1.What are instrument categories?
Ans: General, flow, temperature, pressure, level, density.etc.
2.Which instruments are handled by piping department ?
Ans: flame arrestor, breather valve.
3.What are basic functions of instruments?
Ans: To sense, transmit, indicate, read and control.
4.Why block valve is used at the root of an instrument like pressure
indicator?
Ans: They are needed to isolate gauges for maintenance during plant
operation and during hydrostatic testing of piping system. They are
called root valve.
5.Where diaphragm assembly is used ?
Ans: For corrosive, abrasive, viscous fluids. Neutral fluid like glycol
issued on instrument side of diaphragm.
40+ TOP PIPING/INSTRUMENTATION INTERVIEW
QUESTIONS
6.Where and why bleed valve is used in instruments ?
Ans: If the conveyed fluid is hazardous or under high pressure, a branch
fitted with a bleed valve is inserted between the gauge and its isolating
valve, to relieve pressure and /or drain the liquid before servicing the
gauge. It can also be used to sample or for adding a comparison gauge.
7.Why control valves are usually flanged?
Ans: For ease of installation and removal during maintenance.
8.Where ball control valve is used?
Ans: Suitable where nature of fluid is slurry form or handling two phase
flow having particle in suspension, for non-critical and critical fluids
having a fluid temperature to suit the soft seat material and where
relatively low pressure drop is required across control valve. They have
side mounted actuator.
40+ TOP PIPING/INSTRUMENTATION INTERVIEW
QUESTIONS
9.Where butterfly control valve is used ?
Ans: Used for large size piping network handling clean fluid for low
pressure drop across control valve and soft seated control valve. Metal
seated valves used for higher temperatures.
10.How control valve block valves should be located ?
Ans: They should be as close to control valve as possible, considering
drain requirement and hand wheel clearance. At least one of the block
valve should be placed in vertical so that spool can be removed allowing
the control valve to be removed.
11.How TSO valve should be installed ?
Ans: Tight shut off (TSO) valve or reduced port ball control valve should
be installed in vertical for gas service and horizontal ok for liquid service.
12.How bypass valve in control station should be locate
Ans: Near inlet branch point, not above control valve, with 200mm
clearance between actuator and valve.
13.How control station should be supported ?
Ans: It should be supported such that control station piping is self
supporting even if the control valve is removed. Normally, on exit side
elbows of bottom run of control valve.
14.Why and where drain should be located in control valve
assembly ?
Ans: Drain is used to drain the piping between two block valves on two
sides of control valve before removing control valve for maintenance. It
must be located at lowest point of bottom run. One drain is used if
control valve is fails open, and two drain used if control valve fails close,
40+ TOP PIPING/INSTRUMENTATION INTERVIEW
QUESTIONS
as both sides are blocked in this case. For one drain, it should be
upstream side of control valve.
15.Where reducer shall be located in control valve assembly ?
Ans: As close as possible to control valve, preferably directly welded
control valve flanges.
16.How breakup flanges for control valve should be located ?
Ans: One vertical and one horizontal which is achieved by having one
block valve in vertical leg of control valve inlet. Do not place support on
inlet elbow.
17.What are the types of flow measuring devices?
Ans: Orifice plate, Variable area flow meter i.e. rotameter, magnetic flow
meter, turbine flow meter, positive displacement meter.
18.What is piping and instrument scope of supply for orifice meter
?
Ans: Piping provided gaskets and bolts and tapping from orifice plate to
two block valves. Instrument provides orifice plate and flange assembly
and connection down stream of block valves.
19.How orifice flange taps should be oriented ?
Ans: For liquid and steam, it should be horizontal or 45 degree down
from horizontal on both sides. For gas and vapour lines, it should
bevertical or 45 to vertical on both sides. Taps are 0.5 inch.
20.What are straight run requirements of orifice plate ?
Ans: Inlet straight run requirement can be 15D to 20D and outlet straight
run requirement 5D min. It depends on piping configuration and d/D
ration i.e. ration of inside dia of orifice plate and pipe. It is to be
confirmed with instrument engineer in instrument specification of project.
21.What are straight run requirements for vortex meters?
Ans: 5D upstream.
22.Where restriction orifice plates are used ?
40+ TOP PIPING/INSTRUMENTATION INTERVIEW
QUESTIONS
Ans: For effective distribution of fluid in piping network.
23.What are types of level measurement?
Ans: Direct and inferential
24.What are direct methods of level measurement?
Ans: Gauge glasses, reflex or transparent, calibrated tapes or dip sticks
placed in vessel and calibrated directly in level or volume.
25.What are inferential methods of level measurement?
Ans: Hydrostatic head, buoyancy, conductance, radiation, float.
26.What is hydrostatic head type level transmitter?
Ans: Installed directly on nozzle, uses pressure sensing assembly to get
the level. Diaphragm type used for liquids with solids.
27. What are pressure instruments used in chemical industries?
Ans: Manometers, bourden tubes, bellows and diaphragms.
28.What are manometers?
Ans: Single or U type glass tube with mercury or other fluid. Inclined
tube for very low pressure measurement used.
29.What are types of bourdon tubes?
Ans: C, the spiral and helical, most widely used since 100 years.
40+ TOP PIPING/INSTRUMENTATION INTERVIEW
QUESTIONS
30.What are temperature measuring instruments?
Ans: Thermocouples, resistance temperature detectors, filled
system,bimetallic thermometer, thermowells.
31.What thermocouple metals normally used?
Ans: Iron + Constantine, Chromel + Alumel etc.
32.How resistance thermocouples work ?
Ans : Electrical resistance of a conductor changes with temperature.
33.How filled system temperature element work ?
Ans : Bourdon tube, filled with liquid, liquid expands, bourdoun
tubeindicates on scale temperature.
34. How bimetallic thermocouple work ?
Ans: Different expansion of different metals bends the bimetallic strip
toindicate temperature. Invar and Nickel pair used.
35.What is minimum pipe size required for thermowell installation?
Ans: 3”
36.What are design considerations for pipe rack ?
Ans: Rack width, no of levels and elevations, bent spacing,
pipeflexibility, Access and maintenance of each item in pipe rack.
37.What are steps in rack design?
Ans: Generate line routine diagram, Calculate bent spacing, set width of
rack, decide elevations and levels.
38.What is pipe bent?
Ans: Pipe bent consists of a vertical column or columns and a horizontal
structural member or members that carry piping systems, usually above
the headroom.
39.What factors affect pipe span?
Ans: Size, Schedule, liquid or vapor, insulated or bare pipe.
40.What are spandrels?
40+ TOP PIPING/INSTRUMENTATION INTERVIEW
QUESTIONS
Ans: Horizontal structural members located along the
longitudinalcenterline that are used for structural stability, pipe support
orintermediate pipe bents.
41.Which lines placed where in rack ?
Ans: Process lines on lower level, utility lines on top level, instrument
and cable trays on utility level or separate topmost level, Heavy lines
near columns, Flare line outside rack on cantilever beams or inside rack
above top level , steam lines with expansion loops on one side of rack,
line switch orifice runs on one side of rack beside columns for
maintenance using portable ladder.
42.How much extra space required for rack ?
Ans: 20 % extra for future lines.
43.How to route steam lines on rack ?
Ans: Steam headers on top level or rack, determine growth by
multiplying coefficient (From nomograph) of expansion by length of
line.Try anchor in middle, determine growth of each branch and see
weather the have enough flexibility, if not anchor at ¼ th distance on
both sides,determine amount of expansion leg from nomograph, and
decide loopsize. Line that require largest expansion leg should be
located on the outside of the loop.

Mais conteúdo relacionado

Semelhante a 40+ TOP PIPING_INSTRUMENTATION INTERVIEW QUESTIONS.pdf

Hazard operability study - in Industires and plant
Hazard operability study - in Industires and plantHazard operability study - in Industires and plant
Hazard operability study - in Industires and plant
JayaKarthic1
 
MANUALS FOR FLUID MECHANICS LAB.pdf
MANUALS FOR FLUID MECHANICS LAB.pdfMANUALS FOR FLUID MECHANICS LAB.pdf
MANUALS FOR FLUID MECHANICS LAB.pdf
amgothusandeep
 
Drilling engineering glossary, Sigve Hamilton Aspelund
Drilling engineering glossary, Sigve Hamilton AspelundDrilling engineering glossary, Sigve Hamilton Aspelund
Drilling engineering glossary, Sigve Hamilton Aspelund
Sigve Hamilton Aspelund
 
Gauge installation and removal procedures
Gauge installation and removal proceduresGauge installation and removal procedures
Gauge installation and removal procedures
inmer17
 

Semelhante a 40+ TOP PIPING_INSTRUMENTATION INTERVIEW QUESTIONS.pdf (20)

Instruments - Part 2
Instruments - Part 2Instruments - Part 2
Instruments - Part 2
 
Valves_Control valve_Actuators.ppt
Valves_Control valve_Actuators.pptValves_Control valve_Actuators.ppt
Valves_Control valve_Actuators.ppt
 
3 valve shafts pneumatics and hydraulics
3 valve shafts pneumatics and hydraulics3 valve shafts pneumatics and hydraulics
3 valve shafts pneumatics and hydraulics
 
Session 06 - Instruments - Part 2
Session 06 - Instruments - Part 2Session 06 - Instruments - Part 2
Session 06 - Instruments - Part 2
 
Hazard operability study - in Industires and plant
Hazard operability study - in Industires and plantHazard operability study - in Industires and plant
Hazard operability study - in Industires and plant
 
HAZOP.ppt
HAZOP.pptHAZOP.ppt
HAZOP.ppt
 
Industrial Istrumentation
Industrial IstrumentationIndustrial Istrumentation
Industrial Istrumentation
 
MANUALS FOR FLUID MECHANICS LAB.pdf
MANUALS FOR FLUID MECHANICS LAB.pdfMANUALS FOR FLUID MECHANICS LAB.pdf
MANUALS FOR FLUID MECHANICS LAB.pdf
 
I am chemical engineer magazine 6 2013
I am chemical engineer magazine 6 2013I am chemical engineer magazine 6 2013
I am chemical engineer magazine 6 2013
 
Anaesthesia machine by Dr. shailendra
Anaesthesia machine by Dr. shailendra Anaesthesia machine by Dr. shailendra
Anaesthesia machine by Dr. shailendra
 
Piping fundamental
Piping fundamentalPiping fundamental
Piping fundamental
 
Piping fundamentals bfl
Piping fundamentals bflPiping fundamentals bfl
Piping fundamentals bfl
 
Drilling engineering glossary, Sigve Hamilton Aspelund
Drilling engineering glossary, Sigve Hamilton AspelundDrilling engineering glossary, Sigve Hamilton Aspelund
Drilling engineering glossary, Sigve Hamilton Aspelund
 
Flow through orifice meter
Flow through orifice meterFlow through orifice meter
Flow through orifice meter
 
application of Direction control valve in automatic transmission
application of Direction control valve in automatic transmissionapplication of Direction control valve in automatic transmission
application of Direction control valve in automatic transmission
 
Gauge installation and removal procedures
Gauge installation and removal proceduresGauge installation and removal procedures
Gauge installation and removal procedures
 
Flow measurement part II
Flow measurement   part IIFlow measurement   part II
Flow measurement part II
 
Leak Tests.pptx
Leak Tests.pptxLeak Tests.pptx
Leak Tests.pptx
 
Venturi
VenturiVenturi
Venturi
 
The Humble Check Valve
The Humble Check ValveThe Humble Check Valve
The Humble Check Valve
 

Mais de EmmanuelMatutu

1. Usman Ali CV Project Engineer Electrical.pdf
1. Usman Ali CV Project Engineer Electrical.pdf1. Usman Ali CV Project Engineer Electrical.pdf
1. Usman Ali CV Project Engineer Electrical.pdf
EmmanuelMatutu
 
A Presentation on Field Instrumentation .pdf
A Presentation on Field Instrumentation .pdfA Presentation on Field Instrumentation .pdf
A Presentation on Field Instrumentation .pdf
EmmanuelMatutu
 
API 510 Practice Exam #5 CLOSE BOOK Questions.pdf
API 510 Practice Exam #5 CLOSE BOOK Questions.pdfAPI 510 Practice Exam #5 CLOSE BOOK Questions.pdf
API 510 Practice Exam #5 CLOSE BOOK Questions.pdf
EmmanuelMatutu
 
API 653 Exam March 2019-1.pdf
API 653 Exam March 2019-1.pdfAPI 653 Exam March 2019-1.pdf
API 653 Exam March 2019-1.pdf
EmmanuelMatutu
 
API 570 open book (26-02-18)-1.pdf
API 570 open book (26-02-18)-1.pdfAPI 570 open book (26-02-18)-1.pdf
API 570 open book (26-02-18)-1.pdf
EmmanuelMatutu
 
219816022-Final-Report-on-Electric-Car-Jack-3.pdf
219816022-Final-Report-on-Electric-Car-Jack-3.pdf219816022-Final-Report-on-Electric-Car-Jack-3.pdf
219816022-Final-Report-on-Electric-Car-Jack-3.pdf
EmmanuelMatutu
 
27 Common Job Questions and Answer-1.pdf
27 Common Job Questions and Answer-1.pdf27 Common Job Questions and Answer-1.pdf
27 Common Job Questions and Answer-1.pdf
EmmanuelMatutu
 

Mais de EmmanuelMatutu (13)

1. Usman Ali CV Project Engineer Electrical.pdf
1. Usman Ali CV Project Engineer Electrical.pdf1. Usman Ali CV Project Engineer Electrical.pdf
1. Usman Ali CV Project Engineer Electrical.pdf
 
A Presentation on Field Instrumentation .pdf
A Presentation on Field Instrumentation .pdfA Presentation on Field Instrumentation .pdf
A Presentation on Field Instrumentation .pdf
 
API 510 Practice Exam #5 CLOSE BOOK Questions.pdf
API 510 Practice Exam #5 CLOSE BOOK Questions.pdfAPI 510 Practice Exam #5 CLOSE BOOK Questions.pdf
API 510 Practice Exam #5 CLOSE BOOK Questions.pdf
 
API 653 Exam March 2019-1.pdf
API 653 Exam March 2019-1.pdfAPI 653 Exam March 2019-1.pdf
API 653 Exam March 2019-1.pdf
 
API 570 open book (26-02-18)-1.pdf
API 570 open book (26-02-18)-1.pdfAPI 570 open book (26-02-18)-1.pdf
API 570 open book (26-02-18)-1.pdf
 
API 570 open book.pdf
API 570 open book.pdfAPI 570 open book.pdf
API 570 open book.pdf
 
4419025.pdf
4419025.pdf4419025.pdf
4419025.pdf
 
API_1104-STUDY QUESTION.pdf
API_1104-STUDY QUESTION.pdfAPI_1104-STUDY QUESTION.pdf
API_1104-STUDY QUESTION.pdf
 
API RP 571 (B) 51-100.pdf
API RP 571 (B) 51-100.pdfAPI RP 571 (B) 51-100.pdf
API RP 571 (B) 51-100.pdf
 
219816022-Final-Report-on-Electric-Car-Jack-3.pdf
219816022-Final-Report-on-Electric-Car-Jack-3.pdf219816022-Final-Report-on-Electric-Car-Jack-3.pdf
219816022-Final-Report-on-Electric-Car-Jack-3.pdf
 
27 Common Job Questions and Answer-1.pdf
27 Common Job Questions and Answer-1.pdf27 Common Job Questions and Answer-1.pdf
27 Common Job Questions and Answer-1.pdf
 
API 570 B31.3 qustion.pdf
API 570 B31.3 qustion.pdfAPI 570 B31.3 qustion.pdf
API 570 B31.3 qustion.pdf
 
1-Wikipedia-Dynamo-theory.pdf
1-Wikipedia-Dynamo-theory.pdf1-Wikipedia-Dynamo-theory.pdf
1-Wikipedia-Dynamo-theory.pdf
 

Último

Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
kumaririma588
 
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard ...
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard  ...Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard  ...
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard ...
nirzagarg
 
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
amitlee9823
 
DESIGN THINKING in architecture- Introduction
DESIGN THINKING in architecture- IntroductionDESIGN THINKING in architecture- Introduction
DESIGN THINKING in architecture- Introduction
sivagami49
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
amitlee9823
 
Design Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxDesign Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptx
TusharBahuguna2
 
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
home
 
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman MuscatAbortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Whitefield Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Ba...
Whitefield Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Ba...Whitefield Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Ba...
Whitefield Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Ba...
amitlee9823
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdf
tbatkhuu1
 
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
amitlee9823
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts ServiceVVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
aroranaina404
 

Último (20)

Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
 
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard ...
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard  ...Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard  ...
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard ...
 
Case Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, PuneCase Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, Pune
 
Q4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationQ4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentation
 
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
 
DESIGN THINKING in architecture- Introduction
DESIGN THINKING in architecture- IntroductionDESIGN THINKING in architecture- Introduction
DESIGN THINKING in architecture- Introduction
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
Design Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxDesign Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptx
 
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
 
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman MuscatAbortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
 
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfChapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
 
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
 
Whitefield Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Ba...
Whitefield Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Ba...Whitefield Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Ba...
Whitefield Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Ba...
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdf
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Th...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Th...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Th...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Th...
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
 
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
 
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts ServiceVVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
 

40+ TOP PIPING_INSTRUMENTATION INTERVIEW QUESTIONS.pdf

  • 1. 40+ TOP PIPING/INSTRUMENTATION INTERVIEW QUESTIONS 1.What are instrument categories? Ans: General, flow, temperature, pressure, level, density.etc. 2.Which instruments are handled by piping department ? Ans: flame arrestor, breather valve. 3.What are basic functions of instruments? Ans: To sense, transmit, indicate, read and control. 4.Why block valve is used at the root of an instrument like pressure indicator? Ans: They are needed to isolate gauges for maintenance during plant operation and during hydrostatic testing of piping system. They are called root valve. 5.Where diaphragm assembly is used ? Ans: For corrosive, abrasive, viscous fluids. Neutral fluid like glycol issued on instrument side of diaphragm.
  • 2. 40+ TOP PIPING/INSTRUMENTATION INTERVIEW QUESTIONS 6.Where and why bleed valve is used in instruments ? Ans: If the conveyed fluid is hazardous or under high pressure, a branch fitted with a bleed valve is inserted between the gauge and its isolating valve, to relieve pressure and /or drain the liquid before servicing the gauge. It can also be used to sample or for adding a comparison gauge. 7.Why control valves are usually flanged? Ans: For ease of installation and removal during maintenance. 8.Where ball control valve is used? Ans: Suitable where nature of fluid is slurry form or handling two phase flow having particle in suspension, for non-critical and critical fluids having a fluid temperature to suit the soft seat material and where relatively low pressure drop is required across control valve. They have side mounted actuator.
  • 3. 40+ TOP PIPING/INSTRUMENTATION INTERVIEW QUESTIONS 9.Where butterfly control valve is used ? Ans: Used for large size piping network handling clean fluid for low pressure drop across control valve and soft seated control valve. Metal seated valves used for higher temperatures. 10.How control valve block valves should be located ? Ans: They should be as close to control valve as possible, considering drain requirement and hand wheel clearance. At least one of the block valve should be placed in vertical so that spool can be removed allowing the control valve to be removed. 11.How TSO valve should be installed ? Ans: Tight shut off (TSO) valve or reduced port ball control valve should be installed in vertical for gas service and horizontal ok for liquid service. 12.How bypass valve in control station should be locate Ans: Near inlet branch point, not above control valve, with 200mm clearance between actuator and valve. 13.How control station should be supported ? Ans: It should be supported such that control station piping is self supporting even if the control valve is removed. Normally, on exit side elbows of bottom run of control valve. 14.Why and where drain should be located in control valve assembly ? Ans: Drain is used to drain the piping between two block valves on two sides of control valve before removing control valve for maintenance. It must be located at lowest point of bottom run. One drain is used if control valve is fails open, and two drain used if control valve fails close,
  • 4. 40+ TOP PIPING/INSTRUMENTATION INTERVIEW QUESTIONS as both sides are blocked in this case. For one drain, it should be upstream side of control valve. 15.Where reducer shall be located in control valve assembly ? Ans: As close as possible to control valve, preferably directly welded control valve flanges. 16.How breakup flanges for control valve should be located ? Ans: One vertical and one horizontal which is achieved by having one block valve in vertical leg of control valve inlet. Do not place support on inlet elbow. 17.What are the types of flow measuring devices? Ans: Orifice plate, Variable area flow meter i.e. rotameter, magnetic flow meter, turbine flow meter, positive displacement meter. 18.What is piping and instrument scope of supply for orifice meter ? Ans: Piping provided gaskets and bolts and tapping from orifice plate to two block valves. Instrument provides orifice plate and flange assembly and connection down stream of block valves. 19.How orifice flange taps should be oriented ? Ans: For liquid and steam, it should be horizontal or 45 degree down from horizontal on both sides. For gas and vapour lines, it should bevertical or 45 to vertical on both sides. Taps are 0.5 inch. 20.What are straight run requirements of orifice plate ? Ans: Inlet straight run requirement can be 15D to 20D and outlet straight run requirement 5D min. It depends on piping configuration and d/D ration i.e. ration of inside dia of orifice plate and pipe. It is to be confirmed with instrument engineer in instrument specification of project. 21.What are straight run requirements for vortex meters? Ans: 5D upstream. 22.Where restriction orifice plates are used ?
  • 5. 40+ TOP PIPING/INSTRUMENTATION INTERVIEW QUESTIONS Ans: For effective distribution of fluid in piping network. 23.What are types of level measurement? Ans: Direct and inferential 24.What are direct methods of level measurement? Ans: Gauge glasses, reflex or transparent, calibrated tapes or dip sticks placed in vessel and calibrated directly in level or volume. 25.What are inferential methods of level measurement? Ans: Hydrostatic head, buoyancy, conductance, radiation, float. 26.What is hydrostatic head type level transmitter? Ans: Installed directly on nozzle, uses pressure sensing assembly to get the level. Diaphragm type used for liquids with solids. 27. What are pressure instruments used in chemical industries? Ans: Manometers, bourden tubes, bellows and diaphragms. 28.What are manometers? Ans: Single or U type glass tube with mercury or other fluid. Inclined tube for very low pressure measurement used. 29.What are types of bourdon tubes? Ans: C, the spiral and helical, most widely used since 100 years.
  • 6. 40+ TOP PIPING/INSTRUMENTATION INTERVIEW QUESTIONS 30.What are temperature measuring instruments? Ans: Thermocouples, resistance temperature detectors, filled system,bimetallic thermometer, thermowells. 31.What thermocouple metals normally used? Ans: Iron + Constantine, Chromel + Alumel etc. 32.How resistance thermocouples work ? Ans : Electrical resistance of a conductor changes with temperature. 33.How filled system temperature element work ? Ans : Bourdon tube, filled with liquid, liquid expands, bourdoun tubeindicates on scale temperature. 34. How bimetallic thermocouple work ? Ans: Different expansion of different metals bends the bimetallic strip toindicate temperature. Invar and Nickel pair used. 35.What is minimum pipe size required for thermowell installation? Ans: 3” 36.What are design considerations for pipe rack ? Ans: Rack width, no of levels and elevations, bent spacing, pipeflexibility, Access and maintenance of each item in pipe rack. 37.What are steps in rack design? Ans: Generate line routine diagram, Calculate bent spacing, set width of rack, decide elevations and levels. 38.What is pipe bent? Ans: Pipe bent consists of a vertical column or columns and a horizontal structural member or members that carry piping systems, usually above the headroom. 39.What factors affect pipe span? Ans: Size, Schedule, liquid or vapor, insulated or bare pipe. 40.What are spandrels?
  • 7. 40+ TOP PIPING/INSTRUMENTATION INTERVIEW QUESTIONS Ans: Horizontal structural members located along the longitudinalcenterline that are used for structural stability, pipe support orintermediate pipe bents. 41.Which lines placed where in rack ? Ans: Process lines on lower level, utility lines on top level, instrument and cable trays on utility level or separate topmost level, Heavy lines near columns, Flare line outside rack on cantilever beams or inside rack above top level , steam lines with expansion loops on one side of rack, line switch orifice runs on one side of rack beside columns for maintenance using portable ladder. 42.How much extra space required for rack ? Ans: 20 % extra for future lines. 43.How to route steam lines on rack ? Ans: Steam headers on top level or rack, determine growth by multiplying coefficient (From nomograph) of expansion by length of line.Try anchor in middle, determine growth of each branch and see weather the have enough flexibility, if not anchor at ¼ th distance on both sides,determine amount of expansion leg from nomograph, and decide loopsize. Line that require largest expansion leg should be located on the outside of the loop.