SlideShare uma empresa Scribd logo
1 de 25
Value Stream Map TRAINING
EVENT AGENDA
Team Picture
Job ticket
VSM training
Sensor VSM event
Review event pre-work
Shop floor Gemba walk
Map the current state
Application of Lean elements
Map the future state
Categorize Kaizen bursts
Kaizen newspaper
2
TEAM PICTURE
3
Elvin Aviles
Ruben Acosta
Ana Bayona
Sixto Castro
Reinaldo Correa
Victor Delgado
Francisco Luna
Edwin Rivera
Rosa Roman
Vicente Sotomayor
Juanita Torres
Kevin Valentin
Carlos Zambrana
Meriann Edsall
Lionel Feliciano
Ida Rivera
Marilis Vargas
JOB TICKET
Event Name: UTAS PRER VSM
Event Location: PRER, Santa Isabel
Event Type: Value Stream Mapping
Project Charter
Problem Statement: Currently, the current process for PRER Sensors is not balanced to meet takt time and shows no implementation of lean
principles. The average TAT YTD is 27 days.
Objective: To create a leaner value stream that meets customer requirements on time every time by implementing the lean, as well as
identifying and solving bottlenecks.
Business Impact: The ideal state will improve TAT, CSL and reduce lead time.
Scope and Boundaries: The scope of this mapping event includes all processes from receiving to shipping (Door-to-door). The team will focus
the processes that have an impact to the customer.
Executive Sponsor: George Bowman
Co-Leader(s): Marilis Vargas
Implementation Leader(s): Marilis Vargas
Team Members: Elvin Aviles, Ruben Acosta, Ana Bayona, Sixto Castro, Reinaldo Correa, Victor Delgado, Francisco Luna, Edwin Rivera,
Rosa Roman, Vicente Sotomayor, Juanita Torres, Kevin Valentin, Carlos Zambrana, Meriann Edsall, Lionel Feliciano, Ida Rivera, Marilis Vargas
Pre-Work Plan / Activities: Product Family Matrix, PQ Analysis, Takt Time Calculation, Operations Bar Chart, Load Leveling Chart, QCPC
Data.
Benefits / Measures of Success: The success of this VSM will be measure by QCPC data, MFA score, Lead Time reduction, TAT reduction,
and CSL improvement.
4
PRER PRODUCT FAMILY MATRIX
5
BENCH BENCH TEST STAND BENCH BENCH
TEST
STAND
PRE
VIBRATION
STAND
PRE 7 BENCH BENCH
RECEIVING
INSPECTION
ASSEMBLY TEST REWORK
IN
PROCESS
INSPECTIO
N
BONDING,
DIELECTRI
C ,
MEGAMET
ERTEST
VIBRATION
TEST
FUNCTIONAL
TEST
THERMAL
TEST
FINAL
TEST
INSP. &
TOUCH
UP
FINAL
INSPECTI
ON
818906-1 - AA LRU 1 2 4 5 6 7 8 9 10
770705C - G/E LRU 1 2 3 4 5 6 7 8 9 10
770697A - G/E LRU 1 2 3 4 5 6 7 8 9 10
765990 - LM LRU 1 2 3 4 5 6 7 8 9 10
770701A - G/E LRU 1 2 3 4 5 6 7 8 9 10
770703C - G/E LRU 1 2 3 4 5 6 7 8 9 10
1703230 -
GULFSTREAM LRU
1 2 3 4 5 6 7 8 9 10
754922-11 - TELEDYNE LRU 1 2 3 4 5 6 7 8 9 10
754990-18 - TELEDYNE LRU 1 2 3 4 5 6 7 8 9 10
773683-1 - TELEDYNE LRU 1 2 3 4 5 6 7 8 9 10
1705836A - G/E LRU 1 2 3 4 5 6 7 8 9 10
769099 - BOEING LRU 1 2 3 4 5 6 7 8
11260-4 - TINKER - LM SENSOR 1 2 3 4 5 6 7 8
11260-3 - TINKER - LM SENSOR 1 2 3 4 5 6 7 8
11320-2 - LM SENSOR 1 2 3 4 5 6 7 8
11221-4 - AAR SENSOR 1 2 3 4 5 6 7 8
11221-7 - AAR SENSOR 1 2 3 4 5 6 7 8
1706638 - G/E PWBA 1 2 3 4 5 6 7 8
1705143A - G/E PWBA 1 2 3 4 5 6 7 8
766181 - LM PWBA 1 2 3 4 5 6 7 8
770549 - G/E PWBA 1 2 3 4 5 6 7 8
1707390 - G/E PWBA 1 2 3 4 5 6 7 8
1705843A - G/E PWBA 1 2 3 4 5 6 7 8
1706642A - G/E PWBA 1 2 3 4 5 6 7 8
770563A - G/E PWBA 1 2 3 4 5 6 7 8
770999C - G/E PWBA 1 2 3 4 5 6 7 8
VSM AREA OF FOCUS (SENSORS)
FUEL SHOP P-Q ANALYSIS
6
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0
50
100
150
200
250
300
350
400
450
500
PQ Analysis
PRER (2007 - 2012)
# of Units
Shipped July
2007-Sept 2012
Cummulative
CALCULATING TAKT TIME
7
TAKT Time Calculation
Product Family: 5006286(X)/5006003(X)
Starts Ends Hours Minutes
1st Shift Scheduled work time (1st shift) 7:00 AM to 3:30 PM = 8.9 535
Lunch break 45
Scheduled breaks 30
460
Starts Ends
2nd Shift Scheduled work time (2nd shift) to =
Lunch break
Scheduled breaks
Starts Ends
3rd Shift Scheduled work time (3rd shift) to =
Lunch break
Scheduled breaks
Total Daily
Available
Time
459.6 Minutes
Monthly demand + overdue 30
= 1.50 Average daily demand
Available working days 20
Daily available time 460
= 307 TAKT Time (minutes)
Daily customer demand 1.50
(including overdue)
30 30
91
120
10 13 1 15 15
40 472
90
0
50
100
150
200
250
300
350
Receiving Initial Insp. Initial Test Assy In-process
Insp.
Program
Test
Final Test Final
Preparation
(Labeling)
Clean Final Insp. Shipping
Autotime
Process Time
Takt Time
OPERATIONS BAR CHART (SENSORS)
8
This chart shows variation between processes
in minutes. It gives an indication of what
operations meet or exceed the takt time. By
breaking these operations into smaller
processes or combining them, the takt time will
be met.
60
1
120
14
70
47
90
92
0
50
100
150
200
250
300
350
Receiving/Initial Insp. Initial Test Assy/In-process Insp. Program Test/final
Test
Final Preparation
(Labeling)/Clean/final
inspection
Shipping
Autotime
Process Time
Takt Time
LOAD LEVELING CHART (SENSORS)
9
In order to balance the line and get as close to
the takt time as possible, the processes Test
and Final Prep will be combined. This will help
with flow, and reduce inventory.
Identifying Waste in the Current State
1 – Transportation
2 – Inventory
3 – Motion
4 – Waiting
5 – Overproduction
6 – Overprocessing
7 – Defects
PRER CURRENT STATE
10
2
22 2
22 2 2 2 2
6
7
4
3
1
4
5
Lean Guidelines in the Future State
1 – Takt time
2 – Finished goods strategy
3 – Continuous flow
4 – FIFO flow
5 – Pull System
6 – Schedule only one point
7 – Interval
8 - Pitch
PRER FUTURE STATE
11
3
4
6
4
4
5
8
2
44
APPLICATION OF LEAN ELEMENTS
12
To move from the current state to the future state, we will apply the Lean
Guidelines using a structured approach to eliminate waste.
Lean Guidelines
1 – Takt time
2 – Finished goods strategy
3 – Continuous flow (apply this 1st)
4 – FIFO flow (FIFO when you can)
5 – Pull System (Pull when you cant FIFO)
6 – Schedule only one point (right after a supermarket)
7 – Interval (smaller interval in smaller batches is best)
8 – Pitch (provides a management timeframe)
Identifying & Eliminating Waste
1 – Transportation (found in current state)
2 – Inventory (found in current state)
3 – Motion (found in current state)
4 – Waiting (found in current state)
5 – Overproduction (found in current state)
6 – Overprocessing (found in current state)
7 – Defects (found in current state)
8 – Skills
APPLICATION OF LEAN ELEMENTS
13
•Takt Time: Was calculated by dividing 460 min available working time / an average of 1.5
units demanded daily = 307 minutes takt.
•Finished goods strategy: Units in this value stream are built to shipping.
•FIFO: Was applied in the future state to replace a push strategy that was accumulating
uncontrolled inventory between processes.
•Pull: Was applied where there was a supermarket. The assembly technician will pull from
the materials supermarket with Kanban.
•Schedule only at one point: The scheduling point was removed to enhance continuous flow.
•Interval: Every technical will be trained in every operation and every product in the sensor
line. Units will be received and worked on a first come first served basis, regardless of part
number.
KAIZEN BURST – IMPACT MATRIX
14
1. No P.O.
2. Part shortage
3. WAWF process
4. Delivery order extension
Use to prioritize burst prior to developing the implementation plan.
Low High
High
Low
Degree of Difficulty
ImpacttoBusiness
4
1
5. Incomplete or missing data
6. Machine availability/walking distance
7. Adding parts to parts list
8. Availability of boxes
5
6 7
3
8
2
FIFO
15
Kaizen Newspaper
No. Action Owner Due Date % Complete
1 Establish FIFO standard work Lionel Feliciano 10/26/12
2 Establish FIFO Max Sensor VSM team 10/11/12
3 Brief Employee on standard work and FIFO max Lionel Feliciano 10/26/12
4 Add FIFO standard work to Rack Lionel Feliciano 10/30/12
5
6
7
8
9
PROCESS TIME
16
Kaizen Newspaper
No. Action Owner Due Date % Complete
1 Perform a time study on sensors process Ida L. Rivera 11/29/12
2 Implement the use of time observation sheets for sensors process M.Vargas/L. Feliciano 11/29/12
3 Generate Spaghetti chart for sensor process walking distance. Ida L. Rivera 11/29/12
4 Discuss results with management team Ida L. Rivera 12/7/12
5
6
7
8
9
SERVIGISTIC
17
Kaizen Newspaper
No. Action Owner Due Date % Complete
1 Verify and screen out work orders I.Rivera/M.Vargas 10/11/12
2 Provide info regarding to volume and parts numbers I.Rivera/M.Vargas 10/11/12
3 Provide PQ Analysis for all assemblies at PRR. L. Feliciano 10/15/12
4 Include Andy Yi (servigistic management) and Dave Frederick (planning) in the team. Terry Gill 8/11/12
5 Perform dry run to PRR Terry Gill 1/31/13
6
7
8
9
ACE CONTROL TOWER
18
Kaizen Newspaper
No. Action Owner Due Date % Complete
1 Update Control tower to remove the metrics not required. Team
8/15/12
2 Update EH&S metrics by removing the 2015 level Team
8/15/12
3 Normalized the financial revenue goal Team 8/15/12
4 Perform DIVE activity for Commercial CSL and TAT for missed metrics. Team 10/19/12
5
6
7
8
9
RECEIVING
19
Kaizen Newspaper
No. Action Owner Due Date % Complete
1 Trained RCA in the use of EXOSTAR system Kathy Carlson Pending
2 Generated and review standard work for customer reassignment between RCA. Kathy Carlson Pending
3
Generated standard work to manage units pending PO and establish maximum waiting time before
returning to customer.
M. Vargas/ K. Carlson Pending
4 Request access to EXOSTAR system to internal RCA. Meriann Edsall 10/12/12
5 Generate standard work to update delivery order extension prior to physically receive the units. Paola Campo Pending
6
7
8
9
SHIPPING
20
Kaizen Newspaper
No. Action Owner Due Date % Complete
1 Capital to buy a new barcode reader for UID labels M.Vargas 11/2/12
2 Include PRR management team in the advance notification of any change in the JDE UID process. K. Carlson Pending
3 Generated standard work for WAWF process P.Campo/E.Rivera Pending
4 Generated min/max kanban for shipping carton boxes. Edwin Rivera 10/26/12
5 Include Dymo printer on TPM activities. Edwin Rivera 10/26/12
6 Contact the costumer to negotiate improvement in response time in the TMS PO load M.Vargas/C.Coveney Pending
7
8
9
ASSEMBLY
21
Kaizen Newspaper
No. Action Owner Due Date % Complete
1 Revise the sensors’ provisioning for spare parts on a quarterly basis. Ida Rivera 10/30/12
2 Generate standard work for adding never use parts to the PRER branch. I.Rivera/M.Edsall 11/1612
3 Generate standard work and train assemblers on adding parts to the correct locations. I.Rivera/M.Edsall 11/16/12
4 Request OEM RRCA for excess coating on connectors pins. Lionel Feliciano 10/19/12
5
6
7
8
9
FINAL PREPARATION
22
Kaizen Newspaper
No. Action Owner Due Date % Complete
1 Generate standard work for paint preparation (min batch). M.Vargas/L.Feliciano 11/15/12
2 Capital to request a new laser machine M.Vargas 11/2/12
3 Generate fixture to minimize set up time on laser machine. M.Vargas 12/28/12
4
5
6
7
8
9
INSPECTION
23
Kaizen Newspaper
No. Action Owner Due Date % Complete
1 Generate standard work on part issue process. I.Rivera/M.Edsall 12/21/12
2 Add UID label scanner to final inspection workbench (see Newspaper Shipping) M. Vargas TBD
3
4
5
6
7
8
9
SHOP GEMBA
24
SHOP GEMBA
25

Mais conteúdo relacionado

Mais procurados

Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream MappingTKMG, Inc.
 
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...TKMG, Inc.
 
Process improvement
Process improvementProcess improvement
Process improvementaolrac
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping ProcessAnand Subramaniam
 
Lean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete trainingLean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete trainingAnkit Sharma
 
VSM - Value Stream Mapping for made-to-order manufacturing
VSM - Value Stream Mapping for made-to-order manufacturingVSM - Value Stream Mapping for made-to-order manufacturing
VSM - Value Stream Mapping for made-to-order manufacturingJessica Mitchell
 
Value stream mapping study with example
Value stream mapping study with exampleValue stream mapping study with example
Value stream mapping study with exampleMouhcine Nahal
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mappingmahawar1987
 
Value stream mapping - Future State
Value stream mapping - Future StateValue stream mapping - Future State
Value stream mapping - Future Statekrishnaheda
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklistsSteven Bonacorsi
 
Six Sigma Black Belt Project
Six Sigma Black Belt ProjectSix Sigma Black Belt Project
Six Sigma Black Belt ProjectAndrey Lygin
 
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...Niranjana B
 

Mais procurados (20)

Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Lean Six Sigma Green Belt roadmap poster
Lean Six Sigma Green Belt roadmap posterLean Six Sigma Green Belt roadmap poster
Lean Six Sigma Green Belt roadmap poster
 
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
 
Process improvement
Process improvementProcess improvement
Process improvement
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping Process
 
Lean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete trainingLean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete training
 
Dmaic
DmaicDmaic
Dmaic
 
VSM - Value Stream Mapping for made-to-order manufacturing
VSM - Value Stream Mapping for made-to-order manufacturingVSM - Value Stream Mapping for made-to-order manufacturing
VSM - Value Stream Mapping for made-to-order manufacturing
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Value stream mapping study with example
Value stream mapping study with exampleValue stream mapping study with example
Value stream mapping study with example
 
13. value stream mapping
13. value stream mapping13. value stream mapping
13. value stream mapping
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Lean Six Sigma Projects
Lean Six Sigma ProjectsLean Six Sigma Projects
Lean Six Sigma Projects
 
8 Wastes
8 Wastes8 Wastes
8 Wastes
 
Value stream mapping - Future State
Value stream mapping - Future StateValue stream mapping - Future State
Value stream mapping - Future State
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklists
 
Six Sigma Black Belt Project
Six Sigma Black Belt ProjectSix Sigma Black Belt Project
Six Sigma Black Belt Project
 
Value stream mapping
Value stream mappingValue stream mapping
Value stream mapping
 
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
 
Six sigma
Six sigmaSix sigma
Six sigma
 

Destaque

Business Perspectives on Energy Efficiency from UTC
Business Perspectives on Energy Efficiency from UTCBusiness Perspectives on Energy Efficiency from UTC
Business Perspectives on Energy Efficiency from UTCAlliance To Save Energy
 
A jugar con los colores
A jugar con los coloresA jugar con los colores
A jugar con los coloresKarina Osso
 
Quality Clinic Do-It-Yourself Kit - sample
Quality Clinic Do-It-Yourself Kit - sampleQuality Clinic Do-It-Yourself Kit - sample
Quality Clinic Do-It-Yourself Kit - sampleMark H. Davis
 
Quality Clinic - Lean Six Sigma Fundamentals Training - Sample
Quality Clinic - Lean Six Sigma Fundamentals Training - SampleQuality Clinic - Lean Six Sigma Fundamentals Training - Sample
Quality Clinic - Lean Six Sigma Fundamentals Training - SampleMark H. Davis
 
Soutenance de stage Ingénieur
Soutenance de stage IngénieurSoutenance de stage Ingénieur
Soutenance de stage IngénieurFaten Chalbi
 
Aerospace and Defence Sector Diversification | ACMA
Aerospace and Defence Sector Diversification | ACMAAerospace and Defence Sector Diversification | ACMA
Aerospace and Defence Sector Diversification | ACMAIndia ACMA
 
Duopoly - Boeing Versus Airbus
Duopoly - Boeing Versus AirbusDuopoly - Boeing Versus Airbus
Duopoly - Boeing Versus AirbusArjun Parekh
 
Airbus A380
Airbus A380Airbus A380
Airbus A380rubal_9
 

Destaque (13)

Business Perspectives on Energy Efficiency from UTC
Business Perspectives on Energy Efficiency from UTCBusiness Perspectives on Energy Efficiency from UTC
Business Perspectives on Energy Efficiency from UTC
 
A jugar con los colores
A jugar con los coloresA jugar con los colores
A jugar con los colores
 
Quality Clinic Do-It-Yourself Kit - sample
Quality Clinic Do-It-Yourself Kit - sampleQuality Clinic Do-It-Yourself Kit - sample
Quality Clinic Do-It-Yourself Kit - sample
 
Quality Clinic - Lean Six Sigma Fundamentals Training - Sample
Quality Clinic - Lean Six Sigma Fundamentals Training - SampleQuality Clinic - Lean Six Sigma Fundamentals Training - Sample
Quality Clinic - Lean Six Sigma Fundamentals Training - Sample
 
Soutenance de stage Ingénieur
Soutenance de stage IngénieurSoutenance de stage Ingénieur
Soutenance de stage Ingénieur
 
Aerospace and Defence Sector Diversification | ACMA
Aerospace and Defence Sector Diversification | ACMAAerospace and Defence Sector Diversification | ACMA
Aerospace and Defence Sector Diversification | ACMA
 
Presentation on Boeing
Presentation on BoeingPresentation on Boeing
Presentation on Boeing
 
Duopoly - Boeing Versus Airbus
Duopoly - Boeing Versus AirbusDuopoly - Boeing Versus Airbus
Duopoly - Boeing Versus Airbus
 
UTC_ACE_CaseStudy
UTC_ACE_CaseStudyUTC_ACE_CaseStudy
UTC_ACE_CaseStudy
 
Airbus
AirbusAirbus
Airbus
 
Airbus A380
Airbus A380Airbus A380
Airbus A380
 
Value stream mapping for non manufacturing environments
Value stream mapping for non manufacturing environmentsValue stream mapping for non manufacturing environments
Value stream mapping for non manufacturing environments
 
US Defence Contracting and DFARS Compliance in Europe 2016.PDF
US Defence Contracting and DFARS Compliance in Europe 2016.PDFUS Defence Contracting and DFARS Compliance in Europe 2016.PDF
US Defence Contracting and DFARS Compliance in Europe 2016.PDF
 

Semelhante a UTC Aerospace System - Value Stream Mapping

Lean_Basics_Part_II_Rev4.ppt
Lean_Basics_Part_II_Rev4.pptLean_Basics_Part_II_Rev4.ppt
Lean_Basics_Part_II_Rev4.pptEndi Kustamsi
 
6-Sigma Training-Awareness for automobile industries
6-Sigma Training-Awareness for automobile industries6-Sigma Training-Awareness for automobile industries
6-Sigma Training-Awareness for automobile industriesVivekSingh140912
 
productivity improvement and increase in the material flow
productivity improvement and increase in the material flowproductivity improvement and increase in the material flow
productivity improvement and increase in the material flowmahendran mahendran.m
 
Presentation SLOB Material Reduction
Presentation SLOB Material ReductionPresentation SLOB Material Reduction
Presentation SLOB Material ReductionCATHERINE NGUYEN
 
Blackbeltpresentation
BlackbeltpresentationBlackbeltpresentation
BlackbeltpresentationRobert Peth
 
Final ams power_point_slides-------newwww
Final ams power_point_slides-------newwwwFinal ams power_point_slides-------newwww
Final ams power_point_slides-------newwwwvivekmsmech
 
Storyboard_SPS_Payroll
Storyboard_SPS_PayrollStoryboard_SPS_Payroll
Storyboard_SPS_PayrollBalaguru SP
 
Baskaren Accomplishments Summary
Baskaren Accomplishments SummaryBaskaren Accomplishments Summary
Baskaren Accomplishments Summaryguest524810
 
Lean NMR Laboratory Layout
  Lean NMR Laboratory Layout    Lean NMR Laboratory Layout
Lean NMR Laboratory Layout Javier Siles
 
Supply chain design and operation
Supply chain design and operationSupply chain design and operation
Supply chain design and operationAngelainBay
 
IPC_project final
IPC_project finalIPC_project final
IPC_project finalRatul Das
 
GSI Internship Portfolio
GSI Internship PortfolioGSI Internship Portfolio
GSI Internship PortfolioNicole Ripperda
 
IRJET- Analysis of Crucial Oil Gas and Liquid Sensor Statistics and Productio...
IRJET- Analysis of Crucial Oil Gas and Liquid Sensor Statistics and Productio...IRJET- Analysis of Crucial Oil Gas and Liquid Sensor Statistics and Productio...
IRJET- Analysis of Crucial Oil Gas and Liquid Sensor Statistics and Productio...IRJET Journal
 
FMEA training (AIAG VDA Edition 01)
FMEA training (AIAG VDA Edition 01)FMEA training (AIAG VDA Edition 01)
FMEA training (AIAG VDA Edition 01)Ankit Gupta
 

Semelhante a UTC Aerospace System - Value Stream Mapping (20)

SMC CFT 2012-13-IInd Half.
SMC CFT 2012-13-IInd Half.SMC CFT 2012-13-IInd Half.
SMC CFT 2012-13-IInd Half.
 
Lean_Basics_Part_II_Rev4.ppt
Lean_Basics_Part_II_Rev4.pptLean_Basics_Part_II_Rev4.ppt
Lean_Basics_Part_II_Rev4.ppt
 
6-Sigma Training-Awareness for automobile industries
6-Sigma Training-Awareness for automobile industries6-Sigma Training-Awareness for automobile industries
6-Sigma Training-Awareness for automobile industries
 
SIRFrt Op Ex RCA2015b
SIRFrt Op Ex RCA2015bSIRFrt Op Ex RCA2015b
SIRFrt Op Ex RCA2015b
 
productivity improvement and increase in the material flow
productivity improvement and increase in the material flowproductivity improvement and increase in the material flow
productivity improvement and increase in the material flow
 
Presentation SLOB Material Reduction
Presentation SLOB Material ReductionPresentation SLOB Material Reduction
Presentation SLOB Material Reduction
 
Blackbeltpresentation
BlackbeltpresentationBlackbeltpresentation
Blackbeltpresentation
 
Lean Assessment 03-09-11
Lean Assessment 03-09-11Lean Assessment 03-09-11
Lean Assessment 03-09-11
 
5 Steps to implementing Lean
5  Steps to implementing Lean5  Steps to implementing Lean
5 Steps to implementing Lean
 
Final ams power_point_slides-------newwww
Final ams power_point_slides-------newwwwFinal ams power_point_slides-------newwww
Final ams power_point_slides-------newwww
 
Storyboard_SPS_Payroll
Storyboard_SPS_PayrollStoryboard_SPS_Payroll
Storyboard_SPS_Payroll
 
Baskaren Accomplishments Summary
Baskaren Accomplishments SummaryBaskaren Accomplishments Summary
Baskaren Accomplishments Summary
 
Lean NMR Laboratory Layout
  Lean NMR Laboratory Layout    Lean NMR Laboratory Layout
Lean NMR Laboratory Layout
 
Supply chain design and operation
Supply chain design and operationSupply chain design and operation
Supply chain design and operation
 
Lean Road Map
Lean Road MapLean Road Map
Lean Road Map
 
SMED Jabil Juarez
SMED Jabil JuarezSMED Jabil Juarez
SMED Jabil Juarez
 
IPC_project final
IPC_project finalIPC_project final
IPC_project final
 
GSI Internship Portfolio
GSI Internship PortfolioGSI Internship Portfolio
GSI Internship Portfolio
 
IRJET- Analysis of Crucial Oil Gas and Liquid Sensor Statistics and Productio...
IRJET- Analysis of Crucial Oil Gas and Liquid Sensor Statistics and Productio...IRJET- Analysis of Crucial Oil Gas and Liquid Sensor Statistics and Productio...
IRJET- Analysis of Crucial Oil Gas and Liquid Sensor Statistics and Productio...
 
FMEA training (AIAG VDA Edition 01)
FMEA training (AIAG VDA Edition 01)FMEA training (AIAG VDA Edition 01)
FMEA training (AIAG VDA Edition 01)
 

Mais de Lean6Sigma4all

Cypriot Local Administration Reform - Project overview Final - NOTORIA INTERN...
Cypriot Local Administration Reform - Project overview Final - NOTORIA INTERN...Cypriot Local Administration Reform - Project overview Final - NOTORIA INTERN...
Cypriot Local Administration Reform - Project overview Final - NOTORIA INTERN...Lean6Sigma4all
 
Cross Training Model - The School of Improvement
Cross Training Model - The School of ImprovementCross Training Model - The School of Improvement
Cross Training Model - The School of ImprovementLean6Sigma4all
 
Clustering general-presentation (Project Cyprus Part III)
Clustering general-presentation (Project Cyprus Part III)Clustering general-presentation (Project Cyprus Part III)
Clustering general-presentation (Project Cyprus Part III)Lean6Sigma4all
 
Meeting with the Co-Operative Central Bank Management Board
Meeting with the Co-Operative Central Bank Management BoardMeeting with the Co-Operative Central Bank Management Board
Meeting with the Co-Operative Central Bank Management BoardLean6Sigma4all
 
LOCAL ADMINISTRATION REFORM IN CYPRUS
LOCAL ADMINISTRATION REFORM IN CYPRUSLOCAL ADMINISTRATION REFORM IN CYPRUS
LOCAL ADMINISTRATION REFORM IN CYPRUSLean6Sigma4all
 
Lean6Sigma4all & KPI Fire
Lean6Sigma4all & KPI FireLean6Sigma4all & KPI Fire
Lean6Sigma4all & KPI FireLean6Sigma4all
 
New Lean6Sigma4all.eu BRAND
New Lean6Sigma4all.eu BRANDNew Lean6Sigma4all.eu BRAND
New Lean6Sigma4all.eu BRANDLean6Sigma4all
 
Lean6Sigma4all "Work in Progress"
Lean6Sigma4all "Work in Progress"Lean6Sigma4all "Work in Progress"
Lean6Sigma4all "Work in Progress"Lean6Sigma4all
 
We connect Lean Six Sigma People!!!
We connect Lean Six Sigma People!!!We connect Lean Six Sigma People!!!
We connect Lean Six Sigma People!!!Lean6Sigma4all
 
Advertise with your business on Lean6Sigma4all!
Advertise with your business on Lean6Sigma4all!Advertise with your business on Lean6Sigma4all!
Advertise with your business on Lean6Sigma4all!Lean6Sigma4all
 
Are you looking for a professional Lean Sigma classroom training?
Are you looking for a professional Lean Sigma classroom training?Are you looking for a professional Lean Sigma classroom training?
Are you looking for a professional Lean Sigma classroom training?Lean6Sigma4all
 
Lean6Sigma4all YOUTUBE CHANNEL
Lean6Sigma4all YOUTUBE CHANNELLean6Sigma4all YOUTUBE CHANNEL
Lean6Sigma4all YOUTUBE CHANNELLean6Sigma4all
 
Calculate process mulple flow units
Calculate process mulple flow unitsCalculate process mulple flow units
Calculate process mulple flow unitsLean6Sigma4all
 

Mais de Lean6Sigma4all (20)

Cypriot Local Administration Reform - Project overview Final - NOTORIA INTERN...
Cypriot Local Administration Reform - Project overview Final - NOTORIA INTERN...Cypriot Local Administration Reform - Project overview Final - NOTORIA INTERN...
Cypriot Local Administration Reform - Project overview Final - NOTORIA INTERN...
 
Cross Training Model - The School of Improvement
Cross Training Model - The School of ImprovementCross Training Model - The School of Improvement
Cross Training Model - The School of Improvement
 
Clustering general-presentation (Project Cyprus Part III)
Clustering general-presentation (Project Cyprus Part III)Clustering general-presentation (Project Cyprus Part III)
Clustering general-presentation (Project Cyprus Part III)
 
Meeting with the Co-Operative Central Bank Management Board
Meeting with the Co-Operative Central Bank Management BoardMeeting with the Co-Operative Central Bank Management Board
Meeting with the Co-Operative Central Bank Management Board
 
LOCAL ADMINISTRATION REFORM IN CYPRUS
LOCAL ADMINISTRATION REFORM IN CYPRUSLOCAL ADMINISTRATION REFORM IN CYPRUS
LOCAL ADMINISTRATION REFORM IN CYPRUS
 
Join now!!
Join now!!Join now!!
Join now!!
 
We keep growing!
We keep growing!We keep growing!
We keep growing!
 
DMAIC Methodology
DMAIC MethodologyDMAIC Methodology
DMAIC Methodology
 
Lean6Sigma4all & KPI Fire
Lean6Sigma4all & KPI FireLean6Sigma4all & KPI Fire
Lean6Sigma4all & KPI Fire
 
New Lean6Sigma4all.eu BRAND
New Lean6Sigma4all.eu BRANDNew Lean6Sigma4all.eu BRAND
New Lean6Sigma4all.eu BRAND
 
Lean6Sigma4all "Work in Progress"
Lean6Sigma4all "Work in Progress"Lean6Sigma4all "Work in Progress"
Lean6Sigma4all "Work in Progress"
 
We connect Lean Six Sigma People!!!
We connect Lean Six Sigma People!!!We connect Lean Six Sigma People!!!
We connect Lean Six Sigma People!!!
 
Advertise with your business on Lean6Sigma4all!
Advertise with your business on Lean6Sigma4all!Advertise with your business on Lean6Sigma4all!
Advertise with your business on Lean6Sigma4all!
 
Are you looking for a professional Lean Sigma classroom training?
Are you looking for a professional Lean Sigma classroom training?Are you looking for a professional Lean Sigma classroom training?
Are you looking for a professional Lean Sigma classroom training?
 
Lean Insitute
Lean InsituteLean Insitute
Lean Insitute
 
Survey results
Survey resultsSurvey results
Survey results
 
Lean6Sigma4all YOUTUBE CHANNEL
Lean6Sigma4all YOUTUBE CHANNELLean6Sigma4all YOUTUBE CHANNEL
Lean6Sigma4all YOUTUBE CHANNEL
 
Calculate process mulple flow units
Calculate process mulple flow unitsCalculate process mulple flow units
Calculate process mulple flow units
 
Kata Worksheet Form
Kata Worksheet Form Kata Worksheet Form
Kata Worksheet Form
 
Solutions INVENTORY
Solutions INVENTORYSolutions INVENTORY
Solutions INVENTORY
 

Último

Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 

Último (20)

Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 

UTC Aerospace System - Value Stream Mapping

  • 1. Value Stream Map TRAINING
  • 2. EVENT AGENDA Team Picture Job ticket VSM training Sensor VSM event Review event pre-work Shop floor Gemba walk Map the current state Application of Lean elements Map the future state Categorize Kaizen bursts Kaizen newspaper 2
  • 3. TEAM PICTURE 3 Elvin Aviles Ruben Acosta Ana Bayona Sixto Castro Reinaldo Correa Victor Delgado Francisco Luna Edwin Rivera Rosa Roman Vicente Sotomayor Juanita Torres Kevin Valentin Carlos Zambrana Meriann Edsall Lionel Feliciano Ida Rivera Marilis Vargas
  • 4. JOB TICKET Event Name: UTAS PRER VSM Event Location: PRER, Santa Isabel Event Type: Value Stream Mapping Project Charter Problem Statement: Currently, the current process for PRER Sensors is not balanced to meet takt time and shows no implementation of lean principles. The average TAT YTD is 27 days. Objective: To create a leaner value stream that meets customer requirements on time every time by implementing the lean, as well as identifying and solving bottlenecks. Business Impact: The ideal state will improve TAT, CSL and reduce lead time. Scope and Boundaries: The scope of this mapping event includes all processes from receiving to shipping (Door-to-door). The team will focus the processes that have an impact to the customer. Executive Sponsor: George Bowman Co-Leader(s): Marilis Vargas Implementation Leader(s): Marilis Vargas Team Members: Elvin Aviles, Ruben Acosta, Ana Bayona, Sixto Castro, Reinaldo Correa, Victor Delgado, Francisco Luna, Edwin Rivera, Rosa Roman, Vicente Sotomayor, Juanita Torres, Kevin Valentin, Carlos Zambrana, Meriann Edsall, Lionel Feliciano, Ida Rivera, Marilis Vargas Pre-Work Plan / Activities: Product Family Matrix, PQ Analysis, Takt Time Calculation, Operations Bar Chart, Load Leveling Chart, QCPC Data. Benefits / Measures of Success: The success of this VSM will be measure by QCPC data, MFA score, Lead Time reduction, TAT reduction, and CSL improvement. 4
  • 5. PRER PRODUCT FAMILY MATRIX 5 BENCH BENCH TEST STAND BENCH BENCH TEST STAND PRE VIBRATION STAND PRE 7 BENCH BENCH RECEIVING INSPECTION ASSEMBLY TEST REWORK IN PROCESS INSPECTIO N BONDING, DIELECTRI C , MEGAMET ERTEST VIBRATION TEST FUNCTIONAL TEST THERMAL TEST FINAL TEST INSP. & TOUCH UP FINAL INSPECTI ON 818906-1 - AA LRU 1 2 4 5 6 7 8 9 10 770705C - G/E LRU 1 2 3 4 5 6 7 8 9 10 770697A - G/E LRU 1 2 3 4 5 6 7 8 9 10 765990 - LM LRU 1 2 3 4 5 6 7 8 9 10 770701A - G/E LRU 1 2 3 4 5 6 7 8 9 10 770703C - G/E LRU 1 2 3 4 5 6 7 8 9 10 1703230 - GULFSTREAM LRU 1 2 3 4 5 6 7 8 9 10 754922-11 - TELEDYNE LRU 1 2 3 4 5 6 7 8 9 10 754990-18 - TELEDYNE LRU 1 2 3 4 5 6 7 8 9 10 773683-1 - TELEDYNE LRU 1 2 3 4 5 6 7 8 9 10 1705836A - G/E LRU 1 2 3 4 5 6 7 8 9 10 769099 - BOEING LRU 1 2 3 4 5 6 7 8 11260-4 - TINKER - LM SENSOR 1 2 3 4 5 6 7 8 11260-3 - TINKER - LM SENSOR 1 2 3 4 5 6 7 8 11320-2 - LM SENSOR 1 2 3 4 5 6 7 8 11221-4 - AAR SENSOR 1 2 3 4 5 6 7 8 11221-7 - AAR SENSOR 1 2 3 4 5 6 7 8 1706638 - G/E PWBA 1 2 3 4 5 6 7 8 1705143A - G/E PWBA 1 2 3 4 5 6 7 8 766181 - LM PWBA 1 2 3 4 5 6 7 8 770549 - G/E PWBA 1 2 3 4 5 6 7 8 1707390 - G/E PWBA 1 2 3 4 5 6 7 8 1705843A - G/E PWBA 1 2 3 4 5 6 7 8 1706642A - G/E PWBA 1 2 3 4 5 6 7 8 770563A - G/E PWBA 1 2 3 4 5 6 7 8 770999C - G/E PWBA 1 2 3 4 5 6 7 8 VSM AREA OF FOCUS (SENSORS)
  • 6. FUEL SHOP P-Q ANALYSIS 6 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 0 50 100 150 200 250 300 350 400 450 500 PQ Analysis PRER (2007 - 2012) # of Units Shipped July 2007-Sept 2012 Cummulative
  • 7. CALCULATING TAKT TIME 7 TAKT Time Calculation Product Family: 5006286(X)/5006003(X) Starts Ends Hours Minutes 1st Shift Scheduled work time (1st shift) 7:00 AM to 3:30 PM = 8.9 535 Lunch break 45 Scheduled breaks 30 460 Starts Ends 2nd Shift Scheduled work time (2nd shift) to = Lunch break Scheduled breaks Starts Ends 3rd Shift Scheduled work time (3rd shift) to = Lunch break Scheduled breaks Total Daily Available Time 459.6 Minutes Monthly demand + overdue 30 = 1.50 Average daily demand Available working days 20 Daily available time 460 = 307 TAKT Time (minutes) Daily customer demand 1.50 (including overdue)
  • 8. 30 30 91 120 10 13 1 15 15 40 472 90 0 50 100 150 200 250 300 350 Receiving Initial Insp. Initial Test Assy In-process Insp. Program Test Final Test Final Preparation (Labeling) Clean Final Insp. Shipping Autotime Process Time Takt Time OPERATIONS BAR CHART (SENSORS) 8 This chart shows variation between processes in minutes. It gives an indication of what operations meet or exceed the takt time. By breaking these operations into smaller processes or combining them, the takt time will be met.
  • 9. 60 1 120 14 70 47 90 92 0 50 100 150 200 250 300 350 Receiving/Initial Insp. Initial Test Assy/In-process Insp. Program Test/final Test Final Preparation (Labeling)/Clean/final inspection Shipping Autotime Process Time Takt Time LOAD LEVELING CHART (SENSORS) 9 In order to balance the line and get as close to the takt time as possible, the processes Test and Final Prep will be combined. This will help with flow, and reduce inventory.
  • 10. Identifying Waste in the Current State 1 – Transportation 2 – Inventory 3 – Motion 4 – Waiting 5 – Overproduction 6 – Overprocessing 7 – Defects PRER CURRENT STATE 10 2 22 2 22 2 2 2 2 6 7 4 3 1 4 5
  • 11. Lean Guidelines in the Future State 1 – Takt time 2 – Finished goods strategy 3 – Continuous flow 4 – FIFO flow 5 – Pull System 6 – Schedule only one point 7 – Interval 8 - Pitch PRER FUTURE STATE 11 3 4 6 4 4 5 8 2 44
  • 12. APPLICATION OF LEAN ELEMENTS 12 To move from the current state to the future state, we will apply the Lean Guidelines using a structured approach to eliminate waste. Lean Guidelines 1 – Takt time 2 – Finished goods strategy 3 – Continuous flow (apply this 1st) 4 – FIFO flow (FIFO when you can) 5 – Pull System (Pull when you cant FIFO) 6 – Schedule only one point (right after a supermarket) 7 – Interval (smaller interval in smaller batches is best) 8 – Pitch (provides a management timeframe) Identifying & Eliminating Waste 1 – Transportation (found in current state) 2 – Inventory (found in current state) 3 – Motion (found in current state) 4 – Waiting (found in current state) 5 – Overproduction (found in current state) 6 – Overprocessing (found in current state) 7 – Defects (found in current state) 8 – Skills
  • 13. APPLICATION OF LEAN ELEMENTS 13 •Takt Time: Was calculated by dividing 460 min available working time / an average of 1.5 units demanded daily = 307 minutes takt. •Finished goods strategy: Units in this value stream are built to shipping. •FIFO: Was applied in the future state to replace a push strategy that was accumulating uncontrolled inventory between processes. •Pull: Was applied where there was a supermarket. The assembly technician will pull from the materials supermarket with Kanban. •Schedule only at one point: The scheduling point was removed to enhance continuous flow. •Interval: Every technical will be trained in every operation and every product in the sensor line. Units will be received and worked on a first come first served basis, regardless of part number.
  • 14. KAIZEN BURST – IMPACT MATRIX 14 1. No P.O. 2. Part shortage 3. WAWF process 4. Delivery order extension Use to prioritize burst prior to developing the implementation plan. Low High High Low Degree of Difficulty ImpacttoBusiness 4 1 5. Incomplete or missing data 6. Machine availability/walking distance 7. Adding parts to parts list 8. Availability of boxes 5 6 7 3 8 2
  • 15. FIFO 15 Kaizen Newspaper No. Action Owner Due Date % Complete 1 Establish FIFO standard work Lionel Feliciano 10/26/12 2 Establish FIFO Max Sensor VSM team 10/11/12 3 Brief Employee on standard work and FIFO max Lionel Feliciano 10/26/12 4 Add FIFO standard work to Rack Lionel Feliciano 10/30/12 5 6 7 8 9
  • 16. PROCESS TIME 16 Kaizen Newspaper No. Action Owner Due Date % Complete 1 Perform a time study on sensors process Ida L. Rivera 11/29/12 2 Implement the use of time observation sheets for sensors process M.Vargas/L. Feliciano 11/29/12 3 Generate Spaghetti chart for sensor process walking distance. Ida L. Rivera 11/29/12 4 Discuss results with management team Ida L. Rivera 12/7/12 5 6 7 8 9
  • 17. SERVIGISTIC 17 Kaizen Newspaper No. Action Owner Due Date % Complete 1 Verify and screen out work orders I.Rivera/M.Vargas 10/11/12 2 Provide info regarding to volume and parts numbers I.Rivera/M.Vargas 10/11/12 3 Provide PQ Analysis for all assemblies at PRR. L. Feliciano 10/15/12 4 Include Andy Yi (servigistic management) and Dave Frederick (planning) in the team. Terry Gill 8/11/12 5 Perform dry run to PRR Terry Gill 1/31/13 6 7 8 9
  • 18. ACE CONTROL TOWER 18 Kaizen Newspaper No. Action Owner Due Date % Complete 1 Update Control tower to remove the metrics not required. Team 8/15/12 2 Update EH&S metrics by removing the 2015 level Team 8/15/12 3 Normalized the financial revenue goal Team 8/15/12 4 Perform DIVE activity for Commercial CSL and TAT for missed metrics. Team 10/19/12 5 6 7 8 9
  • 19. RECEIVING 19 Kaizen Newspaper No. Action Owner Due Date % Complete 1 Trained RCA in the use of EXOSTAR system Kathy Carlson Pending 2 Generated and review standard work for customer reassignment between RCA. Kathy Carlson Pending 3 Generated standard work to manage units pending PO and establish maximum waiting time before returning to customer. M. Vargas/ K. Carlson Pending 4 Request access to EXOSTAR system to internal RCA. Meriann Edsall 10/12/12 5 Generate standard work to update delivery order extension prior to physically receive the units. Paola Campo Pending 6 7 8 9
  • 20. SHIPPING 20 Kaizen Newspaper No. Action Owner Due Date % Complete 1 Capital to buy a new barcode reader for UID labels M.Vargas 11/2/12 2 Include PRR management team in the advance notification of any change in the JDE UID process. K. Carlson Pending 3 Generated standard work for WAWF process P.Campo/E.Rivera Pending 4 Generated min/max kanban for shipping carton boxes. Edwin Rivera 10/26/12 5 Include Dymo printer on TPM activities. Edwin Rivera 10/26/12 6 Contact the costumer to negotiate improvement in response time in the TMS PO load M.Vargas/C.Coveney Pending 7 8 9
  • 21. ASSEMBLY 21 Kaizen Newspaper No. Action Owner Due Date % Complete 1 Revise the sensors’ provisioning for spare parts on a quarterly basis. Ida Rivera 10/30/12 2 Generate standard work for adding never use parts to the PRER branch. I.Rivera/M.Edsall 11/1612 3 Generate standard work and train assemblers on adding parts to the correct locations. I.Rivera/M.Edsall 11/16/12 4 Request OEM RRCA for excess coating on connectors pins. Lionel Feliciano 10/19/12 5 6 7 8 9
  • 22. FINAL PREPARATION 22 Kaizen Newspaper No. Action Owner Due Date % Complete 1 Generate standard work for paint preparation (min batch). M.Vargas/L.Feliciano 11/15/12 2 Capital to request a new laser machine M.Vargas 11/2/12 3 Generate fixture to minimize set up time on laser machine. M.Vargas 12/28/12 4 5 6 7 8 9
  • 23. INSPECTION 23 Kaizen Newspaper No. Action Owner Due Date % Complete 1 Generate standard work on part issue process. I.Rivera/M.Edsall 12/21/12 2 Add UID label scanner to final inspection workbench (see Newspaper Shipping) M. Vargas TBD 3 4 5 6 7 8 9