Energy Efficient
        - Buildings Envelope
- From the ECBC Perspective

              ECBC Awareness Workshop
              Saint-Gobain Glass India Ltd
ECBC - Building Envelope
 Opaque Wall & Spandrels: Insulation materials
 and their R-values / U Value;
 Vision Glass or fenestration / glazing:
     U-factors,
     Solar heat gain coefficients (SHGC) or SF
     Visible light transmittance
 Shading: overhangs and side fins,
 Air leakage though facade
 Building envelope sealing details
Glass gives beauty & modernity to architecture:
       - Architectural master pieces
       - Modernity - Transparency

                            Advantages of using Glass & glazing systems:
                            1.   Faster is construction
                            2.   Thinner structure - increase floor area
                            3.   Advance systems
                                       Predictable behavior in case of
                                       earth quark and building settlement
                                       Water tight
                            4.   Glass is lighter by 12 times than brick wall
                                       i.e. 1000sqm of glass of reduces
                                       load of building by 500 tons
Glass is transparent thus:
        - Daylight for interiors
        - Blends Interiors with Exteriors




          Nokia, Gurgaon          Infosys, Mysore




                                   But, it is important to:
                                   1. Control Light – Based on direction
                                      of façade – Minimize Glare
                                   2. Control Energy – Based on the
                                      direction & location – Minimize
                                      Heat Gain


Hyatt Regency, Mumbai             Town Hall London
Key Performance Factors

 Total Heat Gain / Heat Transmission
    SHGC or SF : Solar Heat Gain Coefficient or
    Solar Factor
    U Value
 Light Transmission: percentage of incident
 light transmitted
Day Lighting:
               Control Light –
Based on direction of façade –
               Minimize Glare
Effect of Sun: Day Light
Light Transmission (LT):
How low can the LT of the glass be ?




                              Light required for
                              working = 500 Lux


Sun light: 90,000                                       Shade :
 to 113000 Lux                   Light Transmitted     9,000Lux




Thus…..
Light transmission needs to be optimised to reduce
GLARE and enhance occupant COMFORT
Simple Modification - Reflectors
  Avoids excessive glare, increased depth of natural
     day lighting and acting as shade to vision area




                                           H




    2.5 H
Modern Mechanism: Effective Day Light




                                      Ceramic Fritting




Automated Louvers




                                        Shading Device: Horizontal or
                                                        vertical
                     Light Selves
Total Heat Gain / Heat
          Transferred
Total Heat Gain
          Electromagnetic Spectrum at Terrestrial Level


                   TOTAL HEAT GAIN


                                                   Amount of heat
        Heat Gain due to
                                                  Transferred due to
      direct solar radiation
                                                temperature difference

UV Visible         Near Infra Red                    Far Infra Red

.25 .38      .78                         2.50                        50 µ
                           Wave Length
Heat gain                             directly +
due to Direct                       re-emitted energy
solar radiation                       = S F / SHGC

                        1#    2#


     incident
     solar
     radiation


                                            directly transmitted
     reflected                              energy
     energy
                               re-emitted
                 re-emitted
                               energy
                 energy
Amount of heat
  Transferred due to      U Value
temperature difference


   Area = 1 m2




                            U = 5.7 W/sqm K



    T1 = 1oC             T2 = 0oC
Energy Performance: Tropical Climate
                                 Solar Factor: 0.73     365
                 Clear Glass
                   In DGU
                                                              407 W/sqm
                                 U Value: 2.8 W/sqm K   42


                                 Solar Factor: 0.57     285
                     Low e
                    In DGU
                                                              312 W/sqm
                                 U Value: 1.8 W/sqm K   27
    Solar
  incident
  energy =                       Solar Factor: 0.34     170
                  Hard Coat
 500 W/sqm       Solar Control                                212 W/sqm
                    In DGU       U Value: 2.8 W/sqm K   42
Temperature
 differential                    Solar Factor: 0.18     90
                High Performance
   = 15º C        Coated Glass                                129 W/sqm
                     In DGU      U Value: 2.6 W/sqm K   39


                                 Solar Factor: 0.25     125
                    ECBC                                      173 W/sqm
                                 U Value: 3.2 W/sqm K   48
In tropical countries – In General Sense

1: Select a glass with lowest SOLAR FACTOR
2: High Performance glass solutions is a
   direction in future
Remember : Only low U Value glass will lead
  to heat build up inside the building
Example – Cost Benefit Analysis (CBA)
  Basic Solar Control Glass / Tinted DGU SHGC: 0.6   U Value: 3 W/sqm K

                 ECBC Complaint Glass SHGC: 0.25 U Value: 3 W/sqm K



                 Assuming a glass area in Sqm 1000 sqm

             Cost difference between glass is 11 lakhs

                     A/C tonnage saved - capital 50tons

                        Capital investment saved 20 Lkahs

    Running Cost per year saved per annum 12 lakhs
Prescriptive
Climatic
zone map of
India
WWR: Window to wall ration
             Case 1                               Case 2


                               15M                                  15M



               30M                                  30M
800                                  800
2400                                 2400
800                                  800

                               16M                                  16M




       WWR = 2.4*(30+15)*2*4                WWR = 2.4*(30+15)*2*4
               16*(30+15)*2                         16*(30+15)*2
Compliance Requirement: Heat Gain
through glazing
                        WWR Ratio
                  ≤ 40%        41% to 60%
  Fa e
        or
      at
     ct

             SF or           SF or
    im



                     U Value         U Value
 Cl




             SHGC            SHGC
Hot & Dry     0.25      3.3   0.2      3.3
Composite     0.25      3.3   0.2      3.3
Warm &
             0.25     3.3     0.2      3.3
Humid
Moderate      0.4     6.9      0.3     6.9
Cold         0.51     3.3     0.51     3.3
Compliance Requirement: Glass
Light Transmission

                    Minimum
 WWR
                Light Transmission

 < 30%                 27%
 31% to   40%          20%
 41% to   50%          16%
 51% to   60%          13%
 61% to   70%          11%
Trade off
Trade Off: Glass - SF/SHGC
Horizontal Shading: 0.5m to 0.75m
                     North   South   East/West
 North   M Factor     0.8    0.64      0.65
 India   SF / SHGC   0.31    0.39      0.38
Rest of M Factor     0.74    0.69      0.66
 India SF / SHGC     0.34    0.36      0.38
Trade Off: Glass

  Shading
     Horizontal: for different horizontal projection
     you can calculate the shading Factor
     Vertical shading would also give benefit
  Heat Gain Through Envelope
     Covers: heat gain through: Wall, Fenestration,
     Roof
     Calculate heat gain as per prescribed value
     Calculate heat gain of actual use. This should
     be less than equal to above heat gain
How do we get this
performance from Glass ?
Online
Coating
                                           CVD Coating
          Manufactured during manufacturing of glass it self.
            Process of manufacturing known as pyrolysis

Advantages
   Large production run
   Economical
   Easy to manufacture, install and maintain
Disadvantages
   Limitation in performance
   Non selective coatings
Off Line Coating (Soft Coating)

                                                         Planar
                                                         cathode
                                                         Target
                                                         material
                                                         Anode

                                                         Shielding
                                                         Compartme
                                                         nt walls

                                                         Rollers



           Feeding                                  Stacking       Backing
                                                                   sheet
                     Cleaning   Coating   Quality
                                          Check
Off Line Coating (Soft Coating)
Coating Process:
  Argon gas is pumped into the chamber.
  The cathode, supplies the chamber with electrons,
  which bombard the argon gas, ionising it.
  The magnets, and cathode situated above or within
  the target material, focus the movement of the
  ionised argon atoms towards the target
  The argon ions bombard the target, forcing atoms of
  the target to be released into the chamber.
  The positive target ions are sputtered onto the glass
A modern glazing is a sophisticated filter




nitride - 40 nm

 oxide - 54 nm
  Ag - 10 nm

oxide - 100 nm

  Ag - 11 nm
 oxide - 54 nm
 oxide - 16 nm

    glass
                           200 nm
Coating- offline

Advantages
  Better energy performance
  Selective coatings
  Large range
  Today, coating are flexible, can be
      Bent / curved glazing
      Tempered
      laminated
Conclusion
India : a tropical country



  Excessive                   Excessive
    Light                       Heat



But 15% of energy
                            But 55% of energy
 spent on artificial
                             Spent on cooling
      lighting

              Energy crisis
     made worse by inefficient buildings
World Glass Complex,
Sriperumbasur, Chennai, India
  Campus spread over 177 acres
  Total investment of Rs 1500 crores
  Employs 800 people


           Thank you

Mais conteúdo relacionado

Mais procurados

NIFT Site study,Case study, literature study
NIFT Site study,Case study, literature studyNIFT Site study,Case study, literature study
NIFT Site study,Case study, literature studyAbhinavUpadhyay30
 
CII- SOHRABJI GODREJ GREEN BUSINESS CENTER CASE STUDY PPT
CII- SOHRABJI GODREJ GREEN BUSINESS CENTER CASE STUDY PPT CII- SOHRABJI GODREJ GREEN BUSINESS CENTER CASE STUDY PPT
CII- SOHRABJI GODREJ GREEN BUSINESS CENTER CASE STUDY PPT vk78512
 
The Institute of Rural Research And Development (IRRAD)-Architecture case study
The Institute of Rural Research And Development (IRRAD)-Architecture case studyThe Institute of Rural Research And Development (IRRAD)-Architecture case study
The Institute of Rural Research And Development (IRRAD)-Architecture case studyShailja km
 
American parks Landscape design Central park new york case study
American parks Landscape design Central park new york case studyAmerican parks Landscape design Central park new york case study
American parks Landscape design Central park new york case studyAr.Farooqh A
 
Teri, bangalore & solar passive techniques(rupesh)
Teri, bangalore & solar passive techniques(rupesh)Teri, bangalore & solar passive techniques(rupesh)
Teri, bangalore & solar passive techniques(rupesh)Rupesh Chaurasia
 
Elements of landscape
Elements of landscape Elements of landscape
Elements of landscape Diksha Sharma
 
SITE ANALYSIS .pdf
SITE ANALYSIS .pdfSITE ANALYSIS .pdf
SITE ANALYSIS .pdfSuhanaSb
 
Passive Design Techniques for Subtropical Climate of Nepal
Passive Design Techniques for Subtropical Climate of NepalPassive Design Techniques for Subtropical Climate of Nepal
Passive Design Techniques for Subtropical Climate of NepalShristi Kuikel
 
Unit 03 History of Landscape Architecture
Unit 03 History of Landscape ArchitectureUnit 03 History of Landscape Architecture
Unit 03 History of Landscape ArchitectureGeeva Chandana
 
Composite climate and aurabindo ashramam,new delhi
Composite climate and aurabindo ashramam,new delhiComposite climate and aurabindo ashramam,new delhi
Composite climate and aurabindo ashramam,new delhipadamatikona swapnika
 
Energy efficiency ENERGY EFFICIENT ARCHITECTURE
Energy efficiency ENERGY EFFICIENT ARCHITECTUREEnergy efficiency ENERGY EFFICIENT ARCHITECTURE
Energy efficiency ENERGY EFFICIENT ARCHITECTUREShabana Kotta
 
Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.Vinay M
 
historical time line of Landscape Design
historical time line of Landscape Designhistorical time line of Landscape Design
historical time line of Landscape DesignSAHIL MATHUR
 

Mais procurados (20)

NIFT Site study,Case study, literature study
NIFT Site study,Case study, literature studyNIFT Site study,Case study, literature study
NIFT Site study,Case study, literature study
 
CII- SOHRABJI GODREJ GREEN BUSINESS CENTER CASE STUDY PPT
CII- SOHRABJI GODREJ GREEN BUSINESS CENTER CASE STUDY PPT CII- SOHRABJI GODREJ GREEN BUSINESS CENTER CASE STUDY PPT
CII- SOHRABJI GODREJ GREEN BUSINESS CENTER CASE STUDY PPT
 
Earth air tunnels
Earth air tunnelsEarth air tunnels
Earth air tunnels
 
The Institute of Rural Research And Development (IRRAD)-Architecture case study
The Institute of Rural Research And Development (IRRAD)-Architecture case studyThe Institute of Rural Research And Development (IRRAD)-Architecture case study
The Institute of Rural Research And Development (IRRAD)-Architecture case study
 
Cluster design
Cluster design Cluster design
Cluster design
 
Cbri
CbriCbri
Cbri
 
Tactical Urbanism - examples from India
Tactical Urbanism - examples from IndiaTactical Urbanism - examples from India
Tactical Urbanism - examples from India
 
American parks Landscape design Central park new york case study
American parks Landscape design Central park new york case studyAmerican parks Landscape design Central park new york case study
American parks Landscape design Central park new york case study
 
Teri, bangalore & solar passive techniques(rupesh)
Teri, bangalore & solar passive techniques(rupesh)Teri, bangalore & solar passive techniques(rupesh)
Teri, bangalore & solar passive techniques(rupesh)
 
courtyard thesis
courtyard thesiscourtyard thesis
courtyard thesis
 
Energy Efficient Architecture-Sustainable Habitat
Energy Efficient Architecture-Sustainable HabitatEnergy Efficient Architecture-Sustainable Habitat
Energy Efficient Architecture-Sustainable Habitat
 
Elements of landscape
Elements of landscape Elements of landscape
Elements of landscape
 
SITE ANALYSIS .pdf
SITE ANALYSIS .pdfSITE ANALYSIS .pdf
SITE ANALYSIS .pdf
 
Passive Design Techniques for Subtropical Climate of Nepal
Passive Design Techniques for Subtropical Climate of NepalPassive Design Techniques for Subtropical Climate of Nepal
Passive Design Techniques for Subtropical Climate of Nepal
 
Unit 03 History of Landscape Architecture
Unit 03 History of Landscape ArchitectureUnit 03 History of Landscape Architecture
Unit 03 History of Landscape Architecture
 
Composite climate and aurabindo ashramam,new delhi
Composite climate and aurabindo ashramam,new delhiComposite climate and aurabindo ashramam,new delhi
Composite climate and aurabindo ashramam,new delhi
 
Energy efficiency ENERGY EFFICIENT ARCHITECTURE
Energy efficiency ENERGY EFFICIENT ARCHITECTUREEnergy efficiency ENERGY EFFICIENT ARCHITECTURE
Energy efficiency ENERGY EFFICIENT ARCHITECTURE
 
Ud ppt
Ud pptUd ppt
Ud ppt
 
Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.
 
historical time line of Landscape Design
historical time line of Landscape Designhistorical time line of Landscape Design
historical time line of Landscape Design
 

Destaque

Nj future redevelopment forum 2014 green infrastructure testa
Nj future redevelopment forum 2014 green infrastructure testaNj future redevelopment forum 2014 green infrastructure testa
Nj future redevelopment forum 2014 green infrastructure testaNew Jersey Future
 
plastic Facade- PLOYCARBONATE AND PTFE
plastic Facade- PLOYCARBONATE AND PTFE plastic Facade- PLOYCARBONATE AND PTFE
plastic Facade- PLOYCARBONATE AND PTFE Revathy Royer
 
ALUFORM SYSTEMS : FACADE SOLUTIONS
ALUFORM SYSTEMS : FACADE SOLUTIONSALUFORM SYSTEMS : FACADE SOLUTIONS
ALUFORM SYSTEMS : FACADE SOLUTIONSaluformindia
 
Leads facade- Design Develope Deliver
Leads facade- Design Develope DeliverLeads facade- Design Develope Deliver
Leads facade- Design Develope DeliverLeads Facade
 
The World's Most Fascinating Building Facades Today
The World's Most Fascinating Building Facades TodayThe World's Most Fascinating Building Facades Today
The World's Most Fascinating Building Facades TodayDarwin Jayson Mariano
 
5.thermal systems building envelope
5.thermal systems building envelope5.thermal systems building envelope
5.thermal systems building envelopefvine
 
NRGY62 intelligent aluminium curtain wall solution by Sapa Building System
NRGY62 intelligent aluminium curtain wall solution by Sapa Building SystemNRGY62 intelligent aluminium curtain wall solution by Sapa Building System
NRGY62 intelligent aluminium curtain wall solution by Sapa Building SystemSapa Building System
 
Hot Climate Double Facades: A Focus on Solar Avoidance
Hot Climate Double Facades: A Focus on Solar AvoidanceHot Climate Double Facades: A Focus on Solar Avoidance
Hot Climate Double Facades: A Focus on Solar AvoidanceTerri Meyer Boake
 
Towards Sustainable Facade
Towards Sustainable Facade Towards Sustainable Facade
Towards Sustainable Facade Abhinav Chunchu
 
Eco friendly building materials
Eco friendly building materialsEco friendly building materials
Eco friendly building materialslstikore
 
Green Building Materials
Green Building MaterialsGreen Building Materials
Green Building MaterialsPulkit Shukla
 

Destaque (17)

Nj future redevelopment forum 2014 green infrastructure testa
Nj future redevelopment forum 2014 green infrastructure testaNj future redevelopment forum 2014 green infrastructure testa
Nj future redevelopment forum 2014 green infrastructure testa
 
Facade Pattern
Facade PatternFacade Pattern
Facade Pattern
 
Innovative and Intelligent Facades
Innovative and Intelligent FacadesInnovative and Intelligent Facades
Innovative and Intelligent Facades
 
plastic Facade- PLOYCARBONATE AND PTFE
plastic Facade- PLOYCARBONATE AND PTFE plastic Facade- PLOYCARBONATE AND PTFE
plastic Facade- PLOYCARBONATE AND PTFE
 
ALUFORM SYSTEMS : FACADE SOLUTIONS
ALUFORM SYSTEMS : FACADE SOLUTIONSALUFORM SYSTEMS : FACADE SOLUTIONS
ALUFORM SYSTEMS : FACADE SOLUTIONS
 
Leads facade- Design Develope Deliver
Leads facade- Design Develope DeliverLeads facade- Design Develope Deliver
Leads facade- Design Develope Deliver
 
The World's Most Fascinating Building Facades Today
The World's Most Fascinating Building Facades TodayThe World's Most Fascinating Building Facades Today
The World's Most Fascinating Building Facades Today
 
'GREEN' OFFICE BUILDING-ABHALMAYA-SUSTAINABLE ARCHITECTURE
'GREEN' OFFICE BUILDING-ABHALMAYA-SUSTAINABLE ARCHITECTURE'GREEN' OFFICE BUILDING-ABHALMAYA-SUSTAINABLE ARCHITECTURE
'GREEN' OFFICE BUILDING-ABHALMAYA-SUSTAINABLE ARCHITECTURE
 
5.thermal systems building envelope
5.thermal systems building envelope5.thermal systems building envelope
5.thermal systems building envelope
 
NRGY62 intelligent aluminium curtain wall solution by Sapa Building System
NRGY62 intelligent aluminium curtain wall solution by Sapa Building SystemNRGY62 intelligent aluminium curtain wall solution by Sapa Building System
NRGY62 intelligent aluminium curtain wall solution by Sapa Building System
 
Facade Research Document
Facade Research DocumentFacade Research Document
Facade Research Document
 
Hot Climate Double Facades: A Focus on Solar Avoidance
Hot Climate Double Facades: A Focus on Solar AvoidanceHot Climate Double Facades: A Focus on Solar Avoidance
Hot Climate Double Facades: A Focus on Solar Avoidance
 
Sustainable Skins
Sustainable SkinsSustainable Skins
Sustainable Skins
 
Towards Sustainable Facade
Towards Sustainable Facade Towards Sustainable Facade
Towards Sustainable Facade
 
Eco friendly building materials
Eco friendly building materialsEco friendly building materials
Eco friendly building materials
 
Green Building Materials
Green Building MaterialsGreen Building Materials
Green Building Materials
 
Green buildings
Green buildingsGreen buildings
Green buildings
 

Semelhante a Green Buildings Facade Approach

Building envelope power point
Building envelope power pointBuilding envelope power point
Building envelope power pointVinay Srivastava
 
Solar Thermal Dish Turbine 2 kW
Solar Thermal Dish Turbine 2 kWSolar Thermal Dish Turbine 2 kW
Solar Thermal Dish Turbine 2 kWJack Wong
 
Solar Thermal Dish Steam Turbine Engine
Solar Thermal Dish Steam Turbine EngineSolar Thermal Dish Steam Turbine Engine
Solar Thermal Dish Steam Turbine EngineJack Wong
 
Is there a limit for photovoltaic capacity Hugo Birkelund
Is there a limit for photovoltaic capacity   Hugo BirkelundIs there a limit for photovoltaic capacity   Hugo Birkelund
Is there a limit for photovoltaic capacity Hugo BirkelundInnovation Norway
 
Efficiency of solar panel
Efficiency of solar panelEfficiency of solar panel
Efficiency of solar panelSolarSaving
 
Windows and glazed area technologies and materials in Europe
Windows and glazed area technologies and materials in EuropeWindows and glazed area technologies and materials in Europe
Windows and glazed area technologies and materials in EuropeInternational Energy Agency
 
Yuzhe_LIU_4207891_ERPs_poster
Yuzhe_LIU_4207891_ERPs_posterYuzhe_LIU_4207891_ERPs_poster
Yuzhe_LIU_4207891_ERPs_posterYuzhe LIU
 
Prof. beck 'renewable energy- a short (and cynical) approach
Prof. beck  'renewable energy- a short (and cynical) approachProf. beck  'renewable energy- a short (and cynical) approach
Prof. beck 'renewable energy- a short (and cynical) approachThe Sheffield Colloqouium
 
AppliedPhotoVoltaics.ppt
AppliedPhotoVoltaics.pptAppliedPhotoVoltaics.ppt
AppliedPhotoVoltaics.pptsumit82508
 
AppliedPhotoVoltaics.ppt
AppliedPhotoVoltaics.pptAppliedPhotoVoltaics.ppt
AppliedPhotoVoltaics.pptManish962480
 
Photovoltaic Training Course - Module 1.3 - PV facility calculations
Photovoltaic Training Course - Module 1.3 -  PV facility calculationsPhotovoltaic Training Course - Module 1.3 -  PV facility calculations
Photovoltaic Training Course - Module 1.3 - PV facility calculationsLeonardo ENERGY
 
A NOVEL APPROACH TO OBTAIN MAXIMUM POWER OUTPUT FROM SOLAR PANEL USING PSO
A NOVEL APPROACH TO OBTAIN MAXIMUM POWER OUTPUT FROM SOLAR PANEL USING PSOA NOVEL APPROACH TO OBTAIN MAXIMUM POWER OUTPUT FROM SOLAR PANEL USING PSO
A NOVEL APPROACH TO OBTAIN MAXIMUM POWER OUTPUT FROM SOLAR PANEL USING PSOijsrd.com
 
Solar energy -the ultimate renewable resource
Solar energy -the ultimate  renewable resourceSolar energy -the ultimate  renewable resource
Solar energy -the ultimate renewable resourcerahuldawar
 
" Overview on Solar energy "
" Overview on Solar energy "" Overview on Solar energy "
" Overview on Solar energy "Virendra Uppalwar
 
Dynamic Glazing by Guardian - Tint on demand
Dynamic Glazing by Guardian - Tint on demandDynamic Glazing by Guardian - Tint on demand
Dynamic Glazing by Guardian - Tint on demandSam Malty
 
High Performance Power Electronics Systems for PV Solar Applications
High Performance Power Electronics Systems for PV Solar ApplicationsHigh Performance Power Electronics Systems for PV Solar Applications
High Performance Power Electronics Systems for PV Solar ApplicationsRick Borry
 

Semelhante a Green Buildings Facade Approach (20)

Building envelope power point
Building envelope power pointBuilding envelope power point
Building envelope power point
 
Solar Thermal Dish Turbine 2 kW
Solar Thermal Dish Turbine 2 kWSolar Thermal Dish Turbine 2 kW
Solar Thermal Dish Turbine 2 kW
 
Solar Thermal Dish Steam Turbine Engine
Solar Thermal Dish Steam Turbine EngineSolar Thermal Dish Steam Turbine Engine
Solar Thermal Dish Steam Turbine Engine
 
Is there a limit for photovoltaic capacity Hugo Birkelund
Is there a limit for photovoltaic capacity   Hugo BirkelundIs there a limit for photovoltaic capacity   Hugo Birkelund
Is there a limit for photovoltaic capacity Hugo Birkelund
 
Efficiency of solar panel
Efficiency of solar panelEfficiency of solar panel
Efficiency of solar panel
 
Heat exchange in building.pptx
Heat exchange in building.pptxHeat exchange in building.pptx
Heat exchange in building.pptx
 
Windows and glazed area technologies and materials in Europe
Windows and glazed area technologies and materials in EuropeWindows and glazed area technologies and materials in Europe
Windows and glazed area technologies and materials in Europe
 
Yuzhe_LIU_4207891_ERPs_poster
Yuzhe_LIU_4207891_ERPs_posterYuzhe_LIU_4207891_ERPs_poster
Yuzhe_LIU_4207891_ERPs_poster
 
Prof. beck 'renewable energy- a short (and cynical) approach
Prof. beck  'renewable energy- a short (and cynical) approachProf. beck  'renewable energy- a short (and cynical) approach
Prof. beck 'renewable energy- a short (and cynical) approach
 
AppliedPhotoVoltaics.ppt
AppliedPhotoVoltaics.pptAppliedPhotoVoltaics.ppt
AppliedPhotoVoltaics.ppt
 
AppliedPhotoVoltaics.ppt
AppliedPhotoVoltaics.pptAppliedPhotoVoltaics.ppt
AppliedPhotoVoltaics.ppt
 
IEEE_Report@Projects
IEEE_Report@ProjectsIEEE_Report@Projects
IEEE_Report@Projects
 
Photovoltaic Training Course - Module 1.3 - PV facility calculations
Photovoltaic Training Course - Module 1.3 -  PV facility calculationsPhotovoltaic Training Course - Module 1.3 -  PV facility calculations
Photovoltaic Training Course - Module 1.3 - PV facility calculations
 
Nanogel for super insulaton and energy saving
Nanogel  for super insulaton and energy savingNanogel  for super insulaton and energy saving
Nanogel for super insulaton and energy saving
 
A NOVEL APPROACH TO OBTAIN MAXIMUM POWER OUTPUT FROM SOLAR PANEL USING PSO
A NOVEL APPROACH TO OBTAIN MAXIMUM POWER OUTPUT FROM SOLAR PANEL USING PSOA NOVEL APPROACH TO OBTAIN MAXIMUM POWER OUTPUT FROM SOLAR PANEL USING PSO
A NOVEL APPROACH TO OBTAIN MAXIMUM POWER OUTPUT FROM SOLAR PANEL USING PSO
 
Solar energy -the ultimate renewable resource
Solar energy -the ultimate  renewable resourceSolar energy -the ultimate  renewable resource
Solar energy -the ultimate renewable resource
 
" Overview on Solar energy "
" Overview on Solar energy "" Overview on Solar energy "
" Overview on Solar energy "
 
Dynamic Glazing by Guardian - Tint on demand
Dynamic Glazing by Guardian - Tint on demandDynamic Glazing by Guardian - Tint on demand
Dynamic Glazing by Guardian - Tint on demand
 
High Performance Power Electronics Systems for PV Solar Applications
High Performance Power Electronics Systems for PV Solar ApplicationsHigh Performance Power Electronics Systems for PV Solar Applications
High Performance Power Electronics Systems for PV Solar Applications
 
Solar power
Solar powerSolar power
Solar power
 

Último

SCRIP Lua HTTP PROGRACMACION PLC WECON CA
SCRIP Lua HTTP PROGRACMACION PLC  WECON CASCRIP Lua HTTP PROGRACMACION PLC  WECON CA
SCRIP Lua HTTP PROGRACMACION PLC WECON CANestorGamez6
 
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Delhi Call girls
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsCharles Obaleagbon
 
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfChapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfParomita Roy
 
Nepali Escort Girl Gomti Nagar \ 9548273370 Indian Call Girls Service Lucknow...
Nepali Escort Girl Gomti Nagar \ 9548273370 Indian Call Girls Service Lucknow...Nepali Escort Girl Gomti Nagar \ 9548273370 Indian Call Girls Service Lucknow...
Nepali Escort Girl Gomti Nagar \ 9548273370 Indian Call Girls Service Lucknow...nagunakhan
 
DragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptxDragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptxmirandajeremy200221
 
Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...
Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...
Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...nagunakhan
 
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfThe_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfAmirYakdi
 
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Delhi Call girls
 
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅ Vashi Call Service Available Nea...
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅  Vashi Call Service Available Nea...Kurla Call Girls Pooja Nehwal📞 9892124323 ✅  Vashi Call Service Available Nea...
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅ Vashi Call Service Available Nea...Pooja Nehwal
 
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Call Girls in Nagpur High Profile
 
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️soniya singh
 
Petrosains Drama Competition (PSDC).pptx
Petrosains Drama Competition (PSDC).pptxPetrosains Drama Competition (PSDC).pptx
Petrosains Drama Competition (PSDC).pptxIgnatiusAbrahamBalin
 
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130Suhani Kapoor
 
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun serviceCALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun serviceanilsa9823
 
VIP Call Girls Bhiwandi Ananya 8250192130 Independent Escort Service Bhiwandi
VIP Call Girls Bhiwandi Ananya 8250192130 Independent Escort Service BhiwandiVIP Call Girls Bhiwandi Ananya 8250192130 Independent Escort Service Bhiwandi
VIP Call Girls Bhiwandi Ananya 8250192130 Independent Escort Service BhiwandiSuhani Kapoor
 
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵anilsa9823
 

Último (20)

SCRIP Lua HTTP PROGRACMACION PLC WECON CA
SCRIP Lua HTTP PROGRACMACION PLC  WECON CASCRIP Lua HTTP PROGRACMACION PLC  WECON CA
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
 
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past Questions
 
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfChapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
 
Nepali Escort Girl Gomti Nagar \ 9548273370 Indian Call Girls Service Lucknow...
Nepali Escort Girl Gomti Nagar \ 9548273370 Indian Call Girls Service Lucknow...Nepali Escort Girl Gomti Nagar \ 9548273370 Indian Call Girls Service Lucknow...
Nepali Escort Girl Gomti Nagar \ 9548273370 Indian Call Girls Service Lucknow...
 
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
 
DragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptxDragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptx
 
Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...
Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...
Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...
 
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfThe_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
 
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
 
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅ Vashi Call Service Available Nea...
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅  Vashi Call Service Available Nea...Kurla Call Girls Pooja Nehwal📞 9892124323 ✅  Vashi Call Service Available Nea...
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅ Vashi Call Service Available Nea...
 
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
 
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
 
Petrosains Drama Competition (PSDC).pptx
Petrosains Drama Competition (PSDC).pptxPetrosains Drama Competition (PSDC).pptx
Petrosains Drama Competition (PSDC).pptx
 
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
 
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun serviceCALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
 
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
 
VIP Call Girls Bhiwandi Ananya 8250192130 Independent Escort Service Bhiwandi
VIP Call Girls Bhiwandi Ananya 8250192130 Independent Escort Service BhiwandiVIP Call Girls Bhiwandi Ananya 8250192130 Independent Escort Service Bhiwandi
VIP Call Girls Bhiwandi Ananya 8250192130 Independent Escort Service Bhiwandi
 
escort service sasti (*~Call Girls in Prasad Nagar Metro❤️9953056974
escort service sasti (*~Call Girls in Prasad Nagar Metro❤️9953056974escort service sasti (*~Call Girls in Prasad Nagar Metro❤️9953056974
escort service sasti (*~Call Girls in Prasad Nagar Metro❤️9953056974
 
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
 

Green Buildings Facade Approach

  • 1. Energy Efficient - Buildings Envelope - From the ECBC Perspective ECBC Awareness Workshop Saint-Gobain Glass India Ltd
  • 2. ECBC - Building Envelope Opaque Wall & Spandrels: Insulation materials and their R-values / U Value; Vision Glass or fenestration / glazing: U-factors, Solar heat gain coefficients (SHGC) or SF Visible light transmittance Shading: overhangs and side fins, Air leakage though facade Building envelope sealing details
  • 3. Glass gives beauty & modernity to architecture: - Architectural master pieces - Modernity - Transparency Advantages of using Glass & glazing systems: 1. Faster is construction 2. Thinner structure - increase floor area 3. Advance systems Predictable behavior in case of earth quark and building settlement Water tight 4. Glass is lighter by 12 times than brick wall i.e. 1000sqm of glass of reduces load of building by 500 tons
  • 4. Glass is transparent thus: - Daylight for interiors - Blends Interiors with Exteriors Nokia, Gurgaon Infosys, Mysore But, it is important to: 1. Control Light – Based on direction of façade – Minimize Glare 2. Control Energy – Based on the direction & location – Minimize Heat Gain Hyatt Regency, Mumbai Town Hall London
  • 5. Key Performance Factors Total Heat Gain / Heat Transmission SHGC or SF : Solar Heat Gain Coefficient or Solar Factor U Value Light Transmission: percentage of incident light transmitted
  • 6. Day Lighting: Control Light – Based on direction of façade – Minimize Glare
  • 7. Effect of Sun: Day Light Light Transmission (LT): How low can the LT of the glass be ? Light required for working = 500 Lux Sun light: 90,000 Shade : to 113000 Lux Light Transmitted 9,000Lux Thus….. Light transmission needs to be optimised to reduce GLARE and enhance occupant COMFORT
  • 8. Simple Modification - Reflectors Avoids excessive glare, increased depth of natural day lighting and acting as shade to vision area H 2.5 H
  • 9. Modern Mechanism: Effective Day Light Ceramic Fritting Automated Louvers Shading Device: Horizontal or vertical Light Selves
  • 10. Total Heat Gain / Heat Transferred
  • 11. Total Heat Gain Electromagnetic Spectrum at Terrestrial Level TOTAL HEAT GAIN Amount of heat Heat Gain due to Transferred due to direct solar radiation temperature difference UV Visible Near Infra Red Far Infra Red .25 .38 .78 2.50 50 µ Wave Length
  • 12. Heat gain directly + due to Direct re-emitted energy solar radiation = S F / SHGC 1# 2# incident solar radiation directly transmitted reflected energy energy re-emitted re-emitted energy energy
  • 13. Amount of heat Transferred due to U Value temperature difference Area = 1 m2 U = 5.7 W/sqm K T1 = 1oC T2 = 0oC
  • 14. Energy Performance: Tropical Climate Solar Factor: 0.73 365 Clear Glass In DGU 407 W/sqm U Value: 2.8 W/sqm K 42 Solar Factor: 0.57 285 Low e In DGU 312 W/sqm U Value: 1.8 W/sqm K 27 Solar incident energy = Solar Factor: 0.34 170 Hard Coat 500 W/sqm Solar Control 212 W/sqm In DGU U Value: 2.8 W/sqm K 42 Temperature differential Solar Factor: 0.18 90 High Performance = 15º C Coated Glass 129 W/sqm In DGU U Value: 2.6 W/sqm K 39 Solar Factor: 0.25 125 ECBC 173 W/sqm U Value: 3.2 W/sqm K 48
  • 15. In tropical countries – In General Sense 1: Select a glass with lowest SOLAR FACTOR 2: High Performance glass solutions is a direction in future Remember : Only low U Value glass will lead to heat build up inside the building
  • 16. Example – Cost Benefit Analysis (CBA) Basic Solar Control Glass / Tinted DGU SHGC: 0.6 U Value: 3 W/sqm K ECBC Complaint Glass SHGC: 0.25 U Value: 3 W/sqm K Assuming a glass area in Sqm 1000 sqm Cost difference between glass is 11 lakhs A/C tonnage saved - capital 50tons Capital investment saved 20 Lkahs Running Cost per year saved per annum 12 lakhs
  • 19. WWR: Window to wall ration Case 1 Case 2 15M 15M 30M 30M 800 800 2400 2400 800 800 16M 16M WWR = 2.4*(30+15)*2*4 WWR = 2.4*(30+15)*2*4 16*(30+15)*2 16*(30+15)*2
  • 20. Compliance Requirement: Heat Gain through glazing WWR Ratio ≤ 40% 41% to 60% Fa e or at ct SF or SF or im U Value U Value Cl SHGC SHGC Hot & Dry 0.25 3.3 0.2 3.3 Composite 0.25 3.3 0.2 3.3 Warm & 0.25 3.3 0.2 3.3 Humid Moderate 0.4 6.9 0.3 6.9 Cold 0.51 3.3 0.51 3.3
  • 21. Compliance Requirement: Glass Light Transmission Minimum WWR Light Transmission < 30% 27% 31% to 40% 20% 41% to 50% 16% 51% to 60% 13% 61% to 70% 11%
  • 23. Trade Off: Glass - SF/SHGC Horizontal Shading: 0.5m to 0.75m North South East/West North M Factor 0.8 0.64 0.65 India SF / SHGC 0.31 0.39 0.38 Rest of M Factor 0.74 0.69 0.66 India SF / SHGC 0.34 0.36 0.38
  • 24. Trade Off: Glass Shading Horizontal: for different horizontal projection you can calculate the shading Factor Vertical shading would also give benefit Heat Gain Through Envelope Covers: heat gain through: Wall, Fenestration, Roof Calculate heat gain as per prescribed value Calculate heat gain of actual use. This should be less than equal to above heat gain
  • 25. How do we get this performance from Glass ?
  • 26. Online Coating CVD Coating Manufactured during manufacturing of glass it self. Process of manufacturing known as pyrolysis Advantages Large production run Economical Easy to manufacture, install and maintain Disadvantages Limitation in performance Non selective coatings
  • 27. Off Line Coating (Soft Coating) Planar cathode Target material Anode Shielding Compartme nt walls Rollers Feeding Stacking Backing sheet Cleaning Coating Quality Check
  • 28. Off Line Coating (Soft Coating) Coating Process: Argon gas is pumped into the chamber. The cathode, supplies the chamber with electrons, which bombard the argon gas, ionising it. The magnets, and cathode situated above or within the target material, focus the movement of the ionised argon atoms towards the target The argon ions bombard the target, forcing atoms of the target to be released into the chamber. The positive target ions are sputtered onto the glass
  • 29. A modern glazing is a sophisticated filter nitride - 40 nm oxide - 54 nm Ag - 10 nm oxide - 100 nm Ag - 11 nm oxide - 54 nm oxide - 16 nm glass 200 nm
  • 30. Coating- offline Advantages Better energy performance Selective coatings Large range Today, coating are flexible, can be Bent / curved glazing Tempered laminated
  • 32. India : a tropical country Excessive Excessive Light Heat But 15% of energy But 55% of energy spent on artificial Spent on cooling lighting Energy crisis made worse by inefficient buildings
  • 33. World Glass Complex, Sriperumbasur, Chennai, India Campus spread over 177 acres Total investment of Rs 1500 crores Employs 800 people Thank you