Scheduling Chapter 16
How  Scheduling  fits the Operations Management Philosophy  Operations As a Competitive  Weapon Operations Strategy Project Management Process Strategy Process Analysis Process Performance and Quality Constraint Management Process Layout Lean Systems Supply Chain Strategy Location Inventory Management Forecasting Sales and Operations Planning Resource Planning Scheduling
Scheduling ,[object Object],[object Object],[object Object],[object Object]
Performance Measures ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Gantt Charts ,[object Object],[object Object],[object Object],[object Object]
Gantt Progress Chart Gantt Progress Chart for an Auto Parts Company Plymouth Ford Pontiac Job 4/20 4/22 4/23 4/24 4/25 4/26 4/21 4/17 4/18 4/19 Current date  Scheduled activity time Actual progress Start activity Finish activity Nonproductive time
Gantt Workstation Chart  Gantt Workstation Chart for Hospital Operating Rooms
Scheduling  Customer Demand ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Scheduling Employees ,[object Object],[object Object],[object Object],[object Object]
The  Amalgamated Parcel Service  is open 7 days a week. The schedule of requirements is: The manager needs a workforce schedule that provides two consecutive days off and minimizes the amount of total slack capacity. To break ties in the selection of off days, the scheduler gives preference to Saturday and Sunday if it is one of the tied pairs. If not, she selects one of the tied pairs arbitrarily. Workforce Scheduling Example 16.1 Day M T W Th F S Su Number of employees 6 4 8 9 10 3 2 Required employees
Required employees Workforce Scheduling Example 16.1   Steps 1 & 2 Step 1 . Find all the pairs of consecutive days that exclude the maximum daily requirements. Select the unique pair that has the lowest total requirements for the 2 days. Friday contains the maximum requirements (10), and the pair S–Su has the lowest total requirements. Therefore, Employee 1 is scheduled to work Monday through Friday.  Step 2 . If a tie occurs, choose one of the tied pairs or ask the employee to make a choice. Day M T W Th F S Su Number of employees 6 4 8 9  10*  3 2 Employee 1  X X X X X
Required employees Step 3 . Subtract the requirements satisfied by the Employee 1 from the net requirements for each day the employee is to work and repeat step one. Again the pair S–Su has the lowest total requirements. Therefore, Employee 2 is scheduled to work Monday through Friday. Workforce Scheduling Example 16.1   Step 3   Day M T W Th F S Su Number of employees 6 4 8 9 10* 3 2 Employee 1 X X X X X Requirements 5 3 7 8 9* 3 2 Employee 2 X X X X X
Required employees Workforce Scheduling Example 16.1   Step 4   Step 4 .  Repeat steps 1 through 3 until all the requirements have been satisfied.  After Employees 1, 2, and 3 have reduced the requirements, the pair with the lowest requirements changes, and Employee 4 will be scheduled for Wednesday through Sunday. Day M T W Th F S Su Number of employees 6 4 8 9 10* 3 2 Employee 1 X X X X X Requirement 5 3 7 8 9* 3 2 Employee 2 X X X X X Requirement 4 2 6 7 8* 3 2 Employee 3 X X X X X Requirement 3 1 5 6 7* 3 2
Workforce Scheduling Example 16.1  Step 4   continued Day M T W Th F S Su Number of employees 6 4 8 9 10* 3 2 Employee 1 X X X X X Requirement 5 3 7 8 9* 3 2 Employee 2 X X X X X Requirement 4 2 6 7 8* 3 2 Employee 3 X X X X X Requirement 3 1 5 6 7* 3 2 Employee 4 X X X X X Requirement 3 1 4 5 6* 2 1 Employee 5 X X X X X Required employees
Workforce Scheduling Example 16.1   Step 4   continued Day M T W Th F S Su Requirement 2 0 3 4 5* 2 1 Employee 6 X X X X X Requirement 2 0 2 3 4* 1 0 Employee 7 X X X X X Requirement 1 0 1 2 3* 1 0 Employee 8 X X X X X Requirement 0 0 0 1 2* 1 0 Employee 9 X X X X X Requirement 0 0 0 0 1* 0 0 Employee 10 X X X X X Required employees
Workforce Scheduling Example 16.1   Day M T W Th F S Su Employee 1 X X X X X off off Employee 2 X X X X X off off Employee 3 X X X X X off off Employee 4 off off X X X X X Employee 5 X X X X X off off Employee 6 off off X X X X X Employee 7 X X X X X off off Employee 8 X X X X X off off Employee 9 off X X X X X off Employee 10 X X X X X off off Final Schedule
M T W Th F S Su Employee 1 X X X X X off off Employee 2 X X X X X off off Employee 3 X X X X X off off Employee 4 off off X X X X X Employee 5 X X X X X off off Employee 6 off off X X X X X Employee 7 X X X X X off off Employee 8 X X X X X off off Employee 9 off X X X X X off Employee 10 X X X X X off off Workforce Scheduling Example 16.1   Final Schedule Capacity,  C 7 8 10 10 10 3 2 50 Requirements,  R 6 4 8 9 10 3 2 42 Slack,  C  –  R 1 4 2 1 0 0 0 8 Total Final Schedule
Operations Scheduling ,[object Object],[object Object],[object Object],[object Object],[object Object]
Manufacturing Process Shipping Department Raw Materials Legend: Batch of parts Workstation
Job Shop Dispatching ,[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],Job Shop Dispatching
[object Object],Job Shop Dispatching S/RO = ((Due date  –  Today’s date) – Total shop time remaining)    Number of operations remaining
[object Object],[object Object],[object Object],Scheduling Jobs for  One Workstation
[object Object],[object Object],[object Object],[object Object],Example 16.2 Single-Dimension Rule Sequencing
Average hours early = 0.6 hour Example 16.2 Single-Dimension Rule  –  EDD Average job flow time = 23 hours Average hours past due = 7.2 hours Average WIP = 2.61 blocks Average total inventory = 2.68 engine blocks 8 + 14 + 17 + 32 + 44 44 Job Scheduled Actual Engine Processing Flow Customer Customer Hours Block Begin Time Time Pickup Pickup Hours Past Sequence Work (hr) (hr) Time Time Early Due Ranger 8 10 Explorer 6 12 Econoline 150 3 18 Bronco 15 20 Thunderbird 12 22 0 + = 8 10 2 17 + = 32 32 12 8 + = 14 14 2 14 + = 17 18 1 32 + = 44 44 22 Average total inventory = 10 + 14 + 18 + 32 + 44 44
Average hours early = 3.6 hour Example 16.2 Single-Dimension Rule  –  SPT Average job flow time =   20.4 hours Average hours past due = 7.6 hours Average WIP = 2.32 blocks Average total inventory = 2.73 engine blocks Econoline 150 Explorer Ranger Thunderbird Bronco 0 3 9 17 29 3 6 8 12 15 18 12 10 22 20 3 + 9 + 17 + 29 + 44 44 Job Scheduled Actual Engine Processing Flow Customer Customer Hours Block Begin Time Time Pickup Pickup Hours Past Sequence Work (hr) (hr) Time Time Early Due Ranger 8 10 Explorer 6 12 Econoline 150 3 18 Bronco 15 20 Thunderbird 12 22 0 + = 3 18 15 17 + = 29 29   7 8 + = 9 12   14 + = 17 17 3 7 29 + = 44 44   24 Average total inventory = 18 + 12 + 17 + 20 + 44 44
Comparing the  EDD and SPT Rules Using the previous example, a comparison of the EDD and SPT sequencing is shown below. ,[object Object],[object Object],[object Object],EDD SPT Average job flow time 23.00 20.40 Average hours early 0.60 3.60 Average hours past due 7.20 7.60 Average WIP 2.61 2.32 Average total inventory 2.68 2.73
Example 16.3 Multiple-Dimension Rule –  CR 1 2.3 15 10 6.1 2.46 2 10.5 10 2 7.8 1.28 3 6.2 20 12 14.5 1.38 4 15.6 8 5 10.2 .78 Operation Time Time at Remaining Number of Engine to Due Date Operations Shop Time Job Lathe (hr) (Days) Remaining Remaining CR S/RO CR   =  Time remaining to due date Shop time remaining
Example 16.3 Multiple-Dimension Rule –  S/RO 1 2.3 15 10 6.1 2.46 0.89 2 10.5 10 2 7.8 1.28 1.10 3 6.2 20 12 14.5 1.38 0.46 4 15.6 8 5 10.2 .78 – 0.44 Operation Time Time at Remaining Number of Engine to Due Date Operations Shop Time Job Lathe (hr) (Days) Remaining Remaining CR S/RO S/RO  =  Time remaining to due date  –  Shop time remaining Number of operations remaining
Comparing the  CR  and  S/RO  Rules 1 2.3 15 10 6.1 2.46 0.89 2 10.5 10 2 7.8 1.28 1.10 3 6.2 20 12 14.5 1.38 0.46 4 15.6 8 5 10.2 .78 – 0.44 Operation Time Time at Remaining Number of Engine to Due Date Operations Shop Time Job Lathe (hr) (Days) Remaining Remaining CR S/RO CR Sequence =  4  – 2 – 3 – 1 S/RO Sequence =  4  – 3 – 1 – 2 CR Sequence =
Priority Rule Summary FCFS = 1 – 2 – 3 – 4 SPT = 1 – 3 – 2 – 4 EDD = 4 – 2 – 1 – 3 CR = 4 – 2 – 3 – 1 S/RO = 4 – 3 – 1 – 2 ,[object Object],[object Object],© 2007 Pearson Education Avg Flow Time 17.175 16.100 26.175 27.150 24.025 Avg Early Time 3.425 6.050 0 0 0 Avg Past Due 7.350 8.900 12.925 13.900 10.775 Avg WIP 1.986 1.861 3.026 3.129 2.777 Avg Total Inv 2.382 2.561 3.026 3.129 2.777 Shortest Slack per Processing Earliest Critical Remaining FCFS Time Due Date Ratio Operation
Scheduling Jobs for  Multiple Workstations ,[object Object],[object Object],[object Object],[object Object],[object Object]
Johnson’s Rule ,[object Object],[object Object],[object Object],[object Object]
Example 16.5   Johnson’s Rule   at the  Morris Machine Co.   Sequence  =  M1 M2 M3 M4 M5 Eliminate M3 from consideration. The next shortest time is M2 at Workstation 1, so schedule M2 first. Eliminate M5 from consideration. The next shortest time is M1 at workstation #1, so schedule M1 next. Eliminate M1 and the only job remaining to be scheduled is M4. Time (hr) Motor Workstation 1 Workstation 2 M1 12 22 M2 4 5 M3 5 3 M4 15 16 M5 10 8 Shortest time is 3 hours at workstation 2, so schedule job M3 last.  Eliminate M2 from consideration. The next shortest time is M5 at workstation #2, so schedule M5 next to last.
The schedule minimizes the idle time of workstation 2 and gives the fastest repair time for all five motors. No other sequence will produce a lower makespan. Example 16.5   Johnson’s Rule   at the  Morris Machine Co.   Workstation M2  (4) M1  (12) M4  (15) M5  (10) M3  (5) Idle—available  for further work 0 5 10 15 20 25 30 Day 35 40 45 50 55 60 65 Idle 2 M2  (5) M1  (22) M4  (16) M5  (8) M3  (3) Idle 1 Gantt Chart for the Morris Machine Company Repair Schedule
Labor-limited Environments ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Linking Operations  Scheduling to the Supply Chain ,[object Object],[object Object],[object Object],[object Object],[object Object]

Mais conteúdo relacionado

Mais procurados (20)

Inventory management
Inventory managementInventory management
Inventory management
 
Production planning & control & Forecasting
Production planning & control & ForecastingProduction planning & control & Forecasting
Production planning & control & Forecasting
 
Work measurement
Work measurementWork measurement
Work measurement
 
Bullwhip effect ppt
Bullwhip effect pptBullwhip effect ppt
Bullwhip effect ppt
 
Production planning & control
Production planning & controlProduction planning & control
Production planning & control
 
Production planning control ppt
Production planning control pptProduction planning control ppt
Production planning control ppt
 
Supply Chain Integration
Supply Chain IntegrationSupply Chain Integration
Supply Chain Integration
 
Job Design and Work Measurement
Job Design and Work Measurement Job Design and Work Measurement
Job Design and Work Measurement
 
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP.
 
Design of supply chain networks
Design of supply chain networksDesign of supply chain networks
Design of supply chain networks
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
 
Material requirement planning (mrp1)
Material requirement planning (mrp1)Material requirement planning (mrp1)
Material requirement planning (mrp1)
 
MRP I and MRP II
MRP I and MRP IIMRP I and MRP II
MRP I and MRP II
 
Cycle inventory
Cycle inventoryCycle inventory
Cycle inventory
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planning
 
Just in time manufacturing ppt
Just in time manufacturing pptJust in time manufacturing ppt
Just in time manufacturing ppt
 
Inventory Management And Mrp Erp
Inventory Management And Mrp   ErpInventory Management And Mrp   Erp
Inventory Management And Mrp Erp
 
PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)
 
Scheduling
SchedulingScheduling
Scheduling
 
Just in-time
Just in-timeJust in-time
Just in-time
 

Destaque

Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencingAkanksha Gupta
 
VBA API for scriptDB primer
VBA API for scriptDB primerVBA API for scriptDB primer
VBA API for scriptDB primerBruce McPherson
 
Javascript like objects and JSON processing in VBA
Javascript like objects and JSON processing in VBAJavascript like objects and JSON processing in VBA
Javascript like objects and JSON processing in VBABruce McPherson
 
GanttChart for ClearQuest 1.4 and 1.3.1
GanttChart for ClearQuest 1.4 and 1.3.1GanttChart for ClearQuest 1.4 and 1.3.1
GanttChart for ClearQuest 1.4 and 1.3.1Alexander Novichkov
 
Improve Your Business Operations and Project Success with Gordon Tredgold
Improve Your Business Operations and Project Success with Gordon TredgoldImprove Your Business Operations and Project Success with Gordon Tredgold
Improve Your Business Operations and Project Success with Gordon TredgoldQuickBase, Inc.
 
MB0038 – Management Process and Organization Behavior
 MB0038 – Management Process and Organization Behavior MB0038 – Management Process and Organization Behavior
MB0038 – Management Process and Organization Behaviorswejs
 
Energy Management by Food&Beverage Industry
Energy Management by Food&Beverage IndustryEnergy Management by Food&Beverage Industry
Energy Management by Food&Beverage IndustryAvanceon
 
Boiler MACT and Strategic Air Permitting
Boiler MACT and Strategic Air PermittingBoiler MACT and Strategic Air Permitting
Boiler MACT and Strategic Air PermittingAll4 Inc.
 
Bus 606 operations analysis project - rip curl
Bus 606   operations analysis project - rip curlBus 606   operations analysis project - rip curl
Bus 606 operations analysis project - rip curlRipCurlTeamPhotos
 
Intern operations project
Intern operations projectIntern operations project
Intern operations projectKidd Khazini
 
Project work efficiency of boilers
Project work   efficiency of boilersProject work   efficiency of boilers
Project work efficiency of boilersRodrigo Barcelos
 

Destaque (20)

Chapter 14
Chapter 14Chapter 14
Chapter 14
 
Scheduling
SchedulingScheduling
Scheduling
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
 
VBA API for scriptDB primer
VBA API for scriptDB primerVBA API for scriptDB primer
VBA API for scriptDB primer
 
Production Scheduling in a Job Shop Environment with consideration of Transpo...
Production Scheduling in a Job Shop Environment with consideration of Transpo...Production Scheduling in a Job Shop Environment with consideration of Transpo...
Production Scheduling in a Job Shop Environment with consideration of Transpo...
 
job shop 111
job shop 111job shop 111
job shop 111
 
Ch17
Ch17Ch17
Ch17
 
operations scheduling
operations schedulingoperations scheduling
operations scheduling
 
C8 scheduling
C8 schedulingC8 scheduling
C8 scheduling
 
Javascript like objects and JSON processing in VBA
Javascript like objects and JSON processing in VBAJavascript like objects and JSON processing in VBA
Javascript like objects and JSON processing in VBA
 
GanttChart for ClearQuest 1.4 and 1.3.1
GanttChart for ClearQuest 1.4 and 1.3.1GanttChart for ClearQuest 1.4 and 1.3.1
GanttChart for ClearQuest 1.4 and 1.3.1
 
Improve Your Business Operations and Project Success with Gordon Tredgold
Improve Your Business Operations and Project Success with Gordon TredgoldImprove Your Business Operations and Project Success with Gordon Tredgold
Improve Your Business Operations and Project Success with Gordon Tredgold
 
BRASS MBA in a Day
BRASS MBA in a DayBRASS MBA in a Day
BRASS MBA in a Day
 
MB0038 – Management Process and Organization Behavior
 MB0038 – Management Process and Organization Behavior MB0038 – Management Process and Organization Behavior
MB0038 – Management Process and Organization Behavior
 
Energy Management by Food&Beverage Industry
Energy Management by Food&Beverage IndustryEnergy Management by Food&Beverage Industry
Energy Management by Food&Beverage Industry
 
Boiler MACT and Strategic Air Permitting
Boiler MACT and Strategic Air PermittingBoiler MACT and Strategic Air Permitting
Boiler MACT and Strategic Air Permitting
 
Bus 606 operations analysis project - rip curl
Bus 606   operations analysis project - rip curlBus 606   operations analysis project - rip curl
Bus 606 operations analysis project - rip curl
 
Intern operations project
Intern operations projectIntern operations project
Intern operations project
 
Commercial Condensing Boiler Optimizaiton
Commercial Condensing Boiler OptimizaitonCommercial Condensing Boiler Optimizaiton
Commercial Condensing Boiler Optimizaiton
 
Project work efficiency of boilers
Project work   efficiency of boilersProject work   efficiency of boilers
Project work efficiency of boilers
 

Semelhante a Scheduling

Capacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of CapacityCapacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of CapacityJoanRachelCalansingi
 
Chap017 Scheduling Edit
Chap017 Scheduling EditChap017 Scheduling Edit
Chap017 Scheduling EditRicky Muchtar
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materialspikuoec
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materialspikuoec
 
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaaSCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaainfinitepestcontrol
 
scheduling-sequencing-rules.pptx
scheduling-sequencing-rules.pptxscheduling-sequencing-rules.pptx
scheduling-sequencing-rules.pptxMowazzemHossain1
 
Operation engine ii session iv operations scheduling
Operation engine  ii session iv  operations schedulingOperation engine  ii session iv  operations scheduling
Operation engine ii session iv operations schedulingFatima Aliza
 
Track Software -- Shell presentation
Track Software -- Shell presentationTrack Software -- Shell presentation
Track Software -- Shell presentationtracksoftware
 
SIMULATION AND COMPARISON ANALYSIS OF DUE DATE ASSIGNMENT METHODS USING SCHED...
SIMULATION AND COMPARISON ANALYSIS OF DUE DATE ASSIGNMENT METHODS USING SCHED...SIMULATION AND COMPARISON ANALYSIS OF DUE DATE ASSIGNMENT METHODS USING SCHED...
SIMULATION AND COMPARISON ANALYSIS OF DUE DATE ASSIGNMENT METHODS USING SCHED...IJCSES Journal
 
C0362015022
C0362015022C0362015022
C0362015022theijes
 
Topic 5 Production Sequencing and Scheduling.ppt
Topic 5 Production Sequencing and Scheduling.pptTopic 5 Production Sequencing and Scheduling.ppt
Topic 5 Production Sequencing and Scheduling.pptHassanHani5
 
Production planning and control 2019
Production planning and control 2019Production planning and control 2019
Production planning and control 2019sserwaniko
 

Semelhante a Scheduling (20)

chapter16.ppt
chapter16.pptchapter16.ppt
chapter16.ppt
 
Capacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of CapacityCapacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of Capacity
 
Chap017 Scheduling Edit
Chap017 Scheduling EditChap017 Scheduling Edit
Chap017 Scheduling Edit
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
 
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaaSCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
 
Scheduling
SchedulingScheduling
Scheduling
 
scheduling-sequencing-rules.pptx
scheduling-sequencing-rules.pptxscheduling-sequencing-rules.pptx
scheduling-sequencing-rules.pptx
 
Operation engine ii session iv operations scheduling
Operation engine  ii session iv  operations schedulingOperation engine  ii session iv  operations scheduling
Operation engine ii session iv operations scheduling
 
Om chapter 14
Om chapter 14Om chapter 14
Om chapter 14
 
C8 scheduling
C8 schedulingC8 scheduling
C8 scheduling
 
Track Software -- Shell presentation
Track Software -- Shell presentationTrack Software -- Shell presentation
Track Software -- Shell presentation
 
SIMULATION AND COMPARISON ANALYSIS OF DUE DATE ASSIGNMENT METHODS USING SCHED...
SIMULATION AND COMPARISON ANALYSIS OF DUE DATE ASSIGNMENT METHODS USING SCHED...SIMULATION AND COMPARISON ANALYSIS OF DUE DATE ASSIGNMENT METHODS USING SCHED...
SIMULATION AND COMPARISON ANALYSIS OF DUE DATE ASSIGNMENT METHODS USING SCHED...
 
C0362015022
C0362015022C0362015022
C0362015022
 
Scheduling
SchedulingScheduling
Scheduling
 
Scheduling
SchedulingScheduling
Scheduling
 
Scheduling
SchedulingScheduling
Scheduling
 
Topic 5 Production Sequencing and Scheduling.ppt
Topic 5 Production Sequencing and Scheduling.pptTopic 5 Production Sequencing and Scheduling.ppt
Topic 5 Production Sequencing and Scheduling.ppt
 
Production planning and control 2019
Production planning and control 2019Production planning and control 2019
Production planning and control 2019
 
Pom unit 3
Pom unit 3Pom unit 3
Pom unit 3
 

Último

Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Zilliz
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...apidays
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...Zilliz
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelDeepika Singh
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Angeliki Cooney
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businesspanagenda
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Jeffrey Haguewood
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Bhuvaneswari Subramani
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 

Último (20)

Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 

Scheduling

  • 2. How Scheduling fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management Process Strategy Process Analysis Process Performance and Quality Constraint Management Process Layout Lean Systems Supply Chain Strategy Location Inventory Management Forecasting Sales and Operations Planning Resource Planning Scheduling
  • 3.
  • 4.
  • 5.
  • 6. Gantt Progress Chart Gantt Progress Chart for an Auto Parts Company Plymouth Ford Pontiac Job 4/20 4/22 4/23 4/24 4/25 4/26 4/21 4/17 4/18 4/19 Current date Scheduled activity time Actual progress Start activity Finish activity Nonproductive time
  • 7. Gantt Workstation Chart Gantt Workstation Chart for Hospital Operating Rooms
  • 8.
  • 9.
  • 10. The Amalgamated Parcel Service is open 7 days a week. The schedule of requirements is: The manager needs a workforce schedule that provides two consecutive days off and minimizes the amount of total slack capacity. To break ties in the selection of off days, the scheduler gives preference to Saturday and Sunday if it is one of the tied pairs. If not, she selects one of the tied pairs arbitrarily. Workforce Scheduling Example 16.1 Day M T W Th F S Su Number of employees 6 4 8 9 10 3 2 Required employees
  • 11. Required employees Workforce Scheduling Example 16.1 Steps 1 & 2 Step 1 . Find all the pairs of consecutive days that exclude the maximum daily requirements. Select the unique pair that has the lowest total requirements for the 2 days. Friday contains the maximum requirements (10), and the pair S–Su has the lowest total requirements. Therefore, Employee 1 is scheduled to work Monday through Friday. Step 2 . If a tie occurs, choose one of the tied pairs or ask the employee to make a choice. Day M T W Th F S Su Number of employees 6 4 8 9 10* 3 2 Employee 1 X X X X X
  • 12. Required employees Step 3 . Subtract the requirements satisfied by the Employee 1 from the net requirements for each day the employee is to work and repeat step one. Again the pair S–Su has the lowest total requirements. Therefore, Employee 2 is scheduled to work Monday through Friday. Workforce Scheduling Example 16.1 Step 3 Day M T W Th F S Su Number of employees 6 4 8 9 10* 3 2 Employee 1 X X X X X Requirements 5 3 7 8 9* 3 2 Employee 2 X X X X X
  • 13. Required employees Workforce Scheduling Example 16.1 Step 4 Step 4 . Repeat steps 1 through 3 until all the requirements have been satisfied. After Employees 1, 2, and 3 have reduced the requirements, the pair with the lowest requirements changes, and Employee 4 will be scheduled for Wednesday through Sunday. Day M T W Th F S Su Number of employees 6 4 8 9 10* 3 2 Employee 1 X X X X X Requirement 5 3 7 8 9* 3 2 Employee 2 X X X X X Requirement 4 2 6 7 8* 3 2 Employee 3 X X X X X Requirement 3 1 5 6 7* 3 2
  • 14. Workforce Scheduling Example 16.1 Step 4 continued Day M T W Th F S Su Number of employees 6 4 8 9 10* 3 2 Employee 1 X X X X X Requirement 5 3 7 8 9* 3 2 Employee 2 X X X X X Requirement 4 2 6 7 8* 3 2 Employee 3 X X X X X Requirement 3 1 5 6 7* 3 2 Employee 4 X X X X X Requirement 3 1 4 5 6* 2 1 Employee 5 X X X X X Required employees
  • 15. Workforce Scheduling Example 16.1 Step 4 continued Day M T W Th F S Su Requirement 2 0 3 4 5* 2 1 Employee 6 X X X X X Requirement 2 0 2 3 4* 1 0 Employee 7 X X X X X Requirement 1 0 1 2 3* 1 0 Employee 8 X X X X X Requirement 0 0 0 1 2* 1 0 Employee 9 X X X X X Requirement 0 0 0 0 1* 0 0 Employee 10 X X X X X Required employees
  • 16. Workforce Scheduling Example 16.1 Day M T W Th F S Su Employee 1 X X X X X off off Employee 2 X X X X X off off Employee 3 X X X X X off off Employee 4 off off X X X X X Employee 5 X X X X X off off Employee 6 off off X X X X X Employee 7 X X X X X off off Employee 8 X X X X X off off Employee 9 off X X X X X off Employee 10 X X X X X off off Final Schedule
  • 17. M T W Th F S Su Employee 1 X X X X X off off Employee 2 X X X X X off off Employee 3 X X X X X off off Employee 4 off off X X X X X Employee 5 X X X X X off off Employee 6 off off X X X X X Employee 7 X X X X X off off Employee 8 X X X X X off off Employee 9 off X X X X X off Employee 10 X X X X X off off Workforce Scheduling Example 16.1 Final Schedule Capacity, C 7 8 10 10 10 3 2 50 Requirements, R 6 4 8 9 10 3 2 42 Slack, C – R 1 4 2 1 0 0 0 8 Total Final Schedule
  • 18.
  • 19. Manufacturing Process Shipping Department Raw Materials Legend: Batch of parts Workstation
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25. Average hours early = 0.6 hour Example 16.2 Single-Dimension Rule – EDD Average job flow time = 23 hours Average hours past due = 7.2 hours Average WIP = 2.61 blocks Average total inventory = 2.68 engine blocks 8 + 14 + 17 + 32 + 44 44 Job Scheduled Actual Engine Processing Flow Customer Customer Hours Block Begin Time Time Pickup Pickup Hours Past Sequence Work (hr) (hr) Time Time Early Due Ranger 8 10 Explorer 6 12 Econoline 150 3 18 Bronco 15 20 Thunderbird 12 22 0 + = 8 10 2 17 + = 32 32 12 8 + = 14 14 2 14 + = 17 18 1 32 + = 44 44 22 Average total inventory = 10 + 14 + 18 + 32 + 44 44
  • 26. Average hours early = 3.6 hour Example 16.2 Single-Dimension Rule – SPT Average job flow time = 20.4 hours Average hours past due = 7.6 hours Average WIP = 2.32 blocks Average total inventory = 2.73 engine blocks Econoline 150 Explorer Ranger Thunderbird Bronco 0 3 9 17 29 3 6 8 12 15 18 12 10 22 20 3 + 9 + 17 + 29 + 44 44 Job Scheduled Actual Engine Processing Flow Customer Customer Hours Block Begin Time Time Pickup Pickup Hours Past Sequence Work (hr) (hr) Time Time Early Due Ranger 8 10 Explorer 6 12 Econoline 150 3 18 Bronco 15 20 Thunderbird 12 22 0 + = 3 18 15 17 + = 29 29 7 8 + = 9 12 14 + = 17 17 3 7 29 + = 44 44 24 Average total inventory = 18 + 12 + 17 + 20 + 44 44
  • 27.
  • 28. Example 16.3 Multiple-Dimension Rule – CR 1 2.3 15 10 6.1 2.46 2 10.5 10 2 7.8 1.28 3 6.2 20 12 14.5 1.38 4 15.6 8 5 10.2 .78 Operation Time Time at Remaining Number of Engine to Due Date Operations Shop Time Job Lathe (hr) (Days) Remaining Remaining CR S/RO CR = Time remaining to due date Shop time remaining
  • 29. Example 16.3 Multiple-Dimension Rule – S/RO 1 2.3 15 10 6.1 2.46 0.89 2 10.5 10 2 7.8 1.28 1.10 3 6.2 20 12 14.5 1.38 0.46 4 15.6 8 5 10.2 .78 – 0.44 Operation Time Time at Remaining Number of Engine to Due Date Operations Shop Time Job Lathe (hr) (Days) Remaining Remaining CR S/RO S/RO = Time remaining to due date – Shop time remaining Number of operations remaining
  • 30. Comparing the CR and S/RO Rules 1 2.3 15 10 6.1 2.46 0.89 2 10.5 10 2 7.8 1.28 1.10 3 6.2 20 12 14.5 1.38 0.46 4 15.6 8 5 10.2 .78 – 0.44 Operation Time Time at Remaining Number of Engine to Due Date Operations Shop Time Job Lathe (hr) (Days) Remaining Remaining CR S/RO CR Sequence = 4 – 2 – 3 – 1 S/RO Sequence = 4 – 3 – 1 – 2 CR Sequence =
  • 31.
  • 32.
  • 33.
  • 34. Example 16.5 Johnson’s Rule at the Morris Machine Co. Sequence = M1 M2 M3 M4 M5 Eliminate M3 from consideration. The next shortest time is M2 at Workstation 1, so schedule M2 first. Eliminate M5 from consideration. The next shortest time is M1 at workstation #1, so schedule M1 next. Eliminate M1 and the only job remaining to be scheduled is M4. Time (hr) Motor Workstation 1 Workstation 2 M1 12 22 M2 4 5 M3 5 3 M4 15 16 M5 10 8 Shortest time is 3 hours at workstation 2, so schedule job M3 last. Eliminate M2 from consideration. The next shortest time is M5 at workstation #2, so schedule M5 next to last.
  • 35. The schedule minimizes the idle time of workstation 2 and gives the fastest repair time for all five motors. No other sequence will produce a lower makespan. Example 16.5 Johnson’s Rule at the Morris Machine Co. Workstation M2 (4) M1 (12) M4 (15) M5 (10) M3 (5) Idle—available for further work 0 5 10 15 20 25 30 Day 35 40 45 50 55 60 65 Idle 2 M2 (5) M1 (22) M4 (16) M5 (8) M3 (3) Idle 1 Gantt Chart for the Morris Machine Company Repair Schedule
  • 36.
  • 37.

Notas do Editor

  1. 1
  2. 6
  3. 10
  4. 90
  5. 91
  6. 93
  7. 97
  8. 100
  9. 106
  10. 107
  11. 107
  12. 2
  13. 12
  14. 12
  15. 34
  16. 34
  17. 34
  18. 61
  19. 88