January 9, 2014

Bill Rose
Gary Bousquet


Status of BDCP Design



Role of Water Authority Review



Schedule
July

– Board Review Process

August

– Background & Options to Review
– Review Update

September – Costs and Funding
– Comparison of Estimated Export Yields
October

– Environmental Process Review
– Implementation Process and Portfolio
Alternative Analysis

November – Overview: Supply and Demand Reliability
Assessment


Description of Proposed Facilities



Cost Estimates



Review Process – Gate Process



Initial List of Concerns


Description of Proposed Facilities



Cost Estimates



Review Process – Gate Process



Initial List of Concerns


BDCP Preferred Alternative: 9,000 cfs
pipeline/tunnel



No Action Alternative



NRDC Portfolio Concept



Delta Vision BDCP Plus Concept






3- 3,000 cfs intakes off Sacramento River
w/ sedimentation basins and pumping
plants
3 – North tunnels 20/29 feet diameter,
~14 miles between pumping plants and
intermediate forebay
1 – 40 acre intermediate forebay
connected to main conveyance tunnels





2 – 40 feet diameter 30 mile long tunnels
between intermediate forebay and
modified Clifton Court forebay
5 tunnel launch/retrieval shafts

Clifton Court forebay split into 2, north
and south forebays



Relocation of roads and utilities



Temporary and permanent power



Tunnel and forebay muck disposal

Approximately 15 years from preliminary
engineering to start-up


Description of Proposed Facilities



Cost Estimates



Review Process – Gate Process



Initial List of Concerns
Tunnel Options Construction Costs
Estimated Costs
Dual Tunnels

3,000 cfs

6,000 cfs

BDCP
Proposed
9,000 cfs

15,000 cfs

Construction

$9.4B

$11.4B

$12.4B

$14.5B

Engineering,
project/construction
management

$1.4B

$1.7B

$1.9B
(~15%)

$2.3B

$13.1B

$14.3B

$16.8B

Total
Notes:

$10.8B

1. BDCP revised cost of single bore tunnel is $8.6B per
November 12, 2013 web post.
2. Costs are stated in 2012 dollars.

Source: BDCP, Table 9.B-6, November 2013


River Intake Structures



Forebays & flow control structures



Tunnels and pipelines



Controls and communications



Utilities and power delivery



Contingency ~ 36 percent

* Based on May 2013 BDCP, Appendix 9.B – needs
updating per revised costs.


Project Management



Engineering Design Costs



Construction Administration



Currently 15% included for these items


Description of Proposed Facilities



Cost Estimates



Review Process – Gate Process



Initial List of Concerns


Gate Process



What is a “Gate”?



Gate Group Composition
Planning

• Gate 1: Project Initiation (20 deliverables)

Design

• Gate 2: Design Initiation (10 deliverables)
• Gate 3: Preliminary Design (6 deliverables)
• Gate 4: Mid-Point Design (6 deliverables)
• Gate 5: Final Design (12 deliverables)

Construction

Post-Construction

• Gate 6: Beneficial Occupancy (5 deliverables)
• Gate 7: Approval - Go to Board for NOC (9 deliverables)

• Gate 8: Project Closeout (15 deliverables)
Planning

• Gate 1: Project Initiation (20 deliverables)

Design

• Gate 2: Design Initiation (10 deliverables)
• Gate 3: Preliminary Design (6 deliverables)
• Gate 4: Mid-Point Design (6 deliverables)
• Gate 5: Final Design (12 deliverables)

Construction

Post-Construction

• Gate 6: Beneficial Occupancy (5 deliverables)
• Gate 7: Approval - Go to Board for NOC (9 deliverables)

• Gate 8: Project Closeout (15 deliverables)
Gate 1 – Project Initiation:
 Planning Study Final Report
 Project Delivery Plan
 Preliminary Project Schedule
 Project Budget
 Risk Management Plan
 Public Outreach Consultant Support
 Value Engineering Study for Pipeline Projects
Gate 1 – Project Initiation:
 Planning Study Final Report
 Project Delivery Plan
 Preliminary Project Schedule
 Project Budget
 Risk Management Plan
 Public Outreach Consultant Support
 Value Engineering Study for Pipeline Projects


Project Delivery Plan









Team members
Project objectives
Schedule milestones
Budget
Key Issues
Stakeholder coordination
Anticipated Board actions


Project delivery plan that examines and
explores various options to execute the
project.

Examples:

Design/Bid/Build

Design/Build

Design/Build/Operate

Pre-purchase of equipment

Staged construction






Project scope
Schedule
Desired level of owner involvement
Tolerance for risk
Resources and capabilities
Gate 1 - Risk Management Plan
Identify

Update

Manage
Risks
During All
Project
Phases

Monitor

Analyze

Mitigate

Project Initiation and Design Phases
Gate 2 – Deliverables:
 Life Cycle Cost Analysis
 Preliminary Design Report
 Draft Environmental Impact Report
 Right-of-Way Acquisition Plan
Gate 3 – Preliminary Design:
 Updated Construction Cost Estimate
 Adopted Final Environmental Impact Report
 Updated Project Delivery Plan


Review Documents
◦ BDCP
◦ EIR/EIS
◦ Conceptual Engineering Report
◦ Geotechnical Data Report



Examine through lens of Water Authority
Gate Process


Description of Proposed Facilities



Cost Estimates



Review Process – Gate Process



Initial List of Concerns


Tunnel Muck Removal
◦ Electric Car, fuel driven cars, conveyors



Tunnel Muck Disposal
◦ Where?, alternate uses?



Ventilation Design


Project delivery method



Construction contract requirements
◦ Bonding, owner controlled insurance, project
labor agreement, local labor





Ability to get 10-11 Tunnel Boring
Machines and operators
Temporary Power – project generation air
quality








Permanent Power – multiple power
providers – system control
Unknown if enough suitable borrow
material

Natural gas wells – existing and
abandoned
Infiltrated Water Removal



Relocation of roads and utilities

Price escalation beyond estimates for 15year project



Dewatering intermediate shaft sites



Geotechnical
◦ Unknown subsurface conditions

◦ Harder/softer ground






Historical Data – Collected from other Delta
area projects such as levees and highways
2009-2012 Field Explorations – borings, cone
penetration tests, geophysical surveys, and
laboratory testing
Identifying soils types, hardness,
groundwater elevations, cobbles …


Channel Tunnel (United Kingdom/France)



Alaska Way Viaduct (Seattle)






Review Updated Engineering Conceptual
Design Report – Ongoing
Engineering Assessment of BDCP Costs
Estimates – February 2014

Comment Letter – April 2014

Mais conteúdo relacionado

Mais procurados

C5 Council Workshop Presentation 7-27-11
C5 Council Workshop Presentation 7-27-11C5 Council Workshop Presentation 7-27-11
C5 Council Workshop Presentation 7-27-11publicinvolvement
 
LTCP meeting 02-10-05
LTCP meeting 02-10-05LTCP meeting 02-10-05
LTCP meeting 02-10-05HartTWI
 
Fall 2015--DEC Upated on Spring Creek Restoration Project
Fall 2015--DEC Upated on Spring Creek Restoration ProjectFall 2015--DEC Upated on Spring Creek Restoration Project
Fall 2015--DEC Upated on Spring Creek Restoration Projectecowatchers
 
Birch Rd Presentation 05-11-09 Tm
Birch Rd Presentation 05-11-09 TmBirch Rd Presentation 05-11-09 Tm
Birch Rd Presentation 05-11-09 TmGordon Fowler
 
LTCP meeting 11-18-04
LTCP meeting 11-18-04LTCP meeting 11-18-04
LTCP meeting 11-18-04HartTWI
 
WET Feature 4 - Building bigger and better - Jan_16
WET Feature 4 - Building bigger and better - Jan_16WET Feature 4 - Building bigger and better - Jan_16
WET Feature 4 - Building bigger and better - Jan_16Tim Bail
 
Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...
Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...
Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...Youn Sim, Ph.D., P.E.
 
Tuscarora Lateral Project - Open House Presentation on New 17-Mile Pipeline i...
Tuscarora Lateral Project - Open House Presentation on New 17-Mile Pipeline i...Tuscarora Lateral Project - Open House Presentation on New 17-Mile Pipeline i...
Tuscarora Lateral Project - Open House Presentation on New 17-Mile Pipeline i...Marcellus Drilling News
 
ARTBA Comments on CEQ Draft Guidance Including Climate Change and Greenhouse ...
ARTBA Comments on CEQ Draft Guidance Including Climate Change and Greenhouse ...ARTBA Comments on CEQ Draft Guidance Including Climate Change and Greenhouse ...
ARTBA Comments on CEQ Draft Guidance Including Climate Change and Greenhouse ...artba
 
CPAC Meeting 10-25-04
CPAC Meeting 10-25-04CPAC Meeting 10-25-04
CPAC Meeting 10-25-04HartTWI
 
Time overruns welcome to power line
Time overruns   welcome to power lineTime overruns   welcome to power line
Time overruns welcome to power lineProbodh Mallick
 
Pre proposal meeting - supervisory consultancy
Pre proposal meeting  - supervisory consultancyPre proposal meeting  - supervisory consultancy
Pre proposal meeting - supervisory consultancyRiaz Zalil
 
Clean Water Facility Update
Clean Water Facility UpdateClean Water Facility Update
Clean Water Facility UpdateJackie Dagger
 

Mais procurados (20)

Climate Action Plan Update Sept 12 2013 Special Board Mtg
Climate Action Plan Update Sept 12 2013 Special Board MtgClimate Action Plan Update Sept 12 2013 Special Board Mtg
Climate Action Plan Update Sept 12 2013 Special Board Mtg
 
Bay-Delta Quarterly Update, July 26, 2012
Bay-Delta Quarterly Update, July 26, 2012Bay-Delta Quarterly Update, July 26, 2012
Bay-Delta Quarterly Update, July 26, 2012
 
gibson
gibsongibson
gibson
 
C5 Council Workshop Presentation 7-27-11
C5 Council Workshop Presentation 7-27-11C5 Council Workshop Presentation 7-27-11
C5 Council Workshop Presentation 7-27-11
 
LTCP meeting 02-10-05
LTCP meeting 02-10-05LTCP meeting 02-10-05
LTCP meeting 02-10-05
 
44 ocea lmco-ascari
44 ocea lmco-ascari44 ocea lmco-ascari
44 ocea lmco-ascari
 
Fall 2015--DEC Upated on Spring Creek Restoration Project
Fall 2015--DEC Upated on Spring Creek Restoration ProjectFall 2015--DEC Upated on Spring Creek Restoration Project
Fall 2015--DEC Upated on Spring Creek Restoration Project
 
Birch Rd Presentation 05-11-09 Tm
Birch Rd Presentation 05-11-09 TmBirch Rd Presentation 05-11-09 Tm
Birch Rd Presentation 05-11-09 Tm
 
LTCP meeting 11-18-04
LTCP meeting 11-18-04LTCP meeting 11-18-04
LTCP meeting 11-18-04
 
WET Feature 4 - Building bigger and better - Jan_16
WET Feature 4 - Building bigger and better - Jan_16WET Feature 4 - Building bigger and better - Jan_16
WET Feature 4 - Building bigger and better - Jan_16
 
Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...
Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...
Sustainable Public Works: Benefits of Taking Envision Beyond the Boundary of ...
 
Caltrans Pavement Design Perspective
Caltrans Pavement Design PerspectiveCaltrans Pavement Design Perspective
Caltrans Pavement Design Perspective
 
Tuscarora Lateral Project - Open House Presentation on New 17-Mile Pipeline i...
Tuscarora Lateral Project - Open House Presentation on New 17-Mile Pipeline i...Tuscarora Lateral Project - Open House Presentation on New 17-Mile Pipeline i...
Tuscarora Lateral Project - Open House Presentation on New 17-Mile Pipeline i...
 
ARTBA Comments on CEQ Draft Guidance Including Climate Change and Greenhouse ...
ARTBA Comments on CEQ Draft Guidance Including Climate Change and Greenhouse ...ARTBA Comments on CEQ Draft Guidance Including Climate Change and Greenhouse ...
ARTBA Comments on CEQ Draft Guidance Including Climate Change and Greenhouse ...
 
CPAC Meeting 10-25-04
CPAC Meeting 10-25-04CPAC Meeting 10-25-04
CPAC Meeting 10-25-04
 
Cold-in-Place Recycling (CIR) use in Urban Areas
Cold-in-Place Recycling (CIR) use in Urban AreasCold-in-Place Recycling (CIR) use in Urban Areas
Cold-in-Place Recycling (CIR) use in Urban Areas
 
Time overruns welcome to power line
Time overruns   welcome to power lineTime overruns   welcome to power line
Time overruns welcome to power line
 
Pre proposal meeting - supervisory consultancy
Pre proposal meeting  - supervisory consultancyPre proposal meeting  - supervisory consultancy
Pre proposal meeting - supervisory consultancy
 
Beeville MLT_Administratively Complete Management Plans_Robert Bradley
Beeville MLT_Administratively Complete Management Plans_Robert BradleyBeeville MLT_Administratively Complete Management Plans_Robert Bradley
Beeville MLT_Administratively Complete Management Plans_Robert Bradley
 
Clean Water Facility Update
Clean Water Facility UpdateClean Water Facility Update
Clean Water Facility Update
 

Destaque (8)

Water Talks: Budget and Rates
Water Talks: Budget and RatesWater Talks: Budget and Rates
Water Talks: Budget and Rates
 
Water Talks: Challenges to Regional Water Reliability
Water Talks: Challenges to Regional Water ReliabilityWater Talks: Challenges to Regional Water Reliability
Water Talks: Challenges to Regional Water Reliability
 
Notification of a Drought Alert Condition and Declare Supply Enhancement Stag...
Notification of a Drought Alert Condition and Declare Supply Enhancement Stag...Notification of a Drought Alert Condition and Declare Supply Enhancement Stag...
Notification of a Drought Alert Condition and Declare Supply Enhancement Stag...
 
Wp mp-update-col riverconvey-april_25_2013
Wp   mp-update-col riverconvey-april_25_2013Wp   mp-update-col riverconvey-april_25_2013
Wp mp-update-col riverconvey-april_25_2013
 
Pure Water San Diego
Pure Water San DiegoPure Water San Diego
Pure Water San Diego
 
Water Talks: Investments in Water Reliability
Water Talks: Investments in Water ReliabilityWater Talks: Investments in Water Reliability
Water Talks: Investments in Water Reliability
 
Water Talks: City of San Diego IPR
Water Talks: City of San Diego IPRWater Talks: City of San Diego IPR
Water Talks: City of San Diego IPR
 
Water Rate Litigation Update
Water Rate Litigation UpdateWater Rate Litigation Update
Water Rate Litigation Update
 

Semelhante a BDCP Status Review

Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014
Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014
Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014San Diego County Water Authority
 
Lead Process Engineer
Lead Process EngineerLead Process Engineer
Lead Process EngineerJuber Loharia
 
DBIA 2016 Presentation on Progressive Design Build Aqua Marion WTP Project
DBIA 2016 Presentation on Progressive Design Build Aqua Marion WTP Project DBIA 2016 Presentation on Progressive Design Build Aqua Marion WTP Project
DBIA 2016 Presentation on Progressive Design Build Aqua Marion WTP Project Bowen
 
Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...
Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...
Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...AamerShakoor
 
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...The Piedmont Environmental Council
 
German perez lifes50+ design summary - deep wind 2018
German perez   lifes50+ design summary - deep wind 2018German perez   lifes50+ design summary - deep wind 2018
German perez lifes50+ design summary - deep wind 2018TECNALIA Marine Energy
 
Project Induction Program 11.02.2016
Project Induction Program 11.02.2016Project Induction Program 11.02.2016
Project Induction Program 11.02.2016Lasantha Perera
 
Updated C.V of water & sewerage
Updated  C.V of water & sewerageUpdated  C.V of water & sewerage
Updated C.V of water & sewerageKhalid Pervez
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarAssociation for Project Management
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarAssociation for Project Management
 
PROJECT MGT. PRESENTATION
PROJECT MGT. PRESENTATIONPROJECT MGT. PRESENTATION
PROJECT MGT. PRESENTATIONmaheshvkat1972
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas Rushi Pru Dhvi
 

Semelhante a BDCP Status Review (20)

Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014
Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014
Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014
 
Lead Process Engineer
Lead Process EngineerLead Process Engineer
Lead Process Engineer
 
DBIA 2016 Presentation on Progressive Design Build Aqua Marion WTP Project
DBIA 2016 Presentation on Progressive Design Build Aqua Marion WTP Project DBIA 2016 Presentation on Progressive Design Build Aqua Marion WTP Project
DBIA 2016 Presentation on Progressive Design Build Aqua Marion WTP Project
 
Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...
Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...
Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...
 
Latest CV of Gangadhar
Latest CV of GangadharLatest CV of Gangadhar
Latest CV of Gangadhar
 
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
 
German perez lifes50+ design summary - deep wind 2018
German perez   lifes50+ design summary - deep wind 2018German perez   lifes50+ design summary - deep wind 2018
German perez lifes50+ design summary - deep wind 2018
 
Infrastructure projects
Infrastructure projectsInfrastructure projects
Infrastructure projects
 
Infrastructure projects
Infrastructure projectsInfrastructure projects
Infrastructure projects
 
Project Induction Program 11.02.2016
Project Induction Program 11.02.2016Project Induction Program 11.02.2016
Project Induction Program 11.02.2016
 
Anil_CV_Recent
Anil_CV_RecentAnil_CV_Recent
Anil_CV_Recent
 
Updated C.V of water & sewerage
Updated  C.V of water & sewerageUpdated  C.V of water & sewerage
Updated C.V of water & sewerage
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
 
PROJECT MGT. PRESENTATION
PROJECT MGT. PRESENTATIONPROJECT MGT. PRESENTATION
PROJECT MGT. PRESENTATION
 
W10 not every bore is boring - sciandra
W10 not every bore is boring - sciandraW10 not every bore is boring - sciandra
W10 not every bore is boring - sciandra
 
ASIF CV - HVAC O & M
ASIF CV - HVAC O & MASIF CV - HVAC O & M
ASIF CV - HVAC O & M
 
Nazmy Markos
Nazmy MarkosNazmy Markos
Nazmy Markos
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas
 
Prudhivi__Rushi_CV
Prudhivi__Rushi_CVPrudhivi__Rushi_CV
Prudhivi__Rushi_CV
 

Mais de San Diego County Water Authority

Update on Supply Conditions and Drought Response Activities - September 24, 2015
Update on Supply Conditions and Drought Response Activities - September 24, 2015Update on Supply Conditions and Drought Response Activities - September 24, 2015
Update on Supply Conditions and Drought Response Activities - September 24, 2015San Diego County Water Authority
 
Update on Supply Conditions and Drought Response Activities - June 25, 2015
Update on Supply Conditions and Drought Response Activities - June 25, 2015 Update on Supply Conditions and Drought Response Activities - June 25, 2015
Update on Supply Conditions and Drought Response Activities - June 25, 2015 San Diego County Water Authority
 
Update on Supply Conditions and Drought Response Activities - October 22, 2015
Update on Supply Conditions and Drought Response Activities - October 22, 2015Update on Supply Conditions and Drought Response Activities - October 22, 2015
Update on Supply Conditions and Drought Response Activities - October 22, 2015San Diego County Water Authority
 
Update on Supply Conditions and Drought Response Activities - December 10, 2015
Update on Supply Conditions and Drought Response Activities - December 10, 2015Update on Supply Conditions and Drought Response Activities - December 10, 2015
Update on Supply Conditions and Drought Response Activities - December 10, 2015San Diego County Water Authority
 
Update on Supply Conditions and Drought Response Activities - February 25, 2016
Update on Supply Conditions and Drought Response Activities - February 25, 2016Update on Supply Conditions and Drought Response Activities - February 25, 2016
Update on Supply Conditions and Drought Response Activities - February 25, 2016San Diego County Water Authority
 
Update on Supply Conditions and Drought Response Activities - August 27, 2015
Update on Supply Conditions and Drought Response Activities - August 27, 2015Update on Supply Conditions and Drought Response Activities - August 27, 2015
Update on Supply Conditions and Drought Response Activities - August 27, 2015San Diego County Water Authority
 
Update on Supply Conditions and Drought Response Activities - July 23, 2015
Update on Supply Conditions and Drought Response Activities - July 23, 2015 Update on Supply Conditions and Drought Response Activities - July 23, 2015
Update on Supply Conditions and Drought Response Activities - July 23, 2015 San Diego County Water Authority
 
Bay Delta Conservation Plan/California WaterFix: Potential Cost Impact to the...
Bay Delta Conservation Plan/California WaterFix: Potential Cost Impact to the...Bay Delta Conservation Plan/California WaterFix: Potential Cost Impact to the...
Bay Delta Conservation Plan/California WaterFix: Potential Cost Impact to the...San Diego County Water Authority
 
State Treasurer's Assessment of the Affordability and Financing Consideration...
State Treasurer's Assessment of the Affordability and Financing Consideration...State Treasurer's Assessment of the Affordability and Financing Consideration...
State Treasurer's Assessment of the Affordability and Financing Consideration...San Diego County Water Authority
 
State Treasurer's Assessment of the Affordability and Financing Consideration...
State Treasurer's Assessment of the Affordability and Financing Consideration...State Treasurer's Assessment of the Affordability and Financing Consideration...
State Treasurer's Assessment of the Affordability and Financing Consideration...San Diego County Water Authority
 
Bay-Delta Conservation Plan: Supplemental Draft EIR/EIS Comment Letter - July...
Bay-Delta Conservation Plan: Supplemental Draft EIR/EIS Comment Letter - July...Bay-Delta Conservation Plan: Supplemental Draft EIR/EIS Comment Letter - July...
Bay-Delta Conservation Plan: Supplemental Draft EIR/EIS Comment Letter - July...San Diego County Water Authority
 
Bay-Delta Conservation Plan: Economic and Financial Risk Assessment to the Wa...
Bay-Delta Conservation Plan: Economic and Financial Risk Assessment to the Wa...Bay-Delta Conservation Plan: Economic and Financial Risk Assessment to the Wa...
Bay-Delta Conservation Plan: Economic and Financial Risk Assessment to the Wa...San Diego County Water Authority
 
Bay-Delta Conservation Plan: Draft EIR/EIS Comment Letter - March 27, 2014
Bay-Delta Conservation Plan: Draft EIR/EIS Comment Letter - March 27, 2014Bay-Delta Conservation Plan: Draft EIR/EIS Comment Letter - March 27, 2014
Bay-Delta Conservation Plan: Draft EIR/EIS Comment Letter - March 27, 2014San Diego County Water Authority
 
Update on Supply Conditions and Drought Response Activities
Update on Supply Conditions and Drought Response ActivitiesUpdate on Supply Conditions and Drought Response Activities
Update on Supply Conditions and Drought Response ActivitiesSan Diego County Water Authority
 
Approval of Shortage Management Actions in Response to MWD Supply Cutbacks an...
Approval of Shortage Management Actions in Response to MWD Supply Cutbacks an...Approval of Shortage Management Actions in Response to MWD Supply Cutbacks an...
Approval of Shortage Management Actions in Response to MWD Supply Cutbacks an...San Diego County Water Authority
 

Mais de San Diego County Water Authority (20)

Session 2 presentation
Session 2 presentationSession 2 presentation
Session 2 presentation
 
Update on Supply Conditions and Drought Response Activities - September 24, 2015
Update on Supply Conditions and Drought Response Activities - September 24, 2015Update on Supply Conditions and Drought Response Activities - September 24, 2015
Update on Supply Conditions and Drought Response Activities - September 24, 2015
 
Update on Supply Conditions and Drought Response Activities - June 25, 2015
Update on Supply Conditions and Drought Response Activities - June 25, 2015 Update on Supply Conditions and Drought Response Activities - June 25, 2015
Update on Supply Conditions and Drought Response Activities - June 25, 2015
 
Update on Supply Conditions and Drought Response Activities - October 22, 2015
Update on Supply Conditions and Drought Response Activities - October 22, 2015Update on Supply Conditions and Drought Response Activities - October 22, 2015
Update on Supply Conditions and Drought Response Activities - October 22, 2015
 
Update on Supply Conditions and Drought Response Activities - December 10, 2015
Update on Supply Conditions and Drought Response Activities - December 10, 2015Update on Supply Conditions and Drought Response Activities - December 10, 2015
Update on Supply Conditions and Drought Response Activities - December 10, 2015
 
Update on Supply Conditions and Drought Response Activities - February 25, 2016
Update on Supply Conditions and Drought Response Activities - February 25, 2016Update on Supply Conditions and Drought Response Activities - February 25, 2016
Update on Supply Conditions and Drought Response Activities - February 25, 2016
 
Update on Supply Conditions and Drought Response Activities - August 27, 2015
Update on Supply Conditions and Drought Response Activities - August 27, 2015Update on Supply Conditions and Drought Response Activities - August 27, 2015
Update on Supply Conditions and Drought Response Activities - August 27, 2015
 
Update on Supply Conditions and Drought Response Activities - July 23, 2015
Update on Supply Conditions and Drought Response Activities - July 23, 2015 Update on Supply Conditions and Drought Response Activities - July 23, 2015
Update on Supply Conditions and Drought Response Activities - July 23, 2015
 
Bay Delta Conservation Plan/California WaterFix
Bay Delta Conservation Plan/California WaterFixBay Delta Conservation Plan/California WaterFix
Bay Delta Conservation Plan/California WaterFix
 
Bay Delta Conservation Plan/California WaterFix
Bay Delta Conservation Plan/California WaterFixBay Delta Conservation Plan/California WaterFix
Bay Delta Conservation Plan/California WaterFix
 
Bay Delta Conservation Plan/California WaterFix: Potential Cost Impact to the...
Bay Delta Conservation Plan/California WaterFix: Potential Cost Impact to the...Bay Delta Conservation Plan/California WaterFix: Potential Cost Impact to the...
Bay Delta Conservation Plan/California WaterFix: Potential Cost Impact to the...
 
Bay-Delta Activities Update
Bay-Delta Activities UpdateBay-Delta Activities Update
Bay-Delta Activities Update
 
State Treasurer's Assessment of the Affordability and Financing Consideration...
State Treasurer's Assessment of the Affordability and Financing Consideration...State Treasurer's Assessment of the Affordability and Financing Consideration...
State Treasurer's Assessment of the Affordability and Financing Consideration...
 
State Treasurer's Assessment of the Affordability and Financing Consideration...
State Treasurer's Assessment of the Affordability and Financing Consideration...State Treasurer's Assessment of the Affordability and Financing Consideration...
State Treasurer's Assessment of the Affordability and Financing Consideration...
 
2015-2016 Bay-Delta Workplan - February 26, 2015
2015-2016 Bay-Delta Workplan - February 26, 20152015-2016 Bay-Delta Workplan - February 26, 2015
2015-2016 Bay-Delta Workplan - February 26, 2015
 
Bay-Delta Conservation Plan: Supplemental Draft EIR/EIS Comment Letter - July...
Bay-Delta Conservation Plan: Supplemental Draft EIR/EIS Comment Letter - July...Bay-Delta Conservation Plan: Supplemental Draft EIR/EIS Comment Letter - July...
Bay-Delta Conservation Plan: Supplemental Draft EIR/EIS Comment Letter - July...
 
Bay-Delta Conservation Plan: Economic and Financial Risk Assessment to the Wa...
Bay-Delta Conservation Plan: Economic and Financial Risk Assessment to the Wa...Bay-Delta Conservation Plan: Economic and Financial Risk Assessment to the Wa...
Bay-Delta Conservation Plan: Economic and Financial Risk Assessment to the Wa...
 
Bay-Delta Conservation Plan: Draft EIR/EIS Comment Letter - March 27, 2014
Bay-Delta Conservation Plan: Draft EIR/EIS Comment Letter - March 27, 2014Bay-Delta Conservation Plan: Draft EIR/EIS Comment Letter - March 27, 2014
Bay-Delta Conservation Plan: Draft EIR/EIS Comment Letter - March 27, 2014
 
Update on Supply Conditions and Drought Response Activities
Update on Supply Conditions and Drought Response ActivitiesUpdate on Supply Conditions and Drought Response Activities
Update on Supply Conditions and Drought Response Activities
 
Approval of Shortage Management Actions in Response to MWD Supply Cutbacks an...
Approval of Shortage Management Actions in Response to MWD Supply Cutbacks an...Approval of Shortage Management Actions in Response to MWD Supply Cutbacks an...
Approval of Shortage Management Actions in Response to MWD Supply Cutbacks an...
 

Último

2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docxkfjstone13
 
29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdf29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Pooja Nehwal
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKISHAN REDDY OFFICE
 
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxLorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxlorenzodemidio01
 
1971 war india pakistan bangladesh liberation.ppt
1971 war india pakistan bangladesh liberation.ppt1971 war india pakistan bangladesh liberation.ppt
1971 war india pakistan bangladesh liberation.pptsammehtumblr
 
Minto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptxMinto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptxAwaiskhalid96
 
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...AlexisTorres963861
 
30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkoEmbed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkobhavenpr
 
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadershipanjanibaddipudi1
 
Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Krish109503
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...Diya Sharma
 
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackVerified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackPsychicRuben LoveSpells
 
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书Fi L
 
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Julius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the TableJulius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the Tableget joys
 
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)Delhi Call girls
 
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceDelhi Call girls
 
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 

Último (20)

2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
 
29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdf29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdf
 
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdf
 
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxLorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
 
1971 war india pakistan bangladesh liberation.ppt
1971 war india pakistan bangladesh liberation.ppt1971 war india pakistan bangladesh liberation.ppt
1971 war india pakistan bangladesh liberation.ppt
 
Minto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptxMinto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptx
 
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
 
30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf
 
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkoEmbed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
 
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
 
Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
 
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackVerified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
 
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
 
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
 
Julius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the TableJulius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the Table
 
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
 
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
 
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
 

BDCP Status Review

  • 1. January 9, 2014 Bill Rose Gary Bousquet
  • 2.  Status of BDCP Design  Role of Water Authority Review  Schedule
  • 3. July – Board Review Process August – Background & Options to Review – Review Update September – Costs and Funding – Comparison of Estimated Export Yields October – Environmental Process Review – Implementation Process and Portfolio Alternative Analysis November – Overview: Supply and Demand Reliability Assessment
  • 4.  Description of Proposed Facilities  Cost Estimates  Review Process – Gate Process  Initial List of Concerns
  • 5.  Description of Proposed Facilities  Cost Estimates  Review Process – Gate Process  Initial List of Concerns
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.  BDCP Preferred Alternative: 9,000 cfs pipeline/tunnel  No Action Alternative  NRDC Portfolio Concept  Delta Vision BDCP Plus Concept
  • 11.    3- 3,000 cfs intakes off Sacramento River w/ sedimentation basins and pumping plants 3 – North tunnels 20/29 feet diameter, ~14 miles between pumping plants and intermediate forebay 1 – 40 acre intermediate forebay connected to main conveyance tunnels
  • 12.
  • 13.
  • 14.    2 – 40 feet diameter 30 mile long tunnels between intermediate forebay and modified Clifton Court forebay 5 tunnel launch/retrieval shafts Clifton Court forebay split into 2, north and south forebays  Relocation of roads and utilities  Temporary and permanent power
  • 15.   Tunnel and forebay muck disposal Approximately 15 years from preliminary engineering to start-up
  • 16.
  • 17.  Description of Proposed Facilities  Cost Estimates  Review Process – Gate Process  Initial List of Concerns
  • 18. Tunnel Options Construction Costs Estimated Costs Dual Tunnels 3,000 cfs 6,000 cfs BDCP Proposed 9,000 cfs 15,000 cfs Construction $9.4B $11.4B $12.4B $14.5B Engineering, project/construction management $1.4B $1.7B $1.9B (~15%) $2.3B $13.1B $14.3B $16.8B Total Notes: $10.8B 1. BDCP revised cost of single bore tunnel is $8.6B per November 12, 2013 web post. 2. Costs are stated in 2012 dollars. Source: BDCP, Table 9.B-6, November 2013
  • 19.  River Intake Structures  Forebays & flow control structures  Tunnels and pipelines  Controls and communications  Utilities and power delivery  Contingency ~ 36 percent * Based on May 2013 BDCP, Appendix 9.B – needs updating per revised costs.
  • 20.  Project Management  Engineering Design Costs  Construction Administration  Currently 15% included for these items
  • 21.  Description of Proposed Facilities  Cost Estimates  Review Process – Gate Process  Initial List of Concerns
  • 22.  Gate Process  What is a “Gate”?  Gate Group Composition
  • 23. Planning • Gate 1: Project Initiation (20 deliverables) Design • Gate 2: Design Initiation (10 deliverables) • Gate 3: Preliminary Design (6 deliverables) • Gate 4: Mid-Point Design (6 deliverables) • Gate 5: Final Design (12 deliverables) Construction Post-Construction • Gate 6: Beneficial Occupancy (5 deliverables) • Gate 7: Approval - Go to Board for NOC (9 deliverables) • Gate 8: Project Closeout (15 deliverables)
  • 24. Planning • Gate 1: Project Initiation (20 deliverables) Design • Gate 2: Design Initiation (10 deliverables) • Gate 3: Preliminary Design (6 deliverables) • Gate 4: Mid-Point Design (6 deliverables) • Gate 5: Final Design (12 deliverables) Construction Post-Construction • Gate 6: Beneficial Occupancy (5 deliverables) • Gate 7: Approval - Go to Board for NOC (9 deliverables) • Gate 8: Project Closeout (15 deliverables)
  • 25. Gate 1 – Project Initiation:  Planning Study Final Report  Project Delivery Plan  Preliminary Project Schedule  Project Budget  Risk Management Plan  Public Outreach Consultant Support  Value Engineering Study for Pipeline Projects
  • 26. Gate 1 – Project Initiation:  Planning Study Final Report  Project Delivery Plan  Preliminary Project Schedule  Project Budget  Risk Management Plan  Public Outreach Consultant Support  Value Engineering Study for Pipeline Projects
  • 27.  Project Delivery Plan        Team members Project objectives Schedule milestones Budget Key Issues Stakeholder coordination Anticipated Board actions
  • 28.  Project delivery plan that examines and explores various options to execute the project. Examples:  Design/Bid/Build  Design/Build  Design/Build/Operate  Pre-purchase of equipment  Staged construction
  • 29.      Project scope Schedule Desired level of owner involvement Tolerance for risk Resources and capabilities
  • 30. Gate 1 - Risk Management Plan Identify Update Manage Risks During All Project Phases Monitor Analyze Mitigate Project Initiation and Design Phases
  • 31. Gate 2 – Deliverables:  Life Cycle Cost Analysis  Preliminary Design Report  Draft Environmental Impact Report  Right-of-Way Acquisition Plan
  • 32. Gate 3 – Preliminary Design:  Updated Construction Cost Estimate  Adopted Final Environmental Impact Report  Updated Project Delivery Plan
  • 33.  Review Documents ◦ BDCP ◦ EIR/EIS ◦ Conceptual Engineering Report ◦ Geotechnical Data Report  Examine through lens of Water Authority Gate Process
  • 34.  Description of Proposed Facilities  Cost Estimates  Review Process – Gate Process  Initial List of Concerns
  • 35.  Tunnel Muck Removal ◦ Electric Car, fuel driven cars, conveyors  Tunnel Muck Disposal ◦ Where?, alternate uses?  Ventilation Design
  • 36.  Project delivery method  Construction contract requirements ◦ Bonding, owner controlled insurance, project labor agreement, local labor   Ability to get 10-11 Tunnel Boring Machines and operators Temporary Power – project generation air quality
  • 37.     Permanent Power – multiple power providers – system control Unknown if enough suitable borrow material Natural gas wells – existing and abandoned Infiltrated Water Removal
  • 38.   Relocation of roads and utilities Price escalation beyond estimates for 15year project  Dewatering intermediate shaft sites  Geotechnical ◦ Unknown subsurface conditions ◦ Harder/softer ground
  • 39.    Historical Data – Collected from other Delta area projects such as levees and highways 2009-2012 Field Explorations – borings, cone penetration tests, geophysical surveys, and laboratory testing Identifying soils types, hardness, groundwater elevations, cobbles …
  • 40.
  • 41.
  • 42.
  • 43.
  • 44.  Channel Tunnel (United Kingdom/France)  Alaska Way Viaduct (Seattle)
  • 45.    Review Updated Engineering Conceptual Design Report – Ongoing Engineering Assessment of BDCP Costs Estimates – February 2014 Comment Letter – April 2014