GIS based material management and supplier selection in
Thane city – A case study
Prashant V Thakare1
Dr Sumedh Y Mhaske2
Civil and Environmental Engineering Department Civil and Environmental Engineering Department
Veermata Jijabai Technological Institute, Veermata Jijabai Technological Institute,
Abstract — Materials are the inputs to the construction activity. Materials forms the single largest component of the
total cost of the facility. Material cost being in the range of 50% to 60% of the total cost of the project. Improper
supplier selection usually faces problems in price of material, delivery, communication, quality, timely availability of
materials, etc. and its bad effect on the cost of project, so need of ideal supplier is for avoiding these problems and also
cost overrun. There are several method for supplier selection and it can be possible to select ideal suppliers by using of
those methods but these several traditional methods fails to collect information of all the suppliers with all their
material correctly, also it takes too much time to collect such information manually. For supplier selection purpose
requirement of all data about supplier like personal detail, cost of materials, quantity, quality, delivery services,
location, communication facility, discount, transportation facility, experience, etc. and collecting these information
would be less or no time consuming using data base. Hence GIS is very effective tool for data base management, GIS
should be used for storing and quantifying all data of all suppliers and using these data easily screen all suppliers in
very short time. By using GIS GRAM++ software, digitise map of study area, roads and locate location of suppliers,
Then it is very easy to find out suppliers location, all detail information of suppliers, ideal suppliers and shortest route
between supplier and construction site by developing queries in very short time.
Keywords — Material management, supplier selection, GIS, GRAM++, Shortest path, GRAM Net
I. INTRODUCTION
Today, India is one of the fastest growing economy in the world. And the construction industry is an integral part of the
growing economy. Material management plays an important role in construction industry and to select most ideal
material in the required time, need of a best material supplier. And since because supply on demand is the backbone of
material management, it becomes very important aspect in determination of success of any construction project [1].
A. Materials management
Materials management is a process for planning, executing and controlling field and office activities in construction. The
goal of materials management is to insure that construction materials are available at their point of use when needed. The
materials management system attempts to insure that the right quality and quantity of materials are appropriately selected,
purchased, delivered and handled on site in a timely manner and at a reasonable cost. Materials management is the
system for planning and controlling all of the efforts necessary to ensure that the correct quality and quantity of materials
are properly specified in a timely manner, are obtained at a reasonable cost and most importantly are available at the
point of use when required. Thus Materials management is an important element in project management. Materials
represent a major expense in construction, so minimizing procurement costs improves opportunities for reducing the
overall project costs. Poor materials management can result in increased costs during construction. Efficient management
of materials can result in substantial savings in project costs [1].
B. Supplier selection
Supplier selection is substantial and forms the foundation for success or failure of construction projects. The significance
of maintaining a strong relationship with suppliers to be competitive in today’s construction environment. Quality and
cost of material procurement are two attributes that are directly affected by the material supplier selection process. In
order to maintain both of these attributes, supplier selection should be well defined, in a way that decreases project
logistics and supply chain management costs. Therefore supplier selection criteria should be well defined. Supplier
selection is a multi-criteria decision making problem which includes both qualitative and quantitative considerations. A
trade-off between tangible and intangible criteria is important in selecting the best supplier [4].
C. Critical success factors for supplier selection
a) Quality of materials
b) Quantity of materials
c) Price of materials
d) Availability of materials
e) Delivery service
f) Technical capability
g) Financial strength
International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163
Volume 1 Issue 5 (June 2014) ttp://ijirae.com
_________________________________________________________________________________________________
© 2014, IJIRAE- All Rights Reserved Page -49
h) Geographical Location
i) Reputation
j) Management and Organisation
k) Other factors [6].
D. Major steps of supplier selection
Step 1 - Identification of the need for a specific product
Step 2 - Identify key sourcing requirements and criteria
Step 3 - Determine sourcing strategy
Step 4 - Identify potential supply sources
Step 5 - Limit suppliers in selection pool
Step 6 - Determine method for final selection
Step 7 - Select suppliers and reach agreement [2].
II. GEOGRAPHICAL INFORMATION SYSTEM (GIS)
A Geographic information system is a computer based system capable of capturing, storing, and analysing and displaying
geographically referenced information; that identified according to location. Practitioners also define a GIS as including
the procedures, operating personal and spatial data that goes into system.
A GIS tool is used for mapping and analysing spatial data. GIS technology integrates common database operations such
as query and statistical analysis with the unique visualization and geographic analysis benefits offered by maps [5].
A. Component of GIS
Fig. 1 Component of GIS [5]
B. Working of GIS
GIS stores information about the world as a collection of thematic layers that can be linked together by geography. This
simple but extremely powerful and versatile concept has proven invaluable for solving many real world problems from
modelling global atmospheric circulation, to predicting rural land use, and monitoring changes in rainforest ecosystems.
1. Geographic references
2. Input of data
3. Map making
4. Manipulation of data
5. File management
6. Query and Analysis
7. Visualization [5].
III. CASE STUDY
A. Study Region – Thane City
The city of Thane is one of Maharashtra’s major industrial town and the district headquarters. The National Decennial
Census 2011 pegged the population of the city at 1,818,872. The geographical jurisdiction of the Thane city spreads over
an area of 128.23 sq. km. The city falls on latitude 720
50'12'' North with longitude 190
10'15'' East.
B. Data Acquisition
Total 130 major construction materials suppliers are available in Thane city region. The scope of materials was restricted
to only sand and cement, owing to its importance and availability. Collection of data included personal information of
suppliers like name and address, details of materials like cost, brand, quarry source, available stock, lead time, discount,
transportation, guarantee for safety, replacement, test certificates, etc. The Thane city map was obtained from Thane
Municipal Corporation (TMC) office, Pachpakhadi, Thane. GRAM++ software collected from IIT Bombay.
International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163
Volume 1 Issue 5 (June 2014) ttp://ijirae.com
_________________________________________________________________________________________________
© 2014, IJIRAE- All Rights Reserved Page -50
IV.APPLICATION OF GIS MODEL
A. Procedure for Database generation
1. Geo-registering of Thane city map
Step 1: Create Thane city map file
Step 2: Open image file of Thane city map
Step 3: Add the tic marks to registered the map
Step 4: Calculate error
2. Create different Layers in Thane city map
a. External boundary layer of Thane city – Polygon Layer
b. Roads network and Railway line Layers of Thane city – Segment Layer
c. Supplier’s location Layer in Thane city – Point Layer
3. Digitization of all layers
4. Editing map
5. Polygon formation
6. Adding labels
7. Table creation of supplier’s location layer
8. Preparation of Data base of supplier’s data
Fig. 2 Thane city opened in GRAM++ software and Geo-registered of Thane city map
Fig. 3 Digitized map shows all layers and table creation of supplier location layer of supplier’s data.
B. Generation of Queries
The database file of Thane city map is used in vector GIS. The vector GIS contain vector query module, tin module,
network module. Vector query module basically used for running query and find out best solution. Vector query is very
important to Thane city map vector file. By run query find the more solution and that will more helpful for supplier
selection process. By this query find out minimum cost of materials, available stock, lead time etc. in very few time. Also
it is used to compare more suppliers and evaluate each suppliers.
International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163
Volume 1 Issue 5 (June 2014) ttp://ijirae.com
_________________________________________________________________________________________________
© 2014, IJIRAE- All Rights Reserved Page -51
Query No. 1
Find out lead time of cement is 15 hrs and Condition for this query is “Lead_Time_Cement = 15” and result of this query
is 11 out of 129 suppliers having lead time 15 hrs. This query is very important because information of lead time play an
important role in delivery of materials and supplier selection process. It is very important when emergency requirement of
material And this query and data gives solution in very less time.
Fig. 4 Detail of Query no. 1
Query no.2
Find out multiple characters of suppliers in one click, use of multiple condition i.e. “Cost of sand < 7300 and lead time <=
24 and query source = Gaymukh and discount = Yes” and result of this query is 6 out of 129 suppliers coming under this
condition. This query is important to finding out multiple characters of suppliers in one click. This query gives better idea
for ideal supplier as per requirement.
Fig. 5 Detail of Query no. 2
Query no. 3
Find out detail information of any one supplier in one click, for this condition of query is “Name of shop = Daksha
Traders” and result of this query shows exactly that supplier with location and all detail information.
Fig. 6 Detail of Query no. 3
International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163
Volume 1 Issue 5 (June 2014) ttp://ijirae.com
_________________________________________________________________________________________________
© 2014, IJIRAE- All Rights Reserved Page -52
C. GRAM Network
GRAM Network is used for to find out shortest route between construction site and suppliers location and to find out
nearest and best suppliers among more suppliers.
Fig. 7 Image shows finding best of three suppliers by using best supply node operation in GRAM Net.
Fig. 8 Combine layers of roads layer and supplier’s location layer and find out shortest route between source and destination using shortest route operation
V. RESULT
1. The result of project is there are many method for evaluation and selection of suppliers but all method required
all data of suppliers every time. Collection of all data is time consuming process compare to use stored data in
GIS.
2. Vector queries gives very helpful and very useful result. Its shows and categorised suppliers data as per
requirement and as per condition in very short time. So it helps to reduce the time of supplier selection process
and also helps to select best supplier.
3. Gram Network gives best solution for select nearest best suppliers. It also help for finding shortest route
between supplier’s location and construction site location.
VI.CONCLUSION
Excellent performance of material suppliers is most essential for the smooth obtaining of materials. Supplier evaluation
and selection is a usual main issue. The multi-criteria signify both qualitative and quantitative characteristics.
Construction company would be able to make the appropriate decision using a tool which is interactive, reliable and
affordable. GIS tool is very effective to avoid those problems in very short time to create for supplier selection. And
which is very helpful to integrate and categorised supplier’s data.
ACKNOWLEDGMENT
I would like to Thanks Thane Municipal Corporation (TMC) Pachpakhadi, Thane for providing Thane city map. I would
like to thanks all suppliers for their support for providing data related to construction materials. Also I would like to
thanks IIT Bombay for providing the software needed to carry out the study.
International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163
Volume 1 Issue 5 (June 2014) ttp://ijirae.com
_________________________________________________________________________________________________
© 2014, IJIRAE- All Rights Reserved Page -53
REFERENCES
[1] Prof. Chetna M. Vyas, K.V. Patel, 2008, “Construction Materials Management on Project Sites.”
[2] Don Amila Sajeevan Samarasinghe, John E Tookey, James Olabode Bamidele Rotimi, and Sivadass
Thiruchelvam, 2012, “Supplier Selection in the Construction Material Purchasing Function.”
[3] Bayazit O., Karpak B. & Yagci A., 2006, “A purchasing decision: Selecting a supplier for a construction
company.” Journal of Systems Science and Systems Engineering, vol. 15, no. 2, pp. 217-231.
[4] Mendoza A., 2007, “Effective methodologies for supplier selection and order quantity allocation.” PhD thesis,
The Pennsylvania State University, Pennsylvania.
[5] Kang tsung Chang, 2006, “Introduction to Geographic Information Systems.”
[6] Yong L., Qi W., (2012) “Case study of optimal material supplier selection by the Value Engineering Theory” Key
Engineering Materials, pp. 887-891.
[7] Chen X., Zhou XF., Zhang Y., (2011) “Research on building engineering materials supplier selection based on
ANP method” Key Engineering Materials, pp. 474-476.
[8] Pi W., Low C., (2005) “Supplier evaluation and selection using Taguchi loss functions” The International Journal
of Advanced Manufacturing Technology, vol. 26, no. 1-2, pp. 155-160.
[9] Ho C., Nguyen P., (2007) “Supplier evaluation and selection criteria in the construction industry of Taiwan and
Vietnam” International journal of information and management sciences, vol. 18, pp. 403-426.
[10] Aretoulis G.N., Kalfakakou G.P., Striagka F.Z., 2009, “Construction material supplier selection under multiple
criteria.” Operational Research, vol. 10, no. 2, pp. 209-230.

Mais conteúdo relacionado

Semelhante a GIS based material management and supplier selection in Thane city – A case study

IRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction ProjectIRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction ProjectIRJET Journal
 
Development of a web based decision support system for materials selection in...
Development of a web based decision support system for materials selection in...Development of a web based decision support system for materials selection in...
Development of a web based decision support system for materials selection in...IAEME Publication
 
IRJET- Supplier Selection and Material Management of Vasai-Virar City Municip...
IRJET- Supplier Selection and Material Management of Vasai-Virar City Municip...IRJET- Supplier Selection and Material Management of Vasai-Virar City Municip...
IRJET- Supplier Selection and Material Management of Vasai-Virar City Municip...IRJET Journal
 
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET- 	  Assessment of Role of Material Management in Construction ProjectsIRJET- 	  Assessment of Role of Material Management in Construction Projects
IRJET- Assessment of Role of Material Management in Construction ProjectsIRJET Journal
 
IRJET - A Review Paper on Effective Material Management to Minimize Probl...
IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...
IRJET - A Review Paper on Effective Material Management to Minimize Probl...IRJET Journal
 
IRJET- Efficient Techniques of Construction Material Management in Constr...
IRJET-  	  Efficient Techniques of Construction Material Management in Constr...IRJET-  	  Efficient Techniques of Construction Material Management in Constr...
IRJET- Efficient Techniques of Construction Material Management in Constr...IRJET Journal
 
Systematic Study of Factors Causing Cost Overrun and Delay in Pune Metro Line...
Systematic Study of Factors Causing Cost Overrun and Delay in Pune Metro Line...Systematic Study of Factors Causing Cost Overrun and Delay in Pune Metro Line...
Systematic Study of Factors Causing Cost Overrun and Delay in Pune Metro Line...ijtsrd
 
IRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction ProjectsIRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction ProjectsIRJET Journal
 
Comparative Assessment of Delay Analysis Approaches in a Road Project: A Case...
Comparative Assessment of Delay Analysis Approaches in a Road Project: A Case...Comparative Assessment of Delay Analysis Approaches in a Road Project: A Case...
Comparative Assessment of Delay Analysis Approaches in a Road Project: A Case...IRJET Journal
 
Risk Analysis and Strategic Evaluation of Procurement Process in Construction
Risk Analysis and Strategic Evaluation of Procurement Process in ConstructionRisk Analysis and Strategic Evaluation of Procurement Process in Construction
Risk Analysis and Strategic Evaluation of Procurement Process in ConstructionIRJET Journal
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET Journal
 
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...IRJET Journal
 
A REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRY
A REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRYA REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRY
A REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRYIRJET Journal
 
IRJET-Improving Effective Material Management by Identifying Common Factors i...
IRJET-Improving Effective Material Management by Identifying Common Factors i...IRJET-Improving Effective Material Management by Identifying Common Factors i...
IRJET-Improving Effective Material Management by Identifying Common Factors i...IRJET Journal
 
Factors Affecting Material Management on Construction Site
Factors Affecting Material Management on Construction SiteFactors Affecting Material Management on Construction Site
Factors Affecting Material Management on Construction SiteIRJET Journal
 
A STUDY ON THE QUALITATIVE ANALYSIS OF MATERIALS MANAGEMENT IN KERALA CONSTRU...
A STUDY ON THE QUALITATIVE ANALYSIS OF MATERIALS MANAGEMENT IN KERALA CONSTRU...A STUDY ON THE QUALITATIVE ANALYSIS OF MATERIALS MANAGEMENT IN KERALA CONSTRU...
A STUDY ON THE QUALITATIVE ANALYSIS OF MATERIALS MANAGEMENT IN KERALA CONSTRU...IRJET Journal
 
IRJET- Review on Study and Analysis of Various Automated Construction Mat...
IRJET-  	  Review on Study and Analysis of Various Automated Construction Mat...IRJET-  	  Review on Study and Analysis of Various Automated Construction Mat...
IRJET- Review on Study and Analysis of Various Automated Construction Mat...IRJET Journal
 
Factor Affecting Construction Cost and Time in road project
Factor Affecting Construction Cost and Time in road projectFactor Affecting Construction Cost and Time in road project
Factor Affecting Construction Cost and Time in road projectIRJET Journal
 
IRJET- Equipment Planning and Management in Road Construction Project
IRJET- Equipment Planning and Management in Road Construction ProjectIRJET- Equipment Planning and Management in Road Construction Project
IRJET- Equipment Planning and Management in Road Construction ProjectIRJET Journal
 
An integrated approach for enhancing ready mixed concrete utility using analy...
An integrated approach for enhancing ready mixed concrete utility using analy...An integrated approach for enhancing ready mixed concrete utility using analy...
An integrated approach for enhancing ready mixed concrete utility using analy...prjpublications
 

Semelhante a GIS based material management and supplier selection in Thane city – A case study (20)

IRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction ProjectIRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction Project
 
Development of a web based decision support system for materials selection in...
Development of a web based decision support system for materials selection in...Development of a web based decision support system for materials selection in...
Development of a web based decision support system for materials selection in...
 
IRJET- Supplier Selection and Material Management of Vasai-Virar City Municip...
IRJET- Supplier Selection and Material Management of Vasai-Virar City Municip...IRJET- Supplier Selection and Material Management of Vasai-Virar City Municip...
IRJET- Supplier Selection and Material Management of Vasai-Virar City Municip...
 
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET- 	  Assessment of Role of Material Management in Construction ProjectsIRJET- 	  Assessment of Role of Material Management in Construction Projects
IRJET- Assessment of Role of Material Management in Construction Projects
 
IRJET - A Review Paper on Effective Material Management to Minimize Probl...
IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...
IRJET - A Review Paper on Effective Material Management to Minimize Probl...
 
IRJET- Efficient Techniques of Construction Material Management in Constr...
IRJET-  	  Efficient Techniques of Construction Material Management in Constr...IRJET-  	  Efficient Techniques of Construction Material Management in Constr...
IRJET- Efficient Techniques of Construction Material Management in Constr...
 
Systematic Study of Factors Causing Cost Overrun and Delay in Pune Metro Line...
Systematic Study of Factors Causing Cost Overrun and Delay in Pune Metro Line...Systematic Study of Factors Causing Cost Overrun and Delay in Pune Metro Line...
Systematic Study of Factors Causing Cost Overrun and Delay in Pune Metro Line...
 
IRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction ProjectsIRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction Projects
 
Comparative Assessment of Delay Analysis Approaches in a Road Project: A Case...
Comparative Assessment of Delay Analysis Approaches in a Road Project: A Case...Comparative Assessment of Delay Analysis Approaches in a Road Project: A Case...
Comparative Assessment of Delay Analysis Approaches in a Road Project: A Case...
 
Risk Analysis and Strategic Evaluation of Procurement Process in Construction
Risk Analysis and Strategic Evaluation of Procurement Process in ConstructionRisk Analysis and Strategic Evaluation of Procurement Process in Construction
Risk Analysis and Strategic Evaluation of Procurement Process in Construction
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
 
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
 
A REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRY
A REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRYA REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRY
A REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRY
 
IRJET-Improving Effective Material Management by Identifying Common Factors i...
IRJET-Improving Effective Material Management by Identifying Common Factors i...IRJET-Improving Effective Material Management by Identifying Common Factors i...
IRJET-Improving Effective Material Management by Identifying Common Factors i...
 
Factors Affecting Material Management on Construction Site
Factors Affecting Material Management on Construction SiteFactors Affecting Material Management on Construction Site
Factors Affecting Material Management on Construction Site
 
A STUDY ON THE QUALITATIVE ANALYSIS OF MATERIALS MANAGEMENT IN KERALA CONSTRU...
A STUDY ON THE QUALITATIVE ANALYSIS OF MATERIALS MANAGEMENT IN KERALA CONSTRU...A STUDY ON THE QUALITATIVE ANALYSIS OF MATERIALS MANAGEMENT IN KERALA CONSTRU...
A STUDY ON THE QUALITATIVE ANALYSIS OF MATERIALS MANAGEMENT IN KERALA CONSTRU...
 
IRJET- Review on Study and Analysis of Various Automated Construction Mat...
IRJET-  	  Review on Study and Analysis of Various Automated Construction Mat...IRJET-  	  Review on Study and Analysis of Various Automated Construction Mat...
IRJET- Review on Study and Analysis of Various Automated Construction Mat...
 
Factor Affecting Construction Cost and Time in road project
Factor Affecting Construction Cost and Time in road projectFactor Affecting Construction Cost and Time in road project
Factor Affecting Construction Cost and Time in road project
 
IRJET- Equipment Planning and Management in Road Construction Project
IRJET- Equipment Planning and Management in Road Construction ProjectIRJET- Equipment Planning and Management in Road Construction Project
IRJET- Equipment Planning and Management in Road Construction Project
 
An integrated approach for enhancing ready mixed concrete utility using analy...
An integrated approach for enhancing ready mixed concrete utility using analy...An integrated approach for enhancing ready mixed concrete utility using analy...
An integrated approach for enhancing ready mixed concrete utility using analy...
 

Mais de AM Publications

DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...
DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...
DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...AM Publications
 
TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...
TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...
TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...AM Publications
 
THE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGN
THE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGNTHE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGN
THE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGNAM Publications
 
TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...
TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...
TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...AM Publications
 
USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...
USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...
USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...AM Publications
 
ANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISES
ANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISESANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISES
ANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISESAM Publications
 
REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS
REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS
REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS AM Publications
 
EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...
EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...
EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...AM Publications
 
HMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITION
HMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITIONHMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITION
HMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITIONAM Publications
 
PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...
PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...
PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...AM Publications
 
EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...
EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...
EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...AM Publications
 
UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...
UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...
UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...AM Publications
 
REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...
REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...
REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...AM Publications
 
OPTICAL CHARACTER RECOGNITION USING RBFNN
OPTICAL CHARACTER RECOGNITION USING RBFNNOPTICAL CHARACTER RECOGNITION USING RBFNN
OPTICAL CHARACTER RECOGNITION USING RBFNNAM Publications
 
DETECTION OF MOVING OBJECT
DETECTION OF MOVING OBJECTDETECTION OF MOVING OBJECT
DETECTION OF MOVING OBJECTAM Publications
 
SIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENT
SIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENTSIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENT
SIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENTAM Publications
 
PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...
PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...
PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...AM Publications
 
ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...
ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...
ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...AM Publications
 
A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY
A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY
A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY AM Publications
 

Mais de AM Publications (20)

DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...
DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...
DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...
 
TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...
TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...
TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...
 
THE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGN
THE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGNTHE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGN
THE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGN
 
TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...
TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...
TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...
 
USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...
USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...
USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...
 
ANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISES
ANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISESANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISES
ANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISES
 
REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS
REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS
REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS
 
EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...
EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...
EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...
 
HMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITION
HMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITIONHMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITION
HMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITION
 
PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...
PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...
PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...
 
INTELLIGENT BLIND STICK
INTELLIGENT BLIND STICKINTELLIGENT BLIND STICK
INTELLIGENT BLIND STICK
 
EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...
EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...
EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...
 
UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...
UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...
UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...
 
REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...
REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...
REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...
 
OPTICAL CHARACTER RECOGNITION USING RBFNN
OPTICAL CHARACTER RECOGNITION USING RBFNNOPTICAL CHARACTER RECOGNITION USING RBFNN
OPTICAL CHARACTER RECOGNITION USING RBFNN
 
DETECTION OF MOVING OBJECT
DETECTION OF MOVING OBJECTDETECTION OF MOVING OBJECT
DETECTION OF MOVING OBJECT
 
SIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENT
SIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENTSIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENT
SIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENT
 
PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...
PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...
PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...
 
ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...
ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...
ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...
 
A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY
A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY
A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY
 

Último

DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxnuruddin69
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfsmsksolar
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksMagic Marks
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stageAbc194748
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 

Último (20)

DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptx
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 

GIS based material management and supplier selection in Thane city – A case study

  • 1. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163 Volume 1 Issue 5 (June 2014) ttp://ijirae.com _________________________________________________________________________________________________ © 2014, IJIRAE- All Rights Reserved Page - 48 GIS based material management and supplier selection in Thane city – A case study Prashant V Thakare1 Dr Sumedh Y Mhaske2 Civil and Environmental Engineering Department Civil and Environmental Engineering Department Veermata Jijabai Technological Institute, Veermata Jijabai Technological Institute, Abstract — Materials are the inputs to the construction activity. Materials forms the single largest component of the total cost of the facility. Material cost being in the range of 50% to 60% of the total cost of the project. Improper supplier selection usually faces problems in price of material, delivery, communication, quality, timely availability of materials, etc. and its bad effect on the cost of project, so need of ideal supplier is for avoiding these problems and also cost overrun. There are several method for supplier selection and it can be possible to select ideal suppliers by using of those methods but these several traditional methods fails to collect information of all the suppliers with all their material correctly, also it takes too much time to collect such information manually. For supplier selection purpose requirement of all data about supplier like personal detail, cost of materials, quantity, quality, delivery services, location, communication facility, discount, transportation facility, experience, etc. and collecting these information would be less or no time consuming using data base. Hence GIS is very effective tool for data base management, GIS should be used for storing and quantifying all data of all suppliers and using these data easily screen all suppliers in very short time. By using GIS GRAM++ software, digitise map of study area, roads and locate location of suppliers, Then it is very easy to find out suppliers location, all detail information of suppliers, ideal suppliers and shortest route between supplier and construction site by developing queries in very short time. Keywords — Material management, supplier selection, GIS, GRAM++, Shortest path, GRAM Net I. INTRODUCTION Today, India is one of the fastest growing economy in the world. And the construction industry is an integral part of the growing economy. Material management plays an important role in construction industry and to select most ideal material in the required time, need of a best material supplier. And since because supply on demand is the backbone of material management, it becomes very important aspect in determination of success of any construction project [1]. A. Materials management Materials management is a process for planning, executing and controlling field and office activities in construction. The goal of materials management is to insure that construction materials are available at their point of use when needed. The materials management system attempts to insure that the right quality and quantity of materials are appropriately selected, purchased, delivered and handled on site in a timely manner and at a reasonable cost. Materials management is the system for planning and controlling all of the efforts necessary to ensure that the correct quality and quantity of materials are properly specified in a timely manner, are obtained at a reasonable cost and most importantly are available at the point of use when required. Thus Materials management is an important element in project management. Materials represent a major expense in construction, so minimizing procurement costs improves opportunities for reducing the overall project costs. Poor materials management can result in increased costs during construction. Efficient management of materials can result in substantial savings in project costs [1]. B. Supplier selection Supplier selection is substantial and forms the foundation for success or failure of construction projects. The significance of maintaining a strong relationship with suppliers to be competitive in today’s construction environment. Quality and cost of material procurement are two attributes that are directly affected by the material supplier selection process. In order to maintain both of these attributes, supplier selection should be well defined, in a way that decreases project logistics and supply chain management costs. Therefore supplier selection criteria should be well defined. Supplier selection is a multi-criteria decision making problem which includes both qualitative and quantitative considerations. A trade-off between tangible and intangible criteria is important in selecting the best supplier [4]. C. Critical success factors for supplier selection a) Quality of materials b) Quantity of materials c) Price of materials d) Availability of materials e) Delivery service f) Technical capability g) Financial strength
  • 2. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163 Volume 1 Issue 5 (June 2014) ttp://ijirae.com _________________________________________________________________________________________________ © 2014, IJIRAE- All Rights Reserved Page -49 h) Geographical Location i) Reputation j) Management and Organisation k) Other factors [6]. D. Major steps of supplier selection Step 1 - Identification of the need for a specific product Step 2 - Identify key sourcing requirements and criteria Step 3 - Determine sourcing strategy Step 4 - Identify potential supply sources Step 5 - Limit suppliers in selection pool Step 6 - Determine method for final selection Step 7 - Select suppliers and reach agreement [2]. II. GEOGRAPHICAL INFORMATION SYSTEM (GIS) A Geographic information system is a computer based system capable of capturing, storing, and analysing and displaying geographically referenced information; that identified according to location. Practitioners also define a GIS as including the procedures, operating personal and spatial data that goes into system. A GIS tool is used for mapping and analysing spatial data. GIS technology integrates common database operations such as query and statistical analysis with the unique visualization and geographic analysis benefits offered by maps [5]. A. Component of GIS Fig. 1 Component of GIS [5] B. Working of GIS GIS stores information about the world as a collection of thematic layers that can be linked together by geography. This simple but extremely powerful and versatile concept has proven invaluable for solving many real world problems from modelling global atmospheric circulation, to predicting rural land use, and monitoring changes in rainforest ecosystems. 1. Geographic references 2. Input of data 3. Map making 4. Manipulation of data 5. File management 6. Query and Analysis 7. Visualization [5]. III. CASE STUDY A. Study Region – Thane City The city of Thane is one of Maharashtra’s major industrial town and the district headquarters. The National Decennial Census 2011 pegged the population of the city at 1,818,872. The geographical jurisdiction of the Thane city spreads over an area of 128.23 sq. km. The city falls on latitude 720 50'12'' North with longitude 190 10'15'' East. B. Data Acquisition Total 130 major construction materials suppliers are available in Thane city region. The scope of materials was restricted to only sand and cement, owing to its importance and availability. Collection of data included personal information of suppliers like name and address, details of materials like cost, brand, quarry source, available stock, lead time, discount, transportation, guarantee for safety, replacement, test certificates, etc. The Thane city map was obtained from Thane Municipal Corporation (TMC) office, Pachpakhadi, Thane. GRAM++ software collected from IIT Bombay.
  • 3. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163 Volume 1 Issue 5 (June 2014) ttp://ijirae.com _________________________________________________________________________________________________ © 2014, IJIRAE- All Rights Reserved Page -50 IV.APPLICATION OF GIS MODEL A. Procedure for Database generation 1. Geo-registering of Thane city map Step 1: Create Thane city map file Step 2: Open image file of Thane city map Step 3: Add the tic marks to registered the map Step 4: Calculate error 2. Create different Layers in Thane city map a. External boundary layer of Thane city – Polygon Layer b. Roads network and Railway line Layers of Thane city – Segment Layer c. Supplier’s location Layer in Thane city – Point Layer 3. Digitization of all layers 4. Editing map 5. Polygon formation 6. Adding labels 7. Table creation of supplier’s location layer 8. Preparation of Data base of supplier’s data Fig. 2 Thane city opened in GRAM++ software and Geo-registered of Thane city map Fig. 3 Digitized map shows all layers and table creation of supplier location layer of supplier’s data. B. Generation of Queries The database file of Thane city map is used in vector GIS. The vector GIS contain vector query module, tin module, network module. Vector query module basically used for running query and find out best solution. Vector query is very important to Thane city map vector file. By run query find the more solution and that will more helpful for supplier selection process. By this query find out minimum cost of materials, available stock, lead time etc. in very few time. Also it is used to compare more suppliers and evaluate each suppliers.
  • 4. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163 Volume 1 Issue 5 (June 2014) ttp://ijirae.com _________________________________________________________________________________________________ © 2014, IJIRAE- All Rights Reserved Page -51 Query No. 1 Find out lead time of cement is 15 hrs and Condition for this query is “Lead_Time_Cement = 15” and result of this query is 11 out of 129 suppliers having lead time 15 hrs. This query is very important because information of lead time play an important role in delivery of materials and supplier selection process. It is very important when emergency requirement of material And this query and data gives solution in very less time. Fig. 4 Detail of Query no. 1 Query no.2 Find out multiple characters of suppliers in one click, use of multiple condition i.e. “Cost of sand < 7300 and lead time <= 24 and query source = Gaymukh and discount = Yes” and result of this query is 6 out of 129 suppliers coming under this condition. This query is important to finding out multiple characters of suppliers in one click. This query gives better idea for ideal supplier as per requirement. Fig. 5 Detail of Query no. 2 Query no. 3 Find out detail information of any one supplier in one click, for this condition of query is “Name of shop = Daksha Traders” and result of this query shows exactly that supplier with location and all detail information. Fig. 6 Detail of Query no. 3
  • 5. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163 Volume 1 Issue 5 (June 2014) ttp://ijirae.com _________________________________________________________________________________________________ © 2014, IJIRAE- All Rights Reserved Page -52 C. GRAM Network GRAM Network is used for to find out shortest route between construction site and suppliers location and to find out nearest and best suppliers among more suppliers. Fig. 7 Image shows finding best of three suppliers by using best supply node operation in GRAM Net. Fig. 8 Combine layers of roads layer and supplier’s location layer and find out shortest route between source and destination using shortest route operation V. RESULT 1. The result of project is there are many method for evaluation and selection of suppliers but all method required all data of suppliers every time. Collection of all data is time consuming process compare to use stored data in GIS. 2. Vector queries gives very helpful and very useful result. Its shows and categorised suppliers data as per requirement and as per condition in very short time. So it helps to reduce the time of supplier selection process and also helps to select best supplier. 3. Gram Network gives best solution for select nearest best suppliers. It also help for finding shortest route between supplier’s location and construction site location. VI.CONCLUSION Excellent performance of material suppliers is most essential for the smooth obtaining of materials. Supplier evaluation and selection is a usual main issue. The multi-criteria signify both qualitative and quantitative characteristics. Construction company would be able to make the appropriate decision using a tool which is interactive, reliable and affordable. GIS tool is very effective to avoid those problems in very short time to create for supplier selection. And which is very helpful to integrate and categorised supplier’s data. ACKNOWLEDGMENT I would like to Thanks Thane Municipal Corporation (TMC) Pachpakhadi, Thane for providing Thane city map. I would like to thanks all suppliers for their support for providing data related to construction materials. Also I would like to thanks IIT Bombay for providing the software needed to carry out the study.
  • 6. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163 Volume 1 Issue 5 (June 2014) ttp://ijirae.com _________________________________________________________________________________________________ © 2014, IJIRAE- All Rights Reserved Page -53 REFERENCES [1] Prof. Chetna M. Vyas, K.V. Patel, 2008, “Construction Materials Management on Project Sites.” [2] Don Amila Sajeevan Samarasinghe, John E Tookey, James Olabode Bamidele Rotimi, and Sivadass Thiruchelvam, 2012, “Supplier Selection in the Construction Material Purchasing Function.” [3] Bayazit O., Karpak B. & Yagci A., 2006, “A purchasing decision: Selecting a supplier for a construction company.” Journal of Systems Science and Systems Engineering, vol. 15, no. 2, pp. 217-231. [4] Mendoza A., 2007, “Effective methodologies for supplier selection and order quantity allocation.” PhD thesis, The Pennsylvania State University, Pennsylvania. [5] Kang tsung Chang, 2006, “Introduction to Geographic Information Systems.” [6] Yong L., Qi W., (2012) “Case study of optimal material supplier selection by the Value Engineering Theory” Key Engineering Materials, pp. 887-891. [7] Chen X., Zhou XF., Zhang Y., (2011) “Research on building engineering materials supplier selection based on ANP method” Key Engineering Materials, pp. 474-476. [8] Pi W., Low C., (2005) “Supplier evaluation and selection using Taguchi loss functions” The International Journal of Advanced Manufacturing Technology, vol. 26, no. 1-2, pp. 155-160. [9] Ho C., Nguyen P., (2007) “Supplier evaluation and selection criteria in the construction industry of Taiwan and Vietnam” International journal of information and management sciences, vol. 18, pp. 403-426. [10] Aretoulis G.N., Kalfakakou G.P., Striagka F.Z., 2009, “Construction material supplier selection under multiple criteria.” Operational Research, vol. 10, no. 2, pp. 209-230.