ARC's Greg Gorbach's Standards-based Interoperability Presentation at ARC's 2008 Industry Forum
- 2. 3
© ARC Advisory Group
Leading Manufacturers Connect P2B
Source: ARC Survey of Manufacturers, 2007
Using Piloting or Implementing Exploring
0% 20% 40% 60% 80% 100%
Followers
Competitors
Leaders
Roll-up Info From Multiple
Plants
0% 50% 100%
Followers
Competitors
Leaders
Integration Technology
0% 20% 40% 60% 80%
Followers
Competitors
Leaders
SOA for Manufacturing
0% 20% 40% 60% 80%
Followers
Competitors
Leaders
P2B Business Process
Synchronization
- 3. 4
© ARC Advisory Group
Standards-Based P2B Interoperability
A Brief Review of Activities
Early Key Events
• Users trigger SAP interest:
• 2003, 2004 - Process, Discrete Workshops
• ISA/OAGi agreement signed: end 2005
User Meetings at ARC Forum: February 2006
• Interested in standards convergence, esp. P2B
• Need short time frame: 1 year
• Standards groups ready to step up
Customer Advisory Council and Guideline Working
Group formed: Feb/Mar 2006
- 4. 5
© ARC Advisory Group
Creating P2B Interoperability
Proactive Groups Spark Standards Convergence
These Groups Formed in February/March 2006
- 5. 6
© ARC Advisory Group
Standards Convergence
Status – February 2007
A methodology has been developed for creating ISA
content in OAGIS
The OAGi Board of Directors has agreed to express the
ISA-95 data model in OAGIS, and BODs are being
created
ISA-95 has been improved with:
• UN/CEFACT Core Components (ongoing)
• OAGIS BOD messaging, nouns, verbs, etc.
B2MMLv4 supports ISA-95 object structures by
themselves or wrapped in an OAGIS-style transaction
container
- 6. 7
© ARC Advisory Group
Two ISA-95 Implementations:
Status – February 2007
B2MML
• Supports UN/CEFACT core components using OAGIS
core component schema
• Implemented ISA-95 transactions as subset of
OAGIS transactions
• Extensions permit inclusion of OAGIS components in
B2MML documents
OAGIS
• OAGi Board of Directors authorized incorporating the
ISA SP-95 Data Model into the OAGIS standard
• BODs based on the ISA-SP95 data model are being
developed (starting with Production Performance
and Production Schedule)
• Users can map back and forth from OAGIS to B2MML
by closely aligning some of their messages to the
B2MML implementation.
- 7. 8
© ARC Advisory Group
Current Status - February 2008
Both Customer Advisory Council and
Manufacturing Interoperability Guideline
Working Group No Longer Active
OpenO&M continuing standards collaboration
activities
OAGi (OAGIS BODS) and WBF (B2MML)
Implementations of ISA95 Are Proceeding in
Parallel
- 8. 11
© ARC Advisory Group
OAGI and ISA95
OAGIS Release 9.2 includes the new ISA-95
based BODs
Target Release Date: February 1, 2008
- 9. 12
© ARC Advisory Group
ISA S-95 Production Schedule Model
Personnel
Requirement
Equipment
Requirement
Material Produced
Requirement
Personnel
Model
Equipment
Model
Material
Model
Corresponds to
element in
Corresponds to
element in
Corresponds to
element in
May contain
0..n 0..n0..n0..n
1..n
Personnel
Requirement
Property
Equipment
Requirement
Property
Material Produced
Requirement
Property
1..n 1..n 1..n
Production
Schedule
Process
Parameter
Material Consumed
Requirement
Corresponds to
element in
0..n
Material Consumed
Requirement
Property
1..n
Consumable
Expected
0..n
Consumable
Expected
Property
1..n
Segment
Requirement
1..n
Is made up of
Is made up of
Is associated
to either
Product
Production
Rule
Requested
Segment
Response
Corresponds
to a
Corresponds
to a
Production
Parameter
Production
Request
0..n
Process
Segment
Product
Parameter
Personnel
Requirement
Equipment
Requirement
Material Produced
Requirement
Personnel
Model
Personnel
Model
Equipment
Model
Equipment
Model
Material
Model
Material
Model
Corresponds to
element in
Corresponds to
element in
Corresponds to
element in
May contain
0..n 0..n0..n0..n
1..n
Personnel
Requirement
Property
Equipment
Requirement
Property
Material Produced
Requirement
Property
1..n 1..n 1..n
Production
Schedule
Process
Parameter
Material Consumed
Requirement
Corresponds to
element in
0..n
Material Consumed
Requirement
Property
1..n
Consumable
Expected
0..n
Consumable
Expected
Property
1..n
Segment
Requirement
1..n
Is made up of
Is made up of
Is associated
to either
Product
Production
Rule
Requested
Segment
Response
Corresponds
to a
Corresponds
to a
Production
Parameter
Production
Request
0..n
Process
Segment
Product
Parameter
- 10. 13
© ARC Advisory Group
OAGIS Production Schedule BOD (Draft)
Copyright © 1995 - 2007 Open Applications Group, Inc. All rights reserved
- 11. 14
© ARC Advisory Group
ISA S-95 Production Performance Model
Personnel
Actual
Equipment
Actual
Material Produced
Actual
Production
Data
Personnel
Model
Equipment
Model
Material
Model
Corresponds to
element in
Corresponds to
element in
Corresponds to
element in
May contain
0..n 0..n0..n0..n
1..n
Personnel
Actual
Property
Equipment
Actual
Property
Material Produced
Actual
Property
1..n 1..n 1..n
Production
Performance
Production
Response
Material Consumed
Actual
Corresponds to
element in
0..n
Material Consumed
Actual
Property
1..n
Consumable
Actual
0..n
Consumable
Actual
Property
1..n
Segment
Response
1..n
Is made up of
Is made up of
Process
Segment
Corresponds
to a
Personnel
Actual
Equipment
Actual
Material Produced
Actual
Production
Data
Personnel
Model
Equipment
Model
Material
Model
Corresponds to
element in
Corresponds to
element in
Corresponds to
element in
May contain
0..n 0..n0..n0..n
1..n
Personnel
Actual
Property
Equipment
Actual
Property
Material Produced
Actual
Property
1..n 1..n 1..n
Production
Performance
Production
Response
Material Consumed
Actual
Corresponds to
element in
0..n
Material Consumed
Actual
Property
1..n
Consumable
Actual
0..n
Consumable
Actual
Property
1..n
Segment
Response
1..n
Is made up of
Is made up of
Process
Segment
Corresponds
to a
- 12. 15
© ARC Advisory Group
OAGIS Production Performance BOD
(Draft)
Copyright © 1995 - 2007 Open Applications Group, Inc. All rights reserved
- 13. 16
© ARC Advisory Group
Ongoing Collaboration
OAGi is building the ISA-95 Data Model into
the OAGIS standard to provide a broader
solution for OAGIS users.
OAGIS is sharing their data model with ISA-
95
With BODs based on the ISA-95 data
model, the user can more easily map between
OAGIS and B2MML.
- 14. 18
© ARC Advisory Group
WBF B2MML
B2MML v04 is the latest version
Many enhancements improve alignment between
B2MML and OAGIS 9.0
For example:
• B2MML is designed to implement a subset of the OAGiS 9.0
message rules that are consistent with the ISA 95 Part 5
definitions. The B2MML ApplicationArea and verb
elements are subsets of the full OAGIS 9.0
specifications, with minor differences.
• In order to be consistent with the OAGIS message
transaction format, a change was made to use the
UN/CEFACT core component types as the base types for all
elements.
Source: WBF.
- 15. 19
© ARC Advisory Group
Thank You.
For more information, contact the author at
ggorbach@arcweb.com or visit our web pages at
www.arcweb.com