1. CURRICULM VITAE
Name: Anikin Andrey
Date of birth : 04.12.1976
Education: High Education. Donetsky Government Technician Universities
(Ukrain) in 1998
Specialty: Mechanical Engineer
Experience: 2005- till now – “EICC” Ltd. Moscow
– Chief mechanical engineer
2001 – 2004 – JSC “Stroytransgas”
– Mechanical engineer in Algeria
1998 – 2001 – "Dorstroytech" Ltd.
– Mechanical engineer
Participation in
Construction of
Pipelines:
1. Oil pipeline KTK (Russia)
2. Oil pipeline in Algeria
3. Oil pipeline Melut Basin in Sudan
4. PC Ivanovskaya
5. Reconstruction Main gas pipeline Parabel-Kuzbass
6. Telecommunication gas pipeline LPU Novosibirsk
“Tomsktransgas”
7. PC Proskokovo “Tomsktransgas”
Responsibilities: Monitoring for operation and maintenance of civil
Equipment & vehicles
2. CURRICULUM VITAE
Name: Ereschenko Alexsander
Date of birth : 28.10.1953 г.
Education: High Education. Ukraine Agricultural Academy in 1985
Specialty: Automatic agricultural industry.
Experience: 2002 – till now – “EICC” Ltd. Moscow
– technician, engineer, senior engineer
1985 – 2002 – Radio Set Factory
– engineer of instrument and automatic
– senior electrician engineer
1980 – 1985 – Komintern plant
– senior electrician engineer
– senior engineer of instrument and automatic
Participation in
construction of
pipelines: 1. Oil pipeline in Kouybyshev - Odessa
2. Oil pipeline “Friendship”
3. PC Ivanovskaya
4. Telecommunication gas pipeline LPU Novosibirsk
“Tomsktransgas”
5. PC Proskokovo “Tomsktransgas”
6. Oil pipeline Melut Basin in Sudan
7. Oil pipeline in Algeria
- Houd El Hamra-Arzev 34". OZ-2.
- Pump stations in Kenanda
8. Main gas pipeline Sougueur-Hadjret Ennous in Algerias
Responsibilities: - Installation of electric power supply systems
- Installation and commissioning of CP
- Installation and commissioning of instrument and
control automatic system
- Commissioning of processing valves
- Commissioning
- Putting into operation & Start up
3. CURRICULUM VITEA
Name: Fedyaev Andrey
Date of birth : 31.10.1966
Education: High Education. Graduated from oil institute in Ufa
city (Russia) in 1994
Specialty: Chemical Equipment at chemical plants. Mechanical Engineer
Experience: 2005 – till now – “EICC” Ltd. Moscow
– chief engineer
2000 – 2005 – “Kvantor” Co
– pre-commission & commission
mechanical engineer.
1986 – 2000 – Combined heat power plant in Ufa city
– Chief of turbine department
Participation in
construction of
pipelines: 1. Gas and oil pipeline in Bashneftgas (Bashkiriay)
2. Oil pipeline in Tengiz - Novorossiysk, KTK (Kazakhstan)
3. Oil pipeline in Algeria
4. Oil pipeline Kenkiak – Atyrow (Kazakhstan)
5. Terminal of Sea Primorsk (Russia)
6. PC Ivanovskaya
7. Telecommunication gas pipeline LPU Novosibirsk
“Tomsktransgas”
8. PC Proskokovo “Tomsktransgas”
9. Oil pipeline Melut Basin in Sudan
10. Oil pipeline in Algeria
- Houd El Hamra-Arzev 34". OZ-2.
- Pump stations in Kenanda
11. Main gas pipeline Sougueur-Hadjret Ennous in Algerias
12. Main pipeline 40” Skikda
Responsibilities: - Equipment adjusting at gas &oil pipeline
- Commissioning of processing valves
- Commissioning
- Putting into operation & Start up
4. CURRICULM VITAE
Name: Lerner Boris
Date of birth : 19.04.1942.
Education: High Education. Ivanovo Chemical Technological Institute
(Russia) in 1965
Specialty: Engineer of Instrumentation and Automatic
Experience: 1994 - till now – “EICC” Ltd. Moscow
– General manager
1970 – 1994 – “Gazmontaghavtomatika” Moscow
– foreman, chief engineer, director
1968 – 1970 – “Energoremnaladka” Kemerovo
– chief engineer
1965 – 1970 – plant “Kuzbasselement” Kemerovo
– engineer, senior engineer
Participation in
construction of
pipelines: 1. Gas pipeline Urengoy – Pomary - Uzhgorod
2. Gas pipeline Bukhara - Ural
3. Gas pipeline Middle Asia - Center
4. Gas pipeline “Union”
5. Gas pipeline Ukhta - Torzhok
6. Gas pipeline BGR - TFA
7. Oil pipeline Surgut - Polotsk
8. Gas pipeline and branches in Greece
9. Oil pipeline “Friendship”
10. Oil pipeline Kuybyshev - Lisichansk
11. Gasoline pipeline in Macedonia
12. Gas pipeline in Libya
13. Reconstruction Main gas pipeline Parabel-Kuzbass
14. Pump station in Riazan
15. Reservoirs in Nikolskoe
16. Ammonia pipeline Toliati – Odessa
17. Oil pipeline Kenkiak - Atyrow
18. Pump station in Kotur - Tepe
19. Centre calculation for oil Russia – Ukraine (Chertkovo)
20. Iodine plant of Krasnovodsk
21. Gas treatment plant of Mubarek
22. Multipurpose gas treatment plant in Schatlyk
23. Multipurpose gas treatment plant in Kenkiak
24. Multipurpose gas treatment plant in Schakh – Pakhty
25. PC Ivanovskaya
26. Telecommunication gas pipeline LPU Novosibirsk
“Tomsktransgas”
27. PC Proskokovo “Tomsktransgas”
28. Oil pipeline Melut Basin in Sudan
29. Oil pipeline in Algeria
- Houd El Hamra-Arzev 34". OZ-2.
- Pump stations in Kenanda
30. Main gas pipeline Sougueur-Hadjret Ennous in Algerias
31. Main pipeline GK1 40” Uled Gellal-Skikda
5. Responsibilities: - Installation of electric power supply systems
- Installation and commissioning of CP
- Installation and commissioning of instrument and
control automatic system
- Commissioning of processing valves
- Commissioning
- Putting into operation & Start up
6. CURRICULM VITAE
Name: Lobach Andrey
Date of birth : 21.01.1959 г.
Education: High Education. Moscow Electrical Institute (Russia) in 1982
Specialty: Electrician Engineer
Experience: 1993- till now – “EICC” Ltd. Moscow (SARL ELIC)
– chief mechanic engineer and site manager, general manager
SARL ELIC
1984 г. – 1992 г. – “Gazmontaghavtomatika”
– commission engineer of instrument and avtomatic
control system
1982 г. – 1984 г. – design bureau of Communication Ministry
in USSR – design engineer
Participation in
construction of
pipelines: 1. Oil pipeline construction in Cuba
2. Gas pipeline and branches in Greece
3. Gasoline pipeline in Macedonia
4. Oil pipeline in Algeria
5. Urengou – Pomary – Yzhgorod in Russia
6. Oil pipeline in Algeria
- Houd El Hamra-Arzev 34". OZ-2.
- Pump stations in Kenanda
7. Main gas pipeline Sougueur-Hadjret Ennous in Algerias
8. Main pipeline GK1 40” Uled Gellal-Skikda
9. Gas pipeline GREO 28” Rocade Est-Ouest
10. Gas pipeline LZ2 24” GPL Hassi-Rmel-Arzev
Responsibilities: - Installation of electric power supply systems
- Installation and commissioning of CP
- Installation and commissioning of instrument and
control automatic system
- Commissioning of processing valves
- Commissioning
- Putting into operation & Start up
Foreign language: English
Promoted to position: Chief Coordinator
7. CURRICULM VITAE
Name: Struzh Roman
Date of birth : 17.12.1966
Education: High Education. Forestry engineering Institute in L’vov in 1980
Specialty: Automatic process
Engineer of instrument and automatic
Experience: 2002 - till now – “EICC” Ltd. Moscow
Senior- engineer;
- foreman.
2000 – 2001 – “Eventa” Ltd.
- chief mechanic
- chief engineer
Participation in
construction of
pipelines: 1. Oil pipeline Kuybyschev - Odessa
2. Oil pipeline in Algeria
3. Main gas pipeline in Greece
4. PC Ivanovskaya
5. Telecommunication gas pipeline LPU Novosibirsk
“Tomsktransgas”
6. PC Proskokovo “Tomsktransgas”
7. Oil pipeline Melut Basin in Sudan
8. Oil pipeline in Algeria
- Houd El Hamra-Arzev 34". OZ-2.
- Pump stations in Kenanda
9. Main gas pipeline Sougueur-Hadjret Ennous in Algerias
10. Gas pipeline in Tourkmenia
Responsibilities: - Installation of electric power supply systems
- Installation and commissioning of CP
- Installation and commissioning of instrument and
control automatic system
- Commissioning of processing valves
- Putting into operation
8. CURRICULM VITAE
Name: Tuzhik Vladimir
Date of birth : 14.08.1950 г.
Education: Zhitomir Technicial School N1 in 1968
Specialty: Cogeneration and turbine plants of thermoelectric
power station
Experience: 2003- till now – “EICC” Ltd. Moscow
– senior engineer
2001 - 2003 – OAO “Stroytransgaz”
– installer, engineer construction
1991 - 1998 – OAO “Zarubezhneftegazstroy”
– installer, engineer construction
1990 - 1991 – Specialized directorate №20 of the
“Priobtruboprovodstroy” Trust
– installer of pipelines
1989 - 1990 – OAO “Zarubezhneftegazstroy”
– installer of pipelines
1981 - 1989 – Specialized directorate №20 of the
“Priobtruboprovodstroy” Trust
– installer of pipelines
Participation in
construction of
pipelines: 1. The Igrim – Serov Gas Pipeline
2. The Urengoy – Pomary - Uzhgorod Gas pipeline
3. Oil pipeline in Iraq
4. Gas Pipeline and branches in Greece
5. Gas pipeline in Libya
6. Reconstruction Main gas pipeline Parabel-Kuzbass
7. PC Ivanovskaya
8. Telecommunication LPU Novosibirsk “Tomsktransgas”
9. PC Proskokovo “Tomsktransgas”
10. Oil pipeline Melut Basin in Sudan
11. Oil pipeline in Algeria
- Houd El Hamra-Arzev 34". OZ-2.
- Pump stations in Kenanda
12. Main gas pipeline Sougueur-Hadjret Ennous in Algerias
Responsibilities: - Installation of pipelines
- Installation, pre-commissioning of block valves
- Commissioning of processing valves
- Delivery of product
- Commissioning
- Putting into operation & Start up
9. CURRICULM VITAE
Name: Zakharov Mikhail
Date of birth : 09.11.1978
Education: High Education. Building Institute in Rostov (Russia) in 2000
Specialty: Rail Road Engineer
Experience: 2005 – till now – “EICC” Ltd. Moscow
– Senior engineer
2000 – 2005 – SD “Uzhenergogas”
– senior engineer
Participation in
construction of
pipelines: 1. Gas pipeline “Orenburg – Zainsk” Orenburgasprom
2. Gasoline pipeline “Orenburg – Tuimazy” Orenburgasprom
3. Gasoline pipelines Orenburgasprom
4. Gas pipeline “Belousovo – Leningrad” Mostransgas
5. Gas pipeline “Gorkiy – Center” Mostransgas
6. Gas pipeline “Vykhino – Golovno” Mostransgas
7. Gas pipeline “Torzhok – Minsk - Ivatschevichi” Lentransgas
8. Oil pipeline in Sudan
9. PC Ivanovskaya
10. Telecommunication LPU Novosibirsk “Tomsktransgas”
11. PC Proskokovo “Tomsktransgas”
12. Oil pipeline Melut Basin in Sudan
29. Oil pipeline in Algeria
- Houd El Hamra-Arzev 34". OZ-2.
- Pump stations in Kenanda
Responsibilities: - Installation of electric power supply systems
- Installation and commissioning of CP
- Installation and commissioning of instrument and
control automatic system
- Commissioning
- Putting into operation & Start up