Table 6 identified environmental impacts & proposed mitigation
1. FFC Mirpur Mathelo Initial Environmental Examination
NEC Consultants (Pvt.) Limited 33
Table - 6 : Identified Environmental Impacts & Proposed Mitigation
Aspect Potential Impact Mitigation Measures
Responsible
Parties
(Implementation)
Monitoring
Indicator
Monitoring
& Reporting
Frequency
Responsible
Parties
(Monitoring)
Monitoring
reports to
be
submitted
Construction Phase
Noise
- Affect to nearby
people
- Proper tuning of
vehicles will be
assured to meet
NEQS limits
- FFC
- Contractor
- NEQS - Monthly - FFC / IMC
- SEPA @
quarterly
basis
Solid waste
- Nuisance in case
of improper
handling /
damaging
- Solid waste
management plan
will be developed
and implemented
that will include
efforts to minimize,
collect and disposal
of Solid waste
- FFC
- Contractor
- Implement
solid waste
managemen
t plan
- Monthly - FFC / IMC
- SEPA @
quarterly
basis
Fire hazard - Safety
- All necessary
measures will be
taken to ensure
safety and security
from fire hazard
- Watch guard duties
may be given to
locals.
- This will create
employment among
the locals and
acceptability of the
project.
- Contractor
- Incident /
Accident
Record
- Monthly - FFC / IMC
- SEPA @
quarterly
basis
2. FFC Mirpur Mathelo Initial Environmental Examination
NEC Consultants (Pvt.) Ltd. 34
Aspect Potential Impact Mitigation Measures
Responsible
Parties
(Implementation)
Monitoring
Indicator
Monitoring
& Reporting
Frequency
Responsible
Parties
(Monitoring)
Monitoring
reports to
be
submitted
Diesel Spillage - Nuisance
- Best practices will
be adopted for
Proper
procurement,
storage, and
dispensing of diesel
fuel.
- Incase diesel is
spilled, the area will
be cordoned off,
and soil affected
will be excavated
along with an
additional 3 inches
depth and will be
properly disposed
as directed by
competent
authorities.
- Contractor
- Visual
observation
- Monthly - FFC / IMC
- SEPA @
quarterly
basis
Waste Water - Nuisance
- A septic tank will be
developed for the
human excreta of
camp site.
- Water during hydro
testing shall be
properly disposed in
FFC waste water
treatment facility
- FFC
- Contractor
- BOD, TDS,
TSS,
- Monthly - FFC / IMC
- SEPA @
quarterly
basis
3. FFC Mirpur Mathelo Initial Environmental Examination
NEC Consultants (Pvt.) Ltd. 35
Aspect Potential Impact Mitigation Measures
Responsible
Parties
(Implementation)
Monitoring
Indicator
Monitoring
& Reporting
Frequency
Responsible
Parties
(Monitoring)
Monitoring
reports to
be
submitted
Air Quality
- Deterioration of
air quality
- Water showering of
excavated soil from
trenches.
- Contractor
- Visual
observation
- Monthly - FFC / IMC
- SEPA @
quarterly
basis
Socio-economy Issues
- Generation of
Employment
- It must be ensured
that construction
jobs should be given
to the locals.
- Contractors - Payroll - Monthly - FFC / IMC
- SEPA @
quarterly
basis
Operations Phase
Fire Hazard / Safety
- Damage to gas
pipeline via
vandalism /
terrorism
- All necessary
measures will be
taken to ensure
safety and security
from fire hazard
- Watch guard duties
may be given to
locals.
- This will create
employment among
the locals and
acceptability of the
project.
- FFC
- Contractor
- NEQS - Monthly - FFC / IMC
- SEPA @
quarterly
basis
Socio-economy Issues
- Generation of
Employment
- It must be ensured
that security /
watch guard jobs
should be given to
the locals.
- FFC - Payroll - Monthly - FFC / IMC
- SEPA @
quarterly
basis