By
R. Harry Eddyarso
PT. SARIPARI PERTIWI ABADI
“KMI Goes to Campus Program”
Komunitas Migas Indonesia – Universitas Trisakti
25 November 2006
WE DO APPRECIATE HALLIBURTON AND POWER
WELL SERVICE GROUPS FOR PROVIDING THE WELL
TESTING PRESENTATION MATERIALS FOR LESSON
LEARNED SHARING AND EDUCATIONAL PURPOSES
…….
STATEMENT of APPRECIATION
Finding The Reservoir : Seismic Survey
Making Access to The Reservoir : Drilling
Optimizing The Reservoir : Testing
Evaluating The Reservoir : Logging
Producing The Reservoir : Completion
SEISMIC ALONG WELL PATH
3D DATA
Depth Structure Map
Top B-29A2 Base B-29A2
c.i =25’
Types Of Well Testing Equipment
• DST
(Drill Stem Testing)
DST
Open Hole Cased Hole Barefoot
• STE (Surface
Testing Eqpt.)
STE
Exploration Clean Ups Production
Guide to Better Service and Correct
Sizing of Equipment
Guide to Better Service and Correct
Sizing of Equipment
1. What is the estimated highest pressure at
the wellhead ?.
2. What is the lowest pressure at wellhead ?.
3. What are the expected maximum and
minimum effluent rates ?. Gas/Oil/Water ?.
4. Is the effluent sweet or does it contain
corrosives ?. If it does contain corrosives,
what are the expected highest concentrations of
H2S (This will also include CO2 amounts).
Guide to Better Service and Correct
Sizing of Equipment (Continued)
Guide to Better Service and Correct
Sizing of Equipment (Continued)
5. What is the expected A.P.I. of liquid hydrocarbon
and the specific gravity of gas ?.
6. What is the customer’s requirement for disposal
or storing of liquid hydrocarbon and H2O ?.
7. Are there any special requirements such as
governing bodies’ special rules or regulations,
i.e., maximum weight restrictions, etc. ?.
DRILL STEM TESTING
Definition
• Temporary completion of a well to gather
reservoir data and information for
evaluation.
• Measurement of formation parameters and
characteristics are under dynamic
conditions. Disturbance (flow) of the
formation is measured (Pressure
transient).
Objectives
• Identify the formation
fluid
• Determine the rate at
which fluids can be
produced
• Determine reservoir
parameters
(Productivity, Permeability,
Well Bore Damage, etc )
• Calculating the
Economic Feasibility
of the Well
DRILL STEM TESTING
SECONDARY
CIRCULATING VLV.
DRILL COLLARS
PRIMARY
CIRCULATING VLV.
TESTER VLV.
WORK STRING
PRESSURE /
TEMPERATURE RECORDERS
PACKER BYPASS
PACKER
DRILL COLLARS
DRILL STEM TESTING
PACKER
• Will safely separate well in two sections.
• Will protect formation
• Allow flowing the well inside Tubing while Isolating
the Annulus
PACKER
• Will safely separate well in two sections.
• Will protect formation
• Allow flowing the well inside Tubing while Isolating
the Annulus
PACKER By Pass
• Will divert mud while tripping in and out of the hole.
• Will protect Packer elements during circulation.
• Allow equalization of differential pressure when
unsetting packer
PACKER By Pass
• Will divert mud while tripping in and out of the hole.
• Will protect Packer elements during circulation.
• Allow equalization of differential pressure when
unsetting packer
Pressure Temperature Recorders
• Will record pressure transient
• Must be carried safely and must be protected.
• Location in the string can vary.
• Multiple options exists
Pressure Temperature Recorders
• Will record pressure transient
• Must be carried safely and must be protected.
• Location in the string can vary.
• Multiple options exists
SECONDARY
CIRCULATING VALVE
DRILL COLLARS
PRIMARY
CIRCULATING VALVE
TESTER VALVE
WORK STRING
Pressure / Temperature
Recorders and Carriers
Packer Bypass
Packer
DRILL COLLARS
DRILL STEM TESTING
Tester Valve
• Will provide DOWN HOLE closure.
• Will add a safety barrier. Allow pressure control
inside the string.
• Various types, some allow to “Lock Open” and can
be reversed to “Normal Mode”.
Tester Valve
• Will provide DOWN HOLE closure.
• Will add a safety barrier. Allow pressure control
inside the string.
• Various types, some allow to “Lock Open” and can
be reversed to “Normal Mode”.
Drill Collars
• Will provide a SAFE separation between Ball Valves.
• Will add weight to packer protecting the Tubing.
Drill Collars
• Will provide a SAFE separation between Ball Valves.
• Will add weight to packer protecting the Tubing.
Primary Circulating Valve
• Will provide a mean to circulate without unsetting the
packer. (Before and/or after the DST, and with NO
manipulation of the Tubing)
• Will be re-closable.
• Can isolate formation during circulation, adding
safety to the operation.
Primary Circulating Valve
• Will provide a mean to circulate without unsetting the
packer. (Before and/or after the DST, and with NO
manipulation of the Tubing)
• Will be re-closable.
• Can isolate formation during circulation, adding
safety to the operation.
SECONDARY
CIRCULATING VALVE
Drill Collars
Primary Circulating Valve
Tester Valve
WORK STRING
Pressure / Temperature
Recorders and Carriers
Packer Bypass
Packer
Drill Collars
DRILL STEM TESTING
Secondary Circulating Valve
• To provide a mean to circulate if the primary
circulating valve fails. (Before or after the DST, and
with NO manipulation of the Tubing)
• Could be re-closable, or a one shot.
• Can isolate formation during circulation, adding
safety to the operation.
Secondary Circulating Valve
• To provide a mean to circulate if the primary
circulating valve fails. (Before or after the DST, and
with NO manipulation of the Tubing)
• Could be re-closable, or a one shot.
• Can isolate formation during circulation, adding
safety to the operation.
Work String
• To provide a conduct for the hydrocarbons to
surface.
• To have a mean to operate mechanical tools, such as
Packers or other valves.
• Typically in Cased Hole DST Tubing will be used. In
Open Hole DST Drill Pipe will be used.
Work String
• To provide a conduct for the hydrocarbons to
surface.
• To have a mean to operate mechanical tools, such as
Packers or other valves.
• Typically in Cased Hole DST Tubing will be used. In
Open Hole DST Drill Pipe will be used.
TOOL SYSTEM APPLICATIONS
• OPEN HOLE
• CASED HOLE
DRILL STEM TESTING
TYPICAL
OPEN HOLE
DRILL STEM
TESTING
SYSTEM
IMPACT SUB REV. CIRC. VLV.
DRILL PIPE
DRILL COLLARS
DUAL CIP VALVE
HYDROSPRING TESTER VLV.
PRESSURE RECORDER
VR SAFETY JOINT
ANCHOR PIPE SAFETY JT.
TEMPERATURE RECORDER
NR PACKER
BIG JOHN JAR
FLUSH JOINT ANCHOR
PRESSURE RECORDER
TYPICAL
CASED HOLE
DRILL STEM
TESTING
SYSTEM
RD SAFETY CIRCULATING VLV.
PREMIUM THREADED TUBING
DRILL COLLARS
EXPRESS CIRCULATING VLV.
SURFACE READOUT SYSTEM
SELECT TESTER VLV.
MPV VALVE
PRESSURE / TEMPERATURE REC.
CHAMP IV PACKER
VERTICAL SHOCK ABSORBER
TIME DELAY FIRING HEAD
R/A TAG SUB
BIG JOHN JAR
RTTS SAFETY JOINT
WORK STRING
RADIAL SHOCK ABSORBER
VANN GUNS
BELOW PKR. HYD. SAFETY JOINT
Surface Well Test Package
Surface Test Tree
Data Header
Choke Manifold
Steam Heat Exchanger
Indirect Fired Heater
Separator
Test Tank
Transfer Pump
Burner Boom
Burner Head
Air Inlet
Oil Inlet
Igniter Connections
Nozzle
Gas
Jets
Pilot
Chemical Injection Pump
Well Test Lab
Air Compressor
SCAN (Surface Computerized Acquisition Network)
– PowerWell Services SCAN combines the most up-to date electronic hardware
and data gathering software for unbeatable performance during well test
operations.
– Present equipment consists of Computer and peripherals connected to
transducers and transmitters measuring pressure, temperature, and flow rates.
Data Acquisition
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
11000
12000
13000
14000
15000
16000
10/2712:00:00
10/2800:00:00
10/2812:00:00
10/2900:00:00
10/2912:00:00
10/3000:00:00
10/3012:00:00
10/3100:00:00
10/3112:00:00
11/0100:00:00
11/0112:00:00
11/0200:00:00
11/0212:00:00
11/0300:00:00
11/0312:00:00
11/0400:00:00
11/0412:00:00
11/0500:00:00
11/0512:00:00
11/0600:00:00
Pressure(psi)
Time (mm/dd hh:mm:ss)
60
80
100
120
140
160
180
200
220
240
260
Temperature(°F)
Pressure Inflection Point Temperature
Pressure up
tubing to fire
the guns
Shut in at the choke
manifold and cycle
the OMNI to spot
diesel to lower the
hydrostatic head
Pre-stimulation flow
period for formation
cleanup.
Acidising the formation by
bullheading from surface
Post-Stimulation
flowback and cleanup
Steady flow on
a small choke
Pressure buildup
Second flow period
for sample catching
Pressure & Temperature History Plot for Marrat Object II
Reporting Formats
The Software Gives The Operator The Ability To Create Custom Report Formats
And Save Them For Later Use
Emergency Shutdown System
• The Emergency Shutdown (ESD) system consists of a panel which maintains 1500 psig hydraulic pressure via
a flexible high pressure hose to the Surface Safety Valve or Surface Test Tree flow wing valve. The hydraulic
pressure holds the valve open. In the ESD mode this hydraulic pressure can only be maintained provided the
control valve inside the panel is held closed by a pilot air supply of approximately 40 psig.
• This 40 psig pilot air line is fed via ¼" plastic hose to Hi/Lo pressure pilots and ESD push button stations
situated around the installation:
• Upstream of the choke manifold providing overpressure and line rupture protection for the high pressure
pipework.
• Downstream of the choke manifold providing overpressure and line rupture protection for the low pressure
pipework.
• On the holding tank providing overpressure protection of the vessel.
• On the Heat Exchanger shell providing overpressure protection of the shell if the coils rupture.
• On the low pressure coils of the heat exchanger, providing overpressure protection in the event of a blockage
downstream.
• On the high pressure coils of the heat exchanger, providing overpressure protection in the event of a blockage
upstream.
• Push buttons situated : a) In driller dog house, b) Outside Company office, c) At escape lifeboats, d) In the
welltest area, e) On the ESD panel
• Should any of the Hi/Lo pilots detect over/under pressure during the flow period the pilot air pressure would be
vented, causing the panel control valve to dump the hydraulic pressure that holds the actuator valve open.
The spring inside the actuator closes the actuator valve.
• Should any of the ESD buttons be activated, again the pilot air supply would be dumped and the same
sequence of events would occur.
• A manual override is incorporated in the panel and isolation valves are installed at the Hi/Lo pilots to allow for
pressure testing of the system.
Emergency Shutdown System
Fusible
Plug
S.T.T.
Manifold Optional Remote
E.S.D. Station
Pneumatic
Hydraulic
Hydraulic Return
Hydraulic
Quick Exhaust
Fusible
Plug
DS Pilot DS Pilot DS Pilot DS Pilot
Hydraulic
Actuator
Choke
Manifold
Heat Exchanger Separator Test Tank Pump Burner
05 well testing   trisakti 25 nov 2007

Mais conteúdo relacionado

Mais procurados

Packers & bridge plugs
Packers & bridge plugsPackers & bridge plugs
Fluids & cementing 2022-2023 (1) (1).pdf
Fluids & cementing 2022-2023 (1) (1).pdfFluids & cementing 2022-2023 (1) (1).pdf
Fluids & cementing 2022-2023 (1) (1).pdf
LokmanDridah
 
Q922+de2+l08 v1
Q922+de2+l08 v1Q922+de2+l08 v1
Q922+de2+l08 v1
AFATous
 

Mais procurados (20)

Packers & bridge plugs
Packers & bridge plugsPackers & bridge plugs
Packers & bridge plugs
 
Well Integrity.pptx
Well Integrity.pptxWell Integrity.pptx
Well Integrity.pptx
 
Well control intro presentation
Well control intro presentationWell control intro presentation
Well control intro presentation
 
Side sliding door ssd
Side sliding door ssdSide sliding door ssd
Side sliding door ssd
 
Drill string
Drill stringDrill string
Drill string
 
Coiled Tubing Conveyed Perforations
Coiled Tubing Conveyed PerforationsCoiled Tubing Conveyed Perforations
Coiled Tubing Conveyed Perforations
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operations
 
Drilling Problems.pdf
Drilling Problems.pdfDrilling Problems.pdf
Drilling Problems.pdf
 
Descontrol de pozos
Descontrol de pozosDescontrol de pozos
Descontrol de pozos
 
Rig Operations & Equipment
Rig Operations & EquipmentRig Operations & Equipment
Rig Operations & Equipment
 
Well logging oylex
Well logging oylexWell logging oylex
Well logging oylex
 
Fluids & cementing 2022-2023 (1) (1).pdf
Fluids & cementing 2022-2023 (1) (1).pdfFluids & cementing 2022-2023 (1) (1).pdf
Fluids & cementing 2022-2023 (1) (1).pdf
 
Well Planning
Well PlanningWell Planning
Well Planning
 
Problems during Drilling a Well
Problems during Drilling a WellProblems during Drilling a Well
Problems during Drilling a Well
 
Wellhead basics
Wellhead basicsWellhead basics
Wellhead basics
 
Caving Remedies
Caving RemediesCaving Remedies
Caving Remedies
 
Completion equipment packer part #1
Completion equipment packer part #1Completion equipment packer part #1
Completion equipment packer part #1
 
Q922+de2+l08 v1
Q922+de2+l08 v1Q922+de2+l08 v1
Q922+de2+l08 v1
 
Packers
PackersPackers
Packers
 
Well completion equipment 2. landing nipples
Well completion equipment  2. landing nipplesWell completion equipment  2. landing nipples
Well completion equipment 2. landing nipples
 

Destaque

Well Test Analysis in Horizontal Wells
Well Test Analysis in Horizontal WellsWell Test Analysis in Horizontal Wells
Well Test Analysis in Horizontal Wells
Sohil Shah
 
Shail Soni- Internship Presentation
Shail Soni- Internship PresentationShail Soni- Internship Presentation
Shail Soni- Internship Presentation
Shail Soni
 

Destaque (20)

PetroSync - Well Test Analysis
PetroSync - Well Test AnalysisPetroSync - Well Test Analysis
PetroSync - Well Test Analysis
 
Well test procedures manual
Well test procedures manualWell test procedures manual
Well test procedures manual
 
Well Test Analysis in Horizontal Wells
Well Test Analysis in Horizontal WellsWell Test Analysis in Horizontal Wells
Well Test Analysis in Horizontal Wells
 
Well Teste Interpretation
Well Teste InterpretationWell Teste Interpretation
Well Teste Interpretation
 
Well test analysis
Well test analysisWell test analysis
Well test analysis
 
Well Test Design
Well Test DesignWell Test Design
Well Test Design
 
Well Test Analysis in Horizontal Wells
Well Test Analysis in Horizontal WellsWell Test Analysis in Horizontal Wells
Well Test Analysis in Horizontal Wells
 
Curso TDD Ruby on Rails #01: Introducción al testing
Curso TDD Ruby on Rails #01: Introducción al testingCurso TDD Ruby on Rails #01: Introducción al testing
Curso TDD Ruby on Rails #01: Introducción al testing
 
Fundamentals of Petroleum Engineering Module 2
Fundamentals of Petroleum Engineering Module 2Fundamentals of Petroleum Engineering Module 2
Fundamentals of Petroleum Engineering Module 2
 
Principles of seismic data interpretation m.m.badawy
Principles of seismic data interpretation   m.m.badawyPrinciples of seismic data interpretation   m.m.badawy
Principles of seismic data interpretation m.m.badawy
 
Well test-procedures-manual
Well test-procedures-manualWell test-procedures-manual
Well test-procedures-manual
 
Well lod ,well Testing and mud logging Ghulam Abbas Abbasi
Well lod ,well Testing and mud logging Ghulam Abbas AbbasiWell lod ,well Testing and mud logging Ghulam Abbas Abbasi
Well lod ,well Testing and mud logging Ghulam Abbas Abbasi
 
Shail Soni- Internship Presentation
Shail Soni- Internship PresentationShail Soni- Internship Presentation
Shail Soni- Internship Presentation
 
Testes de pressão em poços de petróleo
Testes de pressão em poços de petróleo Testes de pressão em poços de petróleo
Testes de pressão em poços de petróleo
 
Presentación well testing
Presentación well testingPresentación well testing
Presentación well testing
 
Inovaçoes Tecnologicas para o Pre Sal
Inovaçoes Tecnologicas para o Pre SalInovaçoes Tecnologicas para o Pre Sal
Inovaçoes Tecnologicas para o Pre Sal
 
EarthSci 3 - Minerals and Rocks
EarthSci 3 - Minerals and Rocks EarthSci 3 - Minerals and Rocks
EarthSci 3 - Minerals and Rocks
 
Well testing report
Well testing reportWell testing report
Well testing report
 
Pangtong Wellhead USA Inc.
Pangtong Wellhead USA Inc.Pangtong Wellhead USA Inc.
Pangtong Wellhead USA Inc.
 
SOR-WellheadPressure
SOR-WellheadPressureSOR-WellheadPressure
SOR-WellheadPressure
 

Semelhante a 05 well testing trisakti 25 nov 2007

Pressure safety valves
Pressure safety valvesPressure safety valves
Pressure safety valves
Amol Dudhate
 
Digester cleaning
Digester cleaningDigester cleaning
Digester cleaning
Bio Nomic
 

Semelhante a 05 well testing trisakti 25 nov 2007 (20)

Wen_Design.ppt
Wen_Design.pptWen_Design.ppt
Wen_Design.ppt
 
How to Select the Right Valve for your Application
How to Select the Right Valve for your ApplicationHow to Select the Right Valve for your Application
How to Select the Right Valve for your Application
 
Relief Systems.pdf
Relief Systems.pdfRelief Systems.pdf
Relief Systems.pdf
 
Relief systems
Relief systemsRelief systems
Relief systems
 
Balancing Cost, Performance and Reliability when Choosing Solenoid Valves
Balancing Cost, Performance and Reliability when Choosing Solenoid ValvesBalancing Cost, Performance and Reliability when Choosing Solenoid Valves
Balancing Cost, Performance and Reliability when Choosing Solenoid Valves
 
Valve
ValveValve
Valve
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and more
 
wellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdfwellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdf
 
PSV Sizing.pdf
PSV Sizing.pdfPSV Sizing.pdf
PSV Sizing.pdf
 
Pressure safety valves
Pressure safety valvesPressure safety valves
Pressure safety valves
 
Sprinkler system
Sprinkler systemSprinkler system
Sprinkler system
 
Boiler Mountings
Boiler MountingsBoiler Mountings
Boiler Mountings
 
Digester cleaning
Digester cleaningDigester cleaning
Digester cleaning
 
Hydrotest
HydrotestHydrotest
Hydrotest
 
Well Complection - Basic-1.pptx
Well Complection - Basic-1.pptxWell Complection - Basic-1.pptx
Well Complection - Basic-1.pptx
 
4_5854850146042385629.pdf
4_5854850146042385629.pdf4_5854850146042385629.pdf
4_5854850146042385629.pdf
 
The basic anaesthesia machine
The basic anaesthesia machineThe basic anaesthesia machine
The basic anaesthesia machine
 
Control valve
Control valveControl valve
Control valve
 
Control_Valve_maintenance and calibration.pdf
Control_Valve_maintenance and calibration.pdfControl_Valve_maintenance and calibration.pdf
Control_Valve_maintenance and calibration.pdf
 
Well stimulation.pptx
Well stimulation.pptxWell stimulation.pptx
Well stimulation.pptx
 

Mais de yudi05

224572323-Petunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdf
224572323-Petunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdf224572323-Petunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdf
224572323-Petunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdf
yudi05
 
pengukuran dg total station.pdf
pengukuran dg total station.pdfpengukuran dg total station.pdf
pengukuran dg total station.pdf
yudi05
 
Petunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdf
Petunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdfPetunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdf
Petunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdf
yudi05
 
MATH rekreasi.ppt
MATH rekreasi.pptMATH rekreasi.ppt
MATH rekreasi.ppt
yudi05
 
Dasar-dasar K31_Tbg_pres..ppt
Dasar-dasar K31_Tbg_pres..pptDasar-dasar K31_Tbg_pres..ppt
Dasar-dasar K31_Tbg_pres..ppt
yudi05
 
06 hydraulic workover unit trisakti 25 nov 2007
06 hydraulic workover unit   trisakti 25 nov 200706 hydraulic workover unit   trisakti 25 nov 2007
06 hydraulic workover unit trisakti 25 nov 2007
yudi05
 
03 drilling recent development ui 17 sep 2007
03 drilling recent development   ui 17 sep 200703 drilling recent development   ui 17 sep 2007
03 drilling recent development ui 17 sep 2007
yudi05
 
02 drilling preparation ui 15 sep 2007
02 drilling preparation   ui 15 sep 200702 drilling preparation   ui 15 sep 2007
02 drilling preparation ui 15 sep 2007
yudi05
 
Pelajaran bahasa-arab-kelas-iii-sd
Pelajaran bahasa-arab-kelas-iii-sdPelajaran bahasa-arab-kelas-iii-sd
Pelajaran bahasa-arab-kelas-iii-sd
yudi05
 
Buku bahasa arab_mi_4_siswa
Buku bahasa arab_mi_4_siswaBuku bahasa arab_mi_4_siswa
Buku bahasa arab_mi_4_siswa
yudi05
 
Buku bahasa arab_mi_1_siswa
Buku bahasa arab_mi_1_siswaBuku bahasa arab_mi_1_siswa
Buku bahasa arab_mi_1_siswa
yudi05
 

Mais de yudi05 (19)

224572323-Petunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdf
224572323-Petunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdf224572323-Petunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdf
224572323-Petunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdf
 
pengukuran dg total station.pdf
pengukuran dg total station.pdfpengukuran dg total station.pdf
pengukuran dg total station.pdf
 
Petunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdf
Petunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdfPetunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdf
Petunjuk-Praktis-Nikon-Nivo-C-Series-Indonesia-1.pdf
 
MATH rekreasi.ppt
MATH rekreasi.pptMATH rekreasi.ppt
MATH rekreasi.ppt
 
Dasar-dasar K31_Tbg_pres..ppt
Dasar-dasar K31_Tbg_pres..pptDasar-dasar K31_Tbg_pres..ppt
Dasar-dasar K31_Tbg_pres..ppt
 
Yosemite national park
Yosemite national parkYosemite national park
Yosemite national park
 
Vincent van gogh
Vincent van goghVincent van gogh
Vincent van gogh
 
Teknik peledakan
Teknik peledakanTeknik peledakan
Teknik peledakan
 
Soal tambang terbuka
Soal tambang terbukaSoal tambang terbuka
Soal tambang terbuka
 
Tata surya
Tata suryaTata surya
Tata surya
 
06 hydraulic workover unit trisakti 25 nov 2007
06 hydraulic workover unit   trisakti 25 nov 200706 hydraulic workover unit   trisakti 25 nov 2007
06 hydraulic workover unit trisakti 25 nov 2007
 
03 drilling recent development ui 17 sep 2007
03 drilling recent development   ui 17 sep 200703 drilling recent development   ui 17 sep 2007
03 drilling recent development ui 17 sep 2007
 
02 drilling preparation ui 15 sep 2007
02 drilling preparation   ui 15 sep 200702 drilling preparation   ui 15 sep 2007
02 drilling preparation ui 15 sep 2007
 
Math rekreasi
Math rekreasiMath rekreasi
Math rekreasi
 
Usaha cucian motor
Usaha cucian motorUsaha cucian motor
Usaha cucian motor
 
Pelajaran bahasa-arab-kelas-iii-sd
Pelajaran bahasa-arab-kelas-iii-sdPelajaran bahasa-arab-kelas-iii-sd
Pelajaran bahasa-arab-kelas-iii-sd
 
Buku bahasa arab_mi_4_siswa
Buku bahasa arab_mi_4_siswaBuku bahasa arab_mi_4_siswa
Buku bahasa arab_mi_4_siswa
 
Buku bahasa arab_mi_1_siswa
Buku bahasa arab_mi_1_siswaBuku bahasa arab_mi_1_siswa
Buku bahasa arab_mi_1_siswa
 
Alfred nobel penemu dinamit
Alfred nobel penemu dinamitAlfred nobel penemu dinamit
Alfred nobel penemu dinamit
 

Último

Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 

Último (20)

A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 

05 well testing trisakti 25 nov 2007

  • 1. By R. Harry Eddyarso PT. SARIPARI PERTIWI ABADI “KMI Goes to Campus Program” Komunitas Migas Indonesia – Universitas Trisakti 25 November 2006
  • 2. WE DO APPRECIATE HALLIBURTON AND POWER WELL SERVICE GROUPS FOR PROVIDING THE WELL TESTING PRESENTATION MATERIALS FOR LESSON LEARNED SHARING AND EDUCATIONAL PURPOSES ……. STATEMENT of APPRECIATION
  • 3. Finding The Reservoir : Seismic Survey Making Access to The Reservoir : Drilling Optimizing The Reservoir : Testing Evaluating The Reservoir : Logging Producing The Reservoir : Completion
  • 4. SEISMIC ALONG WELL PATH 3D DATA
  • 5. Depth Structure Map Top B-29A2 Base B-29A2 c.i =25’
  • 6. Types Of Well Testing Equipment • DST (Drill Stem Testing) DST Open Hole Cased Hole Barefoot • STE (Surface Testing Eqpt.) STE Exploration Clean Ups Production
  • 7. Guide to Better Service and Correct Sizing of Equipment Guide to Better Service and Correct Sizing of Equipment 1. What is the estimated highest pressure at the wellhead ?. 2. What is the lowest pressure at wellhead ?. 3. What are the expected maximum and minimum effluent rates ?. Gas/Oil/Water ?. 4. Is the effluent sweet or does it contain corrosives ?. If it does contain corrosives, what are the expected highest concentrations of H2S (This will also include CO2 amounts).
  • 8. Guide to Better Service and Correct Sizing of Equipment (Continued) Guide to Better Service and Correct Sizing of Equipment (Continued) 5. What is the expected A.P.I. of liquid hydrocarbon and the specific gravity of gas ?. 6. What is the customer’s requirement for disposal or storing of liquid hydrocarbon and H2O ?. 7. Are there any special requirements such as governing bodies’ special rules or regulations, i.e., maximum weight restrictions, etc. ?.
  • 9.
  • 10. DRILL STEM TESTING Definition • Temporary completion of a well to gather reservoir data and information for evaluation. • Measurement of formation parameters and characteristics are under dynamic conditions. Disturbance (flow) of the formation is measured (Pressure transient).
  • 11. Objectives • Identify the formation fluid • Determine the rate at which fluids can be produced • Determine reservoir parameters (Productivity, Permeability, Well Bore Damage, etc ) • Calculating the Economic Feasibility of the Well DRILL STEM TESTING
  • 12. SECONDARY CIRCULATING VLV. DRILL COLLARS PRIMARY CIRCULATING VLV. TESTER VLV. WORK STRING PRESSURE / TEMPERATURE RECORDERS PACKER BYPASS PACKER DRILL COLLARS DRILL STEM TESTING PACKER • Will safely separate well in two sections. • Will protect formation • Allow flowing the well inside Tubing while Isolating the Annulus PACKER • Will safely separate well in two sections. • Will protect formation • Allow flowing the well inside Tubing while Isolating the Annulus PACKER By Pass • Will divert mud while tripping in and out of the hole. • Will protect Packer elements during circulation. • Allow equalization of differential pressure when unsetting packer PACKER By Pass • Will divert mud while tripping in and out of the hole. • Will protect Packer elements during circulation. • Allow equalization of differential pressure when unsetting packer Pressure Temperature Recorders • Will record pressure transient • Must be carried safely and must be protected. • Location in the string can vary. • Multiple options exists Pressure Temperature Recorders • Will record pressure transient • Must be carried safely and must be protected. • Location in the string can vary. • Multiple options exists
  • 13. SECONDARY CIRCULATING VALVE DRILL COLLARS PRIMARY CIRCULATING VALVE TESTER VALVE WORK STRING Pressure / Temperature Recorders and Carriers Packer Bypass Packer DRILL COLLARS DRILL STEM TESTING Tester Valve • Will provide DOWN HOLE closure. • Will add a safety barrier. Allow pressure control inside the string. • Various types, some allow to “Lock Open” and can be reversed to “Normal Mode”. Tester Valve • Will provide DOWN HOLE closure. • Will add a safety barrier. Allow pressure control inside the string. • Various types, some allow to “Lock Open” and can be reversed to “Normal Mode”. Drill Collars • Will provide a SAFE separation between Ball Valves. • Will add weight to packer protecting the Tubing. Drill Collars • Will provide a SAFE separation between Ball Valves. • Will add weight to packer protecting the Tubing. Primary Circulating Valve • Will provide a mean to circulate without unsetting the packer. (Before and/or after the DST, and with NO manipulation of the Tubing) • Will be re-closable. • Can isolate formation during circulation, adding safety to the operation. Primary Circulating Valve • Will provide a mean to circulate without unsetting the packer. (Before and/or after the DST, and with NO manipulation of the Tubing) • Will be re-closable. • Can isolate formation during circulation, adding safety to the operation.
  • 14. SECONDARY CIRCULATING VALVE Drill Collars Primary Circulating Valve Tester Valve WORK STRING Pressure / Temperature Recorders and Carriers Packer Bypass Packer Drill Collars DRILL STEM TESTING Secondary Circulating Valve • To provide a mean to circulate if the primary circulating valve fails. (Before or after the DST, and with NO manipulation of the Tubing) • Could be re-closable, or a one shot. • Can isolate formation during circulation, adding safety to the operation. Secondary Circulating Valve • To provide a mean to circulate if the primary circulating valve fails. (Before or after the DST, and with NO manipulation of the Tubing) • Could be re-closable, or a one shot. • Can isolate formation during circulation, adding safety to the operation. Work String • To provide a conduct for the hydrocarbons to surface. • To have a mean to operate mechanical tools, such as Packers or other valves. • Typically in Cased Hole DST Tubing will be used. In Open Hole DST Drill Pipe will be used. Work String • To provide a conduct for the hydrocarbons to surface. • To have a mean to operate mechanical tools, such as Packers or other valves. • Typically in Cased Hole DST Tubing will be used. In Open Hole DST Drill Pipe will be used.
  • 15. TOOL SYSTEM APPLICATIONS • OPEN HOLE • CASED HOLE DRILL STEM TESTING
  • 16. TYPICAL OPEN HOLE DRILL STEM TESTING SYSTEM IMPACT SUB REV. CIRC. VLV. DRILL PIPE DRILL COLLARS DUAL CIP VALVE HYDROSPRING TESTER VLV. PRESSURE RECORDER VR SAFETY JOINT ANCHOR PIPE SAFETY JT. TEMPERATURE RECORDER NR PACKER BIG JOHN JAR FLUSH JOINT ANCHOR PRESSURE RECORDER
  • 17. TYPICAL CASED HOLE DRILL STEM TESTING SYSTEM RD SAFETY CIRCULATING VLV. PREMIUM THREADED TUBING DRILL COLLARS EXPRESS CIRCULATING VLV. SURFACE READOUT SYSTEM SELECT TESTER VLV. MPV VALVE PRESSURE / TEMPERATURE REC. CHAMP IV PACKER VERTICAL SHOCK ABSORBER TIME DELAY FIRING HEAD R/A TAG SUB BIG JOHN JAR RTTS SAFETY JOINT WORK STRING RADIAL SHOCK ABSORBER VANN GUNS BELOW PKR. HYD. SAFETY JOINT
  • 18.
  • 19. Surface Well Test Package
  • 29. Burner Head Air Inlet Oil Inlet Igniter Connections Nozzle Gas Jets Pilot
  • 32.
  • 34. SCAN (Surface Computerized Acquisition Network) – PowerWell Services SCAN combines the most up-to date electronic hardware and data gathering software for unbeatable performance during well test operations. – Present equipment consists of Computer and peripherals connected to transducers and transmitters measuring pressure, temperature, and flow rates.
  • 36. 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 15000 16000 10/2712:00:00 10/2800:00:00 10/2812:00:00 10/2900:00:00 10/2912:00:00 10/3000:00:00 10/3012:00:00 10/3100:00:00 10/3112:00:00 11/0100:00:00 11/0112:00:00 11/0200:00:00 11/0212:00:00 11/0300:00:00 11/0312:00:00 11/0400:00:00 11/0412:00:00 11/0500:00:00 11/0512:00:00 11/0600:00:00 Pressure(psi) Time (mm/dd hh:mm:ss) 60 80 100 120 140 160 180 200 220 240 260 Temperature(°F) Pressure Inflection Point Temperature Pressure up tubing to fire the guns Shut in at the choke manifold and cycle the OMNI to spot diesel to lower the hydrostatic head Pre-stimulation flow period for formation cleanup. Acidising the formation by bullheading from surface Post-Stimulation flowback and cleanup Steady flow on a small choke Pressure buildup Second flow period for sample catching Pressure & Temperature History Plot for Marrat Object II
  • 37. Reporting Formats The Software Gives The Operator The Ability To Create Custom Report Formats And Save Them For Later Use
  • 38. Emergency Shutdown System • The Emergency Shutdown (ESD) system consists of a panel which maintains 1500 psig hydraulic pressure via a flexible high pressure hose to the Surface Safety Valve or Surface Test Tree flow wing valve. The hydraulic pressure holds the valve open. In the ESD mode this hydraulic pressure can only be maintained provided the control valve inside the panel is held closed by a pilot air supply of approximately 40 psig. • This 40 psig pilot air line is fed via ¼" plastic hose to Hi/Lo pressure pilots and ESD push button stations situated around the installation: • Upstream of the choke manifold providing overpressure and line rupture protection for the high pressure pipework. • Downstream of the choke manifold providing overpressure and line rupture protection for the low pressure pipework. • On the holding tank providing overpressure protection of the vessel. • On the Heat Exchanger shell providing overpressure protection of the shell if the coils rupture. • On the low pressure coils of the heat exchanger, providing overpressure protection in the event of a blockage downstream. • On the high pressure coils of the heat exchanger, providing overpressure protection in the event of a blockage upstream. • Push buttons situated : a) In driller dog house, b) Outside Company office, c) At escape lifeboats, d) In the welltest area, e) On the ESD panel • Should any of the Hi/Lo pilots detect over/under pressure during the flow period the pilot air pressure would be vented, causing the panel control valve to dump the hydraulic pressure that holds the actuator valve open. The spring inside the actuator closes the actuator valve. • Should any of the ESD buttons be activated, again the pilot air supply would be dumped and the same sequence of events would occur. • A manual override is incorporated in the panel and isolation valves are installed at the Hi/Lo pilots to allow for pressure testing of the system.
  • 39. Emergency Shutdown System Fusible Plug S.T.T. Manifold Optional Remote E.S.D. Station Pneumatic Hydraulic Hydraulic Return Hydraulic Quick Exhaust Fusible Plug DS Pilot DS Pilot DS Pilot DS Pilot Hydraulic Actuator Choke Manifold Heat Exchanger Separator Test Tank Pump Burner