TOTAL PRODUCTIVE
MAINTENANCE (TPM)
BY
AAKASH G.T(17CER001)
BALA ARAVINTH B(17CER026)
DHANVARSAN S(17CER041)
TOTAL PRODUCTIVE
MAINTENANCE
T: TOTAL
◦ Participation of all Employees.
◦ Include all Departments, operation, equipment and process.
P: PRODUCTIVE
◦ Pursue the maximization of efficiency of the production system by
making all loses zero.
◦ Zero accidents Zero defects Zero breakdowns.
M: MAINTENANCE
◦ To improve the efficiency of the equipment.
◦ Maintenance means the entire life cycle of the production system.
◦ Maintenance is not only to repair and maintain the machines.
WHY TPM ?
1. The major difference between TPM and other concepts is that
the operators are also made to involve in the maintenance
process.
2. Avoid wastage in quickly changing environment.
3. Reduce Cost of Manufacturing.
4. Produce a low batch quantity at the earliest possible time.
5. Goods send to Customers must be “ non – defective”
TPM OBJECTIVES
1. Increase production while, at the same time, increasing
employee morale and job satisfaction.
2. Hold emergency & unscheduled maintenance to a minimum.
3. To provide the safe and good working environment to the
worker.
4. Achieve Zero Defects, Zero Breakdown and Zero accidents in
all functional areas of the organization.
5. Involve people in all levels of organization.
6. Form different teams to reduce defects and Self Maintenance.
7. To maintain the HSE conditions of plant and equipments.
8. To fulfill Regulatory compliances.
BENEFITS OF TPM
✓Increased Employee Morale
✓Increased Productivity
✓Improved Sharing and Working as a Tea
✓Improved tidines and cleaning of the working place
✓Improved Product Quality
✓Improved Customer Satisfaction
✓Reduced Costs
✓Improved Delivery Time
✓Enhanced safety Records
✓Improved Image
✓Improved Reputation
TYPES OF MAINTENANCE
1. Breakdown Maintenance
2. Preventive Maintenance
a)Periodic Maintenance
b)Predictive Maintenance
3. Corrective Maintenance
4. Routine Maintenance
TPM TARGETS
1. PRODUCTION
I). Obtain Minimum 80% Overall Production Efficiency
ii). Obtain Minimum 90% Overall Equipment
Effectiveness
iii). Run the Machine during lunchtime
2. QUALITY Operate in a manner, so that there are no customer
complaint.
3. COST Reduce the manufacturing cost as much as possible
4. DELIVERY Achieve 100% success in delivering the goods as
required by the customer
5. SAFETY Maintain an accident free environment
6. MULTYTASK Develop multiskilled & flexible workers.
MAJOR LOSSES IN PRODUCTION
LINE AND ORGANIZATION
Failure losses – Breakdown loss Management loss
Setup / adjustment Operating motion loss
Cutting blade loss Line organization loss
Start up loss Logistic loss
Minor stoppage / Idling loss. Measurement and adjustment loss
Speed loss - operating at low speed Energy loss
Defect / rework loss Die, jig and tool breakage loss
Scheduled downtime loss Yield loss
FIVE PILLARS OF TPM
The five pillars of TPM are
1. Autonomous Maintenance
2. Focussed improvement
3. Planned Maintenance
4. Quality maintenance
5. Education &Training on the Job
AUTONOMOUS MAINTENANCE
POLICY
1. Uninterrupted operation of equipments
2. Flexible operators to operate & maintain other equipments
3. Eliminating the defects at source through active employee participation
4. Stepwise implementation of JISHU HOZEN activities. .
STEPS
1. Preparation of employees
2. Initial cleanup of machines
3. Take counter measures
4. Fix tentative JH standards
5. General inspection
6. Autonomus inspection
7. Standardization 8. Autonomus management
FOCUSSED IMPROVEMENT
◦ It is for small adjustments and corrections but effects the whole
process and carried out on a continual basis and involves all
people in the organization.
◦ The principal behind is that “ a very large number of small
improvements are more effective in an organizational
environment than a few improvements of large value.
This pillar is aimed at ;
◦ Reducing losses in the work place that affect our efficiencies.
◦ By using a detailed and through procedure, eliminate losses in a
systematic method using various Tools.
PLANNED MAINTENANCE
◦ With planned maintenance, we evolve an effort from a reactive
to a proactive method and use trained maintenance staff to help
train the operators to better maintain their equipment.
POLICY:
◦ Achieve and sustains availability of machines.
◦ Optimum maintenance cost.
◦ Reduce spares inventory.
◦ Improve reliability and maintainability of machines.
STEPS AND TARGET:
◦ Equipment evaluation and recording present status.
◦ Restore deterioration and improve weakness.
◦ Building up information management system.
◦ Prepare time based information system, select equipment, parts
and members and map on the plan.
◦ Prepare predictive maintenance system by introducing
equipment diagnostic techniques.
◦ Evaluation of planned maintenance
QUALITY MAINTENANCE
◦ It is aimed towards customer delight through highest quality
through defect free manufacturing. Focus is on eliminating non-
conformances in a systematic manner.
◦ Quality defects are classified as “CUSTOMER END defects”
and “IN HOUSE defects”.
◦ For customer-end data, we have to get data on Customer-end line
rejection and field complaints. In-house data include data related
to products and data related to process.
POLICY:
◦ Defect free conditions and control of equipments .
◦ QM activities to support quality assurances.
◦ Focus of prevention of defects at source.
◦ Focus on precaution (Pokayoke) system.
◦ In-line detection and segregation of defects.
◦ Effective implementation of operator quality assurance.
TARGET:
◦ Achieve and sustain customer complaints at zero.
◦ Reduce in-process defects by 50%.
◦ Reduce cost of quality by 50%.
EDUCATION &TRAINING ON
THE JOB
◦ It is aimed to have multi-skilled revitalized employees whose
moral is high and who has eager to come to work and perform all
required functions effectively and independently. Education is
given to operators to upgrade their skill.
◦ The employees should be trained to achieve the form phase of
skill which are as under:
PHASE 1: Do not know
PHASE 2: Know the theory but cannot do.
PHASE 3: Can do but cannot teach.
PHASE 4: Can do and also teach.
STEPS IN TRAINING :
1. Setting policies and priorities and checking present status of
education and training.
2. Establish of training system for operations and maintenance
skill up gradation.
3. Training the employees for up gradation the operation and
maintenance skills.
4. Preparation of training calendar.
5. Evaluation of activities and study of future approach
THANK YOU

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

Total Productive Maintenance
Total Productive Maintenance Total Productive Maintenance
Total Productive Maintenance
 
Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overview
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Tpm training
Tpm trainingTpm training
Tpm training
 
SMED - Single Minute Exchange of Dies
SMED - Single Minute Exchange of DiesSMED - Single Minute Exchange of Dies
SMED - Single Minute Exchange of Dies
 
TPM 8 Pillars
TPM 8 PillarsTPM 8 Pillars
TPM 8 Pillars
 
Total productive maintenance(TPM)
Total productive maintenance(TPM)Total productive maintenance(TPM)
Total productive maintenance(TPM)
 
Lean Manufacturing Training
Lean Manufacturing TrainingLean Manufacturing Training
Lean Manufacturing Training
 
Total Productive Maintenance (Tpm) EVERTS 21Aug2018
Total Productive Maintenance (Tpm) EVERTS 21Aug2018Total Productive Maintenance (Tpm) EVERTS 21Aug2018
Total Productive Maintenance (Tpm) EVERTS 21Aug2018
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
TPM - tech talk
TPM - tech talk TPM - tech talk
TPM - tech talk
 
PPT ON VISUAL FACTORY
PPT ON VISUAL FACTORYPPT ON VISUAL FACTORY
PPT ON VISUAL FACTORY
 
Lean ppt
Lean pptLean ppt
Lean ppt
 
Terotechnology
TerotechnologyTerotechnology
Terotechnology
 
Lean manufacturing
Lean manufacturing Lean manufacturing
Lean manufacturing
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
Poka Yoke Final Ppt
Poka Yoke  Final PptPoka Yoke  Final Ppt
Poka Yoke Final Ppt
 
Poka Yoke in Manufacturing
Poka Yoke in Manufacturing Poka Yoke in Manufacturing
Poka Yoke in Manufacturing
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 

Semelhante a Total productive maintenance

Ranveer yadav 2013 14
Ranveer yadav 2013 14Ranveer yadav 2013 14
Ranveer yadav 2013 14
ranviry49
 
Total productive maintenance (Total Quality Management)
Total productive maintenance (Total Quality Management)Total productive maintenance (Total Quality Management)
Total productive maintenance (Total Quality Management)
Ashwin Ashok Kumar
 

Semelhante a Total productive maintenance (20)

TPM-PPT-4.pptx
TPM-PPT-4.pptxTPM-PPT-4.pptx
TPM-PPT-4.pptx
 
Total Productive Maintenance (TPM).pdf
Total Productive Maintenance (TPM).pdfTotal Productive Maintenance (TPM).pdf
Total Productive Maintenance (TPM).pdf
 
Total productive maintance (tpm)
Total productive maintance (tpm)Total productive maintance (tpm)
Total productive maintance (tpm)
 
Ranveer yadav 2013 14
Ranveer yadav 2013 14Ranveer yadav 2013 14
Ranveer yadav 2013 14
 
Presentation on Total Productive Maintenance
Presentation on Total Productive MaintenancePresentation on Total Productive Maintenance
Presentation on Total Productive Maintenance
 
Srj tpm
Srj tpmSrj tpm
Srj tpm
 
Tpm
TpmTpm
Tpm
 
Total Productivity Maintenance
Total Productivity MaintenanceTotal Productivity Maintenance
Total Productivity Maintenance
 
Total productive maintainence
Total productive maintainenceTotal productive maintainence
Total productive maintainence
 
TQM TPM
TQM TPMTQM TPM
TQM TPM
 
tpm (total productive maintenance)
tpm (total productive maintenance)tpm (total productive maintenance)
tpm (total productive maintenance)
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh AroraTotal Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
 
Tpm by drh.
Tpm by drh.Tpm by drh.
Tpm by drh.
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Management
 
Total productive maintenance (Total Quality Management)
Total productive maintenance (Total Quality Management)Total productive maintenance (Total Quality Management)
Total productive maintenance (Total Quality Management)
 
Resume
ResumeResume
Resume
 

Último

Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
vineshkumarsajnani12
 

Último (20)

Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 

Total productive maintenance

  • 1. TOTAL PRODUCTIVE MAINTENANCE (TPM) BY AAKASH G.T(17CER001) BALA ARAVINTH B(17CER026) DHANVARSAN S(17CER041)
  • 2. TOTAL PRODUCTIVE MAINTENANCE T: TOTAL ◦ Participation of all Employees. ◦ Include all Departments, operation, equipment and process. P: PRODUCTIVE ◦ Pursue the maximization of efficiency of the production system by making all loses zero. ◦ Zero accidents Zero defects Zero breakdowns. M: MAINTENANCE ◦ To improve the efficiency of the equipment. ◦ Maintenance means the entire life cycle of the production system. ◦ Maintenance is not only to repair and maintain the machines.
  • 3. WHY TPM ? 1. The major difference between TPM and other concepts is that the operators are also made to involve in the maintenance process. 2. Avoid wastage in quickly changing environment. 3. Reduce Cost of Manufacturing. 4. Produce a low batch quantity at the earliest possible time. 5. Goods send to Customers must be “ non – defective”
  • 4. TPM OBJECTIVES 1. Increase production while, at the same time, increasing employee morale and job satisfaction. 2. Hold emergency & unscheduled maintenance to a minimum. 3. To provide the safe and good working environment to the worker. 4. Achieve Zero Defects, Zero Breakdown and Zero accidents in all functional areas of the organization. 5. Involve people in all levels of organization. 6. Form different teams to reduce defects and Self Maintenance. 7. To maintain the HSE conditions of plant and equipments. 8. To fulfill Regulatory compliances.
  • 5. BENEFITS OF TPM ✓Increased Employee Morale ✓Increased Productivity ✓Improved Sharing and Working as a Tea ✓Improved tidines and cleaning of the working place ✓Improved Product Quality ✓Improved Customer Satisfaction ✓Reduced Costs ✓Improved Delivery Time ✓Enhanced safety Records ✓Improved Image ✓Improved Reputation
  • 6. TYPES OF MAINTENANCE 1. Breakdown Maintenance 2. Preventive Maintenance a)Periodic Maintenance b)Predictive Maintenance 3. Corrective Maintenance 4. Routine Maintenance
  • 7. TPM TARGETS 1. PRODUCTION I). Obtain Minimum 80% Overall Production Efficiency ii). Obtain Minimum 90% Overall Equipment Effectiveness iii). Run the Machine during lunchtime 2. QUALITY Operate in a manner, so that there are no customer complaint. 3. COST Reduce the manufacturing cost as much as possible 4. DELIVERY Achieve 100% success in delivering the goods as required by the customer 5. SAFETY Maintain an accident free environment 6. MULTYTASK Develop multiskilled & flexible workers.
  • 8. MAJOR LOSSES IN PRODUCTION LINE AND ORGANIZATION Failure losses – Breakdown loss Management loss Setup / adjustment Operating motion loss Cutting blade loss Line organization loss Start up loss Logistic loss Minor stoppage / Idling loss. Measurement and adjustment loss Speed loss - operating at low speed Energy loss Defect / rework loss Die, jig and tool breakage loss Scheduled downtime loss Yield loss
  • 9. FIVE PILLARS OF TPM The five pillars of TPM are 1. Autonomous Maintenance 2. Focussed improvement 3. Planned Maintenance 4. Quality maintenance 5. Education &Training on the Job
  • 10. AUTONOMOUS MAINTENANCE POLICY 1. Uninterrupted operation of equipments 2. Flexible operators to operate & maintain other equipments 3. Eliminating the defects at source through active employee participation 4. Stepwise implementation of JISHU HOZEN activities. . STEPS 1. Preparation of employees 2. Initial cleanup of machines 3. Take counter measures 4. Fix tentative JH standards 5. General inspection 6. Autonomus inspection 7. Standardization 8. Autonomus management
  • 11. FOCUSSED IMPROVEMENT ◦ It is for small adjustments and corrections but effects the whole process and carried out on a continual basis and involves all people in the organization. ◦ The principal behind is that “ a very large number of small improvements are more effective in an organizational environment than a few improvements of large value. This pillar is aimed at ; ◦ Reducing losses in the work place that affect our efficiencies. ◦ By using a detailed and through procedure, eliminate losses in a systematic method using various Tools.
  • 12. PLANNED MAINTENANCE ◦ With planned maintenance, we evolve an effort from a reactive to a proactive method and use trained maintenance staff to help train the operators to better maintain their equipment. POLICY: ◦ Achieve and sustains availability of machines. ◦ Optimum maintenance cost. ◦ Reduce spares inventory. ◦ Improve reliability and maintainability of machines.
  • 13. STEPS AND TARGET: ◦ Equipment evaluation and recording present status. ◦ Restore deterioration and improve weakness. ◦ Building up information management system. ◦ Prepare time based information system, select equipment, parts and members and map on the plan. ◦ Prepare predictive maintenance system by introducing equipment diagnostic techniques. ◦ Evaluation of planned maintenance
  • 14. QUALITY MAINTENANCE ◦ It is aimed towards customer delight through highest quality through defect free manufacturing. Focus is on eliminating non- conformances in a systematic manner. ◦ Quality defects are classified as “CUSTOMER END defects” and “IN HOUSE defects”. ◦ For customer-end data, we have to get data on Customer-end line rejection and field complaints. In-house data include data related to products and data related to process.
  • 15. POLICY: ◦ Defect free conditions and control of equipments . ◦ QM activities to support quality assurances. ◦ Focus of prevention of defects at source. ◦ Focus on precaution (Pokayoke) system. ◦ In-line detection and segregation of defects. ◦ Effective implementation of operator quality assurance. TARGET: ◦ Achieve and sustain customer complaints at zero. ◦ Reduce in-process defects by 50%. ◦ Reduce cost of quality by 50%.
  • 16. EDUCATION &TRAINING ON THE JOB ◦ It is aimed to have multi-skilled revitalized employees whose moral is high and who has eager to come to work and perform all required functions effectively and independently. Education is given to operators to upgrade their skill. ◦ The employees should be trained to achieve the form phase of skill which are as under: PHASE 1: Do not know PHASE 2: Know the theory but cannot do. PHASE 3: Can do but cannot teach. PHASE 4: Can do and also teach.
  • 17. STEPS IN TRAINING : 1. Setting policies and priorities and checking present status of education and training. 2. Establish of training system for operations and maintenance skill up gradation. 3. Training the employees for up gradation the operation and maintenance skills. 4. Preparation of training calendar. 5. Evaluation of activities and study of future approach