DV 1x400 kV, 2x400 kV
TRANSMISSIONLINES WORKS
Contract Number:
Client:
Contractor Engineer:
Sub-Contractor:
CLEANING OF LAND SLIDE
ACCES TRACK AT 10
Method of Statement (Specific)
Document Number:
00 23/01/201 8 Approval Arber Dogani
REV DATE ISSUED FOR ISSUED BY HSE CHECKED BY QA/QC TD PM
Contractor
Engineer
□ □ □
DATE BY APPROVED REJECTED NA COMMENTS
Present document is property of the Ow ner and it is prohibited any copy and/or convey of its original copy w ith any means, before the w ritten
confirmation and approvalof the Company's legal representative.
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: 22/01/2018
Revision: 01
Page 2 of 22
REVISION TRACKING PAGE
Revision
Number
Revised
Page
Revision Date Description of Revision Prepared by
00 all 23/01/2018 Prepared and Published A.Dogani
Rev No. 01 02 03 04 05
Date
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 3 of 22
CONTENTS
1 PURPOSE..................................................................................................................................................................................5
2 SCOPE.......................................................................................................................................................................................5
3 DEFINITIONS ...........................................................................................................................................................................6
4 REFERENCES ............................................................................................................................................................................6
5 HEALTH, SAFETY, AND ENVIRONMENT CONSIDERATION.............................................................................................6
5.1 Requirements......................................................................................................................6
5.2 Team Members Trainings.....................................................................................................7
5.3 Tools and Equipment...........................................................................................................7
5.4 Weather Condition ..............................................................................................................8
5.5 Personal Protective Equipment(PPE)....................................................................................8
5.6 Communication...................................................................................................................8
5.7 Working time.......................................................................................................................8
5.8 First Aid and First Aider........................................................................................................8
5.9 Environmental Measures......................................................................................................9
5.10 Visitors or Vendor on site.....................................................................................................9
6 METHODOLOGY .....................................................................................................................................................................9
6.1 Description..........................................................................................................................9
6.2 Clearing and excavation Operations....................................................................................10
7 CONTRACTOR'S ORGANIZATION FOR ACCESS ROAD CONSTRUCTION....................................................................11
8 ATTACHMENT A - LOCATION MAP...................................................................................................................................12
9 ATTACHMENT B – PHOTOS................................................................................................................................................13
PHOTO 1 ..........................................................................................................................................................................................13
10 ATTACHMENT B/2 – PHOTOS ...........................................................................................................................................14
11 ATTACHMENT B/3 – PHOTOS ...........................................................................................................................................15
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 4 of 22
12 ATTACHMENT C - RISK ASSESSMENT SPECIFIC..............................................................................................................16
13 ATTACHMENT D - JOB HAZARD ANALYSIS .....................................................................................................................19
14 ATTACHMENT E – LAST MINUTE RISK ASSESSMENT....................................................................................................21
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 5 of 22
1 PURPOSE
To establish methodology on cleaning of land slide at at 10 required for construction of AT 10 and
towers 8 I, 8 u, 9 u (Appendix A - LOCATION MAP)
2 SCOPE
This procedure establishes description and guidelines for works performed during the removal of the
land slide near tower 9u.
Duration of the works is estimated to be 15 working days starting from receiving confirmation for
starting of the works. However final duration of the works, will be determined by field performance.
Will be used for these work:
Company:
2 Excavators, 2 operators, 2 workers (Wachman’s), 1 Lead Civil Engineer
Contractor:
1 Geologist
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 6 of 22
3 DEFINITIONS
- -Contractor Inginieria y Construccion
PM- Project Manager
DPM- Deputy Project Manager
4 REFERENCES
Health Safety and Environmental (HSE) Plan
 Chapter 6:
Point 6.1 ; Point 6.2 ;
 Chapter 10:
Point 10.1
 Chapter 11: Point 11.1.
 Chapter 12:Point 12,1
 Chapter 13: Points 13.1, 13.2, 13.3, 13.4, 13.5, 13.6, 13.8, 13.10.
Quality Assurance / Quality Control (QA/QC) Plan
5 HEALTH, SAFETY, AND ENVIRONMENT CONSIDERATION
5.1 Requirements
Before the Contractorstart constructionof access roadto towerlocationsthe requirements listedbelow
must be followed and completed.
1. All the crew must be trained for such activity;
2. RiskAssessment(RA)(Appendix C- RISKASSESSMENT) andJobHazardAnalysis(JHA) (Appendix
D - JOB HAZARDANALYSIS) mustbe prepared before any start of activity. JHA must be read and
signed by all the members of the crew before the activity starts;
3. Equipmentmustbe ingoodconditionandall safetydevices mustbe functional andactive during
all the time;
4. Last Minute Risk Assessment will be prepared and signed from HSE Lead and Lead Engineer
every day(No Works will be performed without LMRA)
5. Tools must be in good shape and not damaged or modified;
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 7 of 22
6. Housekeeping and working area must be clean in order to protect the Environment;
7. Communication (Radio);
8. Working time (8Hours).
5.2 Team Members Trainings
Team members must be trained in different disciplines to perform this activity.
 General induction training;
o HS&E Induction
o Environmental Awareness
o Emergency Response Plan Training
o Fire Fighting Training
o First Aid Training
o JHA/Risk Assessment
o HS&E Leadership
o Stop Works
o HS&E Assessments
o Accident/Incident Reporting & Investigation
o Near Miss Reporting
o Cost of Accidents
 Tools and equipment training;
 Watchman Daily Instruction
 PPE training;
 Equipments,
Only this category of workers should be working in Cleaning of Land Slide at AT 10 construction.
5.3 Tools and Equipment
 Tools must be in good condition and free from any damage;
 Only proper tool are allowed to use in this activity;
 Homemade tools are not allowed to use on site;
 Equipment must be in good condition and checked periodically;
 Only authorized operator must use them and to be shore that the equipment to be well
maintained;
 Radio communication
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 8 of 22
 Acoustic High Signal
 Where the equipmentissettle, the areashouldbe barricade byhighvisible safetytape andalso
warning signs must be put in order to inform the public about the work activity.
5.4 Weather Condition
It is not allowed to perform any activity during bad weather condition like;
 storm
 snow
No activity will be performed if equipment are not able to perform safe work because of weather
condition.
5.5 Personal Protective Equipment (PPE)
In order to prevent any injury or accident during the working time, we are forced by the HSE plan and
the AlbanianLaborLow to use the followingpersonal protective equipment during all the time on site.
 hard hat;
 gloves;
 safetyshoes;
 highvisible vest;
 Reflectivesigns.
 Acousticsignalization
All these PPEswill be usedandwearbyeveryone thatwill be partonthe workingsite.Visitorsshall wear
these PPEs (except reflective sign), as well.
5.6 Communication
In orderto have a safe working activity, the communication is a very important issue to be considered.
Workers are not allowed to use or talk on the phone when they are operating or guiding equipment.
Visible and acoustic signs must be used on site.
5.7 Working time
In order to have a safe work condition, road access activity will be performed only during day time. If
proper lighting is provided works can be performed by management decision.
5.8 First Aid and First Aider
Emergency numbers must be place in a visible table from everyone. First aid kit will be put in a place
where everyone may have access.
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 9 of 22
5.9 Environmental Measures
In order to keep a good environment on site, spill prevention must be present on site, garbage and
waste of food will be removed from site and deposited in safe waste area. All the area must be clean
and in good environment condition after work activity.
5.10 Visitors or Vendor on site
Visitors or Vendors are not allowed to enter on site until they have permission, however, visitors and
vendormust have a brief training before they go on site and also they should sign the attendance list.
6 METHODOLOGY
6.1 Description
Cleaning of land slide at access track at 10 will be done with these steps:
 We will beginthe excavationinzone 1, as it is rocky area during excavator work, it will create a
vibrationthatwill affectthe provocation of the surrounding area to see if there is any possible
movement,thisareaisthe safestpartcompact rockerwhere the excavatorwill work and in this
way does not endanger the vehicle and maneuver.
 If the terrain does not show any sign of new displacing, and after the Contractor Geologist
checks and gives OK we will continue with the second phase.
 Afteritwill be continuedwithZone 3 excavation, this area consists of dislocated rock material,
no compact rock,there are soil layers between the rock layers and vegetation and about 60-70
cm of soli above the surface.
Excavationinthiszone will startfromtowerNo.8 inthe directionof landslidebyharassingandrelieving
by 3m created by the land sliding, to see if we will have any possible slide or not.
 If everythinggoeswellandthe Geologisttogetherwiththe Engineeragreesthat the structure is
stable and there is certainty to enter that already cleaned area on both sides then we can
proceed with the cleansing of the rock massive.
 Excavatorsshouldworkwith interchange, only one at the same time during the excavations of
Zone 1 and 3, to avoid any possible incident and to react on time.
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 10 of 22
 For these typesof workwhere the dangerishigh,the escortingteamshave tobe equippedwith
acoustic signalizations and radio to signal the excavator maneuverer to immediately pull back
with the vehicle in case of sliding terrain.
Picture 1: Map of landslide and zones of work
6.2 Clearing and excavation Operations
1. Main contractor shall ensure all required permits are in place prior to the start of clearing and
excavation work operations.
2. Main contractor Geologistshall be presentduringall time toestablishif terrainconditionsallow
to proceed further with the works of clearing and excavations.l
3. The Contractor shall ensure compliance with environmental requirements such as silt fencing,
run-off protection, or dust limitations during clearing and grubbing operation.
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 11 of 22
7 CONTRACTOR'S ORGANIZATION FOR ACCESS ROAD CONSTRUCTION
ProjectManager (ErlirCompany)
Construction Manager (Klevi Kalemi)
Site Engineer (Anil Company)
Excavation Team (Surveyor,
Forman, Operator)
HSE Lead (Arber
Dogani)
Geologist(Contractor)
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 12 of 22
8 ATTACHMENT A - LOCATION MAP
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 13 of 22
9 ATTACHMENT B – PHOTOS
PHOTO1
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 14 of 22
10 ATTACHMENT B/2 – PHOTOS
PHOTO 2
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 15 of 22
11 ATTACHMENT B/3 – PHOTOS
PHOTO 3
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 16 of 22
12 ATTACHMENT C - RISK ASSESSMENT SPECIFIC
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 17 of 22
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 18 of 22
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 19 of 22
13 ATTACHMENT D - JOB HAZARD ANALYSIS
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 20 of 22
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 21 of 22
14 ATTACHMENT E – LAST MINUTE RISK ASSESSMENT
Method of Statement
Removal of land slide at
AT10
ISSUING DATE: __/01/2018
State ofissue: 00
Page 22 of 22

Mais conteúdo relacionado

Mais procurados

Fire Risk Assessment.pdf
Fire Risk Assessment.pdfFire Risk Assessment.pdf
Fire Risk Assessment.pdfHSEXINYIPROJECT
 
OFFICE PORTA CABIN INSPECTION Form # HSEQ - OPC Rev 2.docx
OFFICE PORTA CABIN INSPECTION Form # HSEQ - OPC Rev 2.docxOFFICE PORTA CABIN INSPECTION Form # HSEQ - OPC Rev 2.docx
OFFICE PORTA CABIN INSPECTION Form # HSEQ - OPC Rev 2.docxDwarika Bhushan Sharma
 
Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessmentSimba Zhao
 
LIVE ELECTRICAL WORK PERMIT Form # HSEQ - LEP Rev 2.docx
LIVE ELECTRICAL WORK PERMIT Form # HSEQ - LEP Rev 2.docxLIVE ELECTRICAL WORK PERMIT Form # HSEQ - LEP Rev 2.docx
LIVE ELECTRICAL WORK PERMIT Form # HSEQ - LEP Rev 2.docxDwarika Bhushan Sharma
 
Lifting plan
Lifting planLifting plan
Lifting plantnsv22
 
Facility inspection checklist
Facility inspection checklistFacility inspection checklist
Facility inspection checklistJamie Leeper
 
Weekly HSE Report25.pptx
Weekly HSE Report25.pptxWeekly HSE Report25.pptx
Weekly HSE Report25.pptxsufiyanssk
 
Job safety analysis
Job safety analysis Job safety analysis
Job safety analysis soumenmakar
 
25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templatesDwarika Bhushan Sharma
 
3 emergency management risk assessment templates
3 emergency management risk assessment templates3 emergency management risk assessment templates
3 emergency management risk assessment templatesDwarika Bhushan Sharma
 
Risk assessment for testing & commissioning of cranes
Risk assessment for  testing & commissioning of cranesRisk assessment for  testing & commissioning of cranes
Risk assessment for testing & commissioning of cranesAzmeel Contracting Company
 
Lifting steam drum 72 ton by winch
Lifting steam drum 72 ton by winchLifting steam drum 72 ton by winch
Lifting steam drum 72 ton by winchHaGun Gunawan
 
29 workplace temporary lighting risk assessment templates
29 workplace temporary lighting risk assessment templates29 workplace temporary lighting risk assessment templates
29 workplace temporary lighting risk assessment templatesDwarika Bhushan Sharma
 
LIFE LINE INSPECTION RECORD Form # HSEQ - LLIR Rev 2.docx
LIFE LINE INSPECTION RECORD Form # HSEQ - LLIR Rev 2.docxLIFE LINE INSPECTION RECORD Form # HSEQ - LLIR Rev 2.docx
LIFE LINE INSPECTION RECORD Form # HSEQ - LLIR Rev 2.docxDwarika Bhushan Sharma
 
Daily EHS Report Format-Rev 00_MPL (3).pptx
Daily EHS Report Format-Rev 00_MPL (3).pptxDaily EHS Report Format-Rev 00_MPL (3).pptx
Daily EHS Report Format-Rev 00_MPL (3).pptxsanjeevkumar2911
 

Mais procurados (20)

Fire Risk Assessment.pdf
Fire Risk Assessment.pdfFire Risk Assessment.pdf
Fire Risk Assessment.pdf
 
OFFICE PORTA CABIN INSPECTION Form # HSEQ - OPC Rev 2.docx
OFFICE PORTA CABIN INSPECTION Form # HSEQ - OPC Rev 2.docxOFFICE PORTA CABIN INSPECTION Form # HSEQ - OPC Rev 2.docx
OFFICE PORTA CABIN INSPECTION Form # HSEQ - OPC Rev 2.docx
 
Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessment
 
LIVE ELECTRICAL WORK PERMIT Form # HSEQ - LEP Rev 2.docx
LIVE ELECTRICAL WORK PERMIT Form # HSEQ - LEP Rev 2.docxLIVE ELECTRICAL WORK PERMIT Form # HSEQ - LEP Rev 2.docx
LIVE ELECTRICAL WORK PERMIT Form # HSEQ - LEP Rev 2.docx
 
Lifting plan
Lifting planLifting plan
Lifting plan
 
Facility inspection checklist
Facility inspection checklistFacility inspection checklist
Facility inspection checklist
 
Weekly HSE Report25.pptx
Weekly HSE Report25.pptxWeekly HSE Report25.pptx
Weekly HSE Report25.pptx
 
Job safety analysis
Job safety analysis Job safety analysis
Job safety analysis
 
25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates
 
3 emergency management risk assessment templates
3 emergency management risk assessment templates3 emergency management risk assessment templates
3 emergency management risk assessment templates
 
December -15 Daily Observation Report
December -15 Daily Observation ReportDecember -15 Daily Observation Report
December -15 Daily Observation Report
 
Risk assessment for testing & commissioning of cranes
Risk assessment for  testing & commissioning of cranesRisk assessment for  testing & commissioning of cranes
Risk assessment for testing & commissioning of cranes
 
HSE REPORT 2013-2014.ppt
HSE REPORT 2013-2014.pptHSE REPORT 2013-2014.ppt
HSE REPORT 2013-2014.ppt
 
Lifting steam drum 72 ton by winch
Lifting steam drum 72 ton by winchLifting steam drum 72 ton by winch
Lifting steam drum 72 ton by winch
 
Theories of Accident Causation
Theories of Accident Causation Theories of Accident Causation
Theories of Accident Causation
 
29 workplace temporary lighting risk assessment templates
29 workplace temporary lighting risk assessment templates29 workplace temporary lighting risk assessment templates
29 workplace temporary lighting risk assessment templates
 
LIFE LINE INSPECTION RECORD Form # HSEQ - LLIR Rev 2.docx
LIFE LINE INSPECTION RECORD Form # HSEQ - LLIR Rev 2.docxLIFE LINE INSPECTION RECORD Form # HSEQ - LLIR Rev 2.docx
LIFE LINE INSPECTION RECORD Form # HSEQ - LLIR Rev 2.docx
 
Safety evaluation Best practices-04.11.10
Safety evaluation   Best practices-04.11.10Safety evaluation   Best practices-04.11.10
Safety evaluation Best practices-04.11.10
 
Daily EHS Report Format-Rev 00_MPL (3).pptx
Daily EHS Report Format-Rev 00_MPL (3).pptxDaily EHS Report Format-Rev 00_MPL (3).pptx
Daily EHS Report Format-Rev 00_MPL (3).pptx
 
HSE Monitoring schedule plan
HSE Monitoring schedule planHSE Monitoring schedule plan
HSE Monitoring schedule plan
 

Semelhante a Specific method of statmeents risk assessment -job hazard analysis for land slide

Specific method of statmeents risk assessment -job hazard analysis for land ...
Specific method of statmeents  risk assessment -job hazard analysis for land ...Specific method of statmeents  risk assessment -job hazard analysis for land ...
Specific method of statmeents risk assessment -job hazard analysis for land ...Arber Dogani
 
MS.CPS3 Carport to be designed and installed Rev0.pdf
MS.CPS3 Carport to be designed and installed Rev0.pdfMS.CPS3 Carport to be designed and installed Rev0.pdf
MS.CPS3 Carport to be designed and installed Rev0.pdfNajiRaheem2
 
Investigation report 05.12.2017 lifting operation failure during tower erect...
Investigation report 05.12.2017  lifting operation failure during tower erect...Investigation report 05.12.2017  lifting operation failure during tower erect...
Investigation report 05.12.2017 lifting operation failure during tower erect...Arber Dogani
 
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...MohammedAliQazi
 
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docxDwarika Bhushan Sharma
 
5 trial trenches (temporary works) risk assessment templates
5 trial trenches (temporary works) risk assessment templates5 trial trenches (temporary works) risk assessment templates
5 trial trenches (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
Method statement of temporary office and fa
Method statement of temporary office and faMethod statement of temporary office and fa
Method statement of temporary office and faAl-Amin Ahmed Nabin
 
Ms pipe internal cleaning (2)
Ms pipe internal cleaning (2)Ms pipe internal cleaning (2)
Ms pipe internal cleaning (2)Iqbal Mohammad
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docAtif767782
 
25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docxDwarika Bhushan Sharma
 
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01Andrew Louis
 
NESTLE ABAJI EIA PRESENTATION
NESTLE  ABAJI  EIA  PRESENTATIONNESTLE  ABAJI  EIA  PRESENTATION
NESTLE ABAJI EIA PRESENTATIONAdewunmi Okumodi
 
CV_John_Pennington_Recently updated
CV_John_Pennington_Recently updatedCV_John_Pennington_Recently updated
CV_John_Pennington_Recently updatedJohn Pennington
 
Dynamic positioning-accreditation-and-certification-scheme-standard-10th-janu...
Dynamic positioning-accreditation-and-certification-scheme-standard-10th-janu...Dynamic positioning-accreditation-and-certification-scheme-standard-10th-janu...
Dynamic positioning-accreditation-and-certification-scheme-standard-10th-janu...minte3
 
7 falsework (temporary works) risk assessment templates
7 falsework (temporary works) risk assessment templates7 falsework (temporary works) risk assessment templates
7 falsework (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
Method of works install stator generator+strand jack + 07 july2015
Method of works install stator generator+strand jack + 07 july2015Method of works install stator generator+strand jack + 07 july2015
Method of works install stator generator+strand jack + 07 july2015HaGun Gunawan
 
Appendix J Spill and Waste Management Plan.PDF
Appendix J Spill and Waste Management Plan.PDFAppendix J Spill and Waste Management Plan.PDF
Appendix J Spill and Waste Management Plan.PDFssuserfce39b
 
7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docx7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docxDwarika Bhushan Sharma
 

Semelhante a Specific method of statmeents risk assessment -job hazard analysis for land slide (20)

Specific method of statmeents risk assessment -job hazard analysis for land ...
Specific method of statmeents  risk assessment -job hazard analysis for land ...Specific method of statmeents  risk assessment -job hazard analysis for land ...
Specific method of statmeents risk assessment -job hazard analysis for land ...
 
Telehandler
TelehandlerTelehandler
Telehandler
 
MS.CPS3 Carport to be designed and installed Rev0.pdf
MS.CPS3 Carport to be designed and installed Rev0.pdfMS.CPS3 Carport to be designed and installed Rev0.pdf
MS.CPS3 Carport to be designed and installed Rev0.pdf
 
Emp
EmpEmp
Emp
 
Investigation report 05.12.2017 lifting operation failure during tower erect...
Investigation report 05.12.2017  lifting operation failure during tower erect...Investigation report 05.12.2017  lifting operation failure during tower erect...
Investigation report 05.12.2017 lifting operation failure during tower erect...
 
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
 
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
 
5 trial trenches (temporary works) risk assessment templates
5 trial trenches (temporary works) risk assessment templates5 trial trenches (temporary works) risk assessment templates
5 trial trenches (temporary works) risk assessment templates
 
Method statement of temporary office and fa
Method statement of temporary office and faMethod statement of temporary office and fa
Method statement of temporary office and fa
 
Ms pipe internal cleaning (2)
Ms pipe internal cleaning (2)Ms pipe internal cleaning (2)
Ms pipe internal cleaning (2)
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..doc
 
25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx
 
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
 
NESTLE ABAJI EIA PRESENTATION
NESTLE  ABAJI  EIA  PRESENTATIONNESTLE  ABAJI  EIA  PRESENTATION
NESTLE ABAJI EIA PRESENTATION
 
CV_John_Pennington_Recently updated
CV_John_Pennington_Recently updatedCV_John_Pennington_Recently updated
CV_John_Pennington_Recently updated
 
Dynamic positioning-accreditation-and-certification-scheme-standard-10th-janu...
Dynamic positioning-accreditation-and-certification-scheme-standard-10th-janu...Dynamic positioning-accreditation-and-certification-scheme-standard-10th-janu...
Dynamic positioning-accreditation-and-certification-scheme-standard-10th-janu...
 
7 falsework (temporary works) risk assessment templates
7 falsework (temporary works) risk assessment templates7 falsework (temporary works) risk assessment templates
7 falsework (temporary works) risk assessment templates
 
Method of works install stator generator+strand jack + 07 july2015
Method of works install stator generator+strand jack + 07 july2015Method of works install stator generator+strand jack + 07 july2015
Method of works install stator generator+strand jack + 07 july2015
 
Appendix J Spill and Waste Management Plan.PDF
Appendix J Spill and Waste Management Plan.PDFAppendix J Spill and Waste Management Plan.PDF
Appendix J Spill and Waste Management Plan.PDF
 
7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docx7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docx
 

Mais de Arber Dogani

Risk evaluation template Prepared by A.Dogani 2016(1)
Risk evaluation template Prepared by A.Dogani 2016(1)Risk evaluation template Prepared by A.Dogani 2016(1)
Risk evaluation template Prepared by A.Dogani 2016(1)Arber Dogani
 
Vleresimi i riskut per punimet e percjellesit dhe trosit 110k v banje cerri...
Vleresimi  i riskut  per punimet e percjellesit dhe trosit 110k v banje cerri...Vleresimi  i riskut  per punimet e percjellesit dhe trosit 110k v banje cerri...
Vleresimi i riskut per punimet e percjellesit dhe trosit 110k v banje cerri...Arber Dogani
 
Vleresimi i riskut montimi i shtyllave 2x110k v ulez shkopet-skuraj) 01.07.2016
Vleresimi i riskut montimi i shtyllave 2x110k v ulez shkopet-skuraj) 01.07.2016Vleresimi i riskut montimi i shtyllave 2x110k v ulez shkopet-skuraj) 01.07.2016
Vleresimi i riskut montimi i shtyllave 2x110k v ulez shkopet-skuraj) 01.07.2016Arber Dogani
 
Analiza e rrezikut ne pune montim percjellesi dhe trosi 110k v banje cerrik ...
Analiza e rrezikut ne pune montim percjellesi dhe trosi  110k v banje cerrik ...Analiza e rrezikut ne pune montim percjellesi dhe trosi  110k v banje cerrik ...
Analiza e rrezikut ne pune montim percjellesi dhe trosi 110k v banje cerrik ...Arber Dogani
 
'' Plani menaxhimit te cilesise per linja transmetimi tu tm-tl dhe nenstacio...
'' Plani menaxhimit te cilesise  per linja transmetimi tu tm-tl dhe nenstacio...'' Plani menaxhimit te cilesise  per linja transmetimi tu tm-tl dhe nenstacio...
'' Plani menaxhimit te cilesise per linja transmetimi tu tm-tl dhe nenstacio...Arber Dogani
 
Hse plan zbatim ''siguria shendeti dhe mjedisi'' 2018.04.11 .rev.03
Hse  plan zbatim  ''siguria shendeti dhe mjedisi'' 2018.04.11 .rev.03Hse  plan zbatim  ''siguria shendeti dhe mjedisi'' 2018.04.11 .rev.03
Hse plan zbatim ''siguria shendeti dhe mjedisi'' 2018.04.11 .rev.03Arber Dogani
 
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.dogani
Risk assessment for soil investigation at towers 5,6,7,8  rev01  a.doganiRisk assessment for soil investigation at towers 5,6,7,8  rev01  a.dogani
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.doganiArber Dogani
 
Incident&accident report date 02.08.2014 by arber dogani example for aplic...
Incident&accident  report date 02.08.2014  by arber dogani  example for aplic...Incident&accident  report date 02.08.2014  by arber dogani  example for aplic...
Incident&accident report date 02.08.2014 by arber dogani example for aplic...Arber Dogani
 
Hse templates by.arber dogani
Hse templates by.arber doganiHse templates by.arber dogani
Hse templates by.arber doganiArber Dogani
 
Ditar kantieri (formular)
Ditar kantieri (formular)Ditar kantieri (formular)
Ditar kantieri (formular)Arber Dogani
 
Raport javor punimesh linja transmetimi format raportimi javor _ arber do...
Raport javor punimesh  linja transmetimi format raportimi javor    _ arber do...Raport javor punimesh  linja transmetimi format raportimi javor    _ arber do...
Raport javor punimesh linja transmetimi format raportimi javor _ arber do...Arber Dogani
 
Raport javor siguria shendeti dhe mjedisi Raportim Mujor Statistika Arber Do...
Raport javor siguria shendeti dhe mjedisi  Raportim Mujor Statistika Arber Do...Raport javor siguria shendeti dhe mjedisi  Raportim Mujor Statistika Arber Do...
Raport javor siguria shendeti dhe mjedisi Raportim Mujor Statistika Arber Do...Arber Dogani
 
Plan menanxhimi (mjedisi linjat e transmetimit)rev.00 arber dogani
Plan menanxhimi (mjedisi linjat e transmetimit)rev.00  arber doganiPlan menanxhimi (mjedisi linjat e transmetimit)rev.00  arber dogani
Plan menanxhimi (mjedisi linjat e transmetimit)rev.00 arber doganiArber Dogani
 
Plani emergjences linja transmetimit 110k v rev.00 22.07.2015 arber dogani
Plani emergjences linja transmetimit 110k v rev.00 22.07.2015 arber doganiPlani emergjences linja transmetimit 110k v rev.00 22.07.2015 arber dogani
Plani emergjences linja transmetimit 110k v rev.00 22.07.2015 arber doganiArber Dogani
 
Training hse housekeeping albanian mirembajtja e vendit te punes
Training hse housekeeping albanian mirembajtja e vendit te punesTraining hse housekeeping albanian mirembajtja e vendit te punes
Training hse housekeeping albanian mirembajtja e vendit te punesArber Dogani
 
Hse trainings respiratory protection albanian by a.dogani
Hse trainings respiratory protection albanian by a.doganiHse trainings respiratory protection albanian by a.dogani
Hse trainings respiratory protection albanian by a.doganiArber Dogani
 
Manuali i punes ndertimin e linjave dhe nst te tensionit te larte shqip 2018
Manuali i punes ndertimin e linjave dhe nst te tensionit te larte   shqip 2018Manuali i punes ndertimin e linjave dhe nst te tensionit te larte   shqip 2018
Manuali i punes ndertimin e linjave dhe nst te tensionit te larte shqip 2018Arber Dogani
 
New hire orientation orientim per punonjesit e rinj linja transmetimi ndertim
New hire orientation orientim per punonjesit e rinj linja transmetimi ndertimNew hire orientation orientim per punonjesit e rinj linja transmetimi ndertim
New hire orientation orientim per punonjesit e rinj linja transmetimi ndertimArber Dogani
 
Basic harness awareness training albanian.
Basic harness awareness training albanian.Basic harness awareness training albanian.
Basic harness awareness training albanian.Arber Dogani
 
Ohl transmission lines opgw instalation procedure for fiber optic cables rev.00
Ohl transmission lines opgw instalation procedure for fiber optic cables rev.00Ohl transmission lines opgw instalation procedure for fiber optic cables rev.00
Ohl transmission lines opgw instalation procedure for fiber optic cables rev.00Arber Dogani
 

Mais de Arber Dogani (20)

Risk evaluation template Prepared by A.Dogani 2016(1)
Risk evaluation template Prepared by A.Dogani 2016(1)Risk evaluation template Prepared by A.Dogani 2016(1)
Risk evaluation template Prepared by A.Dogani 2016(1)
 
Vleresimi i riskut per punimet e percjellesit dhe trosit 110k v banje cerri...
Vleresimi  i riskut  per punimet e percjellesit dhe trosit 110k v banje cerri...Vleresimi  i riskut  per punimet e percjellesit dhe trosit 110k v banje cerri...
Vleresimi i riskut per punimet e percjellesit dhe trosit 110k v banje cerri...
 
Vleresimi i riskut montimi i shtyllave 2x110k v ulez shkopet-skuraj) 01.07.2016
Vleresimi i riskut montimi i shtyllave 2x110k v ulez shkopet-skuraj) 01.07.2016Vleresimi i riskut montimi i shtyllave 2x110k v ulez shkopet-skuraj) 01.07.2016
Vleresimi i riskut montimi i shtyllave 2x110k v ulez shkopet-skuraj) 01.07.2016
 
Analiza e rrezikut ne pune montim percjellesi dhe trosi 110k v banje cerrik ...
Analiza e rrezikut ne pune montim percjellesi dhe trosi  110k v banje cerrik ...Analiza e rrezikut ne pune montim percjellesi dhe trosi  110k v banje cerrik ...
Analiza e rrezikut ne pune montim percjellesi dhe trosi 110k v banje cerrik ...
 
'' Plani menaxhimit te cilesise per linja transmetimi tu tm-tl dhe nenstacio...
'' Plani menaxhimit te cilesise  per linja transmetimi tu tm-tl dhe nenstacio...'' Plani menaxhimit te cilesise  per linja transmetimi tu tm-tl dhe nenstacio...
'' Plani menaxhimit te cilesise per linja transmetimi tu tm-tl dhe nenstacio...
 
Hse plan zbatim ''siguria shendeti dhe mjedisi'' 2018.04.11 .rev.03
Hse  plan zbatim  ''siguria shendeti dhe mjedisi'' 2018.04.11 .rev.03Hse  plan zbatim  ''siguria shendeti dhe mjedisi'' 2018.04.11 .rev.03
Hse plan zbatim ''siguria shendeti dhe mjedisi'' 2018.04.11 .rev.03
 
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.dogani
Risk assessment for soil investigation at towers 5,6,7,8  rev01  a.doganiRisk assessment for soil investigation at towers 5,6,7,8  rev01  a.dogani
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.dogani
 
Incident&accident report date 02.08.2014 by arber dogani example for aplic...
Incident&accident  report date 02.08.2014  by arber dogani  example for aplic...Incident&accident  report date 02.08.2014  by arber dogani  example for aplic...
Incident&accident report date 02.08.2014 by arber dogani example for aplic...
 
Hse templates by.arber dogani
Hse templates by.arber doganiHse templates by.arber dogani
Hse templates by.arber dogani
 
Ditar kantieri (formular)
Ditar kantieri (formular)Ditar kantieri (formular)
Ditar kantieri (formular)
 
Raport javor punimesh linja transmetimi format raportimi javor _ arber do...
Raport javor punimesh  linja transmetimi format raportimi javor    _ arber do...Raport javor punimesh  linja transmetimi format raportimi javor    _ arber do...
Raport javor punimesh linja transmetimi format raportimi javor _ arber do...
 
Raport javor siguria shendeti dhe mjedisi Raportim Mujor Statistika Arber Do...
Raport javor siguria shendeti dhe mjedisi  Raportim Mujor Statistika Arber Do...Raport javor siguria shendeti dhe mjedisi  Raportim Mujor Statistika Arber Do...
Raport javor siguria shendeti dhe mjedisi Raportim Mujor Statistika Arber Do...
 
Plan menanxhimi (mjedisi linjat e transmetimit)rev.00 arber dogani
Plan menanxhimi (mjedisi linjat e transmetimit)rev.00  arber doganiPlan menanxhimi (mjedisi linjat e transmetimit)rev.00  arber dogani
Plan menanxhimi (mjedisi linjat e transmetimit)rev.00 arber dogani
 
Plani emergjences linja transmetimit 110k v rev.00 22.07.2015 arber dogani
Plani emergjences linja transmetimit 110k v rev.00 22.07.2015 arber doganiPlani emergjences linja transmetimit 110k v rev.00 22.07.2015 arber dogani
Plani emergjences linja transmetimit 110k v rev.00 22.07.2015 arber dogani
 
Training hse housekeeping albanian mirembajtja e vendit te punes
Training hse housekeeping albanian mirembajtja e vendit te punesTraining hse housekeeping albanian mirembajtja e vendit te punes
Training hse housekeeping albanian mirembajtja e vendit te punes
 
Hse trainings respiratory protection albanian by a.dogani
Hse trainings respiratory protection albanian by a.doganiHse trainings respiratory protection albanian by a.dogani
Hse trainings respiratory protection albanian by a.dogani
 
Manuali i punes ndertimin e linjave dhe nst te tensionit te larte shqip 2018
Manuali i punes ndertimin e linjave dhe nst te tensionit te larte   shqip 2018Manuali i punes ndertimin e linjave dhe nst te tensionit te larte   shqip 2018
Manuali i punes ndertimin e linjave dhe nst te tensionit te larte shqip 2018
 
New hire orientation orientim per punonjesit e rinj linja transmetimi ndertim
New hire orientation orientim per punonjesit e rinj linja transmetimi ndertimNew hire orientation orientim per punonjesit e rinj linja transmetimi ndertim
New hire orientation orientim per punonjesit e rinj linja transmetimi ndertim
 
Basic harness awareness training albanian.
Basic harness awareness training albanian.Basic harness awareness training albanian.
Basic harness awareness training albanian.
 
Ohl transmission lines opgw instalation procedure for fiber optic cables rev.00
Ohl transmission lines opgw instalation procedure for fiber optic cables rev.00Ohl transmission lines opgw instalation procedure for fiber optic cables rev.00
Ohl transmission lines opgw instalation procedure for fiber optic cables rev.00
 

Último

Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 

Último (20)

Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 

Specific method of statmeents risk assessment -job hazard analysis for land slide

  • 1. DV 1x400 kV, 2x400 kV TRANSMISSIONLINES WORKS Contract Number: Client: Contractor Engineer: Sub-Contractor: CLEANING OF LAND SLIDE ACCES TRACK AT 10 Method of Statement (Specific) Document Number: 00 23/01/201 8 Approval Arber Dogani REV DATE ISSUED FOR ISSUED BY HSE CHECKED BY QA/QC TD PM Contractor Engineer □ □ □ DATE BY APPROVED REJECTED NA COMMENTS Present document is property of the Ow ner and it is prohibited any copy and/or convey of its original copy w ith any means, before the w ritten confirmation and approvalof the Company's legal representative.
  • 2. Method of Statement Removal of land slide at AT10 ISSUING DATE: 22/01/2018 Revision: 01 Page 2 of 22 REVISION TRACKING PAGE Revision Number Revised Page Revision Date Description of Revision Prepared by 00 all 23/01/2018 Prepared and Published A.Dogani Rev No. 01 02 03 04 05 Date
  • 3. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 3 of 22 CONTENTS 1 PURPOSE..................................................................................................................................................................................5 2 SCOPE.......................................................................................................................................................................................5 3 DEFINITIONS ...........................................................................................................................................................................6 4 REFERENCES ............................................................................................................................................................................6 5 HEALTH, SAFETY, AND ENVIRONMENT CONSIDERATION.............................................................................................6 5.1 Requirements......................................................................................................................6 5.2 Team Members Trainings.....................................................................................................7 5.3 Tools and Equipment...........................................................................................................7 5.4 Weather Condition ..............................................................................................................8 5.5 Personal Protective Equipment(PPE)....................................................................................8 5.6 Communication...................................................................................................................8 5.7 Working time.......................................................................................................................8 5.8 First Aid and First Aider........................................................................................................8 5.9 Environmental Measures......................................................................................................9 5.10 Visitors or Vendor on site.....................................................................................................9 6 METHODOLOGY .....................................................................................................................................................................9 6.1 Description..........................................................................................................................9 6.2 Clearing and excavation Operations....................................................................................10 7 CONTRACTOR'S ORGANIZATION FOR ACCESS ROAD CONSTRUCTION....................................................................11 8 ATTACHMENT A - LOCATION MAP...................................................................................................................................12 9 ATTACHMENT B – PHOTOS................................................................................................................................................13 PHOTO 1 ..........................................................................................................................................................................................13 10 ATTACHMENT B/2 – PHOTOS ...........................................................................................................................................14 11 ATTACHMENT B/3 – PHOTOS ...........................................................................................................................................15
  • 4. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 4 of 22 12 ATTACHMENT C - RISK ASSESSMENT SPECIFIC..............................................................................................................16 13 ATTACHMENT D - JOB HAZARD ANALYSIS .....................................................................................................................19 14 ATTACHMENT E – LAST MINUTE RISK ASSESSMENT....................................................................................................21
  • 5. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 5 of 22 1 PURPOSE To establish methodology on cleaning of land slide at at 10 required for construction of AT 10 and towers 8 I, 8 u, 9 u (Appendix A - LOCATION MAP) 2 SCOPE This procedure establishes description and guidelines for works performed during the removal of the land slide near tower 9u. Duration of the works is estimated to be 15 working days starting from receiving confirmation for starting of the works. However final duration of the works, will be determined by field performance. Will be used for these work: Company: 2 Excavators, 2 operators, 2 workers (Wachman’s), 1 Lead Civil Engineer Contractor: 1 Geologist
  • 6. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 6 of 22 3 DEFINITIONS - -Contractor Inginieria y Construccion PM- Project Manager DPM- Deputy Project Manager 4 REFERENCES Health Safety and Environmental (HSE) Plan  Chapter 6: Point 6.1 ; Point 6.2 ;  Chapter 10: Point 10.1  Chapter 11: Point 11.1.  Chapter 12:Point 12,1  Chapter 13: Points 13.1, 13.2, 13.3, 13.4, 13.5, 13.6, 13.8, 13.10. Quality Assurance / Quality Control (QA/QC) Plan 5 HEALTH, SAFETY, AND ENVIRONMENT CONSIDERATION 5.1 Requirements Before the Contractorstart constructionof access roadto towerlocationsthe requirements listedbelow must be followed and completed. 1. All the crew must be trained for such activity; 2. RiskAssessment(RA)(Appendix C- RISKASSESSMENT) andJobHazardAnalysis(JHA) (Appendix D - JOB HAZARDANALYSIS) mustbe prepared before any start of activity. JHA must be read and signed by all the members of the crew before the activity starts; 3. Equipmentmustbe ingoodconditionandall safetydevices mustbe functional andactive during all the time; 4. Last Minute Risk Assessment will be prepared and signed from HSE Lead and Lead Engineer every day(No Works will be performed without LMRA) 5. Tools must be in good shape and not damaged or modified;
  • 7. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 7 of 22 6. Housekeeping and working area must be clean in order to protect the Environment; 7. Communication (Radio); 8. Working time (8Hours). 5.2 Team Members Trainings Team members must be trained in different disciplines to perform this activity.  General induction training; o HS&E Induction o Environmental Awareness o Emergency Response Plan Training o Fire Fighting Training o First Aid Training o JHA/Risk Assessment o HS&E Leadership o Stop Works o HS&E Assessments o Accident/Incident Reporting & Investigation o Near Miss Reporting o Cost of Accidents  Tools and equipment training;  Watchman Daily Instruction  PPE training;  Equipments, Only this category of workers should be working in Cleaning of Land Slide at AT 10 construction. 5.3 Tools and Equipment  Tools must be in good condition and free from any damage;  Only proper tool are allowed to use in this activity;  Homemade tools are not allowed to use on site;  Equipment must be in good condition and checked periodically;  Only authorized operator must use them and to be shore that the equipment to be well maintained;  Radio communication
  • 8. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 8 of 22  Acoustic High Signal  Where the equipmentissettle, the areashouldbe barricade byhighvisible safetytape andalso warning signs must be put in order to inform the public about the work activity. 5.4 Weather Condition It is not allowed to perform any activity during bad weather condition like;  storm  snow No activity will be performed if equipment are not able to perform safe work because of weather condition. 5.5 Personal Protective Equipment (PPE) In order to prevent any injury or accident during the working time, we are forced by the HSE plan and the AlbanianLaborLow to use the followingpersonal protective equipment during all the time on site.  hard hat;  gloves;  safetyshoes;  highvisible vest;  Reflectivesigns.  Acousticsignalization All these PPEswill be usedandwearbyeveryone thatwill be partonthe workingsite.Visitorsshall wear these PPEs (except reflective sign), as well. 5.6 Communication In orderto have a safe working activity, the communication is a very important issue to be considered. Workers are not allowed to use or talk on the phone when they are operating or guiding equipment. Visible and acoustic signs must be used on site. 5.7 Working time In order to have a safe work condition, road access activity will be performed only during day time. If proper lighting is provided works can be performed by management decision. 5.8 First Aid and First Aider Emergency numbers must be place in a visible table from everyone. First aid kit will be put in a place where everyone may have access.
  • 9. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 9 of 22 5.9 Environmental Measures In order to keep a good environment on site, spill prevention must be present on site, garbage and waste of food will be removed from site and deposited in safe waste area. All the area must be clean and in good environment condition after work activity. 5.10 Visitors or Vendor on site Visitors or Vendors are not allowed to enter on site until they have permission, however, visitors and vendormust have a brief training before they go on site and also they should sign the attendance list. 6 METHODOLOGY 6.1 Description Cleaning of land slide at access track at 10 will be done with these steps:  We will beginthe excavationinzone 1, as it is rocky area during excavator work, it will create a vibrationthatwill affectthe provocation of the surrounding area to see if there is any possible movement,thisareaisthe safestpartcompact rockerwhere the excavatorwill work and in this way does not endanger the vehicle and maneuver.  If the terrain does not show any sign of new displacing, and after the Contractor Geologist checks and gives OK we will continue with the second phase.  Afteritwill be continuedwithZone 3 excavation, this area consists of dislocated rock material, no compact rock,there are soil layers between the rock layers and vegetation and about 60-70 cm of soli above the surface. Excavationinthiszone will startfromtowerNo.8 inthe directionof landslidebyharassingandrelieving by 3m created by the land sliding, to see if we will have any possible slide or not.  If everythinggoeswellandthe Geologisttogetherwiththe Engineeragreesthat the structure is stable and there is certainty to enter that already cleaned area on both sides then we can proceed with the cleansing of the rock massive.  Excavatorsshouldworkwith interchange, only one at the same time during the excavations of Zone 1 and 3, to avoid any possible incident and to react on time.
  • 10. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 10 of 22  For these typesof workwhere the dangerishigh,the escortingteamshave tobe equippedwith acoustic signalizations and radio to signal the excavator maneuverer to immediately pull back with the vehicle in case of sliding terrain. Picture 1: Map of landslide and zones of work 6.2 Clearing and excavation Operations 1. Main contractor shall ensure all required permits are in place prior to the start of clearing and excavation work operations. 2. Main contractor Geologistshall be presentduringall time toestablishif terrainconditionsallow to proceed further with the works of clearing and excavations.l 3. The Contractor shall ensure compliance with environmental requirements such as silt fencing, run-off protection, or dust limitations during clearing and grubbing operation.
  • 11. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 11 of 22 7 CONTRACTOR'S ORGANIZATION FOR ACCESS ROAD CONSTRUCTION ProjectManager (ErlirCompany) Construction Manager (Klevi Kalemi) Site Engineer (Anil Company) Excavation Team (Surveyor, Forman, Operator) HSE Lead (Arber Dogani) Geologist(Contractor)
  • 12. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 12 of 22 8 ATTACHMENT A - LOCATION MAP
  • 13. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 13 of 22 9 ATTACHMENT B – PHOTOS PHOTO1
  • 14. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 14 of 22 10 ATTACHMENT B/2 – PHOTOS PHOTO 2
  • 15. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 15 of 22 11 ATTACHMENT B/3 – PHOTOS PHOTO 3
  • 16. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 16 of 22 12 ATTACHMENT C - RISK ASSESSMENT SPECIFIC
  • 17. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 17 of 22
  • 18. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 18 of 22
  • 19. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 19 of 22 13 ATTACHMENT D - JOB HAZARD ANALYSIS
  • 20. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 20 of 22
  • 21. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 21 of 22 14 ATTACHMENT E – LAST MINUTE RISK ASSESSMENT
  • 22. Method of Statement Removal of land slide at AT10 ISSUING DATE: __/01/2018 State ofissue: 00 Page 22 of 22