SUMMER INTERNSHIP 2012 @


LARSEN AND TOUBRO
  CONSTRUCTION
  (ECC DIVISION)



10 July 2012 – 25 August 2012


        Kundan Giri
: L & T AT A GLANCE :



       Founded in 1938 by two Danish
        engineers, Henning Holck-Larsen
        and Soren Kristian Toubro


       One of the largest engineering and
          construction company in India.


       L&T ranks 40 in the top 225
          global contractors 2008 data,
          improved from 47th (2007) &
          54th (2006).
L & T BUSINESSES :




       Projects        Products      Services




     Construction    Electrical &      IT &
                     Electronics    Technology
      E&C Projects                   Services
                     Machinery &
      Heavy Engg.     Industrial     Financial
                       Products      Services
Transport Infrastructure & Water
Buildings & Factories

                        ECCD
                                                Process
jaltikalan powergrid, DELHI
Project Location
Project Highlights

 Projective objective: erection of ICT

  (interconnecting transformer)in power
  grid

 No. of transformers : 13

 Transformer capacity : 765/400kv

 Unit weight of each transformer : 209

  MT

 Transformer’s make : TBEA

  Shenyang(chinese)
Project Synopsis

Name of the project           Erection of 765/400 kv ICT (Interconnecting transformers)

Client                        Power grid Corporation of India (PGCIL)

Project Manager               Mr. SNEHASHISH DEBNATH
Site Engineer                 Mr. Jasmeet Singh
Chief Electrical Engineer     Mr. Tushar kumar
Transformers make             TBEA Shenyang(chinese)/500mva each
Q.S./Cost Estimator           Padghams Swett
LEEDS Certification           Surmount Energy Solutions Pvt Ltd.
Type of Contract              Tender
Contract Value                85 Crore
Contract Duration             11 Months. (8+ 3)
Contractual Start (LOI)Date   9th dec 2011
Contractual Completion
                              8th nov 2012
Date
DLP/Maintenance Period        1 Year
SOME FEATURES OF PROJECT
                          • Project Office, Safety hall, Client's
                          Office etc is setup on MMRDA Plot
                          besides site.




         Infrastructure
         Setup

                          • Infrastructure Setup ( Labour
        Proposed Site     Sheds , Batching Plant , etc ) would
                          be arranged on land provided by
                          Client.
PROJECT CHALLENGES


Tight Project Schedule.
Space Constraint
Higher Volume of Work within Stipulated time.
Mobilization of Transformers weighing 209 MT
 Mobilization of skilled Manpower               Place for transformer
CONSTRUCTION METHODOLOGY – TYPICAL FORMWORK SYSTEM




The whole project
can be described in
following manner :

•   Mobilization of
    transformer in
    parts from import
    site to
    construction site



•   Erection of
    proper vibration
    shielding base at
    the site of
    construction
•   Reassembly of parts of
    transformers at the site
•   Unloading and loading
    of transformers using
    2x100 MT hydraulic
    jacks
•   Fixing the transformers
    using concrete
•   Connection of cooling
    lines, transmission
    lines, grid maintenance
    lines
•   Filling of coolant and
    test run using gen-
    sets.
MOMENTS @ SITE




THANKYOU ….

Mais conteúdo relacionado

Mais procurados

Summer training report in civil engineering
Summer training report in civil engineeringSummer training report in civil engineering
Summer training report in civil engineeringalok0025
 
Building construction ppt
Building construction pptBuilding construction ppt
Building construction pptgyan singh
 
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION L&W BUILDING SOLUTIONS PVT. LMT.
 
PROJECT ON Construction of a multistory building POWER POINT PRESENTATION
PROJECT ON Construction of a multistory building POWER POINT PRESENTATIONPROJECT ON Construction of a multistory building POWER POINT PRESENTATION
PROJECT ON Construction of a multistory building POWER POINT PRESENTATIONROHITASH ROJ
 
Construction sequence for metro Project (Elevated and Underground) and Time c...
Construction sequence for metro Project (Elevated and Underground) and Time c...Construction sequence for metro Project (Elevated and Underground) and Time c...
Construction sequence for metro Project (Elevated and Underground) and Time c...Akhilesh Shukla
 
Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)Make Mannan
 
Construction of residential building
Construction of residential buildingConstruction of residential building
Construction of residential buildingSumit Singh
 
Summer Internship Presentation of Building
Summer Internship Presentation of Building Summer Internship Presentation of Building
Summer Internship Presentation of Building Self-employed
 
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTPWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTSatyam Anand
 
Design of Reinforced Concrete Structure (IS 456:2000)
Design of Reinforced Concrete Structure (IS 456:2000)Design of Reinforced Concrete Structure (IS 456:2000)
Design of Reinforced Concrete Structure (IS 456:2000)MachenLink
 
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESHPRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESHImrul Quesh
 
Project report file on construction of flexible pavement by Harshit Prakash Garg
Project report file on construction of flexible pavement by Harshit Prakash GargProject report file on construction of flexible pavement by Harshit Prakash Garg
Project report file on construction of flexible pavement by Harshit Prakash Gargharshit315
 
Industrial training Report
Industrial training ReportIndustrial training Report
Industrial training ReportJaspreet singh
 
Admixture of concrete
Admixture of concreteAdmixture of concrete
Admixture of concreteLavanya Singh
 
Concrete Road Pavement
Concrete Road Pavement Concrete Road Pavement
Concrete Road Pavement Awinash Tiwari
 
Industrial project report ppt CIVIL ENGINEERING
Industrial project report ppt CIVIL ENGINEERINGIndustrial project report ppt CIVIL ENGINEERING
Industrial project report ppt CIVIL ENGINEERINGJAPJEETSINGH13
 
final year civil engineering training report
final year civil engineering training report final year civil engineering training report
final year civil engineering training report Poojan Patel
 

Mais procurados (20)

Summer training report in civil engineering
Summer training report in civil engineeringSummer training report in civil engineering
Summer training report in civil engineering
 
Building construction ppt
Building construction pptBuilding construction ppt
Building construction ppt
 
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
 
PROJECT ON Construction of a multistory building POWER POINT PRESENTATION
PROJECT ON Construction of a multistory building POWER POINT PRESENTATIONPROJECT ON Construction of a multistory building POWER POINT PRESENTATION
PROJECT ON Construction of a multistory building POWER POINT PRESENTATION
 
Construction sequence for metro Project (Elevated and Underground) and Time c...
Construction sequence for metro Project (Elevated and Underground) and Time c...Construction sequence for metro Project (Elevated and Underground) and Time c...
Construction sequence for metro Project (Elevated and Underground) and Time c...
 
Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)
 
Construction of residential building
Construction of residential buildingConstruction of residential building
Construction of residential building
 
Summer Internship Presentation of Building
Summer Internship Presentation of Building Summer Internship Presentation of Building
Summer Internship Presentation of Building
 
Box culverts
Box culvertsBox culverts
Box culverts
 
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTPWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
 
Design of Reinforced Concrete Structure (IS 456:2000)
Design of Reinforced Concrete Structure (IS 456:2000)Design of Reinforced Concrete Structure (IS 456:2000)
Design of Reinforced Concrete Structure (IS 456:2000)
 
Railway over bridge
Railway over bridgeRailway over bridge
Railway over bridge
 
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESHPRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
 
Project report file on construction of flexible pavement by Harshit Prakash Garg
Project report file on construction of flexible pavement by Harshit Prakash GargProject report file on construction of flexible pavement by Harshit Prakash Garg
Project report file on construction of flexible pavement by Harshit Prakash Garg
 
Deep foundation
Deep foundationDeep foundation
Deep foundation
 
Industrial training Report
Industrial training ReportIndustrial training Report
Industrial training Report
 
Admixture of concrete
Admixture of concreteAdmixture of concrete
Admixture of concrete
 
Concrete Road Pavement
Concrete Road Pavement Concrete Road Pavement
Concrete Road Pavement
 
Industrial project report ppt CIVIL ENGINEERING
Industrial project report ppt CIVIL ENGINEERINGIndustrial project report ppt CIVIL ENGINEERING
Industrial project report ppt CIVIL ENGINEERING
 
final year civil engineering training report
final year civil engineering training report final year civil engineering training report
final year civil engineering training report
 

Destaque

Presentation on Training &Development in L&T,Chennai
Presentation  on Training &Development in L&T,ChennaiPresentation  on Training &Development in L&T,Chennai
Presentation on Training &Development in L&T,ChennaiTania Dhar
 
Summer internship report L&T
Summer internship report L&TSummer internship report L&T
Summer internship report L&TUmed Paliwal
 
Summer training @ L&T
Summer training @ L&TSummer training @ L&T
Summer training @ L&Tams_5686
 
Larsen & toubro
Larsen & toubroLarsen & toubro
Larsen & toubroShray Jali
 
Summer training DMRC ppt
Summer training DMRC pptSummer training DMRC ppt
Summer training DMRC pptVimal Maurya
 
Study of cdm in fmcg sector
Study of cdm in fmcg sectorStudy of cdm in fmcg sector
Study of cdm in fmcg sectorvikram0551
 
Summer internship Bhilai Steel Plant
Summer internship Bhilai Steel PlantSummer internship Bhilai Steel Plant
Summer internship Bhilai Steel PlantSaurabh Chaudhary
 
SUMMER TRAINING AT BHILAI STEEL PLANT
SUMMER TRAINING AT BHILAI STEEL PLANTSUMMER TRAINING AT BHILAI STEEL PLANT
SUMMER TRAINING AT BHILAI STEEL PLANTSharanya Menon
 
FINAL Summer Internship REPORT NICMAR
FINAL Summer Internship REPORT NICMARFINAL Summer Internship REPORT NICMAR
FINAL Summer Internship REPORT NICMARKamlesh Chaudhary
 
How to Create an Internship Program in 7 Easy Steps
How to Create an Internship Program in 7 Easy StepsHow to Create an Internship Program in 7 Easy Steps
How to Create an Internship Program in 7 Easy StepsCome Recommended, LLC
 
Summer internship report 2012
Summer internship report 2012Summer internship report 2012
Summer internship report 2012Nilesh Patil
 
L&t industrial marketing ppt
L&t industrial marketing pptL&t industrial marketing ppt
L&t industrial marketing pptMohit Malviya
 
Human resource practices in l&t (presentation on Larsen & toubro)
Human resource practices in l&t (presentation on Larsen & toubro)Human resource practices in l&t (presentation on Larsen & toubro)
Human resource practices in l&t (presentation on Larsen & toubro)manas agrawal
 
DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)Sukhdarshan Singh
 
Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Aashna Sharma
 
Larsen toubro
Larsen toubroLarsen toubro
Larsen toubroDeepak25
 
summer internship project report on union bank of india
summer internship project report on union bank of indiasummer internship project report on union bank of india
summer internship project report on union bank of indiaabhishek rane
 

Destaque (20)

Presentation on Training &Development in L&T,Chennai
Presentation  on Training &Development in L&T,ChennaiPresentation  on Training &Development in L&T,Chennai
Presentation on Training &Development in L&T,Chennai
 
Summer internship report L&T
Summer internship report L&TSummer internship report L&T
Summer internship report L&T
 
Summer training @ L&T
Summer training @ L&TSummer training @ L&T
Summer training @ L&T
 
Larsen & toubro
Larsen & toubroLarsen & toubro
Larsen & toubro
 
Summer training DMRC ppt
Summer training DMRC pptSummer training DMRC ppt
Summer training DMRC ppt
 
Study of cdm in fmcg sector
Study of cdm in fmcg sectorStudy of cdm in fmcg sector
Study of cdm in fmcg sector
 
Summer internship Bhilai Steel Plant
Summer internship Bhilai Steel PlantSummer internship Bhilai Steel Plant
Summer internship Bhilai Steel Plant
 
Atlas Copco Internship Report
Atlas Copco Internship ReportAtlas Copco Internship Report
Atlas Copco Internship Report
 
SUMMER TRAINING AT BHILAI STEEL PLANT
SUMMER TRAINING AT BHILAI STEEL PLANTSUMMER TRAINING AT BHILAI STEEL PLANT
SUMMER TRAINING AT BHILAI STEEL PLANT
 
FINAL Summer Internship REPORT NICMAR
FINAL Summer Internship REPORT NICMARFINAL Summer Internship REPORT NICMAR
FINAL Summer Internship REPORT NICMAR
 
How to Create an Internship Program in 7 Easy Steps
How to Create an Internship Program in 7 Easy StepsHow to Create an Internship Program in 7 Easy Steps
How to Create an Internship Program in 7 Easy Steps
 
Summer internship report 2012
Summer internship report 2012Summer internship report 2012
Summer internship report 2012
 
L&t industrial marketing ppt
L&t industrial marketing pptL&t industrial marketing ppt
L&t industrial marketing ppt
 
Human resource practices in l&t (presentation on Larsen & toubro)
Human resource practices in l&t (presentation on Larsen & toubro)Human resource practices in l&t (presentation on Larsen & toubro)
Human resource practices in l&t (presentation on Larsen & toubro)
 
DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)
 
Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)
 
Larsen toubro
Larsen toubroLarsen toubro
Larsen toubro
 
Metro presentation
Metro presentationMetro presentation
Metro presentation
 
LARSEN AND TOUBRO
 LARSEN AND TOUBRO LARSEN AND TOUBRO
LARSEN AND TOUBRO
 
summer internship project report on union bank of india
summer internship project report on union bank of indiasummer internship project report on union bank of india
summer internship project report on union bank of india
 

Semelhante a Summer training l&t

Semelhante a Summer training l&t (20)

PECL PROJECTS
PECL PROJECTSPECL PROJECTS
PECL PROJECTS
 
V. SRINIVASA RAO CV
V. SRINIVASA RAO CVV. SRINIVASA RAO CV
V. SRINIVASA RAO CV
 
Venkat CV
Venkat CVVenkat CV
Venkat CV
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
 
Govind-CVC5
Govind-CVC5Govind-CVC5
Govind-CVC5
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Alwin CV 032016_neW.
Alwin CV 032016_neW.Alwin CV 032016_neW.
Alwin CV 032016_neW.
 
Arul Jose
Arul JoseArul Jose
Arul Jose
 
DELTAPOWER Comapny Profile
DELTAPOWER Comapny ProfileDELTAPOWER Comapny Profile
DELTAPOWER Comapny Profile
 
Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineer
 
Yahya Khan CV(1)
Yahya Khan CV(1)Yahya Khan CV(1)
Yahya Khan CV(1)
 
project electrical engineer
project electrical engineerproject electrical engineer
project electrical engineer
 
Ambrose Elugbe - CV
Ambrose Elugbe - CVAmbrose Elugbe - CV
Ambrose Elugbe - CV
 
Commissioning Engineer
Commissioning EngineerCommissioning Engineer
Commissioning Engineer
 
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEVIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
 
John_Buckley_CV_V9
John_Buckley_CV_V9John_Buckley_CV_V9
John_Buckley_CV_V9
 
Muditha dasanayake telecommunications engineer
Muditha dasanayake telecommunications engineerMuditha dasanayake telecommunications engineer
Muditha dasanayake telecommunications engineer
 
Resume for Estimation Engineer Electrical 3 year exp
Resume for Estimation Engineer Electrical 3 year expResume for Estimation Engineer Electrical 3 year exp
Resume for Estimation Engineer Electrical 3 year exp
 

Último

SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersChitralekhaTherkar
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 

Último (20)

SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of Powders
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 

Summer training l&t

  • 1. SUMMER INTERNSHIP 2012 @ LARSEN AND TOUBRO CONSTRUCTION (ECC DIVISION) 10 July 2012 – 25 August 2012 Kundan Giri
  • 2. : L & T AT A GLANCE :  Founded in 1938 by two Danish engineers, Henning Holck-Larsen and Soren Kristian Toubro  One of the largest engineering and construction company in India.  L&T ranks 40 in the top 225 global contractors 2008 data, improved from 47th (2007) & 54th (2006).
  • 3. L & T BUSINESSES : Projects Products Services Construction Electrical & IT & Electronics Technology E&C Projects Services Machinery & Heavy Engg. Industrial Financial Products Services
  • 4. Transport Infrastructure & Water Buildings & Factories ECCD Process
  • 7. Project Highlights  Projective objective: erection of ICT (interconnecting transformer)in power grid  No. of transformers : 13  Transformer capacity : 765/400kv  Unit weight of each transformer : 209 MT  Transformer’s make : TBEA Shenyang(chinese)
  • 8. Project Synopsis Name of the project Erection of 765/400 kv ICT (Interconnecting transformers) Client Power grid Corporation of India (PGCIL) Project Manager Mr. SNEHASHISH DEBNATH Site Engineer Mr. Jasmeet Singh Chief Electrical Engineer Mr. Tushar kumar Transformers make TBEA Shenyang(chinese)/500mva each Q.S./Cost Estimator Padghams Swett LEEDS Certification Surmount Energy Solutions Pvt Ltd. Type of Contract Tender Contract Value 85 Crore Contract Duration 11 Months. (8+ 3) Contractual Start (LOI)Date 9th dec 2011 Contractual Completion 8th nov 2012 Date DLP/Maintenance Period 1 Year
  • 9. SOME FEATURES OF PROJECT • Project Office, Safety hall, Client's Office etc is setup on MMRDA Plot besides site. Infrastructure Setup • Infrastructure Setup ( Labour Proposed Site Sheds , Batching Plant , etc ) would be arranged on land provided by Client.
  • 10. PROJECT CHALLENGES Tight Project Schedule. Space Constraint Higher Volume of Work within Stipulated time. Mobilization of Transformers weighing 209 MT  Mobilization of skilled Manpower Place for transformer
  • 11. CONSTRUCTION METHODOLOGY – TYPICAL FORMWORK SYSTEM The whole project can be described in following manner : • Mobilization of transformer in parts from import site to construction site • Erection of proper vibration shielding base at the site of construction
  • 12. Reassembly of parts of transformers at the site • Unloading and loading of transformers using 2x100 MT hydraulic jacks • Fixing the transformers using concrete • Connection of cooling lines, transmission lines, grid maintenance lines • Filling of coolant and test run using gen- sets.