Unit VII ProjectStep 1:Select only ONE of the following two options:Option 1: Design a
system safety program plan for one of your own organization’s work systems, or for an
organization with which you are familiar. Option 2: Design a system safety program plan
for a bulk tank railcar off-loading facility for hydrocarbon products that has the following
features:a. one railcar switch located next to an interstate highway,b. capacity to off-load
liquid hydrocarbon products,c. two 500,000 gallon bulk liquid storage tanks for liquid
hydrocarbon products,d. two diaphragm pumps with piping between the off-loading station
and the bulk liquid storage tanks,e. one off-loading station (single-sided) that is elevated 12
feet from the ground, andf. one switch engine for staging railcars at the off-loading station
and at railcar storage tracks.Step 2: Then, using the CSU APA style example paper as a
formatting guide (including title page, abstract, body, and reference page) , include the
following:Design a minimum of a seven page system safety program plan with a minimum
of five scholarly sources (books and articles, and at least one from the CSU Online Library)
using the following level one headings:1. Defined Objectives2. System Description3. Hazard
Identification4. Hazard Analysis5. Risk Evaluation6. Hazard Controls7. Verification of
Controls8. Risk Acceptance9. Safety Control Structure Diagram (see these instructions in the
paragraph below)10. Planned Periodic System ReviewDesign a safety control structure
diagram for your work system, and embed it within your system safety program plan as the
content for your ninth level one heading. Use Figure 6.2 on page 193 in your textbook of an
ammonia fill station as an example. Notice that the designed controls within this example
structure are the level indicators, control valves, and relief valves.