GROUTING
GROUTING
• Grouting is a process of ground improvement attained by
injecting fluid like material into subsurface soil or rock.
• Grouting is the injection specially formulated cement of stable
suspensions
• or liquid into pores, fissures or voids, or the jetting of cement
mixtures at
• high flow rate and pressure into the soil to create soil-
cement to increase
• the strength.
• Producing mass concrete structures and piles
• Fixing ground anchors for sheet pile walls, concrete pile walls,
retaining walls tunnels etc
• Repairing a ground underneath a formation or cracks and
structural
• Defects on building masonry or pavement.
• Fixing the tendons in prestressed post tensioned concrete
• Filling the void between the lining and rock face in tunnel
works
APPLICATIONS
(a) Suspension grouts: These are multi-phase systems capable of
forming sub systems after being subjected to natural sieving
processes, with chemical properties which must be carefully
scrutinized so as to ensure that they do not militate against controlled
properties of setting and strength. Water in association with cement,
lime, soil, etc., constitute suspensions. Emulsion (asphalt or bitumen)
with water is a two-phase system which is also included under
suspension.
(b) Solution grouts: These are intimate one-phase system retaining
an originally designed chemical balance until completion of the
relevant reactions. Solutions in which the solute is present in the
colloidal state are known as colloidal solutions. Chemical grouts fall
into this category.
GROUTING MATERIAL TYPES
• Cement and water
• Cement, rock flour and water
• Cement, clay and water
• Cement clay, sand and water
• Asphalt
• Clay and water
• Chemicals
MATERIALS USED FOR GROUTING
Common admixtures used with cement grouts:
1. Calcium chloride ]
2. Sodium hydroxide ]-----------------for accelerating setting time
3. Sodium silicate ]
4. Gypsum ]
5. Lime sugar ]----------------------for retarding setting time.
6. Sodium tannate ]
7. Fine bentonite ]
8. Clay ]
9. Ground shale ]--------for reducing cost of grout and reduces
10. Rock flour ] strength of grout
ADMIXTURES
Grout is injected into the soil at low pressure and fills the voids
without significantly changing the soil’s structure and volume.
Variety of binders are used with this technique, the choice of which is
dictated mainly by the permeability of the soil.
When the coefficient of permeability is greater than 10-2cm/sec,
water-cement mixes are used and for permeability as low as 10-5
cm/sec, the more expensive resin based grouts are used. Soils with K
values lower than 10-6 cm/sec are normally not groutable by
permeation.
PERMEATION
The basic concept is of injecting an highly viscous grout with
high internal friction, injected into a compactable soil, the grout
acts as a radial-hydraulic jack and physically displaces the soil
particles thus achieving controlled densification.
Advantages
1.Minimum disturbance to the structure and surrounding ground,
2.Minimum risk during construction.
3.Ground water not affected.
4.Supports all portions of structures.
COMPACTION PERMEATION
Disadvantages
•Grouting adjacent to unsupported slopes may be ineffective.
•Not suitable in decomposable materials.
•Danger of filling underground pipes with grout.
•Effectiveness questionable in saturated clays
COMPACTION PERMEATION
Thick slurries can not penetrate fine cracks and higher
injection pressures would cause fracturing of ground foundations.
Because of the higher water requirements of micro fine cement,
the slurry remains fluid enough to flow into and penetrate fine
sands and small cracks in rock.
These cements can treat finer grained sands not possible to
treat with Portland cement alone. They are also used to stabilize
waste plumes.
MICROFINE CEMENT
A key advantage of chemical grouting is the ability to introduce grout into
soil pores without any essential change in the original soil volume and structure,
thus changing the support capability of granular soils without disturbing them.
Another advantage is the ability to be less disruptive and enable tunneling to
proceed without over-excavation. A possible drawback of chemical grouting is
that only certain soil types are amenable. Another barrier to the use of chemical
grouting techniques in the recent is increasing concern regarding potential
pollution by chemical grouting in urban areas. Two trends have addressed this
issue:
1. Improvement of grouts through the development of new formulae that
enhance the penetrability of particulate suspensions and meet the strictest
specifications for environmental safety
2. Development of alternative techniques which by-pass the penetrability
restraints, such as jet grouting which allows the treatment of most types of soil,
independent of its grain size and permeability, using simple cement grouts
CHEMICAL GROUTING
COMPACTION PERMEATION
1. Compensation (hydrofracture) grouting uses high-mobility grout
to split the ground and thereby create lifting or densification under
structures or other facilities.
2. The ground is deliberately split by injecting stable fluid cement-
based grouts at high pressures in order to increase total stress by the
wedging action of successive thin grout lenses, to fill unconnected
voids, and possibly to consolidate the soil locally under injection.
3. This process is often undertaken as a reaction to movements
while tunnel excavation is in progress.
4. It is important to keep in mind that the effects of compensation
(hydrofracture) grouting are difficult to control and the potential
danger of damaging adjacent structures by the use of high pressure
may prove prohibitive
COMPENSATION GROUTING
1. It is a technology in which high- pressure jets of cement grout
are discharged sideways into the borehole wall to
simultaneously excavate and then mix with the soil.
2. The outstanding feature of jet grouting is the ability to treat a
whole range of soils, from silty sands to cohesive deposits, by
means of simple cement grouts.
3. Jet grouting can be performed in soils with a wide range of
granulometries and permeabilites.
JET GROUTING
1. the ability to use very small drilling tools (90mm diameter) to
create large elements (1.2m to 2.4m diameter) using pressure
and flow;
2. the ability to drill underneath obstacles and solidify zones
which are hard to access;
3. the use of technically sophisticated techniques such as high-
powered pumps and monitoring devices with continuous
measurement of all operational parameters.
ADVANTAGES
JET GROUTING
A grouting plant includes a mixer, an agitator, a pump, and piping
connected to grout holes. Two systems: single line type and
circulating type. In the circulation type, the unused grout is returned
to the agitator and in the single-line type the grout refused is wasted.
The basic items required for a grouting plant and their functions are:
(a) Measuring tank-to control the volume of grout injected.
(b) Mixer-to mix the grout ingredients
(c) Agitator-to keep the solid particles in suspension until pumped
(d) Pump-to draw the grout from the agitator to deliver to the
pumping line.
(e) Control fittings-to control the injection rate and pressure so that
the hole can be regularly blend with water and thin grout.
GROUTING PLANT AND EQUIPMENT
SCHEMATIC REPRESENTATION
PRECAUTIONS
The following are the precautions while mixing a grout:
• Water is placed first in the mixer.
• Mixer is run at the maximum speed before adding the cement.
• Grout is mixed in batches.
• Ingredients have to be measured in volume
• Enough water should be maintained to cover the rotor while it
is functioning.
• Mixer should not be allowed to run for more than a few
minutes between batches.
• Mixers should be cleaned thoroughly after the day’s work.
Holes for the injection of grout may be drilled with jack
hammers, wagon drills or diamond drills, depending on the
terrain, class of foundation material, and size and depth of holes.
Diamond drills usually give holes of uniform shape, while wagon
drills are satisfactory for holes up to about 10 meters depth.
DRILLING INJECTION HOLES
Preparations for washing or grouting seams, consists of
installing a section of pipe of about 35 to 50mm dia and 0.50 to
1.0 m long in the grout hole with the top and projecting out a
short distance for connection to an air line or a pump.
For grouting the seams with neat cement for consolidation
purposes it is desirable to deposit the cement in clean seams by
removing any clay or any other unwanted materials. For this
cleaning effective method is to force a mixture of air and water
through the seams.
For deciding the pressure for grouting operation, most
common practice is to use a pressure 0.2kg/cm2 for each meter
of depth of hole.
WASHING AND GROUTING THE SEAMS

Mais conteúdo relacionado

Mais procurados

Dewatering techniques
Dewatering techniquesDewatering techniques
Dewatering techniquesjamali husain
 
shotcreting and guniting ppt
shotcreting and guniting pptshotcreting and guniting ppt
shotcreting and guniting pptPunit Sharnagat
 
Ground Improvement Techniques
Ground Improvement TechniquesGround Improvement Techniques
Ground Improvement TechniquesLokeswar
 
Soil exploration/Investigation method, purpose depth of exploration (Usefulse...
Soil exploration/Investigation method, purpose depth of exploration (Usefulse...Soil exploration/Investigation method, purpose depth of exploration (Usefulse...
Soil exploration/Investigation method, purpose depth of exploration (Usefulse...Make Mannan
 
Design of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion HeadworkDesign of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion HeadworkRamanuj Jaldhari
 
Concrete Mix Design 10262-2019.pptx
Concrete Mix Design 10262-2019.pptxConcrete Mix Design 10262-2019.pptx
Concrete Mix Design 10262-2019.pptxSunil Jha
 
07 101+ ground improvement techniques
07 101+ ground improvement techniques07 101+ ground improvement techniques
07 101+ ground improvement techniquesAHMED NADIM JILANI
 
pile foundation and pile cap presentation
pile foundation and pile cap presentationpile foundation and pile cap presentation
pile foundation and pile cap presentationRahul bhatnagar
 
Class 7 Consolidation Test ( Geotechnical Engineering )
Class 7    Consolidation Test ( Geotechnical Engineering )Class 7    Consolidation Test ( Geotechnical Engineering )
Class 7 Consolidation Test ( Geotechnical Engineering )Hossam Shafiq I
 
Steel fibre reinforced_concrete
Steel fibre reinforced_concreteSteel fibre reinforced_concrete
Steel fibre reinforced_concretesiddharth sid
 
Various types of pressure pipes
Various types of pressure pipes Various types of pressure pipes
Various types of pressure pipes Lavanya Singh
 
Effect of expansive soils on buildings and its prevention
Effect of expansive soils on buildings and its preventionEffect of expansive soils on buildings and its prevention
Effect of expansive soils on buildings and its preventionSailish Cephas
 
Pre stressed concrete
Pre stressed concretePre stressed concrete
Pre stressed concreteGPT Stvd
 
Ground improvement technique
Ground improvement techniqueGround improvement technique
Ground improvement techniqueSatish Kambaliya
 
Well Foundation
Well FoundationWell Foundation
Well Foundationakjain_mkt
 

Mais procurados (20)

Dewatering techniques
Dewatering techniquesDewatering techniques
Dewatering techniques
 
Si fconn
Si fconnSi fconn
Si fconn
 
shotcreting and guniting ppt
shotcreting and guniting pptshotcreting and guniting ppt
shotcreting and guniting ppt
 
Ground Improvement Techniques
Ground Improvement TechniquesGround Improvement Techniques
Ground Improvement Techniques
 
Soil exploration/Investigation method, purpose depth of exploration (Usefulse...
Soil exploration/Investigation method, purpose depth of exploration (Usefulse...Soil exploration/Investigation method, purpose depth of exploration (Usefulse...
Soil exploration/Investigation method, purpose depth of exploration (Usefulse...
 
Design of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion HeadworkDesign of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion Headwork
 
Section 300
Section 300Section 300
Section 300
 
Concrete Mix Design 10262-2019.pptx
Concrete Mix Design 10262-2019.pptxConcrete Mix Design 10262-2019.pptx
Concrete Mix Design 10262-2019.pptx
 
07 101+ ground improvement techniques
07 101+ ground improvement techniques07 101+ ground improvement techniques
07 101+ ground improvement techniques
 
pile foundation and pile cap presentation
pile foundation and pile cap presentationpile foundation and pile cap presentation
pile foundation and pile cap presentation
 
Class 7 Consolidation Test ( Geotechnical Engineering )
Class 7    Consolidation Test ( Geotechnical Engineering )Class 7    Consolidation Test ( Geotechnical Engineering )
Class 7 Consolidation Test ( Geotechnical Engineering )
 
Steel fibre reinforced_concrete
Steel fibre reinforced_concreteSteel fibre reinforced_concrete
Steel fibre reinforced_concrete
 
Various types of pressure pipes
Various types of pressure pipes Various types of pressure pipes
Various types of pressure pipes
 
Vertical Drain
Vertical Drain Vertical Drain
Vertical Drain
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
 
Effect of expansive soils on buildings and its prevention
Effect of expansive soils on buildings and its preventionEffect of expansive soils on buildings and its prevention
Effect of expansive soils on buildings and its prevention
 
Chapter 15
Chapter 15Chapter 15
Chapter 15
 
Pre stressed concrete
Pre stressed concretePre stressed concrete
Pre stressed concrete
 
Ground improvement technique
Ground improvement techniqueGround improvement technique
Ground improvement technique
 
Well Foundation
Well FoundationWell Foundation
Well Foundation
 

Semelhante a Comprehensive Guide to Grouting Processes

Grouting various techniques of grouting.pptx
Grouting various techniques of grouting.pptxGrouting various techniques of grouting.pptx
Grouting various techniques of grouting.pptxUmarSaba1
 
Gangaram yadav ppt road con....
Gangaram yadav ppt road con....Gangaram yadav ppt road con....
Gangaram yadav ppt road con....RaazYadav6
 
special concrete and high performance concrete
special concrete and high performance concretespecial concrete and high performance concrete
special concrete and high performance concreteErankajKumar
 
unit - IV - Concrete methods.pdf
unit - IV - Concrete methods.pdfunit - IV - Concrete methods.pdf
unit - IV - Concrete methods.pdfAbishekKumar81
 
Repair techniques : Grouting (RR&S)
Repair techniques : Grouting (RR&S)Repair techniques : Grouting (RR&S)
Repair techniques : Grouting (RR&S)RAMPRASAD KUMAWAT
 
Soil improvement Methods.pptx
Soil improvement Methods.pptxSoil improvement Methods.pptx
Soil improvement Methods.pptxFlittiAbdelhamid
 
FOUNDATION ENGINEERING.pptx
FOUNDATION ENGINEERING.pptxFOUNDATION ENGINEERING.pptx
FOUNDATION ENGINEERING.pptxDolanGhosh4
 
Permeation grouting for remediation of dam cores
Permeation grouting for remediation of dam coresPermeation grouting for remediation of dam cores
Permeation grouting for remediation of dam coresUjwal Ujwal
 
Module on Special and high performance concrete
Module on Special and high performance concreteModule on Special and high performance concrete
Module on Special and high performance concreteErankajKumar
 
IRJET- Improving SBC of Sandy Soil by Cement Grouting Technique
IRJET- Improving SBC of Sandy Soil by Cement Grouting TechniqueIRJET- Improving SBC of Sandy Soil by Cement Grouting Technique
IRJET- Improving SBC of Sandy Soil by Cement Grouting TechniqueIRJET Journal
 
Week 01 Preliminaries Works, Soil Investigate & Ground Water Control
Week 01 Preliminaries Works, Soil Investigate & Ground Water ControlWeek 01 Preliminaries Works, Soil Investigate & Ground Water Control
Week 01 Preliminaries Works, Soil Investigate & Ground Water Controlnik kin
 
retrofitting and rehabilitation of structures
retrofitting and rehabilitation of structuresretrofitting and rehabilitation of structures
retrofitting and rehabilitation of structuresKumarS250747
 
Road pavements-of-cement-concrete
Road pavements-of-cement-concreteRoad pavements-of-cement-concrete
Road pavements-of-cement-concreteMylene Delmoro
 
Road pavements-of-cement-concrete
Road pavements-of-cement-concreteRoad pavements-of-cement-concrete
Road pavements-of-cement-concreteMylene Delmoro
 
Fresh concrete for civil engineering
Fresh concrete for civil engineeringFresh concrete for civil engineering
Fresh concrete for civil engineeringlaxman singh
 

Semelhante a Comprehensive Guide to Grouting Processes (20)

6.1 Grouting.pptx
6.1 Grouting.pptx6.1 Grouting.pptx
6.1 Grouting.pptx
 
Grouting n gunintung
Grouting n gunintungGrouting n gunintung
Grouting n gunintung
 
Grouting various techniques of grouting.pptx
Grouting various techniques of grouting.pptxGrouting various techniques of grouting.pptx
Grouting various techniques of grouting.pptx
 
Grouting
GroutingGrouting
Grouting
 
Grout.pptx
Grout.pptxGrout.pptx
Grout.pptx
 
Gangaram yadav ppt road con....
Gangaram yadav ppt road con....Gangaram yadav ppt road con....
Gangaram yadav ppt road con....
 
special concrete and high performance concrete
special concrete and high performance concretespecial concrete and high performance concrete
special concrete and high performance concrete
 
unit - IV - Concrete methods.pdf
unit - IV - Concrete methods.pdfunit - IV - Concrete methods.pdf
unit - IV - Concrete methods.pdf
 
Repair techniques : Grouting (RR&S)
Repair techniques : Grouting (RR&S)Repair techniques : Grouting (RR&S)
Repair techniques : Grouting (RR&S)
 
Soil improvement Methods.pptx
Soil improvement Methods.pptxSoil improvement Methods.pptx
Soil improvement Methods.pptx
 
FOUNDATION ENGINEERING.pptx
FOUNDATION ENGINEERING.pptxFOUNDATION ENGINEERING.pptx
FOUNDATION ENGINEERING.pptx
 
Permeation grouting for remediation of dam cores
Permeation grouting for remediation of dam coresPermeation grouting for remediation of dam cores
Permeation grouting for remediation of dam cores
 
Module on Special and high performance concrete
Module on Special and high performance concreteModule on Special and high performance concrete
Module on Special and high performance concrete
 
Pervious concrete
Pervious concretePervious concrete
Pervious concrete
 
IRJET- Improving SBC of Sandy Soil by Cement Grouting Technique
IRJET- Improving SBC of Sandy Soil by Cement Grouting TechniqueIRJET- Improving SBC of Sandy Soil by Cement Grouting Technique
IRJET- Improving SBC of Sandy Soil by Cement Grouting Technique
 
Week 01 Preliminaries Works, Soil Investigate & Ground Water Control
Week 01 Preliminaries Works, Soil Investigate & Ground Water ControlWeek 01 Preliminaries Works, Soil Investigate & Ground Water Control
Week 01 Preliminaries Works, Soil Investigate & Ground Water Control
 
retrofitting and rehabilitation of structures
retrofitting and rehabilitation of structuresretrofitting and rehabilitation of structures
retrofitting and rehabilitation of structures
 
Road pavements-of-cement-concrete
Road pavements-of-cement-concreteRoad pavements-of-cement-concrete
Road pavements-of-cement-concrete
 
Road pavements-of-cement-concrete
Road pavements-of-cement-concreteRoad pavements-of-cement-concrete
Road pavements-of-cement-concrete
 
Fresh concrete for civil engineering
Fresh concrete for civil engineeringFresh concrete for civil engineering
Fresh concrete for civil engineering
 

Último

MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Último (20)

MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 

Comprehensive Guide to Grouting Processes

  • 2. GROUTING • Grouting is a process of ground improvement attained by injecting fluid like material into subsurface soil or rock. • Grouting is the injection specially formulated cement of stable suspensions • or liquid into pores, fissures or voids, or the jetting of cement mixtures at • high flow rate and pressure into the soil to create soil- cement to increase • the strength.
  • 3. • Producing mass concrete structures and piles • Fixing ground anchors for sheet pile walls, concrete pile walls, retaining walls tunnels etc • Repairing a ground underneath a formation or cracks and structural • Defects on building masonry or pavement. • Fixing the tendons in prestressed post tensioned concrete • Filling the void between the lining and rock face in tunnel works APPLICATIONS
  • 4. (a) Suspension grouts: These are multi-phase systems capable of forming sub systems after being subjected to natural sieving processes, with chemical properties which must be carefully scrutinized so as to ensure that they do not militate against controlled properties of setting and strength. Water in association with cement, lime, soil, etc., constitute suspensions. Emulsion (asphalt or bitumen) with water is a two-phase system which is also included under suspension. (b) Solution grouts: These are intimate one-phase system retaining an originally designed chemical balance until completion of the relevant reactions. Solutions in which the solute is present in the colloidal state are known as colloidal solutions. Chemical grouts fall into this category. GROUTING MATERIAL TYPES
  • 5. • Cement and water • Cement, rock flour and water • Cement, clay and water • Cement clay, sand and water • Asphalt • Clay and water • Chemicals MATERIALS USED FOR GROUTING
  • 6. Common admixtures used with cement grouts: 1. Calcium chloride ] 2. Sodium hydroxide ]-----------------for accelerating setting time 3. Sodium silicate ] 4. Gypsum ] 5. Lime sugar ]----------------------for retarding setting time. 6. Sodium tannate ] 7. Fine bentonite ] 8. Clay ] 9. Ground shale ]--------for reducing cost of grout and reduces 10. Rock flour ] strength of grout ADMIXTURES
  • 7. Grout is injected into the soil at low pressure and fills the voids without significantly changing the soil’s structure and volume. Variety of binders are used with this technique, the choice of which is dictated mainly by the permeability of the soil. When the coefficient of permeability is greater than 10-2cm/sec, water-cement mixes are used and for permeability as low as 10-5 cm/sec, the more expensive resin based grouts are used. Soils with K values lower than 10-6 cm/sec are normally not groutable by permeation. PERMEATION
  • 8. The basic concept is of injecting an highly viscous grout with high internal friction, injected into a compactable soil, the grout acts as a radial-hydraulic jack and physically displaces the soil particles thus achieving controlled densification. Advantages 1.Minimum disturbance to the structure and surrounding ground, 2.Minimum risk during construction. 3.Ground water not affected. 4.Supports all portions of structures. COMPACTION PERMEATION
  • 9. Disadvantages •Grouting adjacent to unsupported slopes may be ineffective. •Not suitable in decomposable materials. •Danger of filling underground pipes with grout. •Effectiveness questionable in saturated clays COMPACTION PERMEATION
  • 10. Thick slurries can not penetrate fine cracks and higher injection pressures would cause fracturing of ground foundations. Because of the higher water requirements of micro fine cement, the slurry remains fluid enough to flow into and penetrate fine sands and small cracks in rock. These cements can treat finer grained sands not possible to treat with Portland cement alone. They are also used to stabilize waste plumes. MICROFINE CEMENT
  • 11. A key advantage of chemical grouting is the ability to introduce grout into soil pores without any essential change in the original soil volume and structure, thus changing the support capability of granular soils without disturbing them. Another advantage is the ability to be less disruptive and enable tunneling to proceed without over-excavation. A possible drawback of chemical grouting is that only certain soil types are amenable. Another barrier to the use of chemical grouting techniques in the recent is increasing concern regarding potential pollution by chemical grouting in urban areas. Two trends have addressed this issue: 1. Improvement of grouts through the development of new formulae that enhance the penetrability of particulate suspensions and meet the strictest specifications for environmental safety 2. Development of alternative techniques which by-pass the penetrability restraints, such as jet grouting which allows the treatment of most types of soil, independent of its grain size and permeability, using simple cement grouts CHEMICAL GROUTING
  • 13. 1. Compensation (hydrofracture) grouting uses high-mobility grout to split the ground and thereby create lifting or densification under structures or other facilities. 2. The ground is deliberately split by injecting stable fluid cement- based grouts at high pressures in order to increase total stress by the wedging action of successive thin grout lenses, to fill unconnected voids, and possibly to consolidate the soil locally under injection. 3. This process is often undertaken as a reaction to movements while tunnel excavation is in progress. 4. It is important to keep in mind that the effects of compensation (hydrofracture) grouting are difficult to control and the potential danger of damaging adjacent structures by the use of high pressure may prove prohibitive COMPENSATION GROUTING
  • 14. 1. It is a technology in which high- pressure jets of cement grout are discharged sideways into the borehole wall to simultaneously excavate and then mix with the soil. 2. The outstanding feature of jet grouting is the ability to treat a whole range of soils, from silty sands to cohesive deposits, by means of simple cement grouts. 3. Jet grouting can be performed in soils with a wide range of granulometries and permeabilites. JET GROUTING
  • 15. 1. the ability to use very small drilling tools (90mm diameter) to create large elements (1.2m to 2.4m diameter) using pressure and flow; 2. the ability to drill underneath obstacles and solidify zones which are hard to access; 3. the use of technically sophisticated techniques such as high- powered pumps and monitoring devices with continuous measurement of all operational parameters. ADVANTAGES
  • 17. A grouting plant includes a mixer, an agitator, a pump, and piping connected to grout holes. Two systems: single line type and circulating type. In the circulation type, the unused grout is returned to the agitator and in the single-line type the grout refused is wasted. The basic items required for a grouting plant and their functions are: (a) Measuring tank-to control the volume of grout injected. (b) Mixer-to mix the grout ingredients (c) Agitator-to keep the solid particles in suspension until pumped (d) Pump-to draw the grout from the agitator to deliver to the pumping line. (e) Control fittings-to control the injection rate and pressure so that the hole can be regularly blend with water and thin grout. GROUTING PLANT AND EQUIPMENT
  • 19. PRECAUTIONS The following are the precautions while mixing a grout: • Water is placed first in the mixer. • Mixer is run at the maximum speed before adding the cement. • Grout is mixed in batches. • Ingredients have to be measured in volume • Enough water should be maintained to cover the rotor while it is functioning. • Mixer should not be allowed to run for more than a few minutes between batches. • Mixers should be cleaned thoroughly after the day’s work.
  • 20. Holes for the injection of grout may be drilled with jack hammers, wagon drills or diamond drills, depending on the terrain, class of foundation material, and size and depth of holes. Diamond drills usually give holes of uniform shape, while wagon drills are satisfactory for holes up to about 10 meters depth. DRILLING INJECTION HOLES
  • 21. Preparations for washing or grouting seams, consists of installing a section of pipe of about 35 to 50mm dia and 0.50 to 1.0 m long in the grout hole with the top and projecting out a short distance for connection to an air line or a pump. For grouting the seams with neat cement for consolidation purposes it is desirable to deposit the cement in clean seams by removing any clay or any other unwanted materials. For this cleaning effective method is to force a mixture of air and water through the seams. For deciding the pressure for grouting operation, most common practice is to use a pressure 0.2kg/cm2 for each meter of depth of hole. WASHING AND GROUTING THE SEAMS