Major Activities· groundwater monitoring and surveillance
Site Size· 36 hectares (88.5 acres)
Start/End Years · 2000/201 0
Estimated Average Annual Cost FY 2000-2006 · $280,000
Wayne Site (page 15)
unknown
Table of Contents

Table of Contents

Dupont & Company ...................................................................... 3
Maywood Chemical Works ................................................................ 5
Middlesex Sampling Plant ................................................................ 7
Princeton Plasma Physics Laboratory ........................................................ 9
Wayne Site ............................................................................ 15

New Jersey

1
National Defense Authorization Act (NOAA) Long-Tenn Stewm·dship Report

New Jersey

2
Dupont & Company

DUPONT & COMPANY

1

SITE SUMMARY

The DuPont & Company site (also known as the DuPont Chambers Dye Works) is located in the Townships of
Pennsville and Penns Grove on the southeastern shore of the Delaware River and is adjacent to the residential
community of Deepwater, New Jersey. The site is bordered on the north by a DuPont property (the Carneys
Works), on the east by U.S. Route 130, on the south by Salem Canal, and on the west by the Delaware River.
During the 1940s E.I. DuPont de Nemours & Company (DuPont) produced uranium products and conducted
research on uranium hexafluoride in three buildings at the site. These activities were conducted first for the U.S.
Office of Scientific Research and Development and later under contract to the Manhattan Engineer District and
the Atomic Energy Commission (AEC), predecessor agencies of the U.S. Department of Energy (DOE). The
activities that DuPont conducted in support of these contracts resulted in the contamination of onsite buildings
and soil and generated radiological waste. After these activities ceased, all the contaminated equipment were
removed and taken to the AEC portion of the Lake Ontario Ordnance Works in Lewiston, NY. Building
decontamination was conducted in 1948 under the direction of the AEC. A radiation survey was then conducted
by the AEC, and the buildings were subsequently released to DuPont.
A further survey in 1977 found elevated levels of uranium in Building 845, where uranium peroxide was
produced, and in surface and subsurface soils. This led to the DuPont & Company Site's inclusion in the

DELAWARE

NEW JERSEY
Meadows National Wildlife Refuge

-Miles

Dupont & Company

1

The DuPont & Company site is one of the 21 Formerly Utilized Sites Remedial Action Program (FUSRAP) sites
where cleanup responsibility was transferred to the U.S. Army Corps of Engineers (Corps) in accordance with the Energy and
Water Development Appropriations Act for FY 1998. At these 21 sites, the Corps is responsible for remediation and DOE is
responsible for long-term stewardship activities, if any are deemed necessary. The cleanup decisions for these sites are not yet
final and, therefore, the extent of long-term stewardship required for these sites, if any, is not yet known.
New Jersey

3
National Defense Authorization Act (NDAA) Long-Term Stewardship Rep01·t

Formerly Utilized Sites Remediation Action Program (FUSRAP).
The Corps' remedial action for this site is not yet complete and, therefore, the extent of long-term stewardship
required, if any, is not yet known.

For additional information about the DuPont & Company site, please contact:
Public Affairs Office
Philadelphia District
U.S. Army Corps of Engineers
W anamak:er Building
100 Penn Square East
Philadelphia, PA 19107-3390
Phone:215-656-6516
or visit the Internet website at: http://www.nap.usace.army.miV

New Jersey

4
Maywood Chemical Works

MAYWOOD CHEMICAL WORKS

1

SITE SUMMARY

The areas comprising the Maywood Chemical Works Site are located in a highly developed area of Bergen
County that includes residential, commercial, and municipal property in the Boroughs of Maywood and Lodi and
the Township of Rochelle Park inNew Jersey. The Maywood Chemical Works Site includes the following areas:
(1) the Maywood Interim Storage Site; (2) the Stepan property, an active chemical plant; and (3) about 80
residential, commercial and governmental properties in Maywood, Lodi, and Rochelle Park. The Maywood
Interim Storage Site is bordered by State Route 17 on the west, the New York Susquehanna and Western Railroad
line on the north, and commercial and industrial properties on the south and east.
From 1916 to 1956, Maywood Chemical Works extracted thorium and rare earth elements from monazite sands
for use in commercial products. During the operation of this plant, radioactive waste migrated or was moved
offsite and contaminated the surrounding areas. Contamination spread via the former Lodi Brook, which ran
south past the site and into the Borough of Lodi. Thorium waste in the brook settled onto properties along its
path where commercial buildings and residential houses were later built. Wastes were also used as fill or mulch
around the area.
Stepan Company acquired the Maywood Chemical Works in the late 1950s. The company began cleaning up
the residual thorium waste by partially stabilizing the residues and tailings. During the 1960s, Stepan Company

Maywood Chemical Works

1

The Maywood Chemical Works is one of the 21 Formerly Utilized Sites Remedial Action Program (FUSRAP) sites
where cleanup responsibility was transferred to the U.S. Army Corps of Engineers (Corps) in accordance with the Energy and
Water Development Appropriations Act for FY 1998. At these 21 sites, the Corps is responsible for remediation and DOE is
responsible for long-term stewardship activities, if any are deemed necessary. The cleanup decisions for these sites are not yet
final and, therefore, the extent of long-term stewardship required for these sites, if any, is not yet known.
New Jersey

5
National Defense Authorization Act (NDAA) Long-Term Stewardship Rep01·t

transferred contaminated material from one area of the site to burial pits on the Stepan property.
In the 1980s, radioactive materials were discovered in the northeastern corner of the site. Subsequent surveys
indicated that the contamination extended beyond site boundaries and, consequently, several residential vicinity
properties required remediation. The primary radioactive contaminants are thorium232 and its decay products,
as well as uranium and radium226. The primary chemical contaminants are heavy metals and rare earth
elements. The risk to the public from these contaminants is minimal. Concentrations are generally low and much
of the material is inaccessible (subsurface or beneath structures).
The Maywood Site was added to the Environmental Protection Agency's National Priorities List. At the
direction of Congress in the 1984 Energy and Water Development Appropriations Act, the site was designated
for cleanup under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Additionally, a
Memorandum of Understanding was signed between DOE and the Borough of Maywood in the 1980s concerning
the removal of the Maywood Interim Storage Pile. The Corps' remedial action for the Maywood Chemical
Works Site is not yet complete and, therefore, the extent of long-term stewardship required, if any, is not yet
known.

For additional information about the Maywood Chemical Works, please contact:
Chief of Public Affairs
New York District
U.S. Army Corps of Engineers
Jacob K. Javits Federal Building
26 Federal Plaza
New York, NY, 10278-0090
Phone: 212-264-0100
or visit the Internet website at: http://www.nan.usace.army.miV

New Jersey

6
Middlesex Sampling Plant

MIDDLESEX SAMPLING PLANT

1

SITE SUMMARY

The Middlesex Sampling Plant is located in the Borough of Middlesex in New Jersey, approximately 56
kilometers (35 miles) northeast of Trenton and 42 kilometers (26 miles) southwest of Newark. The site is
bordered on the east by residential properties on Mountain A venue, on the south by William Street, and on the
north by the Lehigh Valley Railroad line.
In the 1940s, the Manhattan Engineer District (MED), an early predecessor agency to the U.S. Department of
Energy (DOE), established the Middlesex Sampling Plant to sample, store, and ship uranium and thorium ores.
When MED operations at the site ceased in 1955, the Atomic Energy Commission (AEC), the successor agency
to the MED and a predecessor agency to DOE, used this site to store and sample thorium. In the 1960s,
operations at the Middlesex Sampling Plant were terminated and all remaining thorium sampling activities were
transferred to the Feed Materials Production Center and to the Weldon Spring Plant.
The activities that took place at the site during the 1950s and 1960s contaminated not only onsite soil and
facilities but also vicinity properties and a nearby municipal landfill. Primary contaminants at the site include
uranium, radium, thorium, lead, and organics.

NEW JERSEY

Belle Mead General Depot

Miles

Middlesex Sampling Plant

1

The Middlesex Sampling Plant is one of the 21 Formerly Utilized Sites Remedial Action Program (FUSRAP) sites
where cleanup responsibility was transferred to the U.S. Army Corps of Engineers (Corps) in accordance with the Energy and
Water Development Appropriations Act for FY 1998. At these 21 sites, the Corps is responsible for remediation and DOE is
responsible for long-term stewardship activities, if any are deemed necessary. The cleanup decisions for these sites are not yet
final and, therefore, the extent of long-term stewardship required for these sites, if any, is not yet known.
New Jersey

7
National Defense Authorization Act (NDAA) Long-Tet·m Stewanlship Report

When ABC activities were terminated, onsite structures were decontaminated to levels that met the current
standards. From the late 1960s until the late 1970s, the site was used by the U.S. Marine Corps. In 1978, the
DOE assumed custody of the site and the site was designated for cleanup under the Formerly Utilized Sites
Remedial Action Program (FUSRAP). The Army Corps of Engineers' remedial action for the Middlesex
Sampling Plant Site is not yet complete and, therefore, the extent of long-term stewardship required, if any, is
not yet known.

For additional information about the Middlesex Sampling Plant, please contact:
Chief of Public Affairs
New York District
U.S. Army Corps of Engineers
Jacob K. Javits Federal Building
26 Federal Plaza
New York, NY, 10278-0090
Phone: 212-264-0100
or visit the Internet website at: http://www.nan.usace.army.mil/

New Jersey

8
Princeton Plasma Physics Laboratory

PRINCETON PLASMA PHYSICS LABORATORY
1.0

SITE SUMMARY

1.1

Site Description and Mission

The Princeton Plasma Physics Laboratory is a
LONG-TERM STEWARDSHIP HIGHLIGHTS
Collaborative National Center for plasma and fusion
science. The Laboratory is located on 36 hectares (88.5
Major Long-Term Stewardship Activitiesacres) of property leased from Princeton University on
groundwater monitoring and surveillance
the James Forrestal Campus, in Plainsboro Township,
Total Site Area- 36 hectares (88.5 acres)
Middlesex County, New Jersey. The Laboratory
Estimated Volume of Residual Contaminantsoperates several devices, including the National
groundwater 189,270 cubic meters (247,556 cubic
yards)
Spherical Torus Experiment on Princeton University's
Long-Term Stewardship Start-End Years- 2000-2010
campus. The Tokamak Fusion Test Reactor, which
Average Annual Long-Term Stewardship Cost
achieved world-record energy output, is currently
FY2000-2006- $280,000
undergoing dismantlement and will be completed by
Landlord- U.S. Department of Energy, Office of
2003. Other site facilities include maintenance shops,
Science
warehouses, transformer yards, storage buildings,
administrative offices, educational facilities, and
miscellaneous trailers. Princeton University is the operating contractor for the Laboratory. DOE's lease with
Princeton University expires in 2026, unless DOE decides to terminate it earlier.
The Princeton Plasma Physics Laboratory's primary mission is to conduct research and development of nuclear
fusion technology as an attractive energy source. The Laboratory also historically provided research and
development for fusion energy programs sponsored by DOE and its predecessor agencies. Research at the
Laboratory began in 1959 with construction of the Model C-Stellerator, which was later converted to a pulseoperated device. Past activities and operations contaminated the soil and groundwater at the site with volatile
organic compounds (petroleum, hydrocarbons, and solvents). All site remediation activities have been completed
for soil, allowing unrestricted use of the site (with respect to soil). Groundwater in the shallow aquifer along the
southern portion of the site, which comprises a surface area of about 12 hectares (30 acres), contains relatively
low levels of chlorinated volatile organic compounds.
The Laboratory continues to generate waste, including oils, solvents, polychlorinated biphenyls, and low-level
radioactive wastes. Waste is neither treated nor disposed of onsite, but it is collected in satellite accumulation
areas before it is transferred to offsite locations. Hazardous waste is sent to commercial facilities, and low-level
radioactive waste is shipped to other DOE sites for disposal.

1.2

Site Cleanup and Accomplishments

DOE completed soil remediation activities at Site C/D on the university campus in 1999. Soil contamination
consisted of chromium (a heavy metal) and oil-related organic compounds. Approximately 153 cubic meters
(200 cubic yards) of the metal-contaminated soil were excavated and disposed of at a commercial facility
permitted to accept hazardous waste. Approximately 30 cubic meters (40 cubic yards) of organics-contaminated
soil were removed and disposed offsite. All contaminated soils were remediated to cleanup standards dictated
by the New Jersey Department of Environmental Protection. In 2000, the New Jersey Department of
Environmental Protection released the site (with respect to soil) for unrestricted use under a "No Further Action
Determination." Because of the success of the soil removal actions, and the full characterization of the soils
throughout the site, long-term monitoring of the soil is not required.

New Jersey

9
National Defense Authorization Act (NDAA) Long-Tenn Stewardship Report

~ Groundwater Contamination

0

I ,000

2,000

Feet

Basin

Princeton Plasma Physics Laboratory

The single medium of concern that remains at the site is the groundwater contamination within the shallow
aquifer, which most likely resulted from surface spills of solvents. This medium will require long-term
stewardship activities.
All surface water from the building sumps is discharged into a lined stormwater detention basin, which
discharges into a nearby brook. The discharge to the brook is routinely monitored in compliance with a State
of New Jersey surface water discharge permit. Because of the natural degradation of the volatile organic
compounds within the aquifer, dilution, and volatilization, residual volatile organic compounds are below the
regulatory discharge limit to the brook. If volatile organic compounds levels in the discharge rise in the future,
mitigation measures may be necessary.

New Jersey

10
Princeton Plasma Physics Laboratory

2.0

SITE· WIDE LONG· TERM STEWARDSHIP

2.1

Site-Wide Long-Term Stewardship Activities

Because of the contamination resulting from past
operations, long-term stewardship activities will be
required at the Princeton Plasma Physics Laboratory.
These activities, for the most part, will involve
groundwater monitoring and surveillance to prevent
contaminants from migrating offsite. Currently, DOE
anticipates monitoring will continue until 2010. Soils
are not subject to long-term stewardship activities since
they have been remediated to acceptable levels and the
site is no longer restricted for use.
No institutional controls are required under the "No
Further Action Determination" issued by the New
Jersey Department of Environmental Protection.
However, because DOE leases the 36 hectares (88.5
acres) of property from Princeton University, DOE is
bound by the terms of the lease agreement to return the
property to Princeton University free from
environmental hazards.

SITE ACCOMPLISHMENTS
• Removed or closed in-place all (11) underground
storage tank systems and associated contaminated
soil. Added six above-ground, secondarilyconfined tanks (1989-1993)
• Installed impermeable line in retention basin for
collecting onsite surface water and groundwater
from building dewatering sumps (1995)
• Completed two soil removal actions: 153 cubic
meters (200 cubic yards) of soil contaminated with
heavy metal (chromium); 30 cubic meters (40 cubic
yards) of organics-contaminated soil
• Baseline ecological evaluation found no evidence
of impacts to vegetation or wildlife attributable to
onsite environmental conditions (1998)
• All identified areas of concern (10) for soil
contamination characterized, determined clean, and
no further action issued by State of New Jersey for
soil (2000)

ANTICIPATED SITE
The New Jersey Department of Environmental
ACCOMPLISHMENTS AS OF 2006
Protection will implement an institutional control
designated as a "classification exception area" for the
• Princeton Plasma Physics Laboratory will continue
contaminated groundwater plume at the Laboratory.
to monitor the natural attenuation of groundwater
The "classification exception area" functions as a deed
contaminants at least until2010
restriction on groundwater at the site, preventing its
unauthorized use. The "classification exception area"
designation also provides regulatory relief, allowing groundwater contaminants to naturally and passively degrade
until the statewide groundwater quality standards are met. Because soil contamination is no longer present at
levels above New Jersey Department of Environmental Protection standards and the low levels of groundwater
contamination are inaccessible to human contact, exposure to site workers or the public is not a concern. In
addition, a baseline ecological evaluation conducted during a site remedial investigation found no adverse
environmental impacts from the groundwater contamination. As a result, the site does not require any special
physical barriers (e.g., fences) or visual warnings (e.g., signs).
Record-keeping activities are required under a Memorandum of Understanding between Princeton University
and the New Jersey Department of Environmental Protection, which governed the cleanup activities at the
Laboratory. The Laboratory is currently required to maintain all characterization, remediation and monitoring
records for a minium of 30 years. In addition, the Laboratory also maintains a public information repository in
which copies of applicable remedial investigation
documents are kept.
STAKEHOWER INVOLVEMENT

Technology Development and Deployment
Princeton Plasma Physics Laboratory deployed lowflow groundwater sampling pumps in all groundwater
New Jersey

The Laboratory conducts annual briefings with the
local municipal Environmental Advisory Committee as
part of its ongoing public information efforts.
11
National Defense Authorization Act (NDAA) Long-Term Stewm·dship Report

monitoring wells. This technology consists of small air- driven bladder pumps located at the bottom of each well
that gently purges the well water while analyzing various groundwater parameters (e.g., temperature,
alkalinity/acidity, redox). Once the parameters have stabilized, a groundwater sample is taken. As a result, the
depiction of actual groundwater conditions are more precise, and less waste water is generated during the well
purging process. Utilization of this technology will continue for the duration of the long-term stewardship
monitoring program.

2.2

Specific Long-Term Stewardship Activities

Groundwater
The single medium of concern that remains at the site is the groundwater contamination within the shallow
aquifer, which most likely resulted from past surface spills of chlorinated solvents. The remediation strategy
applied to the volatile organic compounds and petroleum (and approved by the New Jersey Department of
Environmental Protection) is hydraulic control of migration with existing building dewatering pumps,
monitoring, and natural attenuation. This remedy- referred to as "hydraulic groundwater control"- will keep
contaminants from migrating offsite while chlorinated volatile organic compounds are allowed to naturally
degrade within the aquifer. At this time, no engineered groundwater treatment system is required. The progress
of natural attenuation will be monitored by quarterly groundwater sampling until New Jersey water quality
standards are met. Target cleanup levels are one part per billion for tetrachloroethene, trichlorethene, 1,1,1trichloroethane, and dichloroethenes under New Jersey groundwater quality standards.
Approximately 12 hectares (30 acres), with an average saturated thickness of nine meters (30 feet), of the aquifer
on the southern boundary of the site is contaminated above New Jersey water standards. This equates to
approximately 189,270 cubic meters (247,556 cubic yards) of contaminated groundwater. Monitoring is required
to document the selected remedy of hydraulic control and natural contaminant attenuation.

2.3

Regulatory Regime

Long-term stewardship activities of the Princeton Plasma Physics Laboratory are governed by the New Jersey
Department of Environmental Protection pursuant to the Administrative Code of the New Jersey Technical
Requirements for Site Remediation. This regulatory requirement is executed in accordance with a Memorandum
of Understanding (Feb. 3, 1993) between Princeton University and theNew Jersey Department of Environmental
Protection for the remediating Site C and D of the James Forrestal Campus. The MOU acknowledges that Site
CID is leased by DOE and that DOE contracts with Princeton University to manage and operate the Laboratory.
A letter issued by the Department's Bureau of Case Management on March 17, 2000, approved the Remedial
Investigation/Remedial Action Selection Report and approved the proposed groundwater remedy of hydraulic
containment and natural attenuation.
All long-term stewardship activities exclusively address the groundwater at the Laboratory. A No Further Action
Letter and Covenant Not to Sue for the soil at Princeton was signed by the New Jersey Department of
Environmental Protection and Princeton University on March 28, 2000. No long-term stewardship activities are
required for the soils at the Princeton Plasma Physics Laboratory. Because the long-term remedial activity at the
Princeton Plasma Physic Laboratory consists only of the continuation of groundwater monitoring, no additional
remedial systems are identified or required at this time. Therefore, a review under the National Environmental
Policy Act of 1969, as amended, is not applicable and no hazardous or low-level radioactive waste will be
generated as a result of the selected long-term stewardship activities.

New Jersey

12
Princeton Plasma Physics Labomtory

2.4

Assumptions and Uncertainties

The long-term surveillance and monitoring of the groundwater contamination is assumed to consist of quarterly
monitoring for at least 10 years until 2010. No further actions will be required. Princeton Plasma Physics
Laboratory will continue to operate as a national laboratory for energy research. Therefore, future use of this
facility will remain industrial.

3.0

ESTIMATED LONG· TERM STEWARDSHIP COSTS

The estimated costs for long-term stewardship activities at the Princeton Plasma Physics Laboratory are identified
in the table below. The annual site-wide cost estimate for long-term stewardship activities is approximately
$280,000 per year for the period of fiscal years (FY) 2000-2010. An annual budget of $273,000 (in FY 1999)
dollars supported the quarterly groundwater collection and analysis, general maintenance of monitoring wells,
administrative reporting and record-keeping. Beginning in FY 2001, these costs and responsibilities will be
transferred from DOE's Office of Environmental Management to DOE's Office of Science.
Site Long-Term Stewardship Costs (Constant Year 2000 Dollars)
Year(s)

Amount

Year(s)

Amount

Year(s)

Amount

FY 2000

$273,000

FY 2008

$281,000

FY 2036-2040

$0

FY 2001

$281,000

FY 2009

$281,000

FY 2041-2045

$0

FY 2002

$281,000

FY 2010

$281,000

FY 2046-2050

$0

FY 2003

$281,000

FY 2011-2015

$0

FY 2051-2055

$0

FY 2004

$281,000

FY 2016-2020

$0

FY 2056-2060

$0

FY 2005

$281,000

FY 2021-2025

$0

FY 2061-2065

$0

FY 2006

$281,000

FY 2026-2030

$0

FY 2066-2070

$0

FY 2007

$281,000

FY2031-2035

$0

4.0

FUTURE USES

The Princeton Plasma Physics Laboratory will continue to operate as a national laboratory conducting research
in plasma science and fusion energy. Therefore, future use of this facility will remain industrial - as a
commercial/research property consistent with past use. With respect to soil contamination, unrestricted use is
allowed. The Laboratory and all surrounding properties receive potable water from the public water utility. The
Laboratory uses the nearby Delaware and Raritan Canal for process cooling water. The onsite water supply wells
are available only for backup fire fighting purposes and are not used for potable purposes. As a result, the existing
groundwater contamination has not affected the existing land use as a "commercial/research property." If the
Laboratory's lease expires in 2026 without renewal, or is terminated prior to expiration, DOE is bound by the
lease agreement to return the property free of environmental hazards.

New Jersey

13
National Defense Authorization Act (NDAA) Long-Term Stewardship Report

For additional information about the Princeton Plasma Physics Laboratory, please contact:
Jeffrey Makiel, Environmental Engineer
P.O. Box 102
Princeton, NJ 08542-0102
Phone: 609-243-3721
or visit the Internet website at http://www.pppl.gov

New Jersey

14
Wayne Site

WAYNE SITE

I

SITE SUMMARY

The Wayne Site is located about 3.2 kilometers (two miles) north of Wayne, New Jersey, in a highly developed
area of Passaic County. The site is approximately 58 kilometers (36 miles) northwest of New York City.
Between 1948 and 1971, Rare Earths, Inc., and its successor, W.R. Grace and Company, processed monazite
sands to recover thorium and other rare earth elements. In 1955, under a contract issued by the Atomic Energy
Commission (AEC), a predecessor agency to the U.S. Department of Energy (DOE), the company began to
process Government-owned thorium ores for the AEC (ABC-funded thorium processing may have begun as early
as 1948). The contract was terminated in 1960. Thereafter, W.R. Grace and Co. processed monazite sands for
commercial purposes until 1971. Between 1967 and 1984, the property was leased to and occupied by ElectroNucleonics, Inc.
Prior to 1960, radioactive residues from the processing of thorium ores were placed in above-ground piles. From
1960 to 1967, the thorium wastes were buried-- sometime between 1960 and 1964, they were buried in large
unlined pits. In 1965, the material was exhumed and buried in smaller pits. From 1967 to 1971, thorium
phosphate wastes were shipped to the W.R. Grace and Co. plant in Chattanooga, Tennessee.
Liquid wastes were neutralized in an onsite treatment plant and released into the storm water sewer system,
which discharges into Sheffield Brook and, eventually, into the Pompton River. In 1971, at the request ofW.R.
Grace and Co., AEC modified the W.R. Grace license to allow only storage.

Wayne Site

1

The Wayne Site is one of the 21 Formerly Utilized Sites Remedial Action Program (FUSRAP) sites where cleanup
responsibility was transferred to the U.S. Army Corps of Engineers (Corps) in accordance with the Energy and Water
Development Appropriations Act for FY 1998. At these 21 sites, the Corps is responsible for remediation and DOE is
responsible for long-term stewardship activities, if any are deemed necessary. The cleanup decisions for these sites are not yet
final and, therefore, the extent of long-term stewardship required for these sites, if any, is not yet known.
New Jersey

15
National Defense Authorization Act (NDAA) Long-lerm Stewardship Report

After plant operations ceased in 1971, W.R. Grace and Co. partially decontaminated the site. In addition to
covering an onsite disposal area with clean fill, the company razed several buildings and buried the resulting
rubble and processing equipment in place. The remaining buildings were decontaminated and left intact.
The primary contaminants of concern are thorium and radium and their daughter products. Tailings migrated
offsite via Sheffield Brook and contaminated vicinity properties. Areas surrounding the railroad spur in nearby
Pequannock, where thorium-containing ores were unloaded, were also contaminated. Cleanup has been
completed and certified at most of the designated vicinity properties. Radioactive residues from the vicinity
property cleanup are in interim storage on the site.
The Wayne Site is on the U.S. Environmental Protection Agency (EPA) National Priorities List and is also the
subject of a Federal Facilities Agreement between U.S. Department of Energy (DOE) and EPA. In 1983,
Congress authorized the cleanup of the Wayne Site under the Formerly Utilized Site Remediation Action
Program (FUSRAP). In September of 1984, the Wayne Site was donated to DOE. The Corps' remedial action
for the site is not yet complete and, therefore, the extent of long-term stewardship required, if any, is not yet
known.

For additional information about the Wayne Site, please contact:
Chief of Public Affairs
New York District
U.S. Army Corps of Engineers
Jacob K. Javits Federal Building
26 Federal Plaza
New York, NY, 10278-0090
Phone:212-264-0100
or visit the Internet website at: http://www.nan.usace.army.mil/

New Jersey

16

Mais conteúdo relacionado

Mais procurados

The Environmental Impact of Macroeconomic Policies On Mining and Quarrying Se...
The Environmental Impact of Macroeconomic Policies On Mining and Quarrying Se...The Environmental Impact of Macroeconomic Policies On Mining and Quarrying Se...
The Environmental Impact of Macroeconomic Policies On Mining and Quarrying Se...No to mining in Palawan
 
Environmental Issues in Real Estate Transactions
Environmental Issues in Real Estate Transactions Environmental Issues in Real Estate Transactions
Environmental Issues in Real Estate Transactions Polsinelli PC
 
South carolina ndaa summary vol 2
South carolina ndaa summary vol 2South carolina ndaa summary vol 2
South carolina ndaa summary vol 2Jim Werner
 

Mais procurados (11)

Resume2009
Resume2009Resume2009
Resume2009
 
The Environmental Impact of Macroeconomic Policies On Mining and Quarrying Se...
The Environmental Impact of Macroeconomic Policies On Mining and Quarrying Se...The Environmental Impact of Macroeconomic Policies On Mining and Quarrying Se...
The Environmental Impact of Macroeconomic Policies On Mining and Quarrying Se...
 
Emc²
Emc²Emc²
Emc²
 
Environmental Issues in Real Estate Transactions
Environmental Issues in Real Estate Transactions Environmental Issues in Real Estate Transactions
Environmental Issues in Real Estate Transactions
 
Nevada
NevadaNevada
Nevada
 
Illinois
IllinoisIllinois
Illinois
 
South carolina ndaa summary vol 2
South carolina ndaa summary vol 2South carolina ndaa summary vol 2
South carolina ndaa summary vol 2
 
Puerto rico
Puerto ricoPuerto rico
Puerto rico
 
Texas
TexasTexas
Texas
 
FONSI
FONSIFONSI
FONSI
 
South dakota
South dakotaSouth dakota
South dakota
 

Destaque

珍惜緣份
珍惜緣份珍惜緣份
珍惜緣份suminch
 
คณิตศาสตร์
คณิตศาสตร์คณิตศาสตร์
คณิตศาสตร์Pim Jazz
 
Cloudian nosql casestudy_20120318
Cloudian nosql casestudy_20120318Cloudian nosql casestudy_20120318
Cloudian nosql casestudy_20120318CLOUDIAN KK
 
Final presentation pearson
Final presentation pearsonFinal presentation pearson
Final presentation pearsonnycylith
 
EPW Tmy Werner July 2007 Final
EPW Tmy Werner July 2007 FinalEPW Tmy Werner July 2007 Final
EPW Tmy Werner July 2007 FinalJim Werner
 
From Cleanup to Stewardship Oct 1999
From Cleanup to Stewardship Oct 1999From Cleanup to Stewardship Oct 1999
From Cleanup to Stewardship Oct 1999Jim Werner
 
What is Seo
What is SeoWhat is Seo
What is Seosyklops
 
Elr rad waste article werner
Elr rad waste article wernerElr rad waste article werner
Elr rad waste article wernerJim Werner
 
File server by CLOUDIAN HyperStore
File server by CLOUDIAN HyperStoreFile server by CLOUDIAN HyperStore
File server by CLOUDIAN HyperStoreCLOUDIAN KK
 
Bernu žūrija
Bernu žūrijaBernu žūrija
Bernu žūrijaValmibibl
 
I miss my best friends !
I miss my best friends !I miss my best friends !
I miss my best friends !miistyxoxo
 
Presentación productos de aragon
Presentación productos de aragonPresentación productos de aragon
Presentación productos de aragonARAGON&CALIDAD*****
 

Destaque (20)

Happinessisa voyage
Happinessisa voyageHappinessisa voyage
Happinessisa voyage
 
Culinary. .art
Culinary. .artCulinary. .art
Culinary. .art
 
珍惜緣份
珍惜緣份珍惜緣份
珍惜緣份
 
Mengenal software geogebra
Mengenal software geogebraMengenal software geogebra
Mengenal software geogebra
 
คณิตศาสตร์
คณิตศาสตร์คณิตศาสตร์
คณิตศาสตร์
 
Cloudian nosql casestudy_20120318
Cloudian nosql casestudy_20120318Cloudian nosql casestudy_20120318
Cloudian nosql casestudy_20120318
 
Final presentation pearson
Final presentation pearsonFinal presentation pearson
Final presentation pearson
 
EPW Tmy Werner July 2007 Final
EPW Tmy Werner July 2007 FinalEPW Tmy Werner July 2007 Final
EPW Tmy Werner July 2007 Final
 
From Cleanup to Stewardship Oct 1999
From Cleanup to Stewardship Oct 1999From Cleanup to Stewardship Oct 1999
From Cleanup to Stewardship Oct 1999
 
China life at home
China life at homeChina life at home
China life at home
 
What is Seo
What is SeoWhat is Seo
What is Seo
 
Iowa
IowaIowa
Iowa
 
Elr rad waste article werner
Elr rad waste article wernerElr rad waste article werner
Elr rad waste article werner
 
Jobmatching udine
Jobmatching udineJobmatching udine
Jobmatching udine
 
Washington
WashingtonWashington
Washington
 
My book
My bookMy book
My book
 
File server by CLOUDIAN HyperStore
File server by CLOUDIAN HyperStoreFile server by CLOUDIAN HyperStore
File server by CLOUDIAN HyperStore
 
Bernu žūrija
Bernu žūrijaBernu žūrija
Bernu žūrija
 
I miss my best friends !
I miss my best friends !I miss my best friends !
I miss my best friends !
 
Presentación productos de aragon
Presentación productos de aragonPresentación productos de aragon
Presentación productos de aragon
 

Semelhante a New jersey

South carolina
South carolinaSouth carolina
South carolinaJim Werner
 
Montrose Del Amo Site Update English Spread Final Web Oct 2016
Montrose Del Amo Site Update English Spread Final Web Oct 2016Montrose Del Amo Site Update English Spread Final Web Oct 2016
Montrose Del Amo Site Update English Spread Final Web Oct 2016Alekito
 
Missouri summary ndaa
Missouri summary ndaaMissouri summary ndaa
Missouri summary ndaaJim Werner
 
Missouri summary ndaa
Missouri summary ndaaMissouri summary ndaa
Missouri summary ndaaJim Werner
 
South carolina
South carolinaSouth carolina
South carolinaJim Werner
 
Missouri summary ndaa
Missouri summary ndaaMissouri summary ndaa
Missouri summary ndaaJim Werner
 
South carolina ndaa summary vol 2
South carolina ndaa summary vol 2South carolina ndaa summary vol 2
South carolina ndaa summary vol 2Jim Werner
 
South carolina ndaa summary vol 2
South carolina ndaa summary vol 2South carolina ndaa summary vol 2
South carolina ndaa summary vol 2Jim Werner
 

Semelhante a New jersey (20)

Oregon
OregonOregon
Oregon
 
Missouri
MissouriMissouri
Missouri
 
Missouri
MissouriMissouri
Missouri
 
South dakota
South dakotaSouth dakota
South dakota
 
Iowa
IowaIowa
Iowa
 
South carolina
South carolinaSouth carolina
South carolina
 
Montrose Del Amo Site Update English Spread Final Web Oct 2016
Montrose Del Amo Site Update English Spread Final Web Oct 2016Montrose Del Amo Site Update English Spread Final Web Oct 2016
Montrose Del Amo Site Update English Spread Final Web Oct 2016
 
Missouri summary ndaa
Missouri summary ndaaMissouri summary ndaa
Missouri summary ndaa
 
Missouri summary ndaa
Missouri summary ndaaMissouri summary ndaa
Missouri summary ndaa
 
South carolina
South carolinaSouth carolina
South carolina
 
Missouri summary ndaa
Missouri summary ndaaMissouri summary ndaa
Missouri summary ndaa
 
Picatinny2
Picatinny2Picatinny2
Picatinny2
 
Tennessee
TennesseeTennessee
Tennessee
 
Idaho
IdahoIdaho
Idaho
 
Kentucky
KentuckyKentucky
Kentucky
 
Puerto rico
Puerto ricoPuerto rico
Puerto rico
 
South carolina ndaa summary vol 2
South carolina ndaa summary vol 2South carolina ndaa summary vol 2
South carolina ndaa summary vol 2
 
South carolina ndaa summary vol 2
South carolina ndaa summary vol 2South carolina ndaa summary vol 2
South carolina ndaa summary vol 2
 
Kentucky
KentuckyKentucky
Kentucky
 
West virginia
West virginiaWest virginia
West virginia
 

Mais de Jim Werner

Mais de Jim Werner (17)

Werner Jim Testomony FINAL Nov 2005 Senate EPW Subcommittee on Clean Air
Werner Jim Testomony FINAL Nov 2005 Senate EPW Subcommittee on Clean AirWerner Jim Testomony FINAL Nov 2005 Senate EPW Subcommittee on Clean Air
Werner Jim Testomony FINAL Nov 2005 Senate EPW Subcommittee on Clean Air
 
ELR Rad Waste Article Werner
ELR Rad Waste Article WernerELR Rad Waste Article Werner
ELR Rad Waste Article Werner
 
cover
covercover
cover
 
Wyoming
WyomingWyoming
Wyoming
 
Utah
UtahUtah
Utah
 
Texas
TexasTexas
Texas
 
Pennsylvania
PennsylvaniaPennsylvania
Pennsylvania
 
Ohio
OhioOhio
Ohio
 
New jersey
New jerseyNew jersey
New jersey
 
New mexico
New mexicoNew mexico
New mexico
 
Nevada
NevadaNevada
Nevada
 
Nebraska
NebraskaNebraska
Nebraska
 
Mississippi
MississippiMississippi
Mississippi
 
Mass
MassMass
Mass
 
Maryland
MarylandMaryland
Maryland
 
Illinois
IllinoisIllinois
Illinois
 
Florida
FloridaFlorida
Florida
 

Último

EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 

Último (20)

EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 

New jersey

  • 1. New Jersey Maywood Chemical Works Princeton Plasma Physics Laboratory Wayne Site Middlesex Sampling Plant DuPont & Company Long-Term Stewardship Site Highlights DuPont and Company (page 3) unknown Maywood Chemical Works (page 5) unknown Middlesex Sampling Plant (page 7) unknown Princeton Plasma Physics Laboratory (page 9) Major Activities· groundwater monitoring and surveillance Site Size· 36 hectares (88.5 acres) Start/End Years · 2000/201 0 Estimated Average Annual Cost FY 2000-2006 · $280,000 Wayne Site (page 15) unknown
  • 2.
  • 3. Table of Contents Table of Contents Dupont & Company ...................................................................... 3 Maywood Chemical Works ................................................................ 5 Middlesex Sampling Plant ................................................................ 7 Princeton Plasma Physics Laboratory ........................................................ 9 Wayne Site ............................................................................ 15 New Jersey 1
  • 4. National Defense Authorization Act (NOAA) Long-Tenn Stewm·dship Report New Jersey 2
  • 5. Dupont & Company DUPONT & COMPANY 1 SITE SUMMARY The DuPont & Company site (also known as the DuPont Chambers Dye Works) is located in the Townships of Pennsville and Penns Grove on the southeastern shore of the Delaware River and is adjacent to the residential community of Deepwater, New Jersey. The site is bordered on the north by a DuPont property (the Carneys Works), on the east by U.S. Route 130, on the south by Salem Canal, and on the west by the Delaware River. During the 1940s E.I. DuPont de Nemours & Company (DuPont) produced uranium products and conducted research on uranium hexafluoride in three buildings at the site. These activities were conducted first for the U.S. Office of Scientific Research and Development and later under contract to the Manhattan Engineer District and the Atomic Energy Commission (AEC), predecessor agencies of the U.S. Department of Energy (DOE). The activities that DuPont conducted in support of these contracts resulted in the contamination of onsite buildings and soil and generated radiological waste. After these activities ceased, all the contaminated equipment were removed and taken to the AEC portion of the Lake Ontario Ordnance Works in Lewiston, NY. Building decontamination was conducted in 1948 under the direction of the AEC. A radiation survey was then conducted by the AEC, and the buildings were subsequently released to DuPont. A further survey in 1977 found elevated levels of uranium in Building 845, where uranium peroxide was produced, and in surface and subsurface soils. This led to the DuPont & Company Site's inclusion in the DELAWARE NEW JERSEY Meadows National Wildlife Refuge -Miles Dupont & Company 1 The DuPont & Company site is one of the 21 Formerly Utilized Sites Remedial Action Program (FUSRAP) sites where cleanup responsibility was transferred to the U.S. Army Corps of Engineers (Corps) in accordance with the Energy and Water Development Appropriations Act for FY 1998. At these 21 sites, the Corps is responsible for remediation and DOE is responsible for long-term stewardship activities, if any are deemed necessary. The cleanup decisions for these sites are not yet final and, therefore, the extent of long-term stewardship required for these sites, if any, is not yet known. New Jersey 3
  • 6. National Defense Authorization Act (NDAA) Long-Term Stewardship Rep01·t Formerly Utilized Sites Remediation Action Program (FUSRAP). The Corps' remedial action for this site is not yet complete and, therefore, the extent of long-term stewardship required, if any, is not yet known. For additional information about the DuPont & Company site, please contact: Public Affairs Office Philadelphia District U.S. Army Corps of Engineers W anamak:er Building 100 Penn Square East Philadelphia, PA 19107-3390 Phone:215-656-6516 or visit the Internet website at: http://www.nap.usace.army.miV New Jersey 4
  • 7. Maywood Chemical Works MAYWOOD CHEMICAL WORKS 1 SITE SUMMARY The areas comprising the Maywood Chemical Works Site are located in a highly developed area of Bergen County that includes residential, commercial, and municipal property in the Boroughs of Maywood and Lodi and the Township of Rochelle Park inNew Jersey. The Maywood Chemical Works Site includes the following areas: (1) the Maywood Interim Storage Site; (2) the Stepan property, an active chemical plant; and (3) about 80 residential, commercial and governmental properties in Maywood, Lodi, and Rochelle Park. The Maywood Interim Storage Site is bordered by State Route 17 on the west, the New York Susquehanna and Western Railroad line on the north, and commercial and industrial properties on the south and east. From 1916 to 1956, Maywood Chemical Works extracted thorium and rare earth elements from monazite sands for use in commercial products. During the operation of this plant, radioactive waste migrated or was moved offsite and contaminated the surrounding areas. Contamination spread via the former Lodi Brook, which ran south past the site and into the Borough of Lodi. Thorium waste in the brook settled onto properties along its path where commercial buildings and residential houses were later built. Wastes were also used as fill or mulch around the area. Stepan Company acquired the Maywood Chemical Works in the late 1950s. The company began cleaning up the residual thorium waste by partially stabilizing the residues and tailings. During the 1960s, Stepan Company Maywood Chemical Works 1 The Maywood Chemical Works is one of the 21 Formerly Utilized Sites Remedial Action Program (FUSRAP) sites where cleanup responsibility was transferred to the U.S. Army Corps of Engineers (Corps) in accordance with the Energy and Water Development Appropriations Act for FY 1998. At these 21 sites, the Corps is responsible for remediation and DOE is responsible for long-term stewardship activities, if any are deemed necessary. The cleanup decisions for these sites are not yet final and, therefore, the extent of long-term stewardship required for these sites, if any, is not yet known. New Jersey 5
  • 8. National Defense Authorization Act (NDAA) Long-Term Stewardship Rep01·t transferred contaminated material from one area of the site to burial pits on the Stepan property. In the 1980s, radioactive materials were discovered in the northeastern corner of the site. Subsequent surveys indicated that the contamination extended beyond site boundaries and, consequently, several residential vicinity properties required remediation. The primary radioactive contaminants are thorium232 and its decay products, as well as uranium and radium226. The primary chemical contaminants are heavy metals and rare earth elements. The risk to the public from these contaminants is minimal. Concentrations are generally low and much of the material is inaccessible (subsurface or beneath structures). The Maywood Site was added to the Environmental Protection Agency's National Priorities List. At the direction of Congress in the 1984 Energy and Water Development Appropriations Act, the site was designated for cleanup under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Additionally, a Memorandum of Understanding was signed between DOE and the Borough of Maywood in the 1980s concerning the removal of the Maywood Interim Storage Pile. The Corps' remedial action for the Maywood Chemical Works Site is not yet complete and, therefore, the extent of long-term stewardship required, if any, is not yet known. For additional information about the Maywood Chemical Works, please contact: Chief of Public Affairs New York District U.S. Army Corps of Engineers Jacob K. Javits Federal Building 26 Federal Plaza New York, NY, 10278-0090 Phone: 212-264-0100 or visit the Internet website at: http://www.nan.usace.army.miV New Jersey 6
  • 9. Middlesex Sampling Plant MIDDLESEX SAMPLING PLANT 1 SITE SUMMARY The Middlesex Sampling Plant is located in the Borough of Middlesex in New Jersey, approximately 56 kilometers (35 miles) northeast of Trenton and 42 kilometers (26 miles) southwest of Newark. The site is bordered on the east by residential properties on Mountain A venue, on the south by William Street, and on the north by the Lehigh Valley Railroad line. In the 1940s, the Manhattan Engineer District (MED), an early predecessor agency to the U.S. Department of Energy (DOE), established the Middlesex Sampling Plant to sample, store, and ship uranium and thorium ores. When MED operations at the site ceased in 1955, the Atomic Energy Commission (AEC), the successor agency to the MED and a predecessor agency to DOE, used this site to store and sample thorium. In the 1960s, operations at the Middlesex Sampling Plant were terminated and all remaining thorium sampling activities were transferred to the Feed Materials Production Center and to the Weldon Spring Plant. The activities that took place at the site during the 1950s and 1960s contaminated not only onsite soil and facilities but also vicinity properties and a nearby municipal landfill. Primary contaminants at the site include uranium, radium, thorium, lead, and organics. NEW JERSEY Belle Mead General Depot Miles Middlesex Sampling Plant 1 The Middlesex Sampling Plant is one of the 21 Formerly Utilized Sites Remedial Action Program (FUSRAP) sites where cleanup responsibility was transferred to the U.S. Army Corps of Engineers (Corps) in accordance with the Energy and Water Development Appropriations Act for FY 1998. At these 21 sites, the Corps is responsible for remediation and DOE is responsible for long-term stewardship activities, if any are deemed necessary. The cleanup decisions for these sites are not yet final and, therefore, the extent of long-term stewardship required for these sites, if any, is not yet known. New Jersey 7
  • 10. National Defense Authorization Act (NDAA) Long-Tet·m Stewanlship Report When ABC activities were terminated, onsite structures were decontaminated to levels that met the current standards. From the late 1960s until the late 1970s, the site was used by the U.S. Marine Corps. In 1978, the DOE assumed custody of the site and the site was designated for cleanup under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The Army Corps of Engineers' remedial action for the Middlesex Sampling Plant Site is not yet complete and, therefore, the extent of long-term stewardship required, if any, is not yet known. For additional information about the Middlesex Sampling Plant, please contact: Chief of Public Affairs New York District U.S. Army Corps of Engineers Jacob K. Javits Federal Building 26 Federal Plaza New York, NY, 10278-0090 Phone: 212-264-0100 or visit the Internet website at: http://www.nan.usace.army.mil/ New Jersey 8
  • 11. Princeton Plasma Physics Laboratory PRINCETON PLASMA PHYSICS LABORATORY 1.0 SITE SUMMARY 1.1 Site Description and Mission The Princeton Plasma Physics Laboratory is a LONG-TERM STEWARDSHIP HIGHLIGHTS Collaborative National Center for plasma and fusion science. The Laboratory is located on 36 hectares (88.5 Major Long-Term Stewardship Activitiesacres) of property leased from Princeton University on groundwater monitoring and surveillance the James Forrestal Campus, in Plainsboro Township, Total Site Area- 36 hectares (88.5 acres) Middlesex County, New Jersey. The Laboratory Estimated Volume of Residual Contaminantsoperates several devices, including the National groundwater 189,270 cubic meters (247,556 cubic yards) Spherical Torus Experiment on Princeton University's Long-Term Stewardship Start-End Years- 2000-2010 campus. The Tokamak Fusion Test Reactor, which Average Annual Long-Term Stewardship Cost achieved world-record energy output, is currently FY2000-2006- $280,000 undergoing dismantlement and will be completed by Landlord- U.S. Department of Energy, Office of 2003. Other site facilities include maintenance shops, Science warehouses, transformer yards, storage buildings, administrative offices, educational facilities, and miscellaneous trailers. Princeton University is the operating contractor for the Laboratory. DOE's lease with Princeton University expires in 2026, unless DOE decides to terminate it earlier. The Princeton Plasma Physics Laboratory's primary mission is to conduct research and development of nuclear fusion technology as an attractive energy source. The Laboratory also historically provided research and development for fusion energy programs sponsored by DOE and its predecessor agencies. Research at the Laboratory began in 1959 with construction of the Model C-Stellerator, which was later converted to a pulseoperated device. Past activities and operations contaminated the soil and groundwater at the site with volatile organic compounds (petroleum, hydrocarbons, and solvents). All site remediation activities have been completed for soil, allowing unrestricted use of the site (with respect to soil). Groundwater in the shallow aquifer along the southern portion of the site, which comprises a surface area of about 12 hectares (30 acres), contains relatively low levels of chlorinated volatile organic compounds. The Laboratory continues to generate waste, including oils, solvents, polychlorinated biphenyls, and low-level radioactive wastes. Waste is neither treated nor disposed of onsite, but it is collected in satellite accumulation areas before it is transferred to offsite locations. Hazardous waste is sent to commercial facilities, and low-level radioactive waste is shipped to other DOE sites for disposal. 1.2 Site Cleanup and Accomplishments DOE completed soil remediation activities at Site C/D on the university campus in 1999. Soil contamination consisted of chromium (a heavy metal) and oil-related organic compounds. Approximately 153 cubic meters (200 cubic yards) of the metal-contaminated soil were excavated and disposed of at a commercial facility permitted to accept hazardous waste. Approximately 30 cubic meters (40 cubic yards) of organics-contaminated soil were removed and disposed offsite. All contaminated soils were remediated to cleanup standards dictated by the New Jersey Department of Environmental Protection. In 2000, the New Jersey Department of Environmental Protection released the site (with respect to soil) for unrestricted use under a "No Further Action Determination." Because of the success of the soil removal actions, and the full characterization of the soils throughout the site, long-term monitoring of the soil is not required. New Jersey 9
  • 12. National Defense Authorization Act (NDAA) Long-Tenn Stewardship Report ~ Groundwater Contamination 0 I ,000 2,000 Feet Basin Princeton Plasma Physics Laboratory The single medium of concern that remains at the site is the groundwater contamination within the shallow aquifer, which most likely resulted from surface spills of solvents. This medium will require long-term stewardship activities. All surface water from the building sumps is discharged into a lined stormwater detention basin, which discharges into a nearby brook. The discharge to the brook is routinely monitored in compliance with a State of New Jersey surface water discharge permit. Because of the natural degradation of the volatile organic compounds within the aquifer, dilution, and volatilization, residual volatile organic compounds are below the regulatory discharge limit to the brook. If volatile organic compounds levels in the discharge rise in the future, mitigation measures may be necessary. New Jersey 10
  • 13. Princeton Plasma Physics Laboratory 2.0 SITE· WIDE LONG· TERM STEWARDSHIP 2.1 Site-Wide Long-Term Stewardship Activities Because of the contamination resulting from past operations, long-term stewardship activities will be required at the Princeton Plasma Physics Laboratory. These activities, for the most part, will involve groundwater monitoring and surveillance to prevent contaminants from migrating offsite. Currently, DOE anticipates monitoring will continue until 2010. Soils are not subject to long-term stewardship activities since they have been remediated to acceptable levels and the site is no longer restricted for use. No institutional controls are required under the "No Further Action Determination" issued by the New Jersey Department of Environmental Protection. However, because DOE leases the 36 hectares (88.5 acres) of property from Princeton University, DOE is bound by the terms of the lease agreement to return the property to Princeton University free from environmental hazards. SITE ACCOMPLISHMENTS • Removed or closed in-place all (11) underground storage tank systems and associated contaminated soil. Added six above-ground, secondarilyconfined tanks (1989-1993) • Installed impermeable line in retention basin for collecting onsite surface water and groundwater from building dewatering sumps (1995) • Completed two soil removal actions: 153 cubic meters (200 cubic yards) of soil contaminated with heavy metal (chromium); 30 cubic meters (40 cubic yards) of organics-contaminated soil • Baseline ecological evaluation found no evidence of impacts to vegetation or wildlife attributable to onsite environmental conditions (1998) • All identified areas of concern (10) for soil contamination characterized, determined clean, and no further action issued by State of New Jersey for soil (2000) ANTICIPATED SITE The New Jersey Department of Environmental ACCOMPLISHMENTS AS OF 2006 Protection will implement an institutional control designated as a "classification exception area" for the • Princeton Plasma Physics Laboratory will continue contaminated groundwater plume at the Laboratory. to monitor the natural attenuation of groundwater The "classification exception area" functions as a deed contaminants at least until2010 restriction on groundwater at the site, preventing its unauthorized use. The "classification exception area" designation also provides regulatory relief, allowing groundwater contaminants to naturally and passively degrade until the statewide groundwater quality standards are met. Because soil contamination is no longer present at levels above New Jersey Department of Environmental Protection standards and the low levels of groundwater contamination are inaccessible to human contact, exposure to site workers or the public is not a concern. In addition, a baseline ecological evaluation conducted during a site remedial investigation found no adverse environmental impacts from the groundwater contamination. As a result, the site does not require any special physical barriers (e.g., fences) or visual warnings (e.g., signs). Record-keeping activities are required under a Memorandum of Understanding between Princeton University and the New Jersey Department of Environmental Protection, which governed the cleanup activities at the Laboratory. The Laboratory is currently required to maintain all characterization, remediation and monitoring records for a minium of 30 years. In addition, the Laboratory also maintains a public information repository in which copies of applicable remedial investigation documents are kept. STAKEHOWER INVOLVEMENT Technology Development and Deployment Princeton Plasma Physics Laboratory deployed lowflow groundwater sampling pumps in all groundwater New Jersey The Laboratory conducts annual briefings with the local municipal Environmental Advisory Committee as part of its ongoing public information efforts. 11
  • 14. National Defense Authorization Act (NDAA) Long-Term Stewm·dship Report monitoring wells. This technology consists of small air- driven bladder pumps located at the bottom of each well that gently purges the well water while analyzing various groundwater parameters (e.g., temperature, alkalinity/acidity, redox). Once the parameters have stabilized, a groundwater sample is taken. As a result, the depiction of actual groundwater conditions are more precise, and less waste water is generated during the well purging process. Utilization of this technology will continue for the duration of the long-term stewardship monitoring program. 2.2 Specific Long-Term Stewardship Activities Groundwater The single medium of concern that remains at the site is the groundwater contamination within the shallow aquifer, which most likely resulted from past surface spills of chlorinated solvents. The remediation strategy applied to the volatile organic compounds and petroleum (and approved by the New Jersey Department of Environmental Protection) is hydraulic control of migration with existing building dewatering pumps, monitoring, and natural attenuation. This remedy- referred to as "hydraulic groundwater control"- will keep contaminants from migrating offsite while chlorinated volatile organic compounds are allowed to naturally degrade within the aquifer. At this time, no engineered groundwater treatment system is required. The progress of natural attenuation will be monitored by quarterly groundwater sampling until New Jersey water quality standards are met. Target cleanup levels are one part per billion for tetrachloroethene, trichlorethene, 1,1,1trichloroethane, and dichloroethenes under New Jersey groundwater quality standards. Approximately 12 hectares (30 acres), with an average saturated thickness of nine meters (30 feet), of the aquifer on the southern boundary of the site is contaminated above New Jersey water standards. This equates to approximately 189,270 cubic meters (247,556 cubic yards) of contaminated groundwater. Monitoring is required to document the selected remedy of hydraulic control and natural contaminant attenuation. 2.3 Regulatory Regime Long-term stewardship activities of the Princeton Plasma Physics Laboratory are governed by the New Jersey Department of Environmental Protection pursuant to the Administrative Code of the New Jersey Technical Requirements for Site Remediation. This regulatory requirement is executed in accordance with a Memorandum of Understanding (Feb. 3, 1993) between Princeton University and theNew Jersey Department of Environmental Protection for the remediating Site C and D of the James Forrestal Campus. The MOU acknowledges that Site CID is leased by DOE and that DOE contracts with Princeton University to manage and operate the Laboratory. A letter issued by the Department's Bureau of Case Management on March 17, 2000, approved the Remedial Investigation/Remedial Action Selection Report and approved the proposed groundwater remedy of hydraulic containment and natural attenuation. All long-term stewardship activities exclusively address the groundwater at the Laboratory. A No Further Action Letter and Covenant Not to Sue for the soil at Princeton was signed by the New Jersey Department of Environmental Protection and Princeton University on March 28, 2000. No long-term stewardship activities are required for the soils at the Princeton Plasma Physics Laboratory. Because the long-term remedial activity at the Princeton Plasma Physic Laboratory consists only of the continuation of groundwater monitoring, no additional remedial systems are identified or required at this time. Therefore, a review under the National Environmental Policy Act of 1969, as amended, is not applicable and no hazardous or low-level radioactive waste will be generated as a result of the selected long-term stewardship activities. New Jersey 12
  • 15. Princeton Plasma Physics Labomtory 2.4 Assumptions and Uncertainties The long-term surveillance and monitoring of the groundwater contamination is assumed to consist of quarterly monitoring for at least 10 years until 2010. No further actions will be required. Princeton Plasma Physics Laboratory will continue to operate as a national laboratory for energy research. Therefore, future use of this facility will remain industrial. 3.0 ESTIMATED LONG· TERM STEWARDSHIP COSTS The estimated costs for long-term stewardship activities at the Princeton Plasma Physics Laboratory are identified in the table below. The annual site-wide cost estimate for long-term stewardship activities is approximately $280,000 per year for the period of fiscal years (FY) 2000-2010. An annual budget of $273,000 (in FY 1999) dollars supported the quarterly groundwater collection and analysis, general maintenance of monitoring wells, administrative reporting and record-keeping. Beginning in FY 2001, these costs and responsibilities will be transferred from DOE's Office of Environmental Management to DOE's Office of Science. Site Long-Term Stewardship Costs (Constant Year 2000 Dollars) Year(s) Amount Year(s) Amount Year(s) Amount FY 2000 $273,000 FY 2008 $281,000 FY 2036-2040 $0 FY 2001 $281,000 FY 2009 $281,000 FY 2041-2045 $0 FY 2002 $281,000 FY 2010 $281,000 FY 2046-2050 $0 FY 2003 $281,000 FY 2011-2015 $0 FY 2051-2055 $0 FY 2004 $281,000 FY 2016-2020 $0 FY 2056-2060 $0 FY 2005 $281,000 FY 2021-2025 $0 FY 2061-2065 $0 FY 2006 $281,000 FY 2026-2030 $0 FY 2066-2070 $0 FY 2007 $281,000 FY2031-2035 $0 4.0 FUTURE USES The Princeton Plasma Physics Laboratory will continue to operate as a national laboratory conducting research in plasma science and fusion energy. Therefore, future use of this facility will remain industrial - as a commercial/research property consistent with past use. With respect to soil contamination, unrestricted use is allowed. The Laboratory and all surrounding properties receive potable water from the public water utility. The Laboratory uses the nearby Delaware and Raritan Canal for process cooling water. The onsite water supply wells are available only for backup fire fighting purposes and are not used for potable purposes. As a result, the existing groundwater contamination has not affected the existing land use as a "commercial/research property." If the Laboratory's lease expires in 2026 without renewal, or is terminated prior to expiration, DOE is bound by the lease agreement to return the property free of environmental hazards. New Jersey 13
  • 16. National Defense Authorization Act (NDAA) Long-Term Stewardship Report For additional information about the Princeton Plasma Physics Laboratory, please contact: Jeffrey Makiel, Environmental Engineer P.O. Box 102 Princeton, NJ 08542-0102 Phone: 609-243-3721 or visit the Internet website at http://www.pppl.gov New Jersey 14
  • 17. Wayne Site WAYNE SITE I SITE SUMMARY The Wayne Site is located about 3.2 kilometers (two miles) north of Wayne, New Jersey, in a highly developed area of Passaic County. The site is approximately 58 kilometers (36 miles) northwest of New York City. Between 1948 and 1971, Rare Earths, Inc., and its successor, W.R. Grace and Company, processed monazite sands to recover thorium and other rare earth elements. In 1955, under a contract issued by the Atomic Energy Commission (AEC), a predecessor agency to the U.S. Department of Energy (DOE), the company began to process Government-owned thorium ores for the AEC (ABC-funded thorium processing may have begun as early as 1948). The contract was terminated in 1960. Thereafter, W.R. Grace and Co. processed monazite sands for commercial purposes until 1971. Between 1967 and 1984, the property was leased to and occupied by ElectroNucleonics, Inc. Prior to 1960, radioactive residues from the processing of thorium ores were placed in above-ground piles. From 1960 to 1967, the thorium wastes were buried-- sometime between 1960 and 1964, they were buried in large unlined pits. In 1965, the material was exhumed and buried in smaller pits. From 1967 to 1971, thorium phosphate wastes were shipped to the W.R. Grace and Co. plant in Chattanooga, Tennessee. Liquid wastes were neutralized in an onsite treatment plant and released into the storm water sewer system, which discharges into Sheffield Brook and, eventually, into the Pompton River. In 1971, at the request ofW.R. Grace and Co., AEC modified the W.R. Grace license to allow only storage. Wayne Site 1 The Wayne Site is one of the 21 Formerly Utilized Sites Remedial Action Program (FUSRAP) sites where cleanup responsibility was transferred to the U.S. Army Corps of Engineers (Corps) in accordance with the Energy and Water Development Appropriations Act for FY 1998. At these 21 sites, the Corps is responsible for remediation and DOE is responsible for long-term stewardship activities, if any are deemed necessary. The cleanup decisions for these sites are not yet final and, therefore, the extent of long-term stewardship required for these sites, if any, is not yet known. New Jersey 15
  • 18. National Defense Authorization Act (NDAA) Long-lerm Stewardship Report After plant operations ceased in 1971, W.R. Grace and Co. partially decontaminated the site. In addition to covering an onsite disposal area with clean fill, the company razed several buildings and buried the resulting rubble and processing equipment in place. The remaining buildings were decontaminated and left intact. The primary contaminants of concern are thorium and radium and their daughter products. Tailings migrated offsite via Sheffield Brook and contaminated vicinity properties. Areas surrounding the railroad spur in nearby Pequannock, where thorium-containing ores were unloaded, were also contaminated. Cleanup has been completed and certified at most of the designated vicinity properties. Radioactive residues from the vicinity property cleanup are in interim storage on the site. The Wayne Site is on the U.S. Environmental Protection Agency (EPA) National Priorities List and is also the subject of a Federal Facilities Agreement between U.S. Department of Energy (DOE) and EPA. In 1983, Congress authorized the cleanup of the Wayne Site under the Formerly Utilized Site Remediation Action Program (FUSRAP). In September of 1984, the Wayne Site was donated to DOE. The Corps' remedial action for the site is not yet complete and, therefore, the extent of long-term stewardship required, if any, is not yet known. For additional information about the Wayne Site, please contact: Chief of Public Affairs New York District U.S. Army Corps of Engineers Jacob K. Javits Federal Building 26 Federal Plaza New York, NY, 10278-0090 Phone:212-264-0100 or visit the Internet website at: http://www.nan.usace.army.mil/ New Jersey 16