Introduction to Set-up Reduction /
Quick Changeover Concepts
December 7 2016
Julian Kalac
BOTTLENECK
3
CONTINUOUS FLOW
• Identification and systemic elimination of non-
value add costs and re-alignment of resources to
deliver value to the customer faster, better, &
more consistently
• Lean in Manufacturing:
– Focus: Eliminate waste, non-value add steps, process
constraints and bottle necks that cause problems in work
throughput
– Approach: Intuitive and broad - “inch-deep, mile wide”
4
What is Lean?
Leading to Leading toEliminate
Waste
Reduced
Cycle Times
Increased
Capacity
Defining Lean
• “A systematic approach to identifying & ELIMINATING
WASTE (NON-VALUE-ADDED ACTIVITIES) through the
implementation of CUSTOMER PULL SYSTEM, CONTINUOUS
ONE PIECE FLOW AND IDENTIFYING AND IMPROVING
PROCESS BOTTLENECKS.”
Lean has been defined in many different ways.
Leading to Leading to
Eliminate
Waste
Reduced Cycle
Times
Increased
Capacity
Process
Value Added
Adds value to
the output and
customer is
willing to pay
for.
Optimize
Non-
Value
AddedDoes not add
value to the
output, and
customer isn’t
willing to pay
for.
Eliminate
Business-Value Added
Does not add value
to output, customer
will not pay for, but
is necessary.
(Legal, Safety, Etc.)
Minimize
LEAN VALUE ADD/NON VALUE ADD
Eliminating the Wastes
Value Added
Typically 95% of all lead time is non-value added
1. Overproduction
2. Waiting
3. Transportation
4. Non-Value Added Processing
5. Excess Inventory/Material
6. Defects
7. Excess Motion
8. Underutilized People
Non-Value Added
5%
| | 8
Lack of cross-functional training
Over relying on a select few while others are
Inadequately trained
 Operators are unable to rotate and help each
other out to balance the work-load
High overtime, increased pressure stress
• Cycle Time is dictated by the slowest (bottleneck) operation in the
cell.
40
min
20
min
25
min
15
min
30
min
1
54
3
2
•What operation controls the cycle?
•How can you relieve the bottleneck?
P1 P2 P3 P4 Min/Pcs=
Min/Pc 20 40 12 20
P1 P2 P3 P4 Min/Pcs=
Min/Pc 25 30 22 25
P1 P2 P3 P4 Min/Pcs=
Min/Pc 25 25 27 25
What is the cycle time of each process
Spot the bottleneck
Bottleneck Management:
Bottleneck Management:
•Maintain buffer in front of bottleneck
– (never starve the bottleneck !)
•Improve bottleneck operation
•Cross train on bottleneck
– Improve Tooling/Equipment or Process
– Balance activities / operations
11
Cost of Poor Quality (COPQ)
Not Doing What is Right the First Time
12
Lost managemant
time cost
Maintenance
cost
Lost opportunity
Lost assets cost
Rerun cost
Lost
business,
goodwill cost
Lost
credibility
cost
Prevention cost
appraisal cost
Project
rework cost
Litigation
SS Titanic
Management
Waste Costs:
Costs driven by problems and process steps that add no value
to products & services delivered to customers
Appraisal Costs:
Costs incurred to determine the degree
of conformance to customer needs
Prevention Costs:
Costs incurred to keep failure and
appraisal costs to a minimum
Failure Costs:
Costs directly incurred
due to defects internal
to the system or after
delivery to the
customer
Basic Lean Concepts
Poke yoke = Error Proofing
• Eliminate/minimize chance for human error
to avoid mistakes
– Prevention Poke Yoke
• Stops the process before failures occur
• Does not allow defects to pass through the process
5 STEPS IN LEAN
• The Five Principles of “Lean Thinking”
1. Define TAKT TIME (min/pc)
2. Map the value stream
3. Eliminating waste, NON-VALUE ADD
4. Continuous Flow production
5. Pursue perfection (continual improvement)
14
What is SMED?
Helping
Our Customers Be More
Successful . . .
SMED stands for:
Single Minute Exchange of Die, methodology
used to reduce setup/changeover time on
machines, equipment
• Developed by TOYOTA for the Japanese Auto
• TOYOTA reduced 3 day car assembly setup
time into 8 min (single minutes)
• That is the reason why TOYOTA called it
Single Minute Exchange Die
OBJECTIVE
• Understand the concepts and
principles of Set-up Reduction.
• Share some ideas and understand the
benefits of Set-up Reduction.
• Apply the concepts, principles and
techniques of SMED to accomplish
• Quick Changeovers !!
WHAT IS SETUP TIME?
• Setup Time
– Starts when last piece of previous job is complete;
ends when first good piece of next job is complete
• Internal set-up: While machine is shut-down
– Strive to minimize this as process is not producing
parts
• External set-up: While machine is working
– Prepare for set-up, get all tools/parts needed
ready and beside the press before starting set-up
Examples Internal vs External
• Internal setup:
• Removing dies and tooling from press, adjusting
Die and shut height in the press, feeding coil into
straightener,
• External setup:
• Checking work order for next job, preparing
needed tools, Staging dies tools, coils for next set-
up, moving coils to the press, inspecting parts,
DIE changeover
Current setup time= 60min
Target setup Time < 15min
How do you do it?
• Next Slide
7 STEPS TO SMED
• 1 Observe video record current set-up process
• 2. Separate Internal and External elements.
• 3. Improve/simplify each setup STEP
• 4. Observe video record NEW set-up process.
• 5 Standardize changeover across all 3 shifts
• 6. Develop Standardize Operating Procedure .
• 7. Track results and deploy on other presses
Apply SMED Changeover method
Review Time Observation and Video
with the team
 Identify opportunities
 Internal vs. External
 Value Added Vs Non-Value Added
 Normal vs. Abnormal
 Seven Types of Waste
 Automatic, Manual, Walking,
 and Waiting times
 Solicit ideas for countermeasures /
improvements
SMED 1000T Punch Press
Automotive Suspension Parts
By Julian Kalac
SETUP ISSUES
• Press Frequent changeover dies 2/day
• Die setup = 2hrs,
• Coil Feeder setup = 1.5hrs
• Conveyor setup= 45min
• Part Chute assy setup = 40min
Die Issues
• Progressive Dies large 6”x 4” loaded by forklift,
• Start of next job not known
• Die requires inspection and first off sign off
• Coils 10.000 lbs only 1 feeder one crane
• Die shut height different for each die
• Each Die has to be located differently in
bolster plate
• 56 bolts x different lengths 8” to 12” length)
used in die setup
SMED PRESS SETUP
o Standardized Die Carts & shadow bo
o Documented SOP and validated set-
 Reduced setup/changeover time from 4hrs t
Setup/Changeover T
BEFORE
AFTER
Punch Press with Die staging
DIES ORGANIZED
Department Reference #
Confirmed ByProcess Owner Date Chapter Rev. PageIssuer
1 of 111
1000 Ton Press
102013Jan KrolOperatorJULIAN KALAC
Inside Tool Racks
Contents:
1. T-BOLTS
2. BAR
3. THREADED BOLT
4. BARRED CLAMP
5. BARRED CLAMP
6. WRENCH
7. T-BOLT NUTS
BAR
WRENCH
T-BOLTS
THREADED
BOLT
BARRED
CLAMP
BARRED
CLAMP
T-BOLT
NUT
SMED Tool ideas
SMED coil Ideas
Die Shadow Box
1. Only the final turn on a bolt
adds value
2. The interrupted screw (or
interrupted thread) provides
one means of clamping and unclamping
something quickly. Artillery breeches have been
sealed in this manner since the nineteenth
century.
DIFFERENT BOLTS/SCREWS
Next step
• Need 1 team from each shift to Video record
coil changeover
• Review the video find ways to reduce the
changeover time by 50%
• Simplify the setup and verify across all 3 shifts
• Video record the improvements
• Document it into a Standard Operating
Procedure (SOP)
• Train all other crews/operators on the SOP
| | 36

Mais conteúdo relacionado

Mais procurados

History of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalHistory of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 Principal
Sumon Kumar Kundu
 

Mais procurados (20)

Kaizen forms xls
Kaizen forms xlsKaizen forms xls
Kaizen forms xls
 
Single Minute Exchange of Dies
Single Minute Exchange of DiesSingle Minute Exchange of Dies
Single Minute Exchange of Dies
 
1 piece flow training
1 piece flow training1 piece flow training
1 piece flow training
 
How to implement Single minute exchange of die
How to implement Single minute exchange of die How to implement Single minute exchange of die
How to implement Single minute exchange of die
 
smed
smedsmed
smed
 
How to reduce changeover loss
How to reduce changeover lossHow to reduce changeover loss
How to reduce changeover loss
 
SMED Kaizen Event
SMED Kaizen EventSMED Kaizen Event
SMED Kaizen Event
 
SMED
SMEDSMED
SMED
 
KAIZEN Technique
KAIZEN TechniqueKAIZEN Technique
KAIZEN Technique
 
SMED - Single Minute Exchange of Dies
SMED - Single Minute Exchange of DiesSMED - Single Minute Exchange of Dies
SMED - Single Minute Exchange of Dies
 
Batch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowBatch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous Flow
 
Lean Manufacturing Training
Lean Manufacturing TrainingLean Manufacturing Training
Lean Manufacturing Training
 
History of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalHistory of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 Principal
 
Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation Sample
 
Line balancing and its formulation
Line balancing and its formulationLine balancing and its formulation
Line balancing and its formulation
 
Smed smpl 1
Smed smpl 1Smed smpl 1
Smed smpl 1
 
SMED overview
SMED overviewSMED overview
SMED overview
 
SMED Training
SMED Training SMED Training
SMED Training
 
Lean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training ModuleLean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training Module
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 

Semelhante a LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS

totalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptxtotalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptx
RichardMagbatoc1
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)
MohammedLahssaini1
 

Semelhante a LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS (20)

Lean Supply Chain Management--by JULIAN KALAC
Lean Supply Chain Management--by JULIAN KALACLean Supply Chain Management--by JULIAN KALAC
Lean Supply Chain Management--by JULIAN KALAC
 
5 Steps to implementing Lean
5  Steps to implementing Lean5  Steps to implementing Lean
5 Steps to implementing Lean
 
eeMba ii pmom_unit-3.2 modern pm tools a
eeMba ii pmom_unit-3.2 modern pm tools aeeMba ii pmom_unit-3.2 modern pm tools a
eeMba ii pmom_unit-3.2 modern pm tools a
 
Total Productive Maintenance_Magbatoc.pptx
Total Productive Maintenance_Magbatoc.pptxTotal Productive Maintenance_Magbatoc.pptx
Total Productive Maintenance_Magbatoc.pptx
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
totalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptxtotalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptx
 
Ch9 Jit
Ch9 JitCh9 Jit
Ch9 Jit
 
Just In Time and Lean Operation Chapter Presentation
Just In Time and Lean Operation Chapter PresentationJust In Time and Lean Operation Chapter Presentation
Just In Time and Lean Operation Chapter Presentation
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)
 
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh Arora
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh AroraIntroduction of Flow Management in Manufacturing - ADDVALUE - Nilesh Arora
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh Arora
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing
 
Moving The OEE Needle -Tips for Surpassing 85%
Moving The OEE Needle -Tips for Surpassing 85% Moving The OEE Needle -Tips for Surpassing 85%
Moving The OEE Needle -Tips for Surpassing 85%
 
CFW - Continuous Improvement & Lean Techniques
CFW - Continuous Improvement & Lean TechniquesCFW - Continuous Improvement & Lean Techniques
CFW - Continuous Improvement & Lean Techniques
 
Process flow and process chart
Process flow and process chartProcess flow and process chart
Process flow and process chart
 
Tpm+basics
Tpm+basicsTpm+basics
Tpm+basics
 
Tpm+basics
Tpm+basicsTpm+basics
Tpm+basics
 
Just in-time
Just in-timeJust in-time
Just in-time
 
Lean vs six sigma -jk
Lean vs six sigma  -jkLean vs six sigma  -jk
Lean vs six sigma -jk
 
Lean Management and Kanban System
Lean Management and Kanban SystemLean Management and Kanban System
Lean Management and Kanban System
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 

Mais de Julian Kalac P.Eng

FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCHFCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
Julian Kalac P.Eng
 

Mais de Julian Kalac P.Eng (20)

SIX SIGMA IMPROVES OEE performance from 20% to 39.1%
SIX SIGMA IMPROVES  OEE performance from 20% to 39.1%SIX SIGMA IMPROVES  OEE performance from 20% to 39.1%
SIX SIGMA IMPROVES OEE performance from 20% to 39.1%
 
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.EngVOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
 
Design for Six Sigma in Automotive
Design for Six Sigma in Automotive Design for Six Sigma in Automotive
Design for Six Sigma in Automotive
 
1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment 1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment
 
Lean logistics
Lean logisticsLean logistics
Lean logistics
 
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
 
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
 
Live wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureLive wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedure
 
Julian Kalac lean 6 sigma project list--2018
 Julian Kalac lean 6 sigma  project list--2018 Julian Kalac lean 6 sigma  project list--2018
Julian Kalac lean 6 sigma project list--2018
 
Machine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag OutMachine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag Out
 
Custom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeoverCustom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeover
 
MWV CONTROL VS SPEC
MWV CONTROL VS SPECMWV CONTROL VS SPEC
MWV CONTROL VS SPEC
 
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCHFCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
 
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
 
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
 
Process Capability shift over time
Process Capability shift over timeProcess Capability shift over time
Process Capability shift over time
 
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
 
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALACLEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
 
Continuous improvement by Julian Kalac
Continuous improvement  by Julian KalacContinuous improvement  by Julian Kalac
Continuous improvement by Julian Kalac
 
The hidden factory by JULIAN KALAC
The hidden factory by JULIAN KALACThe hidden factory by JULIAN KALAC
The hidden factory by JULIAN KALAC
 

Último

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 

Último (20)

Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 

LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS

  • 1. Introduction to Set-up Reduction / Quick Changeover Concepts December 7 2016 Julian Kalac
  • 4. • Identification and systemic elimination of non- value add costs and re-alignment of resources to deliver value to the customer faster, better, & more consistently • Lean in Manufacturing: – Focus: Eliminate waste, non-value add steps, process constraints and bottle necks that cause problems in work throughput – Approach: Intuitive and broad - “inch-deep, mile wide” 4 What is Lean? Leading to Leading toEliminate Waste Reduced Cycle Times Increased Capacity
  • 5. Defining Lean • “A systematic approach to identifying & ELIMINATING WASTE (NON-VALUE-ADDED ACTIVITIES) through the implementation of CUSTOMER PULL SYSTEM, CONTINUOUS ONE PIECE FLOW AND IDENTIFYING AND IMPROVING PROCESS BOTTLENECKS.” Lean has been defined in many different ways. Leading to Leading to Eliminate Waste Reduced Cycle Times Increased Capacity
  • 6. Process Value Added Adds value to the output and customer is willing to pay for. Optimize Non- Value AddedDoes not add value to the output, and customer isn’t willing to pay for. Eliminate Business-Value Added Does not add value to output, customer will not pay for, but is necessary. (Legal, Safety, Etc.) Minimize LEAN VALUE ADD/NON VALUE ADD
  • 7. Eliminating the Wastes Value Added Typically 95% of all lead time is non-value added 1. Overproduction 2. Waiting 3. Transportation 4. Non-Value Added Processing 5. Excess Inventory/Material 6. Defects 7. Excess Motion 8. Underutilized People Non-Value Added 5%
  • 8. | | 8 Lack of cross-functional training Over relying on a select few while others are Inadequately trained  Operators are unable to rotate and help each other out to balance the work-load High overtime, increased pressure stress
  • 9. • Cycle Time is dictated by the slowest (bottleneck) operation in the cell. 40 min 20 min 25 min 15 min 30 min 1 54 3 2 •What operation controls the cycle? •How can you relieve the bottleneck?
  • 10. P1 P2 P3 P4 Min/Pcs= Min/Pc 20 40 12 20 P1 P2 P3 P4 Min/Pcs= Min/Pc 25 30 22 25 P1 P2 P3 P4 Min/Pcs= Min/Pc 25 25 27 25 What is the cycle time of each process Spot the bottleneck
  • 11. Bottleneck Management: Bottleneck Management: •Maintain buffer in front of bottleneck – (never starve the bottleneck !) •Improve bottleneck operation •Cross train on bottleneck – Improve Tooling/Equipment or Process – Balance activities / operations 11
  • 12. Cost of Poor Quality (COPQ) Not Doing What is Right the First Time 12 Lost managemant time cost Maintenance cost Lost opportunity Lost assets cost Rerun cost Lost business, goodwill cost Lost credibility cost Prevention cost appraisal cost Project rework cost Litigation SS Titanic Management Waste Costs: Costs driven by problems and process steps that add no value to products & services delivered to customers Appraisal Costs: Costs incurred to determine the degree of conformance to customer needs Prevention Costs: Costs incurred to keep failure and appraisal costs to a minimum Failure Costs: Costs directly incurred due to defects internal to the system or after delivery to the customer
  • 13. Basic Lean Concepts Poke yoke = Error Proofing • Eliminate/minimize chance for human error to avoid mistakes – Prevention Poke Yoke • Stops the process before failures occur • Does not allow defects to pass through the process
  • 14. 5 STEPS IN LEAN • The Five Principles of “Lean Thinking” 1. Define TAKT TIME (min/pc) 2. Map the value stream 3. Eliminating waste, NON-VALUE ADD 4. Continuous Flow production 5. Pursue perfection (continual improvement) 14
  • 15. What is SMED? Helping Our Customers Be More Successful . . . SMED stands for: Single Minute Exchange of Die, methodology used to reduce setup/changeover time on machines, equipment • Developed by TOYOTA for the Japanese Auto • TOYOTA reduced 3 day car assembly setup time into 8 min (single minutes) • That is the reason why TOYOTA called it Single Minute Exchange Die
  • 16. OBJECTIVE • Understand the concepts and principles of Set-up Reduction. • Share some ideas and understand the benefits of Set-up Reduction. • Apply the concepts, principles and techniques of SMED to accomplish • Quick Changeovers !!
  • 17. WHAT IS SETUP TIME? • Setup Time – Starts when last piece of previous job is complete; ends when first good piece of next job is complete • Internal set-up: While machine is shut-down – Strive to minimize this as process is not producing parts • External set-up: While machine is working – Prepare for set-up, get all tools/parts needed ready and beside the press before starting set-up
  • 18. Examples Internal vs External • Internal setup: • Removing dies and tooling from press, adjusting Die and shut height in the press, feeding coil into straightener, • External setup: • Checking work order for next job, preparing needed tools, Staging dies tools, coils for next set- up, moving coils to the press, inspecting parts,
  • 19. DIE changeover Current setup time= 60min Target setup Time < 15min How do you do it? • Next Slide
  • 20.
  • 21. 7 STEPS TO SMED • 1 Observe video record current set-up process • 2. Separate Internal and External elements. • 3. Improve/simplify each setup STEP • 4. Observe video record NEW set-up process. • 5 Standardize changeover across all 3 shifts • 6. Develop Standardize Operating Procedure . • 7. Track results and deploy on other presses
  • 22. Apply SMED Changeover method Review Time Observation and Video with the team  Identify opportunities  Internal vs. External  Value Added Vs Non-Value Added  Normal vs. Abnormal  Seven Types of Waste  Automatic, Manual, Walking,  and Waiting times  Solicit ideas for countermeasures / improvements
  • 23. SMED 1000T Punch Press Automotive Suspension Parts By Julian Kalac
  • 24. SETUP ISSUES • Press Frequent changeover dies 2/day • Die setup = 2hrs, • Coil Feeder setup = 1.5hrs • Conveyor setup= 45min • Part Chute assy setup = 40min
  • 25. Die Issues • Progressive Dies large 6”x 4” loaded by forklift, • Start of next job not known • Die requires inspection and first off sign off • Coils 10.000 lbs only 1 feeder one crane • Die shut height different for each die • Each Die has to be located differently in bolster plate • 56 bolts x different lengths 8” to 12” length) used in die setup
  • 27. o Standardized Die Carts & shadow bo o Documented SOP and validated set-  Reduced setup/changeover time from 4hrs t Setup/Changeover T BEFORE AFTER Punch Press with Die staging
  • 29. Department Reference # Confirmed ByProcess Owner Date Chapter Rev. PageIssuer 1 of 111 1000 Ton Press 102013Jan KrolOperatorJULIAN KALAC Inside Tool Racks Contents: 1. T-BOLTS 2. BAR 3. THREADED BOLT 4. BARRED CLAMP 5. BARRED CLAMP 6. WRENCH 7. T-BOLT NUTS BAR WRENCH T-BOLTS THREADED BOLT BARRED CLAMP BARRED CLAMP T-BOLT NUT
  • 33. 1. Only the final turn on a bolt adds value 2. The interrupted screw (or interrupted thread) provides one means of clamping and unclamping something quickly. Artillery breeches have been sealed in this manner since the nineteenth century. DIFFERENT BOLTS/SCREWS
  • 34. Next step • Need 1 team from each shift to Video record coil changeover • Review the video find ways to reduce the changeover time by 50% • Simplify the setup and verify across all 3 shifts • Video record the improvements • Document it into a Standard Operating Procedure (SOP) • Train all other crews/operators on the SOP