Time and Schedule
Lecture 7a
American University in Cairo School of Sciences and Engineering
Department of Architectural Engineering
AENG441 – Professional Practice, Design Management and Codes
1
Topics
2
Design Scheduling
3
Design Scheduling
• Phases of production from Conceptual Planning  Start of
Construction.
• Efficient use of Manpower and Resources
• To achieve an economical, functional and harmonious
design
• Executed within a reasonable period of time
• With an efficient utilization of personnel.
• Experience and Judgment
4
Design Scheduling
• Phases (AIA standard owner-architect agreement)
• Schematic Design: Drawings + Cost Estimate
• Design Development: Drawings +Outline Specifications, + Cost
Estimate
• Construction Documents: Working Drawings +Final Specifications
+ Final Cost Estimate
• Bidding and Negotiation: Receipt and Evaluation of Bids +
Addenda
• Construction Administration: Services after bidding or negotiation
to assure that the structure is built in accordance with the
construction documents.
5
Design Scheduling
• Estimate time required for reach phase.
• Schematic Design phase is the most difficult to
estimate - Greatest amount of variability. (1-12
months!)
• Size and Complexity
• Quality and Completeness of the Program Information
• Decision Making Ability of the Client.(committees!)
• Nature of the Design Team.
6
Design Scheduling
• Design Development and Construction Documents:
• More predictable
• Project Architect and/or Job Captain
• From Schematic Design into Preliminary Design Drawings then
Working Drawings
• Complexity not Size determines scheduling and staffing
requirements.
• Coordination between consultants, client and designers is vital!
• From 2 - 4 months
• Construction Documents 3-7 months.
• Bidding or Negotiation 6 weeks.
7
Design Scheduling
• Project financing to convert design into reality.
• Client review and approval between phases depends on
the size and complexity of the project- usually between
one week. And one month.
• Approvals by building department and public agencies
varies considerably.
8
Design Scheduling
9
Contingencies
• Unexpected Problems:
• Building Department
• Consultants
• Staffing problems
• Client
• 10% average additional time
• Flexible and Responsive to changing conditions
10
Working with a Builder
• Working with contractor to Guarantee Maximum Project
Cost (GMP: Guaranteed Maximum Price)
• Time is generally shortened
• Risk that design is not fully developed
• Documents less specific
• No bidding and negotiation phase
11
Extending the Schedule
• Change of staff
• Increase cost due to inflation
12
Shortening the Schedule
• Optimum Use of staff effort and resources
• Work overtime - costly and inefficient
• Hire more people - Part time or freelance or subcontract to
another firm - costly and inefficient.
• Hire new staff - Not familiar with office procedures or projects -
Expensive
• Reduce man-hours - lower quality job, incomplete, unclear
,errors and inconsistencies.
• Higher cost, lower quality.
• Quality work requires time and staff.
13
Construction Scheduling
14
Establishing a Schedule
• Construction Projects are Complicated
• They involve the work of numerous trades and
subcontractors
• Coordination
• Equipment and Materials
• Time schedules and Cost recording
15
Considerations
1. The construction documents - Well or Poorly prepared.
2. The architect-engineer -More or Less demanding
3. The subcontractors - coordination
4. The contractor’s organization - Project manager, field
superintendent, Office and Field staff, … workload
5. Material dealers - Reliability in meeting deliverability
6. Size and complexity of the project - Most critical.
7. Site conditions - Size and Accessibility
8. The Weather
9. The possibility of labor troubles
10. The possibility of material shortage.
16
CPM (Critical Path Method)
17
CPM (Critical Path Method)
• Planning Phase - Diagram is drawn indicating the order in
which various operations are to be accomplished - Called
Activities.
• Activity Start and Finish referred to as “events” or “nodes”
• Event: That moment when a preceding activity has been
completed and the following activity may begin.
• Milestone Events - Important points in the construction process.
• No indication of time - arrows are not indicating time.
• No gaps of discontinuities
• CPM is known as a network diagram
18
CPM (Critical Path Method)
19
Event
Activity
CPM (Critical Path Method)
20
CPM Scheduling
• Time!
• Time is estimated based on past
experience.
• Working day is taken as a unit of time.
• Consult with subcontractors.
21
CPM (Critical Path Method)
22
1 1 1 1 2 1 1
2
2
14
Critical Path
Critical Path
• Critical Path is the longest path!
• Critical activities along the path must be monitored.
23
Float Path
• Paths that are not on the CP.
• The float is a measure of the extra time available for an
activity or group of activities.
24
Project Calendar
• Multiply by 7/5 (5 working days in each 7 days)
• 16 days x 7/5 = 22.4 or 23 calendar days.
• Starting date  Completion date
• Project Calendar
• Critical Activities noted in color or boldface
• Most building construction projects require 9 - 18 months.
25
Contingencies
• Allowance for project delays (weather, …)
• Some contractors add a fixed percentage!
26
CPM Calculations
• CPM Programming
• Programs.
27
Bar Graphs
• Start and finish dates of major phases.
• They don’t indicate relationships nor dependencies!
• Inferior to CPM as a management tool but superior as a
means of visual communication.
• Continue to be widely used.
28
29
Shortening the Schedule
• Business demands.
• Minimize effect of inflation, weather, interest, …
• Reduce CP time.
• Critical activities 25-30% of all activities.
• Shorter time increases direct cost. Less efficiency in supervision
and coordination. Errors are more likely to occur.
• Less time - More direct cost!
• Less time - Less overhead!
• Analyze the effects and determine a balance.
30
Fast-Track Scheduling
• Fast-Track - Accelerated - Telescoped scheduling.
• Determine major building elements.
• Produce detailed working drawings for a portion of work on
which the contractor may begin construction
• Further details continue
• Requires close coordination:
Architect - Engineers - Client - Contractor
• Oversights expected, Correction of errors
• Staged bidding awarded to different contractors
• Cost and Time control by CM (Construction Manager)
31
32
Time Management
• Fabrication Time
• Erection Time
• Sequence of
Construction
Trades
• Scheduling of
Construction
Trades
33
Submittals - Site Visit,
Testing and Inspection
Lecture 7b
American University in Cairo School of Sciences and Engineering
Department of Architectural Engineering
AENG441 – Professional Practice, Design Management and Codes
34
Topics
35
Material and Equipment Submittals
• Shop Drawings, Product Data, and Samples
• Introduction
36
Material and Equipment Submittals
• Shop Drawings, Product Data, and Samples
• Introduction
37
Material and Equipment Submittals
• Shop Drawings, Product Data, and Samples
• Basic Concepts
38
Material and Equipment Submittals
• Shop Drawings, Product Data, and Samples
• Basic Concepts
39
Material and Equipment Submittals
• Shop Drawings, Product Data, and Samples
• Basic Concepts
40
Material and Equipment Submittals
• Shop Drawings, Product Data, and Samples
• Basic Concepts
• Shop drawings are not part of the contract documents.
41
42
Contractor’s Responsibilities
43
Architect’s Responsibilities
44
Procedures
• Recordkeeping
• Dates received and returned
• Action taken: Approves, corrected, revised, resubmit
• Retain copies of all submittals
• Timeliness
• Within a reasonable time
• 10 working days or two weeks
• Changes and Revisions
• Change orders
• Standard Formats for processing submittals
45
Procedures
46
Procedures
47
10 - 15 working days
Procedures
48
Procedures
49
50
Site Visits
• Contract Requirements
• Architect's Role
• Advise owner whether the contractor is performing the work in
accordance with the contract documents.
• Meeting Reports
• Pre-Bid Meetings
• Pre-Construction Meeting
• During Construction
51
Site Visits
52
Site Visits
53
Site Visits
54
Site Visits
55
Site Visits
56
Site Visits
57
Site Visits
Site Visits
• Safety
• Architect’s Role
59
Site Visits
• Safety
• Architect’s Role
60
Site Visits
• Safety
• Contract’s Role
61
Site Visits
• Evaluating Work Against
Contract Documents
62
Site Visits
• Evaluating Work Against
Contract Documents
63
Site Visits
• Evaluating Work Against
Contract Documents
64
Site Visits
• Testing and Inspection
65
Site Visits
• Testing and Inspection
66
Site Visits
• Testing and Inspection
67
Site Visits
• Testing and Inspection
Site Visits
• Testing and Inspection
69
Site Visits
• Testing and Inspection
70
Thank You.
71

Mais conteúdo relacionado

Mais procurados

Architectural Working Drawings - الرسومات التنفيذية المعمارية
Architectural Working Drawings - الرسومات التنفيذية المعماريةArchitectural Working Drawings - الرسومات التنفيذية المعمارية
Architectural Working Drawings - الرسومات التنفيذية المعماريةGalala University
 
Professional Practice
Professional PracticeProfessional Practice
Professional Practiceseenyeeyong
 
How to Choose a Project Delivery Method
How to Choose a Project Delivery MethodHow to Choose a Project Delivery Method
How to Choose a Project Delivery MethodPMA Consultants
 
National building code
National building codeNational building code
National building codeMayank Rawat
 
1.4 town planning ancient india vedic buddha period
1.4 town planning ancient india vedic buddha period1.4 town planning ancient india vedic buddha period
1.4 town planning ancient india vedic buddha periodSachin PatiL
 
architectural working drawings
architectural working drawings  architectural working drawings
architectural working drawings Aditya Sanyal
 
Impact of industrial revolution in architecture
Impact of industrial revolution in architectureImpact of industrial revolution in architecture
Impact of industrial revolution in architectureShabna Azeez
 
Types of contracts
Types of contracts   Types of contracts
Types of contracts MANNU KUMAR
 
Bim projects portfolio
Bim projects  portfolioBim projects  portfolio
Bim projects portfolioAmr-Saad
 
Time-Saver Standards for Architectural Design Data (Malestrom).pdf
Time-Saver Standards for Architectural Design Data (Malestrom).pdfTime-Saver Standards for Architectural Design Data (Malestrom).pdf
Time-Saver Standards for Architectural Design Data (Malestrom).pdfaigle3
 
impact of industrial revolution on architecture
impact of industrial revolution on architectureimpact of industrial revolution on architecture
impact of industrial revolution on architectureGayathri Kumari
 
Functional planning of a residential building
Functional planning of a residential buildingFunctional planning of a residential building
Functional planning of a residential buildingNayana 54321
 

Mais procurados (20)

Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 
TDR and fungible FSI
TDR and fungible FSITDR and fungible FSI
TDR and fungible FSI
 
Architectural Working Drawings - الرسومات التنفيذية المعمارية
Architectural Working Drawings - الرسومات التنفيذية المعماريةArchitectural Working Drawings - الرسومات التنفيذية المعمارية
Architectural Working Drawings - الرسومات التنفيذية المعمارية
 
Professional Practice
Professional PracticeProfessional Practice
Professional Practice
 
How to Choose a Project Delivery Method
How to Choose a Project Delivery MethodHow to Choose a Project Delivery Method
How to Choose a Project Delivery Method
 
Lecture 4 Review 1
Lecture 4   Review 1Lecture 4   Review 1
Lecture 4 Review 1
 
National building code
National building codeNational building code
National building code
 
1.4 town planning ancient india vedic buddha period
1.4 town planning ancient india vedic buddha period1.4 town planning ancient india vedic buddha period
1.4 town planning ancient india vedic buddha period
 
architectural working drawings
architectural working drawings  architectural working drawings
architectural working drawings
 
Impact of industrial revolution in architecture
Impact of industrial revolution in architectureImpact of industrial revolution in architecture
Impact of industrial revolution in architecture
 
Tendering-professional practices-jamia millia islamia
Tendering-professional practices-jamia millia islamiaTendering-professional practices-jamia millia islamia
Tendering-professional practices-jamia millia islamia
 
National Building Code 2005
National Building Code 2005National Building Code 2005
National Building Code 2005
 
Types of contracts
Types of contracts   Types of contracts
Types of contracts
 
BIM
BIMBIM
BIM
 
Bim projects portfolio
Bim projects  portfolioBim projects  portfolio
Bim projects portfolio
 
Time-Saver Standards for Architectural Design Data (Malestrom).pdf
Time-Saver Standards for Architectural Design Data (Malestrom).pdfTime-Saver Standards for Architectural Design Data (Malestrom).pdf
Time-Saver Standards for Architectural Design Data (Malestrom).pdf
 
What is BIM?
What is BIM?What is BIM?
What is BIM?
 
impact of industrial revolution on architecture
impact of industrial revolution on architectureimpact of industrial revolution on architecture
impact of industrial revolution on architecture
 
Functional planning of a residential building
Functional planning of a residential buildingFunctional planning of a residential building
Functional planning of a residential building
 
Dilapidation report
Dilapidation reportDilapidation report
Dilapidation report
 

Semelhante a Time & Schedule, Submittals, Site visits, Testing and Inspection

Project Management
Project ManagementProject Management
Project ManagementXubitech
 
Presintation on Project constraint
Presintation on Project constraint Presintation on Project constraint
Presintation on Project constraint university(kust)
 
3 Ways That Data Helps Reduce Review Cycles - Webinar, May 2016
3 Ways That Data Helps Reduce Review Cycles - Webinar, May 20163 Ways That Data Helps Reduce Review Cycles - Webinar, May 2016
3 Ways That Data Helps Reduce Review Cycles - Webinar, May 2016Aconex
 
Om lect 07 (r3-jul 11)_basics of project management_mms-bharti_sies
Om lect 07 (r3-jul 11)_basics of project management_mms-bharti_siesOm lect 07 (r3-jul 11)_basics of project management_mms-bharti_sies
Om lect 07 (r3-jul 11)_basics of project management_mms-bharti_siesvideoaakash15
 
Lecture 8 monitoring & controlling (1)
Lecture 8  monitoring & controlling (1)Lecture 8  monitoring & controlling (1)
Lecture 8 monitoring & controlling (1)Nur Azwin
 
CAD and BIM Outsourcing Services
CAD and BIM Outsourcing ServicesCAD and BIM Outsourcing Services
CAD and BIM Outsourcing Servicestheaecassociates1
 
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Shrikant Kate
 
139 مبادرة #تواصل_تطوير المحاضرة ال 139 من المبادرة مهندس / محمد ماجد استشاري...
139 مبادرة #تواصل_تطوير المحاضرة ال 139 من المبادرة مهندس / محمد ماجد استشاري...139 مبادرة #تواصل_تطوير المحاضرة ال 139 من المبادرة مهندس / محمد ماجد استشاري...
139 مبادرة #تواصل_تطوير المحاضرة ال 139 من المبادرة مهندس / محمد ماجد استشاري...Egyptian Engineers Association
 
2. PAE AcFn621 Ch-2 Principle ppt.pptx
2. PAE AcFn621 Ch-2 Principle ppt.pptx2. PAE AcFn621 Ch-2 Principle ppt.pptx
2. PAE AcFn621 Ch-2 Principle ppt.pptxProfDrAnbalaganChinn
 
A PPT ON CONSTRUction PROJECT PLANNING - RASHID HUSSAIN.pdf
A PPT ON CONSTRUction PROJECT PLANNING - RASHID HUSSAIN.pdfA PPT ON CONSTRUction PROJECT PLANNING - RASHID HUSSAIN.pdf
A PPT ON CONSTRUction PROJECT PLANNING - RASHID HUSSAIN.pdfssuserfc98db
 
05 Project Monitoring & Cost Control
05 Project Monitoring & Cost Control05 Project Monitoring & Cost Control
05 Project Monitoring & Cost Controlakashpadole
 
CTM - 02 - Construction Project Planning - Copy.pptx
CTM - 02 - Construction Project Planning - Copy.pptxCTM - 02 - Construction Project Planning - Copy.pptx
CTM - 02 - Construction Project Planning - Copy.pptxRaoAnkitYadav1
 
CTM - 02 - Construction Project Planning.pptx
CTM - 02 - Construction Project Planning.pptxCTM - 02 - Construction Project Planning.pptx
CTM - 02 - Construction Project Planning.pptxRaoAnkitYadav1
 
ctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdf
ctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdfctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdf
ctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdfGagandeepKaur617299
 
06 project time management
06  project time management06  project time management
06 project time managementAla Ibrahim
 

Semelhante a Time & Schedule, Submittals, Site visits, Testing and Inspection (20)

Project Management
Project ManagementProject Management
Project Management
 
Presintation on Project constraint
Presintation on Project constraint Presintation on Project constraint
Presintation on Project constraint
 
3 Ways That Data Helps Reduce Review Cycles - Webinar, May 2016
3 Ways That Data Helps Reduce Review Cycles - Webinar, May 20163 Ways That Data Helps Reduce Review Cycles - Webinar, May 2016
3 Ways That Data Helps Reduce Review Cycles - Webinar, May 2016
 
Chapter 03
Chapter 03Chapter 03
Chapter 03
 
Om lect 07 (r3-jul 11)_basics of project management_mms-bharti_sies
Om lect 07 (r3-jul 11)_basics of project management_mms-bharti_siesOm lect 07 (r3-jul 11)_basics of project management_mms-bharti_sies
Om lect 07 (r3-jul 11)_basics of project management_mms-bharti_sies
 
Lecture 8 monitoring & controlling (1)
Lecture 8  monitoring & controlling (1)Lecture 8  monitoring & controlling (1)
Lecture 8 monitoring & controlling (1)
 
CAD and BIM Outsourcing Services
CAD and BIM Outsourcing ServicesCAD and BIM Outsourcing Services
CAD and BIM Outsourcing Services
 
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
 
139 مبادرة #تواصل_تطوير المحاضرة ال 139 من المبادرة مهندس / محمد ماجد استشاري...
139 مبادرة #تواصل_تطوير المحاضرة ال 139 من المبادرة مهندس / محمد ماجد استشاري...139 مبادرة #تواصل_تطوير المحاضرة ال 139 من المبادرة مهندس / محمد ماجد استشاري...
139 مبادرة #تواصل_تطوير المحاضرة ال 139 من المبادرة مهندس / محمد ماجد استشاري...
 
atb-brochure.pdf
atb-brochure.pdfatb-brochure.pdf
atb-brochure.pdf
 
GTB-brochure.pdf
GTB-brochure.pdfGTB-brochure.pdf
GTB-brochure.pdf
 
2. PAE AcFn621 Ch-2 Principle ppt.pptx
2. PAE AcFn621 Ch-2 Principle ppt.pptx2. PAE AcFn621 Ch-2 Principle ppt.pptx
2. PAE AcFn621 Ch-2 Principle ppt.pptx
 
A PPT ON CONSTRUction PROJECT PLANNING - RASHID HUSSAIN.pdf
A PPT ON CONSTRUction PROJECT PLANNING - RASHID HUSSAIN.pdfA PPT ON CONSTRUction PROJECT PLANNING - RASHID HUSSAIN.pdf
A PPT ON CONSTRUction PROJECT PLANNING - RASHID HUSSAIN.pdf
 
Project time management
Project time managementProject time management
Project time management
 
05 Project Monitoring & Cost Control
05 Project Monitoring & Cost Control05 Project Monitoring & Cost Control
05 Project Monitoring & Cost Control
 
CTM - 02 - Construction Project Planning - Copy.pptx
CTM - 02 - Construction Project Planning - Copy.pptxCTM - 02 - Construction Project Planning - Copy.pptx
CTM - 02 - Construction Project Planning - Copy.pptx
 
CTM - 02 - Construction Project Planning.pptx
CTM - 02 - Construction Project Planning.pptxCTM - 02 - Construction Project Planning.pptx
CTM - 02 - Construction Project Planning.pptx
 
ctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdf
ctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdfctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdf
ctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdf
 
Project Schedule Management
Project Schedule ManagementProject Schedule Management
Project Schedule Management
 
06 project time management
06  project time management06  project time management
06 project time management
 

Mais de Galala University

Architecture and Architects in Egypt b
Architecture and Architects in Egypt bArchitecture and Architects in Egypt b
Architecture and Architects in Egypt bGalala University
 
Architecture and Architects in Egypt a
Architecture and Architects in Egypt aArchitecture and Architects in Egypt a
Architecture and Architects in Egypt aGalala University
 
Impact of Climate and Environment Changes on the Sustainability of the Coasta...
Impact of Climate and Environment Changes on the Sustainability of the Coasta...Impact of Climate and Environment Changes on the Sustainability of the Coasta...
Impact of Climate and Environment Changes on the Sustainability of the Coasta...Galala University
 
Sustainability of Tourism Development in the city of Ain-Sukhna, Egypt
Sustainability of Tourism Development in the city of Ain-Sukhna, EgyptSustainability of Tourism Development in the city of Ain-Sukhna, Egypt
Sustainability of Tourism Development in the city of Ain-Sukhna, EgyptGalala University
 
Sustainability of Tourism Development in Al Ain Al Sukhna, Egypt Yasser Mahgo...
Sustainability of Tourism Development in Al Ain Al Sukhna, Egypt Yasser Mahgo...Sustainability of Tourism Development in Al Ain Al Sukhna, Egypt Yasser Mahgo...
Sustainability of Tourism Development in Al Ain Al Sukhna, Egypt Yasser Mahgo...Galala University
 
Typologies of Urban Development in Sukhna-Zaafarana Area.pdf
Typologies of Urban Development in Sukhna-Zaafarana Area.pdfTypologies of Urban Development in Sukhna-Zaafarana Area.pdf
Typologies of Urban Development in Sukhna-Zaafarana Area.pdfGalala University
 
AI-Human Dialogue for Architectural Design Concept Generation presentation 26...
AI-Human Dialogue for Architectural Design Concept Generation presentation 26...AI-Human Dialogue for Architectural Design Concept Generation presentation 26...
AI-Human Dialogue for Architectural Design Concept Generation presentation 26...Galala University
 
Arc341 building 3 spring 2019 lecture 5 - surface active - chapter 4
Arc341 building 3 spring 2019   lecture 5 - surface active - chapter 4Arc341 building 3 spring 2019   lecture 5 - surface active - chapter 4
Arc341 building 3 spring 2019 lecture 5 - surface active - chapter 4Galala University
 
Arc341 building 3 spring 2019 lecture 4 - section active - chapter 3
Arc341 building 3 spring 2019   lecture 4 - section active - chapter 3Arc341 building 3 spring 2019   lecture 4 - section active - chapter 3
Arc341 building 3 spring 2019 lecture 4 - section active - chapter 3Galala University
 
Arc341 building 3 spring 2019 lecture 3 - vector-active - chapter 2
Arc341 building 3 spring 2019   lecture 3 - vector-active - chapter 2Arc341 building 3 spring 2019   lecture 3 - vector-active - chapter 2
Arc341 building 3 spring 2019 lecture 3 - vector-active - chapter 2Galala University
 
Arc341 building 3 spring 2019 lecture 2 - basics - chapter 0
Arc341 building 3 spring 2019   lecture 2 - basics - chapter 0Arc341 building 3 spring 2019   lecture 2 - basics - chapter 0
Arc341 building 3 spring 2019 lecture 2 - basics - chapter 0Galala University
 
Arc341 building 3 spring 2019 lecture 1 - introduction to structures
Arc341 building 3 spring 2019   lecture 1 - introduction to structuresArc341 building 3 spring 2019   lecture 1 - introduction to structures
Arc341 building 3 spring 2019 lecture 1 - introduction to structuresGalala University
 
Fue theory 4 2018 lecture 5 - the formulation and analysis of architectural...
Fue theory 4 2018   lecture 5 - the formulation and analysis of architectural...Fue theory 4 2018   lecture 5 - the formulation and analysis of architectural...
Fue theory 4 2018 lecture 5 - the formulation and analysis of architectural...Galala University
 
Fue theory 4 2018 lecture 4 - the formulation and analysis of architectural...
Fue theory 4 2018   lecture 4 - the formulation and analysis of architectural...Fue theory 4 2018   lecture 4 - the formulation and analysis of architectural...
Fue theory 4 2018 lecture 4 - the formulation and analysis of architectural...Galala University
 
Fue theory 4 2018 lecture 3 - architectural timeline
Fue theory 4 2018   lecture 3 - architectural timelineFue theory 4 2018   lecture 3 - architectural timeline
Fue theory 4 2018 lecture 3 - architectural timelineGalala University
 
Fue theory 4 2018 lecture 2 - history of theory
Fue theory 4 2018   lecture 2 - history of theoryFue theory 4 2018   lecture 2 - history of theory
Fue theory 4 2018 lecture 2 - history of theoryGalala University
 
Fue theory 4 2018 lecture 1- introduction
Fue theory 4 2018   lecture 1- introductionFue theory 4 2018   lecture 1- introduction
Fue theory 4 2018 lecture 1- introductionGalala University
 
Fue theory 4 2018 lecture 6 - synthesis of the design concept- different te...
Fue theory 4 2018   lecture 6 - synthesis of the design concept- different te...Fue theory 4 2018   lecture 6 - synthesis of the design concept- different te...
Fue theory 4 2018 lecture 6 - synthesis of the design concept- different te...Galala University
 
Arc 323 human studies in architecture fall 2018 lecture 9-topics 2
Arc 323 human studies in architecture fall 2018 lecture 9-topics 2Arc 323 human studies in architecture fall 2018 lecture 9-topics 2
Arc 323 human studies in architecture fall 2018 lecture 9-topics 2Galala University
 
Arc 323 human studies in architecture fall 2018 lecture 8-topics 1
Arc 323 human studies in architecture fall 2018 lecture 8-topics 1Arc 323 human studies in architecture fall 2018 lecture 8-topics 1
Arc 323 human studies in architecture fall 2018 lecture 8-topics 1Galala University
 

Mais de Galala University (20)

Architecture and Architects in Egypt b
Architecture and Architects in Egypt bArchitecture and Architects in Egypt b
Architecture and Architects in Egypt b
 
Architecture and Architects in Egypt a
Architecture and Architects in Egypt aArchitecture and Architects in Egypt a
Architecture and Architects in Egypt a
 
Impact of Climate and Environment Changes on the Sustainability of the Coasta...
Impact of Climate and Environment Changes on the Sustainability of the Coasta...Impact of Climate and Environment Changes on the Sustainability of the Coasta...
Impact of Climate and Environment Changes on the Sustainability of the Coasta...
 
Sustainability of Tourism Development in the city of Ain-Sukhna, Egypt
Sustainability of Tourism Development in the city of Ain-Sukhna, EgyptSustainability of Tourism Development in the city of Ain-Sukhna, Egypt
Sustainability of Tourism Development in the city of Ain-Sukhna, Egypt
 
Sustainability of Tourism Development in Al Ain Al Sukhna, Egypt Yasser Mahgo...
Sustainability of Tourism Development in Al Ain Al Sukhna, Egypt Yasser Mahgo...Sustainability of Tourism Development in Al Ain Al Sukhna, Egypt Yasser Mahgo...
Sustainability of Tourism Development in Al Ain Al Sukhna, Egypt Yasser Mahgo...
 
Typologies of Urban Development in Sukhna-Zaafarana Area.pdf
Typologies of Urban Development in Sukhna-Zaafarana Area.pdfTypologies of Urban Development in Sukhna-Zaafarana Area.pdf
Typologies of Urban Development in Sukhna-Zaafarana Area.pdf
 
AI-Human Dialogue for Architectural Design Concept Generation presentation 26...
AI-Human Dialogue for Architectural Design Concept Generation presentation 26...AI-Human Dialogue for Architectural Design Concept Generation presentation 26...
AI-Human Dialogue for Architectural Design Concept Generation presentation 26...
 
Arc341 building 3 spring 2019 lecture 5 - surface active - chapter 4
Arc341 building 3 spring 2019   lecture 5 - surface active - chapter 4Arc341 building 3 spring 2019   lecture 5 - surface active - chapter 4
Arc341 building 3 spring 2019 lecture 5 - surface active - chapter 4
 
Arc341 building 3 spring 2019 lecture 4 - section active - chapter 3
Arc341 building 3 spring 2019   lecture 4 - section active - chapter 3Arc341 building 3 spring 2019   lecture 4 - section active - chapter 3
Arc341 building 3 spring 2019 lecture 4 - section active - chapter 3
 
Arc341 building 3 spring 2019 lecture 3 - vector-active - chapter 2
Arc341 building 3 spring 2019   lecture 3 - vector-active - chapter 2Arc341 building 3 spring 2019   lecture 3 - vector-active - chapter 2
Arc341 building 3 spring 2019 lecture 3 - vector-active - chapter 2
 
Arc341 building 3 spring 2019 lecture 2 - basics - chapter 0
Arc341 building 3 spring 2019   lecture 2 - basics - chapter 0Arc341 building 3 spring 2019   lecture 2 - basics - chapter 0
Arc341 building 3 spring 2019 lecture 2 - basics - chapter 0
 
Arc341 building 3 spring 2019 lecture 1 - introduction to structures
Arc341 building 3 spring 2019   lecture 1 - introduction to structuresArc341 building 3 spring 2019   lecture 1 - introduction to structures
Arc341 building 3 spring 2019 lecture 1 - introduction to structures
 
Fue theory 4 2018 lecture 5 - the formulation and analysis of architectural...
Fue theory 4 2018   lecture 5 - the formulation and analysis of architectural...Fue theory 4 2018   lecture 5 - the formulation and analysis of architectural...
Fue theory 4 2018 lecture 5 - the formulation and analysis of architectural...
 
Fue theory 4 2018 lecture 4 - the formulation and analysis of architectural...
Fue theory 4 2018   lecture 4 - the formulation and analysis of architectural...Fue theory 4 2018   lecture 4 - the formulation and analysis of architectural...
Fue theory 4 2018 lecture 4 - the formulation and analysis of architectural...
 
Fue theory 4 2018 lecture 3 - architectural timeline
Fue theory 4 2018   lecture 3 - architectural timelineFue theory 4 2018   lecture 3 - architectural timeline
Fue theory 4 2018 lecture 3 - architectural timeline
 
Fue theory 4 2018 lecture 2 - history of theory
Fue theory 4 2018   lecture 2 - history of theoryFue theory 4 2018   lecture 2 - history of theory
Fue theory 4 2018 lecture 2 - history of theory
 
Fue theory 4 2018 lecture 1- introduction
Fue theory 4 2018   lecture 1- introductionFue theory 4 2018   lecture 1- introduction
Fue theory 4 2018 lecture 1- introduction
 
Fue theory 4 2018 lecture 6 - synthesis of the design concept- different te...
Fue theory 4 2018   lecture 6 - synthesis of the design concept- different te...Fue theory 4 2018   lecture 6 - synthesis of the design concept- different te...
Fue theory 4 2018 lecture 6 - synthesis of the design concept- different te...
 
Arc 323 human studies in architecture fall 2018 lecture 9-topics 2
Arc 323 human studies in architecture fall 2018 lecture 9-topics 2Arc 323 human studies in architecture fall 2018 lecture 9-topics 2
Arc 323 human studies in architecture fall 2018 lecture 9-topics 2
 
Arc 323 human studies in architecture fall 2018 lecture 8-topics 1
Arc 323 human studies in architecture fall 2018 lecture 8-topics 1Arc 323 human studies in architecture fall 2018 lecture 8-topics 1
Arc 323 human studies in architecture fall 2018 lecture 8-topics 1
 

Último

call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...Delhi Call girls
 
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdfJordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdfamanda2495
 
💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...
💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...
💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...sonalitrivedi431
 
Sector 105, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 105, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 105, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 105, Noida Call girls :8448380779 Model Escorts | 100% verifiedDelhi Call girls
 
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...amitlee9823
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)amitlee9823
 
Anupama Kundoo Cost Effective detailed ppt with plans and elevations with det...
Anupama Kundoo Cost Effective detailed ppt with plans and elevations with det...Anupama Kundoo Cost Effective detailed ppt with plans and elevations with det...
Anupama Kundoo Cost Effective detailed ppt with plans and elevations with det...sriharipichandi
 
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...instagramfab782445
 
Just Call Vip call girls diu Escorts ☎️9352988975 Two shot with one girl (diu )
Just Call Vip call girls diu Escorts ☎️9352988975 Two shot with one girl (diu )Just Call Vip call girls diu Escorts ☎️9352988975 Two shot with one girl (diu )
Just Call Vip call girls diu Escorts ☎️9352988975 Two shot with one girl (diu )gajnagarg
 
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...nirzagarg
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best ServiceHigh Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...amitlee9823
 
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard ...
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard  ...Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard  ...
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard ...nirzagarg
 
8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available
8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available
8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Availabledollysharma2066
 
➥🔝 7737669865 🔝▻ Kolkata Call-girls in Women Seeking Men 🔝Kolkata🔝 Escorts...
➥🔝 7737669865 🔝▻ Kolkata Call-girls in Women Seeking Men  🔝Kolkata🔝   Escorts...➥🔝 7737669865 🔝▻ Kolkata Call-girls in Women Seeking Men  🔝Kolkata🔝   Escorts...
➥🔝 7737669865 🔝▻ Kolkata Call-girls in Women Seeking Men 🔝Kolkata🔝 Escorts...amitlee9823
 
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...SUHANI PANDEY
 
Lecture 01 Introduction To Multimedia.pptx
Lecture 01 Introduction To Multimedia.pptxLecture 01 Introduction To Multimedia.pptx
Lecture 01 Introduction To Multimedia.pptxShoaibRajper1
 
Hingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRL
Hingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRLHingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRL
Hingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRLNitya salvi
 
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️Delhi Call girls
 

Último (20)

call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
 
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdfJordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
 
💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...
💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...
💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...
 
Sector 105, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 105, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 105, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 105, Noida Call girls :8448380779 Model Escorts | 100% verified
 
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
Anupama Kundoo Cost Effective detailed ppt with plans and elevations with det...
Anupama Kundoo Cost Effective detailed ppt with plans and elevations with det...Anupama Kundoo Cost Effective detailed ppt with plans and elevations with det...
Anupama Kundoo Cost Effective detailed ppt with plans and elevations with det...
 
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
 
Just Call Vip call girls diu Escorts ☎️9352988975 Two shot with one girl (diu )
Just Call Vip call girls diu Escorts ☎️9352988975 Two shot with one girl (diu )Just Call Vip call girls diu Escorts ☎️9352988975 Two shot with one girl (diu )
Just Call Vip call girls diu Escorts ☎️9352988975 Two shot with one girl (diu )
 
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best ServiceHigh Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
 
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
 
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard ...
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard  ...Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard  ...
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard ...
 
8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available
8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available
8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available
 
➥🔝 7737669865 🔝▻ Kolkata Call-girls in Women Seeking Men 🔝Kolkata🔝 Escorts...
➥🔝 7737669865 🔝▻ Kolkata Call-girls in Women Seeking Men  🔝Kolkata🔝   Escorts...➥🔝 7737669865 🔝▻ Kolkata Call-girls in Women Seeking Men  🔝Kolkata🔝   Escorts...
➥🔝 7737669865 🔝▻ Kolkata Call-girls in Women Seeking Men 🔝Kolkata🔝 Escorts...
 
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
 
Lecture 01 Introduction To Multimedia.pptx
Lecture 01 Introduction To Multimedia.pptxLecture 01 Introduction To Multimedia.pptx
Lecture 01 Introduction To Multimedia.pptx
 
Hingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRL
Hingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRLHingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRL
Hingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRL
 
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
 

Time & Schedule, Submittals, Site visits, Testing and Inspection

  • 1. Time and Schedule Lecture 7a American University in Cairo School of Sciences and Engineering Department of Architectural Engineering AENG441 – Professional Practice, Design Management and Codes 1
  • 4. Design Scheduling • Phases of production from Conceptual Planning  Start of Construction. • Efficient use of Manpower and Resources • To achieve an economical, functional and harmonious design • Executed within a reasonable period of time • With an efficient utilization of personnel. • Experience and Judgment 4
  • 5. Design Scheduling • Phases (AIA standard owner-architect agreement) • Schematic Design: Drawings + Cost Estimate • Design Development: Drawings +Outline Specifications, + Cost Estimate • Construction Documents: Working Drawings +Final Specifications + Final Cost Estimate • Bidding and Negotiation: Receipt and Evaluation of Bids + Addenda • Construction Administration: Services after bidding or negotiation to assure that the structure is built in accordance with the construction documents. 5
  • 6. Design Scheduling • Estimate time required for reach phase. • Schematic Design phase is the most difficult to estimate - Greatest amount of variability. (1-12 months!) • Size and Complexity • Quality and Completeness of the Program Information • Decision Making Ability of the Client.(committees!) • Nature of the Design Team. 6
  • 7. Design Scheduling • Design Development and Construction Documents: • More predictable • Project Architect and/or Job Captain • From Schematic Design into Preliminary Design Drawings then Working Drawings • Complexity not Size determines scheduling and staffing requirements. • Coordination between consultants, client and designers is vital! • From 2 - 4 months • Construction Documents 3-7 months. • Bidding or Negotiation 6 weeks. 7
  • 8. Design Scheduling • Project financing to convert design into reality. • Client review and approval between phases depends on the size and complexity of the project- usually between one week. And one month. • Approvals by building department and public agencies varies considerably. 8
  • 10. Contingencies • Unexpected Problems: • Building Department • Consultants • Staffing problems • Client • 10% average additional time • Flexible and Responsive to changing conditions 10
  • 11. Working with a Builder • Working with contractor to Guarantee Maximum Project Cost (GMP: Guaranteed Maximum Price) • Time is generally shortened • Risk that design is not fully developed • Documents less specific • No bidding and negotiation phase 11
  • 12. Extending the Schedule • Change of staff • Increase cost due to inflation 12
  • 13. Shortening the Schedule • Optimum Use of staff effort and resources • Work overtime - costly and inefficient • Hire more people - Part time or freelance or subcontract to another firm - costly and inefficient. • Hire new staff - Not familiar with office procedures or projects - Expensive • Reduce man-hours - lower quality job, incomplete, unclear ,errors and inconsistencies. • Higher cost, lower quality. • Quality work requires time and staff. 13
  • 15. Establishing a Schedule • Construction Projects are Complicated • They involve the work of numerous trades and subcontractors • Coordination • Equipment and Materials • Time schedules and Cost recording 15
  • 16. Considerations 1. The construction documents - Well or Poorly prepared. 2. The architect-engineer -More or Less demanding 3. The subcontractors - coordination 4. The contractor’s organization - Project manager, field superintendent, Office and Field staff, … workload 5. Material dealers - Reliability in meeting deliverability 6. Size and complexity of the project - Most critical. 7. Site conditions - Size and Accessibility 8. The Weather 9. The possibility of labor troubles 10. The possibility of material shortage. 16
  • 17. CPM (Critical Path Method) 17
  • 18. CPM (Critical Path Method) • Planning Phase - Diagram is drawn indicating the order in which various operations are to be accomplished - Called Activities. • Activity Start and Finish referred to as “events” or “nodes” • Event: That moment when a preceding activity has been completed and the following activity may begin. • Milestone Events - Important points in the construction process. • No indication of time - arrows are not indicating time. • No gaps of discontinuities • CPM is known as a network diagram 18
  • 19. CPM (Critical Path Method) 19 Event Activity
  • 20. CPM (Critical Path Method) 20
  • 21. CPM Scheduling • Time! • Time is estimated based on past experience. • Working day is taken as a unit of time. • Consult with subcontractors. 21
  • 22. CPM (Critical Path Method) 22 1 1 1 1 2 1 1 2 2 14 Critical Path
  • 23. Critical Path • Critical Path is the longest path! • Critical activities along the path must be monitored. 23
  • 24. Float Path • Paths that are not on the CP. • The float is a measure of the extra time available for an activity or group of activities. 24
  • 25. Project Calendar • Multiply by 7/5 (5 working days in each 7 days) • 16 days x 7/5 = 22.4 or 23 calendar days. • Starting date  Completion date • Project Calendar • Critical Activities noted in color or boldface • Most building construction projects require 9 - 18 months. 25
  • 26. Contingencies • Allowance for project delays (weather, …) • Some contractors add a fixed percentage! 26
  • 27. CPM Calculations • CPM Programming • Programs. 27
  • 28. Bar Graphs • Start and finish dates of major phases. • They don’t indicate relationships nor dependencies! • Inferior to CPM as a management tool but superior as a means of visual communication. • Continue to be widely used. 28
  • 29. 29
  • 30. Shortening the Schedule • Business demands. • Minimize effect of inflation, weather, interest, … • Reduce CP time. • Critical activities 25-30% of all activities. • Shorter time increases direct cost. Less efficiency in supervision and coordination. Errors are more likely to occur. • Less time - More direct cost! • Less time - Less overhead! • Analyze the effects and determine a balance. 30
  • 31. Fast-Track Scheduling • Fast-Track - Accelerated - Telescoped scheduling. • Determine major building elements. • Produce detailed working drawings for a portion of work on which the contractor may begin construction • Further details continue • Requires close coordination: Architect - Engineers - Client - Contractor • Oversights expected, Correction of errors • Staged bidding awarded to different contractors • Cost and Time control by CM (Construction Manager) 31
  • 32. 32
  • 33. Time Management • Fabrication Time • Erection Time • Sequence of Construction Trades • Scheduling of Construction Trades 33
  • 34. Submittals - Site Visit, Testing and Inspection Lecture 7b American University in Cairo School of Sciences and Engineering Department of Architectural Engineering AENG441 – Professional Practice, Design Management and Codes 34
  • 36. Material and Equipment Submittals • Shop Drawings, Product Data, and Samples • Introduction 36
  • 37. Material and Equipment Submittals • Shop Drawings, Product Data, and Samples • Introduction 37
  • 38. Material and Equipment Submittals • Shop Drawings, Product Data, and Samples • Basic Concepts 38
  • 39. Material and Equipment Submittals • Shop Drawings, Product Data, and Samples • Basic Concepts 39
  • 40. Material and Equipment Submittals • Shop Drawings, Product Data, and Samples • Basic Concepts 40
  • 41. Material and Equipment Submittals • Shop Drawings, Product Data, and Samples • Basic Concepts • Shop drawings are not part of the contract documents. 41
  • 42. 42
  • 45. Procedures • Recordkeeping • Dates received and returned • Action taken: Approves, corrected, revised, resubmit • Retain copies of all submittals • Timeliness • Within a reasonable time • 10 working days or two weeks • Changes and Revisions • Change orders • Standard Formats for processing submittals 45
  • 47. Procedures 47 10 - 15 working days
  • 50. 50
  • 51. Site Visits • Contract Requirements • Architect's Role • Advise owner whether the contractor is performing the work in accordance with the contract documents. • Meeting Reports • Pre-Bid Meetings • Pre-Construction Meeting • During Construction 51
  • 59. Site Visits • Safety • Architect’s Role 59
  • 60. Site Visits • Safety • Architect’s Role 60
  • 61. Site Visits • Safety • Contract’s Role 61
  • 62. Site Visits • Evaluating Work Against Contract Documents 62
  • 63. Site Visits • Evaluating Work Against Contract Documents 63
  • 64. Site Visits • Evaluating Work Against Contract Documents 64
  • 65. Site Visits • Testing and Inspection 65
  • 66. Site Visits • Testing and Inspection 66
  • 67. Site Visits • Testing and Inspection 67
  • 68. Site Visits • Testing and Inspection
  • 69. Site Visits • Testing and Inspection 69
  • 70. Site Visits • Testing and Inspection 70