PRINCIPLE 4 :
LEVEL OUT THE WORKLOAD
(HEIJUNKA)
MET MMS (Operations)
Neha Jagare (60)
Saurabh Kothawade (78)
Omkar Sawant(141)
GLIMPSE : THE TOYOTA WAY
TAIICHI OHNO, 1988
“The slower but consistent
tortoise causes less waste and
is much more desirable than the
speedy hare that races ahead
and then stops occasionally to
doze. The Toyota Production
System can be realized only
when all the workers become
tortoises.”
3 M’S (MUDA, MURI, MURA)
LEVEL OUT THE WORKLOAD:
HEIJUNKA
Heijunka is a system of production-leveling that
produces the right product mix as demanded by
the customer by making optimal utilization of the
available capacity
WHAT HEIJUNKA DOES?
 Stabilizes production volume and variety by
consolidating total number of customer orders
 Spreads out the production in an even manner
through-out the day
 Ensures high order fulfillment rate
 Ensures internal production is balanced
 Established capacity is not over or under-utilized
LEVELING OUT THE PRODUCTION
Leveling
By
Quantity Product
WHY IMPLEMENT HEIJUNKA
 Many companies wants to produce what customers
want and when they want
 They follow build-to-order approach
 However customer orders creates uneven
production schedule becomes uneven
 This eventually leads to large amount of inventory ,
hidden problems and poorer quality
 And here arises the need for creating balanced lean
workflow “Heijunka”
ACHIEVING HEIJUNKA
HOW DOES HEIJUNKA WORK
TRADITIONAL PRODUCTION
(UNLEVELED)
DRAWBACKS
TRADITIONAL PRODUCTION (UNLEVELED)
 Customers do not buy products predictably
 There is risk of unsold goods
 The use of resources is unbalanced
 Placing an uneven demand on upstream
processes
MIXED MODEL PRODUCTION
(LEVELED)
BENEFITS
MIXED MODEL PRODUCTION (LEVELED)
 Flexibility to make what customer wants when
they want it
 Reduced risk of unsold goods
 Balanced use of Labor and Machines
 Smoothed demand on upstream process and the
plant’s suppliers
CHALLENGES OF HEIJUNKA
 Requires major tool redesign to gain flexibility
 Large inventory of finished goods
 Requires a predictable environment as well as
timely-accurate data to implement
 Proper co-ordination with the customer to project
better future demand
 High degree of discipline within the workforce
 Thought out work standards must be followed all
the times
 As there is little operator leeway it can result to
resistance due to lack of flexibility
CHALLENGES OF HEIJUNKA
THIS IMPLEMENTS HEIJUNKA
Takt Time
Volume
Leveling
Type
Leveling
Type
Standardization
Work Slowly
&
Consistently
Changeover
Time
Buffer
Inventory
Error-
Proofing
Heijunka
Box & Board
HEIJUNKA BOX AND BOARD
 Place where the
production signals
or Kanban in a
leveled production
system are kept.
 Visual tool to show
the people what to
be produced
LEVELING THE SCHEDULE–
INVENTORY’S ROLE
Heijunka builds inventory to safeguard against
fluctuations. It categorizes inventory into :
Build-to-
Order
inventory
Seasonal
inventory
buffer
Safety
Stock
Buffer Stock
“BUILD TO ORDER”
YET
HEIJUNKA
HEIJUNKA IN SERVICE
OPERATIONS
 Fit customer demand into a leveled schedule
 Establish standard times for delivering different
types of service
JUST IN TIME VS. HEIJUNKA
JIT
 Meet customer demand
upon request
 Reduce finished goods
Inventory
 Unpredictable work
schedules
 Overtime occasionally
Heijunka
 Meet customer demand
in total over a given
period of level production
 Finished goods inventory
to make up for short
periods of higher
demands
 Predictable work
schedules
 Overtime savings
CASE STUDY: 1
Wiremold
CASE STUDY: 2
Building Aluminum Gutters
on a
Level Production Schedule
RESULTS ACHIEVED BY
IMPLEMENTING HEIJUNKA
 40% lead-time reduction
 70% change-over time reduction
 40% reduction in work in progress (WIP)
 60% reduction in inventory obsolescence
 100% improvement in on-time customer delivery
CONCLUSION
Heijunka is fundamental to eliminating
mura, which is fundamental to
eliminating muri and muda
CASE STUDY: 1
EZDK Steel Plant (Egypt)
APPLICATION OF HEIJUNKA
IMPLEMENTING HEIJUNKA USING
‘PULL’

Mais conteúdo relacionado

Mais procurados

SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)Chris Cummins
 
Identify 7 Wastes
Identify 7 WastesIdentify 7 Wastes
Identify 7 WastesLean for U
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mappingmahawar1987
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing ToolsJagriti Prasad
 
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)Inter Alliance Werardt
 
Lean manufacturing and its tool
Lean manufacturing and its toolLean manufacturing and its tool
Lean manufacturing and its toolAnkit Gupta
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturingskchawla4
 
Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)Pramod A
 
just in time manufacturing
just in time manufacturingjust in time manufacturing
just in time manufacturingravindra sharma
 
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comLean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comNareshChawla
 
Lean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training ModuleLean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training ModuleFrank-G. Adler
 

Mais procurados (20)

SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)
 
Identify 7 Wastes
Identify 7 WastesIdentify 7 Wastes
Identify 7 Wastes
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing Tools
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
 
Visual Management
Visual Management Visual Management
Visual Management
 
Lean manufacturing and its tool
Lean manufacturing and its toolLean manufacturing and its tool
Lean manufacturing and its tool
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production System
 
Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)
 
Kanban
KanbanKanban
Kanban
 
Lean Tools
Lean ToolsLean Tools
Lean Tools
 
Lean Manufacturing - An Overview
Lean Manufacturing - An OverviewLean Manufacturing - An Overview
Lean Manufacturing - An Overview
 
OEE
OEEOEE
OEE
 
just in time manufacturing
just in time manufacturingjust in time manufacturing
just in time manufacturing
 
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comLean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
Lean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training ModuleLean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training Module
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 

Semelhante a Principle 4 heijunka

Basics of Pull_Manufacturing - A presentation.ppt
Basics of Pull_Manufacturing - A presentation.pptBasics of Pull_Manufacturing - A presentation.ppt
Basics of Pull_Manufacturing - A presentation.pptvenkatmie
 
Production System and Production Facilities
Production System and Production FacilitiesProduction System and Production Facilities
Production System and Production Facilitiessanket394
 
Operations - Introduction & Production Systems
Operations - Introduction & Production SystemsOperations - Introduction & Production Systems
Operations - Introduction & Production SystemsRobbieA
 
Operations - Introduction & Production Systems
Operations - Introduction & Production SystemsOperations - Introduction & Production Systems
Operations - Introduction & Production SystemsRobbieA
 
TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)Prasanna3804
 
Concept of production
Concept of productionConcept of production
Concept of productionKeshav Bhatia
 
Just In Time and Lean Management
Just In Time and Lean ManagementJust In Time and Lean Management
Just In Time and Lean ManagementRuhi Beri
 

Semelhante a Principle 4 heijunka (20)

Basics of Pull_Manufacturing - A presentation.ppt
Basics of Pull_Manufacturing - A presentation.pptBasics of Pull_Manufacturing - A presentation.ppt
Basics of Pull_Manufacturing - A presentation.ppt
 
Why Pull Manufacturing.ppt
Why Pull Manufacturing.pptWhy Pull Manufacturing.ppt
Why Pull Manufacturing.ppt
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Lean Manufacturing(2)
Lean Manufacturing(2)Lean Manufacturing(2)
Lean Manufacturing(2)
 
Lean Manufacturing(2)
Lean Manufacturing(2)Lean Manufacturing(2)
Lean Manufacturing(2)
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
JUST IN TIME
JUST IN TIMEJUST IN TIME
JUST IN TIME
 
Production System and Production Facilities
Production System and Production FacilitiesProduction System and Production Facilities
Production System and Production Facilities
 
Operations - Introduction & Production Systems
Operations - Introduction & Production SystemsOperations - Introduction & Production Systems
Operations - Introduction & Production Systems
 
Operations - Introduction & Production Systems
Operations - Introduction & Production SystemsOperations - Introduction & Production Systems
Operations - Introduction & Production Systems
 
TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)
 
American Connector
American ConnectorAmerican Connector
American Connector
 
MANT 265 S01.ppt
MANT 265 S01.pptMANT 265 S01.ppt
MANT 265 S01.ppt
 
What is-six-sigma
What is-six-sigmaWhat is-six-sigma
What is-six-sigma
 
04 decentralized pull systems
04 decentralized pull systems04 decentralized pull systems
04 decentralized pull systems
 
SCM HPML
SCM HPMLSCM HPML
SCM HPML
 
Concept of production
Concept of productionConcept of production
Concept of production
 
Just in time
Just in timeJust in time
Just in time
 
Just In Time and Lean Management
Just In Time and Lean ManagementJust In Time and Lean Management
Just In Time and Lean Management
 
Pulljit Sample
Pulljit SamplePulljit Sample
Pulljit Sample
 

Último

Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxCarlos105
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYKayeClaireEstoconing
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Culture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptxCulture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptxPoojaSen20
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)cama23
 

Último (20)

Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Culture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptxCulture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptx
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 

Principle 4 heijunka

  • 1. PRINCIPLE 4 : LEVEL OUT THE WORKLOAD (HEIJUNKA) MET MMS (Operations) Neha Jagare (60) Saurabh Kothawade (78) Omkar Sawant(141)
  • 2. GLIMPSE : THE TOYOTA WAY
  • 3. TAIICHI OHNO, 1988 “The slower but consistent tortoise causes less waste and is much more desirable than the speedy hare that races ahead and then stops occasionally to doze. The Toyota Production System can be realized only when all the workers become tortoises.”
  • 4. 3 M’S (MUDA, MURI, MURA)
  • 5. LEVEL OUT THE WORKLOAD: HEIJUNKA Heijunka is a system of production-leveling that produces the right product mix as demanded by the customer by making optimal utilization of the available capacity
  • 6. WHAT HEIJUNKA DOES?  Stabilizes production volume and variety by consolidating total number of customer orders  Spreads out the production in an even manner through-out the day  Ensures high order fulfillment rate  Ensures internal production is balanced  Established capacity is not over or under-utilized
  • 7. LEVELING OUT THE PRODUCTION Leveling By Quantity Product
  • 8. WHY IMPLEMENT HEIJUNKA  Many companies wants to produce what customers want and when they want  They follow build-to-order approach  However customer orders creates uneven production schedule becomes uneven  This eventually leads to large amount of inventory , hidden problems and poorer quality  And here arises the need for creating balanced lean workflow “Heijunka”
  • 12. DRAWBACKS TRADITIONAL PRODUCTION (UNLEVELED)  Customers do not buy products predictably  There is risk of unsold goods  The use of resources is unbalanced  Placing an uneven demand on upstream processes
  • 14. BENEFITS MIXED MODEL PRODUCTION (LEVELED)  Flexibility to make what customer wants when they want it  Reduced risk of unsold goods  Balanced use of Labor and Machines  Smoothed demand on upstream process and the plant’s suppliers
  • 15. CHALLENGES OF HEIJUNKA  Requires major tool redesign to gain flexibility  Large inventory of finished goods  Requires a predictable environment as well as timely-accurate data to implement  Proper co-ordination with the customer to project better future demand
  • 16.  High degree of discipline within the workforce  Thought out work standards must be followed all the times  As there is little operator leeway it can result to resistance due to lack of flexibility CHALLENGES OF HEIJUNKA
  • 17. THIS IMPLEMENTS HEIJUNKA Takt Time Volume Leveling Type Leveling Type Standardization Work Slowly & Consistently Changeover Time Buffer Inventory Error- Proofing Heijunka Box & Board
  • 18. HEIJUNKA BOX AND BOARD  Place where the production signals or Kanban in a leveled production system are kept.  Visual tool to show the people what to be produced
  • 19. LEVELING THE SCHEDULE– INVENTORY’S ROLE Heijunka builds inventory to safeguard against fluctuations. It categorizes inventory into : Build-to- Order inventory Seasonal inventory buffer Safety Stock Buffer Stock
  • 21. HEIJUNKA IN SERVICE OPERATIONS  Fit customer demand into a leveled schedule  Establish standard times for delivering different types of service
  • 22. JUST IN TIME VS. HEIJUNKA JIT  Meet customer demand upon request  Reduce finished goods Inventory  Unpredictable work schedules  Overtime occasionally Heijunka  Meet customer demand in total over a given period of level production  Finished goods inventory to make up for short periods of higher demands  Predictable work schedules  Overtime savings
  • 24.
  • 25.
  • 26. CASE STUDY: 2 Building Aluminum Gutters on a Level Production Schedule
  • 27. RESULTS ACHIEVED BY IMPLEMENTING HEIJUNKA  40% lead-time reduction  70% change-over time reduction  40% reduction in work in progress (WIP)  60% reduction in inventory obsolescence  100% improvement in on-time customer delivery
  • 28. CONCLUSION Heijunka is fundamental to eliminating mura, which is fundamental to eliminating muri and muda
  • 29.
  • 30.
  • 31. CASE STUDY: 1 EZDK Steel Plant (Egypt)