THE ROAD MAP

6 STEPS FOR IMPROVEMENTS
IN THE OFFICES
Identify process
and value
Draw current
400
state

1- Identify what add value to the customers;
Projects ahead of schedule (July to Dec. 2004)

2 – Understand the current process
100
3 – Identify wastes;
80

4 – Find the root cause of wastes;

Draw Future
6
100
State

40
5 – Draw a high performance process
based on 3 lean solutions

60

200

%

Days

300
Analyze the
wastes

15

0
ZE
Pump Type
Quantity of days 129
33,5
%
Accumulative% 33, 5

C
AP

68
Implementation17,7
51,2

10

20

2

4

7
2
3
6 – Implement actions and manage to
2
1
2
0
AP3V perfection; M
M
C ZE
M BT
B
B S H N G S HV Other
M
S
M
39
25
21
14
14
7
6
5
0

S N
M
57
14,8 10,1
66,0 76,1

6,5
82,6

5,5
3,6
88,1 91,7

3,6
95,3

1,8
97,1

1,6
1, 3
0,0
98,7 100, 0 100,0
FILES
VOC.xls

VOC analysis.xls
VOICE OF CUSTOMER
What happens
with time?

Attractives
Attractives
(unknown)
(unknown)

Performance
Performance
(Spoken)
(Spoken)

Time

Not done
(or done in a bad way)

Ne

ra l
ut

Well done

Basic
Basic

(Expected)
(Expected)
INTERPRETING RESULTS

Functional presentation POSITIVE (+)

Customer
requirements

Satisfied

Functional presentation NEGATIVE (-)
Satisfied

?

Neutral
Attactive

Reverse

Indiferent

Reverse

Reverse

Unsatisfied
Performance

Basic

Neutral

Unsatisfied

?
Identify process
and value
Draw current
400
state

1- Identify what add value to the customers;
Projects ahead of schedule (July to Dec. 2004)

2 – Understand the current process
100
3 – Identify wastes;
80

4 – Find the root cause of wastes;

Draw Future
6
100
State

40
5 – Draw a high performance process
based on 3 lean solutions

60

200

%

Days

300
Analyze the
wastes

15

0
ZE
Pump Type
Quantity of days 129
33,5
%
Accumulative% 33, 5

C
AP

68
Implementation17,7
51,2

10

20

2

4

7
2
3
6 – Implement actions and manage to
2
1
2
0
AP3V perfection; M
M
C ZE
M BT
B
B S H N G S HV Other
M
S
M
39
25
21
14
14
7
6
5
0

S N
M
57
14,8 10,1
66,0 76,1

6,5
82,6

5,5
3,6
88,1 91,7

3,6
95,3

1,8
97,1

1,6
1, 3
0,0
98,7 100, 0 100,0
UNDERSTAND THE CURRENT
PROCESS
Voice of Customer
Survey
> 70% answers to be trustful

Gather people’s
activity information
30 days to avoid seasonality

Critical
Analysis

Prioritized &
Critical
VSMs
GATHER PEOPLE’S ACTIVITY
INFORMATION
Data Gathering.xls

Data Gathering - Consolidation.xls
VALUE STREAM MAPPING
VSM.xls

VSM.pdf

VSM.vsd
WASTES IN OFFICES
 BOUNDARY WASTES
 KNOWLEDGE WASTES
 PLANNING WASTES
9 WASTES IN OFFICES
USELESS
INFORMATION

WAITING
LARGE BATCHES

BOUNDARY
BOUNDARY

LACK OF
LEVELLING

PLANNING
PLANNING

REDUNDANT
TASKS

LACK OF
SYNCHRONISM
POOR QUALITY

REINVENTION

KNOWLEDGE
KNOWLEDGE

STOP AND GO
TASKS
Identify process
and value
Draw current
400
state

1- Identify what add value to the customers;
Projects ahead of schedule (July to Dec. 2004)

2 – Understand the current process
100
3 – Identify wastes;
80

4 – Find the root cause of wastes;

Draw Future
6
100
State

40
5 – Draw a high performance process
based on 3 lean solutions

60

200

%

Days

300
Analyze the
wastes

15

0
ZE
Pump Type
Quantity of days 129
33,5
%
Accumulative% 33, 5

C
AP

68
Implementation17,7
51,2

10

20

2

4

7
2
3
6 – Implement actions and manage to
2
1
2
0
AP3V perfection; M
M
C ZE
M BT
B
B S H N G S HV Other
M
S
M
39
25
21
14
14
7
6
5
0

S N
M
57
14,8 10,1
66,0 76,1

6,5
82,6

5,5
3,6
88,1 91,7

3,6
95,3

1,8
97,1

1,6
1, 3
0,0
98,7 100, 0 100,0
DMAIC TOOLS (ubertool)
BRAINSTORMING
PARETTO
CHART
CHECK-LIST

CHARTS

PRIORITY MATRIX
ISHIKAWA
5W
1H

5W / 1H
DMAIC TOOLS (ubertool)
Quick Hits

Complex

JUST DO IT!

PLAN = 5W1H & 5
WHYs

~ 40% of cases

~ 60% of cases
5W1H
5 WHYS
FILES

5W1H
5 Whys
Identify process
and value
Draw current
400
state

1- Identify what add value to the customers;
Projects ahead of schedule (July to Dec. 2004)

2 – Understand the current process
100
3 – Identify wastes;
80

4 – Find the root cause of wastes;

Draw Future
6
100
State

40
5 – Draw a high performance process
based on 3 lean solutions

60

200

%

Days

300
Analyze the
wastes

15

0
ZE
Pump Type
Quantity of days 129
33,5
%
Accumulative% 33, 5

C
AP

68
Implementation17,7
51,2

10

20

2

4

7
2
3
6 – Implement actions and manage to
2
1
2
0
AP3V perfection; M
M
C ZE
M BT
B
B S H N G S HV Other
M
S
M
39
25
21
14
14
7
6
5
0

S N
M
57
14,8 10,1
66,0 76,1

6,5
82,6

5,5
3,6
88,1 91,7

3,6
95,3

1,8
97,1

1,6
1, 3
0,0
98,7 100, 0 100,0
3 LEAN SOLUTIONS
1 – FLOW;
2 – STANDARDIZATION;
3 – QUALITY MANAGEMENT;
FLOW
 LEVEL THE WORKLOAD;


ELIMINATE
INTERRUPTIONS;
LEVEL THE WORKLOAD
DEMAND

• QUESTIONS:
•

WHAT IS THE CAPACITY OF THE PROCESS?

•

IS THERE A BOTTLENECK?

•

IS THERE AN OVERLOAD?

•

WHAT IS THE RIGHT TIME TO START?

•

WHO SETS PRIORITY?
BALANCE CHART
BALANCE CHART
BALANCE CHART

Balance chart.xls
ELIMINATE INTERRUPTIONS
PROCESS
DATA

DEPTS

INFORMATION
FLOW
WITH NO HAND
OFFS

•PRECIOUS
INFORM.;
• GOOD
DECISION
TRADITIONAL PROCESS
LEAN PROCESS
3 LEAN SOLUTIONS
1 – FLOW;
2 – STANDARDIZATION;
3 – QUALITY MANAGEMENT;
STANDARDIZATION: OFFICE
STANDARD WORK INSTRUCTION
Content:
1 – Work flow
SWI.xls

2 – Processes Inputs and Outputs
3 – Method: detailed instruction, step by
step (element instruction)
3 LEAN SOLUTIONS
1 – FLOW;
2 – STANDARDIZATION;
3 – QUALITY MANAGEMENT;
• LEAN MANAGEMENT SYSTEM
• VISUAL MANAGEMENT
• LESSONS LEARNED
Daily Accountability Routine
7.00 – 8.00 am

Operators

Supervisor

Tier 11
Tier

8.00 – 8.30 am

Data acquisition

Supervisor

Process Eng

Plant Manager

Superintendent

Gather together the information
to share with tier 4

Site
Manager

Plant
Managers

Superintendent

Tier 22
Tier

Maintanance

Planning

Task Accountability Board
Task Accountability Board
9.00 – 9.30 am

Tier 33
Tier

9.30 – 10.00 am

Tier 44
Tier

Signatures

YYYYY

XXXXX

Maintanance
Manager

XXXXX

Planning
Manager
LEAN MANAGEMENT

Lean Management.xls
VISUAL MANAGEMENT

Make easy and widely accessible
the comparison of the expected
performance versus actual
VISUAL MANAGEMENT

Call Center Management
VISUAL MANAGEMENT

Delivery Issues
VISUAL MANAGEMENT

Kamishibai – Routine control
Action Log

VISUAL MANAGEMENT
VISUAL MANAGEMENT

KPIs Visual Management.xls
LESSONS LEARNED
Structured meetings with the following
targets:


Measure results



Focus in facts and data



Process analysis



Feedback of internal customer



Written improvement plan
Identify process
and value
Draw current
400
state

1- Identify what add value to the customers;
Projects ahead of schedule (July to Dec. 2004)

2 – Understand the current process
100
3 – Identify wastes;
80

4 – Find the root cause of wastes;

Draw Future
6
100
State

40
5 – Draw a high performance process
based on 3 lean solutions

60

200

%

Days

300
Analyze the
wastes

15

0
ZE
Pump Type
Quantity of days 129
33,5
%
Accumulative% 33, 5

C
AP

68
Implementation17,7
51,2

10

20

2

4

7
2
3
6 – Implement actions and manage to
2
1
2
0
AP3V perfection; M
M
C ZE
M BT
B
B S H N G S HV Other
M
S
M
39
25
21
14
14
7
6
5
0

S N
M
57
14,8 10,1
66,0 76,1

6,5
82,6

5,5
3,6
88,1 91,7

3,6
95,3

1,8
97,1

1,6
1, 3
0,0
98,7 100, 0 100,0
A3 REPORT
Title

DATE
17/06/08

E.O.

F. B.

M. E.

P. P.

D. M.

A.C.

BACKGROUND / TARGETS

FUTURE STATE

•Historical Context

C. F.

• Actions and why are recommended
• Countermeasures to the root-cause

•What is the problem? What is the relation
with the business?
CURRENT STATE

•Where are we?
•How are we?
•Facts and data

ACTION PLAN

• Which activities are required to reach the
target condition?
• Responsible and when?

ANALYSIS

•What is the root cause?
•What is the restriction?

INDICADORES

• Measurement of impact of the actions in
the KPIs
FILES
A3 Report Template.xls

A3 Report Example.xls

Mais conteúdo relacionado

Mais procurados

Lean Mindsets and Behaviors
Lean Mindsets and BehaviorsLean Mindsets and Behaviors
Lean Mindsets and Behaviors
TKMG, Inc.
 
Kaizen Training
Kaizen Training Kaizen Training
Kaizen Training
jah10632
 
5 Why Training Slides Oct 14, 2009
5 Why Training Slides Oct 14, 20095 Why Training Slides Oct 14, 2009
5 Why Training Slides Oct 14, 2009
ExerciseLeanLLC
 
TPM by Chandan Jha
TPM by Chandan JhaTPM by Chandan Jha
TPM by Chandan Jha
Chanand Jha
 
Quality control circle (qcc)
Quality control circle (qcc)Quality control circle (qcc)
Quality control circle (qcc)
Fickri Hafriz
 

Mais procurados (20)

TPM for lean manufacturing chp4 step of “jlshu hozen “activities
TPM for lean manufacturing  chp4 step of “jlshu hozen “activitiesTPM for lean manufacturing  chp4 step of “jlshu hozen “activities
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
 
Lean Office by Operational Excellence Consulting
Lean Office by Operational Excellence ConsultingLean Office by Operational Excellence Consulting
Lean Office by Operational Excellence Consulting
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)
 
Kaizen ~ Continuous Process Improvement (Cpi)
Kaizen ~  Continuous Process Improvement (Cpi)Kaizen ~  Continuous Process Improvement (Cpi)
Kaizen ~ Continuous Process Improvement (Cpi)
 
Lean Leadership _ ARMA 2015
Lean Leadership _ ARMA 2015Lean Leadership _ ARMA 2015
Lean Leadership _ ARMA 2015
 
TPM Activity
TPM ActivityTPM Activity
TPM Activity
 
Manufacturing Excellence - Visual Factory
Manufacturing Excellence - Visual FactoryManufacturing Excellence - Visual Factory
Manufacturing Excellence - Visual Factory
 
Lean Mindsets and Behaviors
Lean Mindsets and BehaviorsLean Mindsets and Behaviors
Lean Mindsets and Behaviors
 
TPM Overview and AM Workshop
TPM Overview and AM WorkshopTPM Overview and AM Workshop
TPM Overview and AM Workshop
 
"Visual management & 5S " in Lean T.P.S (Workshop slides)
"Visual management &  5S " in Lean T.P.S (Workshop slides)"Visual management &  5S " in Lean T.P.S (Workshop slides)
"Visual management & 5S " in Lean T.P.S (Workshop slides)
 
Kaizen Training
Kaizen Training Kaizen Training
Kaizen Training
 
5 Why Training Slides Oct 14, 2009
5 Why Training Slides Oct 14, 20095 Why Training Slides Oct 14, 2009
5 Why Training Slides Oct 14, 2009
 
TPM by Chandan Jha
TPM by Chandan JhaTPM by Chandan Jha
TPM by Chandan Jha
 
5S: A Lean Transformation Tool
5S: A Lean Transformation Tool5S: A Lean Transformation Tool
5S: A Lean Transformation Tool
 
Lean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training ModuleLean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training Module
 
Kaizen & Small Group Activities
Kaizen & Small Group ActivitiesKaizen & Small Group Activities
Kaizen & Small Group Activities
 
Quality control circle (qcc)
Quality control circle (qcc)Quality control circle (qcc)
Quality control circle (qcc)
 
5 s and workplace productivity cet
5 s and workplace productivity cet5 s and workplace productivity cet
5 s and workplace productivity cet
 
TPM: Focused Improvement (Kobetsu Kaizen) Poster
TPM: Focused Improvement (Kobetsu Kaizen) PosterTPM: Focused Improvement (Kobetsu Kaizen) Poster
TPM: Focused Improvement (Kobetsu Kaizen) Poster
 
TPM For lean manufacturing chp3 | kobetsu kaizen for production efficiency...
TPM For lean manufacturing  chp3 |   kobetsu kaizen for production efficiency...TPM For lean manufacturing  chp3 |   kobetsu kaizen for production efficiency...
TPM For lean manufacturing chp3 | kobetsu kaizen for production efficiency...
 

Destaque

Better Project Selection using Hoshin Planning and Balanced Scorecards
Better Project Selection using Hoshin Planning and Balanced ScorecardsBetter Project Selection using Hoshin Planning and Balanced Scorecards
Better Project Selection using Hoshin Planning and Balanced Scorecards
Grant Crow
 
Deploying Hoshin Kanri as a Competitive Weapon
Deploying Hoshin Kanri as a Competitive WeaponDeploying Hoshin Kanri as a Competitive Weapon
Deploying Hoshin Kanri as a Competitive Weapon
Grant Crow
 

Destaque (12)

A Guide to Operational Excellence
A Guide to Operational ExcellenceA Guide to Operational Excellence
A Guide to Operational Excellence
 
Better Project Selection using Hoshin Planning and Balanced Scorecards
Better Project Selection using Hoshin Planning and Balanced ScorecardsBetter Project Selection using Hoshin Planning and Balanced Scorecards
Better Project Selection using Hoshin Planning and Balanced Scorecards
 
The AIT Group Story
The AIT Group StoryThe AIT Group Story
The AIT Group Story
 
Changing a Public Sector Agency
Changing a Public Sector AgencyChanging a Public Sector Agency
Changing a Public Sector Agency
 
A Developmental Pathway to Lean
A Developmental Pathway to LeanA Developmental Pathway to Lean
A Developmental Pathway to Lean
 
Management Kamishibai Reliable Plant 2011 Compressed
Management Kamishibai   Reliable Plant 2011 CompressedManagement Kamishibai   Reliable Plant 2011 Compressed
Management Kamishibai Reliable Plant 2011 Compressed
 
Apresentação kamishibai em pdf
Apresentação kamishibai em pdfApresentação kamishibai em pdf
Apresentação kamishibai em pdf
 
Kamishibai e kamishibai board
Kamishibai e kamishibai boardKamishibai e kamishibai board
Kamishibai e kamishibai board
 
Kamishibai Process And General Training Instructions Created By Todd Mc Cann
Kamishibai Process And General Training Instructions Created By Todd Mc CannKamishibai Process And General Training Instructions Created By Todd Mc Cann
Kamishibai Process And General Training Instructions Created By Todd Mc Cann
 
Kamishibai in practice
Kamishibai in practiceKamishibai in practice
Kamishibai in practice
 
Muda in service industries
Muda in service industriesMuda in service industries
Muda in service industries
 
Deploying Hoshin Kanri as a Competitive Weapon
Deploying Hoshin Kanri as a Competitive WeaponDeploying Hoshin Kanri as a Competitive Weapon
Deploying Hoshin Kanri as a Competitive Weapon
 

Semelhante a Lean Road Map

ANALYZING THE PROCESS CAPABILITY FOR AN AUTO MANUAL TRANSMISSION BASE PLATE M...
ANALYZING THE PROCESS CAPABILITY FOR AN AUTO MANUAL TRANSMISSION BASE PLATE M...ANALYZING THE PROCESS CAPABILITY FOR AN AUTO MANUAL TRANSMISSION BASE PLATE M...
ANALYZING THE PROCESS CAPABILITY FOR AN AUTO MANUAL TRANSMISSION BASE PLATE M...
ijmvsc
 
Scheduling by Primavera - Training
Scheduling by Primavera - TrainingScheduling by Primavera - Training
Scheduling by Primavera - Training
Mohammed Feroze
 

Semelhante a Lean Road Map (20)

Dmaic
DmaicDmaic
Dmaic
 
ANALYZING THE PROCESS CAPABILITY FOR AN AUTO MANUAL TRANSMISSION BASE PLATE M...
ANALYZING THE PROCESS CAPABILITY FOR AN AUTO MANUAL TRANSMISSION BASE PLATE M...ANALYZING THE PROCESS CAPABILITY FOR AN AUTO MANUAL TRANSMISSION BASE PLATE M...
ANALYZING THE PROCESS CAPABILITY FOR AN AUTO MANUAL TRANSMISSION BASE PLATE M...
 
Six Sigma Process Improvement Foundational Steps
Six Sigma Process Improvement Foundational StepsSix Sigma Process Improvement Foundational Steps
Six Sigma Process Improvement Foundational Steps
 
Analysis and Reduction of Production Waste in the Process of Production of Fr...
Analysis and Reduction of Production Waste in the Process of Production of Fr...Analysis and Reduction of Production Waste in the Process of Production of Fr...
Analysis and Reduction of Production Waste in the Process of Production of Fr...
 
UTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream MappingUTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream Mapping
 
Supply chain design and operation
Supply chain design and operationSupply chain design and operation
Supply chain design and operation
 
Using SCOR Best Practice Webinar
Using SCOR Best Practice WebinarUsing SCOR Best Practice Webinar
Using SCOR Best Practice Webinar
 
Six Sigma
Six SigmaSix Sigma
Six Sigma
 
ProjectReport_SPCinAM
ProjectReport_SPCinAMProjectReport_SPCinAM
ProjectReport_SPCinAM
 
PDO Predictive Analytics Share for the Annual Research Forum 2015
PDO Predictive Analytics Share for the Annual Research Forum 2015PDO Predictive Analytics Share for the Annual Research Forum 2015
PDO Predictive Analytics Share for the Annual Research Forum 2015
 
Six Sigma Green Belt (Product Track)
Six Sigma Green Belt (Product Track)Six Sigma Green Belt (Product Track)
Six Sigma Green Belt (Product Track)
 
Six Sigma Green Belt (Product Track)
Six Sigma Green Belt (Product Track)Six Sigma Green Belt (Product Track)
Six Sigma Green Belt (Product Track)
 
Aplication of on line data analytics to a continuous process polybetene unit
Aplication of on line data analytics to a continuous process polybetene unitAplication of on line data analytics to a continuous process polybetene unit
Aplication of on line data analytics to a continuous process polybetene unit
 
Lean - Tight Oil Design & Construction
Lean - Tight Oil Design & ConstructionLean - Tight Oil Design & Construction
Lean - Tight Oil Design & Construction
 
Service Design and the joy of prototyping operating models
Service Design and the joy of prototyping operating modelsService Design and the joy of prototyping operating models
Service Design and the joy of prototyping operating models
 
Scheduling by Primavera - Training
Scheduling by Primavera - TrainingScheduling by Primavera - Training
Scheduling by Primavera - Training
 
Asq int lss
Asq int lssAsq int lss
Asq int lss
 
ISO 9001:2015 Revision Overview: part 3
ISO 9001:2015 Revision Overview: part 3ISO 9001:2015 Revision Overview: part 3
ISO 9001:2015 Revision Overview: part 3
 
Module Owb Tuning
Module Owb TuningModule Owb Tuning
Module Owb Tuning
 
1b7 quality control
1b7 quality control1b7 quality control
1b7 quality control
 

Mais de Paul J. Walsh

THE SUCCESSFULL INTERVIEWER
THE SUCCESSFULL INTERVIEWERTHE SUCCESSFULL INTERVIEWER
THE SUCCESSFULL INTERVIEWER
Paul J. Walsh
 
THE MOBILE CAREER HUNTER
THE MOBILE CAREER HUNTERTHE MOBILE CAREER HUNTER
THE MOBILE CAREER HUNTER
Paul J. Walsh
 
SUCCESSFUL INTERVIEW PREP.
SUCCESSFUL INTERVIEW PREP.SUCCESSFUL INTERVIEW PREP.
SUCCESSFUL INTERVIEW PREP.
Paul J. Walsh
 
THOUGHTS ON TEAMWORK
THOUGHTS ON TEAMWORKTHOUGHTS ON TEAMWORK
THOUGHTS ON TEAMWORK
Paul J. Walsh
 

Mais de Paul J. Walsh (20)

P.13.programme overview
P.13.programme overviewP.13.programme overview
P.13.programme overview
 
P.12. interview skills ques.
P.12. interview skills ques.P.12. interview skills ques.
P.12. interview skills ques.
 
P.11.what are soft skills (2)
P.11.what are soft skills (2)P.11.what are soft skills (2)
P.11.what are soft skills (2)
 
P.10. working for tips
P.10. working for tipsP.10. working for tips
P.10. working for tips
 
P.8. the successful interview
P.8. the successful interviewP.8. the successful interview
P.8. the successful interview
 
P.7. professional mindset
P.7. professional mindsetP.7. professional mindset
P.7. professional mindset
 
P.6. the professional interview
P.6. the professional interviewP.6. the professional interview
P.6. the professional interview
 
P.5. the entrenpreneur
P.5. the entrenpreneurP.5. the entrenpreneur
P.5. the entrenpreneur
 
P.4. interview questions
P.4. interview questionsP.4. interview questions
P.4. interview questions
 
P.3.hidden jobs
P.3.hidden jobsP.3.hidden jobs
P.3.hidden jobs
 
P.2.motivation for employment
P.2.motivation for employmentP.2.motivation for employment
P.2.motivation for employment
 
P.1. introduction promo
P.1. introduction promoP.1. introduction promo
P.1. introduction promo
 
P.1. introduction
P.1. introductionP.1. introduction
P.1. introduction
 
THE SUCCESSFULL INTERVIEWER
THE SUCCESSFULL INTERVIEWERTHE SUCCESSFULL INTERVIEWER
THE SUCCESSFULL INTERVIEWER
 
THE MOBILE CAREER HUNTER
THE MOBILE CAREER HUNTERTHE MOBILE CAREER HUNTER
THE MOBILE CAREER HUNTER
 
SUCCESSFUL INTERVIEW PREP.
SUCCESSFUL INTERVIEW PREP.SUCCESSFUL INTERVIEW PREP.
SUCCESSFUL INTERVIEW PREP.
 
THOUGHTS ON TEAMWORK
THOUGHTS ON TEAMWORKTHOUGHTS ON TEAMWORK
THOUGHTS ON TEAMWORK
 
EQ FUTUREPOINT
EQ FUTUREPOINTEQ FUTUREPOINT
EQ FUTUREPOINT
 
strategic tools
strategic toolsstrategic tools
strategic tools
 
Lean principles
Lean principlesLean principles
Lean principles
 

Último

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
lizamodels9
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
Matteo Carbone
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 

Último (20)

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 

Lean Road Map

  • 1. THE ROAD MAP 6 STEPS FOR IMPROVEMENTS IN THE OFFICES
  • 2. Identify process and value Draw current 400 state 1- Identify what add value to the customers; Projects ahead of schedule (July to Dec. 2004) 2 – Understand the current process 100 3 – Identify wastes; 80 4 – Find the root cause of wastes; Draw Future 6 100 State 40 5 – Draw a high performance process based on 3 lean solutions 60 200 % Days 300 Analyze the wastes 15 0 ZE Pump Type Quantity of days 129 33,5 % Accumulative% 33, 5 C AP 68 Implementation17,7 51,2 10 20 2 4 7 2 3 6 – Implement actions and manage to 2 1 2 0 AP3V perfection; M M C ZE M BT B B S H N G S HV Other M S M 39 25 21 14 14 7 6 5 0 S N M 57 14,8 10,1 66,0 76,1 6,5 82,6 5,5 3,6 88,1 91,7 3,6 95,3 1,8 97,1 1,6 1, 3 0,0 98,7 100, 0 100,0
  • 4. VOICE OF CUSTOMER What happens with time? Attractives Attractives (unknown) (unknown) Performance Performance (Spoken) (Spoken) Time Not done (or done in a bad way) Ne ra l ut Well done Basic Basic (Expected) (Expected)
  • 5. INTERPRETING RESULTS Functional presentation POSITIVE (+) Customer requirements Satisfied Functional presentation NEGATIVE (-) Satisfied ? Neutral Attactive Reverse Indiferent Reverse Reverse Unsatisfied Performance Basic Neutral Unsatisfied ?
  • 6. Identify process and value Draw current 400 state 1- Identify what add value to the customers; Projects ahead of schedule (July to Dec. 2004) 2 – Understand the current process 100 3 – Identify wastes; 80 4 – Find the root cause of wastes; Draw Future 6 100 State 40 5 – Draw a high performance process based on 3 lean solutions 60 200 % Days 300 Analyze the wastes 15 0 ZE Pump Type Quantity of days 129 33,5 % Accumulative% 33, 5 C AP 68 Implementation17,7 51,2 10 20 2 4 7 2 3 6 – Implement actions and manage to 2 1 2 0 AP3V perfection; M M C ZE M BT B B S H N G S HV Other M S M 39 25 21 14 14 7 6 5 0 S N M 57 14,8 10,1 66,0 76,1 6,5 82,6 5,5 3,6 88,1 91,7 3,6 95,3 1,8 97,1 1,6 1, 3 0,0 98,7 100, 0 100,0
  • 7. UNDERSTAND THE CURRENT PROCESS Voice of Customer Survey > 70% answers to be trustful Gather people’s activity information 30 days to avoid seasonality Critical Analysis Prioritized & Critical VSMs
  • 8. GATHER PEOPLE’S ACTIVITY INFORMATION Data Gathering.xls Data Gathering - Consolidation.xls
  • 10. WASTES IN OFFICES  BOUNDARY WASTES  KNOWLEDGE WASTES  PLANNING WASTES
  • 11. 9 WASTES IN OFFICES USELESS INFORMATION WAITING LARGE BATCHES BOUNDARY BOUNDARY LACK OF LEVELLING PLANNING PLANNING REDUNDANT TASKS LACK OF SYNCHRONISM POOR QUALITY REINVENTION KNOWLEDGE KNOWLEDGE STOP AND GO TASKS
  • 12. Identify process and value Draw current 400 state 1- Identify what add value to the customers; Projects ahead of schedule (July to Dec. 2004) 2 – Understand the current process 100 3 – Identify wastes; 80 4 – Find the root cause of wastes; Draw Future 6 100 State 40 5 – Draw a high performance process based on 3 lean solutions 60 200 % Days 300 Analyze the wastes 15 0 ZE Pump Type Quantity of days 129 33,5 % Accumulative% 33, 5 C AP 68 Implementation17,7 51,2 10 20 2 4 7 2 3 6 – Implement actions and manage to 2 1 2 0 AP3V perfection; M M C ZE M BT B B S H N G S HV Other M S M 39 25 21 14 14 7 6 5 0 S N M 57 14,8 10,1 66,0 76,1 6,5 82,6 5,5 3,6 88,1 91,7 3,6 95,3 1,8 97,1 1,6 1, 3 0,0 98,7 100, 0 100,0
  • 14. DMAIC TOOLS (ubertool) Quick Hits Complex JUST DO IT! PLAN = 5W1H & 5 WHYs ~ 40% of cases ~ 60% of cases
  • 15. 5W1H
  • 18. Identify process and value Draw current 400 state 1- Identify what add value to the customers; Projects ahead of schedule (July to Dec. 2004) 2 – Understand the current process 100 3 – Identify wastes; 80 4 – Find the root cause of wastes; Draw Future 6 100 State 40 5 – Draw a high performance process based on 3 lean solutions 60 200 % Days 300 Analyze the wastes 15 0 ZE Pump Type Quantity of days 129 33,5 % Accumulative% 33, 5 C AP 68 Implementation17,7 51,2 10 20 2 4 7 2 3 6 – Implement actions and manage to 2 1 2 0 AP3V perfection; M M C ZE M BT B B S H N G S HV Other M S M 39 25 21 14 14 7 6 5 0 S N M 57 14,8 10,1 66,0 76,1 6,5 82,6 5,5 3,6 88,1 91,7 3,6 95,3 1,8 97,1 1,6 1, 3 0,0 98,7 100, 0 100,0
  • 19. 3 LEAN SOLUTIONS 1 – FLOW; 2 – STANDARDIZATION; 3 – QUALITY MANAGEMENT;
  • 20. FLOW  LEVEL THE WORKLOAD;  ELIMINATE INTERRUPTIONS;
  • 21. LEVEL THE WORKLOAD DEMAND • QUESTIONS: • WHAT IS THE CAPACITY OF THE PROCESS? • IS THERE A BOTTLENECK? • IS THERE AN OVERLOAD? • WHAT IS THE RIGHT TIME TO START? • WHO SETS PRIORITY?
  • 25. ELIMINATE INTERRUPTIONS PROCESS DATA DEPTS INFORMATION FLOW WITH NO HAND OFFS •PRECIOUS INFORM.; • GOOD DECISION
  • 28. 3 LEAN SOLUTIONS 1 – FLOW; 2 – STANDARDIZATION; 3 – QUALITY MANAGEMENT;
  • 29. STANDARDIZATION: OFFICE STANDARD WORK INSTRUCTION Content: 1 – Work flow SWI.xls 2 – Processes Inputs and Outputs 3 – Method: detailed instruction, step by step (element instruction)
  • 30. 3 LEAN SOLUTIONS 1 – FLOW; 2 – STANDARDIZATION; 3 – QUALITY MANAGEMENT;
  • 31. • LEAN MANAGEMENT SYSTEM • VISUAL MANAGEMENT • LESSONS LEARNED
  • 32. Daily Accountability Routine 7.00 – 8.00 am Operators Supervisor Tier 11 Tier 8.00 – 8.30 am Data acquisition Supervisor Process Eng Plant Manager Superintendent Gather together the information to share with tier 4 Site Manager Plant Managers Superintendent Tier 22 Tier Maintanance Planning Task Accountability Board Task Accountability Board 9.00 – 9.30 am Tier 33 Tier 9.30 – 10.00 am Tier 44 Tier Signatures YYYYY XXXXX Maintanance Manager XXXXX Planning Manager
  • 34. VISUAL MANAGEMENT Make easy and widely accessible the comparison of the expected performance versus actual
  • 40. LESSONS LEARNED Structured meetings with the following targets:  Measure results  Focus in facts and data  Process analysis  Feedback of internal customer  Written improvement plan
  • 41. Identify process and value Draw current 400 state 1- Identify what add value to the customers; Projects ahead of schedule (July to Dec. 2004) 2 – Understand the current process 100 3 – Identify wastes; 80 4 – Find the root cause of wastes; Draw Future 6 100 State 40 5 – Draw a high performance process based on 3 lean solutions 60 200 % Days 300 Analyze the wastes 15 0 ZE Pump Type Quantity of days 129 33,5 % Accumulative% 33, 5 C AP 68 Implementation17,7 51,2 10 20 2 4 7 2 3 6 – Implement actions and manage to 2 1 2 0 AP3V perfection; M M C ZE M BT B B S H N G S HV Other M S M 39 25 21 14 14 7 6 5 0 S N M 57 14,8 10,1 66,0 76,1 6,5 82,6 5,5 3,6 88,1 91,7 3,6 95,3 1,8 97,1 1,6 1, 3 0,0 98,7 100, 0 100,0
  • 42. A3 REPORT Title DATE 17/06/08 E.O. F. B. M. E. P. P. D. M. A.C. BACKGROUND / TARGETS FUTURE STATE •Historical Context C. F. • Actions and why are recommended • Countermeasures to the root-cause •What is the problem? What is the relation with the business? CURRENT STATE •Where are we? •How are we? •Facts and data ACTION PLAN • Which activities are required to reach the target condition? • Responsible and when? ANALYSIS •What is the root cause? •What is the restriction? INDICADORES • Measurement of impact of the actions in the KPIs
  • 43. FILES A3 Report Template.xls A3 Report Example.xls

Notas do Editor

  1. Linha Vermelha = Tempo Takt ( Rodada de linha) Cada barra mostra os elementos de trabalho para um operador As barras são preenchidas de baixo para cima 1-2-3-4 são os elementos que o operador 1 executa, e no tempo de 14 min. Operador 3 é gargalo
  2. Linha Vermelha = Tempo Takt ( Rodada de linha) Cada barra mostra os elementos de trabalho para um operador As barras são preenchidas de baixo para cima 1-2-3-4 são os elementos que o operador 1 executa, e no tempo de 14 min. Operador 3 é gargalo
  3. Hand Off – Causador de desperdício: Termo em Inglês que designa a passagem de Informação de uma pessoa para outra ou de um departamento para outro. ****repare no longo tempo e destorcido tempo de atravessamento
  4. __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________