State Grid Corporation of China!
Otc.2013!
EV infrastructure and standardization in
China!
1 Overview of EV infrastructure construction
2 Standardization of EV infrastructure in China
Comparison of EV infrastructure Standards
3
EV infrastructure!
Charging ! Battery swap!
On-board
charging!
Off-board
charging!
Commercial
vehicle!
Passenger car
l  AC Charging spot! l  DC charger! l  Side-swapping!
l  Rear-swapping!
l  Bottom-swapping!
Overview-types of infrastructure
Private car
Private car
Public bus
Public bus
Sanitation vehicle
Private car
Taxi
【AC Charging Spot】
Item Spec.
Coupler GB
UI
LCD / LED / VFD
Keyboard
	
Billing RFID / IC card
Power
AC 220V (380V)
50Hz ± 1Hz
Output-U single-phase ,220V ± 10%
Output-I ≤ 32A
IP
	
 IP55
Communication
interface
RS485 / 2G / 3G
Installation Pillar/Wallbox
Overview-AC charging spot
Item Spec.
Coupler GB
UI
LCD / LED / VFD
Keyboard
	
Billing RFID / IC card
Power AC 380V ± 10%,50Hz -60Hz
Output
DC 200-500V, 0-100A
DC 300-700V, 0-250(600)A
Efficiency (50%-100%
load)	
≥92% 	
IP
	
 IP55
【DC Charger】
Overview-DC charger
【Battery swap
station】
Side-swapping: applicable to
commercial electric vehicles such as
buses and sanitation trucks which have
battery packs installed in both sides of
the vehicle body.
Rear-swapping:
applicable to
electric passenger
vehicles such as
private cars and
taxis, with battery packs installed in
the trunk of the vehicle body.
Bottom-swapping:
applicable to electric
passenger vehicles
such as private cars
and taxis, with battery packs installed in
the chasiss of the vehicle body.
Overview-battery swap station
Up to Jun.2013, SGCC has built 383 charging
stations/battery swap stations and 15,333 AC charging
spots.!
Overview-main supplier
Up to the end of 2012, CSG has built 18 charging
stations/battery swap stations and 3,229 AC charging
spots.!
Overview-main supplier
Up to the end of 2012, Potevio has built 74
charging stations.!
Overview-main supplier
27,400	
  
39,800	
  
49,700	
  
60,000	
  
2012.12	
   2013.03	
   2013.07	
  
pilot	
  city	
  
na6onwide	
  
Application of new energy vehicles in China!
Overview-summary of NEV
ISO/IEC China
Safety
Interface
Interoperability
Basic Component
System
Design Acceptance
Comparison of the standard structure between ISO/IEC and China
Standardization
ISO/IEC China
Corresponding of the standard
IEC 61851 GB/T 18487-2001
GB/T 27930-2011
IEC 62196
ISO 15118
GB/T 20234-2011
GB/T	
  27930-­‐2011
Q/GDW	
  397-­‐2009	
  
Q/GDW	
  398-­‐2009	
  
Q/GDW	
  399-­‐2009	
  
IEC 62840
GB/T 29317
Q/GDW	
  486-­‐2010	
  
Q/GDW	
  487-­‐2010	
  
Q/GDW	
  488-­‐2010	
  
Q/GDW	
  685-­‐2011	
  
Q/GDW	
  686-­‐2011	
  
System
Interface
Communication
Battery swap
Standardization
Na6onal	
  Standards	
  
No Publish	
  No Name
1 GB/T	
  20234.1-­‐2011
Connec&on	
  set	
  of	
  conduc&ve	
  charging	
  for	
  electric	
  vehicles-­‐
Part	
  1:General	
  requirements
2 GB/T	
  20234.2-­‐2011
Connec&on	
  set	
  of	
  conduc&ve	
  charging	
  for	
  electric	
  vehicles-­‐
Part2:AC	
  Charging	
  coupler
3 GB/T	
  20234.3-­‐2011
Connec&on	
  set	
  of	
  conduc&ve	
  charging	
  for	
  electric	
  vehicles-­‐
Part3:DC	
  charging	
  coupler
4 GB/T	
  27930-­‐2011
Communica&on	
  protocols	
  between	
  off-­‐board	
  conduc&ve	
  charger	
  and	
  
baCery	
  management	
  system	
  for	
  electric	
  vehicle
5 GB/T	
  28569-­‐2012 Electric	
  energy	
  metering	
  for	
  electric	
  vehicle	
  AC	
  charging	
  spot
6 GB/T	
  29317-­‐2012 Terminology	
  of	
  electric	
  vehicle	
  charging/baCery	
  swap	
  infrastructure	
  
7 GB/T	
  29318-­‐2012 Electric	
  energy	
  metering	
  for	
  electric	
  vehicle	
  off-­‐board	
  charger	
  
	
  Maintenance	
  of	
  GB18487.1	
  Electric	
  vehicle	
  conduc&ve	
  charging	
  
system	
  Part1:	
  General	
  requirement	
  (kick-­‐off	
  mee&ng	
  2013.09.02)	
  
Milestone:	
  2013.12	
  1st	
  	
  WD,	
  	
  	
  2014.03	
  2nd	
  WD,	
  	
  	
  2014.05	
  CD,	
  	
  	
  2014.09	
  FDIS
Standardization
(18	
  Industry	
  Standards	
  	
  and	
  37	
  Enterprise	
  Standards	
  are	
  published	
  or	
  being	
  prepared.)
China: Mode 2 and Mode 3 connection with single-phase(32A) power
supply are recommended, three-phase is under consideration.
Mode 2
Mode 1 Mode 3
Ø Mode 1 connection: normal socket-outlet charging
Ø Mode 2 connection : normal socket-outlet with in cable control box
Ø Mode 3 connection : dedicated AC charging spot
AC charging coupler
IEC 62196-2:2010 GB
20234.2-2011
Type1-U.S Type 2-Germany Type 3-Italy China
Phase
Current
Voltage
Single phase
32A(80A U.S)
250V
Single/Three phase
70A/63A
480V
Single phase
16A,32A/32A
250V,250V/500V
Single phase
(Three phase reserved)
16A,32A
250V/400V
Pin &
interlock
5-pin,
mechanical lock
7-pin,
electronic lock
4-pin, 5-pin 7-pin,
mechanical lock
(optional electronic lock)
Control pilot pin Two short pins One short pin, one long pin Two short pins
Male & female
pin
Plug: male
Vehicle connector: female
Plug: male
Vehicle connector: male
Dimensions
Comparison-AC charging coupler
Japan proposal CHAdeMO
China proposal GB/T 20234 Connection set for
conductive charging of electric vehicles
Germany proposal AC & DC Combo coupler
China
Japan Europe/US
Comparison-DC charging coupler
Ø Communication Protocol
International: China:
Physical layer PLC CAN BUS
Link/Network layer IP Based CAN
Ø PWM pilot control
International: China:
EVSE side Voltage detection Current detection
Comparison-Communication interconnection
Thank you for your attention!

Mais conteúdo relacionado

Mais procurados

Electric Vehicle :Literature Review
Electric Vehicle :Literature ReviewElectric Vehicle :Literature Review
Electric Vehicle :Literature Review
ryans09sstc
 

Mais procurados (20)

Electric vehicle Market in India
Electric vehicle Market in India Electric vehicle Market in India
Electric vehicle Market in India
 
Vehicle electrification in indonesia
Vehicle electrification in indonesiaVehicle electrification in indonesia
Vehicle electrification in indonesia
 
Bus Karo: Future of Electric Buses
Bus Karo: Future of Electric Buses Bus Karo: Future of Electric Buses
Bus Karo: Future of Electric Buses
 
Energy Storage Overview- February 2013
Energy Storage Overview- February 2013Energy Storage Overview- February 2013
Energy Storage Overview- February 2013
 
Studies of Electric Vehicle Technologies
Studies of Electric Vehicle TechnologiesStudies of Electric Vehicle Technologies
Studies of Electric Vehicle Technologies
 
Electrical vehicles
Electrical vehiclesElectrical vehicles
Electrical vehicles
 
An overview of electric vehicle - Electrical Prescriptive
An overview of electric vehicle - Electrical PrescriptiveAn overview of electric vehicle - Electrical Prescriptive
An overview of electric vehicle - Electrical Prescriptive
 
Electric vehicles in India (Report)
Electric vehicles in India (Report) Electric vehicles in India (Report)
Electric vehicles in India (Report)
 
DEVELOPING AN EV CHARGING STATION: A TECHNICAL AND REGULATORY OVERVIEW
DEVELOPING AN EV CHARGING STATION: A TECHNICAL AND REGULATORY OVERVIEWDEVELOPING AN EV CHARGING STATION: A TECHNICAL AND REGULATORY OVERVIEW
DEVELOPING AN EV CHARGING STATION: A TECHNICAL AND REGULATORY OVERVIEW
 
Detailed analysis of the toyota prius engine
Detailed analysis of the toyota prius engineDetailed analysis of the toyota prius engine
Detailed analysis of the toyota prius engine
 
PPT (ELECTRIC VEHICLE).pdf
PPT (ELECTRIC VEHICLE).pdfPPT (ELECTRIC VEHICLE).pdf
PPT (ELECTRIC VEHICLE).pdf
 
An Introduction To Electric vehicles
An Introduction To Electric vehiclesAn Introduction To Electric vehicles
An Introduction To Electric vehicles
 
Electric Vehicle :Literature Review
Electric Vehicle :Literature ReviewElectric Vehicle :Literature Review
Electric Vehicle :Literature Review
 
Business model innovation for electrical vehicle futures
Business model innovation for electrical vehicle futuresBusiness model innovation for electrical vehicle futures
Business model innovation for electrical vehicle futures
 
Electric Vehicles Cost/Benefit Analysis by Dick Wanderscheid
Electric Vehicles Cost/Benefit Analysis by Dick WanderscheidElectric Vehicles Cost/Benefit Analysis by Dick Wanderscheid
Electric Vehicles Cost/Benefit Analysis by Dick Wanderscheid
 
Total energy conservation and energy management solutions for intensive energ...
Total energy conservation and energy management solutions for intensive energ...Total energy conservation and energy management solutions for intensive energ...
Total energy conservation and energy management solutions for intensive energ...
 
Electric Vehicle Project Ideas
Electric Vehicle Project IdeasElectric Vehicle Project Ideas
Electric Vehicle Project Ideas
 
Electric vehicle
Electric vehicleElectric vehicle
Electric vehicle
 
DEPLOYING NORTH AMERICA’S LARGEST 2ND LIFE BATTERY STORAGE PROJECT
DEPLOYING NORTH AMERICA’S LARGEST 2ND LIFE BATTERY STORAGE PROJECTDEPLOYING NORTH AMERICA’S LARGEST 2ND LIFE BATTERY STORAGE PROJECT
DEPLOYING NORTH AMERICA’S LARGEST 2ND LIFE BATTERY STORAGE PROJECT
 
House Energy Audit Report
House Energy Audit ReportHouse Energy Audit Report
House Energy Audit Report
 

Semelhante a EVE-07-14e.pdf

vss102_lewis_2015_o
vss102_lewis_2015_ovss102_lewis_2015_o
vss102_lewis_2015_o
Allan Lewis
 
EV infrastructure - AC charger ABB
EV infrastructure - AC charger ABBEV infrastructure - AC charger ABB
EV infrastructure - AC charger ABB
Davide Malacalza
 
Ricardo DC-DC Converter Presentation for NMI
Ricardo DC-DC Converter Presentation for NMIRicardo DC-DC Converter Presentation for NMI
Ricardo DC-DC Converter Presentation for NMI
Frank Warnes
 

Semelhante a EVE-07-14e.pdf (20)

Table-1,2,3.pptx
Table-1,2,3.pptxTable-1,2,3.pptx
Table-1,2,3.pptx
 
SOLAR POWERED WIRELESS CHARGING STATION FOR ELECTRIC CYCLE
SOLAR POWERED WIRELESS CHARGING STATION FOR ELECTRIC CYCLESOLAR POWERED WIRELESS CHARGING STATION FOR ELECTRIC CYCLE
SOLAR POWERED WIRELESS CHARGING STATION FOR ELECTRIC CYCLE
 
vss102_lewis_2015_o
vss102_lewis_2015_ovss102_lewis_2015_o
vss102_lewis_2015_o
 
EV infrastructure - AC charger ABB
EV infrastructure - AC charger ABBEV infrastructure - AC charger ABB
EV infrastructure - AC charger ABB
 
Patent Landscape Report on “Electric vehicles – Vehicle to Grid Technology” b...
Patent Landscape Report on “Electric vehicles – Vehicle to Grid Technology” b...Patent Landscape Report on “Electric vehicles – Vehicle to Grid Technology” b...
Patent Landscape Report on “Electric vehicles – Vehicle to Grid Technology” b...
 
Ricardo DC-DC Converter Presentation for NMI
Ricardo DC-DC Converter Presentation for NMIRicardo DC-DC Converter Presentation for NMI
Ricardo DC-DC Converter Presentation for NMI
 
7 dani heredero v2_g_06_dani h
7 dani heredero v2_g_06_dani h7 dani heredero v2_g_06_dani h
7 dani heredero v2_g_06_dani h
 
IRJET - Semi-Automated Electric Automobile Charger Testing Platform
IRJET -  	  Semi-Automated Electric Automobile Charger Testing PlatformIRJET -  	  Semi-Automated Electric Automobile Charger Testing Platform
IRJET - Semi-Automated Electric Automobile Charger Testing Platform
 
Electric Motorbike
Electric MotorbikeElectric Motorbike
Electric Motorbike
 
EV Charging Infrastructure: Littelfuse Solutions to Enhance Safety, Efficienc...
EV Charging Infrastructure: Littelfuse Solutions to Enhance Safety, Efficienc...EV Charging Infrastructure: Littelfuse Solutions to Enhance Safety, Efficienc...
EV Charging Infrastructure: Littelfuse Solutions to Enhance Safety, Efficienc...
 
Topological Advancement in DVR; A review
Topological Advancement in DVR; A reviewTopological Advancement in DVR; A review
Topological Advancement in DVR; A review
 
Circontrol Circarlife Catalogue 2013 2014 - EV Charging Stations
Circontrol Circarlife Catalogue 2013 2014 - EV Charging StationsCircontrol Circarlife Catalogue 2013 2014 - EV Charging Stations
Circontrol Circarlife Catalogue 2013 2014 - EV Charging Stations
 
Beama ev guide
Beama ev guideBeama ev guide
Beama ev guide
 
8 inch TFT-LCD Datesheet, AUO, 800*1280, MIPI Interface
8 inch TFT-LCD Datesheet, AUO, 800*1280, MIPI Interface8 inch TFT-LCD Datesheet, AUO, 800*1280, MIPI Interface
8 inch TFT-LCD Datesheet, AUO, 800*1280, MIPI Interface
 
IRJET - Single Phase Inverter using MOSFET
IRJET -  	  Single Phase Inverter using MOSFETIRJET -  	  Single Phase Inverter using MOSFET
IRJET - Single Phase Inverter using MOSFET
 
TechShanghai2016 - Reliable automotive-grade Isolators for new energy vehicles
TechShanghai2016 - Reliable automotive-grade Isolators for new energy vehiclesTechShanghai2016 - Reliable automotive-grade Isolators for new energy vehicles
TechShanghai2016 - Reliable automotive-grade Isolators for new energy vehicles
 
IRJET- Smart Battery Management
IRJET- Smart Battery ManagementIRJET- Smart Battery Management
IRJET- Smart Battery Management
 
IRJET- Speed Control of BLDC Motor using PID Tuned Fuzzy Controller
IRJET-  	  Speed Control of BLDC Motor using PID Tuned Fuzzy ControllerIRJET-  	  Speed Control of BLDC Motor using PID Tuned Fuzzy Controller
IRJET- Speed Control of BLDC Motor using PID Tuned Fuzzy Controller
 
Speed control of single phase induction motor by android bluetooth
Speed control of single phase induction motor by android bluetoothSpeed control of single phase induction motor by android bluetooth
Speed control of single phase induction motor by android bluetooth
 
IRJET- A Review Paper on Development of General Purpose Controller Board
IRJET- A Review Paper on Development of General Purpose Controller BoardIRJET- A Review Paper on Development of General Purpose Controller Board
IRJET- A Review Paper on Development of General Purpose Controller Board
 

Mais de Instansi

Mais de Instansi (20)

Heri Subagyo_Pupuk Kaltim_Manfaat Implementasi Sistem Manajemen Energi SNI IS...
Heri Subagyo_Pupuk Kaltim_Manfaat Implementasi Sistem Manajemen Energi SNI IS...Heri Subagyo_Pupuk Kaltim_Manfaat Implementasi Sistem Manajemen Energi SNI IS...
Heri Subagyo_Pupuk Kaltim_Manfaat Implementasi Sistem Manajemen Energi SNI IS...
 
Dewi Komalasari_BSN_SME-Persyaratan dengan pedoman penggunaan.pdf
Dewi Komalasari_BSN_SME-Persyaratan dengan pedoman penggunaan.pdfDewi Komalasari_BSN_SME-Persyaratan dengan pedoman penggunaan.pdf
Dewi Komalasari_BSN_SME-Persyaratan dengan pedoman penggunaan.pdf
 
Kristianto W_BSN_Dukungan SNI Dalam Meningkatkan Efisiensi Energi.pdf
Kristianto W_BSN_Dukungan SNI  Dalam Meningkatkan Efisiensi Energi.pdfKristianto W_BSN_Dukungan SNI  Dalam Meningkatkan Efisiensi Energi.pdf
Kristianto W_BSN_Dukungan SNI Dalam Meningkatkan Efisiensi Energi.pdf
 
EVS-06-33e.pdf
EVS-06-33e.pdfEVS-06-33e.pdf
EVS-06-33e.pdf
 
Battery Management System For Electric Vehicle Applications.pdf
Battery Management System For Electric Vehicle Applications.pdfBattery Management System For Electric Vehicle Applications.pdf
Battery Management System For Electric Vehicle Applications.pdf
 
EVS-08-19e.pdf
EVS-08-19e.pdfEVS-08-19e.pdf
EVS-08-19e.pdf
 
ANSI_EVSP_Roadmap_May_2013.pdf
ANSI_EVSP_Roadmap_May_2013.pdfANSI_EVSP_Roadmap_May_2013.pdf
ANSI_EVSP_Roadmap_May_2013.pdf
 
Final Product information and specification_20170802 to BSN.pdf
Final Product information and specification_20170802 to BSN.pdfFinal Product information and specification_20170802 to BSN.pdf
Final Product information and specification_20170802 to BSN.pdf
 
EVS-04-12e.pdf
EVS-04-12e.pdfEVS-04-12e.pdf
EVS-04-12e.pdf
 
EVS-1-08 (1).pdf
EVS-1-08 (1).pdfEVS-1-08 (1).pdf
EVS-1-08 (1).pdf
 
EVS-1-08.pdf
EVS-1-08.pdfEVS-1-08.pdf
EVS-1-08.pdf
 
SNI UNTUK DAYA SAING PRODUK DAN JASA.pdf
SNI UNTUK DAYA SAING PRODUK DAN JASA.pdfSNI UNTUK DAYA SAING PRODUK DAN JASA.pdf
SNI UNTUK DAYA SAING PRODUK DAN JASA.pdf
 
Tesis tentang Training Kompetensi
Tesis tentang Training KompetensiTesis tentang Training Kompetensi
Tesis tentang Training Kompetensi
 
Motivation at work Deck_HR Business Talks 18 January 2022.pdf
Motivation at work Deck_HR Business Talks 18 January 2022.pdfMotivation at work Deck_HR Business Talks 18 January 2022.pdf
Motivation at work Deck_HR Business Talks 18 January 2022.pdf
 
materi SNI dan CPPOB.pdf
materi SNI dan CPPOB.pdfmateri SNI dan CPPOB.pdf
materi SNI dan CPPOB.pdf
 
Smart City sesuai Standar ISO
Smart City sesuai Standar ISOSmart City sesuai Standar ISO
Smart City sesuai Standar ISO
 
Success story umkm_program_pembinaan_penerapan_sni-bsn_(2018)
Success story umkm_program_pembinaan_penerapan_sni-bsn_(2018)Success story umkm_program_pembinaan_penerapan_sni-bsn_(2018)
Success story umkm_program_pembinaan_penerapan_sni-bsn_(2018)
 
Menemukan ikigai dalam pekerjaan sehari hari
Menemukan ikigai dalam pekerjaan sehari hariMenemukan ikigai dalam pekerjaan sehari hari
Menemukan ikigai dalam pekerjaan sehari hari
 
ISO 37001 : Anti Bribery Management System Fraud & Bribery Concepts, Laws & R...
ISO 37001 : Anti Bribery Management System Fraud & Bribery Concepts, Laws & R...ISO 37001 : Anti Bribery Management System Fraud & Bribery Concepts, Laws & R...
ISO 37001 : Anti Bribery Management System Fraud & Bribery Concepts, Laws & R...
 
kebijakan pengembangan standar SNI
kebijakan pengembangan standar SNIkebijakan pengembangan standar SNI
kebijakan pengembangan standar SNI
 

Último

notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Último (20)

Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 

EVE-07-14e.pdf

  • 1. State Grid Corporation of China! Otc.2013! EV infrastructure and standardization in China!
  • 2. 1 Overview of EV infrastructure construction 2 Standardization of EV infrastructure in China Comparison of EV infrastructure Standards 3
  • 3. EV infrastructure! Charging ! Battery swap! On-board charging! Off-board charging! Commercial vehicle! Passenger car l  AC Charging spot! l  DC charger! l  Side-swapping! l  Rear-swapping! l  Bottom-swapping! Overview-types of infrastructure Private car Private car Public bus Public bus Sanitation vehicle Private car Taxi
  • 4. 【AC Charging Spot】 Item Spec. Coupler GB UI LCD / LED / VFD Keyboard Billing RFID / IC card Power AC 220V (380V) 50Hz ± 1Hz Output-U single-phase ,220V ± 10% Output-I ≤ 32A IP IP55 Communication interface RS485 / 2G / 3G Installation Pillar/Wallbox Overview-AC charging spot
  • 5. Item Spec. Coupler GB UI LCD / LED / VFD Keyboard Billing RFID / IC card Power AC 380V ± 10%,50Hz -60Hz Output DC 200-500V, 0-100A DC 300-700V, 0-250(600)A Efficiency (50%-100% load) ≥92% IP IP55 【DC Charger】 Overview-DC charger
  • 6. 【Battery swap station】 Side-swapping: applicable to commercial electric vehicles such as buses and sanitation trucks which have battery packs installed in both sides of the vehicle body. Rear-swapping: applicable to electric passenger vehicles such as private cars and taxis, with battery packs installed in the trunk of the vehicle body. Bottom-swapping: applicable to electric passenger vehicles such as private cars and taxis, with battery packs installed in the chasiss of the vehicle body. Overview-battery swap station
  • 7. Up to Jun.2013, SGCC has built 383 charging stations/battery swap stations and 15,333 AC charging spots.! Overview-main supplier
  • 8. Up to the end of 2012, CSG has built 18 charging stations/battery swap stations and 3,229 AC charging spots.! Overview-main supplier
  • 9. Up to the end of 2012, Potevio has built 74 charging stations.! Overview-main supplier
  • 10. 27,400   39,800   49,700   60,000   2012.12   2013.03   2013.07   pilot  city   na6onwide   Application of new energy vehicles in China! Overview-summary of NEV
  • 11. ISO/IEC China Safety Interface Interoperability Basic Component System Design Acceptance Comparison of the standard structure between ISO/IEC and China Standardization
  • 12. ISO/IEC China Corresponding of the standard IEC 61851 GB/T 18487-2001 GB/T 27930-2011 IEC 62196 ISO 15118 GB/T 20234-2011 GB/T  27930-­‐2011 Q/GDW  397-­‐2009   Q/GDW  398-­‐2009   Q/GDW  399-­‐2009   IEC 62840 GB/T 29317 Q/GDW  486-­‐2010   Q/GDW  487-­‐2010   Q/GDW  488-­‐2010   Q/GDW  685-­‐2011   Q/GDW  686-­‐2011   System Interface Communication Battery swap Standardization
  • 13. Na6onal  Standards   No Publish  No Name 1 GB/T  20234.1-­‐2011 Connec&on  set  of  conduc&ve  charging  for  electric  vehicles-­‐ Part  1:General  requirements 2 GB/T  20234.2-­‐2011 Connec&on  set  of  conduc&ve  charging  for  electric  vehicles-­‐ Part2:AC  Charging  coupler 3 GB/T  20234.3-­‐2011 Connec&on  set  of  conduc&ve  charging  for  electric  vehicles-­‐ Part3:DC  charging  coupler 4 GB/T  27930-­‐2011 Communica&on  protocols  between  off-­‐board  conduc&ve  charger  and   baCery  management  system  for  electric  vehicle 5 GB/T  28569-­‐2012 Electric  energy  metering  for  electric  vehicle  AC  charging  spot 6 GB/T  29317-­‐2012 Terminology  of  electric  vehicle  charging/baCery  swap  infrastructure   7 GB/T  29318-­‐2012 Electric  energy  metering  for  electric  vehicle  off-­‐board  charger    Maintenance  of  GB18487.1  Electric  vehicle  conduc&ve  charging   system  Part1:  General  requirement  (kick-­‐off  mee&ng  2013.09.02)   Milestone:  2013.12  1st    WD,      2014.03  2nd  WD,      2014.05  CD,      2014.09  FDIS Standardization (18  Industry  Standards    and  37  Enterprise  Standards  are  published  or  being  prepared.)
  • 14. China: Mode 2 and Mode 3 connection with single-phase(32A) power supply are recommended, three-phase is under consideration. Mode 2 Mode 1 Mode 3 Ø Mode 1 connection: normal socket-outlet charging Ø Mode 2 connection : normal socket-outlet with in cable control box Ø Mode 3 connection : dedicated AC charging spot AC charging coupler
  • 15. IEC 62196-2:2010 GB 20234.2-2011 Type1-U.S Type 2-Germany Type 3-Italy China Phase Current Voltage Single phase 32A(80A U.S) 250V Single/Three phase 70A/63A 480V Single phase 16A,32A/32A 250V,250V/500V Single phase (Three phase reserved) 16A,32A 250V/400V Pin & interlock 5-pin, mechanical lock 7-pin, electronic lock 4-pin, 5-pin 7-pin, mechanical lock (optional electronic lock) Control pilot pin Two short pins One short pin, one long pin Two short pins Male & female pin Plug: male Vehicle connector: female Plug: male Vehicle connector: male Dimensions Comparison-AC charging coupler
  • 16. Japan proposal CHAdeMO China proposal GB/T 20234 Connection set for conductive charging of electric vehicles Germany proposal AC & DC Combo coupler China Japan Europe/US Comparison-DC charging coupler
  • 17. Ø Communication Protocol International: China: Physical layer PLC CAN BUS Link/Network layer IP Based CAN Ø PWM pilot control International: China: EVSE side Voltage detection Current detection Comparison-Communication interconnection
  • 18. Thank you for your attention!