2Q08 Results



 August, 2008
Highlights

2Q08
  – Generation 28% above Assured Energy
  – EBITDA of R$ 288.9 million in 2Q08, an increase of 24.2% when compared to
    same period of 2007 (R$ 232.6 million)
  – Net income of R$ 134.1 million in 2Q08, 5.6% lower than that in 2Q07 (R$ 142.1
    million)
  – On May 29th, 2008, the company paid R$ 172.8 million as Dividends regarding
    1Q08 results


Subsequent Events
  – Proposed dividends of R$ 134.1 million, corresponding to 100% of net income on
    2Q08:
      - R$ 0.34 per Common Share
      - R$ 0.37 per Preferred Share




                                                                                     2
Energy Balance

Generation – MW Average                                      Billed Energy – GWh
                                                                            7,239           7,292
                                                                             738            461
                                        121%      128%
                    115%                                                    914            1,234
109%     107%                 112%




                                                   1,635                    5,587          5,597
                                       1,543
         1,363       1,467   1,424
1,392




2003      2004       2005     2006      2007        1H08
                                                                            1H07            1H08
  Generation - MW Average      Generation / Assured Energy
                                                                    Eletropaulo     MRE     CCEE/Losses

 Increase of 29.4% on Generated Energy                         Bilateral Contract with Eletropaulo:
 (2Q08 x 2Q07)                                                    – Price until 07/03/2008 – R$ 131.98/MWh
                                                                  – Prices from July, 2008 – R$ 149.72/MWh
 Generation 28% above Assured Energy
 (1,275 MW average)                                            MRE Tariff – R$ 7.77/MWh

                                                               Average price of 2Q08 billed energy at CCEE
                                                               – R$ 59.72/MWh (R$ 68.82/MWh in 2Q07)

                                                                                                             3
Investments

Capex – 2Q08: R$ 12.9 million                                   1H08
Capex – 1H08: R$ 18.5 million

                                                                                                                Equipment
 – Equipment restoration and upgrade of operating plants -                 45.4%
   R$ 6.0 million                                                                                               Environment
                                                                                                  32.3%
 – Upgrade of the SHPP – R$ 1.7 million                                                                         IT
 – Environmental Projects – R$ 3.3 million                                                                      SHPP
 – Investments on IT – R$ 0.8 million
                                                                                       17.7%
 – SHPPs “São José” and “São Joaquim”, at São Paulo (total               4.5%
   capacity 7MW) – R$ 5.2 million
 – 3 SHPPs at Rio de Janeiro:                                   Investments – R$ million
     •   Installed Capacity of 52MW                                                                   85.9
     •   The installation license was granted in October 2007
                                                                                                      17.7
     •   Until 06/30/2008 R$ 21.0 million were invested, of
                                                                 SHPPs - RJ
         which R$ 1.0 million in 1H08                                                                 68.2
                                                                                           50.7
     •   Waiting for the Vegetation Suppression License                         46.5
         authorization in order to start the construction
                                                                  27.5
                                                                                                                     18.5
Capex 2008 – Estimate revised to R$ 85.9
million
                                                                   2005         2006       2007      2008 (E)        1H08

                                                                                                                            4
Expansion Requirement

Requirement: increase installed capacity, by at least, 15% (400 MW), until
December 2007:
  – Increase the installed capacity in São Paulo State; or
  – Purchase energy from new plants, located in São Paulo, through long term agreements (at
    least 5 years)

Restrictions to accomplish the requirement:
  – São Paulo State – insufficient hydro resources and environmental restrictions to install Thermo
    plants;
  – Insufficiency of gas supply;
  – “New Model of Electric Sector” (Law # 10,848/04)

On February 2008, AES Tietê received a report prepared by a consulting
company, regarding the evaluation of possibilities of expanding its
generation capacity in São Paulo State.
The Company has been developing discussions with different members of
the São Paulo State Government, regarding opportunities related to:
      – Hydroelectric potential
      – Opportunities for joint generation
      – Alternative energies


                                                                                                      5
Gross Revenue – R$ Million

Gross Revenue                                               Without Non-recurring Effects


          +33.1%   809                                      786               809
  608                                                                 +2.9%
                    34                                      74
                                                             74               34
                                                                               34

 (132)             775                                                        775
                                                                               775
                                                            712
                                                             712
                                   +86.8%
  740                                                                                              +1.3%
          +4.6%
                                            395                                             390            395
                            211                                      +8.8%
                                             16                                                             16
                                                                                                           16
                                                                                            37
                           (170)   -0.6%
                                                                                                   +7.4%
                            381             378                                             352
                                                                                             352           378
                                                                                                            378




  1H07             1H08     2Q07            2Q08            1H07              1H08          2Q07           2Q08

                            Net Revenue        Deductions         Reversion of Deductions

         Stable net revenue comparing to 2Q07
          – Change in PIS/Cofins Tax from Cumulative to Non-cumulative generated extraordinary impacts in
           2Q07:
             • Gross Revenue - decrease of R$ 178.2 million
             • Deductions – reversion of R$ 206.7 million
             • Net Revenue – increase of R$ 28.5 million

                                                                                                                  6
Costs and Operational Expenses
                              R$ Million

Costs and Operational Expenses                                    Without Non-recurring Effects


   253
                                                                                  + 4.9 %
              -19.0%
                     205                                                                    205
                                                                         195
                                    164
  175
                     112                      -35.6%                      83
                                                                         102                112                   + 9.3 %
                                                      106                                                               106
                                                                                                           97
                                   132
                                                       58                                                  50
                                                                                                           40               58
                                                                          60
                                                                          60
    45                 60                                                                   60
                                  16                   31                                                 31             31
    33                 33              16            16                   33                33           16            16
                                                                                                          16

  1H07               1H08          2Q07              2Q08               1H07             1H08             2Q07         2Q08
           Power Purchase and Sector Charges                Other Operational Expenses             Depreciation


    TUSDg Costs:
         – Extraordinary impact in 2Q07’s expenses, R$ 92.5 million, retroactively of 07/01/2004
         – Tariff Cycle 2007/2008, R$ 44.3 million (R$ 11 million / quarter)

    Reversal of R$ 15.3 million provision in 2Q07 due to the change of PIS/COFINS tax,
    from cumulative, to non-cumulative


                                                                                                                                 7
EBITDA

EBITDA ( R$ Million )                                 Without Non-recurring Effects



                                                         77.1%           77.8%    77.1%
                    77.8%                     76.4%                                               76.4%
70.2%                       61.1%
          +16.0%
                                                               +9.8%




                   603              +24.0%                             603                +6.4%
   520
    520                                                549

                                             289
                                             289                                 272
                             233                                                                  289



  1H07             1H08      2Q07            2Q08      1H07            1H08      2Q07             2Q08


                                             EBITDA      EBITDA Margin




                                                                                                          8
Financial Results – R$ Million

Financial Results - R$ Million               Without Non-recurring Effects

      1H07        1H08       2Q07     2Q08      1H07         1H08     2Q07          2Q08

                                 10




      (19)                                                            (21)

      - 431.6 %                                                         - 215.8 %
                                               (50)
                                      (65)                                          (65)
                                                 - 103.0 %


                  (101)                                      (101)



     Increase of the average IGP-M (4.34% in 2Q08 x 0.35% in 2Q07), which
     accrues the Company’s debt – amount of R$ 1.3 billion

     Positive effect in 2Q07 due to the change of PIS/COFINS taxation system,
     totaling R$ 30.8 million


                                                                                           9
Results

Net Income - R$ Million                                  Without Non-recurring Effects

                                                          42.3%                     41.9%
40.9%             39.6%                                                     39.6%
                          37.3%              35.4%
         +1.4%
                                                                                                      35.4%
                                                                   +1.8%
                                  - 5.6 %
   303           307                                        301             307
                                                                                            - 9.1%


                           142                                                      154
                                            134                                                      134
                                                                                                      134



  1H07           1H08      2Q07             2Q08            1H07            1H08    2Q07             2Q08
                                            Net Income         Net Margin

 Proposed Dividends of 100% of 2Q08’s                        Ex-Dividend date 08/14/2008
 Net Income:
    – Dividends: R$ 134.1 million;                           Payment date 08/28/2008
    – Total payment by share:
       - R$ 0.34 / common share
       - R$ 0.37 / preferred share
                                                                                                              10
Consolidated Debt

                                                                                                    in R$ million

                   Amount                 Creditor             Maturity              Cost             Collateral
                   1,287.1                Eletrobrás           May, 2013      IGP-M + 10% p.a.      Receivables
                        0.0              FunCesp III           Sep, 2027       IGP-DI + 6% p.a.     Receivables

Net Debt - R$ Million


            2.0x
                               1.4x
       1,253.5                                         0.7x            0.6x                 0.6x                    0.5x
                              1,096.3

                                                       676.5               681.9            660.9                   606.8




        2003                   2004                    2005                2006              2007                   2Q08

                                      Net Debt (R$ million)                       Net Debt / EBITDA


     Cash Availability 06/30/2008 = R$ 680.3 million
         – Marketable securities with maturities lower than 90 days
         – Average rates around 100% of CDI

                                                                                                                            11
Managerial Cash Flow


                         R$ Million                   2Q07       3Q07      4Q07      1Q08      2Q08
INITIAL CASH                                          683.5      571.2     589.0     633.7      814.6
Operating Cash Flow                                    307.9     248.9     271.2     261.5      279.3
Investments                                            (12.0)      (9.3)   (15.0)      (4.1)    (11.6)
Net Financial Expenses                                 (18.0)    (19.3)    (18.4)     (15.3)    (14.1)
Net Amortization                                       (48.3)    (50.8)    (52.0)     (46.2)    (45.6)
Income Tax                                             (16.6)      (9.8)      -       (15.1)    (16.0)
Dividends and IoE                                     (325.4)    (141.9)   (141.0)      -      (334.1)
Free Cash Flow                                        (112.3)     17.8      44.7     180.9     (142.1)
FINAL CASH OF PARENT COMPANY                          571.2      589.0     633.7     814.6      672.5
Final Cash of Subsidiaries and Associated Companies    28.3        4.2        4.6       6.5       7.8
Final Cash                                            599.4      593.2     638.3     821.0      680.3


   Investments – construction of the SHPP’s at São Paulo (R$ 4.2 million) and upgrade of
   the SHPP’s of AES PCH Minas subsidiary (R$ 1.7 million)
   Payment of dividends regarding 4Q07 and 1Q08

                                                                                                         12
Conclusion



Generation was 28% above Assured Energy in 2Q08


EBITDA of R$ 288.9 million in 2Q08, representing an increase of
24.2% when compared to 2Q07 (R$ 232.6 million)


Net income of R$ 134.1 million in 2Q08, represents a decrease of
5.6% when compared to 2Q07 (R$ 142.1 million)


Proposed dividends corresponding to 100% of 2Q08 net income




                                                                   13
2Q08 Results
The statements contained in this document with regard to the
business prospects, projected operating and financial results, and
growth potential are merely forecasts based on the expectations of
the Company’s Management in relation to its future performance.
Such estimates are highly dependent on market behavior and on
the conditions affecting Brazil’s macroeconomic performance as
well as the electric sector and international market, and they are
therefore subject to changes.

Mais conteúdo relacionado

Mais procurados

CTEEP - 2nd Quarter 2009 Results Presentation
CTEEP - 2nd Quarter 2009 Results PresentationCTEEP - 2nd Quarter 2009 Results Presentation
CTEEP - 2nd Quarter 2009 Results PresentationCTEEP
 
Apresentação call tiete 2 q11_final
Apresentação call tiete 2 q11_finalApresentação call tiete 2 q11_final
Apresentação call tiete 2 q11_finalAES Tietê
 
2009 Brazil Equity Ideas Conference - Credit Suisse*
2009 Brazil Equity Ideas Conference - Credit Suisse*2009 Brazil Equity Ideas Conference - Credit Suisse*
2009 Brazil Equity Ideas Conference - Credit Suisse*CPFL RI
 
San Francisco Tax Lien Financing Program for Commercial Building Clean Energy...
San Francisco Tax Lien Financing Program for Commercial Building Clean Energy...San Francisco Tax Lien Financing Program for Commercial Building Clean Energy...
San Francisco Tax Lien Financing Program for Commercial Building Clean Energy...Global Infrastructure Basel Foundation
 
energy future holindings commitments
energy future holindings  commitmentsenergy future holindings  commitments
energy future holindings commitmentsfinance29
 

Mais procurados (6)

CTEEP - 2nd Quarter 2009 Results Presentation
CTEEP - 2nd Quarter 2009 Results PresentationCTEEP - 2nd Quarter 2009 Results Presentation
CTEEP - 2nd Quarter 2009 Results Presentation
 
Managing the Winds of Change – California Experiences
Managing the Winds of Change – California ExperiencesManaging the Winds of Change – California Experiences
Managing the Winds of Change – California Experiences
 
Apresentação call tiete 2 q11_final
Apresentação call tiete 2 q11_finalApresentação call tiete 2 q11_final
Apresentação call tiete 2 q11_final
 
2009 Brazil Equity Ideas Conference - Credit Suisse*
2009 Brazil Equity Ideas Conference - Credit Suisse*2009 Brazil Equity Ideas Conference - Credit Suisse*
2009 Brazil Equity Ideas Conference - Credit Suisse*
 
San Francisco Tax Lien Financing Program for Commercial Building Clean Energy...
San Francisco Tax Lien Financing Program for Commercial Building Clean Energy...San Francisco Tax Lien Financing Program for Commercial Building Clean Energy...
San Francisco Tax Lien Financing Program for Commercial Building Clean Energy...
 
energy future holindings commitments
energy future holindings  commitmentsenergy future holindings  commitments
energy future holindings commitments
 

Destaque

03/31/2008 - 4Q07 and 2007 Earnings Call Presentation
03/31/2008  	-   	4Q07 and 2007 Earnings Call Presentation03/31/2008  	-   	4Q07 and 2007 Earnings Call Presentation
03/31/2008 - 4Q07 and 2007 Earnings Call PresentationAES Tietê
 
12/08/2005 - Bear Stearns
12/08/2005  	-   	Bear Stearns12/08/2005  	-   	Bear Stearns
12/08/2005 - Bear StearnsAES Tietê
 
31/10/2008 - Brazil Day – 2º Semestre 2008
31/10/2008  	-   	Brazil Day – 2º Semestre 200831/10/2008  	-   	Brazil Day – 2º Semestre 2008
31/10/2008 - Brazil Day – 2º Semestre 2008AES Tietê
 

Destaque (7)

03/31/2008 - 4Q07 and 2007 Earnings Call Presentation
03/31/2008  	-   	4Q07 and 2007 Earnings Call Presentation03/31/2008  	-   	4Q07 and 2007 Earnings Call Presentation
03/31/2008 - 4Q07 and 2007 Earnings Call Presentation
 
Picture This Grant
Picture This GrantPicture This Grant
Picture This Grant
 
Synergies of Positivity
Synergies of PositivitySynergies of Positivity
Synergies of Positivity
 
12/08/2005 - Bear Stearns
12/08/2005  	-   	Bear Stearns12/08/2005  	-   	Bear Stearns
12/08/2005 - Bear Stearns
 
31/10/2008 - Brazil Day – 2º Semestre 2008
31/10/2008  	-   	Brazil Day – 2º Semestre 200831/10/2008  	-   	Brazil Day – 2º Semestre 2008
31/10/2008 - Brazil Day – 2º Semestre 2008
 
Hogan Open House
Hogan Open HouseHogan Open House
Hogan Open House
 
Web 2 Websites
Web 2 WebsitesWeb 2 Websites
Web 2 Websites
 

Semelhante a 09/08/2008 - 2Q08 Earnings Call Presentation

4 q07 and 2007 earnings call presentation
4 q07 and 2007 earnings call presentation4 q07 and 2007 earnings call presentation
4 q07 and 2007 earnings call presentationAES Tietê
 
03/30/2009 - 4Q08 and 2008 Earnings Results
03/30/2009  	-   	4Q08 and 2008 Earnings Results03/30/2009  	-   	4Q08 and 2008 Earnings Results
03/30/2009 - 4Q08 and 2008 Earnings ResultsAES Tietê
 
4 q08 and 2008 earnings results
4 q08 and 2008 earnings results4 q08 and 2008 earnings results
4 q08 and 2008 earnings resultsAES Tietê
 
3 q08 earnings call presentation
3 q08 earnings call presentation3 q08 earnings call presentation
3 q08 earnings call presentationAES Tietê
 
6 transmissão paulista february 20 2008
6   transmissão paulista february 20 20086   transmissão paulista february 20 2008
6 transmissão paulista february 20 2008Cteep
 
A 5 auction results
A 5 auction resultsA 5 auction results
A 5 auction resultsMPX_RI
 
xcel energy EEI_Pres_November_2007SEC
xcel energy  EEI_Pres_November_2007SECxcel energy  EEI_Pres_November_2007SEC
xcel energy EEI_Pres_November_2007SECfinance26
 
xcel energy EEI_Pres_November_2007SEC
xcel energy  EEI_Pres_November_2007SECxcel energy  EEI_Pres_November_2007SEC
xcel energy EEI_Pres_November_2007SECfinance26
 
public serviceenterprise group Lehman
public serviceenterprise group Lehmanpublic serviceenterprise group Lehman
public serviceenterprise group Lehmanfinance20
 
public serviceenterprise group Lehman
public serviceenterprise group  Lehmanpublic serviceenterprise group  Lehman
public serviceenterprise group Lehmanfinance20
 
xcel energy BAC_Presentation_112007_Final
xcel energy  BAC_Presentation_112007_Finalxcel energy  BAC_Presentation_112007_Final
xcel energy BAC_Presentation_112007_Finalfinance26
 
xcel energy BAC_Presentation_112007_Final
xcel energy  BAC_Presentation_112007_Finalxcel energy  BAC_Presentation_112007_Final
xcel energy BAC_Presentation_112007_Finalfinance26
 
4TTPSCo_Plan_Xcel_Energy_12052007
4TTPSCo_Plan_Xcel_Energy_120520074TTPSCo_Plan_Xcel_Energy_12052007
4TTPSCo_Plan_Xcel_Energy_12052007finance26
 
4TTPSCo_Plan_Xcel_Energy_12052007
4TTPSCo_Plan_Xcel_Energy_120520074TTPSCo_Plan_Xcel_Energy_12052007
4TTPSCo_Plan_Xcel_Energy_12052007finance26
 
Conference call presentation 4 q10
Conference call presentation 4 q10Conference call presentation 4 q10
Conference call presentation 4 q10MPX_RI
 
Conference call presentation 4 q10 28.03
Conference call presentation 4 q10 28.03Conference call presentation 4 q10 28.03
Conference call presentation 4 q10 28.03MPX_RI
 
xcel energy 9_4LehmanConfPresentation952007SEC
xcel energy  9_4LehmanConfPresentation952007SECxcel energy  9_4LehmanConfPresentation952007SEC
xcel energy 9_4LehmanConfPresentation952007SECfinance26
 
xcel energy 9_4LehmanConfPresentation952007SEC
xcel energy  9_4LehmanConfPresentation952007SECxcel energy  9_4LehmanConfPresentation952007SEC
xcel energy 9_4LehmanConfPresentation952007SECfinance26
 
xcel energy Lehman_Sept_2008-SEC
xcel energy  Lehman_Sept_2008-SECxcel energy  Lehman_Sept_2008-SEC
xcel energy Lehman_Sept_2008-SECfinance26
 
xcel energy Lehman_Sept_2008-SEC
xcel energy  Lehman_Sept_2008-SECxcel energy  Lehman_Sept_2008-SEC
xcel energy Lehman_Sept_2008-SECfinance26
 

Semelhante a 09/08/2008 - 2Q08 Earnings Call Presentation (20)

4 q07 and 2007 earnings call presentation
4 q07 and 2007 earnings call presentation4 q07 and 2007 earnings call presentation
4 q07 and 2007 earnings call presentation
 
03/30/2009 - 4Q08 and 2008 Earnings Results
03/30/2009  	-   	4Q08 and 2008 Earnings Results03/30/2009  	-   	4Q08 and 2008 Earnings Results
03/30/2009 - 4Q08 and 2008 Earnings Results
 
4 q08 and 2008 earnings results
4 q08 and 2008 earnings results4 q08 and 2008 earnings results
4 q08 and 2008 earnings results
 
3 q08 earnings call presentation
3 q08 earnings call presentation3 q08 earnings call presentation
3 q08 earnings call presentation
 
6 transmissão paulista february 20 2008
6   transmissão paulista february 20 20086   transmissão paulista february 20 2008
6 transmissão paulista february 20 2008
 
A 5 auction results
A 5 auction resultsA 5 auction results
A 5 auction results
 
xcel energy EEI_Pres_November_2007SEC
xcel energy  EEI_Pres_November_2007SECxcel energy  EEI_Pres_November_2007SEC
xcel energy EEI_Pres_November_2007SEC
 
xcel energy EEI_Pres_November_2007SEC
xcel energy  EEI_Pres_November_2007SECxcel energy  EEI_Pres_November_2007SEC
xcel energy EEI_Pres_November_2007SEC
 
public serviceenterprise group Lehman
public serviceenterprise group Lehmanpublic serviceenterprise group Lehman
public serviceenterprise group Lehman
 
public serviceenterprise group Lehman
public serviceenterprise group  Lehmanpublic serviceenterprise group  Lehman
public serviceenterprise group Lehman
 
xcel energy BAC_Presentation_112007_Final
xcel energy  BAC_Presentation_112007_Finalxcel energy  BAC_Presentation_112007_Final
xcel energy BAC_Presentation_112007_Final
 
xcel energy BAC_Presentation_112007_Final
xcel energy  BAC_Presentation_112007_Finalxcel energy  BAC_Presentation_112007_Final
xcel energy BAC_Presentation_112007_Final
 
4TTPSCo_Plan_Xcel_Energy_12052007
4TTPSCo_Plan_Xcel_Energy_120520074TTPSCo_Plan_Xcel_Energy_12052007
4TTPSCo_Plan_Xcel_Energy_12052007
 
4TTPSCo_Plan_Xcel_Energy_12052007
4TTPSCo_Plan_Xcel_Energy_120520074TTPSCo_Plan_Xcel_Energy_12052007
4TTPSCo_Plan_Xcel_Energy_12052007
 
Conference call presentation 4 q10
Conference call presentation 4 q10Conference call presentation 4 q10
Conference call presentation 4 q10
 
Conference call presentation 4 q10 28.03
Conference call presentation 4 q10 28.03Conference call presentation 4 q10 28.03
Conference call presentation 4 q10 28.03
 
xcel energy 9_4LehmanConfPresentation952007SEC
xcel energy  9_4LehmanConfPresentation952007SECxcel energy  9_4LehmanConfPresentation952007SEC
xcel energy 9_4LehmanConfPresentation952007SEC
 
xcel energy 9_4LehmanConfPresentation952007SEC
xcel energy  9_4LehmanConfPresentation952007SECxcel energy  9_4LehmanConfPresentation952007SEC
xcel energy 9_4LehmanConfPresentation952007SEC
 
xcel energy Lehman_Sept_2008-SEC
xcel energy  Lehman_Sept_2008-SECxcel energy  Lehman_Sept_2008-SEC
xcel energy Lehman_Sept_2008-SEC
 
xcel energy Lehman_Sept_2008-SEC
xcel energy  Lehman_Sept_2008-SECxcel energy  Lehman_Sept_2008-SEC
xcel energy Lehman_Sept_2008-SEC
 

Mais de AES Tietê

Manual de governanca_corporativa
Manual de governanca_corporativaManual de governanca_corporativa
Manual de governanca_corporativaAES Tietê
 
Apresentação Institucional - Português
Apresentação Institucional - PortuguêsApresentação Institucional - Português
Apresentação Institucional - PortuguêsAES Tietê
 
Apresentação Institucional - Inglês
Apresentação Institucional - InglêsApresentação Institucional - Inglês
Apresentação Institucional - InglêsAES Tietê
 
01/27/2010 - Credit Suisse Conference
01/27/2010  	-   	Credit Suisse Conference01/27/2010  	-   	Credit Suisse Conference
01/27/2010 - Credit Suisse ConferenceAES Tietê
 
08/21/2009 - 2Q09 Earnings Call Presentation
08/21/2009  	-   	2Q09 Earnings Call Presentation08/21/2009  	-   	2Q09 Earnings Call Presentation
08/21/2009 - 2Q09 Earnings Call PresentationAES Tietê
 
10/31/2008 - Brazil Day – 2nd Half 2008
10/31/2008  	-   	Brazil Day – 2nd Half 200810/31/2008  	-   	Brazil Day – 2nd Half 2008
10/31/2008 - Brazil Day – 2nd Half 2008AES Tietê
 
10/31/2008 - ABRADEE – 2nd Half 2008
10/31/2008  	-   	ABRADEE – 2nd Half 200810/31/2008  	-   	ABRADEE – 2nd Half 2008
10/31/2008 - ABRADEE – 2nd Half 2008AES Tietê
 
11/13/2007 - 3Q07 Earnings Call Presentation
11/13/2007  	-   	3Q07 Earnings Call Presentation11/13/2007  	-   	3Q07 Earnings Call Presentation
11/13/2007 - 3Q07 Earnings Call PresentationAES Tietê
 
08/17/2007 - Apimec - 1st HALF 2007
08/17/2007  	-   	Apimec - 1st HALF 200708/17/2007  	-   	Apimec - 1st HALF 2007
08/17/2007 - Apimec - 1st HALF 2007AES Tietê
 
12/08/2005 - Merrill Lynch
12/08/2005  	-   	Merrill Lynch12/08/2005  	-   	Merrill Lynch
12/08/2005 - Merrill LynchAES Tietê
 
31/12/2005 - Abamec - outubro de 2005
31/12/2005  	-   	Abamec - outubro de 200531/12/2005  	-   	Abamec - outubro de 2005
31/12/2005 - Abamec - outubro de 2005AES Tietê
 
30/11/2005 - Santander - setembro de 2005
30/11/2005  	-   	Santander - setembro de 200530/11/2005  	-   	Santander - setembro de 2005
30/11/2005 - Santander - setembro de 2005AES Tietê
 
13/11/2007 - Apresentação da Teleconferência do 3T07
13/11/2007  	-   	Apresentação da Teleconferência do 3T0713/11/2007  	-   	Apresentação da Teleconferência do 3T07
13/11/2007 - Apresentação da Teleconferência do 3T07AES Tietê
 
17/08/2007 - Apimec - 1º Semestre 2007
17/08/2007  	-   	Apimec - 1º Semestre 200717/08/2007  	-   	Apimec - 1º Semestre 2007
17/08/2007 - Apimec - 1º Semestre 2007AES Tietê
 
17/08/2007 - Apimec - 1º Semestre 2007
17/08/2007  	-   	Apimec - 1º Semestre 200717/08/2007  	-   	Apimec - 1º Semestre 2007
17/08/2007 - Apimec - 1º Semestre 2007AES Tietê
 
13/11/2008 - Apresentação da Teleconferência 3T08
13/11/2008  	-   	Apresentação da Teleconferência 3T0813/11/2008  	-   	Apresentação da Teleconferência 3T08
13/11/2008 - Apresentação da Teleconferência 3T08AES Tietê
 
31/03/2008 - Apresentação da Teleconferência do 4T07 e de 2007
31/03/2008  	-   	Apresentação da Teleconferência do 4T07 e de 200731/03/2008  	-   	Apresentação da Teleconferência do 4T07 e de 2007
31/03/2008 - Apresentação da Teleconferência do 4T07 e de 2007AES Tietê
 
07/04/2009 - Apresentação Apimec
07/04/2009  -   Apresentação Apimec07/04/2009  -   Apresentação Apimec
07/04/2009 - Apresentação ApimecAES Tietê
 
30/03/2009 - Apresentação da Teleconferência do 4T08 e 2008
30/03/2009  	-   	Apresentação da Teleconferência do 4T08 e 200830/03/2009  	-   	Apresentação da Teleconferência do 4T08 e 2008
30/03/2009 - Apresentação da Teleconferência do 4T08 e 2008AES Tietê
 
27/01/2010 - 3º Conferência Anual Brasil do Credit Suisse
27/01/2010  	-   	3º Conferência Anual Brasil do Credit Suisse27/01/2010  	-   	3º Conferência Anual Brasil do Credit Suisse
27/01/2010 - 3º Conferência Anual Brasil do Credit SuisseAES Tietê
 

Mais de AES Tietê (20)

Manual de governanca_corporativa
Manual de governanca_corporativaManual de governanca_corporativa
Manual de governanca_corporativa
 
Apresentação Institucional - Português
Apresentação Institucional - PortuguêsApresentação Institucional - Português
Apresentação Institucional - Português
 
Apresentação Institucional - Inglês
Apresentação Institucional - InglêsApresentação Institucional - Inglês
Apresentação Institucional - Inglês
 
01/27/2010 - Credit Suisse Conference
01/27/2010  	-   	Credit Suisse Conference01/27/2010  	-   	Credit Suisse Conference
01/27/2010 - Credit Suisse Conference
 
08/21/2009 - 2Q09 Earnings Call Presentation
08/21/2009  	-   	2Q09 Earnings Call Presentation08/21/2009  	-   	2Q09 Earnings Call Presentation
08/21/2009 - 2Q09 Earnings Call Presentation
 
10/31/2008 - Brazil Day – 2nd Half 2008
10/31/2008  	-   	Brazil Day – 2nd Half 200810/31/2008  	-   	Brazil Day – 2nd Half 2008
10/31/2008 - Brazil Day – 2nd Half 2008
 
10/31/2008 - ABRADEE – 2nd Half 2008
10/31/2008  	-   	ABRADEE – 2nd Half 200810/31/2008  	-   	ABRADEE – 2nd Half 2008
10/31/2008 - ABRADEE – 2nd Half 2008
 
11/13/2007 - 3Q07 Earnings Call Presentation
11/13/2007  	-   	3Q07 Earnings Call Presentation11/13/2007  	-   	3Q07 Earnings Call Presentation
11/13/2007 - 3Q07 Earnings Call Presentation
 
08/17/2007 - Apimec - 1st HALF 2007
08/17/2007  	-   	Apimec - 1st HALF 200708/17/2007  	-   	Apimec - 1st HALF 2007
08/17/2007 - Apimec - 1st HALF 2007
 
12/08/2005 - Merrill Lynch
12/08/2005  	-   	Merrill Lynch12/08/2005  	-   	Merrill Lynch
12/08/2005 - Merrill Lynch
 
31/12/2005 - Abamec - outubro de 2005
31/12/2005  	-   	Abamec - outubro de 200531/12/2005  	-   	Abamec - outubro de 2005
31/12/2005 - Abamec - outubro de 2005
 
30/11/2005 - Santander - setembro de 2005
30/11/2005  	-   	Santander - setembro de 200530/11/2005  	-   	Santander - setembro de 2005
30/11/2005 - Santander - setembro de 2005
 
13/11/2007 - Apresentação da Teleconferência do 3T07
13/11/2007  	-   	Apresentação da Teleconferência do 3T0713/11/2007  	-   	Apresentação da Teleconferência do 3T07
13/11/2007 - Apresentação da Teleconferência do 3T07
 
17/08/2007 - Apimec - 1º Semestre 2007
17/08/2007  	-   	Apimec - 1º Semestre 200717/08/2007  	-   	Apimec - 1º Semestre 2007
17/08/2007 - Apimec - 1º Semestre 2007
 
17/08/2007 - Apimec - 1º Semestre 2007
17/08/2007  	-   	Apimec - 1º Semestre 200717/08/2007  	-   	Apimec - 1º Semestre 2007
17/08/2007 - Apimec - 1º Semestre 2007
 
13/11/2008 - Apresentação da Teleconferência 3T08
13/11/2008  	-   	Apresentação da Teleconferência 3T0813/11/2008  	-   	Apresentação da Teleconferência 3T08
13/11/2008 - Apresentação da Teleconferência 3T08
 
31/03/2008 - Apresentação da Teleconferência do 4T07 e de 2007
31/03/2008  	-   	Apresentação da Teleconferência do 4T07 e de 200731/03/2008  	-   	Apresentação da Teleconferência do 4T07 e de 2007
31/03/2008 - Apresentação da Teleconferência do 4T07 e de 2007
 
07/04/2009 - Apresentação Apimec
07/04/2009  -   Apresentação Apimec07/04/2009  -   Apresentação Apimec
07/04/2009 - Apresentação Apimec
 
30/03/2009 - Apresentação da Teleconferência do 4T08 e 2008
30/03/2009  	-   	Apresentação da Teleconferência do 4T08 e 200830/03/2009  	-   	Apresentação da Teleconferência do 4T08 e 2008
30/03/2009 - Apresentação da Teleconferência do 4T08 e 2008
 
27/01/2010 - 3º Conferência Anual Brasil do Credit Suisse
27/01/2010  	-   	3º Conferência Anual Brasil do Credit Suisse27/01/2010  	-   	3º Conferência Anual Brasil do Credit Suisse
27/01/2010 - 3º Conferência Anual Brasil do Credit Suisse
 

Último

TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdfChristopherTHyatt
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfhans926745
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 

Último (20)

TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 

09/08/2008 - 2Q08 Earnings Call Presentation

  • 2. Highlights 2Q08 – Generation 28% above Assured Energy – EBITDA of R$ 288.9 million in 2Q08, an increase of 24.2% when compared to same period of 2007 (R$ 232.6 million) – Net income of R$ 134.1 million in 2Q08, 5.6% lower than that in 2Q07 (R$ 142.1 million) – On May 29th, 2008, the company paid R$ 172.8 million as Dividends regarding 1Q08 results Subsequent Events – Proposed dividends of R$ 134.1 million, corresponding to 100% of net income on 2Q08: - R$ 0.34 per Common Share - R$ 0.37 per Preferred Share 2
  • 3. Energy Balance Generation – MW Average Billed Energy – GWh 7,239 7,292 738 461 121% 128% 115% 914 1,234 109% 107% 112% 1,635 5,587 5,597 1,543 1,363 1,467 1,424 1,392 2003 2004 2005 2006 2007 1H08 1H07 1H08 Generation - MW Average Generation / Assured Energy Eletropaulo MRE CCEE/Losses Increase of 29.4% on Generated Energy Bilateral Contract with Eletropaulo: (2Q08 x 2Q07) – Price until 07/03/2008 – R$ 131.98/MWh – Prices from July, 2008 – R$ 149.72/MWh Generation 28% above Assured Energy (1,275 MW average) MRE Tariff – R$ 7.77/MWh Average price of 2Q08 billed energy at CCEE – R$ 59.72/MWh (R$ 68.82/MWh in 2Q07) 3
  • 4. Investments Capex – 2Q08: R$ 12.9 million 1H08 Capex – 1H08: R$ 18.5 million Equipment – Equipment restoration and upgrade of operating plants - 45.4% R$ 6.0 million Environment 32.3% – Upgrade of the SHPP – R$ 1.7 million IT – Environmental Projects – R$ 3.3 million SHPP – Investments on IT – R$ 0.8 million 17.7% – SHPPs “São José” and “São Joaquim”, at São Paulo (total 4.5% capacity 7MW) – R$ 5.2 million – 3 SHPPs at Rio de Janeiro: Investments – R$ million • Installed Capacity of 52MW 85.9 • The installation license was granted in October 2007 17.7 • Until 06/30/2008 R$ 21.0 million were invested, of SHPPs - RJ which R$ 1.0 million in 1H08 68.2 50.7 • Waiting for the Vegetation Suppression License 46.5 authorization in order to start the construction 27.5 18.5 Capex 2008 – Estimate revised to R$ 85.9 million 2005 2006 2007 2008 (E) 1H08 4
  • 5. Expansion Requirement Requirement: increase installed capacity, by at least, 15% (400 MW), until December 2007: – Increase the installed capacity in São Paulo State; or – Purchase energy from new plants, located in São Paulo, through long term agreements (at least 5 years) Restrictions to accomplish the requirement: – São Paulo State – insufficient hydro resources and environmental restrictions to install Thermo plants; – Insufficiency of gas supply; – “New Model of Electric Sector” (Law # 10,848/04) On February 2008, AES Tietê received a report prepared by a consulting company, regarding the evaluation of possibilities of expanding its generation capacity in São Paulo State. The Company has been developing discussions with different members of the São Paulo State Government, regarding opportunities related to: – Hydroelectric potential – Opportunities for joint generation – Alternative energies 5
  • 6. Gross Revenue – R$ Million Gross Revenue Without Non-recurring Effects +33.1% 809 786 809 608 +2.9% 34 74 74 34 34 (132) 775 775 775 712 712 +86.8% 740 +1.3% +4.6% 395 390 395 211 +8.8% 16 16 16 37 (170) -0.6% +7.4% 381 378 352 352 378 378 1H07 1H08 2Q07 2Q08 1H07 1H08 2Q07 2Q08 Net Revenue Deductions Reversion of Deductions Stable net revenue comparing to 2Q07 – Change in PIS/Cofins Tax from Cumulative to Non-cumulative generated extraordinary impacts in 2Q07: • Gross Revenue - decrease of R$ 178.2 million • Deductions – reversion of R$ 206.7 million • Net Revenue – increase of R$ 28.5 million 6
  • 7. Costs and Operational Expenses R$ Million Costs and Operational Expenses Without Non-recurring Effects 253 + 4.9 % -19.0% 205 205 195 164 175 112 -35.6% 83 102 112 + 9.3 % 106 106 97 132 58 50 40 58 60 60 45 60 60 16 31 31 31 33 33 16 16 33 33 16 16 16 1H07 1H08 2Q07 2Q08 1H07 1H08 2Q07 2Q08 Power Purchase and Sector Charges Other Operational Expenses Depreciation TUSDg Costs: – Extraordinary impact in 2Q07’s expenses, R$ 92.5 million, retroactively of 07/01/2004 – Tariff Cycle 2007/2008, R$ 44.3 million (R$ 11 million / quarter) Reversal of R$ 15.3 million provision in 2Q07 due to the change of PIS/COFINS tax, from cumulative, to non-cumulative 7
  • 8. EBITDA EBITDA ( R$ Million ) Without Non-recurring Effects 77.1% 77.8% 77.1% 77.8% 76.4% 76.4% 70.2% 61.1% +16.0% +9.8% 603 +24.0% 603 +6.4% 520 520 549 289 289 272 233 289 1H07 1H08 2Q07 2Q08 1H07 1H08 2Q07 2Q08 EBITDA EBITDA Margin 8
  • 9. Financial Results – R$ Million Financial Results - R$ Million Without Non-recurring Effects 1H07 1H08 2Q07 2Q08 1H07 1H08 2Q07 2Q08 10 (19) (21) - 431.6 % - 215.8 % (50) (65) (65) - 103.0 % (101) (101) Increase of the average IGP-M (4.34% in 2Q08 x 0.35% in 2Q07), which accrues the Company’s debt – amount of R$ 1.3 billion Positive effect in 2Q07 due to the change of PIS/COFINS taxation system, totaling R$ 30.8 million 9
  • 10. Results Net Income - R$ Million Without Non-recurring Effects 42.3% 41.9% 40.9% 39.6% 39.6% 37.3% 35.4% +1.4% 35.4% +1.8% - 5.6 % 303 307 301 307 - 9.1% 142 154 134 134 134 1H07 1H08 2Q07 2Q08 1H07 1H08 2Q07 2Q08 Net Income Net Margin Proposed Dividends of 100% of 2Q08’s Ex-Dividend date 08/14/2008 Net Income: – Dividends: R$ 134.1 million; Payment date 08/28/2008 – Total payment by share: - R$ 0.34 / common share - R$ 0.37 / preferred share 10
  • 11. Consolidated Debt in R$ million Amount Creditor Maturity Cost Collateral 1,287.1 Eletrobrás May, 2013 IGP-M + 10% p.a. Receivables 0.0 FunCesp III Sep, 2027 IGP-DI + 6% p.a. Receivables Net Debt - R$ Million 2.0x 1.4x 1,253.5 0.7x 0.6x 0.6x 0.5x 1,096.3 676.5 681.9 660.9 606.8 2003 2004 2005 2006 2007 2Q08 Net Debt (R$ million) Net Debt / EBITDA Cash Availability 06/30/2008 = R$ 680.3 million – Marketable securities with maturities lower than 90 days – Average rates around 100% of CDI 11
  • 12. Managerial Cash Flow R$ Million 2Q07 3Q07 4Q07 1Q08 2Q08 INITIAL CASH 683.5 571.2 589.0 633.7 814.6 Operating Cash Flow 307.9 248.9 271.2 261.5 279.3 Investments (12.0) (9.3) (15.0) (4.1) (11.6) Net Financial Expenses (18.0) (19.3) (18.4) (15.3) (14.1) Net Amortization (48.3) (50.8) (52.0) (46.2) (45.6) Income Tax (16.6) (9.8) - (15.1) (16.0) Dividends and IoE (325.4) (141.9) (141.0) - (334.1) Free Cash Flow (112.3) 17.8 44.7 180.9 (142.1) FINAL CASH OF PARENT COMPANY 571.2 589.0 633.7 814.6 672.5 Final Cash of Subsidiaries and Associated Companies 28.3 4.2 4.6 6.5 7.8 Final Cash 599.4 593.2 638.3 821.0 680.3 Investments – construction of the SHPP’s at São Paulo (R$ 4.2 million) and upgrade of the SHPP’s of AES PCH Minas subsidiary (R$ 1.7 million) Payment of dividends regarding 4Q07 and 1Q08 12
  • 13. Conclusion Generation was 28% above Assured Energy in 2Q08 EBITDA of R$ 288.9 million in 2Q08, representing an increase of 24.2% when compared to 2Q07 (R$ 232.6 million) Net income of R$ 134.1 million in 2Q08, represents a decrease of 5.6% when compared to 2Q07 (R$ 142.1 million) Proposed dividends corresponding to 100% of 2Q08 net income 13
  • 14. 2Q08 Results The statements contained in this document with regard to the business prospects, projected operating and financial results, and growth potential are merely forecasts based on the expectations of the Company’s Management in relation to its future performance. Such estimates are highly dependent on market behavior and on the conditions affecting Brazil’s macroeconomic performance as well as the electric sector and international market, and they are therefore subject to changes.