1. 1
CURRICULUM VITAE
Proposed role in the project: Local Wind Expert
1. Family name: Vu
2. First names: Duy Hung
3. Date of birth: 10 May 1983
4. Nationality: Vietnam
5. Civil status: Vietnam
6. Education:
Date (from – to) Institution Degree(s) or Diploma(s) obtained:
2001-2005 Vietnam National University, Hanoi.
College of Science
Bachelor in Meteorology
2011-2014 Vietnam National University, Hanoi
(VNU)
Master in Climate Change
7. Language skills: Indicate competence on a scale of 1 to 5 (1 – excellent; 5 – basic)
Language Reading Speaking Writing
Vietnamese mother tongue
English 4 5 4
8. Membership of professional bodies: Clean Energy Association of Vietnam
9. Other skills (e.g. computer literacy, etc.): WASP (Wind atlas analysis and application Program) for
calculation, assessment of wind energy potential for areas and electricity production for wind farms;
Microsoft Excel, etc.
10. Present position:Researcher of Center for Renewable Energy, Institute of Energy, Vietnam
Research on wind energy and renewable energy; Supply consultancy service as a national expert in the
field of wind, solar and climate change; Supply adviser to projects/programs of power planning at
provincial and national levels, rural electrification and others
11. Years within the firm: 11
12. Key qualifications (relevant to the project):
13. Other training:
- Capacity building for Wind Power project developers, providers of Engineering Consulting
Services and government planners on the conduct of preparatory activities for the development
of wind power projects in the Philippines and Vietnam and adopting European and international
standards, Co-funded by the European Union through the EC-ASEAN Energy Facility, 2006
- Dynamical Climate Change Downscaling and Adaptation Measures, CSIRO and VNU School of
Graduate Studies (CRISO and VNU SGS), 2014
- Fundamentals of Renewable Energy, Renewables Academy (RENAC) AG, Germany, 2014
- Planning grid-connected PV projects, Renewables Academy (RENAC) AG, Germany, 2015
- Management aspects of Renewable Energy Grid Integration, Renewables Academy (RENAC)
AG, Germany, 2016
14. Professional experience record (projects):
Date 10/2015-02/2016 (5 months)
Location Japan
Company New Energy Foundation and Hitachi, Ltd., Japan
Position Researcher
2. 2
Description Name of assignment or project: Study of introduction of wind turbine systems in the
typhoon dominated South East Asia region
Main project features:
Contents and purpose of this research focuses on analizing the track and wind speed
record of a typhoon attacked Vietnam, the research clarifies the requirements of function
performance, strength to promote the wind power generation at vearious Vietnames
projects. Further analysis is done to clarify the functional requirements of wind turbines
through estimating effects of turbulences, geographical feature in the mountainous and
the island regions in Vietnam. Function performance requirements mentioned above
make the wind turbine system passible to satisfy the Vietnam conditions.
Activities performed:
- Using MASCOT (only Japan) and MATLAB software to Analyses and evaluate the
possibility of installing of Hitachi’s wind turbine systems for Vietnam environmental
conditions.
Vietnam environmental conditions (Grasp and analysis of an Vietnam
environmental conditions; Consideration of Vietnam Typhoon track and wind
velocity; Consideration of the turbulent factor in the Vietnam complex terrain)
Evaluation on conformability of the wind turbine made in Japan. Selection the
most suitable specification for wind turbines in Vietnam.
The advantage evaluation when installing a Japanese wind turbine. Comparison
in annual energy generation between a Japanese and a European wind turbine.
Date
(from –to,
month/year)
2015-2016
Location Vietnam
Company Department of Industrial and Trade of Ba Ria Vung Tau province
Position Technical member
Description Name of assignment or project: Wind Power Development Planning for Ba Ria Vung
Tau province of Vietnam for period up to 2020, with vision to 2030
Main project features:
- Select wind measurement site
- Install measuring mast: 01
Mast configuration:
Mast height: 80m
Instrumentation: Full instrumentation system of NRG company, USA
- Three main measuring points: at 80m; 50m; and 30m
- Wind Power Development Plan for Ba Ria Vung Tau province for period up to 2020,
with vision to 2030
Activities will be performed (on going):
- Current status and orientation for development of power sources and power grid in
province
- Identification of theoretical and technical wind power potential, possibility of making
use of wind energy in province (Input data, Methodology of data processing, Wind
conditions, Identification of regions suitable for wind power development, Assessment
of theoretical wind power potential based on observed data, Determination of
theoretical, technical and financial wind power capacity by regions)
- Regional planning for wind power development and List of wind power projects by 2020
with a view to 2030: Areas and boundaries of regions reserved for wind power
development; capacity of wind power projects (Selection criteria, Primary ranking,
Identification and classification of regions suitable for wind power development, List of
wind power projects (Area and boundaries of regions reserved for wind power
development; capacity of each wind power project)
- Investment capital demand and project financial efficiency
- Environmental impacts assessment for wind power projects
Date 2014-2015
Location Vietnam
Company Department of Industrial and Trade, Thai Binh
Position Technical member
Description Name of assignment or project: Wind Power Development Plan for Thai Binh province
for period up to 2020, with vision to 2030
3. 3
Main project features:
- No. of measuring masts: 01 in the Con Vanh ecotourism area, Nam Phu commune,
Tien Hai district, Thai Binh province.
- Mas configuration:
Mast height: 80m
Instrumentation: Full instrumentation system of NRG company, USA
- Three main measuring points: at 80m; 50m; and 30m
- Wind Power Development Plan for Thai Binh province for period up to 2020, with
vision to 2030
• Activities will be performed (on going):
- Current status and orientation for development of power sources and power grid in
province
- Identification of theoretical and technical wind power potential, possibility of making
use of wind energy in province (Input data, Methodology of data processing, Wind
conditions, Identification of regions suitable for wind power development, Assessment
of theoretical wind power potential based on observed data, Determination of
theoretical, technical and financial wind power capacity by regions)
- Regional planning for wind power development and List of wind power projects by 2020
with a view to 2030: Areas and boundaries of regions reserved for wind power
development; capacity of wind power projects (Selection criteria, Primary ranking,
Identification and classification of regions suitable for wind power development, List of
wind power projects (Area and boundaries of regions reserved for wind power
development; capacity of each wind power project)
- Investment capital demand and project financial efficiency
- Environmental impacts assessment for wind power projects
Date 2012-2014
Location Vietnam
Company Department of Industrial and Trade, Quang Tri
Position Technical member
Description Name of assignment or project: Wind Power Development Plan for Quang Tri province
for period up to 2020, with vision to 2030
Main project features:
- Collected wind data measured in 4 masts
- Analysis and assess wind data collected
- Formulate and develop wind power Development Plan for Quang Tri province for period
up to 2020, with vision to 2030
Activities performed:
- Current status and orientation for development of power sources and power grid in
province
- Identification of theoretical and technical wind power potential, possibility of making
use of wind energy in province (Input data, Methodology of data processing, Wind
conditions, Identification of regions suitable for wind power development, Assessment
of theoretical wind power potential based on observed data, Determination of
theoretical, technical and financial wind power capacity by regions)
- Regional planning for wind power development and List of wind power projects by 2020
with a view to 2030: Areas and boundaries of regions reserved for wind power
development; capacity of wind power projects (Selection criteria, Primary ranking,
Identification and classification of regions suitable for wind power development, List of
wind power projects (Area and boundaries of regions reserved for wind power
development; capacity of each wind power project)
- Investment capital demand and project financial efficiency
- Environmental impacts assessment for wind power projects
Date 2014
Location Vietnam
Company GIZ and Ministry of Industry and Trade
Position National technical member
Description Name of assignment or project: Technical assistance to Ministry of Industry and Trade
on proposal of an appropriate support mechanism for wind power in Vietnam – Revised
FIT for wind projects in Vietnam
Main project features:
4. 4
- The objective of this study has been to: i) support Moist in reviewing the existing Fit
support scheme for wind power, ii) determine the causes for the less than expected
dynamics in wind power deployment and iii) identify adequate solutions to overcome
possible barriers, including the re-calculation of the existing Fit.
- The results of this study are expected to provide all necessary information to policy
makers and planners in order to deepen their insight on issues and challenges
regarding grid-connected wind power. The basis for the revision and approval of a new
incentivizing mechanism, including a re-calculation of the tariff will be then available for
consideration. In this way an improved framework condition for wind energy in Vietnam
may be established which could stimulate investments and boost further development
Activities performed: all activities
Date 09/2012-03/2013 (6 months)
Location Japan
Company New Energy Foundation and Tokyo University in Japan
Position Researcher
Description Name of assignment or project: Study of introduction of wind turbine systems in the
typhoon dominated South East Asia region
Main project features:
Verify high wind speed induced by local tropical cyclone and complex terrain such as
mountains based on existing data; Identify required strength for wind power installation
based on presumption of high wind speed in the right spot, comparing with local wind
atlas. Identify the range cannot be deal with general design method or installation
method and consider the countermeasures.
Activities performed:
- Estimation of Extreme Wind Speed Map in Vietnam by using Monte Carlo Simulation
of Tropical Cyclone.
Also applicable to resource assessment and siting of wind turbine based on
measurement.
Use technic of Monte Carlo Simulation to estimation of Tropical Cyclone
Parameters in Vietnam
Generation of Extreme wind speed map for wind turbine in Vietnam
Date 2011
Location Vietnam
Company Thuan Phong Renewable Energy Development Joint Stock Company
Position Technical member
Description Name of assignment or project: Investment Project Appraisal Report for An Phong
Wind Farm 180 MW in Ninh Thuan Province
Main project features:
To be participated in installation and Measurement of Wind met mast; determine wind
potential and power production estimation for An Phong site in Ninh Thuan province.
Activities performed:
Review factors ensure the feasibility and effectiveness of the project on:
- Legal grounds established investment plan
- Conformity with approved planning
- The inputs ensure the feasibility of the project
- Consider and verify the suitability and feasibility of the proposed technical solution,
selection of investment projects and TKCS
Date 2009-2010 (12 months, from 10/2009-10/2010)
Location Vietnam
Company Ministry of Industry and Trade, and Institute of Energy
Position Participator of Renewable Energy Section
Description Name of assignment or project: Vietnam Electricity Development Master Plan, Stage
VII (2011-2020, vision 2030)
Main project features:
Formulate scenarios, and action plan/road map for development of all kind of RE in VN
by type of Renewable Energy, by regions/provinces and proposal policies and
measurements to implement based on situations of each regions/provinces
Activities performed:
5. 5
- Work directly and make surveys with and in Provinces
Date 2010 – end April 2011 (16 months, from 1/2010 to 4/2011)
Location Vietnam
Company Ministry of Industry and Trade (MOIT)
Position Technical member
Description Name of assignment or project: Strategy for Renewable Energy Development in
Vietnam up to 2030 and outlook to 2050
Main project features:
MoIT has commissioned the preparation of a Strategy on Renewable Energy
Development for period up to 2030 with Outlook to 2050 with emphasis on
• the rationale for RE
• the potential options for carbon finance and subsidy support
• developing supply curves as a basis for setting targets for RE
• Implementation of off-grid renewable energy projects
• Identifying the barriers, and recommending specific policy measures to overcome
them
Activities performed: all activities
Date 2009-2011
Location Ninh Thuan province of Vietnam
Company EAB Vietwindpower Phuoc Huu company
Position Technical member
Description Name of assignment or project: Feasibility Study for Phuoc Huu Wind Farm 40 MW
in Ninh Thuan province
Main project features:
- Assisting in the selection of the installed measuring mast
- Checking in the installation of measuring mast
- Assisting in the data collection and assessment
- Assessing in local data
- Assessing in wind potential
- Making in Feasibility Study for Phuoc Huu Wind Farm 40 MW in Ninh Thuan province
Activities performed:
- Wind resources assessment (Impact on Wind Resources, Correlation to Long Term
Data…).
- Evaluation of project Site, Site Physical Characteristics, Wind Turbine Location, Site
Access, Site Geology and Soil Conditions, Electricity Use, Existing Electrical
Infrastructure, Electrical Interconnection Plan, Electrical Interconnection, Electrical
Interconnection Cost Estimate
- Environmental review and permitting plan
- Wind plant configurations (Foundation and Turbine Support, Noise Assessment,
Visibility Assessment …)
- Energy ptoduction and financial analysis (Project Economics, Estimated Energy
Production, Project Costs, Economic Analysis, Project risk factors…)
Date 2008 -2010 and extension to April 2011 (40 months, from 1/2008-4/2011)
Location Vietnam
Company Ministry of Industry and Trade (MOIT) and Government of Vietnam
Position Participator of Project
Description Name of assignment or project: Master plan for Renewable Energy Development in
Vietnam up to 2020 and outlook to 2030
Main project features:
MoIT has commissioned the preparation of Master plan on Renewable Energy
Development for period up to 2020 with Outlook to 2030 with emphasis on
• the rationale for RE
• the potential options for carbon finance and subsidy support
• developing supply curves as a basis for setting targets for RE
• Implementation of off-grid renewable energy projects
• Identifying the barriers, and recommending specific policy measures to
overcome them
Activities performed: all activities
6. 6
Date 2007
Location Ninh Thuan province of Vietnam
Company Vietnam Renewable Energy Joint Stock Company
Position Participator of Project
Description Name of assignment or project: Feasibility Study for Tuy Phong Wind Farm 30 MW in
Binh Thuan province
Main project features:
- Assisting in the selection of the installed measuring mast
- Checking in the installation of measuring mast
- Assisting in the data collection and assessment
- Assessing in local data
- Assessing in wind potential
- Making in Feasibility Study for Tuy Phong Wind Farm 30 MW in Binh Thuan province
• Activities performed:
- Wind resources assessment (Impact on Wind Resources, Correlation to Long Term
Data…).
- Evaluation of project Site, Site Physical Characteristics, Wind Turbine Location, Site
Access, Site Geology and Soil Conditions, Electricity Use, Existing Electrical
Infrastructure, Electrical Interconnection Plan, Electrical Interconnection, Electrical
Interconnection Cost Estimate
- Environmental review and permitting plan
- Wind plant configurations (Foundation and Turbine Support, Noise Assessment,
Visibility Assessment …)
- Energy ptoduction and financial analysis (Project Economics, Estimated Energy
Production, Project Costs, Economic Analysis, Project risk factors…)
Date 2006-2007
Location Vietnam
Company Electricity of Vietnam (EVN)
Position Participator of Project
Description Name of assignment or project: Wind Energy master Plan for power generation in the
north coastal areas of Vietnam
Main project features:
Electricity of Vietnam has commissioned the preparation of Master plan on Wind Energy
Development for power generation in the north coastal areas of Vietnam with emphasis
on
• the rationale for Wind energy
• developing wind energy projects
• Implementation of on-grid wind energy projects
• Identifying the barriers, and recommending specific policy measures to
overcome them
Activities performed:
- To be participated in installation and Measurement of Wind met mast in Quang Ninh,
Nam Dinh, Thanh Hoa and Ha Tinh provinces; Assess wind energy potential and
master plan for power generation in the Northern Part of Vietnam
- Identification of theoretical and technical wind power potential, possibility of making
use of wind energy in Vietnam (Assessment wind characteristics, identification criteria
for regions having theoretical and technical wind power potential, primary identification
of regions suitable for wind power development, re-assessment of theoretical wind
power potential based on observed data, technical wind potential, wind atlas at typical
elevations)
- List of regions with theoretical and technical wind potential
Classification of regions for wind power development
Primary ranking of regions with good wind power potential, ranking by theoretical
and by technical wind power potential
Identification and classification of regions suitable for wind power development
Classification of regions with wind power development potential
- Technical economic and financial criteria for wind power development
Identification of technical specifications
Identification of economic and financial criteria of wind power projects
Identification of support mechanism for wind power for every 5-year period
7. 7
- Environmental impacts assessment of wind power projects
15. Others (eg. Publications):
Hanoi, 1 July 2016
____________________________________________
Place, date
____________________________________________
Signature Expert