SlideShare uma empresa Scribd logo
1 de 2
Dagoberto Valdez
2804 Cody Ave| Mission, TX 78574
5116 Grande Circle| Harlingen, TX 78552
Cell: (956) 240-1232 email: dvaldez1219@yahoo.com
Objectives
To show qualifications pertaining to the available position available in your company.
Skills
Type 65 wpm, knowledge of all Windows software: including Windows 98-2000ME, XP Professional, Windows
2007. Proficient in Word, Excel, Microsoft PowerPoint, Microsoft Outlook, Extended use of various software,
including SAP, and Cincom programs. Excellent customer and communication skills. Knowledge in all office
equipment, including fax machines, scanners, 10 Key calculators, laminators, multifunction printers, etc. Also a fast
learner and very dedicated to any position acquired. Able to multi task.
Experience
Sept. 2015-present Dr. Hiram Garcia Family Medical Day and Night clinic Pharr, TX
Phlebotomy (Lab Tech, duties as MA):
Collect blood specimen via capillary or by venipuncture. Perform tests; Complete Blood Count, Urinalyses, Lead,
HgbA1C, Lipids, E- Glucose, HPYLORI. Also give Immunizations, Injections. Perform procedures; Ear lavage, cleaning
of wound, assist Doctor or PA with procedure(s). Prepare trays with necessary equipment depending on
procedure. Order and send out color top tube for testing to DHR.: CMP, Urine culture, TSH, Chlamydia and GC, Ova
and parasite, Vitamin-D, etc… (tube collection by proper color and order of draw).
2012 – 2014 Pentair Valves & Controls Harlingen, TX
Master Planner/Scheduler Assistant
Supervised two employees. Set up Manufacturing, Purchasing and Assembly plans/forecast for month. Used daily backlog
and usage reports. Provided information daily via email/spread sheet to other departments. Reviewed open orders and
used replacements as necessary to ship customer orders. Identified SMI (slow moving inventory) and disposed of
properly if not usable to make other parts. Was designated to special projects to further advance the flow of processes.
1997-2012 Tyco Flow Controls Harlingen, TX
Materials Supervisor
Supervised Planning/Scheduling, Purchasing, Shipping/Receiving, Bar stock, Customer Service departments. Supervised
15 employees; appraised, promoted, trained and disciplined. Set up work hours. Ensured that shipping and on time
delivery goals were met. Worked extensively with Customer Service group to reduce past due orders to better our
customer experience. Also stepped in for direct employees when they were not present or on vacation. Continuously
maintained inventory to ensure physical counts were correct.
1995-1997 Tyco Valves & Controls Harlingen, TX
Stafford Production Planner
Assigned to execute production plans for the Stafford plant (offsite). Opened work orders based on material availability.
Would stay ahead on orders to avoid material shortages. Aligned and executed the 7 machines centers (15 machines)
manufacturing load based on work order delivery dates. Exceeded On Time Delivery goals. Kept in constant
communication with Stafford planners and worked with the Quality Department to inspect parts quickly upon arrival for
movement. Doing this helped ship out orders faster and more accurately.
1988-1995 Keystone Valves & Controls Harlingen, TX
Shipping and Receiving Coordinator
Supervised the shipping and receiving department (including Bar stock area). Trained, appraised, promoted and
disciplined. Worked very closely with Assembly Supervisor and Planners to ensure valves were coming in on time and
moved to the warehouse to prepare for shipments to Customers. Processed orders into our system by generating packing
lists and customer invoices. Typed bill of lading; scheduled truck pickups. Processed Customer returns; unpacked, keep
record, disposition and move to perspective departments. Worked with the Quality inspectors to receive and inspect
returns. Also was designated to receive material both physically and enter into the system. Verified quantities, part
numbers, etc. to ensure correct items were received. Communicated any discrepancies to Purchasing. Also entered
returns to vendor on system. In addition, placed items in assigned area and moved them to warehouse.
1984-1988 Instrumentation Products Inc. Harlingen, TX
Material Handler “B” for 2 months, then promoted to Production Scheduler
Filled orders in queue in Assembly. As a Scheduler, assigned to execute the manufacturing process by updated planning
and executing boards for visual goals. Work orders were generated using MRP concept. Aligned work center using block
schedule. Also by grouping similar components we were able to avoid multiple set ups to ensure components were in
warehouse prior to delivery dates to customers
Valdez, Dagoberto P. 2
Education
Kaplan College Oct. 2014
McAllen, TX Phlebotomy Technician
La Joya High School 1981
La Joya, TX High School Diploma
Business References:
Jose Carlos Toledo (jc.toledo@live.com)
Bard Ind. Project Manager
4805 Gumwood
McAllen, TX 78501 (248) 444-6966
Noemi Linan (noemi.linan@twcable.com)
Technical Operations Coordinator
609 Inverary Dr.
Harlingen, TX 78550 (956) 202-2876
Ed Ross (Ed.Ross@Pentair.com)
Pentair, Global Instr. Manager
140 South Shady Oaks
Point Blank, TX 77364 (713) 397-9296

Mais conteúdo relacionado

Mais procurados

Resume -Sidney, Keith A.
Resume -Sidney, Keith A.Resume -Sidney, Keith A.
Resume -Sidney, Keith A.keith sidney
 
CV Santhosh.M Logistics & Procurement
CV Santhosh.M Logistics & Procurement CV Santhosh.M Logistics & Procurement
CV Santhosh.M Logistics & Procurement Santhosh M
 
Mark Leber RESUME
Mark Leber RESUMEMark Leber RESUME
Mark Leber RESUMEMark Leber
 
Jose_Flores_Resume (1)
Jose_Flores_Resume (1)Jose_Flores_Resume (1)
Jose_Flores_Resume (1)Jose Flores
 
r.carino.resume.whsemgr.8.30.15
r.carino.resume.whsemgr.8.30.15r.carino.resume.whsemgr.8.30.15
r.carino.resume.whsemgr.8.30.15RUSSELL CARINO
 
CNarcisse_resume
CNarcisse_resumeCNarcisse_resume
CNarcisse_resumeCnarcsse01
 
Resume- Courtney Morris 3-15-16
Resume- Courtney Morris 3-15-16Resume- Courtney Morris 3-15-16
Resume- Courtney Morris 3-15-16Courtney Morris
 
Steve Morrow Supply Chain Resume
Steve Morrow Supply Chain ResumeSteve Morrow Supply Chain Resume
Steve Morrow Supply Chain ResumeSteve Morrow
 
Mukesh Kumar Updated Resume
Mukesh Kumar Updated ResumeMukesh Kumar Updated Resume
Mukesh Kumar Updated ResumeMukesh Kumar
 

Mais procurados (20)

Resume -Sidney, Keith A.
Resume -Sidney, Keith A.Resume -Sidney, Keith A.
Resume -Sidney, Keith A.
 
CV Santhosh.M Logistics & Procurement
CV Santhosh.M Logistics & Procurement CV Santhosh.M Logistics & Procurement
CV Santhosh.M Logistics & Procurement
 
Resume
ResumeResume
Resume
 
RESUME #1
RESUME #1RESUME #1
RESUME #1
 
Harold Scheunemann Resume - 1
Harold Scheunemann Resume - 1Harold Scheunemann Resume - 1
Harold Scheunemann Resume - 1
 
Praveen.Karabuja.PPIC
Praveen.Karabuja.PPICPraveen.Karabuja.PPIC
Praveen.Karabuja.PPIC
 
Mark Leber RESUME
Mark Leber RESUMEMark Leber RESUME
Mark Leber RESUME
 
EJAZ Warehouse-Resume UPDATE
EJAZ Warehouse-Resume UPDATEEJAZ Warehouse-Resume UPDATE
EJAZ Warehouse-Resume UPDATE
 
DST Resume 6_2015
DST Resume 6_2015DST Resume 6_2015
DST Resume 6_2015
 
Jose_Flores_Resume (1)
Jose_Flores_Resume (1)Jose_Flores_Resume (1)
Jose_Flores_Resume (1)
 
r.carino.resume.whsemgr.8.30.15
r.carino.resume.whsemgr.8.30.15r.carino.resume.whsemgr.8.30.15
r.carino.resume.whsemgr.8.30.15
 
CNarcisse_resume
CNarcisse_resumeCNarcisse_resume
CNarcisse_resume
 
the full CV
the full CVthe full CV
the full CV
 
Resume- Courtney Morris 3-15-16
Resume- Courtney Morris 3-15-16Resume- Courtney Morris 3-15-16
Resume- Courtney Morris 3-15-16
 
Steve Morrow Supply Chain Resume
Steve Morrow Supply Chain ResumeSteve Morrow Supply Chain Resume
Steve Morrow Supply Chain Resume
 
cv prof
cv profcv prof
cv prof
 
Mukesh Kumar Updated Resume
Mukesh Kumar Updated ResumeMukesh Kumar Updated Resume
Mukesh Kumar Updated Resume
 
Praveen.Karabuja.PPIC
Praveen.Karabuja.PPICPraveen.Karabuja.PPIC
Praveen.Karabuja.PPIC
 
JESUS J RIVERA 2015 RESUME
JESUS J RIVERA 2015  RESUMEJESUS J RIVERA 2015  RESUME
JESUS J RIVERA 2015 RESUME
 
Ketan Mistry
Ketan MistryKetan Mistry
Ketan Mistry
 

Destaque

Marketing to Millennials, ACOR Event
Marketing to Millennials, ACOR EventMarketing to Millennials, ACOR Event
Marketing to Millennials, ACOR EventMichael Jans Advisory
 
Listagem trabalhos lages ciências sociais
Listagem trabalhos lages ciências sociaisListagem trabalhos lages ciências sociais
Listagem trabalhos lages ciências sociaispibidsociais
 
Angela Bascombe Recommendation
Angela Bascombe RecommendationAngela Bascombe Recommendation
Angela Bascombe RecommendationBob Benoit
 
Healthcare Rx: The Rise of the Empowered Consumer
Healthcare Rx: The Rise of the Empowered ConsumerHealthcare Rx: The Rise of the Empowered Consumer
Healthcare Rx: The Rise of the Empowered ConsumerCognizant
 
Jyothi_Pawar_ Automation Tester_Resume
Jyothi_Pawar_ Automation Tester_ResumeJyothi_Pawar_ Automation Tester_Resume
Jyothi_Pawar_ Automation Tester_ResumeJyothi Pawar
 
CULTURA DE PAZ x CULTURA DA VIOLÊNCIA. DIREITOS HUMANOS. A FAVOR DA PAZ E CON...
CULTURA DE PAZ x CULTURA DA VIOLÊNCIA. DIREITOS HUMANOS. A FAVOR DA PAZ E CON...CULTURA DE PAZ x CULTURA DA VIOLÊNCIA. DIREITOS HUMANOS. A FAVOR DA PAZ E CON...
CULTURA DE PAZ x CULTURA DA VIOLÊNCIA. DIREITOS HUMANOS. A FAVOR DA PAZ E CON...Paulo David
 

Destaque (10)

Marketing to Millennials, ACOR Event
Marketing to Millennials, ACOR EventMarketing to Millennials, ACOR Event
Marketing to Millennials, ACOR Event
 
Listagem trabalhos lages ciências sociais
Listagem trabalhos lages ciências sociaisListagem trabalhos lages ciências sociais
Listagem trabalhos lages ciências sociais
 
Angela Bascombe Recommendation
Angela Bascombe RecommendationAngela Bascombe Recommendation
Angela Bascombe Recommendation
 
Pitches
PitchesPitches
Pitches
 
Healthcare Rx: The Rise of the Empowered Consumer
Healthcare Rx: The Rise of the Empowered ConsumerHealthcare Rx: The Rise of the Empowered Consumer
Healthcare Rx: The Rise of the Empowered Consumer
 
letter_raif.PDF
letter_raif.PDFletter_raif.PDF
letter_raif.PDF
 
circuito escalera
circuito escaleracircuito escalera
circuito escalera
 
Jyothi_Pawar_ Automation Tester_Resume
Jyothi_Pawar_ Automation Tester_ResumeJyothi_Pawar_ Automation Tester_Resume
Jyothi_Pawar_ Automation Tester_Resume
 
CULTURA DE PAZ x CULTURA DA VIOLÊNCIA. DIREITOS HUMANOS. A FAVOR DA PAZ E CON...
CULTURA DE PAZ x CULTURA DA VIOLÊNCIA. DIREITOS HUMANOS. A FAVOR DA PAZ E CON...CULTURA DE PAZ x CULTURA DA VIOLÊNCIA. DIREITOS HUMANOS. A FAVOR DA PAZ E CON...
CULTURA DE PAZ x CULTURA DA VIOLÊNCIA. DIREITOS HUMANOS. A FAVOR DA PAZ E CON...
 
Antropologia Cognitiva: o que é cultura?
Antropologia Cognitiva: o que é cultura?Antropologia Cognitiva: o que é cultura?
Antropologia Cognitiva: o que é cultura?
 

Semelhante a DValdezResume

Paul Hesner - Dir. of Operations.
Paul Hesner - Dir. of Operations.Paul Hesner - Dir. of Operations.
Paul Hesner - Dir. of Operations.Paul Hesner
 
RONALD D ARMSTRONG RESUME 110814
RONALD D ARMSTRONG RESUME 110814RONALD D ARMSTRONG RESUME 110814
RONALD D ARMSTRONG RESUME 110814Ron Armstrong
 
Leisa Stewart resume
Leisa Stewart resumeLeisa Stewart resume
Leisa Stewart resumeLeisa Stewart
 
JAGISH-5 YEARS-SENIOR MANUFACTURING & INDUSTRIAL MANAGEMENT
JAGISH-5 YEARS-SENIOR MANUFACTURING & INDUSTRIAL MANAGEMENTJAGISH-5 YEARS-SENIOR MANUFACTURING & INDUSTRIAL MANAGEMENT
JAGISH-5 YEARS-SENIOR MANUFACTURING & INDUSTRIAL MANAGEMENTvishalskan
 
David_Walker_new 2015
David_Walker_new 2015David_Walker_new 2015
David_Walker_new 2015david walker
 
Gail-DuBlanc Resume
Gail-DuBlanc ResumeGail-DuBlanc Resume
Gail-DuBlanc ResumeGail DuBlanc
 
Danette Farrar Resume
Danette Farrar ResumeDanette Farrar Resume
Danette Farrar ResumeDani Farrar
 
COMPREHENSIVE RESUME_updated_29102016
COMPREHENSIVE RESUME_updated_29102016COMPREHENSIVE RESUME_updated_29102016
COMPREHENSIVE RESUME_updated_29102016Alejandro Cariliman
 
rene.resume2016.docx
rene.resume2016.docxrene.resume2016.docx
rene.resume2016.docxrene sta.rita
 
Yolanda G. Saenz Resume
Yolanda G. Saenz ResumeYolanda G. Saenz Resume
Yolanda G. Saenz ResumeYOLANDA SAENZ
 

Semelhante a DValdezResume (20)

Paul Hesner - Dir. of Operations.
Paul Hesner - Dir. of Operations.Paul Hesner - Dir. of Operations.
Paul Hesner - Dir. of Operations.
 
RONALD D ARMSTRONG RESUME 110814
RONALD D ARMSTRONG RESUME 110814RONALD D ARMSTRONG RESUME 110814
RONALD D ARMSTRONG RESUME 110814
 
Leisa Stewart resume
Leisa Stewart resumeLeisa Stewart resume
Leisa Stewart resume
 
JAGISH-5 YEARS-SENIOR MANUFACTURING & INDUSTRIAL MANAGEMENT
JAGISH-5 YEARS-SENIOR MANUFACTURING & INDUSTRIAL MANAGEMENTJAGISH-5 YEARS-SENIOR MANUFACTURING & INDUSTRIAL MANAGEMENT
JAGISH-5 YEARS-SENIOR MANUFACTURING & INDUSTRIAL MANAGEMENT
 
Veronica Bishun Res. Nov 22
Veronica Bishun Res. Nov 22Veronica Bishun Res. Nov 22
Veronica Bishun Res. Nov 22
 
David_Walker_new 2015
David_Walker_new 2015David_Walker_new 2015
David_Walker_new 2015
 
My CV
My CVMy CV
My CV
 
Tyler Bloodworth Resume
Tyler Bloodworth ResumeTyler Bloodworth Resume
Tyler Bloodworth Resume
 
Gail-DuBlanc Resume
Gail-DuBlanc ResumeGail-DuBlanc Resume
Gail-DuBlanc Resume
 
Vicor odhiambo resume
Vicor odhiambo resumeVicor odhiambo resume
Vicor odhiambo resume
 
Studer
StuderStuder
Studer
 
cv
cvcv
cv
 
Danette Farrar Resume
Danette Farrar ResumeDanette Farrar Resume
Danette Farrar Resume
 
Rusty'sResume
Rusty'sResumeRusty'sResume
Rusty'sResume
 
Webb.Christopher.2014docx
Webb.Christopher.2014docxWebb.Christopher.2014docx
Webb.Christopher.2014docx
 
Rosa Maciel- 2016
Rosa Maciel- 2016Rosa Maciel- 2016
Rosa Maciel- 2016
 
rudy Resume
rudy Resumerudy Resume
rudy Resume
 
COMPREHENSIVE RESUME_updated_29102016
COMPREHENSIVE RESUME_updated_29102016COMPREHENSIVE RESUME_updated_29102016
COMPREHENSIVE RESUME_updated_29102016
 
rene.resume2016.docx
rene.resume2016.docxrene.resume2016.docx
rene.resume2016.docx
 
Yolanda G. Saenz Resume
Yolanda G. Saenz ResumeYolanda G. Saenz Resume
Yolanda G. Saenz Resume
 

DValdezResume

  • 1. Dagoberto Valdez 2804 Cody Ave| Mission, TX 78574 5116 Grande Circle| Harlingen, TX 78552 Cell: (956) 240-1232 email: dvaldez1219@yahoo.com Objectives To show qualifications pertaining to the available position available in your company. Skills Type 65 wpm, knowledge of all Windows software: including Windows 98-2000ME, XP Professional, Windows 2007. Proficient in Word, Excel, Microsoft PowerPoint, Microsoft Outlook, Extended use of various software, including SAP, and Cincom programs. Excellent customer and communication skills. Knowledge in all office equipment, including fax machines, scanners, 10 Key calculators, laminators, multifunction printers, etc. Also a fast learner and very dedicated to any position acquired. Able to multi task. Experience Sept. 2015-present Dr. Hiram Garcia Family Medical Day and Night clinic Pharr, TX Phlebotomy (Lab Tech, duties as MA): Collect blood specimen via capillary or by venipuncture. Perform tests; Complete Blood Count, Urinalyses, Lead, HgbA1C, Lipids, E- Glucose, HPYLORI. Also give Immunizations, Injections. Perform procedures; Ear lavage, cleaning of wound, assist Doctor or PA with procedure(s). Prepare trays with necessary equipment depending on procedure. Order and send out color top tube for testing to DHR.: CMP, Urine culture, TSH, Chlamydia and GC, Ova and parasite, Vitamin-D, etc… (tube collection by proper color and order of draw). 2012 – 2014 Pentair Valves & Controls Harlingen, TX Master Planner/Scheduler Assistant Supervised two employees. Set up Manufacturing, Purchasing and Assembly plans/forecast for month. Used daily backlog and usage reports. Provided information daily via email/spread sheet to other departments. Reviewed open orders and used replacements as necessary to ship customer orders. Identified SMI (slow moving inventory) and disposed of properly if not usable to make other parts. Was designated to special projects to further advance the flow of processes. 1997-2012 Tyco Flow Controls Harlingen, TX Materials Supervisor Supervised Planning/Scheduling, Purchasing, Shipping/Receiving, Bar stock, Customer Service departments. Supervised 15 employees; appraised, promoted, trained and disciplined. Set up work hours. Ensured that shipping and on time delivery goals were met. Worked extensively with Customer Service group to reduce past due orders to better our customer experience. Also stepped in for direct employees when they were not present or on vacation. Continuously maintained inventory to ensure physical counts were correct. 1995-1997 Tyco Valves & Controls Harlingen, TX Stafford Production Planner Assigned to execute production plans for the Stafford plant (offsite). Opened work orders based on material availability. Would stay ahead on orders to avoid material shortages. Aligned and executed the 7 machines centers (15 machines) manufacturing load based on work order delivery dates. Exceeded On Time Delivery goals. Kept in constant communication with Stafford planners and worked with the Quality Department to inspect parts quickly upon arrival for movement. Doing this helped ship out orders faster and more accurately. 1988-1995 Keystone Valves & Controls Harlingen, TX Shipping and Receiving Coordinator Supervised the shipping and receiving department (including Bar stock area). Trained, appraised, promoted and disciplined. Worked very closely with Assembly Supervisor and Planners to ensure valves were coming in on time and moved to the warehouse to prepare for shipments to Customers. Processed orders into our system by generating packing lists and customer invoices. Typed bill of lading; scheduled truck pickups. Processed Customer returns; unpacked, keep record, disposition and move to perspective departments. Worked with the Quality inspectors to receive and inspect returns. Also was designated to receive material both physically and enter into the system. Verified quantities, part
  • 2. numbers, etc. to ensure correct items were received. Communicated any discrepancies to Purchasing. Also entered returns to vendor on system. In addition, placed items in assigned area and moved them to warehouse. 1984-1988 Instrumentation Products Inc. Harlingen, TX Material Handler “B” for 2 months, then promoted to Production Scheduler Filled orders in queue in Assembly. As a Scheduler, assigned to execute the manufacturing process by updated planning and executing boards for visual goals. Work orders were generated using MRP concept. Aligned work center using block schedule. Also by grouping similar components we were able to avoid multiple set ups to ensure components were in warehouse prior to delivery dates to customers Valdez, Dagoberto P. 2 Education Kaplan College Oct. 2014 McAllen, TX Phlebotomy Technician La Joya High School 1981 La Joya, TX High School Diploma Business References: Jose Carlos Toledo (jc.toledo@live.com) Bard Ind. Project Manager 4805 Gumwood McAllen, TX 78501 (248) 444-6966 Noemi Linan (noemi.linan@twcable.com) Technical Operations Coordinator 609 Inverary Dr. Harlingen, TX 78550 (956) 202-2876 Ed Ross (Ed.Ross@Pentair.com) Pentair, Global Instr. Manager 140 South Shady Oaks Point Blank, TX 77364 (713) 397-9296