2. Project Objective
• Control release of PCBs from Hangar 1 in accordance
with EE/CA (July 2008) and Action Memorandum
(December 2008)
Demolition of interior structures
Removal of contaminated siding
Application of weather-resistant coating to steel frame
2
3. Continued Monitoring and
Protection Measures
• Increased biological activity
• Increased storm water and ground
surface protection during rainy season
• Navy and NASA air monitoring data
demonstrates control of air emissions
3
4. Increased Biological Activity & Mitigation
• No Burrowing Owls
• Discourage Incipient
Nest Building by
Ravens and House
Finches
• Brandt’s Cormorant
Rescue
4
5. Increased Storm Water Management
Protection of Grassy Areas with Runoff Pumped to Holding Tanks
Heavy Plastic Sheeting and Treatment System
5
13. Schedule
• Fieldwork in zones 1 – 3
Nearly Complete
• Fieldwork in zones 4 – 6
Ongoing
• Complete mezzanine and
touch-ups, confirmation
sampling and demobilize
September 2012
• Submit After Action
Completion Report
Winter 2012