PURPOSE
TO IMPROVE THE SENSIVITY OF
DANGER FOR ACHIEVING ZERO
ACCIDENT
INTRODUCTION
K Y - KIKEN YOCHI ( JAPANESE WORD)
KIKEN - DANGER
YOCHI - PREDICTION
IN 1982 SUMIMOTO METAL PLANT AT
JAPAN COMPLIED THIS SAFETY PLAN
FOR THEIR WORKER IN EACH WORK
PLACES THROUGH PDCA CYCLE
DEFINATION
KIKEN YOCHI -- IT IS A PROCEDURE FOR
ON-THE-SPOT RISK ASSESSMENT IN
WORK PLACE. THE GROUP OF WORKER
FOR EACH WORK WILL DISCUSS AMONG
THEMSELVES ABOUT THE HAZARD AND
RISK AND PLANNED FOR
COUNTERMEASURE & ACTION PLAN
BEFORE START ANY WORK.
HOW TO IMPLEMENT
a) IDENTIFY THE POTENTIAL RISK AT THE
WORK SPOT WITH ALL THE WORKER. b)
SELECT THE HAZARD / RISK PRIORITY WISE
ACCORDING TO SERIOUSNESS. c)
PROPOSED COUNTERMEASURE PLAN d)
ACTION TAKEN.
WHY TO IMPLEMENT
TO ELIMINATE THE RISK & UNSAFE
ACT.
WHEN TO IMPLEMENT
EVERYDAY BEFORE START OF ANY WORK.
WORK FLOW DIAGRAM
WORK
PLAN
WPS
ISSUE
JSA & SOP BRIEFING
AMONG THE
WORKER
GATHER
AT WORK
PLACE
KY
DISCUSSION
AT SITE
RECORDED IN
TOOLBOX
MEETING
&SAFETY
MEASURE
TAKEN
JOB EXCUTED 5-S
COMPLETED
WPS HAND
OVER
VARIOUS STEPS FOR SAFETY
AT WORK PLACE
a)TOOL BOX MEETING.
b) SOP - STANDARD OPERATION
PROCEDURE.
c) SAFETY NOTICE.
d) HATTO HIARI .
e) KY.
f) JSA -JOB SAFETY ANALYSIS.
RELATION WITH K-Y AND
OTHER SEFETY PROCEDURE
1. TOOL BOX MEETING.- AFTER K-Y, ALL THE
SAFETY MEASURE/PPE TO BE SELECT IN THE
TOOL BOX MEETING.
2.SOP- IT DESCRIBE THE STEPS TO BE
FOLLOWED & TO BE CONSIDER BEFORE K-Y.
3. SAFETY NOTICE- IT IS A GENERAL
INFORMATION FOR EQUIPMENT,ENVIRONMENT
FOR THAT PARTICULAR AREA & WHICH TO BE
CONSIDER WITH K-Y.
4. JSA- IT BRIEFING THE SAFETY STEPS TO BE
FOLLOWED AS PER SOP & WHICH TO BE
INCLUDED IN K-Y FINDINGS.
GUIDE LINE FOR K-Y
ANALYSIS
1. TECHNICALLY.- a) WORKIBILITY. b) HEALTH
HAZARD. c) ACCIDENT PROBABILITY.
2. HARMFULL SUBSTANCE.-a) ORGANIC
SOLVENTS. b) DUST. c) RADIATION. d) GASES.
3. WORKING ENVIRONMENT.-
a)VENTILATION. b) NOISE. c) TEMPERATUR.
d) POSTURE.
4. WORKING DISPLAY.- a) HOT JOB. b)
CONFINED SPACE WORK. c) FRAGILE ROOF.
DESCRIPTION FOR RISK
ANALYSIS ON FINDINGS.
1. WORKIBILITY/ ACCIDENT PROBABILITY --
OPERATIONALAREA/ ROATATING EQUIPMENT /
WORKING AT HEIGHT.
2. HEALTH HAZARD-- FALL/BURN/ELECTRIC SHOCK/ GAS
POISENED.
3. ORGANIC SOLVENT / DUST / NOISE / GASE / RADIATION
TEMPERATURE-- EFFECT ON HUMAN BODY.
4. HOT JOB.-- FIRE
5.POSTURE -- DIFFICULT TO WORK
6. CONFINED SPACE JOB / VENTILATION -- OXYGEN
DEFFICIENCY.
7. FRAGILE ROOF -- BREAK / FALL
BENEFITS OF K-Y
1. EVERY DAY PRACTICE FOR EACH WORK.
2. ON THE SPOT ACTIVITES GATHER DETAILS
KNOWLEDGE OF PROBLEM.
3. PARTICIPATION & INVOLVMENT OF ALL
WORKER.
4. AVOIDING UNSAFE ACT.
5. ON THE SPOT COUNTERMEASURE WILL
PREVENT CHANCES OF ACCIDENT.
6. SELF DEVELOPMENT & DISIPLINE AT WORK
PLACE.
K-Y CALL
MAIN / TOP PRIORITY ACTION PLAN AS PER K-Y
FINDINGS FOR A PARTICULAR JOB TO BE
CONSIDER AS A K-Y CALL FOR THAT
PARTICULAR WORK.
A COMMON K-Y CALLALSO MAY BE CONSIDER
FOR DEPARTMENT WISE AS PER PREVIOUS
EXPERIENCE / AS PER GENERAL WORK
ACTIVITY.
IT CAN BE WEEKLY / MONTHLY / YEARLY AND
TO BE CALL / TAKING AS A OATH BEFORE START
THE DAILY ACTIVITY.
MECHANICAL K-Y CALL
………...EXAMPLE…………….
MONDAY-CONFIRM SAFETY TREATMENT BEFORE EXECUTE
ANY JOB AT SITE.
TUESDAY- ALWASYS USE TESTED TOOLS & TACLES IN
EXECUSION OF JOB.
WEDNESSDAY- DO NOT SHORT CUT IN OVERHAULING JOB.
THRUSDAY- ALWAYS USE SOP & JSA IN REGISTERED RISK
JOB.
FRIDAY-DO NOT MOVE UNDER LOAD LIFTING AREA.
SATURDAY- ALWAYS USE PROPER PPE.
SUNDAY-DON’T HIDE ANY MISTAKE.
MECHANICAL K-Y CALL
………...FOR-2008…………….
MONDAY-USE FLASHBACK ARRESTER IN GAS CUTTING
SET.
TUESDAY- CONFIRM UNDERGROUND CABLE & PIPE
BEFORE EXCAVATION.
WEDNESSDAY- DON’T THROW ANY OBJECT FROM HEIGHT.
THRUSDAY- DON’T WORK ON AUTO START MACHINE
FRIDAY-USE FULL BODY HARNESS FOR HEIGHT JOB.
SATURDAY- USE OF MASK IS COMPULSORY IN DUST
GENERATING JOB.
SUNDAY- DON’T USE LOOSE UNIFORM AT MACHINE SHOP
AREA.
K-Y TRAINING EXAMPLES & ANALYSIS FOR
SELF IMPROVEMENT.
EXAMPLE-2
CONDITION - A PERSON IS
SETTING SLEEPER &
SIGNALING TO CRANE.
UNSAFE FINDINGS.-
1. HEAVY LOAD MAY FALL ON HIS
HAND DUE TO SIGNALING &
PLACING SLEEPER AT A SAME
TIME & DIRECTION.
2. WHILE GETTING BACK, THE
BACK SIDE SLEEPER MAY HIT HIS
LEG & GETTING INJURED.
CORRECTIVE MEASURES.
1. PLACING & SIGNALING SHOULD
NOT BE AT A TIME. 2.
SAME PERSON SHOULD NOT DO
PLACING & SIGNALING.
K-Y CALL - DO NOT WORK UNDER LOADING CRANE.
K-Y TRAINING EXAMPLES& ANALYSIS FOR
SELF IMPROVEMENT.
EXAMPLE-3
CONDITION-A PERSON IS DOING
PAINTING IN UNDERGROUND TANK
UNSAFE FINDINGS--
1. RESCUE FACILITY NOT
AVAILABLE SUCH AS SEFETY
BELT,LADDER WITH THE MAN.
2. VOC PREVENTION FACILITY
SUCH AS AIR LINE MASK,
VENTILATOR NOT PRESENT.
3. PAINTING CONTAINER MAY
DROP AS IT NEAR BY OPENING.
CORRECTIVE MEASURE--
1. CONFINED SPACE PAINTING
PROCEDURE TO BE FOLLOWED .
2.SPOTTER SHOULD PRESENT.
3.NO MATERIAL KEEP NEAR
OPENING.
K-Y CALL- FOLLOW CONFINED SPACE PAINTING PROCEDURE.
K-Y TRAINING EXAMPLES & ANALYSIS FOR
SELF IMPROVEMENT.
EXAMPLE-4
CONDITION- GRINDING WORK IN
TABLE GRINDING MACHINE
UNSAFE FINDINGS-
1.PPE NOT USE SUCH AS HAND
GLOVES,GOGGLES, MASK.
2. WHEEL COVER NOT FOUND IN
GRINDING MACHINE.
3. MANY MATERIALS LAYING ON
WORKING TABLE WHICH MAY
FALL ON LEG.
CORRECTIVE MEASURE-
1. PPE SHOULD BE USED IN
GRIDING MACHINE WORK.
2. GRINDING WHEEL COVER TO
BE FIXED FOR PROTECTION OF
SPARK & BROKEN PIECE.
3. WORKING TABLE SHOULD BE
KEPT CLEANED.
K-Y CALL- PROPER PPE TO BE USED IN MACHINE WORK.
K-Y TRAINING PHOTOGRAPHS & ANALYSIS FOR
SELF IMPROVEMENT.
CASE-1
CONDITION - UNDER GROUND
EXCAVATION IN PLANT AREA.
UNSAFE FINDINGS-
1. UNDER GROUND CABLE & PIPE
EXISTS IN EXCAVATION AREA.
2.NO BARRICADING / NOTICE
ARROUND EXCAVATION AREA.
3.GUMBOOT NOT USED IN SLUSH
EXCAVATION AREA.
CORRECTIVE MEASURES-
1. NOTICE BOARD FOR
UNDERGROUND PIPE & CABLE TO
BE DISPLAY BEFORE STARTING THE
EXCAVATION.
2. BARRICATION TO BE DONE.
4. TEMPORARY SUPPORT / COVER
TO BE PROVIDED FOR PIPE / CABLE.
K-Y CALL- CONFIRM UNDERGROUND FACILITIES LAYOUT
BEFORE WORK.
K-Y TRAINING PHOTOGRAPHS & ANALYSIS FOR
SELF IMPROVEMENT.
CASE-2
CONDITION- PAINTING
WORK IN PLANT AREA
UNSAFE FINDINGS.-
1. NO SCAFFOLDING, PAINETR IS DOING
PAINT IN HANGING POSITION. 2.
SAFETY BELT NOT USED THOUGH HE
WEAR FULL BODY HARNESS.
CORRECTIVE MEASURES.
1. SCAFFOLDING FOR HEIGHT JOB
SHOULD BE DONE AS MCPI STANDARD.
2. PROPER PPE & THEIR USE TO BE
MAINTAINED.
3. PAINT COTAINER TO BE KEPT NEAR
BY SO THAT HANDLING WILL BE EASY
& PAINT DROPS WILL BE MINIMUM.
K-Y CALL - USE SCAFFOLDING FOR HEIGHT JOB
K-Y TRAINING PHOTOGRAPHS & ANALYSIS FOR
SELF IMPROVEMENT.
CASE-3
CONDITION- PAINTING WORK
NEAR ROATATING MACHINE.
UNSAFE FINDINGS.-
1. THE PAINTER IS RESTING
HAND ON ROATATING SHAFT
COVER WHICH MAY SLIP &
CAUSED TO TOUCH ON SHAFT
AND ACCIDENT MAY HAPPEN.
2. PAINT DROPS MAY FALL ON
ROATATING PARTS & CAUSED
DAMAGED OR MAY CAUSED
FIRE DUE TO HEAT OF
FLAMMABLE MATERIAL.
CORRECTIVE MEASURES .--
1. NO PAINT , NO TOUCH ON
ROATATING MACHINES PART.
2. CARE SHOULD BE TAKEN ON
AUTO START MACHINE ALSO.
K-Y CALL - NO PAINT NO TOUCH ON ROATATING EQUIPMENT.
K-Y TRAINING PHOTOGRAPHS & ANALYSIS FOR
SELF IMPROVEMENT.
CASE-4
CONDITION- A PERSON IS
DOING SCAFFOLDING FOR
COMPRESSOR DUCT .
UNSAFE FINDINGS.
1. SCAFFOLDING STANDARD NOT
MAINTAIN,LONG HORIZINTAL PIPE
BEND & ANY TIME IT WILL FALL.
2. PLATFORM JALLI FIXED WITH
COIRSTRING, WHICH MAY CUT
AND FALL ANY TIME.
3. HAND RAIL / GUARD PIPE NOT
AVAILABLE.
CORRECTIVE MEASURES--
1. SCAFFOLDING TO BE MADE AS
PER MCPI STANDARD.
2. MINIMUM 2 PERSON REQUIRED
FOR HANDLING THE HEAVE TYPE
PLTFORM JALLI.
K-Y CALL - SCAFFOLDING STANDARD TO BE MAINTAIN.
K-Y CALLAT SITE BY CONTRACTOR EMPLOYEE
K- Y CALLAT SITE BY MECHANICAL MEMBER
CONCLUSION
FIND OUT THE PROBLEM IN EACH OF
OUR DAILY ACTIVITY TO APPLY THE
PREVENTION ACTION THROUGH TBM /
JSA / K-Y FOR MINIMISE THE HAZARD /
RISK / ACCIDENT & ALSO CONTINUAL
MONITORING FOR IMPOROVEMENT
OF OURSELVES & OUR SUPPORTING
CONTRACTOR.

Mais conteúdo relacionado

Mais procurados

A Part 1 Safety Induction
A  Part 1 Safety InductionA  Part 1 Safety Induction
A Part 1 Safety InductionJames McCann
 
13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templatesDwarika Bhushan Sharma
 
OSHA 10 Hour machine guarding presentation #4
OSHA 10 Hour machine guarding presentation #4OSHA 10 Hour machine guarding presentation #4
OSHA 10 Hour machine guarding presentation #4larosej
 
working at height
working at heightworking at height
working at heightJYOTHISHKT
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Chris Morris
 
Safety in mechanical maintenance
Safety in mechanical  maintenanceSafety in mechanical  maintenance
Safety in mechanical maintenancePrasadroshan Mythin
 
3 -industrial safety-pp beura
3 -industrial safety-pp beura3 -industrial safety-pp beura
3 -industrial safety-pp beuraSivaranjan
 
New Employee Orientation 05
New Employee Orientation 05New Employee Orientation 05
New Employee Orientation 05txsafety1
 
Job safety Analysis
Job safety Analysis Job safety Analysis
Job safety Analysis Deepu Rajan
 
Top 10 safety slogans near miss
Top 10 safety slogans near missTop 10 safety slogans near miss
Top 10 safety slogans near missLukman Nulhakiem
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptssuser0ebdc3
 
Forklift (Use and Safety) Kegunaan & Keselamatanan
Forklift (Use and Safety) Kegunaan & KeselamatananForklift (Use and Safety) Kegunaan & Keselamatanan
Forklift (Use and Safety) Kegunaan & KeselamatananLWD INDUSTRY SDN BHD
 

Mais procurados (20)

Workplace hazards
Workplace hazardsWorkplace hazards
Workplace hazards
 
Near miss
Near missNear miss
Near miss
 
A Part 1 Safety Induction
A  Part 1 Safety InductionA  Part 1 Safety Induction
A Part 1 Safety Induction
 
13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates
 
Night work safety
Night work safetyNight work safety
Night work safety
 
Behavior Based Safety
Behavior Based Safety Behavior Based Safety
Behavior Based Safety
 
OSHA 10 Hour machine guarding presentation #4
OSHA 10 Hour machine guarding presentation #4OSHA 10 Hour machine guarding presentation #4
OSHA 10 Hour machine guarding presentation #4
 
working at height
working at heightworking at height
working at height
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016
 
Permit to Work Training
Permit to Work TrainingPermit to Work Training
Permit to Work Training
 
Safety in mechanical maintenance
Safety in mechanical  maintenanceSafety in mechanical  maintenance
Safety in mechanical maintenance
 
3 -industrial safety-pp beura
3 -industrial safety-pp beura3 -industrial safety-pp beura
3 -industrial safety-pp beura
 
Hot Works Safety Training
Hot Works Safety TrainingHot Works Safety Training
Hot Works Safety Training
 
New Employee Orientation 05
New Employee Orientation 05New Employee Orientation 05
New Employee Orientation 05
 
Job safety Analysis
Job safety Analysis Job safety Analysis
Job safety Analysis
 
Top 10 safety slogans near miss
Top 10 safety slogans near missTop 10 safety slogans near miss
Top 10 safety slogans near miss
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.ppt
 
HSE REPORT 2013-2014.ppt
HSE REPORT 2013-2014.pptHSE REPORT 2013-2014.ppt
HSE REPORT 2013-2014.ppt
 
Medical emergency mock drill
Medical emergency mock drillMedical emergency mock drill
Medical emergency mock drill
 
Forklift (Use and Safety) Kegunaan & Keselamatanan
Forklift (Use and Safety) Kegunaan & KeselamatananForklift (Use and Safety) Kegunaan & Keselamatanan
Forklift (Use and Safety) Kegunaan & Keselamatanan
 

Destaque

Accident incident investigation
Accident incident investigationAccident incident investigation
Accident incident investigationTariq Hatmi
 
KYT with trn + proposal
KYT with trn + proposalKYT with trn + proposal
KYT with trn + proposaljohn varkey
 
Kaizen Seminar Presentation
Kaizen Seminar PresentationKaizen Seminar Presentation
Kaizen Seminar PresentationOrange Slides
 
Presentation Tyre LH
Presentation Tyre LHPresentation Tyre LH
Presentation Tyre LHRedza Amin
 
G.training evaluation by jyoti k
G.training evaluation by jyoti kG.training evaluation by jyoti k
G.training evaluation by jyoti kjyoti karvande
 
Lean Agile and Respect for People
Lean Agile and Respect for PeopleLean Agile and Respect for People
Lean Agile and Respect for PeopleRussell Pannone
 
ORGANIZATIONAL PERFORMANCE AND EFFECTIVENESS (KAIZEN)
ORGANIZATIONAL PERFORMANCE AND EFFECTIVENESS (KAIZEN) ORGANIZATIONAL PERFORMANCE AND EFFECTIVENESS (KAIZEN)
ORGANIZATIONAL PERFORMANCE AND EFFECTIVENESS (KAIZEN) berhanu taye
 
Company Profile Linkedin
Company Profile LinkedinCompany Profile Linkedin
Company Profile LinkedinSurabhiNigma
 
Training kaizen
Training kaizenTraining kaizen
Training kaizenAmol Girme
 
2012 logistics & supply chain seminars brief
2012 logistics & supply chain seminars brief2012 logistics & supply chain seminars brief
2012 logistics & supply chain seminars briefMadu Obiora
 
kaizen
kaizenkaizen
kaizengkyyy
 
Safety awareness on near miss
Safety awareness on near missSafety awareness on near miss
Safety awareness on near missAshok Singh
 
Patterns Of Kaizen & A3 Thinking
Patterns Of Kaizen & A3 ThinkingPatterns Of Kaizen & A3 Thinking
Patterns Of Kaizen & A3 ThinkingArt of Lean, Inc.
 

Destaque (20)

Accident incident investigation
Accident incident investigationAccident incident investigation
Accident incident investigation
 
KYT with trn + proposal
KYT with trn + proposalKYT with trn + proposal
KYT with trn + proposal
 
Kaizen Ppt
Kaizen PptKaizen Ppt
Kaizen Ppt
 
Kaizen Seminar Presentation
Kaizen Seminar PresentationKaizen Seminar Presentation
Kaizen Seminar Presentation
 
Presentation Tyre LH
Presentation Tyre LHPresentation Tyre LH
Presentation Tyre LH
 
LT KYT危険予知トレーニング 20150820
LT KYT危険予知トレーニング 20150820LT KYT危険予知トレーニング 20150820
LT KYT危険予知トレーニング 20150820
 
G.training evaluation by jyoti k
G.training evaluation by jyoti kG.training evaluation by jyoti k
G.training evaluation by jyoti k
 
Lean Agile and Respect for People
Lean Agile and Respect for PeopleLean Agile and Respect for People
Lean Agile and Respect for People
 
Kaizen (Continual Improvement)
Kaizen (Continual Improvement)Kaizen (Continual Improvement)
Kaizen (Continual Improvement)
 
ORGANIZATIONAL PERFORMANCE AND EFFECTIVENESS (KAIZEN)
ORGANIZATIONAL PERFORMANCE AND EFFECTIVENESS (KAIZEN) ORGANIZATIONAL PERFORMANCE AND EFFECTIVENESS (KAIZEN)
ORGANIZATIONAL PERFORMANCE AND EFFECTIVENESS (KAIZEN)
 
Company Profile Linkedin
Company Profile LinkedinCompany Profile Linkedin
Company Profile Linkedin
 
Training kaizen
Training kaizenTraining kaizen
Training kaizen
 
LeanKaizenTraining
LeanKaizenTrainingLeanKaizenTraining
LeanKaizenTraining
 
1000 Kanji
1000 Kanji1000 Kanji
1000 Kanji
 
2012 logistics & supply chain seminars brief
2012 logistics & supply chain seminars brief2012 logistics & supply chain seminars brief
2012 logistics & supply chain seminars brief
 
Jkk di tempat kerja
Jkk di tempat kerjaJkk di tempat kerja
Jkk di tempat kerja
 
kaizen
kaizenkaizen
kaizen
 
Value Stream Analysis
Value Stream AnalysisValue Stream Analysis
Value Stream Analysis
 
Safety awareness on near miss
Safety awareness on near missSafety awareness on near miss
Safety awareness on near miss
 
Patterns Of Kaizen & A3 Thinking
Patterns Of Kaizen & A3 ThinkingPatterns Of Kaizen & A3 Thinking
Patterns Of Kaizen & A3 Thinking
 

Semelhante a K-Y call

PPT ON EXCAVATION ACCORDING TO SAFETY WORK
PPT ON EXCAVATION ACCORDING TO SAFETY WORKPPT ON EXCAVATION ACCORDING TO SAFETY WORK
PPT ON EXCAVATION ACCORDING TO SAFETY WORKAbdulRazik13
 
Diploma in Occupational Health and Safety UNIT -4
Diploma in Occupational Health and Safety UNIT -4Diploma in Occupational Health and Safety UNIT -4
Diploma in Occupational Health and Safety UNIT -4National Safety Academy
 
description of ergonomics in details .pptx
description of ergonomics in details .pptxdescription of ergonomics in details .pptx
description of ergonomics in details .pptxasmaa sakran
 
SHO_WORKBOOK_Hazard_Identification.docx
SHO_WORKBOOK_Hazard_Identification.docxSHO_WORKBOOK_Hazard_Identification.docx
SHO_WORKBOOK_Hazard_Identification.docxdesmond37129
 
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJESUSBASILIOANTONIO
 
Riddor reportable hand injury
Riddor reportable hand injuryRiddor reportable hand injury
Riddor reportable hand injuryAlan Bassett
 
Riddor reportable hand injury
Riddor reportable hand injuryRiddor reportable hand injury
Riddor reportable hand injuryAlan Bassett
 
Building technology s.b.a .adrian greaves
Building technology s.b.a .adrian greavesBuilding technology s.b.a .adrian greaves
Building technology s.b.a .adrian greavesAdrian Greaves
 
Accident control part 3 final - Fully controlling accidents
Accident control part 3   final - Fully controlling accidentsAccident control part 3   final - Fully controlling accidents
Accident control part 3 final - Fully controlling accidentsLuiz Carlos de Almeida
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfJESUSBASILIOANTONIO
 
Safety management for construction machines & equipments
 Safety management for construction machines & equipments Safety management for construction machines & equipments
Safety management for construction machines & equipmentsSelva Prakash
 
G324 guidelines misc prod paperwork.done
G324 guidelines   misc prod paperwork.doneG324 guidelines   misc prod paperwork.done
G324 guidelines misc prod paperwork.donemunaa007
 
G324 guidelines misc prod paperwork.done
G324 guidelines   misc prod paperwork.doneG324 guidelines   misc prod paperwork.done
G324 guidelines misc prod paperwork.donemunaa007
 
Usage of Personal Protective Equipment
Usage of Personal Protective Equipment Usage of Personal Protective Equipment
Usage of Personal Protective Equipment Reliance
 
Core Risk Assessment for Office work.docx
Core  Risk Assessment for Office work.docxCore  Risk Assessment for Office work.docx
Core Risk Assessment for Office work.docxIbrahimEsmat
 
Human-Factors-Safety-Moment-Final.pptx
Human-Factors-Safety-Moment-Final.pptxHuman-Factors-Safety-Moment-Final.pptx
Human-Factors-Safety-Moment-Final.pptxAliZaminSyed
 

Semelhante a K-Y call (20)

PPT ON EXCAVATION ACCORDING TO SAFETY WORK
PPT ON EXCAVATION ACCORDING TO SAFETY WORKPPT ON EXCAVATION ACCORDING TO SAFETY WORK
PPT ON EXCAVATION ACCORDING TO SAFETY WORK
 
emergency plan.ppt
emergency plan.pptemergency plan.ppt
emergency plan.ppt
 
Diploma in Occupational Health and Safety UNIT -4
Diploma in Occupational Health and Safety UNIT -4Diploma in Occupational Health and Safety UNIT -4
Diploma in Occupational Health and Safety UNIT -4
 
description of ergonomics in details .pptx
description of ergonomics in details .pptxdescription of ergonomics in details .pptx
description of ergonomics in details .pptx
 
diploma in industrial safety UNIT-2
diploma in  industrial safety UNIT-2diploma in  industrial safety UNIT-2
diploma in industrial safety UNIT-2
 
SHO_WORKBOOK_Hazard_Identification.docx
SHO_WORKBOOK_Hazard_Identification.docxSHO_WORKBOOK_Hazard_Identification.docx
SHO_WORKBOOK_Hazard_Identification.docx
 
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
 
Riddor reportable hand injury
Riddor reportable hand injuryRiddor reportable hand injury
Riddor reportable hand injury
 
Riddor reportable hand injury
Riddor reportable hand injuryRiddor reportable hand injury
Riddor reportable hand injury
 
Building technology s.b.a .adrian greaves
Building technology s.b.a .adrian greavesBuilding technology s.b.a .adrian greaves
Building technology s.b.a .adrian greaves
 
Accident control part 3 final - Fully controlling accidents
Accident control part 3   final - Fully controlling accidentsAccident control part 3   final - Fully controlling accidents
Accident control part 3 final - Fully controlling accidents
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdf
 
Safety management for construction machines & equipments
 Safety management for construction machines & equipments Safety management for construction machines & equipments
Safety management for construction machines & equipments
 
Confined Spaces Awareness - 2009
Confined Spaces Awareness - 2009Confined Spaces Awareness - 2009
Confined Spaces Awareness - 2009
 
G324 guidelines misc prod paperwork.done
G324 guidelines   misc prod paperwork.doneG324 guidelines   misc prod paperwork.done
G324 guidelines misc prod paperwork.done
 
G324 guidelines misc prod paperwork.done
G324 guidelines   misc prod paperwork.doneG324 guidelines   misc prod paperwork.done
G324 guidelines misc prod paperwork.done
 
Usage of Personal Protective Equipment
Usage of Personal Protective Equipment Usage of Personal Protective Equipment
Usage of Personal Protective Equipment
 
Blasting rock
Blasting rockBlasting rock
Blasting rock
 
Core Risk Assessment for Office work.docx
Core  Risk Assessment for Office work.docxCore  Risk Assessment for Office work.docx
Core Risk Assessment for Office work.docx
 
Human-Factors-Safety-Moment-Final.pptx
Human-Factors-Safety-Moment-Final.pptxHuman-Factors-Safety-Moment-Final.pptx
Human-Factors-Safety-Moment-Final.pptx
 

Mais de Md.Aminul Islam ,CMRP,CSSBB (8)

Reliability Centred Maintenance - RCM by Aminul Islam
Reliability Centred Maintenance - RCM by Aminul IslamReliability Centred Maintenance - RCM by Aminul Islam
Reliability Centred Maintenance - RCM by Aminul Islam
 
Risk-Based Inspection (RBI) by aminul islam
Risk-Based Inspection (RBI) by aminul islamRisk-Based Inspection (RBI) by aminul islam
Risk-Based Inspection (RBI) by aminul islam
 
Improving the Reliability of MECHANICAL SEALS
Improving the Reliability of MECHANICAL SEALSImproving the Reliability of MECHANICAL SEALS
Improving the Reliability of MECHANICAL SEALS
 
Work environment 5S
Work environment 5SWork environment 5S
Work environment 5S
 
Grease selection techniques
Grease selection techniquesGrease selection techniques
Grease selection techniques
 
5 why training_presentation
5 why training_presentation5 why training_presentation
5 why training_presentation
 
ANSI pump standard
ANSI pump standardANSI pump standard
ANSI pump standard
 
Case study 1 : Compressor low surge flow
Case study 1 : Compressor low surge flowCase study 1 : Compressor low surge flow
Case study 1 : Compressor low surge flow
 

Último

Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEselvakumar948
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 

Último (20)

Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 

K-Y call

  • 1. K-Y CALL Prepared By Md Aminul Islam Reliability Engineer SADAF-SABIC.
  • 2. PURPOSE TO IMPROVE THE SENSIVITY OF DANGER FOR ACHIEVING ZERO ACCIDENT
  • 3. INTRODUCTION K Y - KIKEN YOCHI ( JAPANESE WORD) KIKEN - DANGER YOCHI - PREDICTION IN 1982 SUMIMOTO METAL PLANT AT JAPAN COMPLIED THIS SAFETY PLAN FOR THEIR WORKER IN EACH WORK PLACES THROUGH PDCA CYCLE
  • 4. DEFINATION KIKEN YOCHI -- IT IS A PROCEDURE FOR ON-THE-SPOT RISK ASSESSMENT IN WORK PLACE. THE GROUP OF WORKER FOR EACH WORK WILL DISCUSS AMONG THEMSELVES ABOUT THE HAZARD AND RISK AND PLANNED FOR COUNTERMEASURE & ACTION PLAN BEFORE START ANY WORK.
  • 5. HOW TO IMPLEMENT a) IDENTIFY THE POTENTIAL RISK AT THE WORK SPOT WITH ALL THE WORKER. b) SELECT THE HAZARD / RISK PRIORITY WISE ACCORDING TO SERIOUSNESS. c) PROPOSED COUNTERMEASURE PLAN d) ACTION TAKEN. WHY TO IMPLEMENT TO ELIMINATE THE RISK & UNSAFE ACT. WHEN TO IMPLEMENT EVERYDAY BEFORE START OF ANY WORK.
  • 6. WORK FLOW DIAGRAM WORK PLAN WPS ISSUE JSA & SOP BRIEFING AMONG THE WORKER GATHER AT WORK PLACE KY DISCUSSION AT SITE RECORDED IN TOOLBOX MEETING &SAFETY MEASURE TAKEN JOB EXCUTED 5-S COMPLETED WPS HAND OVER
  • 7. VARIOUS STEPS FOR SAFETY AT WORK PLACE a)TOOL BOX MEETING. b) SOP - STANDARD OPERATION PROCEDURE. c) SAFETY NOTICE. d) HATTO HIARI . e) KY. f) JSA -JOB SAFETY ANALYSIS.
  • 8. RELATION WITH K-Y AND OTHER SEFETY PROCEDURE 1. TOOL BOX MEETING.- AFTER K-Y, ALL THE SAFETY MEASURE/PPE TO BE SELECT IN THE TOOL BOX MEETING. 2.SOP- IT DESCRIBE THE STEPS TO BE FOLLOWED & TO BE CONSIDER BEFORE K-Y. 3. SAFETY NOTICE- IT IS A GENERAL INFORMATION FOR EQUIPMENT,ENVIRONMENT FOR THAT PARTICULAR AREA & WHICH TO BE CONSIDER WITH K-Y. 4. JSA- IT BRIEFING THE SAFETY STEPS TO BE FOLLOWED AS PER SOP & WHICH TO BE INCLUDED IN K-Y FINDINGS.
  • 9. GUIDE LINE FOR K-Y ANALYSIS 1. TECHNICALLY.- a) WORKIBILITY. b) HEALTH HAZARD. c) ACCIDENT PROBABILITY. 2. HARMFULL SUBSTANCE.-a) ORGANIC SOLVENTS. b) DUST. c) RADIATION. d) GASES. 3. WORKING ENVIRONMENT.- a)VENTILATION. b) NOISE. c) TEMPERATUR. d) POSTURE. 4. WORKING DISPLAY.- a) HOT JOB. b) CONFINED SPACE WORK. c) FRAGILE ROOF.
  • 10. DESCRIPTION FOR RISK ANALYSIS ON FINDINGS. 1. WORKIBILITY/ ACCIDENT PROBABILITY -- OPERATIONALAREA/ ROATATING EQUIPMENT / WORKING AT HEIGHT. 2. HEALTH HAZARD-- FALL/BURN/ELECTRIC SHOCK/ GAS POISENED. 3. ORGANIC SOLVENT / DUST / NOISE / GASE / RADIATION TEMPERATURE-- EFFECT ON HUMAN BODY. 4. HOT JOB.-- FIRE 5.POSTURE -- DIFFICULT TO WORK 6. CONFINED SPACE JOB / VENTILATION -- OXYGEN DEFFICIENCY. 7. FRAGILE ROOF -- BREAK / FALL
  • 11. BENEFITS OF K-Y 1. EVERY DAY PRACTICE FOR EACH WORK. 2. ON THE SPOT ACTIVITES GATHER DETAILS KNOWLEDGE OF PROBLEM. 3. PARTICIPATION & INVOLVMENT OF ALL WORKER. 4. AVOIDING UNSAFE ACT. 5. ON THE SPOT COUNTERMEASURE WILL PREVENT CHANCES OF ACCIDENT. 6. SELF DEVELOPMENT & DISIPLINE AT WORK PLACE.
  • 12. K-Y CALL MAIN / TOP PRIORITY ACTION PLAN AS PER K-Y FINDINGS FOR A PARTICULAR JOB TO BE CONSIDER AS A K-Y CALL FOR THAT PARTICULAR WORK. A COMMON K-Y CALLALSO MAY BE CONSIDER FOR DEPARTMENT WISE AS PER PREVIOUS EXPERIENCE / AS PER GENERAL WORK ACTIVITY. IT CAN BE WEEKLY / MONTHLY / YEARLY AND TO BE CALL / TAKING AS A OATH BEFORE START THE DAILY ACTIVITY.
  • 13. MECHANICAL K-Y CALL ………...EXAMPLE……………. MONDAY-CONFIRM SAFETY TREATMENT BEFORE EXECUTE ANY JOB AT SITE. TUESDAY- ALWASYS USE TESTED TOOLS & TACLES IN EXECUSION OF JOB. WEDNESSDAY- DO NOT SHORT CUT IN OVERHAULING JOB. THRUSDAY- ALWAYS USE SOP & JSA IN REGISTERED RISK JOB. FRIDAY-DO NOT MOVE UNDER LOAD LIFTING AREA. SATURDAY- ALWAYS USE PROPER PPE. SUNDAY-DON’T HIDE ANY MISTAKE.
  • 14. MECHANICAL K-Y CALL ………...FOR-2008……………. MONDAY-USE FLASHBACK ARRESTER IN GAS CUTTING SET. TUESDAY- CONFIRM UNDERGROUND CABLE & PIPE BEFORE EXCAVATION. WEDNESSDAY- DON’T THROW ANY OBJECT FROM HEIGHT. THRUSDAY- DON’T WORK ON AUTO START MACHINE FRIDAY-USE FULL BODY HARNESS FOR HEIGHT JOB. SATURDAY- USE OF MASK IS COMPULSORY IN DUST GENERATING JOB. SUNDAY- DON’T USE LOOSE UNIFORM AT MACHINE SHOP AREA.
  • 15. K-Y TRAINING EXAMPLES & ANALYSIS FOR SELF IMPROVEMENT. EXAMPLE-2 CONDITION - A PERSON IS SETTING SLEEPER & SIGNALING TO CRANE. UNSAFE FINDINGS.- 1. HEAVY LOAD MAY FALL ON HIS HAND DUE TO SIGNALING & PLACING SLEEPER AT A SAME TIME & DIRECTION. 2. WHILE GETTING BACK, THE BACK SIDE SLEEPER MAY HIT HIS LEG & GETTING INJURED. CORRECTIVE MEASURES. 1. PLACING & SIGNALING SHOULD NOT BE AT A TIME. 2. SAME PERSON SHOULD NOT DO PLACING & SIGNALING. K-Y CALL - DO NOT WORK UNDER LOADING CRANE.
  • 16. K-Y TRAINING EXAMPLES& ANALYSIS FOR SELF IMPROVEMENT. EXAMPLE-3 CONDITION-A PERSON IS DOING PAINTING IN UNDERGROUND TANK UNSAFE FINDINGS-- 1. RESCUE FACILITY NOT AVAILABLE SUCH AS SEFETY BELT,LADDER WITH THE MAN. 2. VOC PREVENTION FACILITY SUCH AS AIR LINE MASK, VENTILATOR NOT PRESENT. 3. PAINTING CONTAINER MAY DROP AS IT NEAR BY OPENING. CORRECTIVE MEASURE-- 1. CONFINED SPACE PAINTING PROCEDURE TO BE FOLLOWED . 2.SPOTTER SHOULD PRESENT. 3.NO MATERIAL KEEP NEAR OPENING. K-Y CALL- FOLLOW CONFINED SPACE PAINTING PROCEDURE.
  • 17. K-Y TRAINING EXAMPLES & ANALYSIS FOR SELF IMPROVEMENT. EXAMPLE-4 CONDITION- GRINDING WORK IN TABLE GRINDING MACHINE UNSAFE FINDINGS- 1.PPE NOT USE SUCH AS HAND GLOVES,GOGGLES, MASK. 2. WHEEL COVER NOT FOUND IN GRINDING MACHINE. 3. MANY MATERIALS LAYING ON WORKING TABLE WHICH MAY FALL ON LEG. CORRECTIVE MEASURE- 1. PPE SHOULD BE USED IN GRIDING MACHINE WORK. 2. GRINDING WHEEL COVER TO BE FIXED FOR PROTECTION OF SPARK & BROKEN PIECE. 3. WORKING TABLE SHOULD BE KEPT CLEANED. K-Y CALL- PROPER PPE TO BE USED IN MACHINE WORK.
  • 18. K-Y TRAINING PHOTOGRAPHS & ANALYSIS FOR SELF IMPROVEMENT. CASE-1 CONDITION - UNDER GROUND EXCAVATION IN PLANT AREA. UNSAFE FINDINGS- 1. UNDER GROUND CABLE & PIPE EXISTS IN EXCAVATION AREA. 2.NO BARRICADING / NOTICE ARROUND EXCAVATION AREA. 3.GUMBOOT NOT USED IN SLUSH EXCAVATION AREA. CORRECTIVE MEASURES- 1. NOTICE BOARD FOR UNDERGROUND PIPE & CABLE TO BE DISPLAY BEFORE STARTING THE EXCAVATION. 2. BARRICATION TO BE DONE. 4. TEMPORARY SUPPORT / COVER TO BE PROVIDED FOR PIPE / CABLE. K-Y CALL- CONFIRM UNDERGROUND FACILITIES LAYOUT BEFORE WORK.
  • 19. K-Y TRAINING PHOTOGRAPHS & ANALYSIS FOR SELF IMPROVEMENT. CASE-2 CONDITION- PAINTING WORK IN PLANT AREA UNSAFE FINDINGS.- 1. NO SCAFFOLDING, PAINETR IS DOING PAINT IN HANGING POSITION. 2. SAFETY BELT NOT USED THOUGH HE WEAR FULL BODY HARNESS. CORRECTIVE MEASURES. 1. SCAFFOLDING FOR HEIGHT JOB SHOULD BE DONE AS MCPI STANDARD. 2. PROPER PPE & THEIR USE TO BE MAINTAINED. 3. PAINT COTAINER TO BE KEPT NEAR BY SO THAT HANDLING WILL BE EASY & PAINT DROPS WILL BE MINIMUM. K-Y CALL - USE SCAFFOLDING FOR HEIGHT JOB
  • 20. K-Y TRAINING PHOTOGRAPHS & ANALYSIS FOR SELF IMPROVEMENT. CASE-3 CONDITION- PAINTING WORK NEAR ROATATING MACHINE. UNSAFE FINDINGS.- 1. THE PAINTER IS RESTING HAND ON ROATATING SHAFT COVER WHICH MAY SLIP & CAUSED TO TOUCH ON SHAFT AND ACCIDENT MAY HAPPEN. 2. PAINT DROPS MAY FALL ON ROATATING PARTS & CAUSED DAMAGED OR MAY CAUSED FIRE DUE TO HEAT OF FLAMMABLE MATERIAL. CORRECTIVE MEASURES .-- 1. NO PAINT , NO TOUCH ON ROATATING MACHINES PART. 2. CARE SHOULD BE TAKEN ON AUTO START MACHINE ALSO. K-Y CALL - NO PAINT NO TOUCH ON ROATATING EQUIPMENT.
  • 21. K-Y TRAINING PHOTOGRAPHS & ANALYSIS FOR SELF IMPROVEMENT. CASE-4 CONDITION- A PERSON IS DOING SCAFFOLDING FOR COMPRESSOR DUCT . UNSAFE FINDINGS. 1. SCAFFOLDING STANDARD NOT MAINTAIN,LONG HORIZINTAL PIPE BEND & ANY TIME IT WILL FALL. 2. PLATFORM JALLI FIXED WITH COIRSTRING, WHICH MAY CUT AND FALL ANY TIME. 3. HAND RAIL / GUARD PIPE NOT AVAILABLE. CORRECTIVE MEASURES-- 1. SCAFFOLDING TO BE MADE AS PER MCPI STANDARD. 2. MINIMUM 2 PERSON REQUIRED FOR HANDLING THE HEAVE TYPE PLTFORM JALLI. K-Y CALL - SCAFFOLDING STANDARD TO BE MAINTAIN.
  • 22. K-Y CALLAT SITE BY CONTRACTOR EMPLOYEE
  • 23. K- Y CALLAT SITE BY MECHANICAL MEMBER
  • 24. CONCLUSION FIND OUT THE PROBLEM IN EACH OF OUR DAILY ACTIVITY TO APPLY THE PREVENTION ACTION THROUGH TBM / JSA / K-Y FOR MINIMISE THE HAZARD / RISK / ACCIDENT & ALSO CONTINUAL MONITORING FOR IMPOROVEMENT OF OURSELVES & OUR SUPPORTING CONTRACTOR.