Lac à Paul Project – Arianne Resources Inc.
                                 January, 2012
Disclaimer



             Total resources include all categories unless otherwise stated.
             All currency are in US $ unless otherwise stated.

             This presentation contains forward looking statements. All statements, other than statements of
             historical fact, included herein, including without limitation, statements regarding potential
             mineralisation and reserves, exploration results and future plans and objectives of d’Arianne
             Resources Inc, are forward-looking statements that involve various risks and uncertainties.
             There can be no assurance that such statements will prove to be accurate and actual results
             and future events could differ materially from those anticipated in such statements. Important
             factors that could cause actual results to differ materially from d’Arianne Resources Inc’s
             expectations are disclosed under the heading "Risk Factors" and elsewhere in d’Arianne
             Resources Inc’s documents filed from time-to-time with the TSX Venture and other regulatory
             authorities.




20/02/2012                                      Copyright © 2009 Arianne Resources Inc .                       Slide: 2
Overview

        Arianne Resources is a minerals company focused on developing our principal asset, the Lac à
        Paul Phosphate Project

        Lac à Paul Project – Phosphate Rock Concentrate mine located in Saguenay-Lac-St. Jean
        region,Quebec, Canada

             • Pre-feasibility Study completed by Met-Chem in November 2011
              –   Measured and Indicated Resources now 348 Million mt at 6.5% P2O5
              –   Inferred Resources of additional 114 Million mt at 5.5% P2O5
              –   Mine life of 25 years at 2 Million mt/yr 85 BPL P2O5 concentrate
              –   Initial Capital of $649 Million
                                                                                 TSXv: DAN (Jan 6, 2012)
              –   Operating Costs FOB Rail of $98/mt
                  P2O5 concentrate                                              Shares Outstanding            66.3 million
                                                                                     Options                   5.4 million
              –   Assumed Life of Mine Concentrate Sales
                  Price of $175/mt in constant dollars                               Warrants                 11.4 million
              –   NPV (8%): Pre-tax $684 Million, After-                        Fully Diluted                 83.1 million
                  tax $362 Million                                              Recent Share Price                  $1.20
              –   After-tax Payback Period of 5.2 years                         Market Capitalization (FD)   $99.7 million
                                                                                Cash                          $5.5 million
                                                                                Debt                                   $0

20/02/2012                                          Copyright © 2009 Arianne Resources Inc .                         Slide: 3
Overview


        Lac à Paul Project – Phosphate Rock Concentrate mine located in Saguenay-Lac-St. Jean
        region,Quebec, Canada

             • COREM and Jacobs Engineering Testwork completed October 2011
               ‒ Mill recovery at 90% yields 39% P2O5 concentrate with MER of 0.079
               ‒ Acidulation testing confirmed 98% recovery of P2O5 to phosphoric acid
               ‒ Low corrosion of 6.5 mils/yr for 317L and 1.9 mils/yr for 904L
               ‒ Low sulfuric acid use at 2.18 mt/mt P2O5
               ‒ Low gypsum production of 3.94 mt/mt P2O5
               ‒ MAP and DAP exceeding standard grades for N and P2O5
               ‒ High quality concentrate suitable for blending with low-quality rock


             • Existing power, logistics, population + governmental, community and first
              nations support = low-cost production of high-quality product available to
              supply global export phosphate rock market.




20/02/2012                                 Copyright © 2009 Arianne Resources Inc .             Slide: 4
The Arianne Team

                        Bernard has extensive experience in the resource sector. Prior to Arianne, he served as director of the
Bernard Lapointe        Sanguenay-Lac-Saint-Jean Mining Fund. He acted as a geochemist analyst for the Centre for Research in
CEO, Director           Mineral Resources of University of Quebec. Bernard holds a B.A. in geology from the University of Quebec, a
                        Masters degree in structural geology from University of Quebec, and a Ph.D. in mineral resources from the
                        University of Quebec.
                        Jim is a metallurgical engineer with an MBA in finance. He worked in various roles from Mill Metallurgist to
Jim Cowley              Financial and Business Development manager, where he acted as a negotiator in the sale and purchase of
President, Director     mineral assets for Exxon, Climax Molybdenum and Rio Tinto.

                        Luc is currently VP Finance and Marketing of Fromagerie Boivin. He also serves on different boards of
Luc Boivin              directors including Promotion Saguenay. Luc is the chairman of Technologie Biolatis.
Director
                        Dave is a retired metallurgical engineer. He served as Vice President of Energy and Raw Minerals at Agrium, a
Dave DeBiasio           leading global fertilizer company where he actively participated in the development of the Kapuskasing
Director                phosphate mine.

                        Marco is a senior mining exploration professional with 20 years of experience, mostly with major mining
Marco Gagnon            companies. He is currently President and CEO of Adventure Gold, a Montreal-based gold exploration
Director                company. He was a founder and former President and CEO of Focus Metals. He worked with Inmet Mining,
                        Barrick Gold, Minnova and Radisson Mining Resources. He has a graduate degree in geology from the
                        University of Quebec.
                        Guthrie has over 25 years’ experience in private equity investments, senior management and corporate law.
Guthrie Stewart         Until Dec 2007, he was a partner of the Equity Fund of EdgeStone Capital Partners. He is currently serving as
Director, Secretary     the Chairman of Orbit Garant Drilling. He earned an LL B. from Osgoode Hall Law School and an MBA from
                        INSEAD, Europe

Alain Vachon            Alain is a geologist with more than 30 years experience in the mining industry. He has worked for Exploration
                        Noranda, Barrick, and with Rouyn Mining Resources where he was chief geologist of mining operations. In the
Director
                        past 12 years, Alain worked mainly in Peru with Sulliden, Gold Hawk and Paramount Gold.




                                                                                                                                        Slide: 5
History & Going Forward

Brief History of Lac à Paul
• Property discovered in late 1990s
       – Originally explored for Nickel
       – Phosphate/Titanium was discovered
• Market in 1990s was not ready for the project
• Listed in 2003
• Phosphate price escalated in the last 2-3 years, and the
Company decided to move the project forward
• Established Initial Resource
• Completed Scoping Study
• Completed Pre-feasibility Study

Key Catalysts
• Evaluation of increased production scenario (3.0 Mtpy)
and recovery and sale of titanium concentrate (Early 2012)
• Feasibility to commence after the evaluation
• Drilling the Paul Zone and other zones including Lucie
and Nicole Zones




                                                             Slide: 6
Phosphate and the World

  Phosphorous is an essential ingredient in fertilizers                             Phosphate Rock Demand
  used for plant and root development                                               • Phosphate Rock demand reached record
  • There are no substitute for phosphates in fertilizers                           levels in 2010 and is projected to grow at
                                                                                    an annual rate of 2% through 2020
  • 87% of all phosphate supply is used for fertilizers
                                                                                    • Demand for high P2O5, low Cadmium
                                                                                    rock will dominate phosphate rock trade in
                                                                                    EU and North America
 Phosphate Production and Consumption1, 2                                           • CRU projects that phosphate prices will
                                                                                    remain high, having been undervalued vs.
(in mt)                   Production                    Consumption      Surplus/
                                                                                    MAP/DAP prices in past
                      2010 2020 Growth               2010 2020 Growth Deficit
Europe                 13.3   15.1   1.3%             19.6   20.5   0.5%    (5.4)   • Global phosphate rock mining capacity
Africa                 42.2   58.2   3.3%             26.9   40.4   4.2%     17.8   utilization will climb to near-record levels
North America          26.2   24.8 (0.5%)             32.1   31.3 (0.2%)    (6.5)   of 85% by 2020
Latin America           8.3   16.7   7.2%             10.6   16.4   4.5%      0.3
Middle East            14.0   21.1   4.2%              6.7   16.1   9.2%      5.0   • North American phosphate import
Asia-Pacific           74.2   82.4   1.1%             83.7   93.6   1.1%   (11.2)   requirements will grow to 6.5mt by 2020
World                178.2 218.3     2.1%           179.6 218.3     2.0%        -   • Lac a Paul is not included in CRU
                                                                                    production estimates



Note
1 CRU; Phosphate Rock 10-Year Outlook 2011, updated in Sep 2011
2 Growth is based on 2010-2020 annual growth rate


                                                                                                                                   Slide: 7
Lac à Paul


      Project located 200 km north of
      the town of Saguenay in the
      Saguenay-Lac-St-Jean region,
      Québec, Canada


      The property covers an area of
      more than 25,000 hectares or 250
      km²
                                                                                         Road
                                                                                         Train
      Key Highlights
      • Existing heavy-duty road, rail line
      and port = excellent access to
      export market
      • Existing hydro-power facilities
      nearby (35 km) = low power cost
      • Saguenay-Lake St. Jean area
      population of 300,000 = high-
      quality labor pool


20/02/2012                                    Copyright © 2009 Arianne Resources Inc .       Slide: 8
Lac a Paul           Chute-des-Passes Road
Power Generation                                                                             Project              • Well-maintained heavy-duty gravel
• Power requirement of 46 MW                                                                                      road supporting logging industry
easily supplied by 750 MW Rio              Chute-des-Passes                                                       • 165 mt capacity road & bridges
Alcan Chute-des-Passes dam 35                                                                                     support 115 mt/truck phosphate rock
km away or 450 MW Peribonka IV                                                                                    loads
Hydro Quebec dam.                                                                                                 • 210 km from project to railhead at
                                                                                                                  Dolbeau requires 2 truck loads/hour




                                                               Peribonka IV




                                                                                                                  Saguenay Port
                                                                                                                  • Year-round deep water port supports
                                                                                                                  cape-size vessels.
                                                                                                                  • Capacity for 4 million mt/yr
                                                                                                                  concentrate storage, handling and
                                                                                                                  ship-loading.
                                                                      Saguenay-Lac-St-Jean Region                 • Connection to rail infrastructure in
                                                                                                                  progress.
                                                                      •   Population of 272,610
                                                                      •   Largest City: Saguenay (Pop: 143,692)
                                                                      •   Work force: 127,500 (Sep 2011)
                          Lac Saint-Jean                              •   Unemployment Rate: 7.5% (Sep 2011)




Rail
• Rail access at Dolbeau-Mistassini,
210km away from the project via road
• Connected to North American Rail
Network (CN)
                                                                                                                                                20 km


                                                              Copyright © 2009 Arianne Resources Inc .                                             Slide: 9
Lac à Paul




    Proven and
 Problable Reserves




Paul Zone extension
 and other known
  mineralizations




                          1 km


20/02/2012                         Copyright © 2009 Arianne Resources Inc .   Slide: 10
Lac à Paul




                                          Paul                                Nicole
    Proven and
 Problable Reserves                                                                    Manouane




Paul Zone extension
 and other known                                                                                  Lucie
  mineralizations




                          1 km


20/02/2012                         Copyright © 2009 Arianne Resources Inc .                               Slide: 11
Pre-Feasibility Study

      Highlights
                                                                           Prefeasibility Study
      • Open-pit mining operations at the Paul and                         Assumed Concentrate Price           $175/tonne
        Manouane Zones
                                                                           Annual Concentrate Production         ~2mtpa
                                                                           Mine Life                             25 years
      • Low Strip Ratio of 0.83
                                                                           Direct CAPEX                       $454 million
      • Annual Production of 2 million tonnes of 39%                       Indirect CAPEX                     $121 million
        P2O5 apatite concentrate                                           Contingency                         $74 million
                                                                           Total CapEx                        $649 million
      • Average selling price of the concentrate                           Cash Operating Cost (mine site)     $87/tonne
        $175/tonne (2015 to 2020)
                                                                           Cash Operating Cost (Train FOB)      $98/tonne
         ‒ Comparable to 85 BPL Russian grade concentrate
                                                                           Capital Payback (before tax)         4.7 years
      • Estimated mine life: 25 years at 33,000                            IRR (before tax)                       19.2%
        tonnes/day with 89% mill recovery rate                             NPV (8%) (before tax)             $684 million
                                                                           Capital Payback (after tax)           5.2 years
                                                                           IRR (after tax)                         15.2%
      3 million mt/yr Phos Rock Production                                 NPV (8%) (after tax)               $362 million
      Rate Scenario (preliminary figures)
      • Initial Capex increases by 20% to ~$780 million
      • Pre-tax NPV (8%) increases to $1 Billion
      • Operating costs fall considerably (~20%)

20/02/2012                               Copyright © 2009 Arianne Resources Inc .                                      Slide: 12
Future Mine
                                                             Capital Costs Estimate ($ million)
                                                              Mine                                                 66.7
                                                              Ore process (mill)                                  336.6
                                                              Tailings and water management facilities             18.4
                                                              General services and infrasctructure at mine site    61.9
                                                              Service vehicles and equipment                        7.6
                                                              Insurance and spare parts                            10.4
                                                              Power and communication                              67.2
                                                              Stockpile and rail car load-out                      80.2
                                    CRUSHER ORE               Total capital cost                                  649.0
             AGGREGATE   FUEL       AND RECLAIM
               PLANT       GARAGE   ADMIN




20/02/2012                               Copyright © 2009 Arianne Resources Inc .                                     13
Open-pit Paul




                                             CRUSHER ORE
                                              AND RECLAIM
                                AGGREGATE FUEL                    ADMIN
                                             GARAGE
                                  PLANT




20/02/2012             Copyright © 2009 Arianne Resources Inc .           14
Resources NI 43-101


         Updated NI 43-101 Resources
             • M&I resources quadruple over the previous resource estimates
             • Fall 2011 drilling program has extended Paul zone from 1.3km to 2.0km
               strike length and still open in both directions and below 400m
             • Manouane Zone covers an area of about 1000 metres long by 250m wide
               and is open at depth over 300m
             • Drilling program in progress



                                         Paul Zone1                 Manouane Zone1                           Zone 21                  Total
                                    Mt      P2O5      TiO2         Mt          P2O5         TiO2        Mt    P2O5     TiO2    Mt     P2O5    TiO2
                                            (%)       (%)                      (%)          (%)               (%)      (%)            (%)     (%)
   Measured (M)                22.1         6.82      7.89       136.9         5.93         8.77        -       -             159.0   6.05    8.65
   Indicated (I)              161.8          7.1      8.21        26.9         5.64         8.46        -      -              188.7   6.89    8.24
   Total (M&I)               183.9          7.06      8.17      163.8         5.88          8.72        -      -              347.7   6.50    8.43
   Inferred                    50.3         6.61      8.25           -           -                      64    4.55     4.57   114.3   5.46    6.90
    NOTE
    1 Cut-off grade of 2.43% P O
                              2 5




20/02/2012                                                   Copyright © 2009 Arianne Resources Inc .                                         Slide: 15
Products                                           Content                                                       Content
                                 P2O5 (%)1                                   39.1 Total SiO2 (%)1                                          2.49
                                 CaO (%)1                                     52.1 Acid Insoluble SiO2 (%)2                                1.81
                                 MgO (%)1                                     0.96 Acid Soluble SiO2 (%)2                                  0.59
    Apatite Concentrate          Fe2O3 (%)1                                   1.67 Organic C (%)2                                          0.91
    • Apatite concentrate with   Al2O3 (%)1                                   0.84 H2O (%)2                                                0.30
      P2O5 content of 39%        Na2O (%)1                                    0.28 CaO/P2O5 Analytical Ratios1                             1.33
      and and below-
                                 K2O (%)1                                     0.15 F/Soluble SiO21                                         2.88
      detection levels of Cd,
      Hg, As and                 F (%)1                                       1.70 F/(SiO2+Al2O3+MgO)1                                     0.40
      radioactive elements.                                                          (Fe2O3+Al2O3)/P2O51                                 0.064
                                 Cl ppm (water soluble)2                       108 (Fe2O3+Al2O3+MgO)/P2O5 (MER)2                         0.079
                                 Cl ppm (total)1                               860
                                 SO3 (%)2                                     0.12 Cd ppm1                                               < 0.5
                                 CO2   (%)2                                   2.38 Hg ppm         1                                     < 0.02
                                 INSOL (%)2                                   1.75 As ppm         1                                     < 0.05
    Phosphoric Acid,                 Loss of Ignition(LOI)(%)     0.51 U mg/L
                                                                    1                         1                                         < 0.02
    MAP and DAP Production
    • Produced high quality phosphoric acid, MAP and DAP (exceeds standard grades)
    • Low corrosion rates (6.5 mils/yr for 317L and 1.9 mils/yr for 904L)3
    • Low acid use (2.18 mt/mt P2O5)
    • Low gypsum production (3.94 mt/mt P2O5)
    • High recovery from rock to phos acid (98%)
    • No de-foaming or filtration reagents required in phos acid production.                                                    1 Analysis from Corem
                                                                                                              2 Analysis from Jacobs Engineering Inc.
                                          3Note: non-detecable levels of corrosion observed with oxidizer when operating at 30% P O , Jacob's report.
                                                                                                                                   2 5

20/02/2012                                Copyright © 2009 Arianne Resources Inc .                                                          Slide: 16
Not All Phosphates Are Created Equal
                     Igneous Deposits                 Sedimentary Deposits

Grade of rock

                           4-15% P2O5                        10-30% P2O5            Igneous Rocks vs.
Mining and
                                                                                    Sedimentary Rocks
crushing
                       Consolidated rocks              Very easy if the rocks are   • Phosphate rock from Lac à
                                                            unconsolidated
                                                                                    Paul is igneous rock
Beneficiation
                                                                                    • Phosphate rock from Zone
(chemical
treatment)
                                                                                    Paul (average M&I grade of
                 Easy separation and treatment          due to carbonate and
                Recovery % more than 85% (and           phosphate separation        7.06%) can be beneficiated to
                         can be >90%)                 Recovery % between 75 to      phosphate concentrate (39%
                                                                85%                 P2O5)
Concentrate
                                                                                    • Recovery of 89% of P2O5
grade
                          35-41% P2O5                 Average grade of 29% P2O5     • Very low content of
                                                       but can reach 35% P2O5       contaminants in the
Concentrate                                                                         concentrate
quality
                  Contain very little or not at all       Could contain some
                           contaminant                contaminant (heavy metals,
                (Concentrates from carbonite rock            uranium,…)
                 could contain more contaminant)




                                                                                                                    Slide: 17
Comparable Companies

                                               Stonegate                                       MBAC                       Arianne
  Resources                                  M&I: 39.5mt @ 10%
                                                                                            M&I: 58.8mt @ 5.0%
                                          Inf: 376.3mt @ 9% (Peru)
                                                                                        Inf: 24.0mt @ 5.3% (Itafos)   M&I: 347.7mt @ 6.5%
                                                      +
                                                                                                     +                Inf: 114.3mt @ 5.46%
                                             M&I: 19mt @ 30.6%
                                                                                      Inf: 33.5mt @ 12.4% (Santana)
                                         Inf: 12mt @ 30.1% (Idaho)

  Resources -                                  M&I: 9.8Mt P2O5                              M&I: 2.9Mt P2O5             M&I: 22.6Mt P2O5
  P2O5 Content                                 Inf: 37.5Mt P2O5                             Inf: 9.6Mt P2O5              Inf: 6.2Mt P2O5

  Product                                               n/a                              SSP, P2O5 Concentrate        38% P2O5 Concentrate

  Cost/tonne                                            n/a                              US$104.32/tonne (LOM)            C$98/tonne

  NPV                                                   n/a                                US$252.5m (10%)             C$684 million (8%)

  CapEx                                                 n/a                                  US$195 million               C$649 million


  Status                                 Conducting Scoping Study                            PFS Completed               PFS completed


  Geography                                       Peru, Idaho                                    Brazil                     Quebec


  Market Cap1                                    C$168 million                                C$301 million               C$100 million


  Market Cap /                                    $17.1/t P2O5                                $103.8/t P2O5                $4.4/t P2O5
  P2O5 Content2

Note
1 Capital IQ, company filings. As of January 6, 2012. Based on fully-diluted shares
2 M&I P O Content only
        2 5

                                                                                                                                             Slide: 18
Key Milestones

                                                     2012
             Milestones                                                                        2013            2014            2015
                                    Q1        Q2              Q3              Q4

   Additional drilling inside and
   outside mining zones

   Environmental Impact Study

   Additional Metallurgical
   Work1
   Increased Production
   Scenario

   Feasibility Study

   Quebec Government
   Environment Public
   Hearings

   Mine Construction



                                                                                    1to   include ilmenite and magnetite product testing.
20/02/2012                               Copyright © 2009 Arianne Resources Inc .                                                           Slide: 19
Summary & Going Forward

      Key Competitive Advantages of the Lac à Paul Project
      • Extraordinary M&I resource with highly prospective mineralized zones will yield large, low-cost,
        long-lived phosphate rock supply source to export market for 25+ years.
      • Low 0.8:1 strip ratio on existing M&I reserves
      • High-quality igneous deposit = 90% recovery, 39% (85 BPL) concentrate, high-value product
      • Conventional truck & shovel mining, concentrating and transport
      • Existing power and logistics infrastructure ensure competitive cost to export market
      • Quebec's Plan du Nord will support development with infrastructure investment
      • Saguenay Communities and First Nations support new employment opportunity
      • No environmental challenges in resource development-friendly region

                                                                           Next Stages
                                                                           • Evaluation of increased production
                                                                           scenarios (3.0 Mtpy)
                                                                           • More drilling in Paul Zone and other
                                                                           areas including Lucie and Nicole
                                                                           •Feasibility study to commence after the
                                                                           evaluation

                                                                        Paul Zone outcrop
20/02/2012                                  Copyright © 2009 Arianne Resources Inc .                                  Slide: 20
Appendix
Igneous Rock Deposits in the World


                                                                   Rock     Concentrate content
                                                        Tonnes
                                          Location                content    after beneficiation        Status
        Name of site                                     (Mt)
                                                                 (% P2O5)         (% P2O5)
        Khibiny1                         Russia          4 000     15            Unknown           In operation
        Tapira                           Brazil          1010      6.5              35             In operation
        Kovdor                           Russia            700      7            Unknown           In operation
        Araxa                            Brazil            619     15               36             In operation
        Siilinjarvi                      Finland           465      4              35.3            In operation
        Lac à Paul                       Canada          3482      6.5              39             In development
        Kapuskasing                      Canada            n/a     24               35             To close by 2013
        Catalao                          Brazil            275     11               35             In operation
        Jacupiranga                      Brazil            100      5               36             In operation




Notes
1 Biggest deposit in the world, resources not updated
2 Combine mesured and indicated resources.


                                                                                                                      Slide: 22
Sedimentary Rock Deposits in the World

                                                                         Concentrate
                                                                Rock
                                                    Tonnes               content after
   Name of site                         Location               content                         Status
                                                     (Mt)                beneficiation
                                                              (% P2O5)
                                                                           (% P2O5)
   Kara Tau                         Kazakhstan         800      10.1      Unknown        In operation
   New Valley                       Egypt              715      25            31         In operation
   Umm Wu’al                        Saudi Arabia       537    19 to 35    Unknown        In operation
   Al Jalamid                       Saudi Arabia       5341     20.4        32-33        In operation
   Paradise -Legend                 Australia          3922     15.7         32.5        In development
   Lee Creek                        United States      365      30.7      Unknown        In operation
   Arad-Rotem                       Israel             300    23 to 30        32         In operation
   Zohar                            Israel             250    23 to 30        32         In operation
   Zin                              Israel             150    23 to 30        32         In operation




Notes
1 Combined indicated and measured resources
2 Combined indicated and inferred resources


                                                                                                          Slide: 23
Principal Office               Contacts – Investors Relations
30 rue Racine Est, suite 160
Chicoutimi, QC G7H 1P5              Bernard Lapointe, Ph D, geo.
Canada                                                      CEO
                                       bernard@arianne-inc.com
Telephone: (418) 549 7316
Facsimile: (418) 549 5750                           Jim Cowley
                                                      President
Email: info@arianne-inc.com          Telephone: (801) 599-3789
Website:www.arianne-inc.com                jim@arianne-inc.com

Mais conteúdo relacionado

Mais procurados

Lion One Metals Presentation Nov 2021
Lion One Metals Presentation Nov 2021Lion One Metals Presentation Nov 2021
Lion One Metals Presentation Nov 2021Lion One Metals
 
Northisle Oct 2021 Overview Presentation Update
Northisle Oct 2021 Overview Presentation UpdateNorthisle Oct 2021 Overview Presentation Update
Northisle Oct 2021 Overview Presentation UpdateNicholas Van Dyk, CFA
 
Northisle Corporate Presentation January 2022
Northisle Corporate Presentation January 2022Northisle Corporate Presentation January 2022
Northisle Corporate Presentation January 2022Nicholas Van Dyk, CFA
 
ATAC Resources Ltd. Corporate Presentation September 2021
ATAC Resources Ltd. Corporate Presentation September 2021ATAC Resources Ltd. Corporate Presentation September 2021
ATAC Resources Ltd. Corporate Presentation September 2021ATAC Resources Ltd
 
Wrn corporate presentation_sept_2021-final
Wrn corporate presentation_sept_2021-finalWrn corporate presentation_sept_2021-final
Wrn corporate presentation_sept_2021-finalSandyNoyes
 
2021.09.07 prb presentation final
2021.09.07 prb presentation final2021.09.07 prb presentation final
2021.09.07 prb presentation finalProbe Gold
 
BeMetals Presentation - February 1, 2022
BeMetals Presentation - February 1, 2022BeMetals Presentation - February 1, 2022
BeMetals Presentation - February 1, 2022DerekIwanaka1
 
ATAC Resources Ltd. Corporate Presentation August 2021
ATAC Resources Ltd. Corporate Presentation August 2021ATAC Resources Ltd. Corporate Presentation August 2021
ATAC Resources Ltd. Corporate Presentation August 2021ATAC Resources Ltd
 
Silver One - Corporate Presentation - November 2021 short
Silver One - Corporate Presentation - November 2021 shortSilver One - Corporate Presentation - November 2021 short
Silver One - Corporate Presentation - November 2021 shortAdnet Communications
 
Lion One Metals Conference Exploration Presentation Sept 2021
Lion One Metals Conference Exploration Presentation Sept 2021Lion One Metals Conference Exploration Presentation Sept 2021
Lion One Metals Conference Exploration Presentation Sept 2021Joe Gray
 
2021.09.07 prb pea presentation final
2021.09.07 prb pea presentation final2021.09.07 prb pea presentation final
2021.09.07 prb pea presentation finalProbe Gold
 
Gold quest Corporate Presentation November-2016
Gold quest Corporate Presentation November-2016Gold quest Corporate Presentation November-2016
Gold quest Corporate Presentation November-2016GoldQuest Mining Corp.
 
Lion One Metals Presentation Oct 2021
Lion One Metals Presentation Oct 2021Lion One Metals Presentation Oct 2021
Lion One Metals Presentation Oct 2021Joe Gray
 
Moneta Porcupine - Corporate Presentation May 2021
Moneta Porcupine - Corporate Presentation May 2021Moneta Porcupine - Corporate Presentation May 2021
Moneta Porcupine - Corporate Presentation May 2021Adnet Communications
 
Wrn corporate presentation_nov_2021
Wrn corporate presentation_nov_2021Wrn corporate presentation_nov_2021
Wrn corporate presentation_nov_2021SandyNoyes
 
2022.01.10 prb presentation final
2022.01.10 prb presentation final2022.01.10 prb presentation final
2022.01.10 prb presentation finalProbe Gold
 
Wrn corporate presentation_jan_2022
Wrn corporate presentation_jan_2022Wrn corporate presentation_jan_2022
Wrn corporate presentation_jan_2022SandyNoyes
 
LeadFX Presentation
LeadFX PresentationLeadFX Presentation
LeadFX PresentationLead_FX
 
210426 silverton metals corp simplified_jun2021_v3
210426 silverton metals corp simplified_jun2021_v3210426 silverton metals corp simplified_jun2021_v3
210426 silverton metals corp simplified_jun2021_v3Adnet Communications
 

Mais procurados (20)

Lion One Metals Presentation Nov 2021
Lion One Metals Presentation Nov 2021Lion One Metals Presentation Nov 2021
Lion One Metals Presentation Nov 2021
 
Northisle Oct 2021 Overview Presentation Update
Northisle Oct 2021 Overview Presentation UpdateNorthisle Oct 2021 Overview Presentation Update
Northisle Oct 2021 Overview Presentation Update
 
Northisle Corporate Presentation January 2022
Northisle Corporate Presentation January 2022Northisle Corporate Presentation January 2022
Northisle Corporate Presentation January 2022
 
ATAC Resources Ltd. Corporate Presentation September 2021
ATAC Resources Ltd. Corporate Presentation September 2021ATAC Resources Ltd. Corporate Presentation September 2021
ATAC Resources Ltd. Corporate Presentation September 2021
 
Wrn corporate presentation_sept_2021-final
Wrn corporate presentation_sept_2021-finalWrn corporate presentation_sept_2021-final
Wrn corporate presentation_sept_2021-final
 
2021.09.07 prb presentation final
2021.09.07 prb presentation final2021.09.07 prb presentation final
2021.09.07 prb presentation final
 
BeMetals Presentation - February 1, 2022
BeMetals Presentation - February 1, 2022BeMetals Presentation - February 1, 2022
BeMetals Presentation - February 1, 2022
 
ATAC Resources Ltd. Corporate Presentation August 2021
ATAC Resources Ltd. Corporate Presentation August 2021ATAC Resources Ltd. Corporate Presentation August 2021
ATAC Resources Ltd. Corporate Presentation August 2021
 
Silver One - Corporate Presentation - November 2021 short
Silver One - Corporate Presentation - November 2021 shortSilver One - Corporate Presentation - November 2021 short
Silver One - Corporate Presentation - November 2021 short
 
Lion One Metals Conference Exploration Presentation Sept 2021
Lion One Metals Conference Exploration Presentation Sept 2021Lion One Metals Conference Exploration Presentation Sept 2021
Lion One Metals Conference Exploration Presentation Sept 2021
 
2021.09.07 prb pea presentation final
2021.09.07 prb pea presentation final2021.09.07 prb pea presentation final
2021.09.07 prb pea presentation final
 
Gold quest Corporate Presentation November-2016
Gold quest Corporate Presentation November-2016Gold quest Corporate Presentation November-2016
Gold quest Corporate Presentation November-2016
 
Lion One Metals Presentation Oct 2021
Lion One Metals Presentation Oct 2021Lion One Metals Presentation Oct 2021
Lion One Metals Presentation Oct 2021
 
Moneta Porcupine - Corporate Presentation May 2021
Moneta Porcupine - Corporate Presentation May 2021Moneta Porcupine - Corporate Presentation May 2021
Moneta Porcupine - Corporate Presentation May 2021
 
September 2021 mnd gf
September 2021 mnd gfSeptember 2021 mnd gf
September 2021 mnd gf
 
Wrn corporate presentation_nov_2021
Wrn corporate presentation_nov_2021Wrn corporate presentation_nov_2021
Wrn corporate presentation_nov_2021
 
2022.01.10 prb presentation final
2022.01.10 prb presentation final2022.01.10 prb presentation final
2022.01.10 prb presentation final
 
Wrn corporate presentation_jan_2022
Wrn corporate presentation_jan_2022Wrn corporate presentation_jan_2022
Wrn corporate presentation_jan_2022
 
LeadFX Presentation
LeadFX PresentationLeadFX Presentation
LeadFX Presentation
 
210426 silverton metals corp simplified_jun2021_v3
210426 silverton metals corp simplified_jun2021_v3210426 silverton metals corp simplified_jun2021_v3
210426 silverton metals corp simplified_jun2021_v3
 

Semelhante a Arianne Resources (TSX-V:DAN) Corporate Presentation

Iron Road 2012 Annual General Meeting presentation
Iron Road 2012 Annual General Meeting presentationIron Road 2012 Annual General Meeting presentation
Iron Road 2012 Annual General Meeting presentationajstocks
 
Iron Road 2012 Annual General Meeting
Iron Road 2012 Annual General Meeting Iron Road 2012 Annual General Meeting
Iron Road 2012 Annual General Meeting ajstocks
 
Champion Minerals Corporate Presentation November 21, 2011
Champion Minerals Corporate  Presentation November 21, 2011Champion Minerals Corporate  Presentation November 21, 2011
Champion Minerals Corporate Presentation November 21, 2011shosein2011
 
Champion Minerals Corporate Presentation - December 2011
Champion Minerals Corporate Presentation - December 2011Champion Minerals Corporate Presentation - December 2011
Champion Minerals Corporate Presentation - December 2011shosein2011
 
Champion Minerals Corporate Presentation March 30, 2012
Champion Minerals Corporate Presentation March 30, 2012Champion Minerals Corporate Presentation March 30, 2012
Champion Minerals Corporate Presentation March 30, 2012shosein2011
 
Champion iron mines nov. 2012 en
Champion iron mines nov. 2012 enChampion iron mines nov. 2012 en
Champion iron mines nov. 2012 enshosein2011
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012shosein2011
 
English champion iron mines october 2, 2012
English champion iron mines october 2, 2012English champion iron mines october 2, 2012
English champion iron mines october 2, 2012shosein2011
 
Champion Minerals Corporate Presentation December 20, 2011
Champion Minerals Corporate Presentation December 20, 2011Champion Minerals Corporate Presentation December 20, 2011
Champion Minerals Corporate Presentation December 20, 2011shosein2011
 
Champion Minerals Corporate Presentation February 2 2012
Champion Minerals Corporate Presentation February 2 2012Champion Minerals Corporate Presentation February 2 2012
Champion Minerals Corporate Presentation February 2 2012shosein2011
 
Champion Corporate Presentation - Feb 24, 2012
Champion Corporate Presentation - Feb 24, 2012Champion Corporate Presentation - Feb 24, 2012
Champion Corporate Presentation - Feb 24, 2012shosein2011
 
12 champion iron mines oct. 25th
12 champion iron mines oct. 25th12 champion iron mines oct. 25th
12 champion iron mines oct. 25thshosein2011
 
Champion Minerals Corporate Presentation Jan 16th 2012
Champion Minerals Corporate Presentation Jan 16th 2012Champion Minerals Corporate Presentation Jan 16th 2012
Champion Minerals Corporate Presentation Jan 16th 2012shosein2011
 
20140414 jor presentation final
20140414 jor presentation final20140414 jor presentation final
20140414 jor presentation finalMichael Dehn
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012shosein2011
 
English champion iron mines sept 18th 2012
English champion iron mines sept 18th 2012English champion iron mines sept 18th 2012
English champion iron mines sept 18th 2012shosein2011
 
Champion Minerals Corporate Presentation - June 28th 2012
Champion Minerals Corporate Presentation - June 28th 2012Champion Minerals Corporate Presentation - June 28th 2012
Champion Minerals Corporate Presentation - June 28th 2012shosein2011
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012shosein2011
 
English champion iron mines sept 5, 2012
English champion iron mines sept 5, 2012English champion iron mines sept 5, 2012
English champion iron mines sept 5, 2012shosein2011
 

Semelhante a Arianne Resources (TSX-V:DAN) Corporate Presentation (20)

Iron Road 2012 Annual General Meeting presentation
Iron Road 2012 Annual General Meeting presentationIron Road 2012 Annual General Meeting presentation
Iron Road 2012 Annual General Meeting presentation
 
Iron Road 2012 Annual General Meeting
Iron Road 2012 Annual General Meeting Iron Road 2012 Annual General Meeting
Iron Road 2012 Annual General Meeting
 
Champion Minerals Corporate Presentation November 21, 2011
Champion Minerals Corporate  Presentation November 21, 2011Champion Minerals Corporate  Presentation November 21, 2011
Champion Minerals Corporate Presentation November 21, 2011
 
Champion Minerals Corporate Presentation - December 2011
Champion Minerals Corporate Presentation - December 2011Champion Minerals Corporate Presentation - December 2011
Champion Minerals Corporate Presentation - December 2011
 
Champion Minerals Corporate Presentation March 30, 2012
Champion Minerals Corporate Presentation March 30, 2012Champion Minerals Corporate Presentation March 30, 2012
Champion Minerals Corporate Presentation March 30, 2012
 
Champion iron mines nov. 2012 en
Champion iron mines nov. 2012 enChampion iron mines nov. 2012 en
Champion iron mines nov. 2012 en
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012
 
English champion iron mines october 2, 2012
English champion iron mines october 2, 2012English champion iron mines october 2, 2012
English champion iron mines october 2, 2012
 
Champion Minerals Corporate Presentation December 20, 2011
Champion Minerals Corporate Presentation December 20, 2011Champion Minerals Corporate Presentation December 20, 2011
Champion Minerals Corporate Presentation December 20, 2011
 
Champion Minerals Corporate Presentation February 2 2012
Champion Minerals Corporate Presentation February 2 2012Champion Minerals Corporate Presentation February 2 2012
Champion Minerals Corporate Presentation February 2 2012
 
Champion Corporate Presentation - Feb 24, 2012
Champion Corporate Presentation - Feb 24, 2012Champion Corporate Presentation - Feb 24, 2012
Champion Corporate Presentation - Feb 24, 2012
 
12 champion iron mines oct. 25th
12 champion iron mines oct. 25th12 champion iron mines oct. 25th
12 champion iron mines oct. 25th
 
Champion Minerals Corporate Presentation Jan 16th 2012
Champion Minerals Corporate Presentation Jan 16th 2012Champion Minerals Corporate Presentation Jan 16th 2012
Champion Minerals Corporate Presentation Jan 16th 2012
 
20140414 jor presentation final
20140414 jor presentation final20140414 jor presentation final
20140414 jor presentation final
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012
 
English champion iron mines sept 18th 2012
English champion iron mines sept 18th 2012English champion iron mines sept 18th 2012
English champion iron mines sept 18th 2012
 
Champion Minerals Corporate Presentation - June 28th 2012
Champion Minerals Corporate Presentation - June 28th 2012Champion Minerals Corporate Presentation - June 28th 2012
Champion Minerals Corporate Presentation - June 28th 2012
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012
 
English champion iron mines sept 5, 2012
English champion iron mines sept 5, 2012English champion iron mines sept 5, 2012
English champion iron mines sept 5, 2012
 
Exploring past gold producers
Exploring past gold producersExploring past gold producers
Exploring past gold producers
 

Último

WhatsApp 📞 Call : 9892124323 ✅Call Girls In Chembur ( Mumbai ) secure service
WhatsApp 📞 Call : 9892124323  ✅Call Girls In Chembur ( Mumbai ) secure serviceWhatsApp 📞 Call : 9892124323  ✅Call Girls In Chembur ( Mumbai ) secure service
WhatsApp 📞 Call : 9892124323 ✅Call Girls In Chembur ( Mumbai ) secure servicePooja Nehwal
 
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
The Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdfThe Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdfGale Pooley
 
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure serviceCall US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure servicePooja Nehwal
 
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Pooja Nehwal
 
The Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfThe Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfGale Pooley
 
The Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfThe Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfGale Pooley
 
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...ssifa0344
 
The Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdfThe Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdfGale Pooley
 
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...Call Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...Call Girls in Nagpur High Profile
 
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdfFinTech Belgium
 
Basic concepts related to Financial modelling
Basic concepts related to Financial modellingBasic concepts related to Financial modelling
Basic concepts related to Financial modellingbaijup5
 
The Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfThe Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfGale Pooley
 

Último (20)

WhatsApp 📞 Call : 9892124323 ✅Call Girls In Chembur ( Mumbai ) secure service
WhatsApp 📞 Call : 9892124323  ✅Call Girls In Chembur ( Mumbai ) secure serviceWhatsApp 📞 Call : 9892124323  ✅Call Girls In Chembur ( Mumbai ) secure service
WhatsApp 📞 Call : 9892124323 ✅Call Girls In Chembur ( Mumbai ) secure service
 
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
The Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdfThe Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdf
 
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure serviceCall US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
 
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
 
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
 
The Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfThe Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdf
 
The Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfThe Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdf
 
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
 
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
 
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
 
The Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdfThe Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdf
 
(Vedika) Low Rate Call Girls in Pune Call Now 8250077686 Pune Escorts 24x7
(Vedika) Low Rate Call Girls in Pune Call Now 8250077686 Pune Escorts 24x7(Vedika) Low Rate Call Girls in Pune Call Now 8250077686 Pune Escorts 24x7
(Vedika) Low Rate Call Girls in Pune Call Now 8250077686 Pune Escorts 24x7
 
Veritas Interim Report 1 January–31 March 2024
Veritas Interim Report 1 January–31 March 2024Veritas Interim Report 1 January–31 March 2024
Veritas Interim Report 1 January–31 March 2024
 
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
 
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
 
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
 
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
 
Basic concepts related to Financial modelling
Basic concepts related to Financial modellingBasic concepts related to Financial modelling
Basic concepts related to Financial modelling
 
The Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfThe Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdf
 

Arianne Resources (TSX-V:DAN) Corporate Presentation

  • 1. Lac à Paul Project – Arianne Resources Inc. January, 2012
  • 2. Disclaimer Total resources include all categories unless otherwise stated. All currency are in US $ unless otherwise stated. This presentation contains forward looking statements. All statements, other than statements of historical fact, included herein, including without limitation, statements regarding potential mineralisation and reserves, exploration results and future plans and objectives of d’Arianne Resources Inc, are forward-looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from d’Arianne Resources Inc’s expectations are disclosed under the heading "Risk Factors" and elsewhere in d’Arianne Resources Inc’s documents filed from time-to-time with the TSX Venture and other regulatory authorities. 20/02/2012 Copyright © 2009 Arianne Resources Inc . Slide: 2
  • 3. Overview Arianne Resources is a minerals company focused on developing our principal asset, the Lac à Paul Phosphate Project Lac à Paul Project – Phosphate Rock Concentrate mine located in Saguenay-Lac-St. Jean region,Quebec, Canada • Pre-feasibility Study completed by Met-Chem in November 2011 – Measured and Indicated Resources now 348 Million mt at 6.5% P2O5 – Inferred Resources of additional 114 Million mt at 5.5% P2O5 – Mine life of 25 years at 2 Million mt/yr 85 BPL P2O5 concentrate – Initial Capital of $649 Million TSXv: DAN (Jan 6, 2012) – Operating Costs FOB Rail of $98/mt P2O5 concentrate Shares Outstanding 66.3 million Options 5.4 million – Assumed Life of Mine Concentrate Sales Price of $175/mt in constant dollars Warrants 11.4 million – NPV (8%): Pre-tax $684 Million, After- Fully Diluted 83.1 million tax $362 Million Recent Share Price $1.20 – After-tax Payback Period of 5.2 years Market Capitalization (FD) $99.7 million Cash $5.5 million Debt $0 20/02/2012 Copyright © 2009 Arianne Resources Inc . Slide: 3
  • 4. Overview Lac à Paul Project – Phosphate Rock Concentrate mine located in Saguenay-Lac-St. Jean region,Quebec, Canada • COREM and Jacobs Engineering Testwork completed October 2011 ‒ Mill recovery at 90% yields 39% P2O5 concentrate with MER of 0.079 ‒ Acidulation testing confirmed 98% recovery of P2O5 to phosphoric acid ‒ Low corrosion of 6.5 mils/yr for 317L and 1.9 mils/yr for 904L ‒ Low sulfuric acid use at 2.18 mt/mt P2O5 ‒ Low gypsum production of 3.94 mt/mt P2O5 ‒ MAP and DAP exceeding standard grades for N and P2O5 ‒ High quality concentrate suitable for blending with low-quality rock • Existing power, logistics, population + governmental, community and first nations support = low-cost production of high-quality product available to supply global export phosphate rock market. 20/02/2012 Copyright © 2009 Arianne Resources Inc . Slide: 4
  • 5. The Arianne Team Bernard has extensive experience in the resource sector. Prior to Arianne, he served as director of the Bernard Lapointe Sanguenay-Lac-Saint-Jean Mining Fund. He acted as a geochemist analyst for the Centre for Research in CEO, Director Mineral Resources of University of Quebec. Bernard holds a B.A. in geology from the University of Quebec, a Masters degree in structural geology from University of Quebec, and a Ph.D. in mineral resources from the University of Quebec. Jim is a metallurgical engineer with an MBA in finance. He worked in various roles from Mill Metallurgist to Jim Cowley Financial and Business Development manager, where he acted as a negotiator in the sale and purchase of President, Director mineral assets for Exxon, Climax Molybdenum and Rio Tinto. Luc is currently VP Finance and Marketing of Fromagerie Boivin. He also serves on different boards of Luc Boivin directors including Promotion Saguenay. Luc is the chairman of Technologie Biolatis. Director Dave is a retired metallurgical engineer. He served as Vice President of Energy and Raw Minerals at Agrium, a Dave DeBiasio leading global fertilizer company where he actively participated in the development of the Kapuskasing Director phosphate mine. Marco is a senior mining exploration professional with 20 years of experience, mostly with major mining Marco Gagnon companies. He is currently President and CEO of Adventure Gold, a Montreal-based gold exploration Director company. He was a founder and former President and CEO of Focus Metals. He worked with Inmet Mining, Barrick Gold, Minnova and Radisson Mining Resources. He has a graduate degree in geology from the University of Quebec. Guthrie has over 25 years’ experience in private equity investments, senior management and corporate law. Guthrie Stewart Until Dec 2007, he was a partner of the Equity Fund of EdgeStone Capital Partners. He is currently serving as Director, Secretary the Chairman of Orbit Garant Drilling. He earned an LL B. from Osgoode Hall Law School and an MBA from INSEAD, Europe Alain Vachon Alain is a geologist with more than 30 years experience in the mining industry. He has worked for Exploration Noranda, Barrick, and with Rouyn Mining Resources where he was chief geologist of mining operations. In the Director past 12 years, Alain worked mainly in Peru with Sulliden, Gold Hawk and Paramount Gold. Slide: 5
  • 6. History & Going Forward Brief History of Lac à Paul • Property discovered in late 1990s – Originally explored for Nickel – Phosphate/Titanium was discovered • Market in 1990s was not ready for the project • Listed in 2003 • Phosphate price escalated in the last 2-3 years, and the Company decided to move the project forward • Established Initial Resource • Completed Scoping Study • Completed Pre-feasibility Study Key Catalysts • Evaluation of increased production scenario (3.0 Mtpy) and recovery and sale of titanium concentrate (Early 2012) • Feasibility to commence after the evaluation • Drilling the Paul Zone and other zones including Lucie and Nicole Zones Slide: 6
  • 7. Phosphate and the World Phosphorous is an essential ingredient in fertilizers Phosphate Rock Demand used for plant and root development • Phosphate Rock demand reached record • There are no substitute for phosphates in fertilizers levels in 2010 and is projected to grow at an annual rate of 2% through 2020 • 87% of all phosphate supply is used for fertilizers • Demand for high P2O5, low Cadmium rock will dominate phosphate rock trade in EU and North America Phosphate Production and Consumption1, 2 • CRU projects that phosphate prices will remain high, having been undervalued vs. (in mt) Production Consumption Surplus/ MAP/DAP prices in past 2010 2020 Growth 2010 2020 Growth Deficit Europe 13.3 15.1 1.3% 19.6 20.5 0.5% (5.4) • Global phosphate rock mining capacity Africa 42.2 58.2 3.3% 26.9 40.4 4.2% 17.8 utilization will climb to near-record levels North America 26.2 24.8 (0.5%) 32.1 31.3 (0.2%) (6.5) of 85% by 2020 Latin America 8.3 16.7 7.2% 10.6 16.4 4.5% 0.3 Middle East 14.0 21.1 4.2% 6.7 16.1 9.2% 5.0 • North American phosphate import Asia-Pacific 74.2 82.4 1.1% 83.7 93.6 1.1% (11.2) requirements will grow to 6.5mt by 2020 World 178.2 218.3 2.1% 179.6 218.3 2.0% - • Lac a Paul is not included in CRU production estimates Note 1 CRU; Phosphate Rock 10-Year Outlook 2011, updated in Sep 2011 2 Growth is based on 2010-2020 annual growth rate Slide: 7
  • 8. Lac à Paul Project located 200 km north of the town of Saguenay in the Saguenay-Lac-St-Jean region, Québec, Canada The property covers an area of more than 25,000 hectares or 250 km² Road Train Key Highlights • Existing heavy-duty road, rail line and port = excellent access to export market • Existing hydro-power facilities nearby (35 km) = low power cost • Saguenay-Lake St. Jean area population of 300,000 = high- quality labor pool 20/02/2012 Copyright © 2009 Arianne Resources Inc . Slide: 8
  • 9. Lac a Paul Chute-des-Passes Road Power Generation Project • Well-maintained heavy-duty gravel • Power requirement of 46 MW road supporting logging industry easily supplied by 750 MW Rio Chute-des-Passes • 165 mt capacity road & bridges Alcan Chute-des-Passes dam 35 support 115 mt/truck phosphate rock km away or 450 MW Peribonka IV loads Hydro Quebec dam. • 210 km from project to railhead at Dolbeau requires 2 truck loads/hour Peribonka IV Saguenay Port • Year-round deep water port supports cape-size vessels. • Capacity for 4 million mt/yr concentrate storage, handling and ship-loading. Saguenay-Lac-St-Jean Region • Connection to rail infrastructure in progress. • Population of 272,610 • Largest City: Saguenay (Pop: 143,692) • Work force: 127,500 (Sep 2011) Lac Saint-Jean • Unemployment Rate: 7.5% (Sep 2011) Rail • Rail access at Dolbeau-Mistassini, 210km away from the project via road • Connected to North American Rail Network (CN) 20 km Copyright © 2009 Arianne Resources Inc . Slide: 9
  • 10. Lac à Paul Proven and Problable Reserves Paul Zone extension and other known mineralizations 1 km 20/02/2012 Copyright © 2009 Arianne Resources Inc . Slide: 10
  • 11. Lac à Paul Paul Nicole Proven and Problable Reserves Manouane Paul Zone extension and other known Lucie mineralizations 1 km 20/02/2012 Copyright © 2009 Arianne Resources Inc . Slide: 11
  • 12. Pre-Feasibility Study Highlights Prefeasibility Study • Open-pit mining operations at the Paul and Assumed Concentrate Price $175/tonne Manouane Zones Annual Concentrate Production ~2mtpa Mine Life 25 years • Low Strip Ratio of 0.83 Direct CAPEX $454 million • Annual Production of 2 million tonnes of 39% Indirect CAPEX $121 million P2O5 apatite concentrate Contingency $74 million Total CapEx $649 million • Average selling price of the concentrate Cash Operating Cost (mine site) $87/tonne $175/tonne (2015 to 2020) Cash Operating Cost (Train FOB) $98/tonne ‒ Comparable to 85 BPL Russian grade concentrate Capital Payback (before tax) 4.7 years • Estimated mine life: 25 years at 33,000 IRR (before tax) 19.2% tonnes/day with 89% mill recovery rate NPV (8%) (before tax) $684 million Capital Payback (after tax) 5.2 years IRR (after tax) 15.2% 3 million mt/yr Phos Rock Production NPV (8%) (after tax) $362 million Rate Scenario (preliminary figures) • Initial Capex increases by 20% to ~$780 million • Pre-tax NPV (8%) increases to $1 Billion • Operating costs fall considerably (~20%) 20/02/2012 Copyright © 2009 Arianne Resources Inc . Slide: 12
  • 13. Future Mine Capital Costs Estimate ($ million) Mine 66.7 Ore process (mill) 336.6 Tailings and water management facilities 18.4 General services and infrasctructure at mine site 61.9 Service vehicles and equipment 7.6 Insurance and spare parts 10.4 Power and communication 67.2 Stockpile and rail car load-out 80.2 CRUSHER ORE Total capital cost 649.0 AGGREGATE FUEL AND RECLAIM PLANT GARAGE ADMIN 20/02/2012 Copyright © 2009 Arianne Resources Inc . 13
  • 14. Open-pit Paul CRUSHER ORE AND RECLAIM AGGREGATE FUEL ADMIN GARAGE PLANT 20/02/2012 Copyright © 2009 Arianne Resources Inc . 14
  • 15. Resources NI 43-101 Updated NI 43-101 Resources • M&I resources quadruple over the previous resource estimates • Fall 2011 drilling program has extended Paul zone from 1.3km to 2.0km strike length and still open in both directions and below 400m • Manouane Zone covers an area of about 1000 metres long by 250m wide and is open at depth over 300m • Drilling program in progress Paul Zone1 Manouane Zone1 Zone 21 Total Mt P2O5 TiO2 Mt P2O5 TiO2 Mt P2O5 TiO2 Mt P2O5 TiO2 (%) (%) (%) (%) (%) (%) (%) (%) Measured (M) 22.1 6.82 7.89 136.9 5.93 8.77 - - 159.0 6.05 8.65 Indicated (I) 161.8 7.1 8.21 26.9 5.64 8.46 - - 188.7 6.89 8.24 Total (M&I) 183.9 7.06 8.17 163.8 5.88 8.72 - - 347.7 6.50 8.43 Inferred 50.3 6.61 8.25 - - 64 4.55 4.57 114.3 5.46 6.90 NOTE 1 Cut-off grade of 2.43% P O 2 5 20/02/2012 Copyright © 2009 Arianne Resources Inc . Slide: 15
  • 16. Products Content Content P2O5 (%)1 39.1 Total SiO2 (%)1 2.49 CaO (%)1 52.1 Acid Insoluble SiO2 (%)2 1.81 MgO (%)1 0.96 Acid Soluble SiO2 (%)2 0.59 Apatite Concentrate Fe2O3 (%)1 1.67 Organic C (%)2 0.91 • Apatite concentrate with Al2O3 (%)1 0.84 H2O (%)2 0.30 P2O5 content of 39% Na2O (%)1 0.28 CaO/P2O5 Analytical Ratios1 1.33 and and below- K2O (%)1 0.15 F/Soluble SiO21 2.88 detection levels of Cd, Hg, As and F (%)1 1.70 F/(SiO2+Al2O3+MgO)1 0.40 radioactive elements. (Fe2O3+Al2O3)/P2O51 0.064 Cl ppm (water soluble)2 108 (Fe2O3+Al2O3+MgO)/P2O5 (MER)2 0.079 Cl ppm (total)1 860 SO3 (%)2 0.12 Cd ppm1 < 0.5 CO2 (%)2 2.38 Hg ppm 1 < 0.02 INSOL (%)2 1.75 As ppm 1 < 0.05 Phosphoric Acid, Loss of Ignition(LOI)(%) 0.51 U mg/L 1 1 < 0.02 MAP and DAP Production • Produced high quality phosphoric acid, MAP and DAP (exceeds standard grades) • Low corrosion rates (6.5 mils/yr for 317L and 1.9 mils/yr for 904L)3 • Low acid use (2.18 mt/mt P2O5) • Low gypsum production (3.94 mt/mt P2O5) • High recovery from rock to phos acid (98%) • No de-foaming or filtration reagents required in phos acid production. 1 Analysis from Corem 2 Analysis from Jacobs Engineering Inc. 3Note: non-detecable levels of corrosion observed with oxidizer when operating at 30% P O , Jacob's report. 2 5 20/02/2012 Copyright © 2009 Arianne Resources Inc . Slide: 16
  • 17. Not All Phosphates Are Created Equal Igneous Deposits Sedimentary Deposits Grade of rock 4-15% P2O5 10-30% P2O5 Igneous Rocks vs. Mining and Sedimentary Rocks crushing Consolidated rocks Very easy if the rocks are • Phosphate rock from Lac à unconsolidated Paul is igneous rock Beneficiation • Phosphate rock from Zone (chemical treatment) Paul (average M&I grade of Easy separation and treatment due to carbonate and Recovery % more than 85% (and phosphate separation 7.06%) can be beneficiated to can be >90%) Recovery % between 75 to phosphate concentrate (39% 85% P2O5) Concentrate • Recovery of 89% of P2O5 grade 35-41% P2O5 Average grade of 29% P2O5 • Very low content of but can reach 35% P2O5 contaminants in the Concentrate concentrate quality Contain very little or not at all Could contain some contaminant contaminant (heavy metals, (Concentrates from carbonite rock uranium,…) could contain more contaminant) Slide: 17
  • 18. Comparable Companies Stonegate MBAC Arianne Resources M&I: 39.5mt @ 10% M&I: 58.8mt @ 5.0% Inf: 376.3mt @ 9% (Peru) Inf: 24.0mt @ 5.3% (Itafos) M&I: 347.7mt @ 6.5% + + Inf: 114.3mt @ 5.46% M&I: 19mt @ 30.6% Inf: 33.5mt @ 12.4% (Santana) Inf: 12mt @ 30.1% (Idaho) Resources - M&I: 9.8Mt P2O5 M&I: 2.9Mt P2O5 M&I: 22.6Mt P2O5 P2O5 Content Inf: 37.5Mt P2O5 Inf: 9.6Mt P2O5 Inf: 6.2Mt P2O5 Product n/a SSP, P2O5 Concentrate 38% P2O5 Concentrate Cost/tonne n/a US$104.32/tonne (LOM) C$98/tonne NPV n/a US$252.5m (10%) C$684 million (8%) CapEx n/a US$195 million C$649 million Status Conducting Scoping Study PFS Completed PFS completed Geography Peru, Idaho Brazil Quebec Market Cap1 C$168 million C$301 million C$100 million Market Cap / $17.1/t P2O5 $103.8/t P2O5 $4.4/t P2O5 P2O5 Content2 Note 1 Capital IQ, company filings. As of January 6, 2012. Based on fully-diluted shares 2 M&I P O Content only 2 5 Slide: 18
  • 19. Key Milestones 2012 Milestones 2013 2014 2015 Q1 Q2 Q3 Q4 Additional drilling inside and outside mining zones Environmental Impact Study Additional Metallurgical Work1 Increased Production Scenario Feasibility Study Quebec Government Environment Public Hearings Mine Construction 1to include ilmenite and magnetite product testing. 20/02/2012 Copyright © 2009 Arianne Resources Inc . Slide: 19
  • 20. Summary & Going Forward Key Competitive Advantages of the Lac à Paul Project • Extraordinary M&I resource with highly prospective mineralized zones will yield large, low-cost, long-lived phosphate rock supply source to export market for 25+ years. • Low 0.8:1 strip ratio on existing M&I reserves • High-quality igneous deposit = 90% recovery, 39% (85 BPL) concentrate, high-value product • Conventional truck & shovel mining, concentrating and transport • Existing power and logistics infrastructure ensure competitive cost to export market • Quebec's Plan du Nord will support development with infrastructure investment • Saguenay Communities and First Nations support new employment opportunity • No environmental challenges in resource development-friendly region Next Stages • Evaluation of increased production scenarios (3.0 Mtpy) • More drilling in Paul Zone and other areas including Lucie and Nicole •Feasibility study to commence after the evaluation Paul Zone outcrop 20/02/2012 Copyright © 2009 Arianne Resources Inc . Slide: 20
  • 22. Igneous Rock Deposits in the World Rock Concentrate content Tonnes Location content after beneficiation Status Name of site (Mt) (% P2O5) (% P2O5) Khibiny1 Russia 4 000 15 Unknown In operation Tapira Brazil 1010 6.5 35 In operation Kovdor Russia 700 7 Unknown In operation Araxa Brazil 619 15 36 In operation Siilinjarvi Finland 465 4 35.3 In operation Lac à Paul Canada 3482 6.5 39 In development Kapuskasing Canada n/a 24 35 To close by 2013 Catalao Brazil 275 11 35 In operation Jacupiranga Brazil 100 5 36 In operation Notes 1 Biggest deposit in the world, resources not updated 2 Combine mesured and indicated resources. Slide: 22
  • 23. Sedimentary Rock Deposits in the World Concentrate Rock Tonnes content after Name of site Location content Status (Mt) beneficiation (% P2O5) (% P2O5) Kara Tau Kazakhstan 800 10.1 Unknown In operation New Valley Egypt 715 25 31 In operation Umm Wu’al Saudi Arabia 537 19 to 35 Unknown In operation Al Jalamid Saudi Arabia 5341 20.4 32-33 In operation Paradise -Legend Australia 3922 15.7 32.5 In development Lee Creek United States 365 30.7 Unknown In operation Arad-Rotem Israel 300 23 to 30 32 In operation Zohar Israel 250 23 to 30 32 In operation Zin Israel 150 23 to 30 32 In operation Notes 1 Combined indicated and measured resources 2 Combined indicated and inferred resources Slide: 23
  • 24. Principal Office Contacts – Investors Relations 30 rue Racine Est, suite 160 Chicoutimi, QC G7H 1P5 Bernard Lapointe, Ph D, geo. Canada CEO bernard@arianne-inc.com Telephone: (418) 549 7316 Facsimile: (418) 549 5750 Jim Cowley President Email: info@arianne-inc.com Telephone: (801) 599-3789 Website:www.arianne-inc.com jim@arianne-inc.com