INTRODUCTION
 Planning for the metro Started in 1984,when the Delhi Development
Authority and the Urban Arts Commission Came up with a proposal
for developing a multi-modal transport system for the city . The
Government of India and the Government of Delhi jointly set up the
Delhi Metro Rail Corporation(DMRC) in 1995.Construction Started
in 1998,and
The first Section, on the Red Line, opened in 2002,
Followed by Yellow Line in 2004,
The Blue Line in 2005,its branch line in 2009,
The Green and Violet Lines in 2010 and
The Delhi Airport Metro Express in 2011
The network comprising six lines with 140 metro stations.
Rolling stock
 The first wave of Rolling stock was manufactured by a consortium of companies
comprising ROTEM, Mitsubishi Corporation and Mitsubishi Electric Corporation. Initial sets
were built by ROTEM in South Korea, with later examples Completed in India by public
sector undertaking Bharat Earth Movers Limited(BEML).
 BEML is also responsible for the manufacturing coaches under technology transfer
agreement. The air-conditioned trains consist of four 3.2m wide ,stainless steel, lightweight
,although six and eight coaches is possible. The trains have automatic doors, secondary air
suspension and brakes controlled by microprocessor. Delhi Metro has fleet of 280 coaches,
which DMRC Runs as 70 trains everyday. Each train can accommodate about 1,500
people,240 seated. Maximum speed is 80km/h (50mph),with a 20-second dwell time at
stations.
 Train depots are located at Khyber Pass , Najafgarh, Shastri Park , Mundaka , Sarita
Vihar and Yamuna Bank.
 A Phase I board gauge train, supplied by Hyundai Rotem-BEML(RS-1).
 A Phase II board gauge train, supplied by Bombardier(RS-2).
 The Metro Rolling Stock of two different gauges. Phase I lines use 1,676mm (5.499ft) broad
gauge rolling stock, while three Phase II Lines use 1,435mm (4,708 ft)standard gauge rolling
stock.
Broad gauge
The broad Gauge rolling stock is manufactured by two major suppliers Hyundai Rotem ,
Mitsubishi Corporation and MELCO . The coaches were initially built in South Korea by ROTEM.
Standard gauge
The initial trains were made in Germany and Sweden, the remainder will be built at
Bombardier’s factory in Savli , near Vadodara. The coaches posses several improved features like
Closed Circuit Television(CCTV) Cameras , charging points in all coaches for cell phones and
laptops, improved air conditioning to provide a temperature of 25 degree Celsius even in
packed conditions and heaters for Winter.
RS-2 TRAIN OVERVIEW
TRAIN FORMATION:
One train set consists of 4/6/8 cars. Three types of cars (DT,T and M) are used to form a train set. At
each end is a “DT” car which is a trailer car with driver’s cab and pantograph. The other type is an “M”
car, which is a motor car without pantograph and “T” car with pantograph.
-4 car
The 4-car trains consist of driving trailer car with pantograph (DT) and motor
car (M), in the following configuration DT-M + M-DT.
- 6 car
The 6 car train consists of driver trailer car with pantograph (DT), motor car
(M) and trailer car with pantograph (T), in the following configuration DT-
M + T-M + M-DT
- 8 car
The 6 car train consists of driver trailer car with pantograph (DT), motor car (M)
and trailer car with pantograph (T), in the following configuration DT-M + T-M +
T-M + M-DT.
SALIENT FEATURES:
• Broad gauge (1.676 metre )
• 25 KV Supply Voltage System
• Light weight stainless steel structure
• Three phase A.C. induction motor
• Fail safe braking system with regenerative braking.
TYPES OF COUPLINGS BETWEEN COACHES
1 Front Automatic Coupling (FAC)-is used at both ends of the metro train i.e., in front of
the DT car & is very useful in rescue operation
2 Semi- permanent Coupling (SPC)-between the DT and M cars. Since the DT and M cars
serve as one unit, they are not usually required to be separated. Hence, a semi- permanent
coupling is used between the two.
3 Intermediate Automatic Coupling (IAC)-This coupling is used between two M cars in order
to facilitate easy engagement of coaches especially when the number of coaches has to be
increased.
Train Integrated Management System
 Train Integrated Management System (TIMS) provides a centralized function
to monitor the train borne systems and devices. It also provides the operators
interface via a Video Display Unit mounted on the operator desk.
Additional information about other systems can be checked by driver by touching the soft keys at the bottom of
the screen display.
Brake and pneumatic system
• The brake system is a combination of
mechanical and electronic devices
operated by compressed air, arranged
in a system and controlled manually,
pneumatically or electronically by
means of which the motion of cars
is retarded or stopped.
• The brake system includes-
• Friction brake
• Electro Dynamic (ED) brake
• Parking brake
• Holding brake
• Wheel slide protection (WSP)
Air Supply System
The air supply system supplies compressed air to
consumers, such as the brake system, secondary
suspension and pantographs.
The main air supply unit is the subsystem of train
and is fitted in the underframe of each M-car which
supplies compressed air to the
complete train via the Main Reservoir Pipe (MRP).
Air supply unit basically consists of:
• Compressor
• Air treatment
• Filter units
DOORS
A door in a train is a panel or barrier, usually hinged or sliding, that is used to cover an
opening in a train. Exterior doors are doorways that allow entrance or exit from a train.
There are three types of exterior doors available in RS2:
 Cab or driver’s door
 Passenger door
 Detrainment/emergency door
 Partition door
 The function of the cab or driver’s door is to provide access to the cab for the driver. Only
DT car is equipped with two cab doors.
Passenger door
 The function of the passenger door is to prevent passengers from entering or
leaving the train.
 Each car has 8 passenger doors
 Each door consists of two door leaves
 Sliding externally on the car body wall
 Electrically operated
Detrainment/Emergency door
 The function of the detrainment door is to provide evacuation of passengers and
crew to track in case of emergency.
 When detrainment door opens it becomes an emergency ramp from cab floor
level down to track level.
 The detrainment door is bolted into the cab structure.
 The door is located in the front of the cab.
 Free opening width 750 mm.
 Free opening height 1900 mm.
Thank you

Mais conteúdo relacionado

Mais procurados

Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Aashna Sharma
 
Summer training DMRC ppt
Summer training DMRC pptSummer training DMRC ppt
Summer training DMRC pptVimal Maurya
 
Summer Training in DMRC
Summer Training in DMRCSummer Training in DMRC
Summer Training in DMRCAsim Ghatak
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in indiaSourav Paul
 
Summer training from Indian Railway ppt (2)
Summer training from Indian Railway ppt (2)Summer training from Indian Railway ppt (2)
Summer training from Indian Railway ppt (2)Kumud Khandelwal
 
DMRC SUMMER INTERNSHIP REPORT
DMRC SUMMER INTERNSHIP REPORT DMRC SUMMER INTERNSHIP REPORT
DMRC SUMMER INTERNSHIP REPORT Deepak Kumar
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India pptNikita James
 
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian PerspectiveHigh Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian PerspectiveRajesh Prasad
 
Delhi metro rail corporation secondary research
Delhi metro rail corporation secondary researchDelhi metro rail corporation secondary research
Delhi metro rail corporation secondary researchSunil Dayma
 
Delhi metro internship Report (05.05.2018 04.06.2018)
Delhi metro internship Report (05.05.2018 04.06.2018)Delhi metro internship Report (05.05.2018 04.06.2018)
Delhi metro internship Report (05.05.2018 04.06.2018)Shubham Bhargava Slideshares
 
indian railways Presentation .
 indian railways Presentation . indian railways Presentation .
indian railways Presentation .Akash Gupta
 
PPT On High Speed Railways
PPT On High Speed RailwaysPPT On High Speed Railways
PPT On High Speed RailwaysNabh Agrawal
 

Mais procurados (20)

Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)
 
Delhi metro
Delhi metroDelhi metro
Delhi metro
 
Summer training DMRC ppt
Summer training DMRC pptSummer training DMRC ppt
Summer training DMRC ppt
 
INDUSTRIAL TRAINING REPORT ON INDIAN RAILWAYS
INDUSTRIAL TRAINING REPORT ON INDIAN RAILWAYSINDUSTRIAL TRAINING REPORT ON INDIAN RAILWAYS
INDUSTRIAL TRAINING REPORT ON INDIAN RAILWAYS
 
Summer Training in DMRC
Summer Training in DMRCSummer Training in DMRC
Summer Training in DMRC
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in india
 
Summer training from Indian Railway ppt (2)
Summer training from Indian Railway ppt (2)Summer training from Indian Railway ppt (2)
Summer training from Indian Railway ppt (2)
 
Delhi metro
Delhi metroDelhi metro
Delhi metro
 
Delhi Metro
Delhi MetroDelhi Metro
Delhi Metro
 
DMRC SUMMER INTERNSHIP REPORT
DMRC SUMMER INTERNSHIP REPORT DMRC SUMMER INTERNSHIP REPORT
DMRC SUMMER INTERNSHIP REPORT
 
12
1212
12
 
DMRC
DMRCDMRC
DMRC
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India ppt
 
Railway project
Railway projectRailway project
Railway project
 
Metro presentation
Metro presentationMetro presentation
Metro presentation
 
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian PerspectiveHigh Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
 
Delhi metro rail corporation secondary research
Delhi metro rail corporation secondary researchDelhi metro rail corporation secondary research
Delhi metro rail corporation secondary research
 
Delhi metro internship Report (05.05.2018 04.06.2018)
Delhi metro internship Report (05.05.2018 04.06.2018)Delhi metro internship Report (05.05.2018 04.06.2018)
Delhi metro internship Report (05.05.2018 04.06.2018)
 
indian railways Presentation .
 indian railways Presentation . indian railways Presentation .
indian railways Presentation .
 
PPT On High Speed Railways
PPT On High Speed RailwaysPPT On High Speed Railways
PPT On High Speed Railways
 

Destaque

Delhi metro rail corporation project
Delhi metro rail corporation projectDelhi metro rail corporation project
Delhi metro rail corporation projectVimal Maurya
 
DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)Sukhdarshan Singh
 
Delhi metro project
Delhi metro projectDelhi metro project
Delhi metro projectVinay Bardia
 
Infrastructure Management - DMRC Study
Infrastructure Management - DMRC StudyInfrastructure Management - DMRC Study
Infrastructure Management - DMRC StudyMohit Gaur
 
Delhi metro rail corporation slides slides
Delhi metro rail corporation slides slidesDelhi metro rail corporation slides slides
Delhi metro rail corporation slides slidesAmit Trivedi
 
Metro station documentation
Metro station documentationMetro station documentation
Metro station documentationfarouq umar
 
The delhi-metro-project
The delhi-metro-projectThe delhi-metro-project
The delhi-metro-projectVikas Saini
 
Shivam pajpati pptx presebntation
Shivam  pajpati pptx presebntationShivam  pajpati pptx presebntation
Shivam pajpati pptx presebntationShivam Prajapati
 
Rail Simulation System
Rail  Simulation SystemRail  Simulation System
Rail Simulation Systemvchristiano
 
DMRC_COLLEGE_REPORT
DMRC_COLLEGE_REPORTDMRC_COLLEGE_REPORT
DMRC_COLLEGE_REPORTPOOJA SHARMA
 
Backcaster Final Slide
Backcaster Final SlideBackcaster Final Slide
Backcaster Final Slidesinexking
 
[Challenge:Future] New Metro Interior Design An innovative, simple yet effec...
[Challenge:Future] New Metro Interior Design  An innovative, simple yet effec...[Challenge:Future] New Metro Interior Design  An innovative, simple yet effec...
[Challenge:Future] New Metro Interior Design An innovative, simple yet effec...Challenge:Future
 
Mr. roger dirksmeier active fire protection in railway vehicles as ‘compens...
Mr. roger dirksmeier   active fire protection in railway vehicles as ‘compens...Mr. roger dirksmeier   active fire protection in railway vehicles as ‘compens...
Mr. roger dirksmeier active fire protection in railway vehicles as ‘compens...imadhammoud
 
Advance Signalling System-Rajbansh
Advance Signalling System-RajbanshAdvance Signalling System-Rajbansh
Advance Signalling System-RajbanshRom!el Rajbansh
 

Destaque (20)

Delhi metro rail corporation project
Delhi metro rail corporation projectDelhi metro rail corporation project
Delhi metro rail corporation project
 
DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)
 
Delhi metro project
Delhi metro projectDelhi metro project
Delhi metro project
 
Infrastructure Management - DMRC Study
Infrastructure Management - DMRC StudyInfrastructure Management - DMRC Study
Infrastructure Management - DMRC Study
 
Delhi metro rail corporation slides slides
Delhi metro rail corporation slides slidesDelhi metro rail corporation slides slides
Delhi metro rail corporation slides slides
 
Metro station documentation
Metro station documentationMetro station documentation
Metro station documentation
 
36551105 delhi-metro
36551105 delhi-metro36551105 delhi-metro
36551105 delhi-metro
 
The delhi-metro-project
The delhi-metro-projectThe delhi-metro-project
The delhi-metro-project
 
Shivam pajpati pptx presebntation
Shivam  pajpati pptx presebntationShivam  pajpati pptx presebntation
Shivam pajpati pptx presebntation
 
Train management system
Train management systemTrain management system
Train management system
 
Rail Simulation System
Rail  Simulation SystemRail  Simulation System
Rail Simulation System
 
Rabi Kumar Purohita
Rabi Kumar PurohitaRabi Kumar Purohita
Rabi Kumar Purohita
 
DMRC Telecom Internship
DMRC Telecom InternshipDMRC Telecom Internship
DMRC Telecom Internship
 
Dmrc PIDS/PAS Training
Dmrc PIDS/PAS TrainingDmrc PIDS/PAS Training
Dmrc PIDS/PAS Training
 
DMRC_COLLEGE_REPORT
DMRC_COLLEGE_REPORTDMRC_COLLEGE_REPORT
DMRC_COLLEGE_REPORT
 
Backcaster Final Slide
Backcaster Final SlideBackcaster Final Slide
Backcaster Final Slide
 
[Challenge:Future] New Metro Interior Design An innovative, simple yet effec...
[Challenge:Future] New Metro Interior Design  An innovative, simple yet effec...[Challenge:Future] New Metro Interior Design  An innovative, simple yet effec...
[Challenge:Future] New Metro Interior Design An innovative, simple yet effec...
 
Mr. roger dirksmeier active fire protection in railway vehicles as ‘compens...
Mr. roger dirksmeier   active fire protection in railway vehicles as ‘compens...Mr. roger dirksmeier   active fire protection in railway vehicles as ‘compens...
Mr. roger dirksmeier active fire protection in railway vehicles as ‘compens...
 
Advance Signalling System-Rajbansh
Advance Signalling System-RajbanshAdvance Signalling System-Rajbansh
Advance Signalling System-Rajbansh
 
Metro Signalling Revolution in India
Metro Signalling Revolution in IndiaMetro Signalling Revolution in India
Metro Signalling Revolution in India
 

Semelhante a Ppt on DMRC

Metrolite India LRT Dr Namrita Kalsi DMRC
Metrolite India LRT Dr Namrita Kalsi DMRCMetrolite India LRT Dr Namrita Kalsi DMRC
Metrolite India LRT Dr Namrita Kalsi DMRCDr. (Ar.) Namrita Kalsi
 
Manual de tecnoloxia
Manual de tecnoloxiaManual de tecnoloxia
Manual de tecnoloxiaCousasdoCole
 
NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
 NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATIONINDUSTRIAL ENGINEERING
 
INDUSTRIAL_TRAINING_REPORT_ON_DELHI_METR.doc
INDUSTRIAL_TRAINING_REPORT_ON_DELHI_METR.docINDUSTRIAL_TRAINING_REPORT_ON_DELHI_METR.doc
INDUSTRIAL_TRAINING_REPORT_ON_DELHI_METR.docAbhishekKumar408309
 
mrtscp2018-190316162158 mass rapid transit system.pdf
mrtscp2018-190316162158 mass rapid transit system.pdfmrtscp2018-190316162158 mass rapid transit system.pdf
mrtscp2018-190316162158 mass rapid transit system.pdfchhananpooja8827
 
MASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMMASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMChandanPadhi3
 
Noida Metro Rail Corporation
Noida Metro Rail CorporationNoida Metro Rail Corporation
Noida Metro Rail CorporationAnkit Chaudhary
 
electric loco shed lalllguda
electric loco shed lalllgudaelectric loco shed lalllguda
electric loco shed lalllgudazakriya furkhan
 
Summer Internship Report.pptx
Summer Internship Report.pptxSummer Internship Report.pptx
Summer Internship Report.pptxDeepak37004
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training reportALOK RAJ
 
Railway Training Report
Railway Training ReportRailway Training Report
Railway Training ReportVishal Singh
 
Communication Based Train Control (Mobile Train Radio Communication)
Communication Based Train Control (Mobile Train Radio Communication)Communication Based Train Control (Mobile Train Radio Communication)
Communication Based Train Control (Mobile Train Radio Communication)Suraj Talreja
 

Semelhante a Ppt on DMRC (20)

ETCS
ETCSETCS
ETCS
 
Metrolite India LRT Dr Namrita Kalsi DMRC
Metrolite India LRT Dr Namrita Kalsi DMRCMetrolite India LRT Dr Namrita Kalsi DMRC
Metrolite India LRT Dr Namrita Kalsi DMRC
 
A seminar on ir coaches2018
A seminar on ir coaches2018A seminar on ir coaches2018
A seminar on ir coaches2018
 
Innovation in gcc-railway
Innovation in gcc-railwayInnovation in gcc-railway
Innovation in gcc-railway
 
final report
final reportfinal report
final report
 
Manual de tecnoloxia
Manual de tecnoloxiaManual de tecnoloxia
Manual de tecnoloxia
 
NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
 NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
 
INDUSTRIAL_TRAINING_REPORT_ON_DELHI_METR.doc
INDUSTRIAL_TRAINING_REPORT_ON_DELHI_METR.docINDUSTRIAL_TRAINING_REPORT_ON_DELHI_METR.doc
INDUSTRIAL_TRAINING_REPORT_ON_DELHI_METR.doc
 
mrtscp2018-190316162158 mass rapid transit system.pdf
mrtscp2018-190316162158 mass rapid transit system.pdfmrtscp2018-190316162158 mass rapid transit system.pdf
mrtscp2018-190316162158 mass rapid transit system.pdf
 
MASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMMASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEM
 
Noida Metro Rail Corporation
Noida Metro Rail CorporationNoida Metro Rail Corporation
Noida Metro Rail Corporation
 
electric loco shed lalllguda
electric loco shed lalllgudaelectric loco shed lalllguda
electric loco shed lalllguda
 
Summer Internship Report.pptx
Summer Internship Report.pptxSummer Internship Report.pptx
Summer Internship Report.pptx
 
Dubai metro
Dubai metroDubai metro
Dubai metro
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
A Review on
A Review onA Review on
A Review on
 
PPP
PPPPPP
PPP
 
Railway Training Report
Railway Training ReportRailway Training Report
Railway Training Report
 
JMRC PRESENTATION
JMRC PRESENTATIONJMRC PRESENTATION
JMRC PRESENTATION
 
Communication Based Train Control (Mobile Train Radio Communication)
Communication Based Train Control (Mobile Train Radio Communication)Communication Based Train Control (Mobile Train Radio Communication)
Communication Based Train Control (Mobile Train Radio Communication)
 

Mais de Urvashi Khandelwal

LEACH Cluster-based Routing Protocol for Wireless Sensor Networks
LEACH Cluster-based Routing Protocol for Wireless Sensor Networks LEACH Cluster-based Routing Protocol for Wireless Sensor Networks
LEACH Cluster-based Routing Protocol for Wireless Sensor Networks Urvashi Khandelwal
 
presentation on rotor balancing
presentation on rotor balancing presentation on rotor balancing
presentation on rotor balancing Urvashi Khandelwal
 
training report on embedded system and AVR
training report on embedded system and AVRtraining report on embedded system and AVR
training report on embedded system and AVRUrvashi Khandelwal
 

Mais de Urvashi Khandelwal (6)

LEACH Cluster-based Routing Protocol for Wireless Sensor Networks
LEACH Cluster-based Routing Protocol for Wireless Sensor Networks LEACH Cluster-based Routing Protocol for Wireless Sensor Networks
LEACH Cluster-based Routing Protocol for Wireless Sensor Networks
 
ppt on inveters
ppt on invetersppt on inveters
ppt on inveters
 
Report on inverters
Report on invertersReport on inverters
Report on inverters
 
presentation on rotor balancing
presentation on rotor balancing presentation on rotor balancing
presentation on rotor balancing
 
training report on embedded system and AVR
training report on embedded system and AVRtraining report on embedded system and AVR
training report on embedded system and AVR
 
embedded system and AVR
embedded system and AVRembedded system and AVR
embedded system and AVR
 

Último

Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spaintimesproduction05
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 

Último (20)

Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 

Ppt on DMRC

  • 1. DELHI METRO RAIL CORPORATION (DMRC) SUMMER TRAINING PRESENTAION
  • 2. CONTENT DMRC -INTRODUCTION -METRO MAP & ROUTES -ROLLING STOCK -RS2 TRAIN -TIMS(TRAIN INTEGRATED MANAGEMENT SYSTEM) -BRAKES AND PNEUMATIC SYSTEM -AIR SUPPLY SYSTEM -DOORS
  • 4. INTRODUCTION  Planning for the metro Started in 1984,when the Delhi Development Authority and the Urban Arts Commission Came up with a proposal for developing a multi-modal transport system for the city . The Government of India and the Government of Delhi jointly set up the Delhi Metro Rail Corporation(DMRC) in 1995.Construction Started in 1998,and The first Section, on the Red Line, opened in 2002, Followed by Yellow Line in 2004, The Blue Line in 2005,its branch line in 2009, The Green and Violet Lines in 2010 and The Delhi Airport Metro Express in 2011
  • 5.
  • 6. The network comprising six lines with 140 metro stations.
  • 7. Rolling stock  The first wave of Rolling stock was manufactured by a consortium of companies comprising ROTEM, Mitsubishi Corporation and Mitsubishi Electric Corporation. Initial sets were built by ROTEM in South Korea, with later examples Completed in India by public sector undertaking Bharat Earth Movers Limited(BEML).  BEML is also responsible for the manufacturing coaches under technology transfer agreement. The air-conditioned trains consist of four 3.2m wide ,stainless steel, lightweight ,although six and eight coaches is possible. The trains have automatic doors, secondary air suspension and brakes controlled by microprocessor. Delhi Metro has fleet of 280 coaches, which DMRC Runs as 70 trains everyday. Each train can accommodate about 1,500 people,240 seated. Maximum speed is 80km/h (50mph),with a 20-second dwell time at stations.  Train depots are located at Khyber Pass , Najafgarh, Shastri Park , Mundaka , Sarita Vihar and Yamuna Bank.
  • 8.  A Phase I board gauge train, supplied by Hyundai Rotem-BEML(RS-1).  A Phase II board gauge train, supplied by Bombardier(RS-2).  The Metro Rolling Stock of two different gauges. Phase I lines use 1,676mm (5.499ft) broad gauge rolling stock, while three Phase II Lines use 1,435mm (4,708 ft)standard gauge rolling stock. Broad gauge The broad Gauge rolling stock is manufactured by two major suppliers Hyundai Rotem , Mitsubishi Corporation and MELCO . The coaches were initially built in South Korea by ROTEM. Standard gauge The initial trains were made in Germany and Sweden, the remainder will be built at Bombardier’s factory in Savli , near Vadodara. The coaches posses several improved features like Closed Circuit Television(CCTV) Cameras , charging points in all coaches for cell phones and laptops, improved air conditioning to provide a temperature of 25 degree Celsius even in packed conditions and heaters for Winter.
  • 9. RS-2 TRAIN OVERVIEW TRAIN FORMATION: One train set consists of 4/6/8 cars. Three types of cars (DT,T and M) are used to form a train set. At each end is a “DT” car which is a trailer car with driver’s cab and pantograph. The other type is an “M” car, which is a motor car without pantograph and “T” car with pantograph.
  • 10. -4 car The 4-car trains consist of driving trailer car with pantograph (DT) and motor car (M), in the following configuration DT-M + M-DT. - 6 car The 6 car train consists of driver trailer car with pantograph (DT), motor car (M) and trailer car with pantograph (T), in the following configuration DT- M + T-M + M-DT
  • 11. - 8 car The 6 car train consists of driver trailer car with pantograph (DT), motor car (M) and trailer car with pantograph (T), in the following configuration DT-M + T-M + T-M + M-DT. SALIENT FEATURES: • Broad gauge (1.676 metre ) • 25 KV Supply Voltage System • Light weight stainless steel structure • Three phase A.C. induction motor • Fail safe braking system with regenerative braking.
  • 12. TYPES OF COUPLINGS BETWEEN COACHES 1 Front Automatic Coupling (FAC)-is used at both ends of the metro train i.e., in front of the DT car & is very useful in rescue operation 2 Semi- permanent Coupling (SPC)-between the DT and M cars. Since the DT and M cars serve as one unit, they are not usually required to be separated. Hence, a semi- permanent coupling is used between the two. 3 Intermediate Automatic Coupling (IAC)-This coupling is used between two M cars in order to facilitate easy engagement of coaches especially when the number of coaches has to be increased.
  • 13. Train Integrated Management System  Train Integrated Management System (TIMS) provides a centralized function to monitor the train borne systems and devices. It also provides the operators interface via a Video Display Unit mounted on the operator desk. Additional information about other systems can be checked by driver by touching the soft keys at the bottom of the screen display.
  • 14. Brake and pneumatic system • The brake system is a combination of mechanical and electronic devices operated by compressed air, arranged in a system and controlled manually, pneumatically or electronically by means of which the motion of cars is retarded or stopped. • The brake system includes- • Friction brake • Electro Dynamic (ED) brake • Parking brake • Holding brake • Wheel slide protection (WSP)
  • 15. Air Supply System The air supply system supplies compressed air to consumers, such as the brake system, secondary suspension and pantographs. The main air supply unit is the subsystem of train and is fitted in the underframe of each M-car which supplies compressed air to the complete train via the Main Reservoir Pipe (MRP). Air supply unit basically consists of: • Compressor • Air treatment • Filter units
  • 16. DOORS A door in a train is a panel or barrier, usually hinged or sliding, that is used to cover an opening in a train. Exterior doors are doorways that allow entrance or exit from a train. There are three types of exterior doors available in RS2:  Cab or driver’s door  Passenger door  Detrainment/emergency door  Partition door  The function of the cab or driver’s door is to provide access to the cab for the driver. Only DT car is equipped with two cab doors.
  • 17. Passenger door  The function of the passenger door is to prevent passengers from entering or leaving the train.  Each car has 8 passenger doors  Each door consists of two door leaves  Sliding externally on the car body wall  Electrically operated
  • 18. Detrainment/Emergency door  The function of the detrainment door is to provide evacuation of passengers and crew to track in case of emergency.  When detrainment door opens it becomes an emergency ramp from cab floor level down to track level.  The detrainment door is bolted into the cab structure.  The door is located in the front of the cab.  Free opening width 750 mm.  Free opening height 1900 mm.