SlideShare uma empresa Scribd logo
1 de 18
Earned Value
Analysis
HOW TO KNOW WHERE YOUR PROJECT IS
BY DAVID EDGEWORTH
Earned Value (EVM)
 A technique of Cost Control that compares what you’ve received or
produced to what you’ve spent by monitoring the planned value, earned
value, and actual costs expected to produce the work of the project
 Needed to determine and document the cause of the variance, to
determine the impact or the variance, and to determine whether a
corrective action should be implemented as a result
 EMV looks at schedule, cost, and scope project measurements together
and compares them to actual work completed to date
Planned Value (PV)
 Planned Value is the cost of work that has been authorized and budgeted
for a scheduled activity or Work Breakdown Structure component during a
given time period or phase
 PV is also known as the budget cost of work scheduled (BCWS)
 It is usually a chart comparing Earned Value and Actual Cost
 EV=3.8k
 AC=5k
 PV=4.5k
$0.
$2,000.
$4,000.
$6,000.
0 months 10 months
Visual Representation of Current Project Budget
Earned Value Acutual Cost Planned Value
Actual Cost (AC)
 Actual Cost is the cost of complementing the work component in a given
time period
 Also known as actual cost of work performance (ACWP)
Earned Value (EV)
 Earned value is the value of the work completed to date as it compares to
the budgeted amount (PV) for the work component
 EV is typically expressed as a percentage of work complete compared to
the budget
 Also known as budget cost of work performed (BCWP)
 Example-Budget amount is $1,000 and we have completed 30% of the work at
this date. EV=1000 x 30% so our EV= $300
Recap
 PV=is the approved budget assigned to the work to be completed in a
given time
 AC=the money (indirect or direct) that has actually been spent during a
given time period toward the completed work
 EV=the value of the work completed at this moment compared to where
you were suppose to be according to the budget
Cost Variance (CV)
Are we on budget?
 Cost Variance = Earned Value – Actual Cost
 Example: Lets say the
 Planned Cost (budgeted) (also known as the Planned Value) = $720k
 Actual Cost = $600k
 Earned Value = $680k
 Our CV = EV-AC
 680-600 = +80 a positive number means we are most likely going to be under budget
Schedule Variance (SV)
 Compares an activity’s actual progress to date to the estimated progress
and is represented in terms of cost
 Tells you if the schedule is going to be ahead of schedule, on time, or
behind
 Schedule Variance = Earned Value – Planned Value
 Example: Lets say the
 Planned Cost (budgeted) (also known as the Planned Value) = $720k
 Earned Value = $680k
 680-720= -40 a negative number indicates the project is behind schedule
Performance Indexes
 These are used to predict future project performance
 All start with what you have (EV)
Cost Performance Index (CPI)
 Measures the values of work completed at this date (today) against actual
cost
 Cost Performance Index = Earned Value/Actual Cost
 Example: Lets say the
 Actual Cost = $600k
 Earned Value = $680k
 680/600 = 1.13 as the number is more than 1 it means your performance is better
than expected
Schedule Performance Index (SPI)
 SPI measures the progress today against what is planned
 Schedule Performance Index=Earned Value/Planned Value
 Example: Lets say the
 Planned Cost (budgeted) (also known as the Planned Value) = $720k
 Earned Value = $680k
 680/720= 0.94 as the value is less than 1 the project is behind schedule
Estimate at Completion (EAC)
 EAC is used to forecast the total project budget based on the current project
performance and the remaining work
 To get EAC you need to know
 Budget at Completion (BAC)
 The total amount of the budget for the work
 Estimate to Complete (ETC)
 The cost estimate for the remaining project work (usually gotten from expert judgment)
 Estimate at Completion=Actual Cost + Estimate to Complete
 Example: Lets say the
 Planned Cost (budgeted) (also known as the Planned Value or BAC ) = $720k
 Actual Cost = $600k
 Estimate to Complete = $100k
 600+100 = 700 as ETC is less than BAC you will most likely be under budget
To-Complete Performance Index (TCPI)
 TCPI is the projected performance level that the remaining work of the
project must achieve in order to meet the stated financial or scheduled
goals
 To-Complete Performance Index =
 Budget at Completion (BAC) – Earned Value (EV) Budget at
Completion (BAC) – Actual Cost (AC)
 Example:
 Planned Cost (budgeted) (also known as the Planned Value or BAC ) = $720k
 Actual Cost = $600k
 Earned Value = $680k
 (720-680) = 40 40/120 = 0.33 the TCPI is less than 1 so future work does not have
(720-600) = 20 to be as efficiently as past performance to meet the planned
schedule
Variance Analysis (VA)
 Variance Analysis is a comparison of planned results with actual project
results
 Most frequently used to examine the project schedule and project budget
Variance At Completion (VAC)
 Variance At Completion calculates the difference between the budget at
completion and the estimate at completion
 Variance At Completion (VAC)= Budget at Completion (BAC)- Estimate at
Completion (EAC)
 Example:
 Planned Cost (budgeted) (also known as the Planned Value or BAC ) = $720k
 Estimate at Completion (EAC)= $100k
 720-100= 620 VAC indicates we have a positive number meaning the project was
efficient
Final Cost (FC)
 Final Cost can be predicted with the following equation
 Final Cost (FC)=Budgeted Cost/Cost Performance Index (CPI)
 Example:
 Planned Cost (budgeted) (also known as the Planned Value or BAC ) = $720k
 Cost Performance Index (CPI) = 1.13
 720/1.13 = 637.17 meaning the final cost is projected to be $637.17k
Final Project Duration
 Final Project Duration is how long the project will take at the current level
of effort
 Final Project Duration = Planned Project Duration/Schedule Performance
Index (SPI)
 Example
 Planned Project Duration = 20 months
 Duration/Schedule Performance Index (SPI) = 0.94
 20/0.94=21.27 months
 At the current effort the project will take about 5 to 6 weeks longer to finish
What this means
 CV = a positive number we will most likely be under budget
 CV = a negative number we will most likely be over budget
 SV = a positive number we will most likely be ahead of schedule
 SV = a negative number we will most likely be behind schedule
 SV = zero we are neither ahead nor behind schedule
 CPI = more than 1 means your performance is better than expected
 CPI = less than 1 means your performance is worse than expected
 SPI = more than 1 the project is ahead of schedule
 SPI = less than 1 the project is behind schedule
 EAC = if less than BAC you will most likely be under budget
 EAC = if more than BAC you will most likely be over budget
 TCPI = less then 1 future work does not have to be as efficient as past performance to
meet the goal
 TCPI = more then 1 future work must be more efficient as past performance to meet the
goal

Mais conteúdo relacionado

Mais procurados

Earned value analysis - presentation
Earned value analysis  -  presentationEarned value analysis  -  presentation
Earned value analysis - presentationProPM Academy
 
Earned value analysis (1)
Earned value analysis (1)Earned value analysis (1)
Earned value analysis (1)Harshit Mahajan
 
Introduce Project Management
Introduce Project ManagementIntroduce Project Management
Introduce Project Managementguest90bddb
 
7.4 Earned Value Analysis
7.4 Earned Value Analysis7.4 Earned Value Analysis
7.4 Earned Value AnalysisDavidMcLachlan1
 
EVM of Project Management...
EVM of Project Management...EVM of Project Management...
EVM of Project Management...Fahad Ali
 
VERTEX Construction Delays and Forensic Schedule Analyses
VERTEX Construction Delays and Forensic Schedule AnalysesVERTEX Construction Delays and Forensic Schedule Analyses
VERTEX Construction Delays and Forensic Schedule AnalysesThe Vertex Companies, LLC
 
Earned Value Management
Earned Value ManagementEarned Value Management
Earned Value ManagementMansoor Shoaib
 
project control using earned value analysis - Part 01
project control using earned value analysis - Part 01 project control using earned value analysis - Part 01
project control using earned value analysis - Part 01 waleed hamdy
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project ManagementRodolfo Siles
 

Mais procurados (20)

Earned value analysis - presentation
Earned value analysis  -  presentationEarned value analysis  -  presentation
Earned value analysis - presentation
 
EVA - Metrics.ppt
EVA - Metrics.pptEVA - Metrics.ppt
EVA - Metrics.ppt
 
Earned Value Analysis
Earned Value AnalysisEarned Value Analysis
Earned Value Analysis
 
Earned value analysis (1)
Earned value analysis (1)Earned value analysis (1)
Earned value analysis (1)
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Project cost control
Project cost controlProject cost control
Project cost control
 
Introduce Project Management
Introduce Project ManagementIntroduce Project Management
Introduce Project Management
 
7.4 Earned Value Analysis
7.4 Earned Value Analysis7.4 Earned Value Analysis
7.4 Earned Value Analysis
 
PMP_Project Cost Management
PMP_Project Cost ManagementPMP_Project Cost Management
PMP_Project Cost Management
 
07 project cost management
07 project cost management07 project cost management
07 project cost management
 
Project quality management
Project quality managementProject quality management
Project quality management
 
EVM of Project Management...
EVM of Project Management...EVM of Project Management...
EVM of Project Management...
 
Schedule Updates
Schedule UpdatesSchedule Updates
Schedule Updates
 
VERTEX Construction Delays and Forensic Schedule Analyses
VERTEX Construction Delays and Forensic Schedule AnalysesVERTEX Construction Delays and Forensic Schedule Analyses
VERTEX Construction Delays and Forensic Schedule Analyses
 
Earned Value Management
Earned Value ManagementEarned Value Management
Earned Value Management
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
project control using earned value analysis - Part 01
project control using earned value analysis - Part 01 project control using earned value analysis - Part 01
project control using earned value analysis - Part 01
 
Project Management PERT and CPM
Project Management PERT and CPMProject Management PERT and CPM
Project Management PERT and CPM
 
Project cost management
Project cost managementProject cost management
Project cost management
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 

Destaque (7)

EVA/EVM
EVA/EVMEVA/EVM
EVA/EVM
 
Earned Value Analysis - EVA
Earned Value Analysis - EVAEarned Value Analysis - EVA
Earned Value Analysis - EVA
 
Cocomo
CocomoCocomo
Cocomo
 
COCOMO MODEL
COCOMO MODELCOCOMO MODEL
COCOMO MODEL
 
Earned Value Analysis - Basic Concepts
Earned Value Analysis  - Basic ConceptsEarned Value Analysis  - Basic Concepts
Earned Value Analysis - Basic Concepts
 
Software reliability
Software reliabilitySoftware reliability
Software reliability
 
Cocomo model
Cocomo modelCocomo model
Cocomo model
 

Semelhante a Earned Value Analysis

Earned Value AnalysisTracking Project ProgressWh.docx
Earned Value AnalysisTracking Project ProgressWh.docxEarned Value AnalysisTracking Project ProgressWh.docx
Earned Value AnalysisTracking Project ProgressWh.docxsagarlesley
 
What Is Earned Value Analysis
What Is Earned Value AnalysisWhat Is Earned Value Analysis
What Is Earned Value AnalysisSimonRobertson
 
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
5. PAE AcFn621 Ch-5 Execution and Monitoring.pptProfDrAnbalaganChinn
 
Cost Controlling And Forecasting of Project.pdf
Cost Controlling And Forecasting of Project.pdfCost Controlling And Forecasting of Project.pdf
Cost Controlling And Forecasting of Project.pdfNabeel Ahmad
 
Earned value for pmp and pmi acp exam
Earned value for pmp and pmi acp examEarned value for pmp and pmi acp exam
Earned value for pmp and pmi acp examManish Purwar
 
Pm 8 cost_management
Pm 8 cost_managementPm 8 cost_management
Pm 8 cost_managementRadiant Minds
 
Pm 8 cost_management
Pm 8 cost_managementPm 8 cost_management
Pm 8 cost_managementRadiant Minds
 
Earned value management
Earned value managementEarned value management
Earned value managementwhizkris
 
Homework chapter 7
Homework chapter 7Homework chapter 7
Homework chapter 7Miles Nowak
 
Earned value Project Management (evpm)
Earned value Project Management (evpm)Earned value Project Management (evpm)
Earned value Project Management (evpm)Ejaz Bhatti
 
Project monitoring & Earned Value Analysis
Project monitoring & Earned Value AnalysisProject monitoring & Earned Value Analysis
Project monitoring & Earned Value AnalysisBECM, RUET, Bangladesh
 
Earned Value Analysis in Project Management — an Easy Cheat Sheet 🡆 http://b...
Earned Value Analysis in Project Management — an Easy Cheat Sheet  🡆 http://b...Earned Value Analysis in Project Management — an Easy Cheat Sheet  🡆 http://b...
Earned Value Analysis in Project Management — an Easy Cheat Sheet 🡆 http://b...Tipsographic . com
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost ManagementSerdar Temiz
 
Primavera Calender and Earned Value.pdf..
Primavera Calender and Earned Value.pdf..Primavera Calender and Earned Value.pdf..
Primavera Calender and Earned Value.pdf..EngrMuhammadJavidNaw
 

Semelhante a Earned Value Analysis (20)

Project Management EVM & SCBA
Project Management EVM & SCBAProject Management EVM & SCBA
Project Management EVM & SCBA
 
Earned Value AnalysisTracking Project ProgressWh.docx
Earned Value AnalysisTracking Project ProgressWh.docxEarned Value AnalysisTracking Project ProgressWh.docx
Earned Value AnalysisTracking Project ProgressWh.docx
 
What Is Earned Value Analysis
What Is Earned Value AnalysisWhat Is Earned Value Analysis
What Is Earned Value Analysis
 
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
 
Cost Controlling And Forecasting of Project.pdf
Cost Controlling And Forecasting of Project.pdfCost Controlling And Forecasting of Project.pdf
Cost Controlling And Forecasting of Project.pdf
 
Earned value for pmp and pmi acp exam
Earned value for pmp and pmi acp examEarned value for pmp and pmi acp exam
Earned value for pmp and pmi acp exam
 
Pm 8 cost_management
Pm 8 cost_managementPm 8 cost_management
Pm 8 cost_management
 
Pm 8 cost_management
Pm 8 cost_managementPm 8 cost_management
Pm 8 cost_management
 
Pmp cost chapter 7
Pmp cost chapter 7Pmp cost chapter 7
Pmp cost chapter 7
 
PMP COST FORMULAE
PMP COST FORMULAEPMP COST FORMULAE
PMP COST FORMULAE
 
Earned value management
Earned value managementEarned value management
Earned value management
 
Homework chapter 7
Homework chapter 7Homework chapter 7
Homework chapter 7
 
Basics of EVM.pdf
Basics of  EVM.pdfBasics of  EVM.pdf
Basics of EVM.pdf
 
Earned value Project Management (evpm)
Earned value Project Management (evpm)Earned value Project Management (evpm)
Earned value Project Management (evpm)
 
Project managment 6 (a)
Project managment 6 (a)Project managment 6 (a)
Project managment 6 (a)
 
Project monitoring & Earned Value Analysis
Project monitoring & Earned Value AnalysisProject monitoring & Earned Value Analysis
Project monitoring & Earned Value Analysis
 
Earned Value Analysis in Project Management — an Easy Cheat Sheet 🡆 http://b...
Earned Value Analysis in Project Management — an Easy Cheat Sheet  🡆 http://b...Earned Value Analysis in Project Management — an Easy Cheat Sheet  🡆 http://b...
Earned Value Analysis in Project Management — an Easy Cheat Sheet 🡆 http://b...
 
Project Health.doc
Project Health.docProject Health.doc
Project Health.doc
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Primavera Calender and Earned Value.pdf..
Primavera Calender and Earned Value.pdf..Primavera Calender and Earned Value.pdf..
Primavera Calender and Earned Value.pdf..
 

Earned Value Analysis

  • 1. Earned Value Analysis HOW TO KNOW WHERE YOUR PROJECT IS BY DAVID EDGEWORTH
  • 2. Earned Value (EVM)  A technique of Cost Control that compares what you’ve received or produced to what you’ve spent by monitoring the planned value, earned value, and actual costs expected to produce the work of the project  Needed to determine and document the cause of the variance, to determine the impact or the variance, and to determine whether a corrective action should be implemented as a result  EMV looks at schedule, cost, and scope project measurements together and compares them to actual work completed to date
  • 3. Planned Value (PV)  Planned Value is the cost of work that has been authorized and budgeted for a scheduled activity or Work Breakdown Structure component during a given time period or phase  PV is also known as the budget cost of work scheduled (BCWS)  It is usually a chart comparing Earned Value and Actual Cost  EV=3.8k  AC=5k  PV=4.5k $0. $2,000. $4,000. $6,000. 0 months 10 months Visual Representation of Current Project Budget Earned Value Acutual Cost Planned Value
  • 4. Actual Cost (AC)  Actual Cost is the cost of complementing the work component in a given time period  Also known as actual cost of work performance (ACWP)
  • 5. Earned Value (EV)  Earned value is the value of the work completed to date as it compares to the budgeted amount (PV) for the work component  EV is typically expressed as a percentage of work complete compared to the budget  Also known as budget cost of work performed (BCWP)  Example-Budget amount is $1,000 and we have completed 30% of the work at this date. EV=1000 x 30% so our EV= $300
  • 6. Recap  PV=is the approved budget assigned to the work to be completed in a given time  AC=the money (indirect or direct) that has actually been spent during a given time period toward the completed work  EV=the value of the work completed at this moment compared to where you were suppose to be according to the budget
  • 7. Cost Variance (CV) Are we on budget?  Cost Variance = Earned Value – Actual Cost  Example: Lets say the  Planned Cost (budgeted) (also known as the Planned Value) = $720k  Actual Cost = $600k  Earned Value = $680k  Our CV = EV-AC  680-600 = +80 a positive number means we are most likely going to be under budget
  • 8. Schedule Variance (SV)  Compares an activity’s actual progress to date to the estimated progress and is represented in terms of cost  Tells you if the schedule is going to be ahead of schedule, on time, or behind  Schedule Variance = Earned Value – Planned Value  Example: Lets say the  Planned Cost (budgeted) (also known as the Planned Value) = $720k  Earned Value = $680k  680-720= -40 a negative number indicates the project is behind schedule
  • 9. Performance Indexes  These are used to predict future project performance  All start with what you have (EV)
  • 10. Cost Performance Index (CPI)  Measures the values of work completed at this date (today) against actual cost  Cost Performance Index = Earned Value/Actual Cost  Example: Lets say the  Actual Cost = $600k  Earned Value = $680k  680/600 = 1.13 as the number is more than 1 it means your performance is better than expected
  • 11. Schedule Performance Index (SPI)  SPI measures the progress today against what is planned  Schedule Performance Index=Earned Value/Planned Value  Example: Lets say the  Planned Cost (budgeted) (also known as the Planned Value) = $720k  Earned Value = $680k  680/720= 0.94 as the value is less than 1 the project is behind schedule
  • 12. Estimate at Completion (EAC)  EAC is used to forecast the total project budget based on the current project performance and the remaining work  To get EAC you need to know  Budget at Completion (BAC)  The total amount of the budget for the work  Estimate to Complete (ETC)  The cost estimate for the remaining project work (usually gotten from expert judgment)  Estimate at Completion=Actual Cost + Estimate to Complete  Example: Lets say the  Planned Cost (budgeted) (also known as the Planned Value or BAC ) = $720k  Actual Cost = $600k  Estimate to Complete = $100k  600+100 = 700 as ETC is less than BAC you will most likely be under budget
  • 13. To-Complete Performance Index (TCPI)  TCPI is the projected performance level that the remaining work of the project must achieve in order to meet the stated financial or scheduled goals  To-Complete Performance Index =  Budget at Completion (BAC) – Earned Value (EV) Budget at Completion (BAC) – Actual Cost (AC)  Example:  Planned Cost (budgeted) (also known as the Planned Value or BAC ) = $720k  Actual Cost = $600k  Earned Value = $680k  (720-680) = 40 40/120 = 0.33 the TCPI is less than 1 so future work does not have (720-600) = 20 to be as efficiently as past performance to meet the planned schedule
  • 14. Variance Analysis (VA)  Variance Analysis is a comparison of planned results with actual project results  Most frequently used to examine the project schedule and project budget
  • 15. Variance At Completion (VAC)  Variance At Completion calculates the difference between the budget at completion and the estimate at completion  Variance At Completion (VAC)= Budget at Completion (BAC)- Estimate at Completion (EAC)  Example:  Planned Cost (budgeted) (also known as the Planned Value or BAC ) = $720k  Estimate at Completion (EAC)= $100k  720-100= 620 VAC indicates we have a positive number meaning the project was efficient
  • 16. Final Cost (FC)  Final Cost can be predicted with the following equation  Final Cost (FC)=Budgeted Cost/Cost Performance Index (CPI)  Example:  Planned Cost (budgeted) (also known as the Planned Value or BAC ) = $720k  Cost Performance Index (CPI) = 1.13  720/1.13 = 637.17 meaning the final cost is projected to be $637.17k
  • 17. Final Project Duration  Final Project Duration is how long the project will take at the current level of effort  Final Project Duration = Planned Project Duration/Schedule Performance Index (SPI)  Example  Planned Project Duration = 20 months  Duration/Schedule Performance Index (SPI) = 0.94  20/0.94=21.27 months  At the current effort the project will take about 5 to 6 weeks longer to finish
  • 18. What this means  CV = a positive number we will most likely be under budget  CV = a negative number we will most likely be over budget  SV = a positive number we will most likely be ahead of schedule  SV = a negative number we will most likely be behind schedule  SV = zero we are neither ahead nor behind schedule  CPI = more than 1 means your performance is better than expected  CPI = less than 1 means your performance is worse than expected  SPI = more than 1 the project is ahead of schedule  SPI = less than 1 the project is behind schedule  EAC = if less than BAC you will most likely be under budget  EAC = if more than BAC you will most likely be over budget  TCPI = less then 1 future work does not have to be as efficient as past performance to meet the goal  TCPI = more then 1 future work must be more efficient as past performance to meet the goal