1. ICI|FINAL PROJECT|THE DEVELOPMENT PROPOSAL|FNBE MARCH INTAKE 2015
LOW WING CHUN - 0323315|PUI CHUN SHIAN - 0323470|PN.HASMANIRA|TAYLOR’S UNIVERSITY
Final Project :
The Development Proposal
Introduction to the Construction
Industry (QSB30105)
LOW WING CHUN | 0323315
PUI CHUN SHIAN | 0323470
FNBE MARCH 2015
2. ICI|FINAL PROJECT|THE DEVELOPMENT PROPOSAL|FNBE MARCH INTAKE 2015
LOW WING CHUN - 0323315|PUI CHUN SHIAN - 0323470|PN.HASMANIRA|TAYLOR’S UNIVERSITY
CONTENT
No. Title Page
1. Project Introduction 1
2. Introduction to the site 3
3. Location plan, Key plan and Site plan 5
4. Site context 7
5. Existing conditions 9
6. Site analysis 11
3. ICI|FINAL PROJECT|THE DEVELOPMENT PROPOSAL|FNBE MARCH INTAKE 2015
LOW WING CHUN - 0323315|PUI CHUN SHIAN - 0323470|PN.HASMANIRA|TAYLOR’S UNIVERSITY
PROJECT INTRODUCTION
PROJECT BACKGROUND
INTRODUCTION
In this final project, we are given a task to find a specific empty land to
initiate a small construction project. The size of the land must be between 50m
x 50m (2500m2) – 50m x 70m (3500m2). This project is done in a group of 2
people.
We are required to do research on each professionand their responsibilities in
the construction industry such as in the recreational area, commercial area,
industrial area, agricultural area, tourism area and residential area. We are to
include our proposal, suggestions, rationale, and sketches of our concepts, ideas
and proposaland the other requirements of the project. We are also given an
option of include the bubble diagram, the authorities involved and the costing.
For our group, we choosean empty land that is located in Subang Jaya,
Selangor.
4. ICI|FINAL PROJECT|THE DEVELOPMENT PROPOSAL|FNBE MARCH INTAKE 2015
LOW WING CHUN - 0323315|PUI CHUN SHIAN - 0323470|PN.HASMANIRA|TAYLOR’S UNIVERSITY
INTRODUCTION TO THE SITE
In this final project, we are given a task to find a specific empty land to
initiate a small construction project. The size of the land must be between 50m
x 50m (2500m2) – 50m x 70m (3500m2). This project is done in a group of 2
people.
We are required to do research on each professionand their responsibilities in
the construction industry such as in the recreational area, commercial area,
5. ICI|FINAL PROJECT|THE DEVELOPMENT PROPOSAL|FNBE MARCH INTAKE 2015
LOW WING CHUN - 0323315|PUI CHUN SHIAN - 0323470|PN.HASMANIRA|TAYLOR’S UNIVERSITY
industrial area, agricultural area, tourism area and residential area. We are to
include our proposal, suggestions, rationale, and sketches of our concepts, ideas
and proposaland the other requirements of the project. We are also given an
option of include the bubble diagram, the authorities involved and the costing.
For our group, we choosean empty land that is located in Subang Jaya,
Selangor.
LOCATION PLAN, KEY PLAN &
SITE PLAN
Site Location:
Subang Racquet & Golf Center
Lot 9578, Jalan SS 16/1
Ss 16 Bandar Subang Jaya
47500 Subang Jaya
Selangor
6. ICI|FINAL PROJECT|THE DEVELOPMENT PROPOSAL|FNBE MARCH INTAKE 2015
LOW WING CHUN - 0323315|PUI CHUN SHIAN - 0323470|PN.HASMANIRA|TAYLOR’S UNIVERSITY
SITE PLAN
7. ICI|FINAL PROJECT|THE DEVELOPMENT PROPOSAL|FNBE MARCH INTAKE 2015
LOW WING CHUN - 0323315|PUI CHUN SHIAN - 0323470|PN.HASMANIRA|TAYLOR’S UNIVERSITY
SITE CONTEXT
A: Subang Racquet and Golf Centre
B: Olives Residence
8. ICI|FINAL PROJECT|THE DEVELOPMENT PROPOSAL|FNBE MARCH INTAKE 2015
LOW WING CHUN - 0323315|PUI CHUN SHIAN - 0323470|PN.HASMANIRA|TAYLOR’S UNIVERSITY
C: Sekolah Kebangsaan Perdana Jaya
D: TOYOTA E: First Baptist Church
F: Restoran Tomyam Desa
9. ICI|FINAL PROJECT|THE DEVELOPMENT PROPOSAL|FNBE MARCH INTAKE 2015
LOW WING CHUN - 0323315|PUI CHUN SHIAN - 0323470|PN.HASMANIRA|TAYLOR’S UNIVERSITY
EXISITING CONDITIONS
Uncut and long grass
A few trees
Dirty drain
10. ICI|FINAL PROJECT|THE DEVELOPMENT PROPOSAL|FNBE MARCH INTAKE 2015
LOW WING CHUN - 0323315|PUI CHUN SHIAN - 0323470|PN.HASMANIRA|TAYLOR’S UNIVERSITY
Small stream of water
Small parking area
Roadway with potholes
11. ICI|FINAL PROJECT|THE DEVELOPMENT PROPOSAL|FNBE MARCH INTAKE 2015
LOW WING CHUN - 0323315|PUI CHUN SHIAN - 0323470|PN.HASMANIRA|TAYLOR’S UNIVERSITY
SITE ANALYSIS AND
OBSERVATION
Microclimate :
The site is extremely hot in the afternoon at time ranged from 12pm to 4pm. It
is cooler in the morning (6am to 9am) and at night (6pm to midnight).
Drainage:
There are 2 visible drainage found along the empty site. *As seen in Existing
Conditions*
Wind Direction:
The site is not windy and has minimal wind blow.
Circulation:
The site is located beside the highway Jalan Ss16, before residential areas and
after commercial areas. The circulation of cars would be moving on Jalan Ss16
which is next to our site.
Existing Structure:
The site is covered in turfs and there are trees on the site. There is no hardscape
on the site.