1. EX.
FH
30m
FHR
2x4.5kg
DCP
F.H.
30m
FHR
2x4.5kg
DCP
30m
FHR
D/W
U/C FRIDGE
OVEN
FF
COFFEE
DRAIN POINT
PROVIDED BY BUILDER
AC-01
AC-02
AC-03
AC-04
C C C C
SITE ELECTRICIAN TO PROVIDE A
SUITABLE POWER POINT WITHIN 1m
OF EACH UNIT.
REFRIGERANT PIPES TO RISE TO
ROOF PLANT SLAB LEVEL. BUILDER
TO ALLOW FOR BOXED RISER
SHAFTS WHERE SLAB EXTENSION
ENDS TO ACCOMMODATE 4-off
SPACING.
400x
300 DG
400x
300 DG
400x
300 DG
400x400 WEATHER
LOUVRE c/w BURGLAR
BARS. WEATHER TO
ARCHITECT'S COLOUR
SPECIFICATION.
450X450 PENETRATION,c/w
25mm TIMBER FRAME -
400X400 CLEAR OPENING .
EF 01
EF 02
BS BOX 1
FAF 01ISOLATOR
PROVIDED BY
SITE ELECTRICIAN.
FAF 02
4 OFF 10.6 kW
(COOLING LOAD
CAPACITY) CASSETTE
UNIT INVERTERS,
220V/1ph/ 50Hz
KNOCKDOWNS FOR 400X400
CLEAR OPENINGS TO BE MADE
THROUGH FULL HEIGHT WALLS
TO ALLOW FRESH AIR
PASSAGE IN CEILING VOID.
BS BOX 1 BS
AC-06
AC-07
AC-08
AC-05
EF 03
GROUND STOREY
EXTRACTOR CANOPY
30m
FHR
2x4.5kg
DCP
30m
FHR
2x4.5kg DCP
F.H.
PLACE OF
REFUGE
(coms linked to
security)AC-14
AC-9
SITE ELECTRICIAN TO PROVIDE A
SUITABLE POWER POINT WITHIN 1m
OF EACH UNIT.
AC-12
AC-11
AC-10
AC-16
AC-15
C
C
C
C
C
C
REFRIGERANT PIPES TO RISE TO
ROOF PLANT SLAB LEVEL. BUILDER
TO ALLOW FOR BOXED RISER
SHAFTS WHERE SLAB EXTENSION
ENDS TO ACCOMMODATE 4-off
SPACING.
EF 04 300x300 WEATHER
LOUVRE c/w BURGLAR
BARS. WEATHER TO
ARCHITECT'S COLOUR
SPECIFICATION.
350X350 PENETRATION,c/w
25mm TIMBER FRAME -
300X300 CLEAR OPENING .
70 70
70
400 x
300 DG
BS BOX 1
BS BOX 1
AC-17
EF 05
2-OFF 8.2 kW
(COOLING LOAD
CAPACITY) CASSETTE
UNIT INVERTERS,
220V/1ph/ 50Hz
2- OFF 8.2 kW
(COOLING LOAD
CAPACITY) CASSETTE
UNIT INVERTERS,
220V/1ph/ 50Hz
1- OFF 10.6 kW
(COOLING LOAD
CAPACITY) CASSETTE
UNIT INVERTER,
220V/1ph/ 50Hz
1- OFF 8.2 kW
(COOLING LOAD
CAPACITY) CASSETTE
UNIT INVERTER,
220V/1ph/ 50Hz
KNOCKDOWNS FOR 400X400
CLEAR OPENINGS TO BE MADE
THROUGH FULL HEIGHT WALLS
TO ALLOW FRESH AIR
PASSAGE IN CEILING VOID.
400x
300 DG
400x400 WEATHER
LOUVRE c/w BURGLAR
BARS. WEATHER TO
ARCHITECT'S COLOUR
SPECIFICATION.
450X450 PENETRATION,c/w
25mm TIMBER FRAME -
400X400 CLEAR OPENING .
BS BOX 1
BS
BS
BS BOX 1
AC-13
FIRST STOREY
FAF 03
LEGEND
Drawn by : Zipho Zuma Checked by : Zaid Ally
04
Contract No. :
Scale : 1:100 Date : 06/09/2016
Drawing no. :
Rev.
Project Name :
Drawing Title :
MYK FAMILY TRUST
Y. PATEL
SACAP Reg No 5218
GROUND & FIRST FLOOR LAYOUT
MECHANICAL VENTILATION
1500-MV1-101
Owner's Signature :
Name Sign
Architect's Signature :
Name Sign
ALTERATIONS & ADDITIONS TO CONVERT EX.
RESIDENTIAL BUILDING TO PLACE OF INSTRUCTION FOR
THE MYK FAMILY TRUST ON SUB 14 (OF 9)OF LOT 10627
DURBAN
18 ALBANY GROVE DURBAN
CONSULTANT SIGNATURE:
1103 MERCURY HOUSE, 320 SMITH STREET,
DURBAN 4001
TEL : (031) 301 2253 , FAX : (031) 301 2253