Contents

   SD : Background and Objectives


   SD : Proposal vs Final plan


   Tender gateways : SD and BBBEE


   TPT Equipment acquisitions




                                    2
A lack of investment in infrastructure has impacted the capacity and
 capability of the local industry to do business in South Africa and
 subsequently economic growth
        Historical Background                                  Impact on industry
          There has been a significant decline in SA
           local industry over the past years largely due
           to a lack of consistent investment in
           infrastructure                                      The overall impact both from the lack of
                                                                investment in infrastructure and the
                    Ratio of Gross Fixed Capital                suppression of a large percentage of the
                    Formation to GDP (1970-2009)                population from partaking in the economy
                                                                had a significant impact on local industry:
                  30

                  25                                                Loss of key skills and key capabilities
                  20                                                Decrease in manufacturing
                                                                     capabilities and thereby export
                  15
                                                                     potential
                  10
                                                                    Lack of job creation opportunities
                   5                                                Increase in the costs of doing
                   0                                                 business due to higher transportation
                        1974      1982   1990   1998   2006          costs and longer lead times
         Furthermore, due to significant historical
          political and social imbalances a large portion
          of the SA population were unable to
          participate meaningfully in the economy
          thereby creating a gap in wealth distribution


Source: SARB Quarterly Bulletin                                                                                3
The key difference between CSDP and NIPP is that CSDP allows for the
investment to take place in a related industry
                                 NIPP                                CSDP


   Effective Date      • Prior to February 2008                  • February 2008 Onwards



 Transaction target      • 30 % > R100 million                    • 30 % > R100 million



      Focus            • Non Related Industry                    • Related Industry



   Reporting &
                       • DTI                                     • SOE  DPE
    Tracking



                        • Not Part of Evaluation Criteria
      Part of
                        • Not part of SOE responsibility –       • Part of Evaluation
    Negotiation
                          Done by DTI and the Supplier             Criteria




         Spend is channeled into relevant industry development which Transnet can influence
                                                                                              4
Transnet will use its sphere of control to contract with OEM’s as tier-1
suppliers
      Transnet’s CSDP phase one Strategic Approach will be to focus on Tier 1 suppliers to
      assist them in engaging local Tier 2 suppliers


 Supplier Development
       Category
                                               Supplier Base
                                              Sphere of Control
 Transnet’s CSDP




                                                                    CSDP Development:
      Focus




                                                                    Port Equipment
                                                    Tier 1
                                                    Systems –
                                                   Subsystems
                      CSDP Focus
                       Suppliers’
  Transnet’s ED and




                                                    Tier 2
                                                                        s
      PP Focus




                                                  Assemblies
                           Suppliers’ Focus




                                                    Tier 3
                                                  Components


                                              Sphere of Influence           BBBEE Focus
                                                    Other
                                                                            ED Development

 **ED – Enterprise Development / PP – Preferential Procurement
                                                                                             5
Transnet will apply their influence and current resources to actively align
their existing SD activities with the objectives of NGP as reflected below

                                              iSCM/Supply Chain


 Quantum Leap Focus                                                       New growth path

 • Increase productivity                                                  • Increase employment
                                                                            intensity of the
    and efficiency                                                          economy
 • Volume growth
                                                                          • Reduce the cost to
 • Capital investment                                                       improve infrastructure
                                                     Regulatory             and address
 • Financial stability
                                                                            competiveness
                                             Increase
 • Funding                                                      Volume
                                           productivity
                                                                growth    • Balanced spatial
 • Human capital                           & efficiency
                                                                            development of rural
                                                    Improving
 • SHEQ                                                       Human         areas and poorer
                                          SHEQ       customer Resources
 • Regulatory                                                               provinces’
                                                      service
 • Improve customer                          Financial        Capital     • Reduce the carbon
                                           sustainability   investment      intensity of the
    service
                                                                            economy
                                                      Funding
                                                                          • Create opportunities in
                                                                            changing regional and
                                                                            global environments

                                                                          • Increase black
                                                                            ownership and
                                                                            entrepreneurship
                                                                                                6
Source: Transnet Corporate Plan 2011/12
A shared aspiration for SD was created by merging Governments and
Transnet’s objectives

          Government’s Objectives                                              Transnet’s Objectives

                                                                      • Volume and Revenue Growth

 • Increase the percentage of the population                          • Creating Capacity




                                                                                                                Objectives
                                                                                                                Corporate
     involved in quality formal employment                            • Operational Efficiency
                                                          Vision
     opportunities                                                    • Financial Strength

 • Address wealth distribution disparities in the                     • SHEQ

     country by ensuring the participation of
     previously disadvantaged groups in the                           • Promote the

     economy                                                            1) Empowerment of previously




                                                                                                                Objectives
                                                             SD
 • Maintain a healthy balance of payments position       Principles     disadvantaged groups




                                                                                                                   SD
     by reducing the reliance of South African                          2) Increase in local content

     industries on imports                                              3) Improvement of skills and create

 • Increase the participation of public enterprises in                  opportunities for sustainable jobs

     increasing levels of real fixed capital




                                                                                                                Guiding Principles
     formation                                            Values      • Security of Supply




                                                                                                                  Supply Chain
 • Develop key skills and capabilities required                       • Reduction in Costs

     for specific industries where these do not exist                 • Reduction in Working Capital
                                                                      • Enhanced Preferential Procurement
                                                                        and Enterprise Development
                   External Analysis                                                        Internal Analysis

Source: Transnet Corporate Plan, NGP, B-BBEE, CSDP
Supplier Development (SD)

• Supplier development refers to the improvement in the socio-
   economic environment by creating competitive local suppliers via
   Competitive Supplier Development and other initiatives. This results in
   a local supply base that can eventually be competitive to market its
   goods on the international market leading to increased exports

• Transnet’s SD strategy aims to holistically satisfy all of Government’s
   legislation and requirements in respect of identifying and undertaking
   opportunities through specific initiatives




                                                                             8
CSDP opportunities are generally triggered for transactions equal or
   exceeding USD10 million for all tenders after February 2008

         Trigger for a CSDP transaction:                                                               Criteria to be considered to initiate a CSDP
                                                                                                       transaction:

                                                                                                       • To avoid capital leakage;
                                                                                                       • When an opportunity to develop a local industry
                                                                                                       within Transnet’s supply chain; and / or
                                                                                                       • When a limited local supply base exists but the
                                                                                                       potential to develop existing suppliers is evident; and
                                                                                                       / or
                                                                                                       • Where there is a strong opportunity for IP and
                                                                                                       skills transfer to local suppliers and / or Transnet for
         • SOE influences OEM/multinational for CSDP                                                   which the capacity does not presently reside in South
           transactions .                                                                              Africa
         • The following will trigger a CSDP transaction which
           involves the purchase of services and goods:
                 - Single New Contract with an imported content                                        Tender Process:
                   portion that is equal to or exceeds USD 10
                   million*;                                                                           • All contracts sent to the market equal or exceeds
                 - Contract with a renewable option clause, should                                     R70million* will include a CSDP obligation as part
                   the option be exercised, the total value of the                                     of the tender,
                   imported content would be equal to or exceed                                        • A CSDP Proposal must be submitted as part of
                   USD 10 million*                                                                     the tender
                                                                                                       •A CSDP Plan must be signed submitted within 30
         - No CSDP obligations (after Feb 2008) may be claimed for a
         NIPP – Double Counting                                                                        days to Transnet after signing the Letter of Intent
         All CSDP obligations will be considered as standalone -obligations                            (LOI) and be agreed and signed within 15 days
         for each specific tender;                                                                     thereafter by both parties
         - Where a CSDP obligation has not been mutually agreed between
         Transnet and the Supplier after February 2008 a CSDP
         Reconciliation Plan (to date) must be submitted by the Supplier to
         Transnet and agreed and signed off by both parties.

* Total Value planned to spend with a Supplier - (USD 10 million ~ R70 million.
** All CSDP Capability and capacity building in SA efforts initiated by the Supplier since the award of the contract to date must be included into the plan.
                                                                                                                                                               9
The IC3 Matrix is used as the basic framework to plot the SD opportunities
                      identified in its appropriate SD initiative bucket

                         IC3 Supplier Development Classification Matrix2                                                                                             Not currently a focus area
                       High




                                                                     Programmatic1
                                                                                                Industrialisation




                                                                                                                      Strategic Importance to Transnet
                                                                                                                                                         The IC3 supplier development
                                                                                                                                                         classification matrix assists in
                                                                     Strategic                                                                           categorising opportunities
Industrial leverage




                                                                                                                                                         according to their industrial
                                                                                                                                                         leverage, value leverage and
                                                                                                Capability and                                           strategic importance to
                                                                                                capacity                                                 Transnet
                                                                                                building in SA
                                                                                                and Supplier                                             Once opportunities are
                                                                                                Development                                              identified it will be possible to
                                       Small
                                                                                                                                                         identify the tools that should
                                     Enterprise                        Focused                                                                           be implemented to maximise
                                                                                                                                                         the full supplier development
                                    Development
                                                                                                                                                         potential from the
                                                                                                Skills                                                   opportunities
                       Low




                                                                                                Development
                              Low                                                     High

                                                  Value leverage
                  Value Leverage refers to transactions where the financial scale of the transaction allows the buyer the opportunity to negotiate supplier
                  development.
                  Industrial Leverage refers to transactions whereby the nature of the procurement is such that the scale and the industrial complexity of the
                  item being purchased allows for local supply chain development around a particular industry.
                  Strategic Importance to Transnet refers to the extent to which the product to be procured has a impact on Transnet’s core business.

              1 This      could be further refined in the future through the DPE Programmatic Policy
              2Adapted       from the DPE Supplier Classification Matrix focused on Increased Competitiveness, Capability and Capacity.
                                                                                                                                                                                              10
Strategic objectives within each quadrant have been identified
IC3 quadrant               Strategic Objective                                                                   Key Outcomes
                            • Assist Government achieve their industrialisation                                   •   Industrialisation
                              objectives through development of local supplier base to                            •   Technology transfer
Programmatic
                              increase the cost efficiency of fleet procurement, support                          •   Job creation/preservation
                              and maintenance                                                                     •   Skills Development
                                                                                                                  •   Downstream Supplier Development
                                                                                                                  •   Increased exports
                                                                                                                  •   Reduction in capital leakage

                            • Influence multinational organisations toward initiatives  • Capability and capacity building in
                              that lead to the development of local downstream            SA
    Strategic                 suppliers through large-scale SOE procurement in order to • Increased Technology transfer
                              develop a competitive local supplier base focusing on     • Job creation/preservation
                              Rolling stock, Port Equipment and Infrastructure          • Skills development

                            • Assist local suppliers to improve their performance,                                •   Job Creation/preservation
                              enhance their existing production & skills capabilities by                          •   Empowerment
     Focused
                              placing increased emphasis on benefiting previously                                 •   Skills Development
                              disadvantaged individuals and rural development                                     •   Rural Development
                            • Provide a platform through which local suppliers can test
                              their local innovations for export promotion

                            • Assist local suppliers to improve their skills by placing                           •   Empowerment
    Small                     increased emphasis on benefiting previously                                         •   Rural Development
  Enterprise                  disadvantaged individuals and rural development in line                             •   Skills Development
 Development                  with the BBBEE strategy                                                             •   Job Creation/preservation

Transnet has to develop an internal policy to support product development and funding as the current innovation policy drafted by the DPE only allows for testing
local products in the Transnet operating environment
Source: Team analysis
                                                                                                                                                                11
Figure 2: Transnet value capture through supplier influence


                                              Programmatic                 Strategic                     Focused                  Small ED

                                                                                                                                          Decreasing
                                                    • Industrialisation                                                                   emphasis on
                                                                                                                                          evaluation
               Programmatic                                                                                                               criteria
                                                    • localisation               • Localisation
                                                                                                                                          categories

                                                    • Technology                 • Technology                                            Sphere of
                                                      transfer/                    transfer/                                             influence
                                                      sustainability               sustainability
                  Strategic
                                                    • Job creation/              • Job creation /             • . Job creation/
                                                      preservation                 preservation                 preservation



                                                    • Skills                     • Skills                     • Skills
                                                      development                  development                  development
                   Focused

                                                    • Small business             • Small business             • Further
                                                      promotion                    promotion                    recognition*

                                                                                                              • Rural
                                                    • Further                    • Further
                                                                                                                development
                                                      recognition*                 recognition*                                      • Further
                                                                                                                and regional
             Small Enterprise                                                                                                          recognition*
                                                                                                                integration
              Development
                                                    • Rural                      • Rural
                                                      development                  development                • Small business
                                                                                                                                     • Job
                                                      and regional                 and regional                 promotion
                                                                                                                                       preservation
                                                      integration                  integration
   *Points allocated in further recognition of certain components of BBBEE in line with Transnet and government objectives



** Indicative and varies on business and Macro Economic need
                                                                                                                                                        12
The recommended SD categories are based on the alignment with
government objectives
  Category                  Description

                            • Developing local capability and efficiency through : investment in plant, increasing the number
        Capability and        of products bought locally and qualifying suppliers to meet international standards.
        capacity building   • This criterion refers specifically to industrial capability building that focuses on value-add
        in SA                 activities of the local industry through manufacturing or service-related functions.


        Technology
                            • Refers to process, know-how and Intellectual Property associated with developing a
        transfer/
                              competitive local supplier post the current transaction
        Sustainability


                            • Refers to skills transfer with an emphasis on the accumulation of knowledge and experience
        Skills              • Generally targeted toward sector specific skills development with a focus on artisan and
        development           technical skills


                            • Refers to an increase or preserve in the number of jobs due to the award of business from
        Job creation/         Transnet
        preservation        • Favouring more labour intensive methods for job creation
                            • Jobs include both skilled and unskilled


       Small business       • Encourage the growth and expansion of small businesses and start ups through procurement
       promotion              and support mechanisms




Source: Team Analysis
                                                                                                                                13
SD and BBBEE Requirements




      Contents

         SD : Background and Objectives


         SD : Proposal vs Final plan


         Tender gateways : SD and BBBEE


         TPT Equipment acquisitions




                                          14
Summary: SD Process



                                                                           Successful                         SD plan to be
         Compile proposal                    Transnet                      tenderer to                        agreed upon by
         as part of SD plan                  evaluates supplier            compile SD                         Transnet and
                                             SD proposal                   plan                               supplier



Responsible
              Supplier                    Transnet                       Supplier & Transnet               Supplier& Transnet
                                                                     • Only a successful bidder
     • The supplier is expected to   • SD (Proposals)                 will be required to                  • Once the SD plan has
       formulate a SD proposal         responses will be              complete a detailed SD                 been finalised with
       to identify the                 evaluated on their ability     Plan and deliver it to                 Transnet, the supplier
       opportunities that the          to leverage Transnet’s         Transnet in 30 days after             will initiate the plan
       supplier will pursue            long term procurement in       signing the LOI                      • The supplier will be
     • The SD Proposal should          order to promote              • Both the Supplier ad                  required to report
       address the main areas          Capability and capacity         Transnet must agree and              quarterly on the
      Capability and                  building in SA in order to     sign the final SD plan 30             progress being made
         capacity building in SA;      increase the capability and    days thereafter                        against the plan, the
         technology                   capacity, responsiveness      • The SD Plan will have to              attainment of milestones
         transfer/sustainability;      and competitiveness of          outline the:                          and the reasons (if any)
         skills development;          South African supplier              – Type of Capability and          that goals are not being
                                                                             capacity building in SA
         small business               industries                            effort that will be
                                                                                                             met
         promotion                   • The SD Programme’s                    pursued,                      • Transnet will supply
        job                           ability to promote skills           – Anticipated investment,         guidelines to the
                                                                           – Description of products to
         creation/preservation         transfer, Capability and              be produced,
                                                                                                             reporting format required
                                       capacity building in SA             – Skills transfer ,as well as     for the quarterly reports
                                       and the sustainability of           – Processes, systems,
 NOTE:                                 the venture will all be
                                                                             technologies and
 • Both a SD Proposal and SD                                                 equipment required
                                       taken into account during
 Plan must be completed .                                                                                                           15
                                       evaluation
SD Plan: Capability and capacity building in SA
Summary – Supplier (x/x)
    Example
Category                Description        Sub-initiative                                                  Key KPI
A                       Total Summary      • 1.0 xxx                                                       • R xxx.xm
    Capability and                         • 2.0 xxx                                                       • R xxx.xm
    capacity                               • 3.0 xxx                                                       • R xx.xm
    building in SA
                                           • Total Capability and capacity building in SA Value            • R xxx.xm


                        1.0 xxxx           • xxxx                                                          • Rx.xm



                        2.0 xxxx           • xxxx                                                          • Rx.xm


                         3.0 xxxx          • xxxx                                                          • Rx.xm




Transnet Authorised Signatory       Date                            Supplier Authorised Signatory   Date



Name / Title                                                        Name / Title                                        16
SD Plan: SD Capability and capacity building in SA Initiative (x/x)

Initiative Description:                Target      KPI

 Detailed Description                                             Transnet Lead:
                                       R x.x*      ZAR
                                                                  TPT Lead:
                                                   # of reports   Supplier Lead:
                                       x
                                                   completed      Supplier Lead:
                                       TBD at      # of           Start Date:
                                       selection   components
                                       meeting     selected       End Date:

                                                                  Reporting Frequency:            Quarterly (xx May CY, xx, xx
                                                                  (one month prior to DPE         August CY, xx November CY
                                                                  report)                         and February (following Year)
                                                                                                  xx)




Transnet Authorised Signatory   Date                              Supplier Authorised Signatory      Date



Name / Title                                                      Name / Title
                                                                                                                                  17
SD Plan: SD Capability and capacity building in SA Initiative (x/x)

                         Year                       2011                                       2012                                          2013
   Activity                     1   2   3   4   5   6   7   8   9 10 11 12 1   2   3   4   5   6   7   8   9 10 11 12 1   2   3    4     5   6   7   8   9 10 11 12

   xxx

   xxx

   xxx


   xxx

   xxx


   xxx

   xxx


   xxx

   xxx


   xxx


   xxx

   xxx

   xxx

   xxx

   xxx




Transnet Authorised Signatory       Date                                               Supplier Authorised Signatory              Date



Name / Title                                                                           Name / Title

                                                                                                                                                               18
SD and BBBEE Requirements




      Contents

         SD : Background and Objectives


         SD : Proposal vs Final plan


         Tender gateways : SD and BBBEE


         TPT Equipment acquisitions




                                          19
A three step evaluation strategy will be used in the evaluation of the
equipment proposals
          Evaluate for                  Evaluate for                      Evaluate for   Evaluate per
           > Threshold                   >Threshold                       >Threshold     weighting

   1                            2                                     2                     3

  SD / BBBEE                   Eligibility                        Technical              Price                   Award tender to
                                                                                         SD                      successful supplier
                                                                                         BBBEE
             Minimum                         Minimum                       Minimum
             SD/BBBEE                        Eligibility                   Technical
              criteria                        criteria                      criteria

 Equipment                      SD / BBBEE                 Eligibility       Technical             Evaluation weighting (%)
                                threshold                  threshold         threshold                                         3

                                                                                           Price           SD       BBBEE
 Main offer and main                                                                                                (Scorecard and
                                         1                        2                 2                               Further
 offer plus options                                                                                                 recognition
                                                                                                                    criteria)

 RTG Cranes (Proposal A),            40%                       100%               80%       60             20             20
 STS Cranes (Proposal B) and
 RTG Cranes and STS Cranes
 (Proposal C)


 Note: The tender indicates that the SD commitment is aimed at achieving at
 least 30% of the supplier’s tender value as part of the tender bid
 If no tender passes the 2nd stage technical evaluation, the threshold will be
 reduced from 80% to 70%


                                                                                                                                     20
SD and BBBEE Requirements




      Contents

         SD : Background and Objectives


         SD : Proposal vs Final plan


         Tender gateways : SD and BBBEE


         TPT Equipment acquisitions




                                          21
7 Year Capital expenditure plans



   • Transnet’s capital investment over the next 7 years (2012/13 to 2018/19)
     totals R300billion
   • Transnet Port Terminals will be undertaking R33billion (11%) of these projects
     over the next 7 years
   • TPT’s 7 year investment plan will comprise mainly of the following
     acquisitions:
     o Ship to Shore Cranes
     o Rubber-Tyred Gantry Cranes
     o Straddle Carriers
     o Ship Loaders
     o Ship Unloaders
     o Mobile Harbour Cranes
     o Haulers
     o Trailers
     o Reach Stackers
     o Empty Container Handlers




                                                                                      22
Equipment acquisitions : currently in procurement cycle phase


 Item    Project
 1       4 x STS Cranes – Ngqura
 2       18 x RTG Cranes – Ngqura
 3       DGPS (Digital Global Positioning System) - Durban
 4       Supply and installation of a monitoring system for refrigerated containers (Reefers)
         at Cape Town (CTCT & CTMPT), Port Elizabeth (PECT), Ngqura (NCT) and Durban
         Container terminals (Pier1 and Pier2).
 5       Manufacture, supply, delivery and commissioning of 74 Fifth wheel haulers for RBY
 6       Manufacture, supply, delivery and commissioning of forklifts – RBY
         (3x42T;6x32T;10x18T;11x8T); EL (4x7T) and NGQURA (2x2T)
 7       Manufacture, supply, delivery and commissioning of 6 Reachstackers – 2 RBY;2
         NCT;1 Pier 1 and 1 CTNMPT




                                                                                                23
Equipment acquisitions : SD plans being finalised


  Item   Project
  1      1 x Mobile harbour crane for CTN
  2      Design review services
  3      Manufacture, supply, delivery and commissioning of 14 haulers – 4 Saldanha;10
         Pier 1
  4      Manufacture, supply, delivery and commissioning of 9 empty container handlers – 2
         CTN;2 NCT; 5 DCT

  5      Manufacture, supply, delivery and commissioning of 48 haulers for Ngqura




                                                                                             24
Equipment acquisitions : SD plans committed


 Item     Project                       SD value          SD committed
                                        committed (R’m)   %age of
                                                          Contract value
 1        1 x Ship unloader                   15.52            12%
 2        28 x Straddle Carriers              23.00            10%
 3        7 x Tandem lift STS Cranes          47.00            6%
 4        6 x Mobile Harbour Cranes           58.29            23%

 5       33 x Haulers                         4.07              9%
 6       8 x Reachstackers                    18.12            16%




                                                                           25
Equipment acquisitions planned for the remainder of this year (to Mar
2013)

  Item           Project
  1              Ship unloaders for Bulk terminals
  2              Rail Mounted Gantry Cranes for Container Terminals
  3              Wharf Cranes




                                                                        26

Mais conteúdo relacionado

Mais procurados

Preview Deck | Impending Contract Renewals
Preview Deck | Impending Contract RenewalsPreview Deck | Impending Contract Renewals
Preview Deck | Impending Contract RenewalsEverest Group
 
IT Governance/Office of the CIO Trends Stki Summit 2009
IT Governance/Office of the CIO Trends Stki Summit 2009IT Governance/Office of the CIO Trends Stki Summit 2009
IT Governance/Office of the CIO Trends Stki Summit 2009Galit Fein
 
Cobre Panama Basic Engineering & Financing Plan
Cobre Panama Basic Engineering & Financing PlanCobre Panama Basic Engineering & Financing Plan
Cobre Panama Basic Engineering & Financing PlanDogger2000
 
Key Banc Conference Final[1]
Key Banc Conference Final[1]Key Banc Conference Final[1]
Key Banc Conference Final[1]BSTRINGE
 
Outsourcing sample
Outsourcing sampleOutsourcing sample
Outsourcing samplePowerViz
 
華寶8078
華寶8078華寶8078
華寶8078yo9889
 
2009 Apollo Group Strategic Supplier Summit
2009 Apollo Group Strategic Supplier Summit2009 Apollo Group Strategic Supplier Summit
2009 Apollo Group Strategic Supplier Summitplbliss
 
200612 nolan life&annuity-surveyfindings
200612 nolan life&annuity-surveyfindings200612 nolan life&annuity-surveyfindings
200612 nolan life&annuity-surveyfindingsSteven Callahan
 
Vas project RSC presentation final
Vas project RSC presentation finalVas project RSC presentation final
Vas project RSC presentation finalEva Law
 
Presentation template
Presentation templatePresentation template
Presentation templateBaba Thakur
 
IBM Journey To A Value Integrator
IBM Journey To A Value IntegratorIBM Journey To A Value Integrator
IBM Journey To A Value Integratordavid_hawkins
 
Service Excellence Alignment
Service Excellence AlignmentService Excellence Alignment
Service Excellence AlignmentSteveSussman
 
Proj desresdeliv gsw
Proj desresdeliv gswProj desresdeliv gsw
Proj desresdeliv gswwoznite65
 

Mais procurados (17)

Snapshot of IFRS Taxonomy
Snapshot of IFRS TaxonomySnapshot of IFRS Taxonomy
Snapshot of IFRS Taxonomy
 
CREDAI publication
CREDAI publicationCREDAI publication
CREDAI publication
 
Preview Deck | Impending Contract Renewals
Preview Deck | Impending Contract RenewalsPreview Deck | Impending Contract Renewals
Preview Deck | Impending Contract Renewals
 
IT Governance/Office of the CIO Trends Stki Summit 2009
IT Governance/Office of the CIO Trends Stki Summit 2009IT Governance/Office of the CIO Trends Stki Summit 2009
IT Governance/Office of the CIO Trends Stki Summit 2009
 
Cobre Panama Basic Engineering & Financing Plan
Cobre Panama Basic Engineering & Financing PlanCobre Panama Basic Engineering & Financing Plan
Cobre Panama Basic Engineering & Financing Plan
 
Key Banc Conference Final[1]
Key Banc Conference Final[1]Key Banc Conference Final[1]
Key Banc Conference Final[1]
 
Outsourcing sample
Outsourcing sampleOutsourcing sample
Outsourcing sample
 
華寶8078
華寶8078華寶8078
華寶8078
 
2009 Apollo Group Strategic Supplier Summit
2009 Apollo Group Strategic Supplier Summit2009 Apollo Group Strategic Supplier Summit
2009 Apollo Group Strategic Supplier Summit
 
Smar tvt jobs eco dev
Smar tvt jobs eco devSmar tvt jobs eco dev
Smar tvt jobs eco dev
 
Carlsberg lessons learned from re-tendering an international infrastructure ...
Carlsberg  lessons learned from re-tendering an international infrastructure ...Carlsberg  lessons learned from re-tendering an international infrastructure ...
Carlsberg lessons learned from re-tendering an international infrastructure ...
 
200612 nolan life&annuity-surveyfindings
200612 nolan life&annuity-surveyfindings200612 nolan life&annuity-surveyfindings
200612 nolan life&annuity-surveyfindings
 
Vas project RSC presentation final
Vas project RSC presentation finalVas project RSC presentation final
Vas project RSC presentation final
 
Presentation template
Presentation templatePresentation template
Presentation template
 
IBM Journey To A Value Integrator
IBM Journey To A Value IntegratorIBM Journey To A Value Integrator
IBM Journey To A Value Integrator
 
Service Excellence Alignment
Service Excellence AlignmentService Excellence Alignment
Service Excellence Alignment
 
Proj desresdeliv gsw
Proj desresdeliv gswProj desresdeliv gsw
Proj desresdeliv gsw
 

Destaque

Water and Wastewater Rate Proposal 2013-2016
Water and Wastewater Rate Proposal 2013-2016Water and Wastewater Rate Proposal 2013-2016
Water and Wastewater Rate Proposal 2013-2016Chelan County PUD
 
IOW NHS Trust Building Controls Proposal
IOW NHS Trust Building Controls ProposalIOW NHS Trust Building Controls Proposal
IOW NHS Trust Building Controls ProposalKieronRyan
 
Technical Proposal Hrsa Dvta Ii
Technical Proposal Hrsa Dvta IiTechnical Proposal Hrsa Dvta Ii
Technical Proposal Hrsa Dvta Iiriverasierra
 
Multi-Link Presentation for ZipLink Series
Multi-Link Presentation for ZipLink SeriesMulti-Link Presentation for ZipLink Series
Multi-Link Presentation for ZipLink SeriesScott Shelton
 
Technical Proposal Baggage Reclaim System JIAP
Technical Proposal Baggage Reclaim System JIAPTechnical Proposal Baggage Reclaim System JIAP
Technical Proposal Baggage Reclaim System JIAPSaad ul Hasnain
 
WOG Technologies ppt
WOG Technologies pptWOG Technologies ppt
WOG Technologies pptNavneet Nayar
 
Vw dsg tender presentation 14042014
Vw dsg tender presentation 14042014Vw dsg tender presentation 14042014
Vw dsg tender presentation 14042014Alexander Zhironkin
 
Tender Writing – Case Study 1
Tender Writing – Case Study 1Tender Writing – Case Study 1
Tender Writing – Case Study 1Red Tape Busters
 
Mine Water Treatment SOQ
Mine Water Treatment SOQMine Water Treatment SOQ
Mine Water Treatment SOQJoe Woods
 
Contract review
Contract reviewContract review
Contract reviewnethisip13
 
Food testing laboratory proposal
Food testing laboratory proposalFood testing laboratory proposal
Food testing laboratory proposalAyman Al-Sharawi
 
Navneet cv 2012 revised
Navneet cv 2012 revisedNavneet cv 2012 revised
Navneet cv 2012 revisedNavneet Nayar
 
AQUA-SWIFT SOLUTION-TECHNICAL PROPOSAL 001
AQUA-SWIFT SOLUTION-TECHNICAL PROPOSAL 001AQUA-SWIFT SOLUTION-TECHNICAL PROPOSAL 001
AQUA-SWIFT SOLUTION-TECHNICAL PROPOSAL 001Elijah Kiema.
 
MAIS UM DIA - LIVRES PARA ADORAR
MAIS UM DIA - LIVRES PARA ADORARMAIS UM DIA - LIVRES PARA ADORAR
MAIS UM DIA - LIVRES PARA ADORARDiegodmo
 
Cover letter for tender proposal
Cover letter for tender proposalCover letter for tender proposal
Cover letter for tender proposalArthur Wilson
 
biological treatment i activated sludge process
biological treatment i  activated sludge processbiological treatment i  activated sludge process
biological treatment i activated sludge processManish Goyal
 
Water and Wastewater: Challenges & Opportunities in the Mining Industry
Water and Wastewater: Challenges & Opportunities in the Mining IndustryWater and Wastewater: Challenges & Opportunities in the Mining Industry
Water and Wastewater: Challenges & Opportunities in the Mining IndustryAECOM
 
Charity:Water Proposal
Charity:Water ProposalCharity:Water Proposal
Charity:Water ProposalJimmyKnowles1
 

Destaque (20)

Water and Wastewater Rate Proposal 2013-2016
Water and Wastewater Rate Proposal 2013-2016Water and Wastewater Rate Proposal 2013-2016
Water and Wastewater Rate Proposal 2013-2016
 
IOW NHS Trust Building Controls Proposal
IOW NHS Trust Building Controls ProposalIOW NHS Trust Building Controls Proposal
IOW NHS Trust Building Controls Proposal
 
Technical Proposal Hrsa Dvta Ii
Technical Proposal Hrsa Dvta IiTechnical Proposal Hrsa Dvta Ii
Technical Proposal Hrsa Dvta Ii
 
Multi-Link Presentation for ZipLink Series
Multi-Link Presentation for ZipLink SeriesMulti-Link Presentation for ZipLink Series
Multi-Link Presentation for ZipLink Series
 
Technical Proposal Baggage Reclaim System JIAP
Technical Proposal Baggage Reclaim System JIAPTechnical Proposal Baggage Reclaim System JIAP
Technical Proposal Baggage Reclaim System JIAP
 
Final presentation
Final presentationFinal presentation
Final presentation
 
WOG Technologies ppt
WOG Technologies pptWOG Technologies ppt
WOG Technologies ppt
 
Vw dsg tender presentation 14042014
Vw dsg tender presentation 14042014Vw dsg tender presentation 14042014
Vw dsg tender presentation 14042014
 
Tender Writing – Case Study 1
Tender Writing – Case Study 1Tender Writing – Case Study 1
Tender Writing – Case Study 1
 
Mine Water Treatment SOQ
Mine Water Treatment SOQMine Water Treatment SOQ
Mine Water Treatment SOQ
 
Contract review
Contract reviewContract review
Contract review
 
Food testing laboratory proposal
Food testing laboratory proposalFood testing laboratory proposal
Food testing laboratory proposal
 
Navneet cv 2012 revised
Navneet cv 2012 revisedNavneet cv 2012 revised
Navneet cv 2012 revised
 
AQUA-SWIFT SOLUTION-TECHNICAL PROPOSAL 001
AQUA-SWIFT SOLUTION-TECHNICAL PROPOSAL 001AQUA-SWIFT SOLUTION-TECHNICAL PROPOSAL 001
AQUA-SWIFT SOLUTION-TECHNICAL PROPOSAL 001
 
MAIS UM DIA - LIVRES PARA ADORAR
MAIS UM DIA - LIVRES PARA ADORARMAIS UM DIA - LIVRES PARA ADORAR
MAIS UM DIA - LIVRES PARA ADORAR
 
Cover letter for tender proposal
Cover letter for tender proposalCover letter for tender proposal
Cover letter for tender proposal
 
PureWater Proposal
PureWater ProposalPureWater Proposal
PureWater Proposal
 
biological treatment i activated sludge process
biological treatment i  activated sludge processbiological treatment i  activated sludge process
biological treatment i activated sludge process
 
Water and Wastewater: Challenges & Opportunities in the Mining Industry
Water and Wastewater: Challenges & Opportunities in the Mining IndustryWater and Wastewater: Challenges & Opportunities in the Mining Industry
Water and Wastewater: Challenges & Opportunities in the Mining Industry
 
Charity:Water Proposal
Charity:Water ProposalCharity:Water Proposal
Charity:Water Proposal
 

Semelhante a Transnet tpt sd

Software, It and BPO - Industrial Real Estate Perspective
Software, It and BPO - Industrial Real Estate PerspectiveSoftware, It and BPO - Industrial Real Estate Perspective
Software, It and BPO - Industrial Real Estate PerspectiveVu Duong
 
Kpo Market Analysis In India
Kpo Market Analysis In IndiaKpo Market Analysis In India
Kpo Market Analysis In IndiaPreeti Anand
 
Achieving sustainable growth_IT
Achieving sustainable growth_ITAchieving sustainable growth_IT
Achieving sustainable growth_ITVikram Dahiya
 
Randstad Technologies IT Salary Survey 2011
Randstad Technologies IT Salary Survey 2011Randstad Technologies IT Salary Survey 2011
Randstad Technologies IT Salary Survey 2011fidelshelly
 
The future of Finance
The future of FinanceThe future of Finance
The future of Financerix1
 
Analysis design gsw
Analysis design gswAnalysis design gsw
Analysis design gswwoznite65
 
Jat consulting frost and sullivan
Jat consulting frost and sullivanJat consulting frost and sullivan
Jat consulting frost and sullivancasechallenge
 
FIS Road Show Presentation June 2008
FIS Road Show Presentation June 2008FIS Road Show Presentation June 2008
FIS Road Show Presentation June 2008finance48
 
Market Research Report : ICT Adoption in Manufacturing Sector India 2011
Market Research Report : ICT Adoption in Manufacturing Sector India 2011Market Research Report : ICT Adoption in Manufacturing Sector India 2011
Market Research Report : ICT Adoption in Manufacturing Sector India 2011Netscribes, Inc.
 
Market Research Report : Facilities management services market in india 2013 ...
Market Research Report : Facilities management services market in india 2013 ...Market Research Report : Facilities management services market in india 2013 ...
Market Research Report : Facilities management services market in india 2013 ...Netscribes, Inc.
 
ItSMF 23 November 2012 - GREENCLOUDS - Cloud Service Brokerage
ItSMF 23 November 2012 - GREENCLOUDS - Cloud Service BrokerageItSMF 23 November 2012 - GREENCLOUDS - Cloud Service Brokerage
ItSMF 23 November 2012 - GREENCLOUDS - Cloud Service BrokerageGreenclouds
 
Irish Government Cloud Strategy Perspective
Irish Government Cloud Strategy PerspectiveIrish Government Cloud Strategy Perspective
Irish Government Cloud Strategy PerspectiveGar Mac Críosta
 
How to succesfully marry content and information5
How to succesfully marry content and information5How to succesfully marry content and information5
How to succesfully marry content and information5CSIRO National AI Centre
 
Tomorrow calling revenues_business_models
Tomorrow calling revenues_business_modelsTomorrow calling revenues_business_models
Tomorrow calling revenues_business_modelsviasatcreative
 
EDP_Provincial Competitiveness Index
EDP_Provincial Competitiveness IndexEDP_Provincial Competitiveness Index
EDP_Provincial Competitiveness IndexCape Town Partnership
 

Semelhante a Transnet tpt sd (20)

Software, It and BPO - Industrial Real Estate Perspective
Software, It and BPO - Industrial Real Estate PerspectiveSoftware, It and BPO - Industrial Real Estate Perspective
Software, It and BPO - Industrial Real Estate Perspective
 
IBM Global Financing
IBM Global FinancingIBM Global Financing
IBM Global Financing
 
Kpo Market Analysis In India
Kpo Market Analysis In IndiaKpo Market Analysis In India
Kpo Market Analysis In India
 
Achieving sustainable growth_IT
Achieving sustainable growth_ITAchieving sustainable growth_IT
Achieving sustainable growth_IT
 
Randstad Technologies IT Salary Survey 2011
Randstad Technologies IT Salary Survey 2011Randstad Technologies IT Salary Survey 2011
Randstad Technologies IT Salary Survey 2011
 
The future of Finance
The future of FinanceThe future of Finance
The future of Finance
 
Analysis design gsw
Analysis design gswAnalysis design gsw
Analysis design gsw
 
Jat consulting frost and sullivan
Jat consulting frost and sullivanJat consulting frost and sullivan
Jat consulting frost and sullivan
 
FIS Road Show Presentation June 2008
FIS Road Show Presentation June 2008FIS Road Show Presentation June 2008
FIS Road Show Presentation June 2008
 
Market Research Report : ICT Adoption in Manufacturing Sector India 2011
Market Research Report : ICT Adoption in Manufacturing Sector India 2011Market Research Report : ICT Adoption in Manufacturing Sector India 2011
Market Research Report : ICT Adoption in Manufacturing Sector India 2011
 
Preparing students for_future
Preparing students for_futurePreparing students for_future
Preparing students for_future
 
Market Research Report : Facilities management services market in india 2013 ...
Market Research Report : Facilities management services market in india 2013 ...Market Research Report : Facilities management services market in india 2013 ...
Market Research Report : Facilities management services market in india 2013 ...
 
ItSMF 23 November 2012 - GREENCLOUDS - Cloud Service Brokerage
ItSMF 23 November 2012 - GREENCLOUDS - Cloud Service BrokerageItSMF 23 November 2012 - GREENCLOUDS - Cloud Service Brokerage
ItSMF 23 November 2012 - GREENCLOUDS - Cloud Service Brokerage
 
Irish Government Cloud Strategy Perspective
Irish Government Cloud Strategy PerspectiveIrish Government Cloud Strategy Perspective
Irish Government Cloud Strategy Perspective
 
How to succesfully marry content and information5
How to succesfully marry content and information5How to succesfully marry content and information5
How to succesfully marry content and information5
 
Tomorrow calling revenues_business_models
Tomorrow calling revenues_business_modelsTomorrow calling revenues_business_models
Tomorrow calling revenues_business_models
 
EDP_Provincial Competitiveness Index
EDP_Provincial Competitiveness IndexEDP_Provincial Competitiveness Index
EDP_Provincial Competitiveness Index
 
GS100 Survey
GS100 SurveyGS100 Survey
GS100 Survey
 
Hawaii OIMT presentation
Hawaii OIMT presentationHawaii OIMT presentation
Hawaii OIMT presentation
 
Smart com
Smart comSmart com
Smart com
 

Mais de UNIDO SA

Dst localisation presentation
Dst localisation presentationDst localisation presentation
Dst localisation presentationUNIDO SA
 
Idc sector workshop presentation_29092011
Idc sector workshop presentation_29092011Idc sector workshop presentation_29092011
Idc sector workshop presentation_29092011UNIDO SA
 
Cbi marketing support
Cbi marketing supportCbi marketing support
Cbi marketing supportUNIDO SA
 
Siemens - UNIDO SPX Prasa project
Siemens - UNIDO SPX Prasa projectSiemens - UNIDO SPX Prasa project
Siemens - UNIDO SPX Prasa projectUNIDO SA
 
Nuclear bill of materials specification description
Nuclear bill of materials specification descriptionNuclear bill of materials specification description
Nuclear bill of materials specification descriptionUNIDO SA
 
Multiplier presentation march 2011
Multiplier presentation march 2011Multiplier presentation march 2011
Multiplier presentation march 2011UNIDO SA
 
Filter bag sdl presentation v3
Filter bag sdl presentation v3Filter bag sdl presentation v3
Filter bag sdl presentation v3UNIDO SA
 
Eskom supplier dev and localisation unido rhythm 240211
Eskom supplier dev and localisation unido rhythm 240211Eskom supplier dev and localisation unido rhythm 240211
Eskom supplier dev and localisation unido rhythm 240211UNIDO SA
 
Enerkey youth development initiatives to unido 20110208
Enerkey youth development initiatives to unido 20110208 Enerkey youth development initiatives to unido 20110208
Enerkey youth development initiatives to unido 20110208 UNIDO SA
 
UNIDO SA: Supplier development
UNIDO SA: Supplier developmentUNIDO SA: Supplier development
UNIDO SA: Supplier developmentUNIDO SA
 
Wind energy eskom mohsin seedat 2010
Wind energy eskom mohsin seedat 2010Wind energy eskom mohsin seedat 2010
Wind energy eskom mohsin seedat 2010UNIDO SA
 
Unido working group dst localisation 2010
Unido working group dst localisation 2010Unido working group dst localisation 2010
Unido working group dst localisation 2010UNIDO SA
 
Unido rythm working group presentation prasa 2010
Unido rythm working group presentation prasa 2010Unido rythm working group presentation prasa 2010
Unido rythm working group presentation prasa 2010UNIDO SA
 
Tap Foundries Intervention - Mintek
Tap Foundries Intervention - Mintek Tap Foundries Intervention - Mintek
Tap Foundries Intervention - Mintek UNIDO SA
 
Naacam roger pitout 2010
Naacam roger pitout 2010Naacam roger pitout 2010
Naacam roger pitout 2010UNIDO SA
 
Mthombo petro sa sesakho magadla 2010
Mthombo petro sa sesakho magadla 2010Mthombo petro sa sesakho magadla 2010
Mthombo petro sa sesakho magadla 2010UNIDO SA
 
Mthombo csdp presentation to rythmic meeting may 10
Mthombo csdp  presentation to rythmic meeting may 10Mthombo csdp  presentation to rythmic meeting may 10
Mthombo csdp presentation to rythmic meeting may 10UNIDO SA
 
Idc moroasereme ntsoane 2010
Idc moroasereme ntsoane 2010Idc moroasereme ntsoane 2010
Idc moroasereme ntsoane 2010UNIDO SA
 
Dti solar park cob pillay 2010
Dti solar park cob pillay 2010Dti solar park cob pillay 2010
Dti solar park cob pillay 2010UNIDO SA
 
Dst tap programme 2010 05-20 csir
Dst tap programme 2010 05-20 csirDst tap programme 2010 05-20 csir
Dst tap programme 2010 05-20 csirUNIDO SA
 

Mais de UNIDO SA (20)

Dst localisation presentation
Dst localisation presentationDst localisation presentation
Dst localisation presentation
 
Idc sector workshop presentation_29092011
Idc sector workshop presentation_29092011Idc sector workshop presentation_29092011
Idc sector workshop presentation_29092011
 
Cbi marketing support
Cbi marketing supportCbi marketing support
Cbi marketing support
 
Siemens - UNIDO SPX Prasa project
Siemens - UNIDO SPX Prasa projectSiemens - UNIDO SPX Prasa project
Siemens - UNIDO SPX Prasa project
 
Nuclear bill of materials specification description
Nuclear bill of materials specification descriptionNuclear bill of materials specification description
Nuclear bill of materials specification description
 
Multiplier presentation march 2011
Multiplier presentation march 2011Multiplier presentation march 2011
Multiplier presentation march 2011
 
Filter bag sdl presentation v3
Filter bag sdl presentation v3Filter bag sdl presentation v3
Filter bag sdl presentation v3
 
Eskom supplier dev and localisation unido rhythm 240211
Eskom supplier dev and localisation unido rhythm 240211Eskom supplier dev and localisation unido rhythm 240211
Eskom supplier dev and localisation unido rhythm 240211
 
Enerkey youth development initiatives to unido 20110208
Enerkey youth development initiatives to unido 20110208 Enerkey youth development initiatives to unido 20110208
Enerkey youth development initiatives to unido 20110208
 
UNIDO SA: Supplier development
UNIDO SA: Supplier developmentUNIDO SA: Supplier development
UNIDO SA: Supplier development
 
Wind energy eskom mohsin seedat 2010
Wind energy eskom mohsin seedat 2010Wind energy eskom mohsin seedat 2010
Wind energy eskom mohsin seedat 2010
 
Unido working group dst localisation 2010
Unido working group dst localisation 2010Unido working group dst localisation 2010
Unido working group dst localisation 2010
 
Unido rythm working group presentation prasa 2010
Unido rythm working group presentation prasa 2010Unido rythm working group presentation prasa 2010
Unido rythm working group presentation prasa 2010
 
Tap Foundries Intervention - Mintek
Tap Foundries Intervention - Mintek Tap Foundries Intervention - Mintek
Tap Foundries Intervention - Mintek
 
Naacam roger pitout 2010
Naacam roger pitout 2010Naacam roger pitout 2010
Naacam roger pitout 2010
 
Mthombo petro sa sesakho magadla 2010
Mthombo petro sa sesakho magadla 2010Mthombo petro sa sesakho magadla 2010
Mthombo petro sa sesakho magadla 2010
 
Mthombo csdp presentation to rythmic meeting may 10
Mthombo csdp  presentation to rythmic meeting may 10Mthombo csdp  presentation to rythmic meeting may 10
Mthombo csdp presentation to rythmic meeting may 10
 
Idc moroasereme ntsoane 2010
Idc moroasereme ntsoane 2010Idc moroasereme ntsoane 2010
Idc moroasereme ntsoane 2010
 
Dti solar park cob pillay 2010
Dti solar park cob pillay 2010Dti solar park cob pillay 2010
Dti solar park cob pillay 2010
 
Dst tap programme 2010 05-20 csir
Dst tap programme 2010 05-20 csirDst tap programme 2010 05-20 csir
Dst tap programme 2010 05-20 csir
 

Último

Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 

Último (20)

Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 

Transnet tpt sd

  • 1. UNIDO Presentation on TPT’s SD Plans 26th of July 2012
  • 2. Contents SD : Background and Objectives SD : Proposal vs Final plan Tender gateways : SD and BBBEE TPT Equipment acquisitions 2
  • 3. A lack of investment in infrastructure has impacted the capacity and capability of the local industry to do business in South Africa and subsequently economic growth Historical Background Impact on industry  There has been a significant decline in SA local industry over the past years largely due to a lack of consistent investment in infrastructure  The overall impact both from the lack of investment in infrastructure and the Ratio of Gross Fixed Capital suppression of a large percentage of the Formation to GDP (1970-2009) population from partaking in the economy had a significant impact on local industry: 30 25  Loss of key skills and key capabilities 20  Decrease in manufacturing capabilities and thereby export 15 potential 10  Lack of job creation opportunities 5  Increase in the costs of doing 0 business due to higher transportation 1974 1982 1990 1998 2006 costs and longer lead times Furthermore, due to significant historical political and social imbalances a large portion of the SA population were unable to participate meaningfully in the economy thereby creating a gap in wealth distribution Source: SARB Quarterly Bulletin 3
  • 4. The key difference between CSDP and NIPP is that CSDP allows for the investment to take place in a related industry NIPP CSDP Effective Date • Prior to February 2008 • February 2008 Onwards Transaction target • 30 % > R100 million • 30 % > R100 million Focus • Non Related Industry • Related Industry Reporting & • DTI • SOE  DPE Tracking • Not Part of Evaluation Criteria Part of • Not part of SOE responsibility – • Part of Evaluation Negotiation Done by DTI and the Supplier Criteria Spend is channeled into relevant industry development which Transnet can influence 4
  • 5. Transnet will use its sphere of control to contract with OEM’s as tier-1 suppliers Transnet’s CSDP phase one Strategic Approach will be to focus on Tier 1 suppliers to assist them in engaging local Tier 2 suppliers Supplier Development Category Supplier Base Sphere of Control Transnet’s CSDP CSDP Development: Focus Port Equipment Tier 1 Systems – Subsystems CSDP Focus Suppliers’ Transnet’s ED and Tier 2 s PP Focus Assemblies Suppliers’ Focus Tier 3 Components Sphere of Influence BBBEE Focus Other ED Development **ED – Enterprise Development / PP – Preferential Procurement 5
  • 6. Transnet will apply their influence and current resources to actively align their existing SD activities with the objectives of NGP as reflected below iSCM/Supply Chain Quantum Leap Focus New growth path • Increase productivity • Increase employment intensity of the and efficiency economy • Volume growth • Reduce the cost to • Capital investment improve infrastructure Regulatory and address • Financial stability competiveness Increase • Funding Volume productivity growth • Balanced spatial • Human capital & efficiency development of rural Improving • SHEQ Human areas and poorer SHEQ customer Resources • Regulatory provinces’ service • Improve customer Financial Capital • Reduce the carbon sustainability investment intensity of the service economy Funding • Create opportunities in changing regional and global environments • Increase black ownership and entrepreneurship 6 Source: Transnet Corporate Plan 2011/12
  • 7. A shared aspiration for SD was created by merging Governments and Transnet’s objectives Government’s Objectives Transnet’s Objectives • Volume and Revenue Growth • Increase the percentage of the population • Creating Capacity Objectives Corporate involved in quality formal employment • Operational Efficiency Vision opportunities • Financial Strength • Address wealth distribution disparities in the • SHEQ country by ensuring the participation of previously disadvantaged groups in the • Promote the economy 1) Empowerment of previously Objectives SD • Maintain a healthy balance of payments position Principles disadvantaged groups SD by reducing the reliance of South African 2) Increase in local content industries on imports 3) Improvement of skills and create • Increase the participation of public enterprises in opportunities for sustainable jobs increasing levels of real fixed capital Guiding Principles formation Values • Security of Supply Supply Chain • Develop key skills and capabilities required • Reduction in Costs for specific industries where these do not exist • Reduction in Working Capital • Enhanced Preferential Procurement and Enterprise Development External Analysis Internal Analysis Source: Transnet Corporate Plan, NGP, B-BBEE, CSDP
  • 8. Supplier Development (SD) • Supplier development refers to the improvement in the socio- economic environment by creating competitive local suppliers via Competitive Supplier Development and other initiatives. This results in a local supply base that can eventually be competitive to market its goods on the international market leading to increased exports • Transnet’s SD strategy aims to holistically satisfy all of Government’s legislation and requirements in respect of identifying and undertaking opportunities through specific initiatives 8
  • 9. CSDP opportunities are generally triggered for transactions equal or exceeding USD10 million for all tenders after February 2008 Trigger for a CSDP transaction: Criteria to be considered to initiate a CSDP transaction: • To avoid capital leakage; • When an opportunity to develop a local industry within Transnet’s supply chain; and / or • When a limited local supply base exists but the potential to develop existing suppliers is evident; and / or • Where there is a strong opportunity for IP and skills transfer to local suppliers and / or Transnet for • SOE influences OEM/multinational for CSDP which the capacity does not presently reside in South transactions . Africa • The following will trigger a CSDP transaction which involves the purchase of services and goods: - Single New Contract with an imported content Tender Process: portion that is equal to or exceeds USD 10 million*; • All contracts sent to the market equal or exceeds - Contract with a renewable option clause, should R70million* will include a CSDP obligation as part the option be exercised, the total value of the of the tender, imported content would be equal to or exceed • A CSDP Proposal must be submitted as part of USD 10 million* the tender •A CSDP Plan must be signed submitted within 30 - No CSDP obligations (after Feb 2008) may be claimed for a NIPP – Double Counting days to Transnet after signing the Letter of Intent All CSDP obligations will be considered as standalone -obligations (LOI) and be agreed and signed within 15 days for each specific tender; thereafter by both parties - Where a CSDP obligation has not been mutually agreed between Transnet and the Supplier after February 2008 a CSDP Reconciliation Plan (to date) must be submitted by the Supplier to Transnet and agreed and signed off by both parties. * Total Value planned to spend with a Supplier - (USD 10 million ~ R70 million. ** All CSDP Capability and capacity building in SA efforts initiated by the Supplier since the award of the contract to date must be included into the plan. 9
  • 10. The IC3 Matrix is used as the basic framework to plot the SD opportunities identified in its appropriate SD initiative bucket IC3 Supplier Development Classification Matrix2 Not currently a focus area High Programmatic1 Industrialisation Strategic Importance to Transnet The IC3 supplier development classification matrix assists in Strategic categorising opportunities Industrial leverage according to their industrial leverage, value leverage and Capability and strategic importance to capacity Transnet building in SA and Supplier Once opportunities are Development identified it will be possible to Small identify the tools that should Enterprise Focused be implemented to maximise the full supplier development Development potential from the Skills opportunities Low Development Low High Value leverage Value Leverage refers to transactions where the financial scale of the transaction allows the buyer the opportunity to negotiate supplier development. Industrial Leverage refers to transactions whereby the nature of the procurement is such that the scale and the industrial complexity of the item being purchased allows for local supply chain development around a particular industry. Strategic Importance to Transnet refers to the extent to which the product to be procured has a impact on Transnet’s core business. 1 This could be further refined in the future through the DPE Programmatic Policy 2Adapted from the DPE Supplier Classification Matrix focused on Increased Competitiveness, Capability and Capacity. 10
  • 11. Strategic objectives within each quadrant have been identified IC3 quadrant Strategic Objective Key Outcomes • Assist Government achieve their industrialisation • Industrialisation objectives through development of local supplier base to • Technology transfer Programmatic increase the cost efficiency of fleet procurement, support • Job creation/preservation and maintenance • Skills Development • Downstream Supplier Development • Increased exports • Reduction in capital leakage • Influence multinational organisations toward initiatives • Capability and capacity building in that lead to the development of local downstream SA Strategic suppliers through large-scale SOE procurement in order to • Increased Technology transfer develop a competitive local supplier base focusing on • Job creation/preservation Rolling stock, Port Equipment and Infrastructure • Skills development • Assist local suppliers to improve their performance, • Job Creation/preservation enhance their existing production & skills capabilities by • Empowerment Focused placing increased emphasis on benefiting previously • Skills Development disadvantaged individuals and rural development • Rural Development • Provide a platform through which local suppliers can test their local innovations for export promotion • Assist local suppliers to improve their skills by placing • Empowerment Small increased emphasis on benefiting previously • Rural Development Enterprise disadvantaged individuals and rural development in line • Skills Development Development with the BBBEE strategy • Job Creation/preservation Transnet has to develop an internal policy to support product development and funding as the current innovation policy drafted by the DPE only allows for testing local products in the Transnet operating environment Source: Team analysis 11
  • 12. Figure 2: Transnet value capture through supplier influence Programmatic Strategic Focused Small ED Decreasing • Industrialisation emphasis on evaluation Programmatic criteria • localisation • Localisation categories • Technology • Technology Sphere of transfer/ transfer/ influence sustainability sustainability Strategic • Job creation/ • Job creation / • . Job creation/ preservation preservation preservation • Skills • Skills • Skills development development development Focused • Small business • Small business • Further promotion promotion recognition* • Rural • Further • Further development recognition* recognition* • Further and regional Small Enterprise recognition* integration Development • Rural • Rural development development • Small business • Job and regional and regional promotion preservation integration integration *Points allocated in further recognition of certain components of BBBEE in line with Transnet and government objectives ** Indicative and varies on business and Macro Economic need 12
  • 13. The recommended SD categories are based on the alignment with government objectives Category Description • Developing local capability and efficiency through : investment in plant, increasing the number Capability and of products bought locally and qualifying suppliers to meet international standards. capacity building • This criterion refers specifically to industrial capability building that focuses on value-add in SA activities of the local industry through manufacturing or service-related functions. Technology • Refers to process, know-how and Intellectual Property associated with developing a transfer/ competitive local supplier post the current transaction Sustainability • Refers to skills transfer with an emphasis on the accumulation of knowledge and experience Skills • Generally targeted toward sector specific skills development with a focus on artisan and development technical skills • Refers to an increase or preserve in the number of jobs due to the award of business from Job creation/ Transnet preservation • Favouring more labour intensive methods for job creation • Jobs include both skilled and unskilled Small business • Encourage the growth and expansion of small businesses and start ups through procurement promotion and support mechanisms Source: Team Analysis 13
  • 14. SD and BBBEE Requirements Contents SD : Background and Objectives SD : Proposal vs Final plan Tender gateways : SD and BBBEE TPT Equipment acquisitions 14
  • 15. Summary: SD Process Successful SD plan to be Compile proposal Transnet tenderer to agreed upon by as part of SD plan evaluates supplier compile SD Transnet and SD proposal plan supplier Responsible Supplier Transnet Supplier & Transnet Supplier& Transnet • Only a successful bidder • The supplier is expected to • SD (Proposals) will be required to • Once the SD plan has formulate a SD proposal responses will be complete a detailed SD been finalised with to identify the evaluated on their ability Plan and deliver it to Transnet, the supplier opportunities that the to leverage Transnet’s Transnet in 30 days after will initiate the plan supplier will pursue long term procurement in signing the LOI • The supplier will be • The SD Proposal should order to promote • Both the Supplier ad required to report address the main areas Capability and capacity Transnet must agree and quarterly on the  Capability and building in SA in order to sign the final SD plan 30 progress being made capacity building in SA; increase the capability and days thereafter against the plan, the  technology capacity, responsiveness • The SD Plan will have to attainment of milestones transfer/sustainability; and competitiveness of outline the: and the reasons (if any)  skills development; South African supplier – Type of Capability and that goals are not being capacity building in SA  small business industries effort that will be met promotion • The SD Programme’s pursued, • Transnet will supply  job ability to promote skills – Anticipated investment, guidelines to the – Description of products to creation/preservation transfer, Capability and be produced, reporting format required capacity building in SA – Skills transfer ,as well as for the quarterly reports and the sustainability of – Processes, systems, NOTE: the venture will all be technologies and • Both a SD Proposal and SD equipment required taken into account during Plan must be completed . 15 evaluation
  • 16. SD Plan: Capability and capacity building in SA Summary – Supplier (x/x) Example Category Description Sub-initiative Key KPI A Total Summary • 1.0 xxx • R xxx.xm Capability and • 2.0 xxx • R xxx.xm capacity • 3.0 xxx • R xx.xm building in SA • Total Capability and capacity building in SA Value • R xxx.xm 1.0 xxxx • xxxx • Rx.xm 2.0 xxxx • xxxx • Rx.xm 3.0 xxxx • xxxx • Rx.xm Transnet Authorised Signatory Date Supplier Authorised Signatory Date Name / Title Name / Title 16
  • 17. SD Plan: SD Capability and capacity building in SA Initiative (x/x) Initiative Description: Target KPI Detailed Description Transnet Lead: R x.x* ZAR TPT Lead: # of reports Supplier Lead: x completed Supplier Lead: TBD at # of Start Date: selection components meeting selected End Date: Reporting Frequency: Quarterly (xx May CY, xx, xx (one month prior to DPE August CY, xx November CY report) and February (following Year) xx) Transnet Authorised Signatory Date Supplier Authorised Signatory Date Name / Title Name / Title 17
  • 18. SD Plan: SD Capability and capacity building in SA Initiative (x/x) Year 2011 2012 2013 Activity 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx Transnet Authorised Signatory Date Supplier Authorised Signatory Date Name / Title Name / Title 18
  • 19. SD and BBBEE Requirements Contents SD : Background and Objectives SD : Proposal vs Final plan Tender gateways : SD and BBBEE TPT Equipment acquisitions 19
  • 20. A three step evaluation strategy will be used in the evaluation of the equipment proposals Evaluate for Evaluate for Evaluate for Evaluate per > Threshold >Threshold >Threshold weighting 1 2 2 3 SD / BBBEE Eligibility Technical Price Award tender to SD successful supplier BBBEE Minimum Minimum Minimum SD/BBBEE Eligibility Technical criteria criteria criteria Equipment SD / BBBEE Eligibility Technical Evaluation weighting (%) threshold threshold threshold 3 Price SD BBBEE Main offer and main (Scorecard and 1 2 2 Further offer plus options recognition criteria) RTG Cranes (Proposal A), 40% 100% 80% 60 20 20 STS Cranes (Proposal B) and RTG Cranes and STS Cranes (Proposal C) Note: The tender indicates that the SD commitment is aimed at achieving at least 30% of the supplier’s tender value as part of the tender bid If no tender passes the 2nd stage technical evaluation, the threshold will be reduced from 80% to 70% 20
  • 21. SD and BBBEE Requirements Contents SD : Background and Objectives SD : Proposal vs Final plan Tender gateways : SD and BBBEE TPT Equipment acquisitions 21
  • 22. 7 Year Capital expenditure plans • Transnet’s capital investment over the next 7 years (2012/13 to 2018/19) totals R300billion • Transnet Port Terminals will be undertaking R33billion (11%) of these projects over the next 7 years • TPT’s 7 year investment plan will comprise mainly of the following acquisitions: o Ship to Shore Cranes o Rubber-Tyred Gantry Cranes o Straddle Carriers o Ship Loaders o Ship Unloaders o Mobile Harbour Cranes o Haulers o Trailers o Reach Stackers o Empty Container Handlers 22
  • 23. Equipment acquisitions : currently in procurement cycle phase Item Project 1 4 x STS Cranes – Ngqura 2 18 x RTG Cranes – Ngqura 3 DGPS (Digital Global Positioning System) - Durban 4 Supply and installation of a monitoring system for refrigerated containers (Reefers) at Cape Town (CTCT & CTMPT), Port Elizabeth (PECT), Ngqura (NCT) and Durban Container terminals (Pier1 and Pier2). 5 Manufacture, supply, delivery and commissioning of 74 Fifth wheel haulers for RBY 6 Manufacture, supply, delivery and commissioning of forklifts – RBY (3x42T;6x32T;10x18T;11x8T); EL (4x7T) and NGQURA (2x2T) 7 Manufacture, supply, delivery and commissioning of 6 Reachstackers – 2 RBY;2 NCT;1 Pier 1 and 1 CTNMPT 23
  • 24. Equipment acquisitions : SD plans being finalised Item Project 1 1 x Mobile harbour crane for CTN 2 Design review services 3 Manufacture, supply, delivery and commissioning of 14 haulers – 4 Saldanha;10 Pier 1 4 Manufacture, supply, delivery and commissioning of 9 empty container handlers – 2 CTN;2 NCT; 5 DCT 5 Manufacture, supply, delivery and commissioning of 48 haulers for Ngqura 24
  • 25. Equipment acquisitions : SD plans committed Item Project SD value SD committed committed (R’m) %age of Contract value 1 1 x Ship unloader 15.52 12% 2 28 x Straddle Carriers 23.00 10% 3 7 x Tandem lift STS Cranes 47.00 6% 4 6 x Mobile Harbour Cranes 58.29 23% 5 33 x Haulers 4.07 9% 6 8 x Reachstackers 18.12 16% 25
  • 26. Equipment acquisitions planned for the remainder of this year (to Mar 2013) Item Project 1 Ship unloaders for Bulk terminals 2 Rail Mounted Gantry Cranes for Container Terminals 3 Wharf Cranes 26