IntroductionIntroduction
 What is Line Balancing?What is Line Balancing?
Line Balancing is the technique of planningLine Balancing is the technique of planning
sufficient work load to each operator to achievesufficient work load to each operator to achieve
required output.required output.
Line Balancing includesLine Balancing includes
 Everyone is doing the same amount of wok.Everyone is doing the same amount of wok.
 Doing the same amount of work to customerDoing the same amount of work to customer
requirementrequirement
 Variation is smoothedVariation is smoothed
 No one over burdenedNo one over burdened
 No one waitingNo one waiting
 Everyone working together in balanced fashionEveryone working together in balanced fashion
Introduction : What is Line Balancing?Introduction : What is Line Balancing?
Introduction : What is Line Balancing?Introduction : What is Line Balancing?
When is the Line Balancing required?When is the Line Balancing required?
 Before starting a new styleBefore starting a new style
 While the style is being producedWhile the style is being produced
Everyday when the production starts or more than oneEveryday when the production starts or more than one
time a day, it depends on the situationtime a day, it depends on the situation
Line Balancing depends on;Line Balancing depends on;
 Performance of the individualsPerformance of the individuals
 Work in progressWork in progress
 AbsenteeismAbsenteeism
 Labour turnoverLabour turnover
 Management efficiencyManagement efficiency
AdvantagesAdvantages
 Line Balancing is an effective tool to improve the throughLine Balancing is an effective tool to improve the through
put of assembly line while reducing man powerput of assembly line while reducing man power
requirements and costsrequirements and costs
 It results in less work in processIt results in less work in process
 Assembly line balancing ensures:Assembly line balancing ensures:
1.1. The minimization of the number of work stationsThe minimization of the number of work stations
2.2. The minimization of cycle timeThe minimization of cycle time
3.3. The maximization of work load smoothnessThe maximization of work load smoothness
4.4. The maximization of work relatednessThe maximization of work relatedness
ProblemsProblems
 When assigning different tasks to individualWhen assigning different tasks to individual
workstations sum of task time at any stations shouldworkstations sum of task time at any stations should
not exceed the station time.not exceed the station time.
 Potential bottlenecks and work imbalancePotential bottlenecks and work imbalance
 Machinery failureMachinery failure
 Slow operators and absenteeism may interrupt the workSlow operators and absenteeism may interrupt the work
flowflow
 The change of operator efficiency during real timeThe change of operator efficiency during real time
production is the main reason that causes productionproduction is the main reason that causes production
line imbalanceline imbalance
Solution for ProblemsSolution for Problems
 Cross train operators to perform more than oneCross train operators to perform more than one
operationoperation
 Substitute machines must readily available forSubstitute machines must readily available for
immediate replacement if equipment breaksimmediate replacement if equipment breaks
downdown
 Reroute work, shift personal or reschedule toReroute work, shift personal or reschedule to
avoid delaysavoid delays
EngineeringEngineering
 Operation bulletin and machine specificationsOperation bulletin and machine specifications
o Article detailsArticle details
o No of operations involvedNo of operations involved
o Types of machines usedTypes of machines used
 Dividing the line in to two partsDividing the line in to two parts
o Preparation areaPreparation area
Small parts attachment Eg : Zipper to flySmall parts attachment Eg : Zipper to fly
o Assembling areaAssembling area
Assembling the garment Eg : Planning attachmentAssembling the garment Eg : Planning attachment
SMVSMV
 Visually absorbing the time taken by theVisually absorbing the time taken by the
operator for the specific taskoperator for the specific task
 Repeating the exercise for number of timeRepeating the exercise for number of time
 Standardizing the valueStandardizing the value
 Calculating the SMV of garmentCalculating the SMV of garment
 Forecasting the productionForecasting the production
 Implementing on the lineImplementing on the line
 Calculating number of operators required forCalculating number of operators required for
each operationeach operation
o Balance the line by adjusting the number ofBalance the line by adjusting the number of
operators tact time (TOPS)operators tact time (TOPS)
 EfficiencyEfficiency
o Production @100%Production @100%
o Production at present efficiencyProduction at present efficiency
o Implement the betterment on the lineImplement the betterment on the line
ExampleExample
 Coin pocket hem takes 0.16 minutes andCoin pocket hem takes 0.16 minutes and
requires one machine with the target of 375requires one machine with the target of 375
pieces, the next operations in the preparationpieces, the next operations in the preparation
area is coin pocket attachment on the facingarea is coin pocket attachment on the facing
takes 0.35 minutes with the target of 171 piecestakes 0.35 minutes with the target of 171 pieces
@100% efficiency. Working time is 8 hours.@100% efficiency. Working time is 8 hours.
According to TOPS, operator required for theAccording to TOPS, operator required for the
first operation would be 0.68=1 but the operatorfirst operation would be 0.68=1 but the operator
required for the second operations wouldrequired for the second operations would
be1.5=2.be1.5=2.
Balancing exercise for garment industry

Mais conteúdo relacionado

Mais procurados

Web stitching & stitch bonding warp knitt
Web stitching & stitch bonding warp knittWeb stitching & stitch bonding warp knitt
Web stitching & stitch bonding warp knitt
Himanshu Gupta
 

Mais procurados (20)

Application area of Computer Technology in Apparel Manufacturing
Application area of Computer Technology in Apparel Manufacturing Application area of Computer Technology in Apparel Manufacturing
Application area of Computer Technology in Apparel Manufacturing
 
Garment costing
Garment costingGarment costing
Garment costing
 
Robotics in Apparel Industry
Robotics in Apparel IndustryRobotics in Apparel Industry
Robotics in Apparel Industry
 
Knitting
KnittingKnitting
Knitting
 
Process sequence of weaving
Process sequence of weavingProcess sequence of weaving
Process sequence of weaving
 
Finishing process and parameters
Finishing process  and parametersFinishing process  and parameters
Finishing process and parameters
 
Line Balancing In Garments Industry
Line Balancing In Garments IndustryLine Balancing In Garments Industry
Line Balancing In Garments Industry
 
Web stitching & stitch bonding warp knitt
Web stitching & stitch bonding warp knittWeb stitching & stitch bonding warp knitt
Web stitching & stitch bonding warp knitt
 
Duties and responsibilities of different department
Duties and responsibilities of different departmentDuties and responsibilities of different department
Duties and responsibilities of different department
 
Relation between gsm and yarn count for different
Relation between gsm and yarn count for differentRelation between gsm and yarn count for different
Relation between gsm and yarn count for different
 
Flatlock stitches and its Mechanisms
Flatlock stitches and its MechanismsFlatlock stitches and its Mechanisms
Flatlock stitches and its Mechanisms
 
Presentation On Marker Making
Presentation On Marker MakingPresentation On Marker Making
Presentation On Marker Making
 
Alternate method of joining in Apparel sector
Alternate method of joining in Apparel sectorAlternate method of joining in Apparel sector
Alternate method of joining in Apparel sector
 
Garment inspection
Garment inspectionGarment inspection
Garment inspection
 
Yarn lea strength tester.
Yarn lea strength tester.Yarn lea strength tester.
Yarn lea strength tester.
 
industrial engineering in sewing department
industrial engineering in sewing department industrial engineering in sewing department
industrial engineering in sewing department
 
Garment production systems
Garment production systemsGarment production systems
Garment production systems
 
Computerised marker making
Computerised marker makingComputerised marker making
Computerised marker making
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
knitting machine in bangladesh
knitting machine in bangladeshknitting machine in bangladesh
knitting machine in bangladesh
 

Destaque

Artistic apparel audit presentation ...
Artistic apparel audit presentation ...Artistic apparel audit presentation ...
Artistic apparel audit presentation ...
Üzâîr Âhmêd
 
Arena product presentation
Arena product presentationArena product presentation
Arena product presentation
jhjsmits
 
attachements in sewing
attachements in sewingattachements in sewing
attachements in sewing
suniltalekar1
 

Destaque (20)

Effect of time and motion study
Effect of time and motion studyEffect of time and motion study
Effect of time and motion study
 
WORK study& LINE BALANCING
WORK study& LINE BALANCING WORK study& LINE BALANCING
WORK study& LINE BALANCING
 
Artistic apparel audit presentation ...
Artistic apparel audit presentation ...Artistic apparel audit presentation ...
Artistic apparel audit presentation ...
 
Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!
 
How to Improve Productivity
How to Improve ProductivityHow to Improve Productivity
How to Improve Productivity
 
Arena product presentation
Arena product presentationArena product presentation
Arena product presentation
 
Presentation on work study
Presentation on work studyPresentation on work study
Presentation on work study
 
Simulation with Arena (Dental Clinic project)
Simulation with Arena (Dental Clinic project)Simulation with Arena (Dental Clinic project)
Simulation with Arena (Dental Clinic project)
 
Line balancing
Line balancing Line balancing
Line balancing
 
Time & action plan of garment industry by sushant lulla
Time & action plan of garment industry by sushant lullaTime & action plan of garment industry by sushant lulla
Time & action plan of garment industry by sushant lulla
 
Skill matrix
Skill matrixSkill matrix
Skill matrix
 
Work Study
Work StudyWork Study
Work Study
 
Line balancing
Line balancing Line balancing
Line balancing
 
Line study of sewing section ( a detail overview)
Line study of sewing section ( a detail overview)Line study of sewing section ( a detail overview)
Line study of sewing section ( a detail overview)
 
History of workstudy - Workmeasurement - Job design
History of workstudy - Workmeasurement - Job designHistory of workstudy - Workmeasurement - Job design
History of workstudy - Workmeasurement - Job design
 
Introduction to work study
Introduction to work study Introduction to work study
Introduction to work study
 
Case Study Sri Lanka Lean Wip Reduction
Case Study Sri Lanka   Lean Wip ReductionCase Study Sri Lanka   Lean Wip Reduction
Case Study Sri Lanka Lean Wip Reduction
 
Work Study
Work StudyWork Study
Work Study
 
attachements in sewing
attachements in sewingattachements in sewing
attachements in sewing
 
Work study presentation
Work study presentationWork study presentation
Work study presentation
 

Semelhante a Balancing exercise for garment industry

Production-line balancing & capacity planning decision
Production-line balancing & capacity planning decisionProduction-line balancing & capacity planning decision
Production-line balancing & capacity planning decision
Rohit Raina
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
Karina Islam
 

Semelhante a Balancing exercise for garment industry (20)

Line balancing
Line balancingLine balancing
Line balancing
 
PRODUCTIVITY IMPROVEMENT OF AUTOMOTIVE ASSEMBLY LINE THROUGH LINE BALANCING
PRODUCTIVITY IMPROVEMENT OF AUTOMOTIVE ASSEMBLY LINE THROUGH LINE BALANCINGPRODUCTIVITY IMPROVEMENT OF AUTOMOTIVE ASSEMBLY LINE THROUGH LINE BALANCING
PRODUCTIVITY IMPROVEMENT OF AUTOMOTIVE ASSEMBLY LINE THROUGH LINE BALANCING
 
In apparel manufacturing (2 files merged)
In apparel manufacturing (2 files merged)In apparel manufacturing (2 files merged)
In apparel manufacturing (2 files merged)
 
Cnc Milling (Heidenhain ISO)
Cnc Milling (Heidenhain ISO)Cnc Milling (Heidenhain ISO)
Cnc Milling (Heidenhain ISO)
 
Leaning out the assembly process
Leaning out the assembly processLeaning out the assembly process
Leaning out the assembly process
 
H0432045055
H0432045055H0432045055
H0432045055
 
Dore Dore case study
Dore Dore case studyDore Dore case study
Dore Dore case study
 
Production-line balancing & capacity planning decision
Production-line balancing & capacity planning decisionProduction-line balancing & capacity planning decision
Production-line balancing & capacity planning decision
 
line balancing in garment industry
 line balancing in garment industry line balancing in garment industry
line balancing in garment industry
 
A line in apparel
A line in apparelA line in apparel
A line in apparel
 
EngManagement-Lecture 9.pptx
EngManagement-Lecture 9.pptxEngManagement-Lecture 9.pptx
EngManagement-Lecture 9.pptx
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
 
Ch19
Ch19Ch19
Ch19
 
IRJET- Basic Study of Assembly Line Balancing
IRJET- Basic Study of Assembly Line BalancingIRJET- Basic Study of Assembly Line Balancing
IRJET- Basic Study of Assembly Line Balancing
 
Standardised work for garment industry- Prakhar Jain
Standardised work for garment industry- Prakhar JainStandardised work for garment industry- Prakhar Jain
Standardised work for garment industry- Prakhar Jain
 
7. scheduling
7. scheduling7. scheduling
7. scheduling
 
Ruby3x3: How are we going to measure 3x
Ruby3x3: How are we going to measure 3xRuby3x3: How are we going to measure 3x
Ruby3x3: How are we going to measure 3x
 
Lean in fishing net
Lean in fishing netLean in fishing net
Lean in fishing net
 
Supply chain logistic review by lisa ferguson
Supply chain logistic review by lisa fergusonSupply chain logistic review by lisa ferguson
Supply chain logistic review by lisa ferguson
 
2.IE Presentation.pptx
2.IE Presentation.pptx2.IE Presentation.pptx
2.IE Presentation.pptx
 

Último

Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
Renandantas16
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 

Último (20)

Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Phases of negotiation .pptx
 Phases of negotiation .pptx Phases of negotiation .pptx
Phases of negotiation .pptx
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 

Balancing exercise for garment industry

  • 2. IntroductionIntroduction  What is Line Balancing?What is Line Balancing? Line Balancing is the technique of planningLine Balancing is the technique of planning sufficient work load to each operator to achievesufficient work load to each operator to achieve required output.required output.
  • 3. Line Balancing includesLine Balancing includes  Everyone is doing the same amount of wok.Everyone is doing the same amount of wok.  Doing the same amount of work to customerDoing the same amount of work to customer requirementrequirement  Variation is smoothedVariation is smoothed  No one over burdenedNo one over burdened  No one waitingNo one waiting  Everyone working together in balanced fashionEveryone working together in balanced fashion
  • 4. Introduction : What is Line Balancing?Introduction : What is Line Balancing?
  • 5. Introduction : What is Line Balancing?Introduction : What is Line Balancing?
  • 6. When is the Line Balancing required?When is the Line Balancing required?  Before starting a new styleBefore starting a new style  While the style is being producedWhile the style is being produced Everyday when the production starts or more than oneEveryday when the production starts or more than one time a day, it depends on the situationtime a day, it depends on the situation
  • 7. Line Balancing depends on;Line Balancing depends on;  Performance of the individualsPerformance of the individuals  Work in progressWork in progress  AbsenteeismAbsenteeism  Labour turnoverLabour turnover  Management efficiencyManagement efficiency
  • 8. AdvantagesAdvantages  Line Balancing is an effective tool to improve the throughLine Balancing is an effective tool to improve the through put of assembly line while reducing man powerput of assembly line while reducing man power requirements and costsrequirements and costs  It results in less work in processIt results in less work in process  Assembly line balancing ensures:Assembly line balancing ensures: 1.1. The minimization of the number of work stationsThe minimization of the number of work stations 2.2. The minimization of cycle timeThe minimization of cycle time 3.3. The maximization of work load smoothnessThe maximization of work load smoothness 4.4. The maximization of work relatednessThe maximization of work relatedness
  • 9. ProblemsProblems  When assigning different tasks to individualWhen assigning different tasks to individual workstations sum of task time at any stations shouldworkstations sum of task time at any stations should not exceed the station time.not exceed the station time.  Potential bottlenecks and work imbalancePotential bottlenecks and work imbalance  Machinery failureMachinery failure  Slow operators and absenteeism may interrupt the workSlow operators and absenteeism may interrupt the work flowflow  The change of operator efficiency during real timeThe change of operator efficiency during real time production is the main reason that causes productionproduction is the main reason that causes production line imbalanceline imbalance
  • 10. Solution for ProblemsSolution for Problems  Cross train operators to perform more than oneCross train operators to perform more than one operationoperation  Substitute machines must readily available forSubstitute machines must readily available for immediate replacement if equipment breaksimmediate replacement if equipment breaks downdown  Reroute work, shift personal or reschedule toReroute work, shift personal or reschedule to avoid delaysavoid delays
  • 11. EngineeringEngineering  Operation bulletin and machine specificationsOperation bulletin and machine specifications o Article detailsArticle details o No of operations involvedNo of operations involved o Types of machines usedTypes of machines used  Dividing the line in to two partsDividing the line in to two parts o Preparation areaPreparation area Small parts attachment Eg : Zipper to flySmall parts attachment Eg : Zipper to fly o Assembling areaAssembling area Assembling the garment Eg : Planning attachmentAssembling the garment Eg : Planning attachment
  • 12. SMVSMV  Visually absorbing the time taken by theVisually absorbing the time taken by the operator for the specific taskoperator for the specific task  Repeating the exercise for number of timeRepeating the exercise for number of time  Standardizing the valueStandardizing the value  Calculating the SMV of garmentCalculating the SMV of garment  Forecasting the productionForecasting the production  Implementing on the lineImplementing on the line
  • 13.  Calculating number of operators required forCalculating number of operators required for each operationeach operation o Balance the line by adjusting the number ofBalance the line by adjusting the number of operators tact time (TOPS)operators tact time (TOPS)  EfficiencyEfficiency o Production @100%Production @100% o Production at present efficiencyProduction at present efficiency o Implement the betterment on the lineImplement the betterment on the line
  • 14. ExampleExample  Coin pocket hem takes 0.16 minutes andCoin pocket hem takes 0.16 minutes and requires one machine with the target of 375requires one machine with the target of 375 pieces, the next operations in the preparationpieces, the next operations in the preparation area is coin pocket attachment on the facingarea is coin pocket attachment on the facing takes 0.35 minutes with the target of 171 piecestakes 0.35 minutes with the target of 171 pieces @100% efficiency. Working time is 8 hours.@100% efficiency. Working time is 8 hours. According to TOPS, operator required for theAccording to TOPS, operator required for the first operation would be 0.68=1 but the operatorfirst operation would be 0.68=1 but the operator required for the second operations wouldrequired for the second operations would be1.5=2.be1.5=2.