Fire and Life Safety 
Integration: Building Automation 
Systems and Fire/Life Safety
Presenters: 
Erik Anderson, PE, Manager, 
Koffel Associates, 
Columbia, Md. 
Wayne D. Moore, PE, CFPS, SET, FSFPE, F.NSPE, 
Principal and Vice President, 
Hughes Associates | RJA Group, 
Warwick, R.I. 
Moderator: Jack Smith, 
Consulting-Specifying Engineer, 
CFE Media, LLC
Fire and Life Safety 
Integration: Building Automation Systems and Fire /Life Safety 
Erik Anderson, PE, Manager, 
Koffel Associates, 
Columbia, Md. 
Wayne D. Moore, PE, CFPS, SET, FSFPE, 
F.NSPE, Principal and Vice President, 
Hughes Associates | RJA Group, 
Warwick, R.I.
What is a building automation system? 
• BAS: network of integrated 
electronic devices designed 
to monitor and control 
building systems 
• Other names: 
– Building management system 
– Smart building 
– Distributed control system 
• Used for HVAC, lighting, 
security…fire? 
BAS
Communication protocols 
BACnet, short for building automation 
control network, is a data 
communication protocol for building 
automation and control networks. 
BACnet is both an international (ISO) 
and ANSI standard for interoperability 
between cooperating building 
automation devices.
Communication protocols 
• LonWorks: local operating network. Proprietary 
protocol developed in 1988. Networking platform 
created to automate controls. 
• Many others types exist: 
– Modbus 
– Profibus 
– X10
BACnet changes 
• More object types added in 2001 
– Life safety points and zones 
– Latching alarm state, manual reset 
• Incorporates more system types 
• More open protocols and interoperability among 
vendors 
• Living document
BACnet Standard 
• The BACnet Standard 
addresses integration 
across a broad range 
of building systems 
• BACnet provides a 
collection of objects that 
manufacturers can 
combine to build devices 
tailored to specific 
applications. 
Fire 
Life 
Safety 
Security 
Vertical 
Transport 
CCTV 
Access 
Control 
HVAC 
Lighting 
Laboratory
Integration of BAS and safety systems 
• Opportunities to integrate: 
– Smoke control systems and HVAC 
– Fire alarm systems 
– Elevator occupant evacuation operation (OEO) 
integration.
BAS and smoke control 
• Smoke control = mechanical 
equipment 
• Historically controlled by fire alarm 
system 
• Obvious choice for integration 
– Fans starting/stopping 
– Dampers open/close 
– Doors closed and elevators recalled 
• Eliminate overrides and duplicate 
controls 
• More control.
BAS and fire alarm systems 
• Combination system per 
NFPA 72-2013: 
“A fire alarm system in which 
components are used, in whole 
or in part, in common with a 
nonfire signaling system.”
BAS and fire alarm systems 
• Fire alarm products now have a 
BACnet gateway 
– Allows monitoring but little/no 
control 
– Manufacturers of both fire alarm 
and BAS can have bidirectional 
communication if listed to UUKL 
• Research underway at NIST 
– Sensor data to estimate fire 
conditions.
BAS and fire alarm systems 
Most fire alarm systems on the 
market today have the capability 
to output fire alarm signals over 
BACnet protocols. This is 
accomplished via a BACnet 
gateway that allows the fire 
alarm system to output signals 
to third-party equipment as 
BACnet objects. The third-party 
equipment can be configured to 
read and react to data received 
from the gateway.
NFPA 72 and BAS 
• In order to ensure life safety is not impacted by 
any integrated non-fire system, a listed barrier 
gateway, integral with or attached to each 
control unit or group of control units, as 
appropriate, must be provided to prevent the 
other systems from interfering with or controlling 
the fire alarm system. (NFPA 72-2013 - 23.8.2.6.2 & 
24.4.3.22.1.2)
NFPA 72 and BAS 
The BACnet interface is a standalone piece of fire 
alarm equipment, so it is constantly online and goes 
offline only if it loses both primary and backup power, 
or if it is being serviced. Therefore, there is no 
downtime or signal restoration necessary when the 
fire alarm system is reset. If any of the fire alarm 
points that are being supervised by the gateway 
change state at any time, the BACnet gateway will 
automatically change the status of the BACnet 
objects associated with those points.
NFPA 72 and OEO 
For elevator OEO, the interface requirements are 
more complex than those of Phase I elevator 
recall. In the elevator OEO scenario, there are two 
categories of interfaces: 
• First: manual initiation of OEO by emergency 
personnel via fire alarm system controls located in 
the building’s emergency command center 
• Second: automatic initiation of OEO by the fire alarm 
system via the automatic detection of fire on any 
floor of the building.
NFPA 72 and OEO 
Note that any automatic fire alarm initiating device 
associated with Phase I elevator recall is not permitted to 
initiate elevator OEO, as Phase I elevator recall takes 
priority over elevator OEO (NFPA 72 Section 21.6.2.1.1(1)). 
Also important to note is the intentional omission of manual 
fire alarm boxes throughout the building from initiating 
elevator OEO. These are not required to initiate elevator 
OEO because these devices are typically activated away 
from the fire and could lead to confusion on the location of 
the fire and initiate an incorrect sequence of operation 
(NFPA 72 Section A.26.6.2.1.1(2)).
OEO and the codes 
Specific OEO requirements are contained in the IBC, NFPA 
101, NFPA 72, and ASME A17.1. It should be noted that 
these codes do not always require elevator OEO to be 
provided in buildings. However, where required and/or 
when a building owner or designer decides to provide 
elevators for OEO, they must comply with the provisions of 
these codes. Currently, the only requirement for OEO within 
any of the above codes and standards is an exception to 
the requirement of IBC Section 403.5.2, which allows OEO 
to be used instead of providing an additional exit stairway 
in buildings more than 420 ft. high with occupancy 
classifications of other than Group R-2.
NFPA 72 and OEO 
Chapter 21: emergency control function 
interfaces 
• Section 6: occupant evacuation elevators of 
the 2013 edition contains the OEO 
requirements that apply to the control 
function interfaces between building fire 
alarm systems and OEO elevator controllers 
• Section 21.6.1 requires that all elevators 
designated and marked for use by 
occupants for evacuation during fires must 
also comply with NFPA 72 Section 21.5, 
which contains requirements for fire service 
access elevators.
NFPA 72 and BAS 
Section 21.5 requires that elevators designated as fire service 
access elevators comply with specific supervision and 
annunciation requirements. The section requires the following 
functions be supervised and annunciated at the fire command 
center: 
• The availability of main and emergency power to operate the 
elevators, elevator controllers, and machine room ventilation 
(if provided) 
• Status of the elevators including location within the hoist way, 
direction of travel, and whether they are occupied 
• Temperature and presence of smoke in associated lobbies 
and machine room (if provided) 
• The supervision of the temperature and presence of smoke 
within elevator lobbies and machine rooms can be 
accomplished by the fire alarm system.
NFPA 72 and OEO 
Occupant notification requirements for elevator 
OEO: 
• NFPA 72, Section 21.6.2.1.4 contains 
requirements for occupant notification during times 
of elevator OEO. 
• These requirements specify variations of voice 
messages that must be automatically transmitted 
to the specified floors throughout the building 
during elevator OEO.
NFPA 72 and OEO 
Occupant notification requirements for elevator OEO: 
Automatic voice messages are required to be transmitted 
as follows (NFPA 72 Sections 21.6.2.1.4 and 21.6.2.2.3): 
• Throughout all floors of the building when total building 
evacuation has been initiated: automatic voice message 
indicating the need to evacuate the building and that 
elevator service is available 
• Throughout all floors identified for elevator OEO when 
the elevators are under Phase I recall: automatic voice 
message indicating the need to evacuate and that 
elevator service is not available for evacuation.
NFPA 72 and OEO 
Occupant notification requirements for elevator OEO: 
Automatic voice messages are required to be transmitted as 
follows (NFPA 72 Sections 21.6.2.1.4 & 21.6.2.2.3): 
• NFPA 72 Section 21.6.2.1.4(D) further requires all automatic 
voice messages to be coordinated with the text displays 
provided separately by the elevator management system. 
• Also important is to coordinate elevator car voice messages 
and elevator lobby variable message signs that originate 
from the elevator management system. This will ensure that 
all building occupants are given uniform instructions and 
information over both the fire alarm and elevator 
management systems.
IBC and BAS 
• IBC Section 907: fire alarm 
– UL 864 compliance 
– NFPA 72 compliance 
• IBC Section 909: smoke control 
– Control system compliance with 
NFPA 72 and UL 864/UUKL 
– Marking and labeling 
– Raceway required 
– Control diagrams 
– Response time 
– Status indicators (fans, dampers).
IBC and BAS 
IBC Section 3008: 
• Occupant evacuation elevators 
• Referenced by Section 403.5.2 
• Many additional requirements 
• Controls/communications 
– Two-way communications 
– Elevator status monitoring 
– Lobby status indicator. 
“In Case of Fire – 
Use the Exit 
Stairs???” 
EXIT 
…or elevator?
Benefits to integration 
• Reduces the amount of equipment 
• Reduces installation costs 
• Expedites system acceptance 
• Consolidates building information at a central 
location; simplifies workstations 
• Increases reliability 
• Simplifies troubleshooting.
Design considerations 
• Challenges 
– Unauthorized changes to BAS programming 
• What is possible today? 
– BACnet gateways built into fire alarm panels 
– BACnet smoke control system (UUKL) 
• Future? 
– More integration, less interface equipment, such 
as relays 
– Wireless technology may replace traditional wired 
BAS infrastructure 
– Power over Ethernet (POE).
Design considerations 
• UL listing implications 
– UL 864 (fire alarm) listing if BACnet is 
performing fire alarm functions 
– UUKL category if BACnet is used for 
smoke control 
• BACnet fire alarm system 
limitations 
– Fire alarm addressable circuits are not 
directly compatible with BACnet 
– Bridging or open gateway processing 
is necessary 
– One-way communications only unless 
manufacturer supplies both fire alarm 
and BAS.
Commissioning, installation, testing, and 
maintenance 
• BAS may allow for changes during testing 
– VFD fans 
– Programing changes rather than relays 
• If used for fire, BAS testing may be more robust 
– NFPA 3: Recommended Practice for 
Commissioning and Integrated Testing of Fire 
Protection and Life Safety Systems 
– BAS technician involvement 
– Test interoperability, automatic, and manual 
– Special inspections required for smoke control.
Commissioning, installation, testing, and 
maintenance 
• Documentation 
– Testing documents 
– Tracking of system 
modifications.
Summary 
We discussed: 
• Building automation systems in general 
• Integration of fire/life safety systems into BAS 
• NFPA 72 and IBC criteria 
• UL listing implications 
• Design considerations when integrating safety 
systems 
• Commissioning and testing considerations.
BAS References 
• American Society of Mechanical Engineers: 
www.asme.org 
• ASHRAE: www.ashrae.org 
• BACnet: www.bacnet.org and 
www.bacnet.org/Contact/NIST-ITC/Consortium.htm 
• International Building Code (IBC): www.iccsafe.org 
• International Organization for Standardization (ISO) 
• LonWorks: www.lonmark.org 
• National Institute of Standards and Technology (NIST): 
www.nist.gov/building-and-fire-research-portal.cfm and 
www.nist.gov/el/building_environment/mechsys/ 
• NFPA: www.nfpa.org
Presenters: 
Erik Anderson, PE, Manager, 
Koffel Associates, 
Columbia, Md. 
Wayne D. Moore, PE, CFPS, SET, FSFPE, F.NSPE, 
Principal and Vice President, 
Hughes Associates | RJA Group, 
Warwick, R.I. 
Moderator: Jack Smith, 
Consulting-Specifying Engineer, 
CFE Media, LLC
Fire and Life Safety 
Integration: Building Automation 
Systems and Fire/Life Safety

Mais conteúdo relacionado

Mais procurados

Planning and design of building services in multi Story
Planning and design of building services in multi Story Planning and design of building services in multi Story
Planning and design of building services in multi Story Vj NiroSh
 
Fire Detection and Alarm Systems
Fire Detection and Alarm SystemsFire Detection and Alarm Systems
Fire Detection and Alarm SystemsJ.T.A.JONES
 
Building Services II Presentation Slides
Building Services II Presentation SlidesBuilding Services II Presentation Slides
Building Services II Presentation Slidesashleyyeap
 
Fire Safety and Building Materials
Fire Safety and Building MaterialsFire Safety and Building Materials
Fire Safety and Building MaterialsSorab Mishra
 
Chapter 07-High-Rise Building Fires
Chapter 07-High-Rise Building FiresChapter 07-High-Rise Building Fires
Chapter 07-High-Rise Building Firessnoshoesam
 
Fire Protection Systems Unit-I
Fire Protection Systems Unit-IFire Protection Systems Unit-I
Fire Protection Systems Unit-IGAURAV. H .TANDON
 
Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)Ritesh Ambadkar
 
Intelligent building ppt
Intelligent building pptIntelligent building ppt
Intelligent building pptBeing Deepak
 
Fire alarm system and common types of detectors
Fire alarm system and common types of detectorsFire alarm system and common types of detectors
Fire alarm system and common types of detectorsMuhammad Farid
 
FIRE ALARM SYSTEM
FIRE ALARM SYSTEM FIRE ALARM SYSTEM
FIRE ALARM SYSTEM Sebin James
 
Building Management Services
Building Management Services Building Management Services
Building Management Services Aroh Thombre
 
Fire protection system
Fire protection systemFire protection system
Fire protection systemDeepak Thapa
 
Smoke Control in Buildings
Smoke Control in BuildingsSmoke Control in Buildings
Smoke Control in BuildingsIllinois ASHRAE
 
building services- II Lighting
building services- II Lightingbuilding services- II Lighting
building services- II LightingKethees Waran
 
Building Services Electrical (MEP)
Building Services Electrical (MEP)Building Services Electrical (MEP)
Building Services Electrical (MEP)Manoj Mawle
 

Mais procurados (20)

Planning and design of building services in multi Story
Planning and design of building services in multi Story Planning and design of building services in multi Story
Planning and design of building services in multi Story
 
Bms system
Bms  systemBms  system
Bms system
 
Fire Detection and Alarm Systems
Fire Detection and Alarm SystemsFire Detection and Alarm Systems
Fire Detection and Alarm Systems
 
Building Services II Presentation Slides
Building Services II Presentation SlidesBuilding Services II Presentation Slides
Building Services II Presentation Slides
 
Fire Safety and Building Materials
Fire Safety and Building MaterialsFire Safety and Building Materials
Fire Safety and Building Materials
 
Fire Fighting System
Fire Fighting SystemFire Fighting System
Fire Fighting System
 
Chapter 07-High-Rise Building Fires
Chapter 07-High-Rise Building FiresChapter 07-High-Rise Building Fires
Chapter 07-High-Rise Building Fires
 
Fire Protection Systems Unit-I
Fire Protection Systems Unit-IFire Protection Systems Unit-I
Fire Protection Systems Unit-I
 
Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)
 
Ventilation System
Ventilation System Ventilation System
Ventilation System
 
Intelligent building ppt
Intelligent building pptIntelligent building ppt
Intelligent building ppt
 
HVAC Fundamentals
HVAC  FundamentalsHVAC  Fundamentals
HVAC Fundamentals
 
Fire alarm system and common types of detectors
Fire alarm system and common types of detectorsFire alarm system and common types of detectors
Fire alarm system and common types of detectors
 
FIRE ALARM SYSTEM
FIRE ALARM SYSTEM FIRE ALARM SYSTEM
FIRE ALARM SYSTEM
 
Building Management Services
Building Management Services Building Management Services
Building Management Services
 
Introduction To Building Services
Introduction To Building ServicesIntroduction To Building Services
Introduction To Building Services
 
Fire protection system
Fire protection systemFire protection system
Fire protection system
 
Smoke Control in Buildings
Smoke Control in BuildingsSmoke Control in Buildings
Smoke Control in Buildings
 
building services- II Lighting
building services- II Lightingbuilding services- II Lighting
building services- II Lighting
 
Building Services Electrical (MEP)
Building Services Electrical (MEP)Building Services Electrical (MEP)
Building Services Electrical (MEP)
 

Destaque

Critical Power: Generators and Generator System Design
Critical Power: Generators and Generator System DesignCritical Power: Generators and Generator System Design
Critical Power: Generators and Generator System DesignConsultingSpecifyingEngineer
 
Home and building automation systems
Home and building automation systemsHome and building automation systems
Home and building automation systemsDario Bonino
 
Critical Power: NFPA 110: Standard for Emergency and Standby Power
Critical Power: NFPA 110: Standard for Emergency and Standby Power Critical Power: NFPA 110: Standard for Emergency and Standby Power
Critical Power: NFPA 110: Standard for Emergency and Standby Power ConsultingSpecifyingEngineer
 
HVAC Energy Efficiency in Commercial Buildings
HVAC Energy Efficiency in Commercial BuildingsHVAC Energy Efficiency in Commercial Buildings
HVAC Energy Efficiency in Commercial BuildingsAlan Richardson
 
Intelligent building
Intelligent buildingIntelligent building
Intelligent buildingKhyati Saggu
 
Building Management System BMS Introduction
Building Management System BMS  IntroductionBuilding Management System BMS  Introduction
Building Management System BMS IntroductionGAUTAM KOPPALA (JORGE)
 
Intelligent building system
Intelligent building systemIntelligent building system
Intelligent building systemSaifullah Memon
 
Building automation & controls
Building automation & controlsBuilding automation & controls
Building automation & controlsIllinois ASHRAE
 
Fire Safety Management
Fire Safety ManagementFire Safety Management
Fire Safety ManagementNc Das
 
Fire prevention.ppt
Fire prevention.pptFire prevention.ppt
Fire prevention.pptSahl Ahmed
 
Hvac Presentation
Hvac PresentationHvac Presentation
Hvac PresentationChoong KW
 
Intelligent BMS for Green Hotels
Intelligent BMS for Green HotelsIntelligent BMS for Green Hotels
Intelligent BMS for Green HotelsFiras Obeido
 
Biometric access control
Biometric access controlBiometric access control
Biometric access controlPragya Tripathi
 
Fire Pump Transfer Switch Basics
Fire Pump Transfer Switch BasicsFire Pump Transfer Switch Basics
Fire Pump Transfer Switch BasicsJames S Nasby
 

Destaque (20)

HVAC for Data Centers
HVAC for Data CentersHVAC for Data Centers
HVAC for Data Centers
 
Critical Power: Generators and Generator System Design
Critical Power: Generators and Generator System DesignCritical Power: Generators and Generator System Design
Critical Power: Generators and Generator System Design
 
Home and building automation systems
Home and building automation systemsHome and building automation systems
Home and building automation systems
 
Critical Power: NFPA 110: Standard for Emergency and Standby Power
Critical Power: NFPA 110: Standard for Emergency and Standby Power Critical Power: NFPA 110: Standard for Emergency and Standby Power
Critical Power: NFPA 110: Standard for Emergency and Standby Power
 
HVAC Energy Efficiency in Commercial Buildings
HVAC Energy Efficiency in Commercial BuildingsHVAC Energy Efficiency in Commercial Buildings
HVAC Energy Efficiency in Commercial Buildings
 
Intelligent building
Intelligent buildingIntelligent building
Intelligent building
 
Intelligent Buildings
Intelligent BuildingsIntelligent Buildings
Intelligent Buildings
 
Building Management System BMS Introduction
Building Management System BMS  IntroductionBuilding Management System BMS  Introduction
Building Management System BMS Introduction
 
Intelligent building system
Intelligent building systemIntelligent building system
Intelligent building system
 
HVAC: New chiller requirements
HVAC: New chiller requirementsHVAC: New chiller requirements
HVAC: New chiller requirements
 
Building automation & controls
Building automation & controlsBuilding automation & controls
Building automation & controls
 
Bms system basic
Bms system  basicBms system  basic
Bms system basic
 
HVAC Sysems & AHU
HVAC Sysems & AHUHVAC Sysems & AHU
HVAC Sysems & AHU
 
Fire Safety Management
Fire Safety ManagementFire Safety Management
Fire Safety Management
 
Basics of Fire fighting
Basics of Fire fightingBasics of Fire fighting
Basics of Fire fighting
 
Fire prevention.ppt
Fire prevention.pptFire prevention.ppt
Fire prevention.ppt
 
Hvac Presentation
Hvac PresentationHvac Presentation
Hvac Presentation
 
Intelligent BMS for Green Hotels
Intelligent BMS for Green HotelsIntelligent BMS for Green Hotels
Intelligent BMS for Green Hotels
 
Biometric access control
Biometric access controlBiometric access control
Biometric access control
 
Fire Pump Transfer Switch Basics
Fire Pump Transfer Switch BasicsFire Pump Transfer Switch Basics
Fire Pump Transfer Switch Basics
 

Semelhante a Fire and Life Safety: Integration: Building Automation Systems and Fire/Life Safety

Building Lighting Automation through the Integration of DALI with Wireless Se...
Building Lighting Automation through the Integration of DALI with Wireless Se...Building Lighting Automation through the Integration of DALI with Wireless Se...
Building Lighting Automation through the Integration of DALI with Wireless Se...Anand Parakkat Parambil
 
IRJET- Building Management System and its Network Design
IRJET- Building Management System and its Network DesignIRJET- Building Management System and its Network Design
IRJET- Building Management System and its Network DesignIRJET Journal
 
CS0022 - Automotive PBS Conveyor and Controls
CS0022 - Automotive PBS Conveyor and ControlsCS0022 - Automotive PBS Conveyor and Controls
CS0022 - Automotive PBS Conveyor and ControlsNick Darrall
 
CS0022 - Automotive PBS Conveyor and Controls
CS0022 - Automotive PBS Conveyor and ControlsCS0022 - Automotive PBS Conveyor and Controls
CS0022 - Automotive PBS Conveyor and ControlsGuy Black
 
Building management system
Building management systemBuilding management system
Building management systemcharan malyala
 
California Firecodes
California FirecodesCalifornia Firecodes
California Firecodesmalcolmfd
 
Plc course presentation
Plc course presentationPlc course presentation
Plc course presentationOsama Wahdan
 
ABB BMS Automation HVAC Presentation.pdf
ABB BMS Automation HVAC  Presentation.pdfABB BMS Automation HVAC  Presentation.pdf
ABB BMS Automation HVAC Presentation.pdfsajamal1
 
Fire alarm checklist
Fire alarm checklistFire alarm checklist
Fire alarm checklistirhabsyam
 
Proof energy@work midih oc2-demo_day
Proof energy@work midih oc2-demo_dayProof energy@work midih oc2-demo_day
Proof energy@work midih oc2-demo_dayMIDIH_EU
 
ap700-AIRONET.pdf
ap700-AIRONET.pdfap700-AIRONET.pdf
ap700-AIRONET.pdfDanar52
 
3 Phase NFV/SDN Virtualizartion Road Map
3 Phase NFV/SDN Virtualizartion Road Map3 Phase NFV/SDN Virtualizartion Road Map
3 Phase NFV/SDN Virtualizartion Road MapMettle Networks
 
Fire alarm 3-e-public_emergency_alarm_reporting_systems
Fire alarm 3-e-public_emergency_alarm_reporting_systemsFire alarm 3-e-public_emergency_alarm_reporting_systems
Fire alarm 3-e-public_emergency_alarm_reporting_systemsgrantlerc
 
How to Implement Functional Safety in Mobile Machinery IQAN MC4xFS Parker Han...
How to Implement Functional Safety in Mobile Machinery IQAN MC4xFS Parker Han...How to Implement Functional Safety in Mobile Machinery IQAN MC4xFS Parker Han...
How to Implement Functional Safety in Mobile Machinery IQAN MC4xFS Parker Han...Parker Hannifin Corporation
 
Remote monitoring of noxious gases and automated control
Remote monitoring of noxious gases and automated controlRemote monitoring of noxious gases and automated control
Remote monitoring of noxious gases and automated controlPINAKI ROY
 
Video Based Industry Control
Video Based Industry ControlVideo Based Industry Control
Video Based Industry ControlJun Steed Huang
 
A CAN BUS BASED SYSTEM FOR MONITORING AND FAULT DIAGNOSIS IN WIND TURBINE
A CAN BUS BASED SYSTEM FOR MONITORING AND FAULT DIAGNOSIS IN WIND TURBINE A CAN BUS BASED SYSTEM FOR MONITORING AND FAULT DIAGNOSIS IN WIND TURBINE
A CAN BUS BASED SYSTEM FOR MONITORING AND FAULT DIAGNOSIS IN WIND TURBINE Own preparations
 
EUCA22 - Patch Management ISO_IEC 15408 & 18045
EUCA22 - Patch Management ISO_IEC 15408 & 18045EUCA22 - Patch Management ISO_IEC 15408 & 18045
EUCA22 - Patch Management ISO_IEC 15408 & 18045Javier Tallón
 
4010 front-panel-installing,-operating-and-programming-manual
4010 front-panel-installing,-operating-and-programming-manual4010 front-panel-installing,-operating-and-programming-manual
4010 front-panel-installing,-operating-and-programming-manualHeru Heru
 

Semelhante a Fire and Life Safety: Integration: Building Automation Systems and Fire/Life Safety (20)

Building Lighting Automation through the Integration of DALI with Wireless Se...
Building Lighting Automation through the Integration of DALI with Wireless Se...Building Lighting Automation through the Integration of DALI with Wireless Se...
Building Lighting Automation through the Integration of DALI with Wireless Se...
 
IRJET- Building Management System and its Network Design
IRJET- Building Management System and its Network DesignIRJET- Building Management System and its Network Design
IRJET- Building Management System and its Network Design
 
CS0022 - Automotive PBS Conveyor and Controls
CS0022 - Automotive PBS Conveyor and ControlsCS0022 - Automotive PBS Conveyor and Controls
CS0022 - Automotive PBS Conveyor and Controls
 
CS0022 - Automotive PBS Conveyor and Controls
CS0022 - Automotive PBS Conveyor and ControlsCS0022 - Automotive PBS Conveyor and Controls
CS0022 - Automotive PBS Conveyor and Controls
 
Building management system
Building management systemBuilding management system
Building management system
 
California Firecodes
California FirecodesCalifornia Firecodes
California Firecodes
 
Plc course presentation
Plc course presentationPlc course presentation
Plc course presentation
 
IO-Summary-for-IBMS-Service.pdf
IO-Summary-for-IBMS-Service.pdfIO-Summary-for-IBMS-Service.pdf
IO-Summary-for-IBMS-Service.pdf
 
ABB BMS Automation HVAC Presentation.pdf
ABB BMS Automation HVAC  Presentation.pdfABB BMS Automation HVAC  Presentation.pdf
ABB BMS Automation HVAC Presentation.pdf
 
Fire alarm checklist
Fire alarm checklistFire alarm checklist
Fire alarm checklist
 
Proof energy@work midih oc2-demo_day
Proof energy@work midih oc2-demo_dayProof energy@work midih oc2-demo_day
Proof energy@work midih oc2-demo_day
 
ap700-AIRONET.pdf
ap700-AIRONET.pdfap700-AIRONET.pdf
ap700-AIRONET.pdf
 
3 Phase NFV/SDN Virtualizartion Road Map
3 Phase NFV/SDN Virtualizartion Road Map3 Phase NFV/SDN Virtualizartion Road Map
3 Phase NFV/SDN Virtualizartion Road Map
 
Fire alarm 3-e-public_emergency_alarm_reporting_systems
Fire alarm 3-e-public_emergency_alarm_reporting_systemsFire alarm 3-e-public_emergency_alarm_reporting_systems
Fire alarm 3-e-public_emergency_alarm_reporting_systems
 
How to Implement Functional Safety in Mobile Machinery IQAN MC4xFS Parker Han...
How to Implement Functional Safety in Mobile Machinery IQAN MC4xFS Parker Han...How to Implement Functional Safety in Mobile Machinery IQAN MC4xFS Parker Han...
How to Implement Functional Safety in Mobile Machinery IQAN MC4xFS Parker Han...
 
Remote monitoring of noxious gases and automated control
Remote monitoring of noxious gases and automated controlRemote monitoring of noxious gases and automated control
Remote monitoring of noxious gases and automated control
 
Video Based Industry Control
Video Based Industry ControlVideo Based Industry Control
Video Based Industry Control
 
A CAN BUS BASED SYSTEM FOR MONITORING AND FAULT DIAGNOSIS IN WIND TURBINE
A CAN BUS BASED SYSTEM FOR MONITORING AND FAULT DIAGNOSIS IN WIND TURBINE A CAN BUS BASED SYSTEM FOR MONITORING AND FAULT DIAGNOSIS IN WIND TURBINE
A CAN BUS BASED SYSTEM FOR MONITORING AND FAULT DIAGNOSIS IN WIND TURBINE
 
EUCA22 - Patch Management ISO_IEC 15408 & 18045
EUCA22 - Patch Management ISO_IEC 15408 & 18045EUCA22 - Patch Management ISO_IEC 15408 & 18045
EUCA22 - Patch Management ISO_IEC 15408 & 18045
 
4010 front-panel-installing,-operating-and-programming-manual
4010 front-panel-installing,-operating-and-programming-manual4010 front-panel-installing,-operating-and-programming-manual
4010 front-panel-installing,-operating-and-programming-manual
 

Mais de ConsultingSpecifyingEngineer

Critical Power: Integrating Renewable Power into Buildings
Critical Power: Integrating Renewable Power into BuildingsCritical Power: Integrating Renewable Power into Buildings
Critical Power: Integrating Renewable Power into BuildingsConsultingSpecifyingEngineer
 
Fire and Life Safety: Notification and Emergency Communication Systems
Fire and Life Safety: Notification and Emergency Communication SystemsFire and Life Safety: Notification and Emergency Communication Systems
Fire and Life Safety: Notification and Emergency Communication SystemsConsultingSpecifyingEngineer
 
Critical Power: Circuit Protection in Health Care Facilities
Critical Power: Circuit Protection in Health Care FacilitiesCritical Power: Circuit Protection in Health Care Facilities
Critical Power: Circuit Protection in Health Care FacilitiesConsultingSpecifyingEngineer
 
Industrial Branding: The Lost Art in the Industrial Marketplace
Industrial Branding: The Lost Art in the Industrial MarketplaceIndustrial Branding: The Lost Art in the Industrial Marketplace
Industrial Branding: The Lost Art in the Industrial MarketplaceConsultingSpecifyingEngineer
 
Creating an Integrated Marketing Campaign for Impact and Results
Creating an Integrated Marketing Campaign for Impact and ResultsCreating an Integrated Marketing Campaign for Impact and Results
Creating an Integrated Marketing Campaign for Impact and ResultsConsultingSpecifyingEngineer
 
Marketing New Product Introductions in Mobility & SaaS: Ideation to Marketing...
Marketing New Product Introductions in Mobility & SaaS: Ideation to Marketing...Marketing New Product Introductions in Mobility & SaaS: Ideation to Marketing...
Marketing New Product Introductions in Mobility & SaaS: Ideation to Marketing...ConsultingSpecifyingEngineer
 
Integrating the Marketing and Engineering Points of View in Marketing Communi...
Integrating the Marketing and Engineering Points of View in Marketing Communi...Integrating the Marketing and Engineering Points of View in Marketing Communi...
Integrating the Marketing and Engineering Points of View in Marketing Communi...ConsultingSpecifyingEngineer
 
The State of the Electrical/Power Engineering Industry
The State of the Electrical/Power Engineering Industry The State of the Electrical/Power Engineering Industry
The State of the Electrical/Power Engineering Industry ConsultingSpecifyingEngineer
 

Mais de ConsultingSpecifyingEngineer (12)

Critical power: Transfer switches and switchgear
Critical power: Transfer switches and switchgearCritical power: Transfer switches and switchgear
Critical power: Transfer switches and switchgear
 
Electrical Systems: Designing electrical rooms
Electrical Systems: Designing electrical roomsElectrical Systems: Designing electrical rooms
Electrical Systems: Designing electrical rooms
 
Critical Power: Integrating Renewable Power into Buildings
Critical Power: Integrating Renewable Power into BuildingsCritical Power: Integrating Renewable Power into Buildings
Critical Power: Integrating Renewable Power into Buildings
 
Modular Data Center Design
Modular Data Center DesignModular Data Center Design
Modular Data Center Design
 
Fire and Life Safety: Notification and Emergency Communication Systems
Fire and Life Safety: Notification and Emergency Communication SystemsFire and Life Safety: Notification and Emergency Communication Systems
Fire and Life Safety: Notification and Emergency Communication Systems
 
Critical Power: Circuit Protection in Health Care Facilities
Critical Power: Circuit Protection in Health Care FacilitiesCritical Power: Circuit Protection in Health Care Facilities
Critical Power: Circuit Protection in Health Care Facilities
 
Create Marketing Engineers Love
Create Marketing Engineers LoveCreate Marketing Engineers Love
Create Marketing Engineers Love
 
Industrial Branding: The Lost Art in the Industrial Marketplace
Industrial Branding: The Lost Art in the Industrial MarketplaceIndustrial Branding: The Lost Art in the Industrial Marketplace
Industrial Branding: The Lost Art in the Industrial Marketplace
 
Creating an Integrated Marketing Campaign for Impact and Results
Creating an Integrated Marketing Campaign for Impact and ResultsCreating an Integrated Marketing Campaign for Impact and Results
Creating an Integrated Marketing Campaign for Impact and Results
 
Marketing New Product Introductions in Mobility & SaaS: Ideation to Marketing...
Marketing New Product Introductions in Mobility & SaaS: Ideation to Marketing...Marketing New Product Introductions in Mobility & SaaS: Ideation to Marketing...
Marketing New Product Introductions in Mobility & SaaS: Ideation to Marketing...
 
Integrating the Marketing and Engineering Points of View in Marketing Communi...
Integrating the Marketing and Engineering Points of View in Marketing Communi...Integrating the Marketing and Engineering Points of View in Marketing Communi...
Integrating the Marketing and Engineering Points of View in Marketing Communi...
 
The State of the Electrical/Power Engineering Industry
The State of the Electrical/Power Engineering Industry The State of the Electrical/Power Engineering Industry
The State of the Electrical/Power Engineering Industry
 

Último

Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024Janet Corral
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 

Último (20)

Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 

Fire and Life Safety: Integration: Building Automation Systems and Fire/Life Safety

  • 1. Fire and Life Safety Integration: Building Automation Systems and Fire/Life Safety
  • 2. Presenters: Erik Anderson, PE, Manager, Koffel Associates, Columbia, Md. Wayne D. Moore, PE, CFPS, SET, FSFPE, F.NSPE, Principal and Vice President, Hughes Associates | RJA Group, Warwick, R.I. Moderator: Jack Smith, Consulting-Specifying Engineer, CFE Media, LLC
  • 3. Fire and Life Safety Integration: Building Automation Systems and Fire /Life Safety Erik Anderson, PE, Manager, Koffel Associates, Columbia, Md. Wayne D. Moore, PE, CFPS, SET, FSFPE, F.NSPE, Principal and Vice President, Hughes Associates | RJA Group, Warwick, R.I.
  • 4. What is a building automation system? • BAS: network of integrated electronic devices designed to monitor and control building systems • Other names: – Building management system – Smart building – Distributed control system • Used for HVAC, lighting, security…fire? BAS
  • 5. Communication protocols BACnet, short for building automation control network, is a data communication protocol for building automation and control networks. BACnet is both an international (ISO) and ANSI standard for interoperability between cooperating building automation devices.
  • 6. Communication protocols • LonWorks: local operating network. Proprietary protocol developed in 1988. Networking platform created to automate controls. • Many others types exist: – Modbus – Profibus – X10
  • 7. BACnet changes • More object types added in 2001 – Life safety points and zones – Latching alarm state, manual reset • Incorporates more system types • More open protocols and interoperability among vendors • Living document
  • 8. BACnet Standard • The BACnet Standard addresses integration across a broad range of building systems • BACnet provides a collection of objects that manufacturers can combine to build devices tailored to specific applications. Fire Life Safety Security Vertical Transport CCTV Access Control HVAC Lighting Laboratory
  • 9. Integration of BAS and safety systems • Opportunities to integrate: – Smoke control systems and HVAC – Fire alarm systems – Elevator occupant evacuation operation (OEO) integration.
  • 10. BAS and smoke control • Smoke control = mechanical equipment • Historically controlled by fire alarm system • Obvious choice for integration – Fans starting/stopping – Dampers open/close – Doors closed and elevators recalled • Eliminate overrides and duplicate controls • More control.
  • 11. BAS and fire alarm systems • Combination system per NFPA 72-2013: “A fire alarm system in which components are used, in whole or in part, in common with a nonfire signaling system.”
  • 12. BAS and fire alarm systems • Fire alarm products now have a BACnet gateway – Allows monitoring but little/no control – Manufacturers of both fire alarm and BAS can have bidirectional communication if listed to UUKL • Research underway at NIST – Sensor data to estimate fire conditions.
  • 13. BAS and fire alarm systems Most fire alarm systems on the market today have the capability to output fire alarm signals over BACnet protocols. This is accomplished via a BACnet gateway that allows the fire alarm system to output signals to third-party equipment as BACnet objects. The third-party equipment can be configured to read and react to data received from the gateway.
  • 14. NFPA 72 and BAS • In order to ensure life safety is not impacted by any integrated non-fire system, a listed barrier gateway, integral with or attached to each control unit or group of control units, as appropriate, must be provided to prevent the other systems from interfering with or controlling the fire alarm system. (NFPA 72-2013 - 23.8.2.6.2 & 24.4.3.22.1.2)
  • 15. NFPA 72 and BAS The BACnet interface is a standalone piece of fire alarm equipment, so it is constantly online and goes offline only if it loses both primary and backup power, or if it is being serviced. Therefore, there is no downtime or signal restoration necessary when the fire alarm system is reset. If any of the fire alarm points that are being supervised by the gateway change state at any time, the BACnet gateway will automatically change the status of the BACnet objects associated with those points.
  • 16. NFPA 72 and OEO For elevator OEO, the interface requirements are more complex than those of Phase I elevator recall. In the elevator OEO scenario, there are two categories of interfaces: • First: manual initiation of OEO by emergency personnel via fire alarm system controls located in the building’s emergency command center • Second: automatic initiation of OEO by the fire alarm system via the automatic detection of fire on any floor of the building.
  • 17. NFPA 72 and OEO Note that any automatic fire alarm initiating device associated with Phase I elevator recall is not permitted to initiate elevator OEO, as Phase I elevator recall takes priority over elevator OEO (NFPA 72 Section 21.6.2.1.1(1)). Also important to note is the intentional omission of manual fire alarm boxes throughout the building from initiating elevator OEO. These are not required to initiate elevator OEO because these devices are typically activated away from the fire and could lead to confusion on the location of the fire and initiate an incorrect sequence of operation (NFPA 72 Section A.26.6.2.1.1(2)).
  • 18. OEO and the codes Specific OEO requirements are contained in the IBC, NFPA 101, NFPA 72, and ASME A17.1. It should be noted that these codes do not always require elevator OEO to be provided in buildings. However, where required and/or when a building owner or designer decides to provide elevators for OEO, they must comply with the provisions of these codes. Currently, the only requirement for OEO within any of the above codes and standards is an exception to the requirement of IBC Section 403.5.2, which allows OEO to be used instead of providing an additional exit stairway in buildings more than 420 ft. high with occupancy classifications of other than Group R-2.
  • 19. NFPA 72 and OEO Chapter 21: emergency control function interfaces • Section 6: occupant evacuation elevators of the 2013 edition contains the OEO requirements that apply to the control function interfaces between building fire alarm systems and OEO elevator controllers • Section 21.6.1 requires that all elevators designated and marked for use by occupants for evacuation during fires must also comply with NFPA 72 Section 21.5, which contains requirements for fire service access elevators.
  • 20. NFPA 72 and BAS Section 21.5 requires that elevators designated as fire service access elevators comply with specific supervision and annunciation requirements. The section requires the following functions be supervised and annunciated at the fire command center: • The availability of main and emergency power to operate the elevators, elevator controllers, and machine room ventilation (if provided) • Status of the elevators including location within the hoist way, direction of travel, and whether they are occupied • Temperature and presence of smoke in associated lobbies and machine room (if provided) • The supervision of the temperature and presence of smoke within elevator lobbies and machine rooms can be accomplished by the fire alarm system.
  • 21. NFPA 72 and OEO Occupant notification requirements for elevator OEO: • NFPA 72, Section 21.6.2.1.4 contains requirements for occupant notification during times of elevator OEO. • These requirements specify variations of voice messages that must be automatically transmitted to the specified floors throughout the building during elevator OEO.
  • 22. NFPA 72 and OEO Occupant notification requirements for elevator OEO: Automatic voice messages are required to be transmitted as follows (NFPA 72 Sections 21.6.2.1.4 and 21.6.2.2.3): • Throughout all floors of the building when total building evacuation has been initiated: automatic voice message indicating the need to evacuate the building and that elevator service is available • Throughout all floors identified for elevator OEO when the elevators are under Phase I recall: automatic voice message indicating the need to evacuate and that elevator service is not available for evacuation.
  • 23. NFPA 72 and OEO Occupant notification requirements for elevator OEO: Automatic voice messages are required to be transmitted as follows (NFPA 72 Sections 21.6.2.1.4 & 21.6.2.2.3): • NFPA 72 Section 21.6.2.1.4(D) further requires all automatic voice messages to be coordinated with the text displays provided separately by the elevator management system. • Also important is to coordinate elevator car voice messages and elevator lobby variable message signs that originate from the elevator management system. This will ensure that all building occupants are given uniform instructions and information over both the fire alarm and elevator management systems.
  • 24. IBC and BAS • IBC Section 907: fire alarm – UL 864 compliance – NFPA 72 compliance • IBC Section 909: smoke control – Control system compliance with NFPA 72 and UL 864/UUKL – Marking and labeling – Raceway required – Control diagrams – Response time – Status indicators (fans, dampers).
  • 25. IBC and BAS IBC Section 3008: • Occupant evacuation elevators • Referenced by Section 403.5.2 • Many additional requirements • Controls/communications – Two-way communications – Elevator status monitoring – Lobby status indicator. “In Case of Fire – Use the Exit Stairs???” EXIT …or elevator?
  • 26. Benefits to integration • Reduces the amount of equipment • Reduces installation costs • Expedites system acceptance • Consolidates building information at a central location; simplifies workstations • Increases reliability • Simplifies troubleshooting.
  • 27. Design considerations • Challenges – Unauthorized changes to BAS programming • What is possible today? – BACnet gateways built into fire alarm panels – BACnet smoke control system (UUKL) • Future? – More integration, less interface equipment, such as relays – Wireless technology may replace traditional wired BAS infrastructure – Power over Ethernet (POE).
  • 28. Design considerations • UL listing implications – UL 864 (fire alarm) listing if BACnet is performing fire alarm functions – UUKL category if BACnet is used for smoke control • BACnet fire alarm system limitations – Fire alarm addressable circuits are not directly compatible with BACnet – Bridging or open gateway processing is necessary – One-way communications only unless manufacturer supplies both fire alarm and BAS.
  • 29. Commissioning, installation, testing, and maintenance • BAS may allow for changes during testing – VFD fans – Programing changes rather than relays • If used for fire, BAS testing may be more robust – NFPA 3: Recommended Practice for Commissioning and Integrated Testing of Fire Protection and Life Safety Systems – BAS technician involvement – Test interoperability, automatic, and manual – Special inspections required for smoke control.
  • 30. Commissioning, installation, testing, and maintenance • Documentation – Testing documents – Tracking of system modifications.
  • 31. Summary We discussed: • Building automation systems in general • Integration of fire/life safety systems into BAS • NFPA 72 and IBC criteria • UL listing implications • Design considerations when integrating safety systems • Commissioning and testing considerations.
  • 32. BAS References • American Society of Mechanical Engineers: www.asme.org • ASHRAE: www.ashrae.org • BACnet: www.bacnet.org and www.bacnet.org/Contact/NIST-ITC/Consortium.htm • International Building Code (IBC): www.iccsafe.org • International Organization for Standardization (ISO) • LonWorks: www.lonmark.org • National Institute of Standards and Technology (NIST): www.nist.gov/building-and-fire-research-portal.cfm and www.nist.gov/el/building_environment/mechsys/ • NFPA: www.nfpa.org
  • 33. Presenters: Erik Anderson, PE, Manager, Koffel Associates, Columbia, Md. Wayne D. Moore, PE, CFPS, SET, FSFPE, F.NSPE, Principal and Vice President, Hughes Associates | RJA Group, Warwick, R.I. Moderator: Jack Smith, Consulting-Specifying Engineer, CFE Media, LLC
  • 34. Fire and Life Safety Integration: Building Automation Systems and Fire/Life Safety

Notas do Editor

  1. Jack Smith
  2. Jack Smith
  3. Title Slide for Erik Anderson to begin the presentation
  4. Erik What is BAS? Explain what it is, where it came from, how it is used, system types controlled. Other names. Not only for HVAC, but HVAC is a major emphasis. Intent was to incorporate other system types. Like BAS, fire protection and alarm systems have also evolved into sophisticated computer-based systems.
  5. Erik BACnet is a data communication protocol which is a set of rules governing the exchange of data over a computer network. The rules or protocal take the form of a written specification that spells out what is required to conform to that protocol.
  6. Erik LonWorks is actually a family of products originally developed by the Echelon Corporation. At the core of this technology is a proprietary communications protocol called LonTalk. In this context, the term "proprietary" means that the technology was initially owned by a single proprietor, namely Echelon. To use LonTalk the equipment needs to have
  7. Erik BACnet is moving toward incorporating fire and life safety systems.
  8. Wayne BACnet is moving toward incorporating fire and life safety systems.
  9. Wayne Typical responses to fire alarm system status changes might include: HVAC fan control operation, elevator capture, lighting control, and security system awareness. Specific examples could include turning on lighting where needed, aiming security cameras on specific areas, providing door release, and implementing detailed fan exhaust and/or pressurization instructions
  10. Erik
  11. Erik
  12. Erik
  13. Wayne
  14. Wayne
  15. Wayne
  16. Wayne
  17. Wayne
  18. Erik
  19. Erik
  20. Wayne
  21. Wayne
  22. Wayne
  23. Erik IBC doesn’t reference BAS specifically.
  24. Erik
  25. Erik
  26. Erik Future: Wireless technology is limited to sensor-type devices and suffers from issues including a lack of clear wireless standard, short battery life, and communication challenges through building structures. Fire alarm.
  27. Erik Future: Wireless technology is limited to sensor-type devices and suffers from issues including a lack of clear wireless standard, short battery life, and communication challenges through building structures. Fire alarm.
  28. Erik
  29. Erik
  30. Wayne
  31. Wayne
  32. Jack Smith
  33. Jack Smith