How an intelligent infrastructure
reduces operating costs and
improves patient care
Graeme Robertson
Global Business Development Director,
Healthcare Solutions, Schneider Electric
Key Elements of an Intelligent
Infrastructure
                                                          HVAC Controls/BMS               ICT/Data Centre




                                      Operating Theatre    OT                         Power Infrastructure


                                                                              Medical Wards
                             Life Safety Systems



                                Integrated Security                                Enterprise Management

                                                  Lighting Control




Schneider Electric - Division - Name – Date                                                                  2
Key Technologies


                                                              Noise Monitoring Systems


                                                                                         Infection Control Systems
                                   Staff Support Systems




                                              Visitor Management

                                                                              Patient Healing Environment



Schneider Electric - Division - Name – Date                                                                     3
Intelligent Interoperation
                       Lighting Control       Integrated Security   Integrated Building         Data Centre
                                                                                                                     Operating Theatre
                           System                  Systems              Automation             Infrastructure

                          Dimmer units              IP CCTV            HVAC controls          Power distribution     Electrical distribution
                       Lighting controllers      Access control       Utilities metering             UPS
                       Room switch units                                                                                      IPS
                                                   Staff attack      Pred maintenance        In-row cooling units
                          Multi sensors                                                                                      UPS
                                                 Infant tagging              SCADA            Integrated security
                                                                                                                        Surgeons panel
                          Scene setting
                          RFID LOCATION          Video intercom               M&T               Room cooling          RFID LOCATION
                                                                                                                        Environmental
                        External lighting
                              SYSTEM           Intruder detection                               Energy reclaim            SYSTEM




                                              Hospital Intelligent Technology Infrastructure




                          RFID LOCATION                                                                                    Servers
                                                                                                                      RFID LOCATION
                                                                    HV/ MV / LV switchgear
                                                                                             24/ 7 remote services       SYSTEM
                             SYSTEM
                           Fire alarm             Nurse call                                                           Video recording
                                                                                               Energy modeling
                       Emergency lighting      Bedhead services        Transformers                                     POE switches
                                                Entertainment                                    Bill validation
                         Public address                             Generator integration                                 Firewalls
                                                 RFID systems                                    Energy pricing
                        Voice evacuation                              Busbar trunking                                  Quality of service
                                                                                                 Load shedding
                         Fire dampers            Environment             Distribution                                   Digital signage
                                                                                              Maximum demand

                         Fire Safety                                     Electrical              Energy
                                                Medical Areas                                                                ICT
                          Systems                                       Distribution           Management




Schneider Electric - Division - Name – Date                                                                                                    4
Integration – Infant Abduction
     HVAC Controls/BMS                          Power Infrastructure   Integrated Security   Lighting Control




                                                                                                            Bed
Elevators
                                                                                                          Services




  Car Park Management                                   24/7 Remote Management               Nurse Call & RTLS
  Schneider Electric - Division - Name – Date                                                                    5
Integration – Life Safety
     HVAC Controls/BMS                          Power Infrastructure   Integrated Security   Lighting Control




                                                                                                            Bed
Elevators
                                                                                                          Services




  Car Park Management                                   24/7 Remote Management               Nurse Call & RTLS
  Schneider Electric - Division - Name – Date                                                                    6
Integration – Patient Room
     HVAC Controls/BMS                          Power Infrastructure   Integrated Security   Lighting Control




                                                                                                            Bed
Elevators
                                                                                                          Services




  Car Park Management                                   24/7 Remote Management               Nurse Call & RTLS
  Schneider Electric - Division - Name – Date                                                                    7
Integration – Operating Room
     HVAC Controls/BMS                          Power Infrastructure   Integrated Security   Lighting Control




                                                                                                            Bed
Elevators
                                                                                                          Services




  Car Park Management                                   24/7 Remote Management               Nurse Call & RTLS
  Schneider Electric - Division - Name – Date                                                                    8
Integration – Asset Management
     HVAC Controls/BMS                          Power Infrastructure   Integrated Security   Lighting Control




                                                                                                            Bed
Elevators
                                                                                                          Services




  Car Park Management                                   24/7 Remote Management               Nurse Call & RTLS
  Schneider Electric - Division - Name – Date                                                                    9
Human Interaction                                                  Executive


                   Executive View
                                                                                                                                                Dashboards
                                                                   Reporting




                                                                                              Hospital Intelligent Technology Infrastructure
                                                                   KPI reports
                                                                 Energy efficiency
                                                                   environment                                                                  Energy efficiency
                                                                  Staff efficiency
                                                                 Security overview
                   Operational View




                                                                                                                                                                      Operating
                                          Fire Panel             Nurse Station                                                                  Patient Panel
                                                                                                                                                                       Theatre

                                                                   Environment                                                                   Environment
                                                                  Lighting control                                                              Lighting control      UPS status
                                            Fire alarms
                                                                     Nurse call                                                                    Nurse call        Environmental
                                        Fireman's override
                                                                  Security RFID                                                                     Internet          Alarm status
                                                                     Intercom                                                                    entertainment

                                                             Hospital Intelligent Technology Infrastructure
                   Expert Monitoring




                                          Energy                  Building                                                                       Security
                                                                                                                                                                     Data Centre
                                        Management               Management                                                                     Management
                     and Control




                                          24/7 remote              Maintenance
                                                                                                                                                   Security            Operations
                                             services                 SCADA
                                                                                                                                                Video analytics       management
                                        Energy modeling           Environmental
                                                                                                                                                Access control      Energy efficiency
                                          Bill validation         Lighting control
                                                                                                                                                 Safety control         Network
                                         Load shedding                  M&T
                                                                                                                                                     M&T             Remote access
                                        Maximum demand            Remote access


                                          Building                  Lighting                                                                     Integrated           Operating
                                         Automation                 Control                                                                       Security             Theatre
                                                                   Dimmer units                                                                     IP CCTV
                                                                                                                                                                       Electrical
                                         HVAC controls              Controllers                                                                  Access control
                                                                                                                                                                      distribution
                   Integrated Systems




                                        Utilities metering       Room switch units                                                                 Staff attack
                                                                                                                                                                          IPS
                                        Room controllers           Multi sensors                                                                 Infant tagging
                                                                                                                                                                         UPS
                                         Control panels            Scene setting                                                                 Video intercom
                                                                                                                                                                    Surgeon’s panel
                                                                  External lighting                                                                  Intruder


                                          Electrical              Data Centre                                                                    Life Safety
                                                                                             ICT                                                                    Medical Areas
                                         Distribution            Infrastructure                                                                   Systems
                                                                  Power distribution       Servers                                                                     Nurse call
                                           Switchgear                                                                                              Fire alarm
                                                                         UPS             Digital video                                                              Bedhead services
                                          Transformers                                                                                         Emergency lighting
                                                                    In-row cooling      POE switches                                                                 Entertainment
                                           Generators                                                                                            Public address
                                                                 Integrated security       Firewalls                                                                  RFID location
                                         Busbar trunking                                                                                        Voice evacuation
                                                                    Room cooling       Quality of service                                                               systems
                                           Plug & play                                                                                           Fire dampers
                                                                   Energy reclaim       Digital signage                                                               Environment

Schneider Electric - Division - Name – Date                                                                                                                                             10
Healing Environment




Patient Environment                            Staff Environment
      •Reduce Patient Falls                        •Facilitate Hand Cleaning
      •Provide Access to Daylight & Views          •Increase Patient Visibility
      •Improve Indoor Air Quality                  •Reduce Travel Distances
      •Consider Ergonomics/ Accessibility          •Provide Appropriate Lighting
      •Reduce Infection Risk                       •Provide Easy Access to
      •Reduce Noise                                Information
                                                   •Create Restorative Spaces

 Schneider Electric - Division - Name – Date                                   11
Reduce Airborne Infections - UVC




Schneider Electric - Division - Name – Date   12
Efficient Fluid Power
                                              Damper
                                                         Filter     Cooling coil    UVC


    Outside air
    contains
    viruses,
    bacteria, mold
    spores, and
    VOCs


                                                             Spores        UVC EmittersTM destroy      Clean Air
                                                         reproduce in      mold, bacteria, viruses,   supplied to
                                                         filter, cooling    and VOCs preventing        building
                                                       coil and drip pan    them from the airflow
                                                         reducing coil        and increases coil
                                                            efficiency            efficiency

                     99% Kill rate of                                  77% Increase in
                airborne pathogens                                          Cooling Coil
                                                                             Efficiency
Schneider Electric - Division - Name – Date                                                                         13
Case Study
Ultra Violet Air Treatment

Before and after study for the
installation of UVC emitters in
all hospital air systems
conducted in October 2010.

                                        Cooling Coil
                                        Efficiency
                                        Improvement 77%


                                       Bacteria Reduction 99%



                                        Return on Investment 15   months

Schneider Electric - Division - Name – Date                                14
UVC Study Results


BEFORE                                             AFTER




                       BOTTOM OF COOLING COIL




                                                   AFTER
BEFORE




                                   DAMPER BLADES
Schneider Electric - Division - Name – Date                15
Automatic Hand Hygiene Monitoring




                                              67% reduction in hospital-
                                                 acquired infections


Schneider Electric - Division - Name – Date                                16
Case Studies
                               Automatic Hand Hygiene Compliance Monitoring




                                                         1000% increase in hand hygiene
                                                         observations

                                              Compliance levels maintained above 90% for all
                                              working shifts

                                  HAI’s (Healthcare Associated Infections) reduced by
                                  67% in following 3 years after installation

Schneider Electric - Division - Name – Date                                                    17
Case Studies
                               Automatic Hand Hygiene Compliance Monitoring




          The Hawthorne Effect:
          “The tendency to perform or
          perceive differently when one
          knows they are being observed”



Schneider Electric - Division - Name – Date                                   18
Infection control – auto flushing
   Hygienic flushing unit links to the Schneider Electric intelligent hospital
   infrastructure:

                            Hospital intelligent
                              infrastructure

                                                   H.F.U




                                       H.F.U




                                                           Each hygienic flushing unit
                                                           incorporates intelligent valve
                                                           technology with temperature
                                                           and volume control.

Schneider Electric - Division - Name – Date                                                 19
Case Study
Automatic Hygienic Flushing

Cold water supply acts as heat
sink for building
40% reduction in legionella
bacteria in existing hospital –
Liverpool Broadgreen Study.
100% elimination of legionella
bacteria in Manchester Hospital –
2 year study



                                              Water Savings due to elimination
                                              of unnecessary flushing



Schneider Electric - Division - Name – Date                                      20
Integrated Infection Control


                     UVC anti-bacterial          Automatic hand
                     air treatment               hygiene monitoring




                                                       Wireless monitored
                                                         hand sanitizer

       Automatic
      Anti-bacterial
      Flushing Unit




                                              Staff base human
                                              machine interface
Schneider Electric - Division - Name – Date                                 21
Patient Micro Climate
   •Contamination
   •Air quality
   •Smoke detection
   •Temperature
   •Humidity
                                                                   Lighting control




    •Autoblinds
    •Daylight control




•Touchpad interface
•Internet
                                                                           Nurse call
•Telephone
•TV/Radio
•Room controls


                                                                 Staff base human
                                                 Ambient noise   machine interface
   Schneider Electric - Division - Name – Date                                          22
Case Study
Patient Micro Climate Control

270 bed hospital installed
effective control and monitoring
of patient room environment
including lighting and solar blind
configuration to increase amount
of natural light received by
patients.
Patients with increased natural
light:
1. Reported less perceived
stress, resulting in 20% less
pain medication costs.
2. Had a reduced Average
Length of Stay (ALOS)

Schneider Electric - Division - Name – Date   23
Hospital Noise and Sleep Fragmentation
                              John Hopkins Hospital USA



•
                                         50%
                                         increase
    Night                                            60
    Sound
    Level                          40
    dB(A)




                                 1960               2010


                                                      Noise Effects:
                                                      •Lower oxygen saturation
                                                      •Higher respiratory rate
                                                      •Higher blood pressure
                                                      •Faster heart rate
                                                      •Slower weight gain
                                                      •Impaired sleep

      Schneider Electric - Division - Name – Date                                24
Noise Monitoring
                                                                                               Display Unit




                                                                                         Control Unit

                External
               Microphone

                                              Hospital Intelligent Technology Infrastructure


Schneider Electric - Division - Name – Date                                                                   25
Case Study
Noise Monitoring
Study of noise monitoring and
1.5 hours per day mandatory
quiet time:
• TV’s & music only via noise
cancelling headphones
• Limited staff movement
• Visitor restrictions
Results:
1. 50% reduction in noise levels
2.Patients twice as likely to
gain undisturbed sleep
3. Positive effect on patient blood
pressure, pain experience and
emotional wellbeing.
Schneider Electric - Division - Name – Date   26
Case Study - Quiron Hospital, Madrid
   HVAC Controls/BMS                          Power Infrastructure   Integrated Security   Lighting Control




                                                      24/7 Remote Management
Schneider Electric - Division - Name – Date                                                                   27
Case Study - Quiron Hospital, Madrid
   HVAC Controls/BMS                          Power Infrastructure   Integrated Security   Lighting Control




                                        Energy Efficient Installation &
                                        Intelligent Functionality for lighting

                                       Reduced power losses and
                                       improved power quality

                                       Efficiency based HVAC control for
                                       central plant and ventilation

                                       Extensive sub metering and 24/7
                                       enterprise energy management



                                                      24/7 Remote Management
Schneider Electric - Division - Name – Date                                                                   28
Case Study - Quiron Hospital, Madrid
   HVAC Controls/BMS                          Power Infrastructure   Integrated Security   Lighting Control




                                                                 ENERGY
                                                                 SAVING

                                                                 CAPEX
                                                                 SAVING



                                                      24/7 Remote Management
Schneider Electric - Division - Name – Date                                                                   29
Case Study – Skane Hospitals Sweden
   HVAC Controls/BMS                          Power Infrastructure    Integrated Security   Lighting Control




          Staff Training                                                                         Water
                                                                                               Management

                                       Kristianstad            Lund           Helsingborg
                                        120,479 m2          191,296 m2        131,970 m2




                                         Performance Assurance        24/7 Remote Management

Schneider Electric - Division - Name – Date                                                                    30
Case Study – Skane Hospitals Sweden
   HVAC Controls/BMS                          Power Infrastructure   Integrated Security   Lighting Control



                                      Energy Efficient Installation &
                                      Intelligent Functionality for lighting
                                      Reduced power losses and
                                      improved power quality
                                      Efficiency based HVAC control for
                                      central plant and ventilation
          Staff Training              Extensive sub metering and 24/7                           Water
                                      enterprise energy management                            Management
                                      Intelligent integrated water saving
                                      technology installed throughout
                                      Performance assurance service
                                      with predictive maintenance


                                         Performance Assurance       24/7 Remote Management

Schneider Electric - Division - Name – Date                                                                   31
Case Study – Skane Hospitals Sweden
   HVAC Controls/BMS                          Power Infrastructure   Integrated Security   Lighting Control


                        Savings District Heating            Dist       Dist       Elec     Elec %
                        & Electricity                       Htg       Htg %      MWh/yr
                                                           MWh/yr
                        Lund                                7,860      27%        207         13%

                        Helsingborg                         4,984      26%        1,343       8%

                        Kristianstad                        6,298      30%        116         8%

                        Overall                            19,142     28%        1,666        9%




          Staff Training                                                                        Water
                                                                                              Management
                                                  Overall Water Savings 56,000m³/yr




                                         Performance Assurance       24/7 Remote Management

Schneider Electric - Division - Name – Date                                                                   32
Efficient Data Centre/Server Rooms
     Heat recovery                             In row cooling




Reduced Floor Area




 Schneider Electric - Division - Name – Date                    33
Dynamic Simulation – Pilot Study

A pilot study was conducted using a standard building design model and
applying Schneider Electric’s EcoStruxure for energy efficiency design
measures at neutral capital cost impact.

                   Standard Design




Schneider Electric - Division - Name – Date                              34
Pilot Study Building Data

 Building Type & Location                     Acute Hospital, London, UK
 Number of Beds                               400
 Number of Floors                             7
 Building Floor Area                          36,384m²
 Building Conditioned Volume                  145,536m³
 Configuration                                Energy & Ventilation Plant Roof Mounted
                                              Floors – mix single, 4bed & 6 bed wards
                                              Operating Theatres & departments
 Design Parameters                            Compliant to current building regulations




Schneider Electric - Division - Name – Date                                               35
Energy Saving Design Features
                                                   ADVANCED METERING AND
                                                    ENERGY MANAGEMENT
                              HIGH EFFICIENCY
                            SMART ELECTRICAL                               EFFICIENCY BASED
                                  POWER                                    BUILDING SERVICES
                             INFRASTRUCTURE                                    CONTROL
• Power Quality                                                                           • Main Energy Plant
• Reduced Losses                                                                          • Ventilation Plant
• Power Management                                                                        • DDC Terminal Control




• Energy Alarms                                                                            • HVAC Set Back
• Advanced Analysis                                                                        • Power De-energisation
• Corrective Actions                                                                       • Lighting switch off

                               24/7 REMOTE                                 OCCUPANCY BASED
                            SPECIALIST ENERGY                               INTEROPERATION
                                ANALYSIS
                                                       INTELLIGENT LOW
                                                       ENERGY LIGHTING
                                                           CONTROL


     Schneider Electric - Division - Name – Date                                                             36
Dynamic Simulation Results



                                                  Total Energy: Typical v. Proposed
                                                                                                Total Energy (MWh)
                                                                                                Hospital Typical
          7000.00
          6000.00                                                                               Total Energy (MWh)
          5000.00                                                                               Hospital Proposed
    MWh




          4000.00

          3000.00
          2000.00
          1000.00
             0.00
                    1         2         3     4   5      6     7     8      9    10   11   12
                                                         Months
                         Typical – 43,607 MWh/year
                         Proposed – 29,552 MWh/year


Schneider Electric - Division - Name – Date                                                                          37
Dynamic Simulation Results

                                                           Lighting Energy



      200.00
                                                                                            Hospital Typical
      180.00
      160.00

      140.00

      120.00                                                                                Hospital Proposed
MWh




      100.00
       80.00

       60.00

       40.00
       20.00

        0.00
               1       2         3            4   5   6    7    8      9     10   11   12
                                                      Months




Schneider Electric - Division - Name – Date                                                                     38
Dynamic Simulation Results

                                                      Total Gas: Typical v. Proposed




         6,000.00


         5,000.00                                                                            Hospital Typical

         4,000.00
   MWh




                                                                                             Hospital Proposed
         3,000.00


         2,000.00


         1,000.00


            0.00
                    1       2        3        4   5   6     7     8     9    10    11   12
                                                       Months




Schneider Electric - Division - Name – Date                                                                      39
Dynamic Simulation Results

                                                  Total Electricity: Typical v. Proposed



              1,600.00

              1,400.00

              1,200.00

              1,000.00
        MWh




               800.00                                                                           Hospital Typical

               600.00                                                                           Hospital Proposed

               400.00

               200.00

                  0.00
                         1       2        3   4   5     6     7     8     9    10    11    12
                                                        Months




Schneider Electric - Division - Name – Date                                                                         40
Holistic Infrastructure Model
                                                                          • Department
                                                                            KPI’s
                                                                          • Process                      • Patient KPI’s • Building +
               Data centre                                                  efficiency    • Hospital KPI • Process         environment +
               • Electronic                                                 data sheets     dashboard      analysis tools asset dashboards




                                              Infrastructure Management
                 health records
               • X-ray
               • Diagnostic data



                                              level          level




                                                                                   Intelligent Technology Infrastructure
                                                 Facility level




                                                                          Admissions Procedures           Recovery         Discharge             Home
               Doctor’s surgery
                                                                          • Wireless      • Data input    • Environment      • Data input        • Telecare
                                                                            devices       • Tracking      • Measurement • Patient satisfaction
                                                                          • Data input    • Measurement   • Patient control • Measurements of
                                                                                                          • Infection control performance

Schneider Electric - Division - Name – Date                                                                                                                   41
Design Considerations - Delivery
                                                   Ability to impact cost and functional capabilities
              Design Effort / Effect



                                                                                                                           Cost of design
                                                                                                                           changes

                                              IPD process


                                                                                                            Traditional process




                                          Pre-design       Schematic     Design       Construction      Agency permit/   Construction
                                                            design     development     documents             bidding
                                       Conceptualization    Criteria     Detailed    Implementation          Agency      Construction
                                                            design        design       documents         coordination/
                                                                                                          final buyout

                                                           IPD – Integrated Project Delivery
 Schneider Electric - Division - Name – Date                                                                                                42
Summary

Five main reasons why an intelligent infrastructure
  should be installed in hospitals: -
  1. Improve Patient Care
  2. Improve Staff Prodcutivity
  3. Improve Adaptability & Future Proofing of the
     Facility
  4. Reduce Life Cycle Costs
  5. Reduce Waste


Schneider Electric - Division - Name – Date           43

Mais conteúdo relacionado

Mais procurados

Telecom argentina datacenters
Telecom argentina datacentersTelecom argentina datacenters
Telecom argentina datacentersMario Lostri
 
Grid optimization through intelligent control
Grid optimization through intelligent controlGrid optimization through intelligent control
Grid optimization through intelligent controlEchelon Corporation
 
CM4 Four-Point Continuous Monitor
CM4 Four-Point Continuous MonitorCM4 Four-Point Continuous Monitor
CM4 Four-Point Continuous Monitorro19hit
 
Two-node Co2 sensor network
Two-node Co2 sensor networkTwo-node Co2 sensor network
Two-node Co2 sensor networkClinton Smith
 
Starnberger internet of things droidcon berlin 2013i
Starnberger internet of things droidcon berlin 2013iStarnberger internet of things droidcon berlin 2013i
Starnberger internet of things droidcon berlin 2013iDroidcon Berlin
 
ICT in SMPK 4
ICT in SMPK 4ICT in SMPK 4
ICT in SMPK 4k4_ict
 
Enhancing Facility Performance | Maximizing Investments | Reducing Utility
Enhancing Facility Performance | Maximizing Investments | Reducing UtilityEnhancing Facility Performance | Maximizing Investments | Reducing Utility
Enhancing Facility Performance | Maximizing Investments | Reducing UtilityCenter for Sustainable Energy
 
WiFi new generation par Guy PUJOLLE - Fevrier 2013
WiFi new generation par Guy PUJOLLE - Fevrier 2013WiFi new generation par Guy PUJOLLE - Fevrier 2013
WiFi new generation par Guy PUJOLLE - Fevrier 2013Yves-Alain STORY
 
Automated systems
Automated systemsAutomated systems
Automated systemsIRC
 
Residential Surge Protection 3
Residential Surge Protection 3Residential Surge Protection 3
Residential Surge Protection 3Sakshi Vashist
 
Analog to-digital conversion, 2e
Analog to-digital conversion, 2eAnalog to-digital conversion, 2e
Analog to-digital conversion, 2eSpringer
 

Mais procurados (17)

Surge Trifold_UK
Surge Trifold_UKSurge Trifold_UK
Surge Trifold_UK
 
Telecom argentina datacenters
Telecom argentina datacentersTelecom argentina datacenters
Telecom argentina datacenters
 
Grid optimization through intelligent control
Grid optimization through intelligent controlGrid optimization through intelligent control
Grid optimization through intelligent control
 
CM4 Four-Point Continuous Monitor
CM4 Four-Point Continuous MonitorCM4 Four-Point Continuous Monitor
CM4 Four-Point Continuous Monitor
 
Company overview 130405
Company overview 130405Company overview 130405
Company overview 130405
 
Two-node Co2 sensor network
Two-node Co2 sensor networkTwo-node Co2 sensor network
Two-node Co2 sensor network
 
Starnberger internet of things droidcon berlin 2013i
Starnberger internet of things droidcon berlin 2013iStarnberger internet of things droidcon berlin 2013i
Starnberger internet of things droidcon berlin 2013i
 
Xu100
Xu100Xu100
Xu100
 
ICT in SMPK 4
ICT in SMPK 4ICT in SMPK 4
ICT in SMPK 4
 
Multiparametrico
MultiparametricoMultiparametrico
Multiparametrico
 
Cap 320
Cap 320Cap 320
Cap 320
 
Enhancing Facility Performance | Maximizing Investments | Reducing Utility
Enhancing Facility Performance | Maximizing Investments | Reducing UtilityEnhancing Facility Performance | Maximizing Investments | Reducing Utility
Enhancing Facility Performance | Maximizing Investments | Reducing Utility
 
WiFi new generation par Guy PUJOLLE - Fevrier 2013
WiFi new generation par Guy PUJOLLE - Fevrier 2013WiFi new generation par Guy PUJOLLE - Fevrier 2013
WiFi new generation par Guy PUJOLLE - Fevrier 2013
 
Automated systems
Automated systemsAutomated systems
Automated systems
 
Residential Surge Protection 3
Residential Surge Protection 3Residential Surge Protection 3
Residential Surge Protection 3
 
Kdc100
Kdc100Kdc100
Kdc100
 
Analog to-digital conversion, 2e
Analog to-digital conversion, 2eAnalog to-digital conversion, 2e
Analog to-digital conversion, 2e
 

Destaque

PDC_2009_Samehanded Study
PDC_2009_Samehanded StudyPDC_2009_Samehanded Study
PDC_2009_Samehanded StudyUpali Nanda
 
Reducing Electrical Control Panel Size
Reducing Electrical Control Panel SizeReducing Electrical Control Panel Size
Reducing Electrical Control Panel SizeCMA/Flodyne/Hydradyne
 
Performing mensuration and calculation
Performing mensuration and calculationPerforming mensuration and calculation
Performing mensuration and calculationNorman Polilin
 
MCC PANEL WIRING, GA and BOM Sample
MCC PANEL WIRING, GA and BOM SampleMCC PANEL WIRING, GA and BOM Sample
MCC PANEL WIRING, GA and BOM SampleShashi Kant
 
Schneider Electric Innovation Summit 2016.pptx
Schneider Electric Innovation Summit 2016.pptxSchneider Electric Innovation Summit 2016.pptx
Schneider Electric Innovation Summit 2016.pptxSchneider Electric
 
Schneider electric strategy presentation
Schneider electric strategy presentationSchneider electric strategy presentation
Schneider electric strategy presentationbkaur11
 
Schneider Electric Smart energy Presentation - Smart Gird domains
Schneider Electric Smart energy Presentation - Smart Gird domainsSchneider Electric Smart energy Presentation - Smart Gird domains
Schneider Electric Smart energy Presentation - Smart Gird domainsSchneider Electric India
 
Simulation Techniques
Simulation TechniquesSimulation Techniques
Simulation Techniquesmailrenuka
 
2015 Healthcare IT Vision: Top 5 eHealth Trends
2015 Healthcare IT Vision: Top 5 eHealth Trends2015 Healthcare IT Vision: Top 5 eHealth Trends
2015 Healthcare IT Vision: Top 5 eHealth Trendsaccenture
 
10 Tech Trends in Healthcare
10 Tech Trends in Healthcare10 Tech Trends in Healthcare
10 Tech Trends in HealthcareVala Afshar
 

Destaque (20)

PDC_2009_Samehanded Study
PDC_2009_Samehanded StudyPDC_2009_Samehanded Study
PDC_2009_Samehanded Study
 
서비스매뉴얼 택시
서비스매뉴얼 택시서비스매뉴얼 택시
서비스매뉴얼 택시
 
Reducing Electrical Control Panel Size
Reducing Electrical Control Panel SizeReducing Electrical Control Panel Size
Reducing Electrical Control Panel Size
 
Meters and measurements
Meters and measurements  Meters and measurements
Meters and measurements
 
Performing mensuration and calculation
Performing mensuration and calculationPerforming mensuration and calculation
Performing mensuration and calculation
 
Simulation PowerPoint
Simulation PowerPointSimulation PowerPoint
Simulation PowerPoint
 
Earthing
EarthingEarthing
Earthing
 
MCC PANEL WIRING, GA and BOM Sample
MCC PANEL WIRING, GA and BOM SampleMCC PANEL WIRING, GA and BOM Sample
MCC PANEL WIRING, GA and BOM Sample
 
Schneider Electric Innovation Summit 2016.pptx
Schneider Electric Innovation Summit 2016.pptxSchneider Electric Innovation Summit 2016.pptx
Schneider Electric Innovation Summit 2016.pptx
 
Schneider electric strategy presentation
Schneider electric strategy presentationSchneider electric strategy presentation
Schneider electric strategy presentation
 
Schneider Electric Smart energy Presentation - Smart Gird domains
Schneider Electric Smart energy Presentation - Smart Gird domainsSchneider Electric Smart energy Presentation - Smart Gird domains
Schneider Electric Smart energy Presentation - Smart Gird domains
 
Simulation
SimulationSimulation
Simulation
 
Medical Technology Innovation Techniques & Funding
Medical Technology Innovation Techniques & FundingMedical Technology Innovation Techniques & Funding
Medical Technology Innovation Techniques & Funding
 
Control Panel
Control PanelControl Panel
Control Panel
 
Panel designing
Panel designingPanel designing
Panel designing
 
Simulation Techniques
Simulation TechniquesSimulation Techniques
Simulation Techniques
 
SIMULATION
SIMULATIONSIMULATION
SIMULATION
 
2015 Healthcare IT Vision: Top 5 eHealth Trends
2015 Healthcare IT Vision: Top 5 eHealth Trends2015 Healthcare IT Vision: Top 5 eHealth Trends
2015 Healthcare IT Vision: Top 5 eHealth Trends
 
10 Tech Trends in Healthcare
10 Tech Trends in Healthcare10 Tech Trends in Healthcare
10 Tech Trends in Healthcare
 
Simulation Powerpoint- Lecture Notes
Simulation Powerpoint- Lecture NotesSimulation Powerpoint- Lecture Notes
Simulation Powerpoint- Lecture Notes
 

Semelhante a How intelligent infrastructure reduces operating costs and improves patient care slideshare

Cisco Connected Grid Solutions
Cisco Connected Grid SolutionsCisco Connected Grid Solutions
Cisco Connected Grid SolutionsAmos Simoes
 
TRADOC OE Ian Pearson--Future Presentation
TRADOC OE Ian Pearson--Future PresentationTRADOC OE Ian Pearson--Future Presentation
TRADOC OE Ian Pearson--Future PresentationUS Army TRADOC G2
 
Cfd presentation customer version
Cfd presentation customer versionCfd presentation customer version
Cfd presentation customer versionMarty Hayman
 
Centros de contacto: las demandas y requerimientos del mercado
Centros de contacto: las demandas y requerimientos del mercadoCentros de contacto: las demandas y requerimientos del mercado
Centros de contacto: las demandas y requerimientos del mercadoMundo Contact
 
09 05 26 Hd Offering 09
09 05 26  Hd Offering 0909 05 26  Hd Offering 09
09 05 26 Hd Offering 09davidpslow
 
Blaze automation _ rfid technologies
Blaze automation _ rfid technologiesBlaze automation _ rfid technologies
Blaze automation _ rfid technologiesBlaze_Hyd
 
[M2M-Frukostseminarium] Richard Savage, Qualcomm
[M2M-Frukostseminarium] Richard Savage, Qualcomm[M2M-Frukostseminarium] Richard Savage, Qualcomm
[M2M-Frukostseminarium] Richard Savage, QualcommMobilbusiness
 
Functional Test Automotive Seminar in Mexico
Functional Test Automotive Seminar in MexicoFunctional Test Automotive Seminar in Mexico
Functional Test Automotive Seminar in MexicoInterlatin
 
Integrated smart surveillance systems for rail-based mass transportation
Integrated smart surveillance systems for rail-based mass transportationIntegrated smart surveillance systems for rail-based mass transportation
Integrated smart surveillance systems for rail-based mass transportationFrancesco Flammini
 
Oncor AMS to IBM Innovation Cafe Nov 2009
Oncor AMS to IBM Innovation Cafe Nov 2009Oncor AMS to IBM Innovation Cafe Nov 2009
Oncor AMS to IBM Innovation Cafe Nov 2009Jonathan Pettit
 
Smart Grid Security by Falgun Rathod
Smart Grid Security by Falgun RathodSmart Grid Security by Falgun Rathod
Smart Grid Security by Falgun RathodClubHack
 

Semelhante a How intelligent infrastructure reduces operating costs and improves patient care slideshare (20)

Cisco Connected Grid Solutions
Cisco Connected Grid SolutionsCisco Connected Grid Solutions
Cisco Connected Grid Solutions
 
Digital Telepathy: When Every Thing Connects SXSW 2013
Digital Telepathy:  When Every Thing Connects  SXSW 2013Digital Telepathy:  When Every Thing Connects  SXSW 2013
Digital Telepathy: When Every Thing Connects SXSW 2013
 
TRADOC OE Ian Pearson--Future Presentation
TRADOC OE Ian Pearson--Future PresentationTRADOC OE Ian Pearson--Future Presentation
TRADOC OE Ian Pearson--Future Presentation
 
Cfd presentation customer version
Cfd presentation customer versionCfd presentation customer version
Cfd presentation customer version
 
Smart grid aep_ge
Smart grid aep_geSmart grid aep_ge
Smart grid aep_ge
 
Centros de contacto: las demandas y requerimientos del mercado
Centros de contacto: las demandas y requerimientos del mercadoCentros de contacto: las demandas y requerimientos del mercado
Centros de contacto: las demandas y requerimientos del mercado
 
Corporate overview 1.2
Corporate overview 1.2Corporate overview 1.2
Corporate overview 1.2
 
09 05 26 Hd Offering 09
09 05 26  Hd Offering 0909 05 26  Hd Offering 09
09 05 26 Hd Offering 09
 
Blaze automation _ rfid technologies
Blaze automation _ rfid technologiesBlaze automation _ rfid technologies
Blaze automation _ rfid technologies
 
[M2M-Frukostseminarium] Richard Savage, Qualcomm
[M2M-Frukostseminarium] Richard Savage, Qualcomm[M2M-Frukostseminarium] Richard Savage, Qualcomm
[M2M-Frukostseminarium] Richard Savage, Qualcomm
 
Functional Test Automotive Seminar in Mexico
Functional Test Automotive Seminar in MexicoFunctional Test Automotive Seminar in Mexico
Functional Test Automotive Seminar in Mexico
 
Retail Loss Prevention Summit V1.0
Retail Loss Prevention Summit V1.0Retail Loss Prevention Summit V1.0
Retail Loss Prevention Summit V1.0
 
Corporate overview 2.0
Corporate overview 2.0Corporate overview 2.0
Corporate overview 2.0
 
Le Hive
Le HiveLe Hive
Le Hive
 
Teletron
TeletronTeletron
Teletron
 
Ams Oncor March 2010
Ams Oncor March 2010Ams Oncor March 2010
Ams Oncor March 2010
 
Integrated smart surveillance systems for rail-based mass transportation
Integrated smart surveillance systems for rail-based mass transportationIntegrated smart surveillance systems for rail-based mass transportation
Integrated smart surveillance systems for rail-based mass transportation
 
Home automation
Home automationHome automation
Home automation
 
Oncor AMS to IBM Innovation Cafe Nov 2009
Oncor AMS to IBM Innovation Cafe Nov 2009Oncor AMS to IBM Innovation Cafe Nov 2009
Oncor AMS to IBM Innovation Cafe Nov 2009
 
Smart Grid Security by Falgun Rathod
Smart Grid Security by Falgun RathodSmart Grid Security by Falgun Rathod
Smart Grid Security by Falgun Rathod
 

How intelligent infrastructure reduces operating costs and improves patient care slideshare

  • 1. How an intelligent infrastructure reduces operating costs and improves patient care Graeme Robertson Global Business Development Director, Healthcare Solutions, Schneider Electric
  • 2. Key Elements of an Intelligent Infrastructure HVAC Controls/BMS ICT/Data Centre Operating Theatre OT Power Infrastructure Medical Wards Life Safety Systems Integrated Security Enterprise Management Lighting Control Schneider Electric - Division - Name – Date 2
  • 3. Key Technologies Noise Monitoring Systems Infection Control Systems Staff Support Systems Visitor Management Patient Healing Environment Schneider Electric - Division - Name – Date 3
  • 4. Intelligent Interoperation Lighting Control Integrated Security Integrated Building Data Centre Operating Theatre System Systems Automation Infrastructure Dimmer units IP CCTV HVAC controls Power distribution Electrical distribution Lighting controllers Access control Utilities metering UPS Room switch units IPS Staff attack Pred maintenance In-row cooling units Multi sensors UPS Infant tagging SCADA Integrated security Surgeons panel Scene setting RFID LOCATION Video intercom M&T Room cooling RFID LOCATION Environmental External lighting SYSTEM Intruder detection Energy reclaim SYSTEM Hospital Intelligent Technology Infrastructure RFID LOCATION Servers RFID LOCATION HV/ MV / LV switchgear 24/ 7 remote services SYSTEM SYSTEM Fire alarm Nurse call Video recording Energy modeling Emergency lighting Bedhead services Transformers POE switches Entertainment Bill validation Public address Generator integration Firewalls RFID systems Energy pricing Voice evacuation Busbar trunking Quality of service Load shedding Fire dampers Environment Distribution Digital signage Maximum demand Fire Safety Electrical Energy Medical Areas ICT Systems Distribution Management Schneider Electric - Division - Name – Date 4
  • 5. Integration – Infant Abduction HVAC Controls/BMS Power Infrastructure Integrated Security Lighting Control Bed Elevators Services Car Park Management 24/7 Remote Management Nurse Call & RTLS Schneider Electric - Division - Name – Date 5
  • 6. Integration – Life Safety HVAC Controls/BMS Power Infrastructure Integrated Security Lighting Control Bed Elevators Services Car Park Management 24/7 Remote Management Nurse Call & RTLS Schneider Electric - Division - Name – Date 6
  • 7. Integration – Patient Room HVAC Controls/BMS Power Infrastructure Integrated Security Lighting Control Bed Elevators Services Car Park Management 24/7 Remote Management Nurse Call & RTLS Schneider Electric - Division - Name – Date 7
  • 8. Integration – Operating Room HVAC Controls/BMS Power Infrastructure Integrated Security Lighting Control Bed Elevators Services Car Park Management 24/7 Remote Management Nurse Call & RTLS Schneider Electric - Division - Name – Date 8
  • 9. Integration – Asset Management HVAC Controls/BMS Power Infrastructure Integrated Security Lighting Control Bed Elevators Services Car Park Management 24/7 Remote Management Nurse Call & RTLS Schneider Electric - Division - Name – Date 9
  • 10. Human Interaction Executive Executive View Dashboards Reporting Hospital Intelligent Technology Infrastructure KPI reports Energy efficiency environment Energy efficiency Staff efficiency Security overview Operational View Operating Fire Panel Nurse Station Patient Panel Theatre Environment Environment Lighting control Lighting control UPS status Fire alarms Nurse call Nurse call Environmental Fireman's override Security RFID Internet Alarm status Intercom entertainment Hospital Intelligent Technology Infrastructure Expert Monitoring Energy Building Security Data Centre Management Management Management and Control 24/7 remote Maintenance Security Operations services SCADA Video analytics management Energy modeling Environmental Access control Energy efficiency Bill validation Lighting control Safety control Network Load shedding M&T M&T Remote access Maximum demand Remote access Building Lighting Integrated Operating Automation Control Security Theatre Dimmer units IP CCTV Electrical HVAC controls Controllers Access control distribution Integrated Systems Utilities metering Room switch units Staff attack IPS Room controllers Multi sensors Infant tagging UPS Control panels Scene setting Video intercom Surgeon’s panel External lighting Intruder Electrical Data Centre Life Safety ICT Medical Areas Distribution Infrastructure Systems Power distribution Servers Nurse call Switchgear Fire alarm UPS Digital video Bedhead services Transformers Emergency lighting In-row cooling POE switches Entertainment Generators Public address Integrated security Firewalls RFID location Busbar trunking Voice evacuation Room cooling Quality of service systems Plug & play Fire dampers Energy reclaim Digital signage Environment Schneider Electric - Division - Name – Date 10
  • 11. Healing Environment Patient Environment Staff Environment •Reduce Patient Falls •Facilitate Hand Cleaning •Provide Access to Daylight & Views •Increase Patient Visibility •Improve Indoor Air Quality •Reduce Travel Distances •Consider Ergonomics/ Accessibility •Provide Appropriate Lighting •Reduce Infection Risk •Provide Easy Access to •Reduce Noise Information •Create Restorative Spaces Schneider Electric - Division - Name – Date 11
  • 12. Reduce Airborne Infections - UVC Schneider Electric - Division - Name – Date 12
  • 13. Efficient Fluid Power Damper Filter Cooling coil UVC Outside air contains viruses, bacteria, mold spores, and VOCs Spores UVC EmittersTM destroy Clean Air reproduce in mold, bacteria, viruses, supplied to filter, cooling and VOCs preventing building coil and drip pan them from the airflow reducing coil and increases coil efficiency efficiency 99% Kill rate of 77% Increase in airborne pathogens Cooling Coil Efficiency Schneider Electric - Division - Name – Date 13
  • 14. Case Study Ultra Violet Air Treatment Before and after study for the installation of UVC emitters in all hospital air systems conducted in October 2010. Cooling Coil Efficiency Improvement 77% Bacteria Reduction 99% Return on Investment 15 months Schneider Electric - Division - Name – Date 14
  • 15. UVC Study Results BEFORE AFTER BOTTOM OF COOLING COIL AFTER BEFORE DAMPER BLADES Schneider Electric - Division - Name – Date 15
  • 16. Automatic Hand Hygiene Monitoring 67% reduction in hospital- acquired infections Schneider Electric - Division - Name – Date 16
  • 17. Case Studies Automatic Hand Hygiene Compliance Monitoring 1000% increase in hand hygiene observations Compliance levels maintained above 90% for all working shifts HAI’s (Healthcare Associated Infections) reduced by 67% in following 3 years after installation Schneider Electric - Division - Name – Date 17
  • 18. Case Studies Automatic Hand Hygiene Compliance Monitoring The Hawthorne Effect: “The tendency to perform or perceive differently when one knows they are being observed” Schneider Electric - Division - Name – Date 18
  • 19. Infection control – auto flushing Hygienic flushing unit links to the Schneider Electric intelligent hospital infrastructure: Hospital intelligent infrastructure H.F.U H.F.U Each hygienic flushing unit incorporates intelligent valve technology with temperature and volume control. Schneider Electric - Division - Name – Date 19
  • 20. Case Study Automatic Hygienic Flushing Cold water supply acts as heat sink for building 40% reduction in legionella bacteria in existing hospital – Liverpool Broadgreen Study. 100% elimination of legionella bacteria in Manchester Hospital – 2 year study Water Savings due to elimination of unnecessary flushing Schneider Electric - Division - Name – Date 20
  • 21. Integrated Infection Control UVC anti-bacterial Automatic hand air treatment hygiene monitoring Wireless monitored hand sanitizer Automatic Anti-bacterial Flushing Unit Staff base human machine interface Schneider Electric - Division - Name – Date 21
  • 22. Patient Micro Climate •Contamination •Air quality •Smoke detection •Temperature •Humidity Lighting control •Autoblinds •Daylight control •Touchpad interface •Internet Nurse call •Telephone •TV/Radio •Room controls Staff base human Ambient noise machine interface Schneider Electric - Division - Name – Date 22
  • 23. Case Study Patient Micro Climate Control 270 bed hospital installed effective control and monitoring of patient room environment including lighting and solar blind configuration to increase amount of natural light received by patients. Patients with increased natural light: 1. Reported less perceived stress, resulting in 20% less pain medication costs. 2. Had a reduced Average Length of Stay (ALOS) Schneider Electric - Division - Name – Date 23
  • 24. Hospital Noise and Sleep Fragmentation John Hopkins Hospital USA • 50% increase Night 60 Sound Level 40 dB(A) 1960 2010 Noise Effects: •Lower oxygen saturation •Higher respiratory rate •Higher blood pressure •Faster heart rate •Slower weight gain •Impaired sleep Schneider Electric - Division - Name – Date 24
  • 25. Noise Monitoring Display Unit Control Unit External Microphone Hospital Intelligent Technology Infrastructure Schneider Electric - Division - Name – Date 25
  • 26. Case Study Noise Monitoring Study of noise monitoring and 1.5 hours per day mandatory quiet time: • TV’s & music only via noise cancelling headphones • Limited staff movement • Visitor restrictions Results: 1. 50% reduction in noise levels 2.Patients twice as likely to gain undisturbed sleep 3. Positive effect on patient blood pressure, pain experience and emotional wellbeing. Schneider Electric - Division - Name – Date 26
  • 27. Case Study - Quiron Hospital, Madrid HVAC Controls/BMS Power Infrastructure Integrated Security Lighting Control 24/7 Remote Management Schneider Electric - Division - Name – Date 27
  • 28. Case Study - Quiron Hospital, Madrid HVAC Controls/BMS Power Infrastructure Integrated Security Lighting Control Energy Efficient Installation & Intelligent Functionality for lighting Reduced power losses and improved power quality Efficiency based HVAC control for central plant and ventilation Extensive sub metering and 24/7 enterprise energy management 24/7 Remote Management Schneider Electric - Division - Name – Date 28
  • 29. Case Study - Quiron Hospital, Madrid HVAC Controls/BMS Power Infrastructure Integrated Security Lighting Control ENERGY SAVING CAPEX SAVING 24/7 Remote Management Schneider Electric - Division - Name – Date 29
  • 30. Case Study – Skane Hospitals Sweden HVAC Controls/BMS Power Infrastructure Integrated Security Lighting Control Staff Training Water Management Kristianstad Lund Helsingborg 120,479 m2 191,296 m2 131,970 m2 Performance Assurance 24/7 Remote Management Schneider Electric - Division - Name – Date 30
  • 31. Case Study – Skane Hospitals Sweden HVAC Controls/BMS Power Infrastructure Integrated Security Lighting Control Energy Efficient Installation & Intelligent Functionality for lighting Reduced power losses and improved power quality Efficiency based HVAC control for central plant and ventilation Staff Training Extensive sub metering and 24/7 Water enterprise energy management Management Intelligent integrated water saving technology installed throughout Performance assurance service with predictive maintenance Performance Assurance 24/7 Remote Management Schneider Electric - Division - Name – Date 31
  • 32. Case Study – Skane Hospitals Sweden HVAC Controls/BMS Power Infrastructure Integrated Security Lighting Control Savings District Heating Dist Dist Elec Elec % & Electricity Htg Htg % MWh/yr MWh/yr Lund 7,860 27% 207 13% Helsingborg 4,984 26% 1,343 8% Kristianstad 6,298 30% 116 8% Overall 19,142 28% 1,666 9% Staff Training Water Management Overall Water Savings 56,000m³/yr Performance Assurance 24/7 Remote Management Schneider Electric - Division - Name – Date 32
  • 33. Efficient Data Centre/Server Rooms Heat recovery In row cooling Reduced Floor Area Schneider Electric - Division - Name – Date 33
  • 34. Dynamic Simulation – Pilot Study A pilot study was conducted using a standard building design model and applying Schneider Electric’s EcoStruxure for energy efficiency design measures at neutral capital cost impact. Standard Design Schneider Electric - Division - Name – Date 34
  • 35. Pilot Study Building Data Building Type & Location Acute Hospital, London, UK Number of Beds 400 Number of Floors 7 Building Floor Area 36,384m² Building Conditioned Volume 145,536m³ Configuration Energy & Ventilation Plant Roof Mounted Floors – mix single, 4bed & 6 bed wards Operating Theatres & departments Design Parameters Compliant to current building regulations Schneider Electric - Division - Name – Date 35
  • 36. Energy Saving Design Features ADVANCED METERING AND ENERGY MANAGEMENT HIGH EFFICIENCY SMART ELECTRICAL EFFICIENCY BASED POWER BUILDING SERVICES INFRASTRUCTURE CONTROL • Power Quality • Main Energy Plant • Reduced Losses • Ventilation Plant • Power Management • DDC Terminal Control • Energy Alarms • HVAC Set Back • Advanced Analysis • Power De-energisation • Corrective Actions • Lighting switch off 24/7 REMOTE OCCUPANCY BASED SPECIALIST ENERGY INTEROPERATION ANALYSIS INTELLIGENT LOW ENERGY LIGHTING CONTROL Schneider Electric - Division - Name – Date 36
  • 37. Dynamic Simulation Results Total Energy: Typical v. Proposed Total Energy (MWh) Hospital Typical 7000.00 6000.00 Total Energy (MWh) 5000.00 Hospital Proposed MWh 4000.00 3000.00 2000.00 1000.00 0.00 1 2 3 4 5 6 7 8 9 10 11 12 Months Typical – 43,607 MWh/year Proposed – 29,552 MWh/year Schneider Electric - Division - Name – Date 37
  • 38. Dynamic Simulation Results Lighting Energy 200.00 Hospital Typical 180.00 160.00 140.00 120.00 Hospital Proposed MWh 100.00 80.00 60.00 40.00 20.00 0.00 1 2 3 4 5 6 7 8 9 10 11 12 Months Schneider Electric - Division - Name – Date 38
  • 39. Dynamic Simulation Results Total Gas: Typical v. Proposed 6,000.00 5,000.00 Hospital Typical 4,000.00 MWh Hospital Proposed 3,000.00 2,000.00 1,000.00 0.00 1 2 3 4 5 6 7 8 9 10 11 12 Months Schneider Electric - Division - Name – Date 39
  • 40. Dynamic Simulation Results Total Electricity: Typical v. Proposed 1,600.00 1,400.00 1,200.00 1,000.00 MWh 800.00 Hospital Typical 600.00 Hospital Proposed 400.00 200.00 0.00 1 2 3 4 5 6 7 8 9 10 11 12 Months Schneider Electric - Division - Name – Date 40
  • 41. Holistic Infrastructure Model • Department KPI’s • Process • Patient KPI’s • Building + Data centre efficiency • Hospital KPI • Process environment + • Electronic data sheets dashboard analysis tools asset dashboards Infrastructure Management health records • X-ray • Diagnostic data level level Intelligent Technology Infrastructure Facility level Admissions Procedures Recovery Discharge Home Doctor’s surgery • Wireless • Data input • Environment • Data input • Telecare devices • Tracking • Measurement • Patient satisfaction • Data input • Measurement • Patient control • Measurements of • Infection control performance Schneider Electric - Division - Name – Date 41
  • 42. Design Considerations - Delivery Ability to impact cost and functional capabilities Design Effort / Effect Cost of design changes IPD process Traditional process Pre-design Schematic Design Construction Agency permit/ Construction design development documents bidding Conceptualization Criteria Detailed Implementation Agency Construction design design documents coordination/ final buyout IPD – Integrated Project Delivery Schneider Electric - Division - Name – Date 42
  • 43. Summary Five main reasons why an intelligent infrastructure should be installed in hospitals: - 1. Improve Patient Care 2. Improve Staff Prodcutivity 3. Improve Adaptability & Future Proofing of the Facility 4. Reduce Life Cycle Costs 5. Reduce Waste Schneider Electric - Division - Name – Date 43