Technical Specifications for Battery Pack Testing Station
Scope: HPCL proposes to procure Battery Pack Testing Station for performance evaluation of
various commercial and in-house developed battery packs.
The job involves, supply, installation, testing and commissioning of the Battery Pack Testing
Station, related accessories and software at Hindustan Petroleum Green R&D Centre
(HPGRDC), Bangalore.
The Battery Pack Testing Station should have the following features which will form the
basis for technical evaluation.
Total no. Of channels required: 16 Independent Channels
1. The equipment should have battery testing voltage /Channel: 0 Volt or lower to 10
Volt or higher.
2. Voltage measurement accuracy: should be ± 0.1% or better of the Full scale range
3. Current limit: ±1 mA or lower to ±10 A or higher in each cell.
4. Current measurement accuracy: should be ± 0.1% or better of the Full scale value.
5. Data record time should be 10 ms or less.
6. The equipment should have facility to make the channels parallel and series to get
higher current of 300 A or higher and 80 volt or higher.
7. The equipment should have the facility of testing at least 2 Battery packs parallelly of
power 10kW or more.
8. The vendor should provide proper accessories to monitor the cell temperature in the
range of 0 C or less to 100 C or more during charging and discharging.
9. The vendor should provide suitable cables and related accessories for measuring
cells and battery Packs – 16 Nos for Cells and 2 Nos for Battery Packs.
10. The vendor should provide suitable cabinet/racks for placing the cells and Battery
packs.
11. The equipment/software should have the facility of remote viewing and remote
operation by Ethernet or other suitable system.
12. The battery analyzer should have charge / discharge cycle controlled with voltage,
current, power and resistance.
13. The equipment should have automatic calibration system.
14. Charge-Discharge should be measured at various C rate.
15. Voltage-time curve, current-time curve, capacity-voltage curve, loops times
charge/discharge capacity curve, loops times charge/ discharge efficiency curve,
should be generated from the software.
16. A compatible Dell/HP desktop with i7 6700 processor 16 GB DDR4 RAM, 1 TB 7200
RPM HDD, DVD RW drive, 2X GB Ethernet ports, 32-inch monitor, mouse, Keyboard,
Windows 10 professional, MS office professional along with battery related software
and suitable printer having automatic double sided printing and scanning facility (HP
Leaser Jet pro MFPM225 PCL6 or better) should be provided with the Battery Pack
Tester.
17. The instrument and related accessories should have at least 1-year warranty.
2
18. Safety: The equipment should have all safety features for totally safe operations.
These features have to be given while quoting.
19. The equipment should safely shutdown during power outages without causing
damage/repair.
20. All electrical mechanical safety features to be available in the equipment.
Special Terms and Conditions
1. Consumables & Spares
Consumables & spares (Hardware, electrical etc) if any for ONE Year trouble free
Operation should be provided for the quoted instrument. All the required spares would
be made available as and when required for next 5 years from the date of supply.
1. Installation, Commissioning & training.
Installation & Commissioning of the equipment should be done by Trained Engineers of
the Company at HPCL R&D site and demonstration to be given for at least 5 HPCL
scientists/operators/instrumentation engineers. Cost of this activity to be included during
quoting the equipment cost.
2. After sales service
The vendor shall give guarantee after sales services as per HPCL’s “General terms and
conditions for supply’’. The vendor should have an authorized Indian/representative to
provide Installation, commissioning, training and after sale service. The detailed address of
the service Agents to be provided along with the offer.
3. Guarantee: The vendors should provide guarantee for one year from the date of complete
installation for all the equipment as per HPCL’s “General terms and conditions for supply’’.
4. The vendor should provide the ‘Soft’ and ‘Hard’ Copies of All Operating Manuals, Service
Manuals catalogues brochures giving particulars and details of operation/Maintenance of
the instrument, & detailed list of all spare parts.
5. All performance and operational specifications as mentioned in the technical specification
must be demonstrated satisfactorily at the user’s laboratory.
6. The rate quoted should be inclusive of all the software, power supply, calibration and
other requirements to meet the functioning of the equipment.
7. The equipment offered shall have performance track record for similar application.
3
8. Vendor shall furnish installation details for the equipment including any special
requirements like power supply, utilities etc. along-with the offer.
9. The equipment to be configured for 200 to 240 V volts 50 Hz Operation.
10. Payment Terms:
The vendor should provide Performance Bank Guarantee (PBG) as per the “General Terms
and Conditions” of HPCL.
90% of the total order value will be paid after receiving the materials and submission of
10% PBG to HPCL. The remaining 10% will be paid only after successful completion of
installation, commissioning & Training.
11. Annual Maintenance Contract: Parties must quote firm and fixed AMC charges
(comprising of at least two visits per year) for three years after completion of guarantee
period. The same cost shall form the cost of equipment for evaluation purpose. Order
shall be placed at later date. In case of breakdown, vendor representative will visit within
3 days or earlier. AMC is only for services and price of spares will be paid on actuals.
12. Users list
Users list for the quoted model along with the address and contact person should be
provided. The offered instrument should be of latest version at the time of dispatch
13. Delivery Schedule: Four months from the Date of purchase order/LOA.
14. Equipment must be supplied with complete standard accessories.

Mais conteúdo relacionado

Semelhante a Battery Pack Testing Station 15 12 2022.docx

Auto Tools Fyler – CarQuest – PetesPaint.ca – Q1 2018
Auto Tools Fyler – CarQuest – PetesPaint.ca – Q1 2018Auto Tools Fyler – CarQuest – PetesPaint.ca – Q1 2018
Auto Tools Fyler – CarQuest – PetesPaint.ca – Q1 2018Petes Paint & Auto Parts
 
Auto Tools Fyler – CarQuest – DTAuto.ca – Q1 2018
Auto Tools Fyler – CarQuest – DTAuto.ca – Q1 2018Auto Tools Fyler – CarQuest – DTAuto.ca – Q1 2018
Auto Tools Fyler – CarQuest – DTAuto.ca – Q1 2018DT AUTO PARTS Leamington
 
0.5m inspection conveyor user manual
0.5m inspection conveyor user manual0.5m inspection conveyor user manual
0.5m inspection conveyor user manualssuser660147
 
Planned Preventive Ambulance Medical Equipment Maintenance
Planned Preventive Ambulance Medical Equipment MaintenancePlanned Preventive Ambulance Medical Equipment Maintenance
Planned Preventive Ambulance Medical Equipment MaintenanceAshendu Pandey
 
132901 draft-001-001
132901 draft-001-001132901 draft-001-001
132901 draft-001-001Huy Nguyen
 
Alan Bull CTOTF NERC Presentation
Alan Bull CTOTF NERC PresentationAlan Bull CTOTF NERC Presentation
Alan Bull CTOTF NERC PresentationNAES Corporation
 
Fire alarm checklist
Fire alarm checklistFire alarm checklist
Fire alarm checklistirhabsyam
 
110KV Substation spec with AnnexuresR.pdf
110KV Substation spec with AnnexuresR.pdf110KV Substation spec with AnnexuresR.pdf
110KV Substation spec with AnnexuresR.pdfKSLDESIGN
 
Clelio alves petrobras english
Clelio alves petrobras englishClelio alves petrobras english
Clelio alves petrobras englishFieldComm Group
 
URS - USER REQUIREMENT SPECIFICATIONS.pdf
URS - USER REQUIREMENT SPECIFICATIONS.pdfURS - USER REQUIREMENT SPECIFICATIONS.pdf
URS - USER REQUIREMENT SPECIFICATIONS.pdfDiegoMonge23
 
NOCCA Robotics - Ventilator Project.pptx
NOCCA Robotics - Ventilator Project.pptxNOCCA Robotics - Ventilator Project.pptx
NOCCA Robotics - Ventilator Project.pptxShanaya5
 

Semelhante a Battery Pack Testing Station 15 12 2022.docx (20)

Blood gas analyser
Blood gas analyserBlood gas analyser
Blood gas analyser
 
Auto Tools Fyler – CarQuest – PetesPaint.ca – Q1 2018
Auto Tools Fyler – CarQuest – PetesPaint.ca – Q1 2018Auto Tools Fyler – CarQuest – PetesPaint.ca – Q1 2018
Auto Tools Fyler – CarQuest – PetesPaint.ca – Q1 2018
 
Auto Tools Fyler – CarQuest – DTAuto.ca – Q1 2018
Auto Tools Fyler – CarQuest – DTAuto.ca – Q1 2018Auto Tools Fyler – CarQuest – DTAuto.ca – Q1 2018
Auto Tools Fyler – CarQuest – DTAuto.ca – Q1 2018
 
Auto Tools Fyler – CarQuest – AutoBarn.ca
Auto Tools Fyler – CarQuest – AutoBarn.ca Auto Tools Fyler – CarQuest – AutoBarn.ca
Auto Tools Fyler – CarQuest – AutoBarn.ca
 
0.5m inspection conveyor user manual
0.5m inspection conveyor user manual0.5m inspection conveyor user manual
0.5m inspection conveyor user manual
 
Cv
CvCv
Cv
 
Planned Preventive Ambulance Medical Equipment Maintenance
Planned Preventive Ambulance Medical Equipment MaintenancePlanned Preventive Ambulance Medical Equipment Maintenance
Planned Preventive Ambulance Medical Equipment Maintenance
 
Stc cctv-spec
Stc cctv-specStc cctv-spec
Stc cctv-spec
 
132901 draft-001-001
132901 draft-001-001132901 draft-001-001
132901 draft-001-001
 
Siddhartha_Saxena_25_Feb_2016
Siddhartha_Saxena_25_Feb_2016Siddhartha_Saxena_25_Feb_2016
Siddhartha_Saxena_25_Feb_2016
 
Alan Bull CTOTF NERC Presentation
Alan Bull CTOTF NERC PresentationAlan Bull CTOTF NERC Presentation
Alan Bull CTOTF NERC Presentation
 
Fire alarm checklist
Fire alarm checklistFire alarm checklist
Fire alarm checklist
 
110KV Substation spec with AnnexuresR.pdf
110KV Substation spec with AnnexuresR.pdf110KV Substation spec with AnnexuresR.pdf
110KV Substation spec with AnnexuresR.pdf
 
CV
CVCV
CV
 
Clelio alves petrobras english
Clelio alves petrobras englishClelio alves petrobras english
Clelio alves petrobras english
 
Grid stds
Grid stdsGrid stds
Grid stds
 
URS - USER REQUIREMENT SPECIFICATIONS.pdf
URS - USER REQUIREMENT SPECIFICATIONS.pdfURS - USER REQUIREMENT SPECIFICATIONS.pdf
URS - USER REQUIREMENT SPECIFICATIONS.pdf
 
NOCCA Robotics - Ventilator Project.pptx
NOCCA Robotics - Ventilator Project.pptxNOCCA Robotics - Ventilator Project.pptx
NOCCA Robotics - Ventilator Project.pptx
 
D. Medina's CV (01)
D. Medina's CV (01)D. Medina's CV (01)
D. Medina's CV (01)
 
Volume iii revised
Volume iii revisedVolume iii revised
Volume iii revised
 

Último

(办理原版一样)Flinders毕业证弗林德斯大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)Flinders毕业证弗林德斯大学毕业证学位证留信学历认证成绩单补办(办理原版一样)Flinders毕业证弗林德斯大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)Flinders毕业证弗林德斯大学毕业证学位证留信学历认证成绩单补办fqiuho152
 
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证jjrehjwj11gg
 
What Could Cause A VW Tiguan's Radiator Fan To Stop Working
What Could Cause A VW Tiguan's Radiator Fan To Stop WorkingWhat Could Cause A VW Tiguan's Radiator Fan To Stop Working
What Could Cause A VW Tiguan's Radiator Fan To Stop WorkingEscondido German Auto
 
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdfkushkruthik555
 
办理科廷科技大学毕业证Curtin毕业证留信学历认证
办理科廷科技大学毕业证Curtin毕业证留信学历认证办理科廷科技大学毕业证Curtin毕业证留信学历认证
办理科廷科技大学毕业证Curtin毕业证留信学历认证jdkhjh
 
What Could Be Causing My Jaguar XF To Lose Coolant
What Could Be Causing My Jaguar XF To Lose CoolantWhat Could Be Causing My Jaguar XF To Lose Coolant
What Could Be Causing My Jaguar XF To Lose CoolantEMC- European Motor Cars
 
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样gfghbihg
 
What Causes The key not detected Message In Mercedes Cars
What Causes The key not detected Message In Mercedes CarsWhat Causes The key not detected Message In Mercedes Cars
What Causes The key not detected Message In Mercedes CarsGermany's Best Inc
 
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...Forth
 
原版1:1定制(IC大学毕业证)帝国理工学院大学毕业证国外文凭复刻成绩单#电子版制作#留信入库#多年经营绝对保证质量
原版1:1定制(IC大学毕业证)帝国理工学院大学毕业证国外文凭复刻成绩单#电子版制作#留信入库#多年经营绝对保证质量原版1:1定制(IC大学毕业证)帝国理工学院大学毕业证国外文凭复刻成绩单#电子版制作#留信入库#多年经营绝对保证质量
原版1:1定制(IC大学毕业证)帝国理工学院大学毕业证国外文凭复刻成绩单#电子版制作#留信入库#多年经营绝对保证质量208367051
 
2024 TOP 10 most fuel-efficient vehicles according to the US agency
2024 TOP 10 most fuel-efficient vehicles according to the US agency2024 TOP 10 most fuel-efficient vehicles according to the US agency
2024 TOP 10 most fuel-efficient vehicles according to the US agencyHyundai Motor Group
 
定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制
定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制
定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制miwhjk
 
(Griffith毕业证)格里菲斯大学毕业证毕业证成绩单修改留信学历认证原版一比一
(Griffith毕业证)格里菲斯大学毕业证毕业证成绩单修改留信学历认证原版一比一(Griffith毕业证)格里菲斯大学毕业证毕业证成绩单修改留信学历认证原版一比一
(Griffith毕业证)格里菲斯大学毕业证毕业证成绩单修改留信学历认证原版一比一ejgeojhg
 
Building a Future Where Everyone Can Ride and Drive Electric by Bridget Gilmore
Building a Future Where Everyone Can Ride and Drive Electric by Bridget GilmoreBuilding a Future Where Everyone Can Ride and Drive Electric by Bridget Gilmore
Building a Future Where Everyone Can Ride and Drive Electric by Bridget GilmoreForth
 
办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书
办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书
办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书zdzoqco
 
2.2 CLSS hydraulic Pumps on komatsu pc200 series
2.2 CLSS hydraulic Pumps on komatsu pc200 series2.2 CLSS hydraulic Pumps on komatsu pc200 series
2.2 CLSS hydraulic Pumps on komatsu pc200 seriesdatazaky
 
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607dollysharma2066
 

Último (20)

(办理原版一样)Flinders毕业证弗林德斯大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)Flinders毕业证弗林德斯大学毕业证学位证留信学历认证成绩单补办(办理原版一样)Flinders毕业证弗林德斯大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)Flinders毕业证弗林德斯大学毕业证学位证留信学历认证成绩单补办
 
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
 
What Could Cause A VW Tiguan's Radiator Fan To Stop Working
What Could Cause A VW Tiguan's Radiator Fan To Stop WorkingWhat Could Cause A VW Tiguan's Radiator Fan To Stop Working
What Could Cause A VW Tiguan's Radiator Fan To Stop Working
 
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf
 
办理科廷科技大学毕业证Curtin毕业证留信学历认证
办理科廷科技大学毕业证Curtin毕业证留信学历认证办理科廷科技大学毕业证Curtin毕业证留信学历认证
办理科廷科技大学毕业证Curtin毕业证留信学历认证
 
What Could Be Causing My Jaguar XF To Lose Coolant
What Could Be Causing My Jaguar XF To Lose CoolantWhat Could Be Causing My Jaguar XF To Lose Coolant
What Could Be Causing My Jaguar XF To Lose Coolant
 
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
 
What Causes The key not detected Message In Mercedes Cars
What Causes The key not detected Message In Mercedes CarsWhat Causes The key not detected Message In Mercedes Cars
What Causes The key not detected Message In Mercedes Cars
 
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...
 
原版1:1定制(IC大学毕业证)帝国理工学院大学毕业证国外文凭复刻成绩单#电子版制作#留信入库#多年经营绝对保证质量
原版1:1定制(IC大学毕业证)帝国理工学院大学毕业证国外文凭复刻成绩单#电子版制作#留信入库#多年经营绝对保证质量原版1:1定制(IC大学毕业证)帝国理工学院大学毕业证国外文凭复刻成绩单#电子版制作#留信入库#多年经营绝对保证质量
原版1:1定制(IC大学毕业证)帝国理工学院大学毕业证国外文凭复刻成绩单#电子版制作#留信入库#多年经营绝对保证质量
 
2024 TOP 10 most fuel-efficient vehicles according to the US agency
2024 TOP 10 most fuel-efficient vehicles according to the US agency2024 TOP 10 most fuel-efficient vehicles according to the US agency
2024 TOP 10 most fuel-efficient vehicles according to the US agency
 
定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制
定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制
定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制
 
Hot Sexy call girls in Pira Garhi🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Pira Garhi🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Pira Garhi🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Pira Garhi🔝 9953056974 🔝 escort Service
 
(Griffith毕业证)格里菲斯大学毕业证毕业证成绩单修改留信学历认证原版一比一
(Griffith毕业证)格里菲斯大学毕业证毕业证成绩单修改留信学历认证原版一比一(Griffith毕业证)格里菲斯大学毕业证毕业证成绩单修改留信学历认证原版一比一
(Griffith毕业证)格里菲斯大学毕业证毕业证成绩单修改留信学历认证原版一比一
 
Building a Future Where Everyone Can Ride and Drive Electric by Bridget Gilmore
Building a Future Where Everyone Can Ride and Drive Electric by Bridget GilmoreBuilding a Future Where Everyone Can Ride and Drive Electric by Bridget Gilmore
Building a Future Where Everyone Can Ride and Drive Electric by Bridget Gilmore
 
办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书
办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书
办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书
 
2.2 CLSS hydraulic Pumps on komatsu pc200 series
2.2 CLSS hydraulic Pumps on komatsu pc200 series2.2 CLSS hydraulic Pumps on komatsu pc200 series
2.2 CLSS hydraulic Pumps on komatsu pc200 series
 
sauth delhi call girls in Connaught Place🔝 9953056974 🔝 escort Service
sauth delhi call girls in  Connaught Place🔝 9953056974 🔝 escort Servicesauth delhi call girls in  Connaught Place🔝 9953056974 🔝 escort Service
sauth delhi call girls in Connaught Place🔝 9953056974 🔝 escort Service
 
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
 

Battery Pack Testing Station 15 12 2022.docx

  • 1. 1 Technical Specifications for Battery Pack Testing Station Scope: HPCL proposes to procure Battery Pack Testing Station for performance evaluation of various commercial and in-house developed battery packs. The job involves, supply, installation, testing and commissioning of the Battery Pack Testing Station, related accessories and software at Hindustan Petroleum Green R&D Centre (HPGRDC), Bangalore. The Battery Pack Testing Station should have the following features which will form the basis for technical evaluation. Total no. Of channels required: 16 Independent Channels 1. The equipment should have battery testing voltage /Channel: 0 Volt or lower to 10 Volt or higher. 2. Voltage measurement accuracy: should be ± 0.1% or better of the Full scale range 3. Current limit: ±1 mA or lower to ±10 A or higher in each cell. 4. Current measurement accuracy: should be ± 0.1% or better of the Full scale value. 5. Data record time should be 10 ms or less. 6. The equipment should have facility to make the channels parallel and series to get higher current of 300 A or higher and 80 volt or higher. 7. The equipment should have the facility of testing at least 2 Battery packs parallelly of power 10kW or more. 8. The vendor should provide proper accessories to monitor the cell temperature in the range of 0 C or less to 100 C or more during charging and discharging. 9. The vendor should provide suitable cables and related accessories for measuring cells and battery Packs – 16 Nos for Cells and 2 Nos for Battery Packs. 10. The vendor should provide suitable cabinet/racks for placing the cells and Battery packs. 11. The equipment/software should have the facility of remote viewing and remote operation by Ethernet or other suitable system. 12. The battery analyzer should have charge / discharge cycle controlled with voltage, current, power and resistance. 13. The equipment should have automatic calibration system. 14. Charge-Discharge should be measured at various C rate. 15. Voltage-time curve, current-time curve, capacity-voltage curve, loops times charge/discharge capacity curve, loops times charge/ discharge efficiency curve, should be generated from the software. 16. A compatible Dell/HP desktop with i7 6700 processor 16 GB DDR4 RAM, 1 TB 7200 RPM HDD, DVD RW drive, 2X GB Ethernet ports, 32-inch monitor, mouse, Keyboard, Windows 10 professional, MS office professional along with battery related software and suitable printer having automatic double sided printing and scanning facility (HP Leaser Jet pro MFPM225 PCL6 or better) should be provided with the Battery Pack Tester. 17. The instrument and related accessories should have at least 1-year warranty.
  • 2. 2 18. Safety: The equipment should have all safety features for totally safe operations. These features have to be given while quoting. 19. The equipment should safely shutdown during power outages without causing damage/repair. 20. All electrical mechanical safety features to be available in the equipment. Special Terms and Conditions 1. Consumables & Spares Consumables & spares (Hardware, electrical etc) if any for ONE Year trouble free Operation should be provided for the quoted instrument. All the required spares would be made available as and when required for next 5 years from the date of supply. 1. Installation, Commissioning & training. Installation & Commissioning of the equipment should be done by Trained Engineers of the Company at HPCL R&D site and demonstration to be given for at least 5 HPCL scientists/operators/instrumentation engineers. Cost of this activity to be included during quoting the equipment cost. 2. After sales service The vendor shall give guarantee after sales services as per HPCL’s “General terms and conditions for supply’’. The vendor should have an authorized Indian/representative to provide Installation, commissioning, training and after sale service. The detailed address of the service Agents to be provided along with the offer. 3. Guarantee: The vendors should provide guarantee for one year from the date of complete installation for all the equipment as per HPCL’s “General terms and conditions for supply’’. 4. The vendor should provide the ‘Soft’ and ‘Hard’ Copies of All Operating Manuals, Service Manuals catalogues brochures giving particulars and details of operation/Maintenance of the instrument, & detailed list of all spare parts. 5. All performance and operational specifications as mentioned in the technical specification must be demonstrated satisfactorily at the user’s laboratory. 6. The rate quoted should be inclusive of all the software, power supply, calibration and other requirements to meet the functioning of the equipment. 7. The equipment offered shall have performance track record for similar application.
  • 3. 3 8. Vendor shall furnish installation details for the equipment including any special requirements like power supply, utilities etc. along-with the offer. 9. The equipment to be configured for 200 to 240 V volts 50 Hz Operation. 10. Payment Terms: The vendor should provide Performance Bank Guarantee (PBG) as per the “General Terms and Conditions” of HPCL. 90% of the total order value will be paid after receiving the materials and submission of 10% PBG to HPCL. The remaining 10% will be paid only after successful completion of installation, commissioning & Training. 11. Annual Maintenance Contract: Parties must quote firm and fixed AMC charges (comprising of at least two visits per year) for three years after completion of guarantee period. The same cost shall form the cost of equipment for evaluation purpose. Order shall be placed at later date. In case of breakdown, vendor representative will visit within 3 days or earlier. AMC is only for services and price of spares will be paid on actuals. 12. Users list Users list for the quoted model along with the address and contact person should be provided. The offered instrument should be of latest version at the time of dispatch 13. Delivery Schedule: Four months from the Date of purchase order/LOA. 14. Equipment must be supplied with complete standard accessories.