Management Lecture Notes
Production and Operation Management Lecture NotesFellowBuddy.com
 
Introduction to production management
Introduction to production managementIntroduction to production management
Introduction to production managementSiddhant Ghadse
 
Mba ii pmom_unit-1.1 introduction to production & operation management a - copy
Mba ii pmom_unit-1.1 introduction to production & operation management a - copyMba ii pmom_unit-1.1 introduction to production & operation management a - copy
Mba ii pmom_unit-1.1 introduction to production & operation management a - copyRai University
 
Dba1651 production management anna univ entire notes
Dba1651   production management anna univ entire notesDba1651   production management anna univ entire notes
Dba1651 production management anna univ entire notesrishabhwassan
 
Operation management -introduction
Operation management -introductionOperation management -introduction
Operation management -introductionTemidara Adeosun
 
Introduction to Operation & production Management
Introduction to Operation & production ManagementIntroduction to Operation & production Management
Introduction to Operation & production ManagementQamar Farooq
 
Production and operations managment notes
Production and operations managment notesProduction and operations managment notes
Production and operations managment notesWasim Arshad
 
Production planning & control & Forecasting
Production planning & control & ForecastingProduction planning & control & Forecasting
Production planning & control & ForecastingJenıstön Delımä
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and ControlSwatanu Satpathy
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)Soh Shing
 
Operation management-notes
Operation management-notesOperation management-notes
Operation management-notesismatullahzazai
 
Production & operations management
Production & operations managementProduction & operations management
Production & operations managementshart sood
 

Destaque (14)

Production and Operations Management
Production and Operations ManagementProduction and Operations Management
Production and Operations Management
 
Pom
PomPom
Pom
 
Production and Operation Management Lecture Notes
Production and Operation Management Lecture NotesProduction and Operation Management Lecture Notes
Production and Operation Management Lecture Notes
 
Introduction to production management
Introduction to production managementIntroduction to production management
Introduction to production management
 
Mba ii pmom_unit-1.1 introduction to production & operation management a - copy
Mba ii pmom_unit-1.1 introduction to production & operation management a - copyMba ii pmom_unit-1.1 introduction to production & operation management a - copy
Mba ii pmom_unit-1.1 introduction to production & operation management a - copy
 
Dba1651 production management anna univ entire notes
Dba1651   production management anna univ entire notesDba1651   production management anna univ entire notes
Dba1651 production management anna univ entire notes
 
Operation management -introduction
Operation management -introductionOperation management -introduction
Operation management -introduction
 
Introduction to Operation & production Management
Introduction to Operation & production ManagementIntroduction to Operation & production Management
Introduction to Operation & production Management
 
Production and operations managment notes
Production and operations managment notesProduction and operations managment notes
Production and operations managment notes
 
Production planning & control & Forecasting
Production planning & control & ForecastingProduction planning & control & Forecasting
Production planning & control & Forecasting
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)
 
Operation management-notes
Operation management-notesOperation management-notes
Operation management-notes
 
Production & operations management
Production & operations managementProduction & operations management
Production & operations management
 

Semelhante a Production & Operarions Management Compre Review

Production & operarions management review
Production & operarions management reviewProduction & operarions management review
Production & operarions management reviewRamon Fernandez, MBA
 
3. Capacity 22 HR.ppt
3. Capacity 22 HR.ppt3. Capacity 22 HR.ppt
3. Capacity 22 HR.pptMehulDatta1
 
Symposium 2016 : CONF. 401 Jonathan Shriqui EVM: Go Beyond the Numbers
Symposium 2016 : CONF. 401  Jonathan Shriqui EVM: Go Beyond the NumbersSymposium 2016 : CONF. 401  Jonathan Shriqui EVM: Go Beyond the Numbers
Symposium 2016 : CONF. 401 Jonathan Shriqui EVM: Go Beyond the NumbersPMI-Montréal
 
SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)Chris Cummins
 
Power financials - how we work
Power financials - how we workPower financials - how we work
Power financials - how we workSteve Power
 
Six sigma case study-a good approach with example
Six sigma case study-a good approach with exampleSix sigma case study-a good approach with example
Six sigma case study-a good approach with examplebhanutomar
 
Project Performance Measurement Earned Value A Starter
Project Performance Measurement   Earned Value   A StarterProject Performance Measurement   Earned Value   A Starter
Project Performance Measurement Earned Value A StarterSimonRobertson
 
3. capacity planning
3. capacity planning3. capacity planning
3. capacity planningSudipta Saha
 
Jared Amato - Six Sigma Green Belt Reporting
Jared Amato - Six Sigma Green Belt ReportingJared Amato - Six Sigma Green Belt Reporting
Jared Amato - Six Sigma Green Belt ReportingJared Amato
 
08.1 Aggregate Planning in SC. and scope pptx
08.1 Aggregate Planning in SC. and scope pptx08.1 Aggregate Planning in SC. and scope pptx
08.1 Aggregate Planning in SC. and scope pptxassadullahdm1
 
Service Design and the joy of prototyping operating models
Service Design and the joy of prototyping operating modelsService Design and the joy of prototyping operating models
Service Design and the joy of prototyping operating modelsStephen McKernon
 
Techniques for measurement of productivity
Techniques for measurement of productivityTechniques for measurement of productivity
Techniques for measurement of productivityANSHUL AHUJA
 
Lean, Six Sigma, ToC using DMAIC - Measure phase
Lean, Six Sigma, ToC using DMAIC - Measure phase Lean, Six Sigma, ToC using DMAIC - Measure phase
Lean, Six Sigma, ToC using DMAIC - Measure phase Simon Misiewicz
 
OpenText Live: Modeling your business processes to new ways of working
OpenText Live: Modeling your business processes to new ways of workingOpenText Live: Modeling your business processes to new ways of working
OpenText Live: Modeling your business processes to new ways of workingOpenText Portfolio
 
Lean Cell Design -Presentation project part c rohan naik & aditya kamble
Lean Cell Design -Presentation project part c  rohan naik & aditya kambleLean Cell Design -Presentation project part c  rohan naik & aditya kamble
Lean Cell Design -Presentation project part c rohan naik & aditya kambleRohan Naik
 

Semelhante a Production & Operarions Management Compre Review (20)

Production & operarions management review
Production & operarions management reviewProduction & operarions management review
Production & operarions management review
 
3. Capacity 22 HR.ppt
3. Capacity 22 HR.ppt3. Capacity 22 HR.ppt
3. Capacity 22 HR.ppt
 
Symposium 2016 : CONF. 401 Jonathan Shriqui EVM: Go Beyond the Numbers
Symposium 2016 : CONF. 401  Jonathan Shriqui EVM: Go Beyond the NumbersSymposium 2016 : CONF. 401  Jonathan Shriqui EVM: Go Beyond the Numbers
Symposium 2016 : CONF. 401 Jonathan Shriqui EVM: Go Beyond the Numbers
 
SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)
 
SCM PROJECT
SCM PROJECTSCM PROJECT
SCM PROJECT
 
Log11 uitwerking opdrachten
Log11 uitwerking opdrachtenLog11 uitwerking opdrachten
Log11 uitwerking opdrachten
 
Power financials - how we work
Power financials - how we workPower financials - how we work
Power financials - how we work
 
Six sigma case study-a good approach with example
Six sigma case study-a good approach with exampleSix sigma case study-a good approach with example
Six sigma case study-a good approach with example
 
Project Performance Measurement Earned Value A Starter
Project Performance Measurement   Earned Value   A StarterProject Performance Measurement   Earned Value   A Starter
Project Performance Measurement Earned Value A Starter
 
3. capacity planning
3. capacity planning3. capacity planning
3. capacity planning
 
Bengkel POM
Bengkel POMBengkel POM
Bengkel POM
 
Jared Amato - Six Sigma Green Belt Reporting
Jared Amato - Six Sigma Green Belt ReportingJared Amato - Six Sigma Green Belt Reporting
Jared Amato - Six Sigma Green Belt Reporting
 
08.1 Aggregate Planning in SC. and scope pptx
08.1 Aggregate Planning in SC. and scope pptx08.1 Aggregate Planning in SC. and scope pptx
08.1 Aggregate Planning in SC. and scope pptx
 
ROI of Machine Learning In IoT
ROI of Machine Learning In IoTROI of Machine Learning In IoT
ROI of Machine Learning In IoT
 
OEE IMPLEMENTATION part 1
OEE IMPLEMENTATION part 1OEE IMPLEMENTATION part 1
OEE IMPLEMENTATION part 1
 
Service Design and the joy of prototyping operating models
Service Design and the joy of prototyping operating modelsService Design and the joy of prototyping operating models
Service Design and the joy of prototyping operating models
 
Techniques for measurement of productivity
Techniques for measurement of productivityTechniques for measurement of productivity
Techniques for measurement of productivity
 
Lean, Six Sigma, ToC using DMAIC - Measure phase
Lean, Six Sigma, ToC using DMAIC - Measure phase Lean, Six Sigma, ToC using DMAIC - Measure phase
Lean, Six Sigma, ToC using DMAIC - Measure phase
 
OpenText Live: Modeling your business processes to new ways of working
OpenText Live: Modeling your business processes to new ways of workingOpenText Live: Modeling your business processes to new ways of working
OpenText Live: Modeling your business processes to new ways of working
 
Lean Cell Design -Presentation project part c rohan naik & aditya kamble
Lean Cell Design -Presentation project part c  rohan naik & aditya kambleLean Cell Design -Presentation project part c  rohan naik & aditya kamble
Lean Cell Design -Presentation project part c rohan naik & aditya kamble
 

Último

Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jisc
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfNirmal Dwivedi
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...Amil baba
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxPooja Bhuva
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structuredhanjurrannsibayan2
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfDr Vijay Vishwakarma
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17Celine George
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 

Último (20)

Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 

Production & Operarions Management Compre Review

  • 2. 1. Introduction 2. Forecasting 3. Design of Goods & Services, Processes & Systems 4. Facilities & Capacity Planning 5. Inventory Planning and Supply Chain Management 6. Materials, Manufacturing & Enterprise Resource Planning (MRP, ERP) 8. Quality Management, TQM, ISO 9. Quality Improvement, JIT, Lean, Six Sigma 10. Project Management 11. Service Operations Management 12. Operations Strategy, Sustainability, Social & Ethics 13. Plant Tour/Group Project * 7. Midterm Exam and 14 Final Exam REVIEW OUTLINE POM Syllabus
  • 7. POM DEFINITION WHAT IS OPERATIONS MANAGEMENT?  Production is the creation of goods and services  Operations management (OM) is the set of activities that create value in the form of goods and services by transforming inputs into outputs
  • 8. Design of Goods & Services, Processes & Systems
  • 11.
  • 12. PRODUCTIVITY CHALLENGE Productivity is the ratio of outputs (goods and services) divided by the inputs (resources such as labor and capital) The objective is to improve productivity! Important Note! Production is a measure of output only and not a measure of efficiency
  • 13.
  • 14. ▶ Measure of process improvement ▶ Represents output relative to input ▶ Only through productivity increases can our standard of living improve PRODUCTIVITY Productivity = Units produced Input used
  • 15. PRODUCTIVITY CALCULATIONS Productivity = Units produced Labor-hours used = = 4 units/labor-hour 1,000 250 Labor Productivity One resource input  single-factor productivity
  • 16. MULTI-FACTOR PRODUCTIVITY Output Labor + Material + Factory OH Productivity = ► Also known as total factor productivity ► Output and inputs are often expressed in dollars Multiple resource inputs  multi-factor productivity
  • 17. COLLINS TITLE PRODUCTIVITY Staff of 4 workers 8 hrs/day 8 titles/day Payroll cost = $640/day Overhead = $400/day Old System: 14 titles/day Overhead = $800/day New System: 8 titles/day $640 + 400 14 titles/day $640 + 800 = Old multifactor productivity = New multifactor productivity = .0077 titles/dollar = .0097 titles/dollar
  • 18. IMPROVING PRODUCTIVITY AT STARBUCKS A team of 10 analysts continually look for ways to shave time. Some improvements: Stop requiring signatures on credit card purchases under $25 Saved 8 seconds per transaction Change the size of the ice scoop Saved 14 seconds per drink New espresso machines Saved 12 seconds per shot Operations improvements have helped Starbucks increase yearly revenue per outlet by $250,000 to $1,000,000 in seven years. Productivity has improved by 27%, or about 4.5% per year.
  • 20.
  • 21. FORECASTING METHODS Copyright ©2013 Pearson Education 14 - 22  Naïve Method The forecast for the next period is the demand for the current period  Moving Average Method  Weighted Moving Average Method  Exponential Smoothing Method  Linear Regression Method
  • 22. MOVING AVERAGE METHOD Compute a three-week moving average forecast for the arrival of medical clinic patients in week 4. The numbers of arrivals for the past 3 weeks were: Week Patient Arrivals 1 400 2 380 3 411 14 - 23
  • 23. WEIGHTED AVERAGE METHOD Compute the forecast for the arrival of medical patients in week 4 using the weighted average method. The numbers of arrivals were as follows: Week Patient Arrivals Weight 1 400 20% 2 380 30% 3 411 50% 14 - 24
  • 24. EXPONENTIAL SMOOTHING METHOD Compute the forecast for the arrival of patients in week 4 using the exponential smoothing method. The smoothing constant is α = 0.10: Week Patient Arrivals Previous Forecast 1 400 2 380 3 411 415 FNew = FPrevious + α (Actual – FPrevious)
  • 25. LINEAR REGRESSION METHOD Compute forecast for week 7 using the linear regression method. Week Patient Arrivals 1 400 2 380 3 411 4 415 5 421 6 427 Y = A(X) + B Where A = slope, B = Y-intercept
  • 26. LINEAR REGRESSION METHOD Formula Result ΣX 21 ΣY 2,454 n 6 ΣX2 91 ΣY2 1,005,116 ΣXY 8,720
  • 27. LINEAR REGRESSION METHOD nΣXY – ΣXΣY 6(8720)-(21)(2,454) 786 A = ------------- = ---------------------- = ----- = 7.485714 nΣX2 – (ΣX)2 6(91) – (21)2 105 ΣY – AΣX 2,454 – (7.485714)(21) 2296.8 B = ---------- = --------------------------- = -------- = 382.8 n 6 6 Y7 = A(X7) + B = 7.485714 (7) + 382.8 = 435.2
  • 28. LINEAR REGRESSION METHOD nΣXY – ΣXΣY R = -------------------------------------- = 0.828103 √(𝒏𝚺𝑿 𝟐 – (𝚺𝑿) 𝟐)(𝒏𝚺𝒀 𝟐 – (𝚺𝒀) 𝟐) REGRESSION COEFFICIENT 0 < /r/ < 0.3 = Weak Correlation .3 < /r/ < 0.7 = Moderate Correlation /r/ > 0.7 = Strong Correlation
  • 29. Facilities Planning Copyright ©2013 Pearson Education 11- 030
  • 30.  Proximity to the Market  Location of the Plant, Warehouse and Office  Size of the Plant, Warehouse and Office  Construction and Renovation Costs  Equipment, Furniture and Fixtures Required  Organization and Manpower Requirements  Purchasing of Equipment, Furniture & Fixtures  Supply Chain for Raw Materials and Consumables  Environmental Conditions  Community and Social Responsibility KEY DECISIONS IN FACILITIES PLANNING
  • 32. Site Selection in Physical Distribution
  • 33.
  • 34.
  • 36. Economic Order Quantity A local company expects to sell 9000 tires of a certain tire next year, Annual carrying cost is P640 per tire and ordering cost is P3,000. The distributor operates 288 days a year. a. What is the EOQ? b. How many times does the store have to re- order per year? c. What is the total annual cost, if the EOQ is ordered?
  • 37. EOQ a. Economic Order Quantity b. Optimal No. of Orders Per Year N = D = 9,000 EOQ 290 N = 31 Orders/Year Given: K = Ordering Cost 3,000.00 Pesos H = Carrying Cost 640.00 Pesos/Yr D = Demand 9,000 Units/Yr Working Days 288 Days Daily Demand = Consumption 31.25 Units/Day EOQ = 2 D K = 2(9,000)(3,000) H 640 = 54,000,000 = 84,375 640 EOQ = 290 Units √ √ √ √
  • 38. EOQ Given: K = Ordering Cost 3,000.00 Pesos H = Carrying Cost 640.00 Pesos/Yr D = Demand 9,000 Units/Yr Working Days 288 Days Daily Demand = Consumption 31.25 Units/Day c. Minimum Total Annual Inventory Cost Total Cost = Ordering + Holding Tc = To + Th + H Q/2 + (640)(290) 2 + 92,952 Pesos Per Year 92,952 D K/Q (3000)(9000) 290 185,903.20
  • 40. Quality Management A time study in an assembly line yielded the following observation times and the performance rating is 1.13 seconds. a. Using an allowance of 20% on job time, determine the appropriate standard time for the operation. b. Develop a quality control chart for the process, using six sigma limits. Observation Time (secs.) 1 1.12 2 1.15 3 1.16 4 1.12 5 1.15 6 1.18 7 1.14 8 1.14 9 1.19 Given allowance 20% Assembly Line
  • 41. Quality Management a. Using an allowance of 20% on job time, determine the appropriate standard time for the operation. Observation Time (secs.) 1 1.12 2 1.15 3 1.16 4 1.12 5 1.15 6 1.18 7 1.14 8 1.14 9 1.19 Mean 1.15 Allowance (20%) 0.23 Standard Time Lower limit = 0.92 Upper limit = 1.38
  • 42. Six Sigma Limits 6 Sigma Limits 4 Sigma Limits 2 Sigma Limits 99.73% 95.45% 68.27%
  • 43. Six Sigma Control Chart Observation Time (secs.) 1 1.12 2 1.15 3 1.16 4 1.12 5 1.15 6 1.18 7 1.14 8 1.14 9 1.19 Mean 1.15 Standard Deviation 0.0240 Six-Sigma Limits Lower limit = 1.08 Upper limit = 1.22 1.221.08 1.15 b. Develop a quality control chart for the process, using six sigma limits.
  • 44. Project Management Garage Bed Room1 Master’s Bedroom Living Room Kitchen Bed Room2 3 – Bedroom Bungalow (One Storey) House BUILDING A HOUSE Watch Video
  • 45. BUILDING A HOUSE RECORD 4 Hours, 18 Minutes 700 People Cement Mixer and Cranes Skilled Workers w/ Power Tools Pre-Fabricated Wood Framing San Diego California Team A vs Team B will attempt to break the world record.
  • 46. FinishStart A B C D E F G H I J K A — B — C A D B E B F A G C H D I A J E,G,H K F,I,J Immediate Predecessor 02 - 47 CRITICAL PATH METHOD Duration (Days)
  • 48. FinishStart A B C D E F G H I J K Path Time (days) A-I-K 33 A-F-K 28 A-C-G-J-K 67 B-D-H-J-K 69 B-E-J-K 43 Paths are the sequence of activities between a project’s start and finish. 02 - 49 CRITICAL PATH METHOD
  • 49. 02 - 50 Latest finish time Latest start time Activity Duration Earliest start time Earliest finish time 0 2 12 14 A 12 CRITICAL PATH METHOD
  • 50. K 6 C 10 G 35 J 4 H 40 B 9 D 10 E 24 I 15 FinishStart A 12 F 10 0 9 9 33 9 19 19 59 22 5712 22 59 63 12 27 12 22 63 690 12 48 63 53 63 59 63 24 59 19 59 35 59 14 24 9 19 2 14 0 9 63 69 PERT/CPM S = 0 S = 2 S = 26 S = 0 S = 36 S = 2 S = 2 S = 41 S = 0 S = 0 S = 0 The critical path is B–D –H –J - K with a project duration of 69 days.