Back To The Future: The Aviation Noise & Air Quality Symposium



  Integrating Airspace Redesign and Airport
                  Planning:
     A Vital Step Towards Sustainability


                        Jawad Rachami
                         7 March 2006
Airport Improvement Program
  Program         Airspace Redesign
                                                   Airport Noise Compatibility


                          ATO
Organization                                                     ARP



                 FAA Operating Budget                            AIP
  Funding

                                                             Master Plan
  Process        Airspace Management                          Part 150


                   RAMS, TARGETS,
                                              TAAM               INM
Technology            SDAT, NIRS
                                              SIMMOD

               Capacity, Efficiency, Safety              Capacity, development
 Priorities                                      Noise Compatibility/abatement/mitigation
Problem Statement (1)


– Disconnected planning processes driven by competing priorities
  and goals create large inefficiencies and missed opportunities

– Large complex systems are locked in a path dependence cycle
  both in terms of technology and process.

– Industry innovation & Experimentation provided great benefits
  but also resulted in confused plans & increased uncertainty

– Needs & requirements of airspace v. airport stakeholders are on
  different time scales (tactical v. strategic)
Problem Statement (2)


– Changing demographics: Baby-boomers spending more time at
  home and requiring higher quality of life standards.

– Changing jobs: Upward trend in At-home Work as transition
  continues to knowledge-based economy means more people
  spending more time at home.

– Old & unchanged metrics to assess and analyze a problem that
  is has evolved and will continue to evolve over time.

– Plenty of Conflict in system but not enough system-wide conflict
  resolution mechanisms
The Hierarchy Of Change


         Policy / Vision


Organization      Funding/Financing



Technology             Process
The Hierarchy Of Change
                    Needs/Opportunities                Challenges

                    • Long-term: NGATS              • NGATS primary focus is
 Policy / Vision                                    modernization, capacity, &
                    • Short-term: New policy with   efficiency
                    focus on sustainability

  Organization


Funding/Financing


    Process


   Technology
Vision 100 - Century of Aviation Reauthorization Act
                              Public Law 108-176




The Next Generation Air Transportation System shall:

1. Improve safety, security, efficiency, quality, and affordability of the NAS and aviation
   services;

2. Take advantage of data from emerging CNS technologies;

3. Integrate data streams from multiple agencies and sources to enable situational
   awareness and seamless global operations;

4. Leverage investments and build upon current ATM and infrastructure initiatives to
   meet system performance requirements;
Vision 100 - Century of Aviation Reauthorization Act
                              Public Law 108-176




The Next Generation Air Transportation System shall:

5. Be scalable to accommodate/encourage substantial growth in domestic and
   international transportation and anticipate/accommodate new technology;

6. Accommodate a wide range of aircraft operations, including airlines, air taxis,
   helicopters, general aviation, and unmanned aerial vehicles;

7. To the greatest extent practicable, reduce exposure of noise and emissions pollution
   on affected residents.
The Hierarchy Of Change
                    Needs/Opportunities                 Challenges

 Policy / Vision

                                                    • JPDO slow in coming
                    • Long-term: JPDO
                                                    together & current structure
  Organization      • Short-term: Joint ATO/ARP -
                                                    • Current org culture at FAA
                    Work with users & local
                    jurisdictions                   • Competing interests and
                                                    perceptions at local level
Funding/Financing


    Process


   Technology
The Hierarchy Of Change
                              Needs                     Challenges

 Policy / Vision


  Organization
                    • Performance-based financing
                    • More R&D                      • Shrinking Trust fund
                    • Funding for sustainability    receipts
Funding/Financing   planning & mediation of         • Govt budget cuts
                    development alternatives
                                                    • Other funding priorities
                    •Local-based economic
                    incentives                      • Externalities
    Process


   Technology
The Hierarchy Of Change
                        Opportunities                 Challenges

 Policy / Vision


  Organization

                    • Focus on sustainable
Funding/Financing   development
                    • Create Combined process     • Added complexity
                    with two-way (bottom-up and   • Conflicting needs &
                    top-down) development         requirements
    Process         • New metrics                 • Difficult to address tactical-
                    • Mediation of Stakeholder    level planning/support
                    development alternatives
   Technology       •Conflict resolution
                    tools/mechanisms
The Hierarchy Of Change
                        Opportunities                  Challenges

 Policy / Vision


  Organization


Funding/Financing
                    • Integrate Airspace and
                    airport/ noise planning tools

    Process         • Create Inter-operable
                    Decision Support Tools
                    • Inclusive & accurate          •Path dependence
                    modeling
   Technology       • Mapping Cost/Benefit
                                                    •Investment on Supply Side
                    Influences for sustainable      •Funding from Demand Side
                    land-use
Current Challenges

     Airport Planning                  Airspace Redesign


• Capacity Constraints           • New vehicles (UAVs, microjets,etc)
• Modernization &                • Information-sharing &
  Competitiveness                  Collaborative Decision-Making
• Adaptive security              • Capacity Constraints
• Introduction of new vehicles   • Security
• Environmental Compatibility    • System Delay
• Community & Land-use           • Military/Civilian coordination
  planning                       • Manage environment-connected
• Regional planning                actions
                                 • Regional airspace harmonization
Competing Priorities
                             Increased Complexity
Competing Interests
                             Increased Mobility
Competing Perceptions
                         +   Increased Information
Competing Trends
                             Increased QOL Expect.
Competing Goals
Competing Requirements
…in the short term
Priorities


“The changes occurring in our skies and coming down our runways
   combined with the security challenges of a post-9/11 world are so
   significant and so fundamental that temporary adjustments and
   band-aid solutions just won’t do. ” Secretary Mineta - January 24,
    2006

DOT Priorities:

•   A new cost-based financing system for the FAA - Create a more direct
    relationship between revenue collected and services rendered
•   Negotiating a new labor agreement with NATCA
•   Modernizing the system through NGATS
FAA ATO

• Cost Controls:
   – Means support for new runway airspace redesign but no new
     redesign/optimization
   – Ops budget cut 20%
   – Unfunded programs (POET, RAPT)

• Staffing Challenges:
   – NATCA Labor Agreement
   – ATC Retirement vs. Staffing
   – Limited internal environmental resources

• Re-organization & performance-based service
…In the medium & long terms
FAA (ATO) Flight Plan

•   Increase safety
    Achieve the lowest possible accident rate and constantly improve safety.

•   Greater Capacity
    Work with local governments and airspace users to provide capacity in the US
      airspace system that meets projected demand in an environmentally sound
      manner.

•   International Leadership
    Increase the safety and capacity of the global civil aerospace system in an
       environmentally sound manner

•   Organizational Excellence
    Ensure the success of the FAA’s mission through stronger leadership, a better
       trained workforce, enhanced cost-control measures, and improved decision-
       making based on reliable data.
Broad Area Precision Navigation




• Navigation precision sufficient to perform landings without ground-
  based aids at any “air portal.”
• Reliable service available over large areas (almost global).
• Reduction / elimination of legacy systems
Management-by-Trajectory




• Users have 4D trajectories which are the basis for planning
  and execution
• 4D trajectories exchanged and conflicts resolved among users
  and ATM service providers – “The Evaluator”
• Strategic traffic management and separation assurance
National Dynamic Airspace




• Airspace configuration driven by User needs, National Security
  requirements, Safety, Overall efficiency of operations
• Reconfigurable hourly
• Single mechanism for implementing SUA, TFR’s, etc.
• Temporal implementation of high-density, high-demand
  corridors, etc.
Weather Information in ATM System




• Stable fusion of weather observations and forecasts from multiple
  sensors and prediction models into one national database
• Dynamic updating and support for all push/pull operations
• Seamless assimilation of weather information in ATM
  system “decision loops.”
“Super density” Airport Operations




• Maximize runway capacity by minimizing arrival/departure spacing for
  single or parallel runways due to wake vortex constraints.
• Reduce runway occupancy time.
• Simultaneous operations on single runway.
Thank You

Mais conteúdo relacionado

Destaque

History of women's excersice
History of women's excersiceHistory of women's excersice
History of women's excersice
brazilc19
 
Fluid mechanics assignment 2
Fluid mechanics  assignment 2Fluid mechanics  assignment 2
Fluid mechanics assignment 2
kushal_chats
 

Destaque (16)

150111001 ainun musrifah tohir studi kasus_bab 1
150111001 ainun musrifah tohir studi kasus_bab 1150111001 ainun musrifah tohir studi kasus_bab 1
150111001 ainun musrifah tohir studi kasus_bab 1
 
History of women's excersice
History of women's excersiceHistory of women's excersice
History of women's excersice
 
Papo de produção #2: Bloco K do SPED Fiscal
Papo de produção #2: Bloco K do SPED FiscalPapo de produção #2: Bloco K do SPED Fiscal
Papo de produção #2: Bloco K do SPED Fiscal
 
Contabilidade Fiscal - 2ª edição
Contabilidade Fiscal - 2ª ediçãoContabilidade Fiscal - 2ª edição
Contabilidade Fiscal - 2ª edição
 
Salt River Bay Marine Research and Education Center
Salt River Bay Marine Research and Education CenterSalt River Bay Marine Research and Education Center
Salt River Bay Marine Research and Education Center
 
Bloco K do SPED Fiscal | Ebook Versão 1
Bloco K do SPED Fiscal | Ebook Versão 1Bloco K do SPED Fiscal | Ebook Versão 1
Bloco K do SPED Fiscal | Ebook Versão 1
 
Sintaxis u5
Sintaxis u5Sintaxis u5
Sintaxis u5
 
Papo de produção #5: Como formar o preço de venda de um produto e maximizar ...
Papo de produção #5:  Como formar o preço de venda de um produto e maximizar ...Papo de produção #5:  Como formar o preço de venda de um produto e maximizar ...
Papo de produção #5: Como formar o preço de venda de um produto e maximizar ...
 
Demam berdarah-dengue-dbd
Demam berdarah-dengue-dbdDemam berdarah-dengue-dbd
Demam berdarah-dengue-dbd
 
High Performance Parallel Computing with Clouds and Cloud Technologies
High Performance Parallel Computing with Clouds and Cloud TechnologiesHigh Performance Parallel Computing with Clouds and Cloud Technologies
High Performance Parallel Computing with Clouds and Cloud Technologies
 
Aircraft Maintenance
Aircraft MaintenanceAircraft Maintenance
Aircraft Maintenance
 
Arima Forecasting - Presentation by Sera Cresta, Nora Alosaimi and Puneet Mahana
Arima Forecasting - Presentation by Sera Cresta, Nora Alosaimi and Puneet MahanaArima Forecasting - Presentation by Sera Cresta, Nora Alosaimi and Puneet Mahana
Arima Forecasting - Presentation by Sera Cresta, Nora Alosaimi and Puneet Mahana
 
The Internet of Flying Things - Part 2
The Internet of Flying Things - Part 2The Internet of Flying Things - Part 2
The Internet of Flying Things - Part 2
 
Fluid mechanics assignment 2
Fluid mechanics  assignment 2Fluid mechanics  assignment 2
Fluid mechanics assignment 2
 
Wind provisions
Wind provisionsWind provisions
Wind provisions
 
Digital Transformation How to Get C Level Commitment and Bottom up Adoption- KPN
Digital Transformation How to Get C Level Commitment and Bottom up Adoption- KPNDigital Transformation How to Get C Level Commitment and Bottom up Adoption- KPN
Digital Transformation How to Get C Level Commitment and Bottom up Adoption- KPN
 

Semelhante a Airspace Redesign and Airport Planning

Securing & Asuring E Governance Services
Securing & Asuring E Governance ServicesSecuring & Asuring E Governance Services
Securing & Asuring E Governance Services
subramanian K
 
Dumbacher
DumbacherDumbacher
Dumbacher
NASAPMC
 
Bauer.frank
Bauer.frankBauer.frank
Bauer.frank
NASAPMC
 

Semelhante a Airspace Redesign and Airport Planning (20)

Meeting HR Challenges through Organisational Transformation Process in Hydroc...
Meeting HR Challenges through Organisational Transformation Process in Hydroc...Meeting HR Challenges through Organisational Transformation Process in Hydroc...
Meeting HR Challenges through Organisational Transformation Process in Hydroc...
 
Exploring the Challenges of Implementing and Sustaining Cross-Platform NAS Ca...
Exploring the Challenges of Implementing and Sustaining Cross-Platform NAS Ca...Exploring the Challenges of Implementing and Sustaining Cross-Platform NAS Ca...
Exploring the Challenges of Implementing and Sustaining Cross-Platform NAS Ca...
 
Securing & Asuring E Governance Services
Securing & Asuring E Governance ServicesSecuring & Asuring E Governance Services
Securing & Asuring E Governance Services
 
Aviation Sector Development in Latin America (2005)
Aviation Sector Development in Latin America (2005)Aviation Sector Development in Latin America (2005)
Aviation Sector Development in Latin America (2005)
 
Public to Private Partnership in water sector
Public to Private Partnership in water sectorPublic to Private Partnership in water sector
Public to Private Partnership in water sector
 
CCXG Global Forum October 2018 Breakout Group 5 by Amr Osama Abdel-Aziz
CCXG Global Forum October 2018 Breakout Group 5 by Amr Osama Abdel-AzizCCXG Global Forum October 2018 Breakout Group 5 by Amr Osama Abdel-Aziz
CCXG Global Forum October 2018 Breakout Group 5 by Amr Osama Abdel-Aziz
 
ThelmaSteidleCVProvider1 (1)
ThelmaSteidleCVProvider1 (1)ThelmaSteidleCVProvider1 (1)
ThelmaSteidleCVProvider1 (1)
 
Flour Presentation MEED MENA 2014
Flour Presentation MEED MENA 2014Flour Presentation MEED MENA 2014
Flour Presentation MEED MENA 2014
 
Global awards 2010
Global awards 2010Global awards 2010
Global awards 2010
 
Oman EPC 2015 summary and recommendations
Oman EPC 2015 summary and recommendationsOman EPC 2015 summary and recommendations
Oman EPC 2015 summary and recommendations
 
2010 Global Awards for Excellence in BPM and Workflow
2010 Global Awards for Excellence in BPM and Workflow2010 Global Awards for Excellence in BPM and Workflow
2010 Global Awards for Excellence in BPM and Workflow
 
Dumbacher
DumbacherDumbacher
Dumbacher
 
Right Cloud Mindset: Survey Results Aviation | Accenture
Right Cloud Mindset: Survey Results Aviation | AccentureRight Cloud Mindset: Survey Results Aviation | Accenture
Right Cloud Mindset: Survey Results Aviation | Accenture
 
SESAR at ATC Global - Technical Workshop on Green ATM
SESAR at ATC Global - Technical Workshop on Green ATMSESAR at ATC Global - Technical Workshop on Green ATM
SESAR at ATC Global - Technical Workshop on Green ATM
 
eDocument Sciences SaaS 101
eDocument Sciences SaaS 101eDocument Sciences SaaS 101
eDocument Sciences SaaS 101
 
Wash tech mole conf 2
Wash tech mole conf 2Wash tech mole conf 2
Wash tech mole conf 2
 
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...
 
Case Study: Vivo Automated IT Capacity Management to Optimize Usage of its Cr...
Case Study: Vivo Automated IT Capacity Management to Optimize Usage of its Cr...Case Study: Vivo Automated IT Capacity Management to Optimize Usage of its Cr...
Case Study: Vivo Automated IT Capacity Management to Optimize Usage of its Cr...
 
The Next Generation Air Transportation System V1
The Next Generation Air Transportation System V1The Next Generation Air Transportation System V1
The Next Generation Air Transportation System V1
 
Bauer.frank
Bauer.frankBauer.frank
Bauer.frank
 

Mais de Jawad Rachami

Mais de Jawad Rachami (7)

Harnessing the Technological IQ of the New Generation
Harnessing the Technological IQ of the New GenerationHarnessing the Technological IQ of the New Generation
Harnessing the Technological IQ of the New Generation
 
Environmental Modeling of NextGen (2010)
Environmental Modeling of NextGen (2010)Environmental Modeling of NextGen (2010)
Environmental Modeling of NextGen (2010)
 
Looming Challenges of Aviation GHG (2009)
Looming Challenges of Aviation GHG (2009)Looming Challenges of Aviation GHG (2009)
Looming Challenges of Aviation GHG (2009)
 
Enhancing Energy Reliability: A Silicon Valley Perspective
Enhancing Energy Reliability: A Silicon Valley PerspectiveEnhancing Energy Reliability: A Silicon Valley Perspective
Enhancing Energy Reliability: A Silicon Valley Perspective
 
Netzero to the Edge - version 1
Netzero to the Edge - version 1Netzero to the Edge - version 1
Netzero to the Edge - version 1
 
Innovation In Aviation
Innovation In AviationInnovation In Aviation
Innovation In Aviation
 
Profit Potential of Green Airport Strategies
Profit Potential of Green Airport StrategiesProfit Potential of Green Airport Strategies
Profit Potential of Green Airport Strategies
 

Último

Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 

Último (20)

How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 

Airspace Redesign and Airport Planning

  • 1. Back To The Future: The Aviation Noise & Air Quality Symposium Integrating Airspace Redesign and Airport Planning: A Vital Step Towards Sustainability Jawad Rachami 7 March 2006
  • 2. Airport Improvement Program Program Airspace Redesign Airport Noise Compatibility ATO Organization ARP FAA Operating Budget AIP Funding Master Plan Process Airspace Management Part 150 RAMS, TARGETS, TAAM INM Technology SDAT, NIRS SIMMOD Capacity, Efficiency, Safety Capacity, development Priorities Noise Compatibility/abatement/mitigation
  • 3. Problem Statement (1) – Disconnected planning processes driven by competing priorities and goals create large inefficiencies and missed opportunities – Large complex systems are locked in a path dependence cycle both in terms of technology and process. – Industry innovation & Experimentation provided great benefits but also resulted in confused plans & increased uncertainty – Needs & requirements of airspace v. airport stakeholders are on different time scales (tactical v. strategic)
  • 4. Problem Statement (2) – Changing demographics: Baby-boomers spending more time at home and requiring higher quality of life standards. – Changing jobs: Upward trend in At-home Work as transition continues to knowledge-based economy means more people spending more time at home. – Old & unchanged metrics to assess and analyze a problem that is has evolved and will continue to evolve over time. – Plenty of Conflict in system but not enough system-wide conflict resolution mechanisms
  • 5. The Hierarchy Of Change Policy / Vision Organization Funding/Financing Technology Process
  • 6. The Hierarchy Of Change Needs/Opportunities Challenges • Long-term: NGATS • NGATS primary focus is Policy / Vision modernization, capacity, & • Short-term: New policy with efficiency focus on sustainability Organization Funding/Financing Process Technology
  • 7. Vision 100 - Century of Aviation Reauthorization Act Public Law 108-176 The Next Generation Air Transportation System shall: 1. Improve safety, security, efficiency, quality, and affordability of the NAS and aviation services; 2. Take advantage of data from emerging CNS technologies; 3. Integrate data streams from multiple agencies and sources to enable situational awareness and seamless global operations; 4. Leverage investments and build upon current ATM and infrastructure initiatives to meet system performance requirements;
  • 8. Vision 100 - Century of Aviation Reauthorization Act Public Law 108-176 The Next Generation Air Transportation System shall: 5. Be scalable to accommodate/encourage substantial growth in domestic and international transportation and anticipate/accommodate new technology; 6. Accommodate a wide range of aircraft operations, including airlines, air taxis, helicopters, general aviation, and unmanned aerial vehicles; 7. To the greatest extent practicable, reduce exposure of noise and emissions pollution on affected residents.
  • 9. The Hierarchy Of Change Needs/Opportunities Challenges Policy / Vision • JPDO slow in coming • Long-term: JPDO together & current structure Organization • Short-term: Joint ATO/ARP - • Current org culture at FAA Work with users & local jurisdictions • Competing interests and perceptions at local level Funding/Financing Process Technology
  • 10. The Hierarchy Of Change Needs Challenges Policy / Vision Organization • Performance-based financing • More R&D • Shrinking Trust fund • Funding for sustainability receipts Funding/Financing planning & mediation of • Govt budget cuts development alternatives • Other funding priorities •Local-based economic incentives • Externalities Process Technology
  • 11. The Hierarchy Of Change Opportunities Challenges Policy / Vision Organization • Focus on sustainable Funding/Financing development • Create Combined process • Added complexity with two-way (bottom-up and • Conflicting needs & top-down) development requirements Process • New metrics • Difficult to address tactical- • Mediation of Stakeholder level planning/support development alternatives Technology •Conflict resolution tools/mechanisms
  • 12. The Hierarchy Of Change Opportunities Challenges Policy / Vision Organization Funding/Financing • Integrate Airspace and airport/ noise planning tools Process • Create Inter-operable Decision Support Tools • Inclusive & accurate •Path dependence modeling Technology • Mapping Cost/Benefit •Investment on Supply Side Influences for sustainable •Funding from Demand Side land-use
  • 13. Current Challenges Airport Planning Airspace Redesign • Capacity Constraints • New vehicles (UAVs, microjets,etc) • Modernization & • Information-sharing & Competitiveness Collaborative Decision-Making • Adaptive security • Capacity Constraints • Introduction of new vehicles • Security • Environmental Compatibility • System Delay • Community & Land-use • Military/Civilian coordination planning • Manage environment-connected • Regional planning actions • Regional airspace harmonization
  • 14. Competing Priorities Increased Complexity Competing Interests Increased Mobility Competing Perceptions + Increased Information Competing Trends Increased QOL Expect. Competing Goals Competing Requirements
  • 16. Priorities “The changes occurring in our skies and coming down our runways combined with the security challenges of a post-9/11 world are so significant and so fundamental that temporary adjustments and band-aid solutions just won’t do. ” Secretary Mineta - January 24, 2006 DOT Priorities: • A new cost-based financing system for the FAA - Create a more direct relationship between revenue collected and services rendered • Negotiating a new labor agreement with NATCA • Modernizing the system through NGATS
  • 17. FAA ATO • Cost Controls: – Means support for new runway airspace redesign but no new redesign/optimization – Ops budget cut 20% – Unfunded programs (POET, RAPT) • Staffing Challenges: – NATCA Labor Agreement – ATC Retirement vs. Staffing – Limited internal environmental resources • Re-organization & performance-based service
  • 18. …In the medium & long terms
  • 19. FAA (ATO) Flight Plan • Increase safety Achieve the lowest possible accident rate and constantly improve safety. • Greater Capacity Work with local governments and airspace users to provide capacity in the US airspace system that meets projected demand in an environmentally sound manner. • International Leadership Increase the safety and capacity of the global civil aerospace system in an environmentally sound manner • Organizational Excellence Ensure the success of the FAA’s mission through stronger leadership, a better trained workforce, enhanced cost-control measures, and improved decision- making based on reliable data.
  • 20. Broad Area Precision Navigation • Navigation precision sufficient to perform landings without ground- based aids at any “air portal.” • Reliable service available over large areas (almost global). • Reduction / elimination of legacy systems
  • 21. Management-by-Trajectory • Users have 4D trajectories which are the basis for planning and execution • 4D trajectories exchanged and conflicts resolved among users and ATM service providers – “The Evaluator” • Strategic traffic management and separation assurance
  • 22. National Dynamic Airspace • Airspace configuration driven by User needs, National Security requirements, Safety, Overall efficiency of operations • Reconfigurable hourly • Single mechanism for implementing SUA, TFR’s, etc. • Temporal implementation of high-density, high-demand corridors, etc.
  • 23. Weather Information in ATM System • Stable fusion of weather observations and forecasts from multiple sensors and prediction models into one national database • Dynamic updating and support for all push/pull operations • Seamless assimilation of weather information in ATM system “decision loops.”
  • 24. “Super density” Airport Operations • Maximize runway capacity by minimizing arrival/departure spacing for single or parallel runways due to wake vortex constraints. • Reduce runway occupancy time. • Simultaneous operations on single runway.