Thompson’s Mining & Smelting Co.
Bank Ground of The study
The company is planning to increase it’s
production rate. The company’s refinery at
Wekusko is under discussion, where
production is planned to increase to 35000
tons per week. Mr. Brian Walker, the
superintendent of the plant had carried
out a study at the plant to ensure for
achieving the target. An analysis of
operation was carried out for maximizing
the use of available resources.
Facts of the Wekusko Plant
1. Location : California
2. Resources Avaialble
a) Three Yard Shovels -
3Nos. Located at different areas
b) 20 Ton Trucks 12 Nos.
c) Primary Crusher - 1 No.
3) Opearating schedule of
the Plant
a) Shift – I for 8
hours:
2 shovels along with 4 trucks /
shovel.
b) Shift – II for 8 hours
1 Shovel along with 5 Trucks
4. Trucks could not be switch over from
one shovel to another.
5. The plant is working 5 days a week
6. Capacity of Primary Crusher : 9600
Tons per Shift (480 Trucks Load)
Objectives
The Company’s objective of increased
production to 35000 Tons per week could
be achieved by exploring 7000 tons of ore
per day from all the shovels. whereas the
Crusher is having the capacity of 9600
tons per shift.
Criteria
1. It could be possible with the
following by 100% utilizing the
crusher to the best of it’s capacity,
which is possible only by reducing
the waiting time for crusher, for
which, the waiting time of the
trucks at each shovel as tabulated
below, needs to be eliminated.
S.
No.
Shovel Waiting
time for
Trucks at
shovel in
every round
trip (in
Minutes)
Extra Cost
per Hour
in US$ *
1 1 1.17 1.36
2 2 -0.41 1.00
* Computation of Extra Cost Per Hour
In shift – I at shovel - I, the truck remains idle
for 1.17 min for every round trip, which comes
to 10.74 min per hour (60/6.54*1.17) resulting
into extra cost of US$ 1.36 per hour.
In shift – I at Shovel - II, the shovel remains
idle for 0.41 min for every round trip, which
comes to 3.03 min per hour (60/8.12*0.41)
resulting into extra cost of US$ 1.00 per hour.
End Result
Under the above situation the Crusher
is supplied with 10601 Tons of Material
(60/8.12*8*4*20+60/6.54*8*4*20)
against its capacity of 9600 Tons per
Shift. It is not out of place to mention
here that there is the scope of
reducing the transportation cost &
Shovel Cost as attributable to the
1001 Tons to line up with the capacity
of Crusher.
Parameters Used in Calculations
A queuing model is defined with formulae
that make use of the variables described
in the following.
QUEUING MODEL CHARACTERISTICS
Primary Queuing Model
Characteristics
A queuing model is defined in terms of the
following primary characteristics. For use
in calculations, these characteristics are
expressed using the letter that is indicated
in brackets following the name of the
characteristic.
• Request Arrival Rate (a). Service
requests arrive according to one of
four patterns: steady, irregular,
regular, or random.
• Service Distribution Rate (s). The
mean number of requests that are
processed within a time period.
• Utilization (u). The intensity of the
traffic. That is, the request arrival rate
divided by the service rate.
• Number of Servers (c). The
number of servers that can process
the request. The number of tellers on
duty affects the length of the line. A
server in this case may not be the
physical server, but may be a critical
subcomponent, depending on what is
being modelled.
• Queue Discipline. How queued
requests are processed, which affects
the standard deviation calculation.
Examples are: first-in-first-out (FIFO),
last-in-first-out (LIFO), and priority
ordered. This technique assumes FIFO
queues in all cases.
Variables in Queuing Model
Formulae
The primary queuing model
characteristics are common in the
model formulae. In addition, the
following variables may be used
depending on the queuing model.
• Average number of waiting
requests (w),
• Average number in the system (S),
• Average waiting time (Tw),
• Average time in system, i.e.,
response time (Ts),
• Delay due to queuing (D),
• Number of requests or clients (K),
• Probability that all servers are busy
(P(c)),
• Probability that there are K
requests in the system (P(K)),
• Probability that there is no delay
(P(0)),
• Erlang-B (B(c,U)),
• Erlang-C (C(c,U)),
• Erlang moment (m).
The formulae used to calculate these
values depend on the type of queue
and the type of distribution. More
complex queues, for example multiple
server queues, require use of more of
these values.
We will Solve your :-
ACCOUNTING
ASSIGNMENTS
&
FINANCE
ASSIGNMENTS
accountinghomeworkhelp
@yahoo.co.in
GET QUOTE IN
2 HOURS
accountinghomeworkhelp
@yahoo.co.in
We will Solve your :-
ACCOUNTING
ASSIGNMENTS
&
FINANCE
ASSIGNMENTS
accountinghomeworkhelp
@yahoo.co.in
GET QUOTE IN
2 HOURS
accountinghomeworkhelp
@yahoo.co.in
GET QUOTE IN
2 HOURS
accountinghomeworkhelp
@yahoo.co.in

Mais conteúdo relacionado

Semelhante a accounting assignment help

Lecture 3 inventory_build_up_january_2020
Lecture 3 inventory_build_up_january_2020Lecture 3 inventory_build_up_january_2020
Lecture 3 inventory_build_up_january_2020blinking1
 
Improving Truck-Shovel Energy Efficiency through Discrete Event Modeling
Improving Truck-Shovel Energy Efficiency through Discrete Event ModelingImproving Truck-Shovel Energy Efficiency through Discrete Event Modeling
Improving Truck-Shovel Energy Efficiency through Discrete Event ModelingKwame Awuah-Offei
 
2 maintainance of_farm_machinery
2 maintainance of_farm_machinery2 maintainance of_farm_machinery
2 maintainance of_farm_machineryRione Drevale
 
Maintainance of farm machinery
Maintainance of farm machineryMaintainance of farm machinery
Maintainance of farm machineryRione Drevale
 
Queuing model
Queuing model Queuing model
Queuing model goyalrama
 
To Minimize the Waiting Time and Waiting Time Cost of Dumpers, Waiting in a Q...
To Minimize the Waiting Time and Waiting Time Cost of Dumpers, Waiting in a Q...To Minimize the Waiting Time and Waiting Time Cost of Dumpers, Waiting in a Q...
To Minimize the Waiting Time and Waiting Time Cost of Dumpers, Waiting in a Q...IJERA Editor
 
Construction Equipment Fleet Management
Construction Equipment Fleet ManagementConstruction Equipment Fleet Management
Construction Equipment Fleet ManagementIJMER
 
CEMEX_SeniorDesignPosterUpdate4.21.3.pptx
CEMEX_SeniorDesignPosterUpdate4.21.3.pptxCEMEX_SeniorDesignPosterUpdate4.21.3.pptx
CEMEX_SeniorDesignPosterUpdate4.21.3.pptxArda Onkol
 
Jonson"s Rule Production scheduling
 Jonson"s Rule Production scheduling Jonson"s Rule Production scheduling
Jonson"s Rule Production schedulingmrinalmanik64
 
Reliability Spares And Other Considerations
Reliability Spares And Other ConsiderationsReliability Spares And Other Considerations
Reliability Spares And Other ConsiderationsEdWelch
 
construction equpment Chapter 2.pdf
construction equpment Chapter 2.pdfconstruction equpment Chapter 2.pdf
construction equpment Chapter 2.pdfexample43
 
Tugger Route Generation - Flow Planner - Dr. Dave Sly
Tugger Route Generation - Flow Planner - Dr. Dave SlyTugger Route Generation - Flow Planner - Dr. Dave Sly
Tugger Route Generation - Flow Planner - Dr. Dave SlyProplanner Asia
 
The productivity of lhd in underground coal mines
The productivity of   lhd in underground coal minesThe productivity of   lhd in underground coal mines
The productivity of lhd in underground coal minesSafdar Ali
 
Shovel dumper productivity calculation.pptx
Shovel dumper productivity calculation.pptxShovel dumper productivity calculation.pptx
Shovel dumper productivity calculation.pptxRiteshkumarMadhukar
 
Case study electronics industry
Case study   electronics industryCase study   electronics industry
Case study electronics industryGanesh TN
 

Semelhante a accounting assignment help (20)

Lecture 3 inventory_build_up_january_2020
Lecture 3 inventory_build_up_january_2020Lecture 3 inventory_build_up_january_2020
Lecture 3 inventory_build_up_january_2020
 
Improving Truck-Shovel Energy Efficiency through Discrete Event Modeling
Improving Truck-Shovel Energy Efficiency through Discrete Event ModelingImproving Truck-Shovel Energy Efficiency through Discrete Event Modeling
Improving Truck-Shovel Energy Efficiency through Discrete Event Modeling
 
2 maintainance of_farm_machinery
2 maintainance of_farm_machinery2 maintainance of_farm_machinery
2 maintainance of_farm_machinery
 
Maintainance of farm machinery
Maintainance of farm machineryMaintainance of farm machinery
Maintainance of farm machinery
 
Ncc case study
Ncc case studyNcc case study
Ncc case study
 
Queuing model
Queuing model Queuing model
Queuing model
 
Eka-stockpile-optimization-article
Eka-stockpile-optimization-articleEka-stockpile-optimization-article
Eka-stockpile-optimization-article
 
Toll plaza
Toll plazaToll plaza
Toll plaza
 
To Minimize the Waiting Time and Waiting Time Cost of Dumpers, Waiting in a Q...
To Minimize the Waiting Time and Waiting Time Cost of Dumpers, Waiting in a Q...To Minimize the Waiting Time and Waiting Time Cost of Dumpers, Waiting in a Q...
To Minimize the Waiting Time and Waiting Time Cost of Dumpers, Waiting in a Q...
 
Presentation3 modified
Presentation3 modifiedPresentation3 modified
Presentation3 modified
 
Construction Equipment Fleet Management
Construction Equipment Fleet ManagementConstruction Equipment Fleet Management
Construction Equipment Fleet Management
 
CEMEX_SeniorDesignPosterUpdate4.21.3.pptx
CEMEX_SeniorDesignPosterUpdate4.21.3.pptxCEMEX_SeniorDesignPosterUpdate4.21.3.pptx
CEMEX_SeniorDesignPosterUpdate4.21.3.pptx
 
EGR 590 Final GM
EGR 590 Final GM EGR 590 Final GM
EGR 590 Final GM
 
Jonson"s Rule Production scheduling
 Jonson"s Rule Production scheduling Jonson"s Rule Production scheduling
Jonson"s Rule Production scheduling
 
Reliability Spares And Other Considerations
Reliability Spares And Other ConsiderationsReliability Spares And Other Considerations
Reliability Spares And Other Considerations
 
construction equpment Chapter 2.pdf
construction equpment Chapter 2.pdfconstruction equpment Chapter 2.pdf
construction equpment Chapter 2.pdf
 
Tugger Route Generation - Flow Planner - Dr. Dave Sly
Tugger Route Generation - Flow Planner - Dr. Dave SlyTugger Route Generation - Flow Planner - Dr. Dave Sly
Tugger Route Generation - Flow Planner - Dr. Dave Sly
 
The productivity of lhd in underground coal mines
The productivity of   lhd in underground coal minesThe productivity of   lhd in underground coal mines
The productivity of lhd in underground coal mines
 
Shovel dumper productivity calculation.pptx
Shovel dumper productivity calculation.pptxShovel dumper productivity calculation.pptx
Shovel dumper productivity calculation.pptx
 
Case study electronics industry
Case study   electronics industryCase study   electronics industry
Case study electronics industry
 

Último

Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...anjaliyadav012327
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...Pooja Nehwal
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 

Último (20)

Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 

accounting assignment help

  • 2. Thompson’s Mining & Smelting Co. Bank Ground of The study The company is planning to increase it’s production rate. The company’s refinery at Wekusko is under discussion, where production is planned to increase to 35000 tons per week. Mr. Brian Walker, the superintendent of the plant had carried out a study at the plant to ensure for achieving the target. An analysis of operation was carried out for maximizing the use of available resources. Facts of the Wekusko Plant 1. Location : California 2. Resources Avaialble
  • 3. a) Three Yard Shovels - 3Nos. Located at different areas b) 20 Ton Trucks 12 Nos. c) Primary Crusher - 1 No. 3) Opearating schedule of the Plant a) Shift – I for 8 hours: 2 shovels along with 4 trucks / shovel. b) Shift – II for 8 hours 1 Shovel along with 5 Trucks 4. Trucks could not be switch over from one shovel to another. 5. The plant is working 5 days a week
  • 4. 6. Capacity of Primary Crusher : 9600 Tons per Shift (480 Trucks Load) Objectives The Company’s objective of increased production to 35000 Tons per week could be achieved by exploring 7000 tons of ore per day from all the shovels. whereas the Crusher is having the capacity of 9600 tons per shift. Criteria 1. It could be possible with the following by 100% utilizing the crusher to the best of it’s capacity, which is possible only by reducing the waiting time for crusher, for
  • 5. which, the waiting time of the trucks at each shovel as tabulated below, needs to be eliminated. S. No. Shovel Waiting time for Trucks at shovel in every round trip (in Minutes) Extra Cost per Hour in US$ * 1 1 1.17 1.36 2 2 -0.41 1.00 * Computation of Extra Cost Per Hour In shift – I at shovel - I, the truck remains idle for 1.17 min for every round trip, which comes to 10.74 min per hour (60/6.54*1.17) resulting into extra cost of US$ 1.36 per hour. In shift – I at Shovel - II, the shovel remains idle for 0.41 min for every round trip, which
  • 6. comes to 3.03 min per hour (60/8.12*0.41) resulting into extra cost of US$ 1.00 per hour.
  • 7. End Result Under the above situation the Crusher is supplied with 10601 Tons of Material (60/8.12*8*4*20+60/6.54*8*4*20) against its capacity of 9600 Tons per Shift. It is not out of place to mention here that there is the scope of reducing the transportation cost & Shovel Cost as attributable to the 1001 Tons to line up with the capacity of Crusher. Parameters Used in Calculations A queuing model is defined with formulae that make use of the variables described in the following.
  • 8. QUEUING MODEL CHARACTERISTICS Primary Queuing Model Characteristics A queuing model is defined in terms of the following primary characteristics. For use in calculations, these characteristics are expressed using the letter that is indicated in brackets following the name of the characteristic. • Request Arrival Rate (a). Service requests arrive according to one of
  • 9. four patterns: steady, irregular, regular, or random. • Service Distribution Rate (s). The mean number of requests that are processed within a time period. • Utilization (u). The intensity of the traffic. That is, the request arrival rate divided by the service rate. • Number of Servers (c). The number of servers that can process the request. The number of tellers on duty affects the length of the line. A server in this case may not be the physical server, but may be a critical
  • 10. subcomponent, depending on what is being modelled. • Queue Discipline. How queued requests are processed, which affects the standard deviation calculation. Examples are: first-in-first-out (FIFO), last-in-first-out (LIFO), and priority ordered. This technique assumes FIFO queues in all cases. Variables in Queuing Model Formulae The primary queuing model characteristics are common in the model formulae. In addition, the
  • 11. following variables may be used depending on the queuing model. • Average number of waiting requests (w), • Average number in the system (S), • Average waiting time (Tw), • Average time in system, i.e., response time (Ts), • Delay due to queuing (D), • Number of requests or clients (K), • Probability that all servers are busy (P(c)), • Probability that there are K requests in the system (P(K)), • Probability that there is no delay (P(0)),
  • 12. • Erlang-B (B(c,U)), • Erlang-C (C(c,U)), • Erlang moment (m). The formulae used to calculate these values depend on the type of queue and the type of distribution. More complex queues, for example multiple server queues, require use of more of these values.
  • 13. We will Solve your :- ACCOUNTING ASSIGNMENTS & FINANCE ASSIGNMENTS accountinghomeworkhelp @yahoo.co.in
  • 14. GET QUOTE IN 2 HOURS accountinghomeworkhelp @yahoo.co.in
  • 15. We will Solve your :- ACCOUNTING ASSIGNMENTS & FINANCE ASSIGNMENTS accountinghomeworkhelp @yahoo.co.in
  • 16. GET QUOTE IN 2 HOURS accountinghomeworkhelp @yahoo.co.in
  • 17. GET QUOTE IN 2 HOURS accountinghomeworkhelp @yahoo.co.in