Lean Management
=
Learn Management
Klaus Beulker
Managing Director Terex Cranes Germany
Copyright Institut Lean France 2016 Page 1
Lean Management = Learn Management
Source: The Machine That Changed the World by J. P. Womack, D. T. Jones and D. Roos
Copyright Institut Lean France 2016 Page 2
But there are ongoing rumours that the original text looked like:
“We felt that the most constructive step we could take to prevent this development from occurring
would be to undertake a detailed study of the new Japanese techniques, which we subsequently
named “learn production”, compared with the older Western mass-production techniques, and
to do so in partnership with all the world´s motor-vehicle manufacturers. But how?...”
Published Text:
“We felt that the most constructive step we could take to prevent this development from occurring
would be to undertake a detailed study of the new Japanese techniques, which we subsequently named
“lean production”, compared with the older Western mass-production techniques, and to do so in
partnership with all the world´s motor-vehicle manufacturers. But how?...”
Agenda
 Introduction
 What is Lean Managemen at Terex Cranes Zweibrücken
 Examples how Lean at Terex is organized and applied
 Change and Learning if Lean Management is applied at Terex
 Summary
Copyright Institut Lean France 2016 Page 3
Lean Management = Learn Management
streng vertraulich
0,0
0,5
1,0
1,5
2,0
2,5
3,0
3,5
4,0
4,5
5,0
90.000
100.000
110.000
120.000
130.000
140.000
150.000
160.000
4
Inventory
reduction
by
35Mio.€
Turns
improved
from
2 to 4.3
Close
the
door
Reduce
leadtime
in SAP
Apply the
lean tools
Apply the lean tools: Based on JIT and JIDOKA the lean promise works.
2013 2014 2015
Lean Approach started in September 2014.
End 2015: Turns 4.3, Inventory -35Mio.€.
Copyright Institut Lean France 2016 Page 5
Range of Products Terex Cranes
Telescopic Cranes
- Maximum lifting capacity of 100-1000t
- Can be used for a wide range of lifting needs
in a variety of terrain (off and on the highway)
- Can quickly move to another job
Customer Takt: 1day
Cycle time: 40days
Crawler Cranes
- Terex is market leader for Crawler Cranes
above 400t lifting capacity (400-3,200t)
- Is primarily used in the petrochemical industry,
power plant construction, infrastructure and to
build up windmills
Customer Takt: 5days
Cycle time: 100days
Copyright Institut Lean France 2016 Page 6
Operations Terex Cranes Zweibrücken
Operations Team Terex Cranes Zweibrücken:
Safety – Quality – Plant DS – Plant WS – Plant Bierbach – Plant Pecs – R&D – Procurement – HR – TBS
3 Locations in Germany:
Dinglerstraße, Wallerscheid & Bierbach
Around 1600 Team Member
1 Location in Hungary – Pecs
Around 250 Team Member
Steelwork Telescopic Cranes
Plant
Steelwork Crawler Cranes
Plant
Telescopic Cranes
Plant
Crawler Cranes
Plant
Copyright Institut Lean France 2016 Page 7
Examples of Application of Terex Cranes
Telescopic Cranes:
Lifting the roof of a
building.
Crawler Cranes:
Lifting Space Shuttle on an
airplane.
Agenda
 Introduction
 What is Lean Managemen at Terex Cranes Zweibrücken
 Examples how Lean at Terex is organized and applied
 Change and Learning if Lean Management is applied at Terex
 Summary
Copyright Institut Lean France 2016 Page 8
Lean Management = Learn Management
Copyright Institut Lean France 2016 Page 9
What is Lean Management at Terex Cranes?
Answers to what Lean Management is:
1. Let the material flow.
2. All life is problem solving.
3. Lead with respect.
4. Touch the product.
And – there are 5 laws of nature:
1. Every second decision is wrong.
2. Operator is always right.
3. Not thinking, knowing.
4. Quality first is Quality first.
5. Pay now or pay later.
And for sure Lean Management is the opposite of
what we can see on the picture.
Copyright Institut Lean France 2016 Page 10
Toyota House reminds us what is the North
Star we are aiming for.
Competetive advantage by
customer satisfaction
through
people development.
JIT
Teamwork:
• Flow
• Takt
• Pull
JIDOKA
Respect:
• Stop the line
• Seperate man
and machine
Basic Stability
Safety, quality, flexibility, costs, …
Standardized Work
and KaizenHeijunka
Copyright Institut Lean France 2016 Page 11
Let the Material flow
Ohno, Toyota Production System, page 1:
„All we are doing is looking at the time line. From the
moment the customer gives us an order to the point
when we collect the cash. And we are reducing that
time line by removing the non-value-added wastes.“
Cycle Time
Order Cash
Source: Ohno, Toyota Production System
Copyright Institut Lean France 2016 Page 12
Leadership, Teamwork and Support is
needed in a Lean Management System.
Stop the line
5S
TPM
Yamazumi
SMED
Flow
Pull
Takt
Heijunka
Standards and
Visualization
Kaizen
Leadership
Teamwork
Support
Let the material flow
Agenda
 Introduction
 What is Lean Managemen at Terex Cranes Zweibrücken
 Examples how Lean at Terex is organized and applied
 Change and Learning if Lean Management is applied at Terex
 Summary
Copyright Institut Lean France 2016 Page 13
Lean Management = Learn Management
Copyright Institut Lean France 2016 Page 14
Material- and Informationflow of Crawler
Cranes Plant
• Flow
• Pull
• Levelling
• Heijunka
• After Pacemaker Fifo
• Before Pacemaker Pull
• Quality gates
• Visualization and Standards
Informationflow
Materialflow
Incoming Goods Assembly, Painting, Testing ShippingSteelwork
Copyright Institut Lean France 2016 Page 15
Quality Gates and Stable Teams
Lackierung Qualitätstor1
Qualitätstor3
Qualitätstor2
Qualitätstor6
Qualitätstor4
Quality Gates are defined for each logical part of the supply
chain.
Each Quality Gate is defining an area of responsibility for a
defined team. The Team is in charge of daily output, quality,
standards and Kaizen.
TEREX?
Copyright Institut Lean France 2016 Page 16
Size of the teams is between 5 to 12 Team
members
Assembly Steelwork
Plant Manager
Supervisor Supervisor
Hancho Hancho Hancho Hancho Hancho Hancho Hancho Hancho Hancho Hancho Hancho Hancho
Production Manager
Copyright Institut Lean France 2016 Page 17
Obeya Room in the Plants
On daily basis plant management is meeting in the
Obeya room.
Daily Topics:
1. Safety
2. Quality
3. Specific Customer requests for each crane
4. Delivery
5. Engineering Changes
The Obeya room gives orientation.
On one hand it‘s about managing the day.
On the other hand every day people have the
opportunity to learn from each other more about the
business.
Copyright Institut Lean France 2016 Page 18
Lean Management Architecture at Terex
Cranes Zweibrücken
Hoshin Kanri
Monthly
improving the value stream (flow, tact, pull)
Kaizen workshops
continuous improvement on the shop floor
Daily
Communication and meaningful discussions: what to change, where to go, next step
2 times a year
Copyright Institut Lean France 2016 Page 19
Hoshin Kanri on a monthly basis
Monthly meeting as a team:
Engineering, production,
procurement, quality, finance,….
1. Use of an X Matrix make strategy deployment visible. Team
leaders and support teams are identified. Everyone is on the same
page.
2. Status of scorecard on a regular monthly basis.
3. Milestones in the action plan. critical path identified. Clear
picture of the impact of the different activities.
4. The Team identifies the problem, understands the problem,
agrees to the problem, address the issue and fix it, using the
discipline of root cause analysis (root cause analysis).
The format of the meeting is standardized making sure to have
meaningful discussions from the beginning.
Copyright Institut Lean France 2016 Page 20
Is it a good day or a bad day?
Every Team has a daily target
The team has to visualize the output
If the promise of the hour cannot be fullfilled,
the team has to visualize the problem and to
share their opinion what the reason could be.
This offers the opportunity to support short
term and to have a discussion how the
production system works.
Handwritten production loss analysis board
Copyright Institut Lean France 2016 Page 21
Problemsolving: Using A3 in order to have a
structured way to learn.
Each defect offers the
opportunity to learn and to
improve
Problem description
Short term countermeasure
Thesis and ideas
Checking the thesis and ideas
Ask 5 Why
Introduce Countermeasures
Check if it works
Evaluate and share with your colleagues
Copyright Institut Lean France 2016 Page 22
Engineering
Visualization of:
Risk analysis of new developments from customer perspective
Customer Request
Field issues
Serial support
Copyright Institut Lean France 2016 Page 23
Procurement
Visualization of:
Missing Parts
Supplier development projects
Problem solving in Teams
Introduction of Milk Runs
Copyright Institut Lean France 2016 Page 24
Role of the Teamleader (Hancho)
Go and see (Dojo, Kata)
Understand deeply the working condition and skills
Have a discussion to find opportunities for improvements every
day and every TM
Copyright Institut Lean France 2016 Page 25
Opportunities of improvements
or: „Do we show respect?“
Plan – do – check - act
Visualization of:
New ideas of Team Members
Ideas for implementation and evaluation
Action plan
Copyright Institut Lean France 2016 Page 26
Improving
Improve performance
Improve processes Improve visualization
Improve working conditions and/ or skills
Agenda
 Introduction
 What is Lean Managemen at Terex Cranes Zweibrücken
 Examples how Lean at Terex is organized and applied
 Change and Learning if Lean Management is applied at Terex
 Summary
Copyright Institut Lean France 2016 Page 27
Lean Management = Learn Management
Copyright Institut Lean France 2016 Page 28
Problem Solving as a Driver of
Lean Management Implementation
Ressources: Inventory, People,
Capacity, Time.
Problems
Copyright Institut Lean France 2016 Page 29
Leading change is changing how to lead.
Source: Heitger/ Doujak, Harte Schnitte – neues Wachstum
Ability to change
Necessitytochange
Learning organisation
Teamwork
Secure survival
Crisis management
Direction of change
Copyright Institut Lean France 2016 Page 30
Steps how people learn: „Ohnono method.“
Data
Symbols
220 C/ y
220 Cranes per year
- Information - Knowledge - Problemsolving - Responsibility
- Understanding- Emotional Engaged - Competency - Development and Growth
Copyright Institut Lean France 2016 Page 31
Change Management
Source: Königswieser, Das Überbringen schlechter Nachrichten
Change
New Identity
Fear,
Unsecure,
Worries
Irritation, Rage,
Aggressive
Actual Identity
Sadness
Curiosity,
Interest,
Breakup
Frustration,
Depression
Copyright Institut Lean France 2016 Page 32
Mentor/ Mentee Prinziple
or: „Produce people before producing parts.“
Take customer perspective
On the spot
Daily check of standardized processes for deviations
Enquiring and respectful fundamental attitude
Define challenging and reachable target states
Show opportunities and allow to use
Proceed step by step
Run PDCA cycles
Start experimental tests immediately
Secure review and evaluation of results
Telemachos und Mentor
Frequency
of
problems
Difficulty of problems
Expert knowledge necessary
for solving
Copyright Institut Lean France 2016 Page 33
Gemba walks on a daily basis
or: „It is clear, what is important.“
Typical questions on the walk:
Good or bad day?
Can we comply with the standardized workflow?
Which barriers do exist between the target and the
current state?
How can we overcome these barriers?
Daily Gemba walk:
Learning on the shop floor
Act
Evaluate
What ergonomic problems the company leaves
to operators?
What quality problems the company leaves to
customers?
What flexibility problems the company ignores?
What cost the company accepted to spend?
What visible problems the company thinks
don’t exist?
Plan
Agenda
 Introduction
 What is Lean Managemen at Terex Cranes Zweibrücken
 Examples how Lean at Terex is organized and applied
 Change and Learning if Lean Management is applied at Terex
 Summary
Copyright Institut Lean France 2016 Page 34
Lean Management = Learn Management
streng vertraulich
0,0
0,5
1,0
1,5
2,0
2,5
3,0
3,5
4,0
4,5
5,0
90.000
100.000
110.000
120.000
130.000
140.000
150.000
160.000
35
Inventory
reduction
by
35Mio.€
Turns
improved
from
2 to 4.3
Close
the
door
Reduce
leadtime
in SAP
Apply the
lean tools
Apply the lean tools: Based on JIT and JIDOKA the lean promise works.
2013 2014 2015
Lean Approach started in September 2014.
End 2015: Turns 4.3, Inventory -35Mio.€.
Copyright Institut Lean France 2016 Page 36
Lean Management = Learn Management
Critical process performance indicator
is the leadtime. By using value stream
mapping waste is identified and can be
eliminated. Applying the lean tools again
and again lead to the expected results.
Continuos improvement has to be organized on the shop floor on a daily basis (go to gemba).
Applying lean tools leads to sustainable results if the activities are organized, standardized and
practised every day (Dojo-/ Kata- Activities). The improvements are based on behaviour of the
leadership team.
Repetition, practising and applying the lean tools change behaviour and mental frameworks. It leads to
recognition, respect and trust.
Matrix: „There is no spoon.“

Mais conteúdo relacionado

Mais procurados

Kaizen Events Blitz & Lean Projects
Kaizen Events   Blitz  & Lean ProjectsKaizen Events   Blitz  & Lean Projects
Kaizen Events Blitz & Lean ProjectsAnand Subramaniam
 
A Kaizen - Continues Improvement
A Kaizen - Continues ImprovementA Kaizen - Continues Improvement
A Kaizen - Continues ImprovementShravan Bhumkar
 
Kanban system (presentation for blog )
Kanban system (presentation for blog )Kanban system (presentation for blog )
Kanban system (presentation for blog )industrialengg
 
Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3TKMG, Inc.
 
Lean Kanban Systems Training Module
Lean Kanban Systems Training ModuleLean Kanban Systems Training Module
Lean Kanban Systems Training ModuleFrank-G. Adler
 
Learning to see (VSM)
Learning to see (VSM)Learning to see (VSM)
Learning to see (VSM)Mohamed Effat
 
Lean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarLean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarMichael E. Parker
 
Kaizen – Forms & Checklists
Kaizen – Forms & ChecklistsKaizen – Forms & Checklists
Kaizen – Forms & ChecklistsAnand Subramaniam
 
Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance DEEPAK SAHOO
 
The 4 Phases to Visual Management - ADDVALUE - Nilesh Arora
The 4 Phases to Visual Management - ADDVALUE - Nilesh AroraThe 4 Phases to Visual Management - ADDVALUE - Nilesh Arora
The 4 Phases to Visual Management - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 

Mais procurados (20)

Kaizen training
Kaizen trainingKaizen training
Kaizen training
 
5S For The Office by Operational Excellence Consulting
5S For The Office by Operational Excellence Consulting5S For The Office by Operational Excellence Consulting
5S For The Office by Operational Excellence Consulting
 
Kaizen Events Blitz & Lean Projects
Kaizen Events   Blitz  & Lean ProjectsKaizen Events   Blitz  & Lean Projects
Kaizen Events Blitz & Lean Projects
 
A Kaizen - Continues Improvement
A Kaizen - Continues ImprovementA Kaizen - Continues Improvement
A Kaizen - Continues Improvement
 
Kaizen Event Guide
Kaizen Event GuideKaizen Event Guide
Kaizen Event Guide
 
Kanban system (presentation for blog )
Kanban system (presentation for blog )Kanban system (presentation for blog )
Kanban system (presentation for blog )
 
Hourly Lean Introduction
Hourly Lean IntroductionHourly Lean Introduction
Hourly Lean Introduction
 
Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3
 
Kaizenpresentation
KaizenpresentationKaizenpresentation
Kaizenpresentation
 
Kaizen
Kaizen Kaizen
Kaizen
 
Lean Kanban Systems Training Module
Lean Kanban Systems Training ModuleLean Kanban Systems Training Module
Lean Kanban Systems Training Module
 
Learning to see (VSM)
Learning to see (VSM)Learning to see (VSM)
Learning to see (VSM)
 
Lean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarLean Fundamentals Overview Webinar
Lean Fundamentals Overview Webinar
 
Lean Thinking by Operational Excellence Consulting
Lean Thinking by Operational Excellence ConsultingLean Thinking by Operational Excellence Consulting
Lean Thinking by Operational Excellence Consulting
 
Lean Thinking and Daily Work Management
Lean Thinking and Daily Work ManagementLean Thinking and Daily Work Management
Lean Thinking and Daily Work Management
 
Kaizen – Forms & Checklists
Kaizen – Forms & ChecklistsKaizen – Forms & Checklists
Kaizen – Forms & Checklists
 
Standard Work
Standard WorkStandard Work
Standard Work
 
8 Wastes of Lean
8 Wastes of Lean8 Wastes of Lean
8 Wastes of Lean
 
Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance
 
The 4 Phases to Visual Management - ADDVALUE - Nilesh Arora
The 4 Phases to Visual Management - ADDVALUE - Nilesh AroraThe 4 Phases to Visual Management - ADDVALUE - Nilesh Arora
The 4 Phases to Visual Management - ADDVALUE - Nilesh Arora
 

Destaque

Comment les flux tirés ont sauvé mon entreprise par N.Guillemet
Comment les flux tirés ont sauvé mon entreprise par N.GuillemetComment les flux tirés ont sauvé mon entreprise par N.Guillemet
Comment les flux tirés ont sauvé mon entreprise par N.GuillemetInstitut Lean France
 
Le Lean dans un CHU de l'APHP : un retour d'expérience par Niccolo Curatolo
Le Lean dans un CHU de l'APHP : un retour d'expérience par Niccolo CuratoloLe Lean dans un CHU de l'APHP : un retour d'expérience par Niccolo Curatolo
Le Lean dans un CHU de l'APHP : un retour d'expérience par Niccolo CuratoloInstitut Lean France
 
New frontiers: Lean in the digital age by Daniel T Jones
New frontiers: Lean in the digital age by Daniel T JonesNew frontiers: Lean in the digital age by Daniel T Jones
New frontiers: Lean in the digital age by Daniel T JonesInstitut Lean France
 
Reconfigurer un site chimique ancien grâce au Lean par J.Ferradini
Reconfigurer un site chimique ancien grâce au Lean par J.FerradiniReconfigurer un site chimique ancien grâce au Lean par J.Ferradini
Reconfigurer un site chimique ancien grâce au Lean par J.FerradiniInstitut Lean France
 
Une stratégie basée sur les préférences client, Jean-Louis Nicque
Une stratégie basée sur les préférences client, Jean-Louis NicqueUne stratégie basée sur les préférences client, Jean-Louis Nicque
Une stratégie basée sur les préférences client, Jean-Louis NicqueInstitut Lean France
 
Les managers face au déploiement du Lean par MC Boutonnet, Philips
Les managers face au déploiement du Lean par MC Boutonnet, PhilipsLes managers face au déploiement du Lean par MC Boutonnet, Philips
Les managers face au déploiement du Lean par MC Boutonnet, PhilipsInstitut Lean France
 
Lean, stratégie et résultats par Catherine Chabiron
Lean, stratégie et résultats par Catherine Chabiron Lean, stratégie et résultats par Catherine Chabiron
Lean, stratégie et résultats par Catherine Chabiron Institut Lean France
 
L’engagement du dirigeant au cœur de la démarche Lean par C.Riboulet et C.Dané
L’engagement du dirigeant au cœur de la démarche Lean par C.Riboulet et C.DanéL’engagement du dirigeant au cœur de la démarche Lean par C.Riboulet et C.Dané
L’engagement du dirigeant au cœur de la démarche Lean par C.Riboulet et C.DanéInstitut Lean France
 
Management visuel pour l'amélioration des activités de service, Aurore Xemar
Management visuel pour l'amélioration des activités de service, Aurore XemarManagement visuel pour l'amélioration des activités de service, Aurore Xemar
Management visuel pour l'amélioration des activités de service, Aurore XemarInstitut Lean France
 
Etre Lean dans la durée par Pierre Vareille et Yves Merel
Etre Lean dans la durée par Pierre Vareille et Yves MerelEtre Lean dans la durée par Pierre Vareille et Yves Merel
Etre Lean dans la durée par Pierre Vareille et Yves MerelInstitut Lean France
 
Agile et Lean : des univers convergents ? par Dimitri Baeli
Agile et Lean : des univers convergents ? par Dimitri BaeliAgile et Lean : des univers convergents ? par Dimitri Baeli
Agile et Lean : des univers convergents ? par Dimitri BaeliInstitut Lean France
 
Du Lean en maintenance ferroviaire par Boris Evesque de la SNCF
Du Lean en maintenance ferroviaire par Boris Evesque de la SNCFDu Lean en maintenance ferroviaire par Boris Evesque de la SNCF
Du Lean en maintenance ferroviaire par Boris Evesque de la SNCFInstitut Lean France
 
Le choix du Lean pour accompagner notre croissance, E.Legault de Cadiou
Le choix du Lean pour accompagner notre croissance, E.Legault de CadiouLe choix du Lean pour accompagner notre croissance, E.Legault de Cadiou
Le choix du Lean pour accompagner notre croissance, E.Legault de CadiouInstitut Lean France
 
Le Lean en ingénierie par Cécile Roche de Thales
Le Lean en ingénierie par Cécile Roche de ThalesLe Lean en ingénierie par Cécile Roche de Thales
Le Lean en ingénierie par Cécile Roche de ThalesInstitut Lean France
 
Lean management en milieu hypercomplexe : à l'hôpital par B.Garel
Lean management en milieu hypercomplexe : à l'hôpital par B.GarelLean management en milieu hypercomplexe : à l'hôpital par B.Garel
Lean management en milieu hypercomplexe : à l'hôpital par B.GarelInstitut Lean France
 

Destaque (15)

Comment les flux tirés ont sauvé mon entreprise par N.Guillemet
Comment les flux tirés ont sauvé mon entreprise par N.GuillemetComment les flux tirés ont sauvé mon entreprise par N.Guillemet
Comment les flux tirés ont sauvé mon entreprise par N.Guillemet
 
Le Lean dans un CHU de l'APHP : un retour d'expérience par Niccolo Curatolo
Le Lean dans un CHU de l'APHP : un retour d'expérience par Niccolo CuratoloLe Lean dans un CHU de l'APHP : un retour d'expérience par Niccolo Curatolo
Le Lean dans un CHU de l'APHP : un retour d'expérience par Niccolo Curatolo
 
New frontiers: Lean in the digital age by Daniel T Jones
New frontiers: Lean in the digital age by Daniel T JonesNew frontiers: Lean in the digital age by Daniel T Jones
New frontiers: Lean in the digital age by Daniel T Jones
 
Reconfigurer un site chimique ancien grâce au Lean par J.Ferradini
Reconfigurer un site chimique ancien grâce au Lean par J.FerradiniReconfigurer un site chimique ancien grâce au Lean par J.Ferradini
Reconfigurer un site chimique ancien grâce au Lean par J.Ferradini
 
Une stratégie basée sur les préférences client, Jean-Louis Nicque
Une stratégie basée sur les préférences client, Jean-Louis NicqueUne stratégie basée sur les préférences client, Jean-Louis Nicque
Une stratégie basée sur les préférences client, Jean-Louis Nicque
 
Les managers face au déploiement du Lean par MC Boutonnet, Philips
Les managers face au déploiement du Lean par MC Boutonnet, PhilipsLes managers face au déploiement du Lean par MC Boutonnet, Philips
Les managers face au déploiement du Lean par MC Boutonnet, Philips
 
Lean, stratégie et résultats par Catherine Chabiron
Lean, stratégie et résultats par Catherine Chabiron Lean, stratégie et résultats par Catherine Chabiron
Lean, stratégie et résultats par Catherine Chabiron
 
L’engagement du dirigeant au cœur de la démarche Lean par C.Riboulet et C.Dané
L’engagement du dirigeant au cœur de la démarche Lean par C.Riboulet et C.DanéL’engagement du dirigeant au cœur de la démarche Lean par C.Riboulet et C.Dané
L’engagement du dirigeant au cœur de la démarche Lean par C.Riboulet et C.Dané
 
Management visuel pour l'amélioration des activités de service, Aurore Xemar
Management visuel pour l'amélioration des activités de service, Aurore XemarManagement visuel pour l'amélioration des activités de service, Aurore Xemar
Management visuel pour l'amélioration des activités de service, Aurore Xemar
 
Etre Lean dans la durée par Pierre Vareille et Yves Merel
Etre Lean dans la durée par Pierre Vareille et Yves MerelEtre Lean dans la durée par Pierre Vareille et Yves Merel
Etre Lean dans la durée par Pierre Vareille et Yves Merel
 
Agile et Lean : des univers convergents ? par Dimitri Baeli
Agile et Lean : des univers convergents ? par Dimitri BaeliAgile et Lean : des univers convergents ? par Dimitri Baeli
Agile et Lean : des univers convergents ? par Dimitri Baeli
 
Du Lean en maintenance ferroviaire par Boris Evesque de la SNCF
Du Lean en maintenance ferroviaire par Boris Evesque de la SNCFDu Lean en maintenance ferroviaire par Boris Evesque de la SNCF
Du Lean en maintenance ferroviaire par Boris Evesque de la SNCF
 
Le choix du Lean pour accompagner notre croissance, E.Legault de Cadiou
Le choix du Lean pour accompagner notre croissance, E.Legault de CadiouLe choix du Lean pour accompagner notre croissance, E.Legault de Cadiou
Le choix du Lean pour accompagner notre croissance, E.Legault de Cadiou
 
Le Lean en ingénierie par Cécile Roche de Thales
Le Lean en ingénierie par Cécile Roche de ThalesLe Lean en ingénierie par Cécile Roche de Thales
Le Lean en ingénierie par Cécile Roche de Thales
 
Lean management en milieu hypercomplexe : à l'hôpital par B.Garel
Lean management en milieu hypercomplexe : à l'hôpital par B.GarelLean management en milieu hypercomplexe : à l'hôpital par B.Garel
Lean management en milieu hypercomplexe : à l'hôpital par B.Garel
 

Semelhante a Lean management = Learn management par Klaus Beulker

Lean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training ModuleLean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training ModuleFrank-G. Adler
 
Lean Journey At C1
Lean Journey At C1Lean Journey At C1
Lean Journey At C1Beth Johnson
 
Angel Day: Lean Innovation - How to increase the Success of Start-ups
Angel Day: Lean Innovation -  How to increase the Success of Start-upsAngel Day: Lean Innovation -  How to increase the Success of Start-ups
Angel Day: Lean Innovation - How to increase the Success of Start-upspragmatic solutions gmbh
 
Lean Management explained to CEOs & Others
Lean Management explained to CEOs & OthersLean Management explained to CEOs & Others
Lean Management explained to CEOs & OthersEquable
 
Agile concepts and opportunities for contract management r walters
Agile concepts and opportunities for contract management  r walters Agile concepts and opportunities for contract management  r walters
Agile concepts and opportunities for contract management r walters Expressworks International
 
Increasing Vehicle Outsourcing ( % Of Car Value ) Essay
Increasing Vehicle Outsourcing ( % Of Car Value ) EssayIncreasing Vehicle Outsourcing ( % Of Car Value ) Essay
Increasing Vehicle Outsourcing ( % Of Car Value ) EssayAlison Reed
 
Making intranets work (for communicators)
Making intranets work (for communicators)Making intranets work (for communicators)
Making intranets work (for communicators)James Robertson
 
Critical Chain Project Management - Training Material Extract of 1 Day Europe...
Critical Chain Project Management - Training Material Extract of 1 Day Europe...Critical Chain Project Management - Training Material Extract of 1 Day Europe...
Critical Chain Project Management - Training Material Extract of 1 Day Europe...MARRIS Consulting
 
The toyota way Book Review
The toyota way Book ReviewThe toyota way Book Review
The toyota way Book ReviewRoshani Mehta
 
The Scale of the Lean Service Opportunity
The Scale of the Lean Service OpportunityThe Scale of the Lean Service Opportunity
The Scale of the Lean Service OpportunityLean Enterprise Academy
 
Professional Project Manager Should Be Proficient in Agile
Professional Project Manager Should Be Proficient in AgileProfessional Project Manager Should Be Proficient in Agile
Professional Project Manager Should Be Proficient in AgileNitor
 
Aftermarket2012 cargotec malcolmyoull
Aftermarket2012 cargotec malcolmyoullAftermarket2012 cargotec malcolmyoull
Aftermarket2012 cargotec malcolmyoullCopperberg
 
Global cement magazine operational transformation feature article jan 2017
Global cement magazine operational transformation feature article  jan 2017Global cement magazine operational transformation feature article  jan 2017
Global cement magazine operational transformation feature article jan 2017Angus Maclean
 
Lean Times Require Lean Thinking
Lean Times Require Lean ThinkingLean Times Require Lean Thinking
Lean Times Require Lean ThinkingThoughtworks
 
Lean times require lean thinking
Lean times require lean thinkingLean times require lean thinking
Lean times require lean thinkingCatchi
 

Semelhante a Lean management = Learn management par Klaus Beulker (20)

Lean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training ModuleLean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training Module
 
Lean Journey At C1
Lean Journey At C1Lean Journey At C1
Lean Journey At C1
 
Building a Lean Management System
Building a Lean Management System Building a Lean Management System
Building a Lean Management System
 
Training Strategie Action Learning
Training Strategie  Action Learning Training Strategie  Action Learning
Training Strategie Action Learning
 
Angel Day: Lean Innovation - How to increase the Success of Start-ups
Angel Day: Lean Innovation -  How to increase the Success of Start-upsAngel Day: Lean Innovation -  How to increase the Success of Start-ups
Angel Day: Lean Innovation - How to increase the Success of Start-ups
 
Lean Management explained to CEOs & Others
Lean Management explained to CEOs & OthersLean Management explained to CEOs & Others
Lean Management explained to CEOs & Others
 
The Toyota Way
The Toyota WayThe Toyota Way
The Toyota Way
 
Agile concepts and opportunities for contract management r walters
Agile concepts and opportunities for contract management  r walters Agile concepts and opportunities for contract management  r walters
Agile concepts and opportunities for contract management r walters
 
Increasing Vehicle Outsourcing ( % Of Car Value ) Essay
Increasing Vehicle Outsourcing ( % Of Car Value ) EssayIncreasing Vehicle Outsourcing ( % Of Car Value ) Essay
Increasing Vehicle Outsourcing ( % Of Car Value ) Essay
 
Autoliv
AutolivAutoliv
Autoliv
 
Making intranets work (for communicators)
Making intranets work (for communicators)Making intranets work (for communicators)
Making intranets work (for communicators)
 
Critical Chain Project Management - Training Material Extract of 1 Day Europe...
Critical Chain Project Management - Training Material Extract of 1 Day Europe...Critical Chain Project Management - Training Material Extract of 1 Day Europe...
Critical Chain Project Management - Training Material Extract of 1 Day Europe...
 
The toyota way Book Review
The toyota way Book ReviewThe toyota way Book Review
The toyota way Book Review
 
The Scale of the Lean Service Opportunity
The Scale of the Lean Service OpportunityThe Scale of the Lean Service Opportunity
The Scale of the Lean Service Opportunity
 
Professional Project Manager Should Be Proficient in Agile
Professional Project Manager Should Be Proficient in AgileProfessional Project Manager Should Be Proficient in Agile
Professional Project Manager Should Be Proficient in Agile
 
Aftermarket2012 cargotec malcolmyoull
Aftermarket2012 cargotec malcolmyoullAftermarket2012 cargotec malcolmyoull
Aftermarket2012 cargotec malcolmyoull
 
Global cement magazine operational transformation feature article jan 2017
Global cement magazine operational transformation feature article  jan 2017Global cement magazine operational transformation feature article  jan 2017
Global cement magazine operational transformation feature article jan 2017
 
Lean And Six Sigma
Lean And Six SigmaLean And Six Sigma
Lean And Six Sigma
 
Lean Times Require Lean Thinking
Lean Times Require Lean ThinkingLean Times Require Lean Thinking
Lean Times Require Lean Thinking
 
Lean times require lean thinking
Lean times require lean thinkingLean times require lean thinking
Lean times require lean thinking
 

Mais de Institut Lean France

Le "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de criseLe "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de criseInstitut Lean France
 
Le "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de crise Le "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de crise Institut Lean France
 
Build Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-Cuthill
Build Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-CuthillBuild Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-Cuthill
Build Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-CuthillInstitut Lean France
 
Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...
Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...
Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...Institut Lean France
 
The story of our Lean IT journey Melanie Noyel, Acta Mobilier
The story of our Lean IT journey Melanie Noyel, Acta MobilierThe story of our Lean IT journey Melanie Noyel, Acta Mobilier
The story of our Lean IT journey Melanie Noyel, Acta MobilierInstitut Lean France
 
Why kanban is the secret to scale your tech team by Marc-Antoine Lacroix Qonto
Why kanban is the secret to scale your tech team by Marc-Antoine Lacroix QontoWhy kanban is the secret to scale your tech team by Marc-Antoine Lacroix Qonto
Why kanban is the secret to scale your tech team by Marc-Antoine Lacroix QontoInstitut Lean France
 
Management practices for the digital era by Cecil Dijoux
Management practices for the digital era by Cecil DijouxManagement practices for the digital era by Cecil Dijoux
Management practices for the digital era by Cecil DijouxInstitut Lean France
 
Build hyper efficient team with TPS by Pierre Jannez
Build hyper efficient team with TPS by Pierre JannezBuild hyper efficient team with TPS by Pierre Jannez
Build hyper efficient team with TPS by Pierre JannezInstitut Lean France
 
Lean organization framework by Pierre Masai
Lean organization framework by Pierre MasaiLean organization framework by Pierre Masai
Lean organization framework by Pierre MasaiInstitut Lean France
 
The high performance learning enterpris, by Steve Bell and Karen Whitley
The high performance learning enterpris, by Steve Bell and Karen WhitleyThe high performance learning enterpris, by Steve Bell and Karen Whitley
The high performance learning enterpris, by Steve Bell and Karen WhitleyInstitut Lean France
 
True Continuous Improvement with Toyota Kata, Jesper Boeg
True Continuous Improvement with Toyota Kata, Jesper BoegTrue Continuous Improvement with Toyota Kata, Jesper Boeg
True Continuous Improvement with Toyota Kata, Jesper BoegInstitut Lean France
 
Getting to the heart of agile by Alistair Cockburn
Getting to the heart of agile by Alistair CockburnGetting to the heart of agile by Alistair Cockburn
Getting to the heart of agile by Alistair CockburnInstitut Lean France
 
Lean and agile software because or despite rising complexity by Yves Caseau
Lean and agile software because or despite rising complexity by Yves CaseauLean and agile software because or despite rising complexity by Yves Caseau
Lean and agile software because or despite rising complexity by Yves CaseauInstitut Lean France
 
A transformation journey for a complex development organization
A transformation journey for a complex development organizationA transformation journey for a complex development organization
A transformation journey for a complex development organizationInstitut Lean France
 
Can Lean help improve the Architecture Maturity of an entire Organization?
Can Lean help improve the Architecture Maturity of an entire Organization?Can Lean help improve the Architecture Maturity of an entire Organization?
Can Lean help improve the Architecture Maturity of an entire Organization?Institut Lean France
 
Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...
Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...
Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...Institut Lean France
 
Se transformer soi-même pour transformer sa boite, Priscilla Saunier
Se transformer soi-même pour transformer sa boite, Priscilla SaunierSe transformer soi-même pour transformer sa boite, Priscilla Saunier
Se transformer soi-même pour transformer sa boite, Priscilla SaunierInstitut Lean France
 
Présentation COGETIQ Lean Tour Blois 2018
Présentation COGETIQ Lean Tour Blois 2018 Présentation COGETIQ Lean Tour Blois 2018
Présentation COGETIQ Lean Tour Blois 2018 Institut Lean France
 
Présentation BMI Lean Tour Blois 2018
Présentation BMI   Lean Tour Blois 2018Présentation BMI   Lean Tour Blois 2018
Présentation BMI Lean Tour Blois 2018Institut Lean France
 

Mais de Institut Lean France (20)

Le "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de criseLe "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de crise
 
Le "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de crise Le "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de crise
 
Build Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-Cuthill
Build Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-CuthillBuild Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-Cuthill
Build Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-Cuthill
 
Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...
Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...
Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...
 
The story of our Lean IT journey Melanie Noyel, Acta Mobilier
The story of our Lean IT journey Melanie Noyel, Acta MobilierThe story of our Lean IT journey Melanie Noyel, Acta Mobilier
The story of our Lean IT journey Melanie Noyel, Acta Mobilier
 
Why kanban is the secret to scale your tech team by Marc-Antoine Lacroix Qonto
Why kanban is the secret to scale your tech team by Marc-Antoine Lacroix QontoWhy kanban is the secret to scale your tech team by Marc-Antoine Lacroix Qonto
Why kanban is the secret to scale your tech team by Marc-Antoine Lacroix Qonto
 
Management practices for the digital era by Cecil Dijoux
Management practices for the digital era by Cecil DijouxManagement practices for the digital era by Cecil Dijoux
Management practices for the digital era by Cecil Dijoux
 
Build hyper efficient team with TPS by Pierre Jannez
Build hyper efficient team with TPS by Pierre JannezBuild hyper efficient team with TPS by Pierre Jannez
Build hyper efficient team with TPS by Pierre Jannez
 
Lean organization framework by Pierre Masai
Lean organization framework by Pierre MasaiLean organization framework by Pierre Masai
Lean organization framework by Pierre Masai
 
The high performance learning enterpris, by Steve Bell and Karen Whitley
The high performance learning enterpris, by Steve Bell and Karen WhitleyThe high performance learning enterpris, by Steve Bell and Karen Whitley
The high performance learning enterpris, by Steve Bell and Karen Whitley
 
Story of LeSS by Bas Vodde
Story of LeSS by Bas VoddeStory of LeSS by Bas Vodde
Story of LeSS by Bas Vodde
 
True Continuous Improvement with Toyota Kata, Jesper Boeg
True Continuous Improvement with Toyota Kata, Jesper BoegTrue Continuous Improvement with Toyota Kata, Jesper Boeg
True Continuous Improvement with Toyota Kata, Jesper Boeg
 
Getting to the heart of agile by Alistair Cockburn
Getting to the heart of agile by Alistair CockburnGetting to the heart of agile by Alistair Cockburn
Getting to the heart of agile by Alistair Cockburn
 
Lean and agile software because or despite rising complexity by Yves Caseau
Lean and agile software because or despite rising complexity by Yves CaseauLean and agile software because or despite rising complexity by Yves Caseau
Lean and agile software because or despite rising complexity by Yves Caseau
 
A transformation journey for a complex development organization
A transformation journey for a complex development organizationA transformation journey for a complex development organization
A transformation journey for a complex development organization
 
Can Lean help improve the Architecture Maturity of an entire Organization?
Can Lean help improve the Architecture Maturity of an entire Organization?Can Lean help improve the Architecture Maturity of an entire Organization?
Can Lean help improve the Architecture Maturity of an entire Organization?
 
Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...
Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...
Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...
 
Se transformer soi-même pour transformer sa boite, Priscilla Saunier
Se transformer soi-même pour transformer sa boite, Priscilla SaunierSe transformer soi-même pour transformer sa boite, Priscilla Saunier
Se transformer soi-même pour transformer sa boite, Priscilla Saunier
 
Présentation COGETIQ Lean Tour Blois 2018
Présentation COGETIQ Lean Tour Blois 2018 Présentation COGETIQ Lean Tour Blois 2018
Présentation COGETIQ Lean Tour Blois 2018
 
Présentation BMI Lean Tour Blois 2018
Présentation BMI   Lean Tour Blois 2018Présentation BMI   Lean Tour Blois 2018
Présentation BMI Lean Tour Blois 2018
 

Último

BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic managementharfimakarim
 
Strategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal AnalsysisStrategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal Analsysistanmayarora45
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxssuserf63bd7
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field ArtilleryKennethSwanberg
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Hedda Bird
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptxAss.Prof. Dr. Mogeeb Mosleh
 
Independent Escorts Vikaspuri / 9899900591 High Profile Escort Service in Delhi
Independent Escorts Vikaspuri  / 9899900591 High Profile Escort Service in DelhiIndependent Escorts Vikaspuri  / 9899900591 High Profile Escort Service in Delhi
Independent Escorts Vikaspuri / 9899900591 High Profile Escort Service in Delhiguptaswati8536
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxalinstan901
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentNimot Muili
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdfAlejandromexEspino
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxAaron Stannard
 
Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...Ram V Chary
 

Último (15)

Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 
Strategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal AnalsysisStrategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal Analsysis
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
Independent Escorts Vikaspuri / 9899900591 High Profile Escort Service in Delhi
Independent Escorts Vikaspuri  / 9899900591 High Profile Escort Service in DelhiIndependent Escorts Vikaspuri  / 9899900591 High Profile Escort Service in Delhi
Independent Escorts Vikaspuri / 9899900591 High Profile Escort Service in Delhi
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...
 

Lean management = Learn management par Klaus Beulker

  • 1. Lean Management = Learn Management Klaus Beulker Managing Director Terex Cranes Germany Copyright Institut Lean France 2016 Page 1
  • 2. Lean Management = Learn Management Source: The Machine That Changed the World by J. P. Womack, D. T. Jones and D. Roos Copyright Institut Lean France 2016 Page 2 But there are ongoing rumours that the original text looked like: “We felt that the most constructive step we could take to prevent this development from occurring would be to undertake a detailed study of the new Japanese techniques, which we subsequently named “learn production”, compared with the older Western mass-production techniques, and to do so in partnership with all the world´s motor-vehicle manufacturers. But how?...” Published Text: “We felt that the most constructive step we could take to prevent this development from occurring would be to undertake a detailed study of the new Japanese techniques, which we subsequently named “lean production”, compared with the older Western mass-production techniques, and to do so in partnership with all the world´s motor-vehicle manufacturers. But how?...”
  • 3. Agenda  Introduction  What is Lean Managemen at Terex Cranes Zweibrücken  Examples how Lean at Terex is organized and applied  Change and Learning if Lean Management is applied at Terex  Summary Copyright Institut Lean France 2016 Page 3 Lean Management = Learn Management
  • 4. streng vertraulich 0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 90.000 100.000 110.000 120.000 130.000 140.000 150.000 160.000 4 Inventory reduction by 35Mio.€ Turns improved from 2 to 4.3 Close the door Reduce leadtime in SAP Apply the lean tools Apply the lean tools: Based on JIT and JIDOKA the lean promise works. 2013 2014 2015 Lean Approach started in September 2014. End 2015: Turns 4.3, Inventory -35Mio.€.
  • 5. Copyright Institut Lean France 2016 Page 5 Range of Products Terex Cranes Telescopic Cranes - Maximum lifting capacity of 100-1000t - Can be used for a wide range of lifting needs in a variety of terrain (off and on the highway) - Can quickly move to another job Customer Takt: 1day Cycle time: 40days Crawler Cranes - Terex is market leader for Crawler Cranes above 400t lifting capacity (400-3,200t) - Is primarily used in the petrochemical industry, power plant construction, infrastructure and to build up windmills Customer Takt: 5days Cycle time: 100days
  • 6. Copyright Institut Lean France 2016 Page 6 Operations Terex Cranes Zweibrücken Operations Team Terex Cranes Zweibrücken: Safety – Quality – Plant DS – Plant WS – Plant Bierbach – Plant Pecs – R&D – Procurement – HR – TBS 3 Locations in Germany: Dinglerstraße, Wallerscheid & Bierbach Around 1600 Team Member 1 Location in Hungary – Pecs Around 250 Team Member Steelwork Telescopic Cranes Plant Steelwork Crawler Cranes Plant Telescopic Cranes Plant Crawler Cranes Plant
  • 7. Copyright Institut Lean France 2016 Page 7 Examples of Application of Terex Cranes Telescopic Cranes: Lifting the roof of a building. Crawler Cranes: Lifting Space Shuttle on an airplane.
  • 8. Agenda  Introduction  What is Lean Managemen at Terex Cranes Zweibrücken  Examples how Lean at Terex is organized and applied  Change and Learning if Lean Management is applied at Terex  Summary Copyright Institut Lean France 2016 Page 8 Lean Management = Learn Management
  • 9. Copyright Institut Lean France 2016 Page 9 What is Lean Management at Terex Cranes? Answers to what Lean Management is: 1. Let the material flow. 2. All life is problem solving. 3. Lead with respect. 4. Touch the product. And – there are 5 laws of nature: 1. Every second decision is wrong. 2. Operator is always right. 3. Not thinking, knowing. 4. Quality first is Quality first. 5. Pay now or pay later. And for sure Lean Management is the opposite of what we can see on the picture.
  • 10. Copyright Institut Lean France 2016 Page 10 Toyota House reminds us what is the North Star we are aiming for. Competetive advantage by customer satisfaction through people development. JIT Teamwork: • Flow • Takt • Pull JIDOKA Respect: • Stop the line • Seperate man and machine Basic Stability Safety, quality, flexibility, costs, … Standardized Work and KaizenHeijunka
  • 11. Copyright Institut Lean France 2016 Page 11 Let the Material flow Ohno, Toyota Production System, page 1: „All we are doing is looking at the time line. From the moment the customer gives us an order to the point when we collect the cash. And we are reducing that time line by removing the non-value-added wastes.“ Cycle Time Order Cash Source: Ohno, Toyota Production System
  • 12. Copyright Institut Lean France 2016 Page 12 Leadership, Teamwork and Support is needed in a Lean Management System. Stop the line 5S TPM Yamazumi SMED Flow Pull Takt Heijunka Standards and Visualization Kaizen Leadership Teamwork Support Let the material flow
  • 13. Agenda  Introduction  What is Lean Managemen at Terex Cranes Zweibrücken  Examples how Lean at Terex is organized and applied  Change and Learning if Lean Management is applied at Terex  Summary Copyright Institut Lean France 2016 Page 13 Lean Management = Learn Management
  • 14. Copyright Institut Lean France 2016 Page 14 Material- and Informationflow of Crawler Cranes Plant • Flow • Pull • Levelling • Heijunka • After Pacemaker Fifo • Before Pacemaker Pull • Quality gates • Visualization and Standards Informationflow Materialflow Incoming Goods Assembly, Painting, Testing ShippingSteelwork
  • 15. Copyright Institut Lean France 2016 Page 15 Quality Gates and Stable Teams Lackierung Qualitätstor1 Qualitätstor3 Qualitätstor2 Qualitätstor6 Qualitätstor4 Quality Gates are defined for each logical part of the supply chain. Each Quality Gate is defining an area of responsibility for a defined team. The Team is in charge of daily output, quality, standards and Kaizen. TEREX?
  • 16. Copyright Institut Lean France 2016 Page 16 Size of the teams is between 5 to 12 Team members Assembly Steelwork Plant Manager Supervisor Supervisor Hancho Hancho Hancho Hancho Hancho Hancho Hancho Hancho Hancho Hancho Hancho Hancho Production Manager
  • 17. Copyright Institut Lean France 2016 Page 17 Obeya Room in the Plants On daily basis plant management is meeting in the Obeya room. Daily Topics: 1. Safety 2. Quality 3. Specific Customer requests for each crane 4. Delivery 5. Engineering Changes The Obeya room gives orientation. On one hand it‘s about managing the day. On the other hand every day people have the opportunity to learn from each other more about the business.
  • 18. Copyright Institut Lean France 2016 Page 18 Lean Management Architecture at Terex Cranes Zweibrücken Hoshin Kanri Monthly improving the value stream (flow, tact, pull) Kaizen workshops continuous improvement on the shop floor Daily Communication and meaningful discussions: what to change, where to go, next step 2 times a year
  • 19. Copyright Institut Lean France 2016 Page 19 Hoshin Kanri on a monthly basis Monthly meeting as a team: Engineering, production, procurement, quality, finance,…. 1. Use of an X Matrix make strategy deployment visible. Team leaders and support teams are identified. Everyone is on the same page. 2. Status of scorecard on a regular monthly basis. 3. Milestones in the action plan. critical path identified. Clear picture of the impact of the different activities. 4. The Team identifies the problem, understands the problem, agrees to the problem, address the issue and fix it, using the discipline of root cause analysis (root cause analysis). The format of the meeting is standardized making sure to have meaningful discussions from the beginning.
  • 20. Copyright Institut Lean France 2016 Page 20 Is it a good day or a bad day? Every Team has a daily target The team has to visualize the output If the promise of the hour cannot be fullfilled, the team has to visualize the problem and to share their opinion what the reason could be. This offers the opportunity to support short term and to have a discussion how the production system works. Handwritten production loss analysis board
  • 21. Copyright Institut Lean France 2016 Page 21 Problemsolving: Using A3 in order to have a structured way to learn. Each defect offers the opportunity to learn and to improve Problem description Short term countermeasure Thesis and ideas Checking the thesis and ideas Ask 5 Why Introduce Countermeasures Check if it works Evaluate and share with your colleagues
  • 22. Copyright Institut Lean France 2016 Page 22 Engineering Visualization of: Risk analysis of new developments from customer perspective Customer Request Field issues Serial support
  • 23. Copyright Institut Lean France 2016 Page 23 Procurement Visualization of: Missing Parts Supplier development projects Problem solving in Teams Introduction of Milk Runs
  • 24. Copyright Institut Lean France 2016 Page 24 Role of the Teamleader (Hancho) Go and see (Dojo, Kata) Understand deeply the working condition and skills Have a discussion to find opportunities for improvements every day and every TM
  • 25. Copyright Institut Lean France 2016 Page 25 Opportunities of improvements or: „Do we show respect?“ Plan – do – check - act Visualization of: New ideas of Team Members Ideas for implementation and evaluation Action plan
  • 26. Copyright Institut Lean France 2016 Page 26 Improving Improve performance Improve processes Improve visualization Improve working conditions and/ or skills
  • 27. Agenda  Introduction  What is Lean Managemen at Terex Cranes Zweibrücken  Examples how Lean at Terex is organized and applied  Change and Learning if Lean Management is applied at Terex  Summary Copyright Institut Lean France 2016 Page 27 Lean Management = Learn Management
  • 28. Copyright Institut Lean France 2016 Page 28 Problem Solving as a Driver of Lean Management Implementation Ressources: Inventory, People, Capacity, Time. Problems
  • 29. Copyright Institut Lean France 2016 Page 29 Leading change is changing how to lead. Source: Heitger/ Doujak, Harte Schnitte – neues Wachstum Ability to change Necessitytochange Learning organisation Teamwork Secure survival Crisis management Direction of change
  • 30. Copyright Institut Lean France 2016 Page 30 Steps how people learn: „Ohnono method.“ Data Symbols 220 C/ y 220 Cranes per year - Information - Knowledge - Problemsolving - Responsibility - Understanding- Emotional Engaged - Competency - Development and Growth
  • 31. Copyright Institut Lean France 2016 Page 31 Change Management Source: Königswieser, Das Überbringen schlechter Nachrichten Change New Identity Fear, Unsecure, Worries Irritation, Rage, Aggressive Actual Identity Sadness Curiosity, Interest, Breakup Frustration, Depression
  • 32. Copyright Institut Lean France 2016 Page 32 Mentor/ Mentee Prinziple or: „Produce people before producing parts.“ Take customer perspective On the spot Daily check of standardized processes for deviations Enquiring and respectful fundamental attitude Define challenging and reachable target states Show opportunities and allow to use Proceed step by step Run PDCA cycles Start experimental tests immediately Secure review and evaluation of results Telemachos und Mentor Frequency of problems Difficulty of problems Expert knowledge necessary for solving
  • 33. Copyright Institut Lean France 2016 Page 33 Gemba walks on a daily basis or: „It is clear, what is important.“ Typical questions on the walk: Good or bad day? Can we comply with the standardized workflow? Which barriers do exist between the target and the current state? How can we overcome these barriers? Daily Gemba walk: Learning on the shop floor Act Evaluate What ergonomic problems the company leaves to operators? What quality problems the company leaves to customers? What flexibility problems the company ignores? What cost the company accepted to spend? What visible problems the company thinks don’t exist? Plan
  • 34. Agenda  Introduction  What is Lean Managemen at Terex Cranes Zweibrücken  Examples how Lean at Terex is organized and applied  Change and Learning if Lean Management is applied at Terex  Summary Copyright Institut Lean France 2016 Page 34 Lean Management = Learn Management
  • 35. streng vertraulich 0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 90.000 100.000 110.000 120.000 130.000 140.000 150.000 160.000 35 Inventory reduction by 35Mio.€ Turns improved from 2 to 4.3 Close the door Reduce leadtime in SAP Apply the lean tools Apply the lean tools: Based on JIT and JIDOKA the lean promise works. 2013 2014 2015 Lean Approach started in September 2014. End 2015: Turns 4.3, Inventory -35Mio.€.
  • 36. Copyright Institut Lean France 2016 Page 36 Lean Management = Learn Management Critical process performance indicator is the leadtime. By using value stream mapping waste is identified and can be eliminated. Applying the lean tools again and again lead to the expected results. Continuos improvement has to be organized on the shop floor on a daily basis (go to gemba). Applying lean tools leads to sustainable results if the activities are organized, standardized and practised every day (Dojo-/ Kata- Activities). The improvements are based on behaviour of the leadership team. Repetition, practising and applying the lean tools change behaviour and mental frameworks. It leads to recognition, respect and trust. Matrix: „There is no spoon.“