SlideShare uma empresa Scribd logo
1 de 48
PMP
                                Procurement
                               Management




Presenter: Hazem Soliman, PMP.

                        Emak International Academy   1
Procurement weighs 7% in the
 PMP exam = 15 Questions!




            Emak International Academy   2
What is Procurement Management?

 Includes the processes required to acquire
  goods or services from outside the project
  team.
 It also includes Contract Management and
  Change Control Processes.




                   Emak International Academy   3
Project Procurement Management


Plan Procurements
  Plan Procurements           Administer Procurements
                               Administer Procurements



              Conduct Procurements                   Close Procurements




                        Emak International Academy                        4
1. PLAN PROCUREMENTS
INPUTS                                                TOOLS & TECHNIQUES
1.    Scope Baseline
2.    Requirements Documentation                      1.      Make or Buy Analysis
3.    Teaming Agreements                              2.      Expert Judgment
4.    Risk Register                                   3.      Contract Types
5.    Risk Related Contract Decisions
6.    Activity Resource Requirements
7.    Project Schedule
8.    Activity Cost Estimates
9.    Cost Performance Baseline
10.   Enterprise Environmental Factors
11.   Organizational Process Assets


OUTPUTS
1.    Procurement Management Plan
2.    Procurement SOW
3.    Make or Buy Decisions
4.    Procurement Documents
5.    Selection Criteria
                                 Emak International Academy                          5
6.    Change Requests
1. PLAN PROCUREMENTS - Inputs

 Identifies products or services that can be
  acquired from outside the project organization Vs
  needs that can be accomplished by the project
  team.

 Involves consideration of potential sellers.

 Can influence project schedule, resource
  estimating and make or buy decisions.

 Includes reviewing the risks involved and type of
  contract to be used.

                     Emak International Academy       6
1. PLAN PROCUREMENTS - Inputs
1. Scope Baseline
2. Requirements Documentation
    Project Requirements
    Legal and Contractual Requirements; health,
     safety, warrantees, insurance, IPR, terms and
     conditions, KPIs, SLAs…etc.
3. Teaming Agreements (Contractual Agreements)




                    Emak International Academy   7
1. PLAN PROCUREMENTS - Inputs
4. Risk Register
5. Risk Related Contract Decisions
6. Activity Resource Requirements (People,
   equipment or location)
7. Project Schedule
8. Activity Cost Estimates (Internal Cost
   Estimates for activities being procured)
9. Cost Performance Baseline (Planned Budget)




                  Emak International Academy   8
1. PLAN PROCUREMENTS - Inputs
10. Enterprise Environmental Factors:
   Market place conditions: (Products and
    services available in the market, from whom
    and under what terms and conditions.)
   Suppliers and typical terms and conditions?


11. Organizational Process Assets:
   Procurement related policies and guidelines.
     Centralized or Decentralized?



                     Emak International Academy   9
1. PLAN PROCUREMENTS – Tools &
Techniques
1. Make or Buy Analysis:

    Determine whether a product or service
     needs to be procured or can be produced
     by the project team.
    Purchase or make - Purchase or
     renting/leasing
Reasons to Buy:
    Capacity and Capability
    Exploit Opportunity
    Shift risk (cost, time, or scope)
Reasons to Make:
    Idle resources
    Want to control
    Confidential information Academy
                       Emak International      10
1. PLAN PROCUREMENTS – Tools
 & Techniques
2.     Expert Judgment

3.     Contract types

 The primary aim of considering which contract
  type is most suitable for the procurement
  situation is to distribute the risk between
  buyer and seller.

 The three major types of contracts are:
      Fixed-Price
      Cost-Reimbursable
      Time and Material
                      Emak International Academy   11
1. PLAN PROCUREMENTS –
Tools & Techniques
A. Fixed Price:
                                                  FFP
 - Well defined scope/ product.
 - Fixed total Price.                             FPIF
 - Risk is on the seller.
                                                  FP-EPA




B. Cost Reimbursable
                                                  CPFF
Contract:
 - Scope and Product aren’t                       CPIF
exactly defined.
 - Price is open based on the                     CPAF
final costs the product will incur.
 - Risk is on the buyer.
                     Emak International Academy            12
1. PLAN PROCUREMENTS – Tools &
Techniques
C. Time and Material:
    - Cost is charged to identified tasks of an on
  going activity, ex. research.
    - Scope per unit is defined.
    - Risk is on the buyer. (seller has no incentive to
  control costs)




                      Emak International Academy      13
1. PLAN PROCUREMENTS –Outputs

1. Procurement Management Plan: It includes;

     Procurement Processes
     Risk Management
     Standardized Procurement Documents
     Types of contracts used
     Responsibilities
     Pre-qualified sellers
     Scheduled dates for deliverables
     Managing multiple providers

                  Emak International Academy   14
1. PLAN PROCUREMENTS –Outputs

2.Procurement Statement of Work: includes
 Specifications, quality levels, quantity desired
  and other requirements.
 Describes the procurement item in sufficient
  detail to allow sellers to determine if they are
  capable of providing the item.
3. Make or Buy Decisions: documented
  decisions.
4. Change Requests


                    Emak International Academy       15
1. PLAN PROCUREMENTS – Outputs

5. Procurement Documents: are used to solicit
   proposals, quotes, and bids from sellers

   Bid / Tender / Quotation (IRB – RFT –
    RFQ)
      • Selection is mainly based on price.
   Proposal
      • Selection will be based on price and other
        factors; as technical capability, technical
        approach…etc.

   Terminology may vary by industry.
                     Emak International Academy       16
1. PLAN PROCUREMENTS –Outputs
6. Source Selection Criteria:
    The project team must be prepared to compare
     the proposals received in an unbiased manner
     based on identified and documented selection
     criteria to rate or score proposals.
    Includes:
        Past performance
        Understanding of need
        Overall or life cycle cost
        References
        Technical capability and approach
        Risk
        Management approach
        Financial stability and capacity
                     Emak International Academy   17
Q: With a clear scope of work a seller completes work
    as specified, but the buyer is not pleased with the
    results. The contract is considered to be:

a. Null and void
b. Incomplete
c. Complete
d. Waived



 C. Complete


                       Emak International Academy         18
Q. In a fixed price contract, the fee or profit is:

a.   Unknown
b.   Part of the negotiation involved in paying every invoice
c.   Applied as a line item in every invoice
d.   Determined at the end of the project




 a. unknown

                         Emak International Academy             19
2. CONDUCT PROCUREMENTS

INPUTS                                            TOOLS & TECHNIQUES
                                                  1.   Bidder Conferences
1.   Project Management Plan
                                                  2.   Proposal Evaluation Techniques
2.   Procurement Documents
                                                  3.   Independent Estimates
3.   Source Selection Criteria
                                                  4.   Expert Judgment
4.   Qualified Seller List
                                                  5.   Advertising
5.   Seller Proposals
                                                  6.   Internet Search
6.   Project Documents
                                                  7.   Procurement Negotiations
7.   Make or Buy Decisions
8.   Teaming Agreements
9.   Organizational Process Assets



OUTPUTS
1.   Selected Sellers
2.   Procurement Contract Award
3.   Resource Calendars
4.   Change Requests
5.   Project Management Plan Updates
6.   Project Documents Updates Emak International Academy                               20
2. CONDUCT PROCUREMENTS

 Obtain sellers’ responses, select sellers and
  award contracts.




                   Emak International Academy     21
2. CONDUCT PROCUREMENTS - Inputs
1. Project Management Plan
2. Procurement Documents
3. Source Selection Criteria
4. Qualified Seller List (Approved Bidders List and
   new pre-qualified sellers)

5. Seller Proposals (obtained from sellers)
6. Project Documents (Scope, Schedule, Cost, Risk)
7. Make or Buy Decisions
8. Teaming Agreements
9. Organizational Process Assets (Past Experience,
   Bidders List)
                        Emak International Academy    22
2. CONDUCT PROCUREMENTS –
Tools & Techniques
1. Bidder Conferences
   Are also known as contractor, vendor, or pre-
     bid conferences.
   The purpose of these conferences is to clarify
     any of the information not clearly stated in
     the RFP.
   Creates a clear and common understanding
     of the procurement.
   Proposals received will be more clearly
     aligned with project requirements, due to the
     fact that bidder conferences make the
     requirements clear.
                    Emak International Academy   23
2. CONDUCT PROCUREMENTS –
Tools & Techniques
2. Proposal Evaluation Techniques (agreed by
   Evaluation Committee)
3. Independent Estimates (serves as a
   benchmark and help uncover SOW deficiencies
   and ambiguities misunderstanding of Scope)
4. Expert Judgment
5. Advertising
   - Is a tool that may be used to increase the
   number of potential sellers contacted via
   Newspapers, Professional journals or Websites



                   Emak International Academy      24
2. CONDUCT PROCUREMENTS –
Tools & Techniques
6. Internet Search
7. Procurement Negotiations (Team)

    Negotiations can cover the following
     areas:
     Responsibilities and authorities
     Applicable terms and law
     Scope, technical and business management
       approaches
     Contract financing (Payment Schedule)
     Price
                   Emak International Academy   25
2. CONDUCT PROCUREMENTS –
Outputs
1. Selected Sellers
2. Procurement contract Award
     A mutually binding agreement that obligates the seller to
     provide the specified product and obligates the buyer to
     pay for it.

    Major components:
SOW            Schedule                        Roles and responsibilities
Pricing        Payment                         Acceptance criteria
Warranty       product support                 Incentives
Penalties      Insurance                       Performance bonds
Change requests                                Termination mechanisms


                          Emak International Academy                        26
2. CONDUCT PROCUREMENTS Outputs

 3. Resource Calendars
 4. Change Requests
 5. Project Management Plan Updates (Scope,
    Cost, Schedule, Procurement Management
    Plan…etc.)
 6. Project Document Updates (SOW and
    Requirements Documentation)




                  Emak International Academy   27
Q: Bidder Conferences are part of :


a. Plan Procurements
b. Conduct Procurements
c. Administer Procurements
d. Conduct Purchasing



 Answer B

                    Emak International Academy   28
Q. The project team is arguing about whether they
    should complete a work package themselves or
    outsource the work. What part of the procurement
    process are they in:

a.   Contract administration
b.   Plan Procurements
c.   Conduct Procurements
d.   Select sellers




     Answer B

                        Emak International Academy     29
3. ADMINISTER PROCUREMENTS
INPUTS                                           TOOLS & TECHNIQUES

1.   Procurement Documents                       1.     Contract Change Control System
2.   Project Management Plan                     2.     Procurement Performance Reviews
3.   Contract                                    3.     Inspections and Audits
4.   Performance Reports                         4.     Performance Reporting
5.   Approved Change Requests                    5.     Payment Systems
6.   Work Performance Information                6.     Claims Administration
                                                 7.     Records Management System




OUTPUTS
1.   Procurement Documentation
2.   Organizational Process Assets Updates
3.   Change Requests
4.   Project Management Plan Updates
                                    Emak International Academy                            30
3. ADMINISTER PROCUREMENTS

Manage procurements relationships,
monitor contract performance and make
changes and corrections as needed.




                 Emak International Academy   31
3. ADMINISTER PROCUREMENTS -Inputs

 1. Procurement Documents
 2. Project Management Plan
 3. Contract
 4. Performance Reports
    Technical documentation and other
      deliverables information developed by the
      seller.
    Seller Performance Reports.



                    Emak International Academy    32
3. ADMINISTER PROCUREMENTS -
Inputs
5. Approved Change Request.

6. Work Performance Information: Includes;
   The extent to which quality standards are
    being met.
   Indicates which deliverables have been
    completed.
   Identifies which costs have been incurred.
   Seller invoices: submitted from time to time
    to request payment for work performed.


                   Emak International Academy      33
3. ADMINISTER PROCUREMENTS –
  Tools and Techniques
1. Contract Change Control System
 Defines the process by which the contract
  may be modified.
 It includes the paperwork, tracking systems,
  dispute resolution procedures, and approval
  levels necessary for authorizing changes.
 Should be integrated with the integrated
  change control system.

2. Procurement Performance
   Review; A structured review on the
  sellers’ progress to deliver as per planned
  scope – quality – schedule – quality, etc..



                          Emak International Academy   34
3. ADMINISTER PROCUREMENTS –
Tools and Techniques
3. Inspections and Audits; required by the buyer
  and supported by the seller to identify any
  weaknesses in the seller’s work performance or
  deliverables.
4. Performance Reporting: Provides information to
  management about how effectively the seller is
  achieving the contractual objectives.
5. Payment System: Handled by the accounts
  payable department of the performing organization.
  Must include reviews and approvals of seller invoices
  by the project team prior to issuing a payment to a
  seller.



                      Emak International Academy      35
3. ADMINISTER PROCUREMENTS –
Tools and Techniques
6. Claims Administration: (disputes or appeals)
   Where buyer and seller cannot agree on
    compensation for the change, or that a change has
    even occurred.
   Should be documented and managed in accordance
    with the terms of the contract.
   Might involve arbitration or litigation.

7. Record Management System:
   A set of processes and automation tools
    consolidated into the project Management
    Information System to manage contract
    documentation and records.
   To maintain an index of contract records, and
    correspondences for archiving and future use.
                     Emak International Academy     36
3. ADMINISTER PROCUREMENTS –
Outputs
1. Procurement Documentation: A complete
   set of indexed records regarding the contract.
   Includes;
   Schedules
   Approved and unapproved change requests
   Technical documentation
   Work performance information
   Performance reports
   Financial docs (invoices ad payment records)


2. Change Requests

                    Emak International Academy      37
3. ADMINISTER PROCUREMENTS –
Outputs
3. Updated Organizational Process Assets:
  including
    Correspondence: communication between buyer
     and seller.
    Payment Schedules and requests; if the project
     is using an external payment system.
    Seller performance Evaluation documentation:
     performed by the buyer to document seller’s
     ability to continue to perform work on the
     project or to be allowed to work on future
     projects.
     Basis for early termination
     Can be included in qualified seller lists in the
      organization.
4.Updated Project Management Plan
                          Emak International Academy     38
Q. All of the following statements about change control are
    incorrect EXCEPT:

a.   A fixed price contract will minimize the need for change
     control.
b.   Changes seldom provide real benefits to the project
c.   Contracts should include procedures to accommodate
     changes.
d.   More detailed specifications eliminate the causes of
     changes.




     Answer C
                            Emak International Academy          39
4. CLOSE PROCUREMENTS

INPUTS                                         TOOLS & TECHNIQUES

1.   Procurement Documentation                 1.     Procurement Audits
2.   Project Management Plan                   2.     Negotiated Settlements
                                               3.     Records Management System




OUTPUTS

1.   Closed Procurement
2.   Organizational Process Assets Updates

                                  Emak International Academy                      40
4. CLOSE PROCUREMENTS

The process of completing each project procurement.

Involves verification that all of the procurement work
  was completed and accepted. (Product Verification)




                    Emak International Academy     41
4. CLOSE PROCUREMENTS - Inputs

1. Project Management Plan
2. Procurement Documentation
    The contract.
    Supporting schedules
    Requested and approved changes
    Technical documentation
    Performance reports
    Financial reports



                 Emak International Academy   42
4. CLOSE PROCUREMENTS – Tools
and Techniques
1. Procurement Audits:
   A structured review of the procurement
     process from Plan Procurements to Administer
     Procurements.
   The objective is to identify the successes and
     failures that warrant recognition.
2. Negotiated Settlements
3. Records Management System.




                    Emak International Academy       43
4. CLOSE PROCUREMENTS – outputs

1. Closed Procurements: Formal written notice
   that the contract has been completed.
2. Updated Organizational Process Assets:
    Contract File:
      A complete set of indexed contract documentation.
   Deliverable Acceptance:
      A formal written notice from the buyer that the
       contract has been accepted.
      Requirements should be defined in the contract.
   Lessons Learned documentation



                      Emak International Academy           44
Emak International Academy   45
R
Emak International Academy   46
Emak International Academy   47
Q&A




Emak International Academy   48

Mais conteúdo relacionado

Mais procurados

Project Procurement - Principles and Case Study
Project Procurement - Principles and Case StudyProject Procurement - Principles and Case Study
Project Procurement - Principles and Case Study
Kiran Radhakrishnan
 
Purchase cost reduction
Purchase cost reductionPurchase cost reduction
Purchase cost reduction
Isha Varma
 

Mais procurados (20)

Chap12 project procurement management
Chap12 project procurement managementChap12 project procurement management
Chap12 project procurement management
 
Pmp procurement chapter 12
Pmp procurement chapter 12Pmp procurement chapter 12
Pmp procurement chapter 12
 
Project Procurement Management - PMP preparation course
Project Procurement Management - PMP preparation courseProject Procurement Management - PMP preparation course
Project Procurement Management - PMP preparation course
 
Project Procurement - Principles and Case Study
Project Procurement - Principles and Case StudyProject Procurement - Principles and Case Study
Project Procurement - Principles and Case Study
 
Pm session11
Pm session11Pm session11
Pm session11
 
Public Procurement and Contract - Theory and practice in Nepal_2013
Public Procurement and Contract - Theory and practice in Nepal_2013Public Procurement and Contract - Theory and practice in Nepal_2013
Public Procurement and Contract - Theory and practice in Nepal_2013
 
Procurement Plan
Procurement PlanProcurement Plan
Procurement Plan
 
Session 19 4th edition PMP
Session  19 4th edition PMPSession  19 4th edition PMP
Session 19 4th edition PMP
 
9. project procurement management
9. project procurement management9. project procurement management
9. project procurement management
 
Procurement Cost Saving Strategy " Procurement dari cost centre menjadi profit...
Procurement Cost Saving Strategy " Procurement dari cost centre menjadi profit...Procurement Cost Saving Strategy " Procurement dari cost centre menjadi profit...
Procurement Cost Saving Strategy " Procurement dari cost centre menjadi profit...
 
What is the Impact of the New Standard on the Intermediate Accounting Course?
What is the Impact of the New Standard on the Intermediate Accounting Course?What is the Impact of the New Standard on the Intermediate Accounting Course?
What is the Impact of the New Standard on the Intermediate Accounting Course?
 
Streamlined Tender Evaluation Presentation
Streamlined Tender Evaluation PresentationStreamlined Tender Evaluation Presentation
Streamlined Tender Evaluation Presentation
 
Purchase cost reduction
Purchase cost reductionPurchase cost reduction
Purchase cost reduction
 
Project Management For Good Procurement Practices
Project Management For Good Procurement PracticesProject Management For Good Procurement Practices
Project Management For Good Procurement Practices
 
Plan procurement management
Plan procurement management Plan procurement management
Plan procurement management
 
Public procurement roadshow presentation
Public procurement roadshow presentationPublic procurement roadshow presentation
Public procurement roadshow presentation
 
ACH 216 Lecture 04b (Bidding) Part 2
ACH 216 Lecture 04b (Bidding) Part 2ACH 216 Lecture 04b (Bidding) Part 2
ACH 216 Lecture 04b (Bidding) Part 2
 
IFAD Procurement Guidelines revised 2008
IFAD Procurement Guidelines revised 2008IFAD Procurement Guidelines revised 2008
IFAD Procurement Guidelines revised 2008
 
11- PMP Training - Procurement Management
11- PMP Training - Procurement Management 11- PMP Training - Procurement Management
11- PMP Training - Procurement Management
 
Guide to BS8534 British Standard on Procurement
Guide to BS8534 British Standard on ProcurementGuide to BS8534 British Standard on Procurement
Guide to BS8534 British Standard on Procurement
 

Destaque

Adb procurement guidelines icb-b1
Adb procurement guidelines   icb-b1Adb procurement guidelines   icb-b1
Adb procurement guidelines icb-b1
Joy Irman
 
Ankur Sood-Instrument engineer
Ankur Sood-Instrument engineerAnkur Sood-Instrument engineer
Ankur Sood-Instrument engineer
ankur sood
 
PMP Training - 12 project procurement management
PMP Training - 12 project procurement managementPMP Training - 12 project procurement management
PMP Training - 12 project procurement management
ejlp12
 

Destaque (18)

Adb procurement guidelines icb-b1
Adb procurement guidelines   icb-b1Adb procurement guidelines   icb-b1
Adb procurement guidelines icb-b1
 
Ankur Sood-Instrument engineer
Ankur Sood-Instrument engineerAnkur Sood-Instrument engineer
Ankur Sood-Instrument engineer
 
CV of Viswanathan KK
CV of Viswanathan KKCV of Viswanathan KK
CV of Viswanathan KK
 
Mouneer ALjebn CV
Mouneer ALjebn CVMouneer ALjebn CV
Mouneer ALjebn CV
 
PMP CAPM Study Guide Procurement Management
PMP CAPM Study Guide Procurement ManagementPMP CAPM Study Guide Procurement Management
PMP CAPM Study Guide Procurement Management
 
Epc presentation robert foxpresentation
Epc presentation robert foxpresentationEpc presentation robert foxpresentation
Epc presentation robert foxpresentation
 
Construction phases
Construction phasesConstruction phases
Construction phases
 
Class 42 control valves - valve positioners, cavitation and flashing
Class 42   control valves - valve positioners, cavitation and flashingClass 42   control valves - valve positioners, cavitation and flashing
Class 42 control valves - valve positioners, cavitation and flashing
 
Class 37 inferential control, gain scheduling
Class 37   inferential control, gain schedulingClass 37   inferential control, gain scheduling
Class 37 inferential control, gain scheduling
 
12 pmp procurement management exam
12 pmp procurement management exam12 pmp procurement management exam
12 pmp procurement management exam
 
Types of contracts
Types of contractsTypes of contracts
Types of contracts
 
Online PMP Training Material for PMP Exam - Risk Management Knowledge Area
Online PMP Training Material for PMP Exam - Risk Management Knowledge AreaOnline PMP Training Material for PMP Exam - Risk Management Knowledge Area
Online PMP Training Material for PMP Exam - Risk Management Knowledge Area
 
Online PMP Training Material for PMP Exam - Procurement Management Knowledge ...
Online PMP Training Material for PMP Exam - Procurement Management Knowledge ...Online PMP Training Material for PMP Exam - Procurement Management Knowledge ...
Online PMP Training Material for PMP Exam - Procurement Management Knowledge ...
 
Pmp procurement rev
Pmp procurement revPmp procurement rev
Pmp procurement rev
 
Pmbok 4th edition chapter 12 - Project Procurement Management
Pmbok 4th edition   chapter 12 - Project Procurement ManagementPmbok 4th edition   chapter 12 - Project Procurement Management
Pmbok 4th edition chapter 12 - Project Procurement Management
 
PMP Training - 12 project procurement management
PMP Training - 12 project procurement managementPMP Training - 12 project procurement management
PMP Training - 12 project procurement management
 
80 instrumentation interview questions with answers
80 instrumentation interview questions with answers80 instrumentation interview questions with answers
80 instrumentation interview questions with answers
 
3 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 20173 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 2017
 

Semelhante a Procurment Management

Procurement quality-management PJM400 Mod2
Procurement quality-management PJM400 Mod2Procurement quality-management PJM400 Mod2
Procurement quality-management PJM400 Mod2
KHogan62
 
Lecture-10-10052021-030135pm-29092022-070414pm.pptx
Lecture-10-10052021-030135pm-29092022-070414pm.pptxLecture-10-10052021-030135pm-29092022-070414pm.pptx
Lecture-10-10052021-030135pm-29092022-070414pm.pptx
MuhammadAftab89
 

Semelhante a Procurment Management (20)

Project Procurement Management
Project Procurement ManagementProject Procurement Management
Project Procurement Management
 
12.1 Plan Procurement Management
12.1 Plan Procurement Management12.1 Plan Procurement Management
12.1 Plan Procurement Management
 
Conduct procurements
Conduct procurements Conduct procurements
Conduct procurements
 
12.0 Project Procurement Management Overview
12.0 Project Procurement Management Overview12.0 Project Procurement Management Overview
12.0 Project Procurement Management Overview
 
Project management procurement
Project management  procurementProject management  procurement
Project management procurement
 
12.2 Conduct Procurements
12.2 Conduct Procurements12.2 Conduct Procurements
12.2 Conduct Procurements
 
12.2 Conduct Procurements
12.2 Conduct Procurements12.2 Conduct Procurements
12.2 Conduct Procurements
 
2 asca 2- purcasing [compatibility mode]
2 asca 2- purcasing [compatibility mode]2 asca 2- purcasing [compatibility mode]
2 asca 2- purcasing [compatibility mode]
 
Procurement quality-management PJM400 Mod2
Procurement quality-management PJM400 Mod2Procurement quality-management PJM400 Mod2
Procurement quality-management PJM400 Mod2
 
CCPC Certified Construction Project Consultant by Syseneg Academy sysenegacad...
CCPC Certified Construction Project Consultant by Syseneg Academy sysenegacad...CCPC Certified Construction Project Consultant by Syseneg Academy sysenegacad...
CCPC Certified Construction Project Consultant by Syseneg Academy sysenegacad...
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in construction
 
Procurements Chapter 12
Procurements Chapter 12Procurements Chapter 12
Procurements Chapter 12
 
Control procurement
Control procurement Control procurement
Control procurement
 
ProTech training presentation
ProTech training presentationProTech training presentation
ProTech training presentation
 
Procurement management
Procurement managementProcurement management
Procurement management
 
Faid daoud updated cv 19 july 2016
Faid daoud updated cv 19 july 2016Faid daoud updated cv 19 july 2016
Faid daoud updated cv 19 july 2016
 
Global emerging markets sourcing through procurement sub contractors
Global emerging markets sourcing through procurement sub contractorsGlobal emerging markets sourcing through procurement sub contractors
Global emerging markets sourcing through procurement sub contractors
 
Procurement Strategy Development
Procurement Strategy DevelopmentProcurement Strategy Development
Procurement Strategy Development
 
Uap Document
Uap DocumentUap Document
Uap Document
 
Lecture-10-10052021-030135pm-29092022-070414pm.pptx
Lecture-10-10052021-030135pm-29092022-070414pm.pptxLecture-10-10052021-030135pm-29092022-070414pm.pptx
Lecture-10-10052021-030135pm-29092022-070414pm.pptx
 

Procurment Management

  • 1. PMP Procurement Management Presenter: Hazem Soliman, PMP. Emak International Academy 1
  • 2. Procurement weighs 7% in the PMP exam = 15 Questions! Emak International Academy 2
  • 3. What is Procurement Management?  Includes the processes required to acquire goods or services from outside the project team.  It also includes Contract Management and Change Control Processes. Emak International Academy 3
  • 4. Project Procurement Management Plan Procurements Plan Procurements Administer Procurements Administer Procurements Conduct Procurements Close Procurements Emak International Academy 4
  • 5. 1. PLAN PROCUREMENTS INPUTS TOOLS & TECHNIQUES 1. Scope Baseline 2. Requirements Documentation 1. Make or Buy Analysis 3. Teaming Agreements 2. Expert Judgment 4. Risk Register 3. Contract Types 5. Risk Related Contract Decisions 6. Activity Resource Requirements 7. Project Schedule 8. Activity Cost Estimates 9. Cost Performance Baseline 10. Enterprise Environmental Factors 11. Organizational Process Assets OUTPUTS 1. Procurement Management Plan 2. Procurement SOW 3. Make or Buy Decisions 4. Procurement Documents 5. Selection Criteria Emak International Academy 5 6. Change Requests
  • 6. 1. PLAN PROCUREMENTS - Inputs  Identifies products or services that can be acquired from outside the project organization Vs needs that can be accomplished by the project team.  Involves consideration of potential sellers.  Can influence project schedule, resource estimating and make or buy decisions.  Includes reviewing the risks involved and type of contract to be used. Emak International Academy 6
  • 7. 1. PLAN PROCUREMENTS - Inputs 1. Scope Baseline 2. Requirements Documentation  Project Requirements  Legal and Contractual Requirements; health, safety, warrantees, insurance, IPR, terms and conditions, KPIs, SLAs…etc. 3. Teaming Agreements (Contractual Agreements) Emak International Academy 7
  • 8. 1. PLAN PROCUREMENTS - Inputs 4. Risk Register 5. Risk Related Contract Decisions 6. Activity Resource Requirements (People, equipment or location) 7. Project Schedule 8. Activity Cost Estimates (Internal Cost Estimates for activities being procured) 9. Cost Performance Baseline (Planned Budget) Emak International Academy 8
  • 9. 1. PLAN PROCUREMENTS - Inputs 10. Enterprise Environmental Factors:  Market place conditions: (Products and services available in the market, from whom and under what terms and conditions.)  Suppliers and typical terms and conditions? 11. Organizational Process Assets: Procurement related policies and guidelines. Centralized or Decentralized? Emak International Academy 9
  • 10. 1. PLAN PROCUREMENTS – Tools & Techniques 1. Make or Buy Analysis:  Determine whether a product or service needs to be procured or can be produced by the project team.  Purchase or make - Purchase or renting/leasing Reasons to Buy:  Capacity and Capability  Exploit Opportunity  Shift risk (cost, time, or scope) Reasons to Make:  Idle resources  Want to control  Confidential information Academy Emak International 10
  • 11. 1. PLAN PROCUREMENTS – Tools & Techniques 2. Expert Judgment 3. Contract types  The primary aim of considering which contract type is most suitable for the procurement situation is to distribute the risk between buyer and seller.  The three major types of contracts are:  Fixed-Price  Cost-Reimbursable  Time and Material Emak International Academy 11
  • 12. 1. PLAN PROCUREMENTS – Tools & Techniques A. Fixed Price: FFP - Well defined scope/ product. - Fixed total Price. FPIF - Risk is on the seller. FP-EPA B. Cost Reimbursable CPFF Contract: - Scope and Product aren’t CPIF exactly defined. - Price is open based on the CPAF final costs the product will incur. - Risk is on the buyer. Emak International Academy 12
  • 13. 1. PLAN PROCUREMENTS – Tools & Techniques C. Time and Material: - Cost is charged to identified tasks of an on going activity, ex. research. - Scope per unit is defined. - Risk is on the buyer. (seller has no incentive to control costs) Emak International Academy 13
  • 14. 1. PLAN PROCUREMENTS –Outputs 1. Procurement Management Plan: It includes;  Procurement Processes  Risk Management  Standardized Procurement Documents  Types of contracts used  Responsibilities  Pre-qualified sellers  Scheduled dates for deliverables  Managing multiple providers Emak International Academy 14
  • 15. 1. PLAN PROCUREMENTS –Outputs 2.Procurement Statement of Work: includes  Specifications, quality levels, quantity desired and other requirements.  Describes the procurement item in sufficient detail to allow sellers to determine if they are capable of providing the item. 3. Make or Buy Decisions: documented decisions. 4. Change Requests Emak International Academy 15
  • 16. 1. PLAN PROCUREMENTS – Outputs 5. Procurement Documents: are used to solicit proposals, quotes, and bids from sellers  Bid / Tender / Quotation (IRB – RFT – RFQ) • Selection is mainly based on price.  Proposal • Selection will be based on price and other factors; as technical capability, technical approach…etc.  Terminology may vary by industry. Emak International Academy 16
  • 17. 1. PLAN PROCUREMENTS –Outputs 6. Source Selection Criteria:  The project team must be prepared to compare the proposals received in an unbiased manner based on identified and documented selection criteria to rate or score proposals.  Includes:  Past performance  Understanding of need  Overall or life cycle cost  References  Technical capability and approach  Risk  Management approach  Financial stability and capacity Emak International Academy 17
  • 18. Q: With a clear scope of work a seller completes work as specified, but the buyer is not pleased with the results. The contract is considered to be: a. Null and void b. Incomplete c. Complete d. Waived C. Complete Emak International Academy 18
  • 19. Q. In a fixed price contract, the fee or profit is: a. Unknown b. Part of the negotiation involved in paying every invoice c. Applied as a line item in every invoice d. Determined at the end of the project a. unknown Emak International Academy 19
  • 20. 2. CONDUCT PROCUREMENTS INPUTS TOOLS & TECHNIQUES 1. Bidder Conferences 1. Project Management Plan 2. Proposal Evaluation Techniques 2. Procurement Documents 3. Independent Estimates 3. Source Selection Criteria 4. Expert Judgment 4. Qualified Seller List 5. Advertising 5. Seller Proposals 6. Internet Search 6. Project Documents 7. Procurement Negotiations 7. Make or Buy Decisions 8. Teaming Agreements 9. Organizational Process Assets OUTPUTS 1. Selected Sellers 2. Procurement Contract Award 3. Resource Calendars 4. Change Requests 5. Project Management Plan Updates 6. Project Documents Updates Emak International Academy 20
  • 21. 2. CONDUCT PROCUREMENTS  Obtain sellers’ responses, select sellers and award contracts. Emak International Academy 21
  • 22. 2. CONDUCT PROCUREMENTS - Inputs 1. Project Management Plan 2. Procurement Documents 3. Source Selection Criteria 4. Qualified Seller List (Approved Bidders List and new pre-qualified sellers) 5. Seller Proposals (obtained from sellers) 6. Project Documents (Scope, Schedule, Cost, Risk) 7. Make or Buy Decisions 8. Teaming Agreements 9. Organizational Process Assets (Past Experience, Bidders List) Emak International Academy 22
  • 23. 2. CONDUCT PROCUREMENTS – Tools & Techniques 1. Bidder Conferences  Are also known as contractor, vendor, or pre- bid conferences.  The purpose of these conferences is to clarify any of the information not clearly stated in the RFP.  Creates a clear and common understanding of the procurement.  Proposals received will be more clearly aligned with project requirements, due to the fact that bidder conferences make the requirements clear. Emak International Academy 23
  • 24. 2. CONDUCT PROCUREMENTS – Tools & Techniques 2. Proposal Evaluation Techniques (agreed by Evaluation Committee) 3. Independent Estimates (serves as a benchmark and help uncover SOW deficiencies and ambiguities misunderstanding of Scope) 4. Expert Judgment 5. Advertising - Is a tool that may be used to increase the number of potential sellers contacted via Newspapers, Professional journals or Websites Emak International Academy 24
  • 25. 2. CONDUCT PROCUREMENTS – Tools & Techniques 6. Internet Search 7. Procurement Negotiations (Team)  Negotiations can cover the following areas:  Responsibilities and authorities  Applicable terms and law  Scope, technical and business management approaches  Contract financing (Payment Schedule)  Price Emak International Academy 25
  • 26. 2. CONDUCT PROCUREMENTS – Outputs 1. Selected Sellers 2. Procurement contract Award A mutually binding agreement that obligates the seller to provide the specified product and obligates the buyer to pay for it.  Major components: SOW Schedule Roles and responsibilities Pricing Payment Acceptance criteria Warranty product support Incentives Penalties Insurance Performance bonds Change requests Termination mechanisms Emak International Academy 26
  • 27. 2. CONDUCT PROCUREMENTS Outputs 3. Resource Calendars 4. Change Requests 5. Project Management Plan Updates (Scope, Cost, Schedule, Procurement Management Plan…etc.) 6. Project Document Updates (SOW and Requirements Documentation) Emak International Academy 27
  • 28. Q: Bidder Conferences are part of : a. Plan Procurements b. Conduct Procurements c. Administer Procurements d. Conduct Purchasing Answer B Emak International Academy 28
  • 29. Q. The project team is arguing about whether they should complete a work package themselves or outsource the work. What part of the procurement process are they in: a. Contract administration b. Plan Procurements c. Conduct Procurements d. Select sellers Answer B Emak International Academy 29
  • 30. 3. ADMINISTER PROCUREMENTS INPUTS TOOLS & TECHNIQUES 1. Procurement Documents 1. Contract Change Control System 2. Project Management Plan 2. Procurement Performance Reviews 3. Contract 3. Inspections and Audits 4. Performance Reports 4. Performance Reporting 5. Approved Change Requests 5. Payment Systems 6. Work Performance Information 6. Claims Administration 7. Records Management System OUTPUTS 1. Procurement Documentation 2. Organizational Process Assets Updates 3. Change Requests 4. Project Management Plan Updates Emak International Academy 30
  • 31. 3. ADMINISTER PROCUREMENTS Manage procurements relationships, monitor contract performance and make changes and corrections as needed. Emak International Academy 31
  • 32. 3. ADMINISTER PROCUREMENTS -Inputs 1. Procurement Documents 2. Project Management Plan 3. Contract 4. Performance Reports  Technical documentation and other deliverables information developed by the seller.  Seller Performance Reports. Emak International Academy 32
  • 33. 3. ADMINISTER PROCUREMENTS - Inputs 5. Approved Change Request. 6. Work Performance Information: Includes;  The extent to which quality standards are being met.  Indicates which deliverables have been completed.  Identifies which costs have been incurred.  Seller invoices: submitted from time to time to request payment for work performed. Emak International Academy 33
  • 34. 3. ADMINISTER PROCUREMENTS – Tools and Techniques 1. Contract Change Control System  Defines the process by which the contract may be modified.  It includes the paperwork, tracking systems, dispute resolution procedures, and approval levels necessary for authorizing changes.  Should be integrated with the integrated change control system. 2. Procurement Performance Review; A structured review on the sellers’ progress to deliver as per planned scope – quality – schedule – quality, etc.. Emak International Academy 34
  • 35. 3. ADMINISTER PROCUREMENTS – Tools and Techniques 3. Inspections and Audits; required by the buyer and supported by the seller to identify any weaknesses in the seller’s work performance or deliverables. 4. Performance Reporting: Provides information to management about how effectively the seller is achieving the contractual objectives. 5. Payment System: Handled by the accounts payable department of the performing organization. Must include reviews and approvals of seller invoices by the project team prior to issuing a payment to a seller. Emak International Academy 35
  • 36. 3. ADMINISTER PROCUREMENTS – Tools and Techniques 6. Claims Administration: (disputes or appeals)  Where buyer and seller cannot agree on compensation for the change, or that a change has even occurred.  Should be documented and managed in accordance with the terms of the contract.  Might involve arbitration or litigation. 7. Record Management System:  A set of processes and automation tools consolidated into the project Management Information System to manage contract documentation and records.  To maintain an index of contract records, and correspondences for archiving and future use. Emak International Academy 36
  • 37. 3. ADMINISTER PROCUREMENTS – Outputs 1. Procurement Documentation: A complete set of indexed records regarding the contract. Includes;  Schedules  Approved and unapproved change requests  Technical documentation  Work performance information  Performance reports  Financial docs (invoices ad payment records) 2. Change Requests Emak International Academy 37
  • 38. 3. ADMINISTER PROCUREMENTS – Outputs 3. Updated Organizational Process Assets: including  Correspondence: communication between buyer and seller.  Payment Schedules and requests; if the project is using an external payment system.  Seller performance Evaluation documentation: performed by the buyer to document seller’s ability to continue to perform work on the project or to be allowed to work on future projects. Basis for early termination Can be included in qualified seller lists in the organization. 4.Updated Project Management Plan Emak International Academy 38
  • 39. Q. All of the following statements about change control are incorrect EXCEPT: a. A fixed price contract will minimize the need for change control. b. Changes seldom provide real benefits to the project c. Contracts should include procedures to accommodate changes. d. More detailed specifications eliminate the causes of changes. Answer C Emak International Academy 39
  • 40. 4. CLOSE PROCUREMENTS INPUTS TOOLS & TECHNIQUES 1. Procurement Documentation 1. Procurement Audits 2. Project Management Plan 2. Negotiated Settlements 3. Records Management System OUTPUTS 1. Closed Procurement 2. Organizational Process Assets Updates Emak International Academy 40
  • 41. 4. CLOSE PROCUREMENTS The process of completing each project procurement. Involves verification that all of the procurement work was completed and accepted. (Product Verification) Emak International Academy 41
  • 42. 4. CLOSE PROCUREMENTS - Inputs 1. Project Management Plan 2. Procurement Documentation  The contract.  Supporting schedules  Requested and approved changes  Technical documentation  Performance reports  Financial reports Emak International Academy 42
  • 43. 4. CLOSE PROCUREMENTS – Tools and Techniques 1. Procurement Audits:  A structured review of the procurement process from Plan Procurements to Administer Procurements.  The objective is to identify the successes and failures that warrant recognition. 2. Negotiated Settlements 3. Records Management System. Emak International Academy 43
  • 44. 4. CLOSE PROCUREMENTS – outputs 1. Closed Procurements: Formal written notice that the contract has been completed. 2. Updated Organizational Process Assets:  Contract File:  A complete set of indexed contract documentation.  Deliverable Acceptance:  A formal written notice from the buyer that the contract has been accepted.  Requirements should be defined in the contract.  Lessons Learned documentation Emak International Academy 44