SlideShare uma empresa Scribd logo
1 de 73
1
THE
QUEENSFERRY
CROSSING
2
THIS TALK DEALS WITH ONLY
ONE ASPECT OF THE FRC
THE £1.5Bn COST
3
First – a wee bit history
4th April 2000
– Holyrood Building Debate –
A presentation was arranged prior to the debate
ONLY SIXTEEN MSPs TURNED UP
15th January 2009
- Forth Replacement Crossing Debate –
Scotland’s biggest ever project.
ONLY SEVENTEEN MSPs TURNED UP
So before we start let’s deal with the politicians
4
SCOTLAND’S RECENT
MAJOR PROJECTS RECORD
UK average motorway cost per
mile is £30m
M8 motorway missing link and
other work to cost £415m
M8 was £70m per mile
5
EDINBURGH TRAMS
Now over £1,000 million
The TIE Directors who made a mess of this resigned
They were awarded severance payment totalling
£406,635.
Originally 2003 cost was £375 million
6
SKYE BRIDGE
cost £25m
now £93m
BORDERS
RAILWAY
Was £155m now £295M
Edinburgh Infirmary
Cost £185m
Repayment £1,000+
Stirling-Kincardine
Railway line-just finished
needs to be rebuilt
Would you like to see some more
disasters for the taxpayer?
7
Wendy AlexanderSarah Boyack Iain Gray Nicol Stephen
Tavish Scott Jack McConnell Stewart Stevenson Keith Brown
Holyrood started business in 1999
How many Ministers of Transport
do you think have been appointed ?
Less than two years in office????
Alex S
“870 of the 1,041 orders have gone to Scottish companies” (84%)
Something’s missing Alex!!
“118 Subcontracts awarded to Scottish firms from the total of 155” (76%)
First Minister’s Questions 2 Feb 2012
Who is actually building the bridge
CONTRACT COMPANY NATIONALITY
CONSTRUCTION
CONSORTIUM
DRAGADOS SPANISH
HOCHTIEF GERMAN
AMERICAN BRIDGE USA
MORRISON CONSTRUCTION ENGLISH (Now)
9
CONTRACT COMPANY NATIONALITY
MAJOR
MANUFACTURERS
Zhenhua Heavy Industries CHINA
Tecade-Megusa SPAIN
Crist-Gdansk POLAND
Cleveland Bridge ENGLAND
Scottish contractor awards = £143 million (1%)
“870 of the 1,041 orders have gone to Scottish companies” (84%)
“118 Subcontracts awarded to Scottish firms from the total of 155” (76%)
BEFORE WE
START
10
3 TECHNICAL
ASPECTS
Cable Stayed Bridge
11
Before we begin you should be you should be
aware of the difference between these structures
A SUSPENSION BRIDGE
A CABLE STAYED BRIDGE
A MULTIMODAL BRIDGE
SUSPENSION BRIDGE STRUCTURE
ORIGINAL FORTH ROAD BRIDGE
12
Cable Stayed Bridge
The New Forth Bridge
13
PROPOSED FRC STRUCTURE
WAS MULTIMODAL
14
LET’S START WITH A LOOK AT THE
GOVERNMENT’S COST OF THE 1965
FORTH ROAD BRIDGE
Their 1965 cost is £19.5m
Their 2005 inflation figure is £250
My 2016 inflation figure is £340m
Their data can be verified on their web
15
STRUCTURE COST COMPARISON
The old bridge is a
SUSPENSION BRIDGE
The new bridge is a CABLE
STAYED BRIDGE
Structural engineers will tell you that suspension bridges are
10% more expensive than cable stayed bridges
SO WHY IS THE NEW BRIDGE
5 TIMES MORE EXPENSIVE
Made in
UK
Made in
China
16 miles of road
24 other bridges
8 miles of road
No other bridges
16
NOWADAYS – Can a cable stayed bridge of
similar structure be built for around £340m
OF COURSE IT CAN - IT HAS BEEN DONE
AND by one of the main contractors
involved with Scotland’s FRC
Hong Kong’s Stone Cutters Bridge
Examine the location
Over one of the world’s busies sea routes
Land prices 10 times the cost
Located over a built up area
Please examine the access roads...
And the cost??
£245m
18
THE COST FLUCTUATION FARCE
• THE COST REVISIONS ARE QUITE STAGGERING
• DESIGN CHANGES ARE MINIMAL
• ONE CHANGE ILLUSTRATES THE POINT
19
No Date Source Cost
2 Jan 05 Faber and Maunsell £500m
1 Jun 04 FETA £500m
3 Feb 07 Scottish Government £1,000+m
4 Dec 07 Scottish Government £2,790 to £3,630m
5 Jan 08 Scottish Government £3,250 to £4.220m
7 Mar 11 Scottish Government £1,470 to £1.620m
6 Sep 09 Scottish Government £1,700 to £2,300m
£4,220m
20SKYSCRAPERCITY.COM
Scotland to build the
World's most expensive bridge
This pretty average 2km bridge
has a budget of up to £4.2 billion
This is a larger amount than even the entire
Fehmarn Belt project.
Scottish Finance Secretary, John Swinney,
announced … "Forth Replacement Crossing",
21
The FRC cost here are when the quoted price
was £4,220m
World Bridge Graphs
Let’s compare.
22
COST of VARIOUS TYPES TYPES OF WORLD BRIDGES -£M
The FRC was the world’s most
expensive bridge.
£36
£84
£102
£106
£136
£146
£163
£198
£319
£357
£367
£392
£497
£498
£510
£561
£567
£576
£796
£854
£941
£1,081
£1,081
£4,050
£4,109
£4,220
£-
£500
£1,000
£1,500
£2,000
£2,500
£3,000
£3,500
£4,000
£4,500
23
36
84
102
106
146
163
319
367
392
497
561
567
576
796
941
1,081
4,220
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
COST of ONLY CABLE STAYED BRIDGES -£m
Again – the FRC was
by far the most costly
0240
5000
10000
15000
20000
25000
30000
35000
40000
45000
1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70 73 76 79 82 85 88 91 94 97 100103106109112115118121124127
COMPARATIVE LENGTH of WORLD BRIDGES
The FRC is tiny: a mere 127th in world ranking..
25
£-
£200
£400
£600
£800
£1,000
£1,200
£1,400
£1,600
£1,800
WORLD AVERAGE COST PER METRE
£200K
The FRC COST PER METRE WAS
£1,500
LET’S NOW EXAMINE THE COST PER METRE
WE’VE SEEN TOTAL COST
LET’S NOW CHECK THE COST PER LENGTH
£1,563
26
US CONSTRUCTION INDUSTRY DATA (Jan 2004)
Between $4k and $5K per square metre
The FRC cost- $60k per sq m.
COST OF (Cable Stayed) BRIDGES
PER SQUARE METRE
2009
THE WORLD’S THREE
MOST EXPENSIVE BRIDGES
27
1st - Scotland’s Multimodal FRC
2nd - Japan’s Pearl Bridge
3rd - Sweden/Denmark’s -Oresund Crossing
Cost over £4,000m+ world crossings
028
2nd -The Pearl Bridge Japan Opened in 1998 for
$4,300m
The world’s longest suspension bridge -3,910m
Tornadoes (180mph) – hinged-girder system
Fierce sea currents & deep water
Why is it so expensive
Earthquakes (8.5 Richter scale) –TMD pendulums
tuned mass damper
3rd - THE ORESUND CROSSING
29
WORLD’S LARGEST
MULTIMODAL CROSSING
An Island
A Bridge
and
A Tunnel
30
Bridge
Tunnel
DENMARK SWEDEN
Island
SATELLITE VIEW
The Oresund Project
Let’s build it in Fife!!!!!
31
A 4 km Artificial Island
32
A 4 km multimodal tunnel
Road &
Rail
Tunnel
4050 metres
33
A 8 km multimodal bridge
Road
& Rail Bridge 8km long
34
Oresund Crossing cost £4,100m *
Oresund Project 8 times the size of the FRC
Built in 5 ½ years; and the FRC???
5 ½ years
* Transport Scotland data says £4,400m
Forth Crossing cost £4,220m
35
Professor John Kay.
Do you know this man?
Chosen Financial Adviser
to the
SCOTTISH
GOVERNMENT.
Public lecture – Sept 2007 on
the FRC
“Expressed astonishment”
“..more than 4 times the final cost of
the Oresund bridge”
36
THE NEW
MERSEY GATEWAY BRIDGE
England’s MULTI-MODAL Comparison
COMPLETION 2016
STRUCTURE MULTI-MODAL
TYPE CABLE STAYED
LENGTH 2.3 Km
TOWERS 3
LANES 6
COST UNDER £600 million
37
The Occasion
Project Director
Steve Nicholson
Feb. 27th, 2012
The Statement
“ Dropping the double deck and
other measures will save
..£30m
38
The Occasion
Finance Secretary
John Swinney
Scottish Parliament
Dec. 19th, 2007
The Statement
“The tram section removed..”
“A revised saving will be…”
..£580m
39
Dec 2009 cost is now ± £1,600m
Let’s compare it with
another UK crossing
THE SEVERN BRIDGE
AN EXCELLENT COMPARISON
Both UK projects
Similar environments
Contemporary
Cable Stayed Structures
40
041
Second Severn Crossing FORTH REPLACEMENT CROSSING
“MADE IN CHINA”“MADE IN UK”
Six+hs Lanes Four+hs
5,200 m Length 2,700
18.5 km Roads 4.5 km
4 years Build time 5.5 years
£810 m Cost ± £1,500
*Transport Scotland have it at £890m
Hard
Shoulder
FRC IS HALF THE SIZE & TWICE THE PRICE
42
Three ‘ICONIC’ world bridges.
Is the FRC really so expensive?
Greece -Rio Antirio Bridge
WORLD’S MOST
DIFFICULT BRIDGE
TO BUILD
44
 2,880 Metres Cable Stayed
 No bedrock
 64 metre deep Sea crossing
 Seismic & Tsunami
45
65 metres
SEA DEPTH
200 STEEL PIPES
2 METRE IN DIAMETER
30 METRE IN LENGTH
BURIED IN THE SEA BED
46
800 pipes –200 per pier - 2m diameter – 25/30 m long
47
Four gigantic CAISSONS
installed over the pipes
48
049
Length
m
Lanes Towers Build
Time
Cost
2016
Rio Antirio 2880 6 4 6.0 £576m
Forth 2700 4 3 5.5 £1,600m
Rio Antirio
Opened in 2004
at a cost of
€630M
WORLD’S MOST
DIFFICULT BRIDGE
WORLD’S
HIGHEST BRIDGE
MILLAU
VIADUCT
France
Opened in 2004
€350m
Length
m
Lanes Towers Build
Time
Cost
2016
Millau 2460 4 7 3 £400m
Forth 2700 4 3 5.5 £1,600m
051
VASCO de
GAMA
Opened in 1998
at a cost of
$1000m
Length
m
Lanes Towers Build
Time
Cost
2016
Vasco de
Gama
17200 6 2 1.5 £941m
Forth 2700 4 3 5.5 £1,600m
EUROPE’S
LONGEST BRIDGE
52
THE TUNNEL OPTION
The best till last!!
If YOUR credibility has been stretched
THE FINAL DATA IS
(ALMOST) UNBELIEVABLE
worst
COULD IT BE
SOMEONE DIDN’T
WANT A TUNNEL?
THEIR LIST IN FAVOUR OFA TUNNEL
1. 5km more roadway
3. 4 million tonnes of spoil
4. Multi-modal option needs another tunnel
5. Prohibited goods (like whisky)
8. More expensive
7. No pedestrians or cyclists
6. Would take 7.5 years
2. Special Protection Areas
GOVERMENT LIST AGAINST A TUNNEL
An underground tunnel has less environmental impact.
The bridge is 2.7km the tunnel is 8km –why more
The Eurotunnel used their spoil to prevent erosion.
The tram link was dropped – simply not valid.
London’s M25 tunnel escort goods- we still have a bridge
How come - the 31 mile Channel Tunnel was built in 6 years
Tourists would prefer the bridge stupid
LET’S EXAMINE THIS CLAIM IN DETAIL……..
The best means available to assess this
cost is again by comparison
You are about to see why!!!!
Gotthard Base Tunnel
A single comparison here will suffice
We’ll use the world’s longest tunnel
World's longest tunnel
Its very deep too!!!
ROUTE LENGTH 58 km+
Additional shafts 152 km
Construction Time 17 Years
Construction Team 2,600
4 Giant borers used
simultaneously
Tunnel lining
Cement cladding
MAIN SHAFT
58 kM
AUXILIARY SHAFTS
152 kM
Let’s build it across the
Forth for comparison
Oor wee tunnel
Now the Swiss one
TOTAL COST AS OF NOV 2010
£ 6,300m
Now the Forth’s
Bored Tunnel Option
FETA commissioned
this study in
JAN 2005
66
This detailed 80 page report was commission to examine FRC options
FORTH ESTUARY TRANSPORT AUTHORITY
Second Forth Road Crossing Consolidated report
Jan 2005 FABER MAUNSELL
Page 23
..Bored Tunnel cost..
£598M
Why did FETA remove this document from
their web site???
SCALE MODELS
Forth
tunnel 8km
You won’t believe it!!!
Cost £6,300m
70
The Occasion
Finance Secretary
John Swinney
Scottish Parliament
Dec. 19th, 2007
The Statement
“I have the cost estimates..”
“A bored tunnel would cost.”.
..£6,600m
71
BACK TO HOLLYROOD
I'm still awaiting an answer to the following simple question
Quote to me “.. Remember we are just laymen”
Not one MSP has questioned these outrageous costs
Labour started this cost fiasco SNP continued
AUDIT SCOTLAND has never investigated these costs
“Please provide a list of more
expensive comparable bridges”
YOU
JUDGE
72
“Facts do not cease to exist
because they are ignored.”
Aldous Huxley
73
Thank
you

Mais conteúdo relacionado

Mais procurados

The role of the railroads in the life
The role of the railroads in the lifeThe role of the railroads in the life
The role of the railroads in the lifeAnna Semenova
 
The hornibrook bridge
The hornibrook bridgeThe hornibrook bridge
The hornibrook bridgeamcferran
 
Chevy Visits London
Chevy Visits LondonChevy Visits London
Chevy Visits Londonmsjlmiller
 
Bridge Presentation
Bridge PresentationBridge Presentation
Bridge Presentationdysalot
 
C:\Fake Path\London Eye
C:\Fake Path\London EyeC:\Fake Path\London Eye
C:\Fake Path\London EyeInna Mikova
 
Jack's Presentation on the Sydney Harbour Bridge
Jack's Presentation on the Sydney Harbour BridgeJack's Presentation on the Sydney Harbour Bridge
Jack's Presentation on the Sydney Harbour BridgeKate Todd
 
Day 1-in-london-animated
Day 1-in-london-animatedDay 1-in-london-animated
Day 1-in-london-animatedpaolacascone
 
east_london_line_reborn (2)
east_london_line_reborn (2)east_london_line_reborn (2)
east_london_line_reborn (2)Robert Sharpe
 
Our Summer Vacation
Our Summer VacationOur Summer Vacation
Our Summer VacationJohn Trone
 
The united kingdom quiz
The united kingdom quizThe united kingdom quiz
The united kingdom quizMonica Reig
 
Project management final report ENG3004 Griffith University Guri Dam & Chunne...
Project management final report ENG3004 Griffith University Guri Dam & Chunne...Project management final report ENG3004 Griffith University Guri Dam & Chunne...
Project management final report ENG3004 Griffith University Guri Dam & Chunne...peter747
 

Mais procurados (19)

London
London London
London
 
The role of the railroads in the life
The role of the railroads in the lifeThe role of the railroads in the life
The role of the railroads in the life
 
Sydney harbour bridge
Sydney harbour bridgeSydney harbour bridge
Sydney harbour bridge
 
The hornibrook bridge
The hornibrook bridgeThe hornibrook bridge
The hornibrook bridge
 
Chevy Visits London
Chevy Visits LondonChevy Visits London
Chevy Visits London
 
Bridge Presentation
Bridge PresentationBridge Presentation
Bridge Presentation
 
C:\Fake Path\London Eye
C:\Fake Path\London EyeC:\Fake Path\London Eye
C:\Fake Path\London Eye
 
Jack's Presentation on the Sydney Harbour Bridge
Jack's Presentation on the Sydney Harbour BridgeJack's Presentation on the Sydney Harbour Bridge
Jack's Presentation on the Sydney Harbour Bridge
 
Day 1-in-london-animated
Day 1-in-london-animatedDay 1-in-london-animated
Day 1-in-london-animated
 
Velká Británie - základní údaje
Velká Británie - základní údajeVelká Británie - základní údaje
Velká Británie - základní údaje
 
Eurotunnel
EurotunnelEurotunnel
Eurotunnel
 
east_london_line_reborn (2)
east_london_line_reborn (2)east_london_line_reborn (2)
east_london_line_reborn (2)
 
Our Summer Vacation
Our Summer VacationOur Summer Vacation
Our Summer Vacation
 
Channel tunnel
Channel tunnelChannel tunnel
Channel tunnel
 
LONDON
LONDONLONDON
LONDON
 
My Home Town
My Home TownMy Home Town
My Home Town
 
Eurotunnel
EurotunnelEurotunnel
Eurotunnel
 
The united kingdom quiz
The united kingdom quizThe united kingdom quiz
The united kingdom quiz
 
Project management final report ENG3004 Griffith University Guri Dam & Chunne...
Project management final report ENG3004 Griffith University Guri Dam & Chunne...Project management final report ENG3004 Griffith University Guri Dam & Chunne...
Project management final report ENG3004 Griffith University Guri Dam & Chunne...
 

Destaque

Suspension Bridges VS Cable-Stayed Bridges
Suspension Bridges VS Cable-Stayed BridgesSuspension Bridges VS Cable-Stayed Bridges
Suspension Bridges VS Cable-Stayed BridgesHussein Zidan
 
Wonder woman
Wonder womanWonder woman
Wonder woman112909
 
Ekonomi politik international
Ekonomi politik internationalEkonomi politik international
Ekonomi politik internationalAziz Zindani
 
Kit digital Pepa Pig para imprimir gratis criatividade ativa
Kit digital Pepa Pig para imprimir gratis criatividade ativaKit digital Pepa Pig para imprimir gratis criatividade ativa
Kit digital Pepa Pig para imprimir gratis criatividade ativaCasal Criginski
 
Innovation through understanding of transferred technology in China
Innovation through understanding of transferred technology in ChinaInnovation through understanding of transferred technology in China
Innovation through understanding of transferred technology in ChinaKenneth Lim
 
Đắc nhân tâm
Đắc nhân tâmĐắc nhân tâm
Đắc nhân tâmOneCt Tran
 
BigGiftCorporatePresentation
BigGiftCorporatePresentationBigGiftCorporatePresentation
BigGiftCorporatePresentationRaj Agarwal
 
20120308Social cafe 補足資料
20120308Social cafe 補足資料20120308Social cafe 補足資料
20120308Social cafe 補足資料Hiroshi Morimoto
 
The horse and the ass
The horse and the assThe horse and the ass
The horse and the assAndrea Torres
 
Power point informàtica
Power point informàticaPower point informàtica
Power point informàticadavid3024
 
5Jpro CTLes : intervention de Fabien Plazannet
5Jpro CTLes : intervention de Fabien Plazannet5Jpro CTLes : intervention de Fabien Plazannet
5Jpro CTLes : intervention de Fabien PlazannetCTLes
 
Коммуникация стратегии и ваши сотрудники
Коммуникация стратегии и ваши сотрудникиКоммуникация стратегии и ваши сотрудники
Коммуникация стратегии и ваши сотрудникиТатьяна Романова
 
Presentation of graduation
Presentation of graduationPresentation of graduation
Presentation of graduationWillow Cheng
 
Digital transformation - taking a macro view
Digital transformation - taking a macro viewDigital transformation - taking a macro view
Digital transformation - taking a macro viewAlisdair Blackman
 

Destaque (20)

Suspension Bridges VS Cable-Stayed Bridges
Suspension Bridges VS Cable-Stayed BridgesSuspension Bridges VS Cable-Stayed Bridges
Suspension Bridges VS Cable-Stayed Bridges
 
Wonder woman
Wonder womanWonder woman
Wonder woman
 
Subhasri Final Resume
Subhasri Final ResumeSubhasri Final Resume
Subhasri Final Resume
 
Ekonomi politik international
Ekonomi politik internationalEkonomi politik international
Ekonomi politik international
 
Kit digital Pepa Pig para imprimir gratis criatividade ativa
Kit digital Pepa Pig para imprimir gratis criatividade ativaKit digital Pepa Pig para imprimir gratis criatividade ativa
Kit digital Pepa Pig para imprimir gratis criatividade ativa
 
Innovation through understanding of transferred technology in China
Innovation through understanding of transferred technology in ChinaInnovation through understanding of transferred technology in China
Innovation through understanding of transferred technology in China
 
Informe de gestion
Informe de gestionInforme de gestion
Informe de gestion
 
Alfenia
AlfeniaAlfenia
Alfenia
 
Đắc nhân tâm
Đắc nhân tâmĐắc nhân tâm
Đắc nhân tâm
 
BigGiftCorporatePresentation
BigGiftCorporatePresentationBigGiftCorporatePresentation
BigGiftCorporatePresentation
 
Rural marketing
Rural marketingRural marketing
Rural marketing
 
20120308Social cafe 補足資料
20120308Social cafe 補足資料20120308Social cafe 補足資料
20120308Social cafe 補足資料
 
The horse and the ass
The horse and the assThe horse and the ass
The horse and the ass
 
Power point informàtica
Power point informàticaPower point informàtica
Power point informàtica
 
5Jpro CTLes : intervention de Fabien Plazannet
5Jpro CTLes : intervention de Fabien Plazannet5Jpro CTLes : intervention de Fabien Plazannet
5Jpro CTLes : intervention de Fabien Plazannet
 
Коммуникация стратегии и ваши сотрудники
Коммуникация стратегии и ваши сотрудникиКоммуникация стратегии и ваши сотрудники
Коммуникация стратегии и ваши сотрудники
 
Porque tú:
Porque tú:Porque tú:
Porque tú:
 
Presentation of graduation
Presentation of graduationPresentation of graduation
Presentation of graduation
 
Sistema de tierra
Sistema de tierraSistema de tierra
Sistema de tierra
 
Digital transformation - taking a macro view
Digital transformation - taking a macro viewDigital transformation - taking a macro view
Digital transformation - taking a macro view
 

Semelhante a Bridge apr 2014

Islington council presentation on Wharfdale Road bridge
Islington council presentation on Wharfdale Road bridgeIslington council presentation on Wharfdale Road bridge
Islington council presentation on Wharfdale Road bridgewilliam perrin
 
Delivering a Cruise/Ferry Port at Preston Links
Delivering a Cruise/Ferry Port at Preston LinksDelivering a Cruise/Ferry Port at Preston Links
Delivering a Cruise/Ferry Port at Preston LinksCalum Miller
 
Delivering Transformation - Place Making in North Lincolnshire
Delivering Transformation - Place Making in North LincolnshireDelivering Transformation - Place Making in North Lincolnshire
Delivering Transformation - Place Making in North LincolnshirePAS_Team
 
Crossrail Presentation: Moving London Forward
Crossrail Presentation: Moving London ForwardCrossrail Presentation: Moving London Forward
Crossrail Presentation: Moving London Forwardinmidtown
 
2006 06 Severn Barrage: Is the Tide Turning? - David Kerr, Sir Robert McAlpine
2006 06 Severn Barrage: Is the Tide Turning? - David Kerr, Sir Robert McAlpine 2006 06 Severn Barrage: Is the Tide Turning? - David Kerr, Sir Robert McAlpine
2006 06 Severn Barrage: Is the Tide Turning? - David Kerr, Sir Robert McAlpine SevernEstuary
 
Nr idea workshop oxford april 2016 version1
Nr idea workshop oxford april 2016 version1Nr idea workshop oxford april 2016 version1
Nr idea workshop oxford april 2016 version1Idea Project
 
Reflections on lessons learnt from projects
Reflections on lessons learnt from projectsReflections on lessons learnt from projects
Reflections on lessons learnt from projectsDr David Hancock
 
Lessons learnt from projects
Lessons learnt from projectsLessons learnt from projects
Lessons learnt from projectsguestc3931a
 
Energy: a national perspective - Paul Cosgrove, Arup
Energy: a national perspective - Paul Cosgrove, ArupEnergy: a national perspective - Paul Cosgrove, Arup
Energy: a national perspective - Paul Cosgrove, ArupGo Green
 
Emtelle Fibre & Power Cable Ducts Helped To Construct London Olympic Stadium
Emtelle Fibre & Power Cable Ducts Helped To Construct London Olympic StadiumEmtelle Fibre & Power Cable Ducts Helped To Construct London Olympic Stadium
Emtelle Fibre & Power Cable Ducts Helped To Construct London Olympic StadiumThorne & Derrick International
 
2010 07 Bristol Port, Deep Water Container Terminal – John Chaplin
2010 07 Bristol Port, Deep Water Container Terminal – John Chaplin 2010 07 Bristol Port, Deep Water Container Terminal – John Chaplin
2010 07 Bristol Port, Deep Water Container Terminal – John Chaplin SevernEstuary
 
Building Bridges with Kier
Building Bridges with KierBuilding Bridges with Kier
Building Bridges with KierKier Group
 
Extended metro in stockholm, stockholm county council
Extended metro in stockholm, stockholm county councilExtended metro in stockholm, stockholm county council
Extended metro in stockholm, stockholm county councilBusiness Finland
 
Crossrail Suppy Chain Engagement Seminar 2013 - MARTIN QUAID, COSTAIN SKANSKA...
Crossrail Suppy Chain Engagement Seminar 2013 - MARTIN QUAID, COSTAIN SKANSKA...Crossrail Suppy Chain Engagement Seminar 2013 - MARTIN QUAID, COSTAIN SKANSKA...
Crossrail Suppy Chain Engagement Seminar 2013 - MARTIN QUAID, COSTAIN SKANSKA...Invest Northern Ireland
 

Semelhante a Bridge apr 2014 (20)

Islington council presentation on Wharfdale Road bridge
Islington council presentation on Wharfdale Road bridgeIslington council presentation on Wharfdale Road bridge
Islington council presentation on Wharfdale Road bridge
 
Delivering a Cruise/Ferry Port at Preston Links
Delivering a Cruise/Ferry Port at Preston LinksDelivering a Cruise/Ferry Port at Preston Links
Delivering a Cruise/Ferry Port at Preston Links
 
Delivering Transformation - Place Making in North Lincolnshire
Delivering Transformation - Place Making in North LincolnshireDelivering Transformation - Place Making in North Lincolnshire
Delivering Transformation - Place Making in North Lincolnshire
 
Transport in london
 Transport in london  Transport in london
Transport in london
 
Crossrail Presentation: Moving London Forward
Crossrail Presentation: Moving London ForwardCrossrail Presentation: Moving London Forward
Crossrail Presentation: Moving London Forward
 
RA_CV - October 2016
RA_CV - October 2016RA_CV - October 2016
RA_CV - October 2016
 
Opening Keynote - Phil Hare, Pöyry - UKCCSRC Strathclyde Biannual 8-9 Septemb...
Opening Keynote - Phil Hare, Pöyry - UKCCSRC Strathclyde Biannual 8-9 Septemb...Opening Keynote - Phil Hare, Pöyry - UKCCSRC Strathclyde Biannual 8-9 Septemb...
Opening Keynote - Phil Hare, Pöyry - UKCCSRC Strathclyde Biannual 8-9 Septemb...
 
2006 06 Severn Barrage: Is the Tide Turning? - David Kerr, Sir Robert McAlpine
2006 06 Severn Barrage: Is the Tide Turning? - David Kerr, Sir Robert McAlpine 2006 06 Severn Barrage: Is the Tide Turning? - David Kerr, Sir Robert McAlpine
2006 06 Severn Barrage: Is the Tide Turning? - David Kerr, Sir Robert McAlpine
 
Nr idea workshop oxford april 2016 version1
Nr idea workshop oxford april 2016 version1Nr idea workshop oxford april 2016 version1
Nr idea workshop oxford april 2016 version1
 
Reflections on lessons learnt from projects
Reflections on lessons learnt from projectsReflections on lessons learnt from projects
Reflections on lessons learnt from projects
 
Lessons learnt from projects
Lessons learnt from projectsLessons learnt from projects
Lessons learnt from projects
 
Energy: a national perspective - Paul Cosgrove, Arup
Energy: a national perspective - Paul Cosgrove, ArupEnergy: a national perspective - Paul Cosgrove, Arup
Energy: a national perspective - Paul Cosgrove, Arup
 
Emtelle Fibre & Power Cable Ducts Helped To Construct London Olympic Stadium
Emtelle Fibre & Power Cable Ducts Helped To Construct London Olympic StadiumEmtelle Fibre & Power Cable Ducts Helped To Construct London Olympic Stadium
Emtelle Fibre & Power Cable Ducts Helped To Construct London Olympic Stadium
 
2010 07 Bristol Port, Deep Water Container Terminal – John Chaplin
2010 07 Bristol Port, Deep Water Container Terminal – John Chaplin 2010 07 Bristol Port, Deep Water Container Terminal – John Chaplin
2010 07 Bristol Port, Deep Water Container Terminal – John Chaplin
 
London eye
London eyeLondon eye
London eye
 
Crossrail 2 - Planning for the Future
Crossrail 2 - Planning for the FutureCrossrail 2 - Planning for the Future
Crossrail 2 - Planning for the Future
 
Building Bridges with Kier
Building Bridges with KierBuilding Bridges with Kier
Building Bridges with Kier
 
Extended metro in stockholm, stockholm county council
Extended metro in stockholm, stockholm county councilExtended metro in stockholm, stockholm county council
Extended metro in stockholm, stockholm county council
 
Transatlantic Tunnel
Transatlantic TunnelTransatlantic Tunnel
Transatlantic Tunnel
 
Crossrail Suppy Chain Engagement Seminar 2013 - MARTIN QUAID, COSTAIN SKANSKA...
Crossrail Suppy Chain Engagement Seminar 2013 - MARTIN QUAID, COSTAIN SKANSKA...Crossrail Suppy Chain Engagement Seminar 2013 - MARTIN QUAID, COSTAIN SKANSKA...
Crossrail Suppy Chain Engagement Seminar 2013 - MARTIN QUAID, COSTAIN SKANSKA...
 

Último

EDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxEDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxaaryamanorathofficia
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...aartirawatdelhi
 
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.Christina Parmionova
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersCongressional Budget Office
 
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escortsaditipandeya
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxtsionhagos36
 
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...Suhani Kapoor
 
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCongressional Budget Office
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...Hemant Purohit
 
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxIncident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxPeter Miles
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginningsinfo695895
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfahcitycouncil
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27JSchaus & Associates
 
Climate change and occupational safety and health.
Climate change and occupational safety and health.Climate change and occupational safety and health.
Climate change and occupational safety and health.Christina Parmionova
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)ahcitycouncil
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29JSchaus & Associates
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTaccounts329278
 

Último (20)

EDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxEDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptx
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
 
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists Lawmakers
 
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptx
 
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
 
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related Topics
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
 
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxIncident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
 
How to Save a Place: 12 Tips To Research & Know the Threat
How to Save a Place: 12 Tips To Research & Know the ThreatHow to Save a Place: 12 Tips To Research & Know the Threat
How to Save a Place: 12 Tips To Research & Know the Threat
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdf
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27
 
Call Girls In Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In  Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In  Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
Climate change and occupational safety and health.
Climate change and occupational safety and health.Climate change and occupational safety and health.
Climate change and occupational safety and health.
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CT
 

Bridge apr 2014

  • 2. 2 THIS TALK DEALS WITH ONLY ONE ASPECT OF THE FRC THE £1.5Bn COST
  • 3. 3 First – a wee bit history 4th April 2000 – Holyrood Building Debate – A presentation was arranged prior to the debate ONLY SIXTEEN MSPs TURNED UP 15th January 2009 - Forth Replacement Crossing Debate – Scotland’s biggest ever project. ONLY SEVENTEEN MSPs TURNED UP So before we start let’s deal with the politicians
  • 4. 4 SCOTLAND’S RECENT MAJOR PROJECTS RECORD UK average motorway cost per mile is £30m M8 motorway missing link and other work to cost £415m M8 was £70m per mile
  • 5. 5 EDINBURGH TRAMS Now over £1,000 million The TIE Directors who made a mess of this resigned They were awarded severance payment totalling £406,635. Originally 2003 cost was £375 million
  • 6. 6 SKYE BRIDGE cost £25m now £93m BORDERS RAILWAY Was £155m now £295M Edinburgh Infirmary Cost £185m Repayment £1,000+ Stirling-Kincardine Railway line-just finished needs to be rebuilt Would you like to see some more disasters for the taxpayer?
  • 7. 7 Wendy AlexanderSarah Boyack Iain Gray Nicol Stephen Tavish Scott Jack McConnell Stewart Stevenson Keith Brown Holyrood started business in 1999 How many Ministers of Transport do you think have been appointed ? Less than two years in office????
  • 8. Alex S “870 of the 1,041 orders have gone to Scottish companies” (84%) Something’s missing Alex!! “118 Subcontracts awarded to Scottish firms from the total of 155” (76%) First Minister’s Questions 2 Feb 2012
  • 9. Who is actually building the bridge CONTRACT COMPANY NATIONALITY CONSTRUCTION CONSORTIUM DRAGADOS SPANISH HOCHTIEF GERMAN AMERICAN BRIDGE USA MORRISON CONSTRUCTION ENGLISH (Now) 9 CONTRACT COMPANY NATIONALITY MAJOR MANUFACTURERS Zhenhua Heavy Industries CHINA Tecade-Megusa SPAIN Crist-Gdansk POLAND Cleveland Bridge ENGLAND Scottish contractor awards = £143 million (1%) “870 of the 1,041 orders have gone to Scottish companies” (84%) “118 Subcontracts awarded to Scottish firms from the total of 155” (76%)
  • 11. Cable Stayed Bridge 11 Before we begin you should be you should be aware of the difference between these structures A SUSPENSION BRIDGE A CABLE STAYED BRIDGE A MULTIMODAL BRIDGE SUSPENSION BRIDGE STRUCTURE ORIGINAL FORTH ROAD BRIDGE
  • 12. 12 Cable Stayed Bridge The New Forth Bridge
  • 14. 14 LET’S START WITH A LOOK AT THE GOVERNMENT’S COST OF THE 1965 FORTH ROAD BRIDGE Their 1965 cost is £19.5m Their 2005 inflation figure is £250 My 2016 inflation figure is £340m Their data can be verified on their web
  • 15. 15 STRUCTURE COST COMPARISON The old bridge is a SUSPENSION BRIDGE The new bridge is a CABLE STAYED BRIDGE Structural engineers will tell you that suspension bridges are 10% more expensive than cable stayed bridges SO WHY IS THE NEW BRIDGE 5 TIMES MORE EXPENSIVE Made in UK Made in China 16 miles of road 24 other bridges 8 miles of road No other bridges
  • 16. 16 NOWADAYS – Can a cable stayed bridge of similar structure be built for around £340m OF COURSE IT CAN - IT HAS BEEN DONE AND by one of the main contractors involved with Scotland’s FRC
  • 17. Hong Kong’s Stone Cutters Bridge Examine the location Over one of the world’s busies sea routes Land prices 10 times the cost Located over a built up area Please examine the access roads... And the cost?? £245m
  • 18. 18 THE COST FLUCTUATION FARCE • THE COST REVISIONS ARE QUITE STAGGERING • DESIGN CHANGES ARE MINIMAL • ONE CHANGE ILLUSTRATES THE POINT
  • 19. 19 No Date Source Cost 2 Jan 05 Faber and Maunsell £500m 1 Jun 04 FETA £500m 3 Feb 07 Scottish Government £1,000+m 4 Dec 07 Scottish Government £2,790 to £3,630m 5 Jan 08 Scottish Government £3,250 to £4.220m 7 Mar 11 Scottish Government £1,470 to £1.620m 6 Sep 09 Scottish Government £1,700 to £2,300m £4,220m
  • 20. 20SKYSCRAPERCITY.COM Scotland to build the World's most expensive bridge This pretty average 2km bridge has a budget of up to £4.2 billion This is a larger amount than even the entire Fehmarn Belt project. Scottish Finance Secretary, John Swinney, announced … "Forth Replacement Crossing",
  • 21. 21 The FRC cost here are when the quoted price was £4,220m World Bridge Graphs Let’s compare.
  • 22. 22 COST of VARIOUS TYPES TYPES OF WORLD BRIDGES -£M The FRC was the world’s most expensive bridge. £36 £84 £102 £106 £136 £146 £163 £198 £319 £357 £367 £392 £497 £498 £510 £561 £567 £576 £796 £854 £941 £1,081 £1,081 £4,050 £4,109 £4,220 £- £500 £1,000 £1,500 £2,000 £2,500 £3,000 £3,500 £4,000 £4,500
  • 24. 0240 5000 10000 15000 20000 25000 30000 35000 40000 45000 1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70 73 76 79 82 85 88 91 94 97 100103106109112115118121124127 COMPARATIVE LENGTH of WORLD BRIDGES The FRC is tiny: a mere 127th in world ranking..
  • 25. 25 £- £200 £400 £600 £800 £1,000 £1,200 £1,400 £1,600 £1,800 WORLD AVERAGE COST PER METRE £200K The FRC COST PER METRE WAS £1,500 LET’S NOW EXAMINE THE COST PER METRE WE’VE SEEN TOTAL COST LET’S NOW CHECK THE COST PER LENGTH £1,563
  • 26. 26 US CONSTRUCTION INDUSTRY DATA (Jan 2004) Between $4k and $5K per square metre The FRC cost- $60k per sq m. COST OF (Cable Stayed) BRIDGES PER SQUARE METRE
  • 27. 2009 THE WORLD’S THREE MOST EXPENSIVE BRIDGES 27 1st - Scotland’s Multimodal FRC 2nd - Japan’s Pearl Bridge 3rd - Sweden/Denmark’s -Oresund Crossing Cost over £4,000m+ world crossings
  • 28. 028 2nd -The Pearl Bridge Japan Opened in 1998 for $4,300m The world’s longest suspension bridge -3,910m Tornadoes (180mph) – hinged-girder system Fierce sea currents & deep water Why is it so expensive Earthquakes (8.5 Richter scale) –TMD pendulums tuned mass damper
  • 29. 3rd - THE ORESUND CROSSING 29 WORLD’S LARGEST MULTIMODAL CROSSING An Island A Bridge and A Tunnel
  • 30. 30 Bridge Tunnel DENMARK SWEDEN Island SATELLITE VIEW The Oresund Project Let’s build it in Fife!!!!!
  • 31. 31 A 4 km Artificial Island
  • 32. 32 A 4 km multimodal tunnel Road & Rail Tunnel 4050 metres
  • 33. 33 A 8 km multimodal bridge Road & Rail Bridge 8km long
  • 34. 34 Oresund Crossing cost £4,100m * Oresund Project 8 times the size of the FRC Built in 5 ½ years; and the FRC??? 5 ½ years * Transport Scotland data says £4,400m Forth Crossing cost £4,220m
  • 35. 35 Professor John Kay. Do you know this man? Chosen Financial Adviser to the SCOTTISH GOVERNMENT. Public lecture – Sept 2007 on the FRC “Expressed astonishment” “..more than 4 times the final cost of the Oresund bridge”
  • 36. 36 THE NEW MERSEY GATEWAY BRIDGE England’s MULTI-MODAL Comparison COMPLETION 2016 STRUCTURE MULTI-MODAL TYPE CABLE STAYED LENGTH 2.3 Km TOWERS 3 LANES 6 COST UNDER £600 million
  • 37. 37 The Occasion Project Director Steve Nicholson Feb. 27th, 2012 The Statement “ Dropping the double deck and other measures will save ..£30m
  • 38. 38 The Occasion Finance Secretary John Swinney Scottish Parliament Dec. 19th, 2007 The Statement “The tram section removed..” “A revised saving will be…” ..£580m
  • 39. 39 Dec 2009 cost is now ± £1,600m Let’s compare it with another UK crossing THE SEVERN BRIDGE
  • 40. AN EXCELLENT COMPARISON Both UK projects Similar environments Contemporary Cable Stayed Structures 40
  • 41. 041 Second Severn Crossing FORTH REPLACEMENT CROSSING “MADE IN CHINA”“MADE IN UK” Six+hs Lanes Four+hs 5,200 m Length 2,700 18.5 km Roads 4.5 km 4 years Build time 5.5 years £810 m Cost ± £1,500 *Transport Scotland have it at £890m Hard Shoulder FRC IS HALF THE SIZE & TWICE THE PRICE
  • 42. 42 Three ‘ICONIC’ world bridges. Is the FRC really so expensive?
  • 43. Greece -Rio Antirio Bridge WORLD’S MOST DIFFICULT BRIDGE TO BUILD
  • 44. 44  2,880 Metres Cable Stayed  No bedrock  64 metre deep Sea crossing  Seismic & Tsunami
  • 46. 200 STEEL PIPES 2 METRE IN DIAMETER 30 METRE IN LENGTH BURIED IN THE SEA BED 46 800 pipes –200 per pier - 2m diameter – 25/30 m long
  • 48. 48
  • 49. 049 Length m Lanes Towers Build Time Cost 2016 Rio Antirio 2880 6 4 6.0 £576m Forth 2700 4 3 5.5 £1,600m Rio Antirio Opened in 2004 at a cost of €630M WORLD’S MOST DIFFICULT BRIDGE
  • 50. WORLD’S HIGHEST BRIDGE MILLAU VIADUCT France Opened in 2004 €350m Length m Lanes Towers Build Time Cost 2016 Millau 2460 4 7 3 £400m Forth 2700 4 3 5.5 £1,600m
  • 51. 051 VASCO de GAMA Opened in 1998 at a cost of $1000m Length m Lanes Towers Build Time Cost 2016 Vasco de Gama 17200 6 2 1.5 £941m Forth 2700 4 3 5.5 £1,600m EUROPE’S LONGEST BRIDGE
  • 52. 52 THE TUNNEL OPTION The best till last!! If YOUR credibility has been stretched THE FINAL DATA IS (ALMOST) UNBELIEVABLE worst
  • 53. COULD IT BE SOMEONE DIDN’T WANT A TUNNEL?
  • 54. THEIR LIST IN FAVOUR OFA TUNNEL
  • 55. 1. 5km more roadway 3. 4 million tonnes of spoil 4. Multi-modal option needs another tunnel 5. Prohibited goods (like whisky) 8. More expensive 7. No pedestrians or cyclists 6. Would take 7.5 years 2. Special Protection Areas GOVERMENT LIST AGAINST A TUNNEL An underground tunnel has less environmental impact. The bridge is 2.7km the tunnel is 8km –why more The Eurotunnel used their spoil to prevent erosion. The tram link was dropped – simply not valid. London’s M25 tunnel escort goods- we still have a bridge How come - the 31 mile Channel Tunnel was built in 6 years Tourists would prefer the bridge stupid LET’S EXAMINE THIS CLAIM IN DETAIL……..
  • 56. The best means available to assess this cost is again by comparison You are about to see why!!!! Gotthard Base Tunnel A single comparison here will suffice We’ll use the world’s longest tunnel
  • 58. Its very deep too!!!
  • 59. ROUTE LENGTH 58 km+ Additional shafts 152 km Construction Time 17 Years Construction Team 2,600
  • 60. 4 Giant borers used simultaneously
  • 63. MAIN SHAFT 58 kM AUXILIARY SHAFTS 152 kM Let’s build it across the Forth for comparison Oor wee tunnel Now the Swiss one
  • 64. TOTAL COST AS OF NOV 2010 £ 6,300m
  • 65. Now the Forth’s Bored Tunnel Option FETA commissioned this study in JAN 2005
  • 66. 66 This detailed 80 page report was commission to examine FRC options FORTH ESTUARY TRANSPORT AUTHORITY Second Forth Road Crossing Consolidated report Jan 2005 FABER MAUNSELL
  • 68. £598M Why did FETA remove this document from their web site???
  • 69. SCALE MODELS Forth tunnel 8km You won’t believe it!!! Cost £6,300m
  • 70. 70 The Occasion Finance Secretary John Swinney Scottish Parliament Dec. 19th, 2007 The Statement “I have the cost estimates..” “A bored tunnel would cost.”. ..£6,600m
  • 71. 71 BACK TO HOLLYROOD I'm still awaiting an answer to the following simple question Quote to me “.. Remember we are just laymen” Not one MSP has questioned these outrageous costs Labour started this cost fiasco SNP continued AUDIT SCOTLAND has never investigated these costs “Please provide a list of more expensive comparable bridges” YOU JUDGE
  • 72. 72 “Facts do not cease to exist because they are ignored.” Aldous Huxley

Notas do Editor

  1. COSTING -costing history
  2. COSTING -costing history
  3. COSTING - Do you want to review the costs: look at the alterations?
  4. GRAPH 1 - Let’s now look at some graphs on contemporary bridges of various designs .America, Far East & Europe Note the costs are all inflated to 2016 prices; that is when the FRC is meant to be finished and is priced accordingly. One can see the costs vary widely BUT the FRC is the most expensive
  5. CABLE STAYED ONLY - As the FRC is to be a Cable stayed design this slide illustrates these bridges only. Again a huge discrepancy.
  6. LENGTH - If we now look at the lengths of bridges; not the sole criteria environmental and geographic conditions are obviously contributory factor on cost. I agree but obviously the larger the structure the more likely it is to be more expensive. i.e. is size the reason the FRC is so expensive – afraid not –it’s tiny.
  7. COST per M - Extrapolating the bridge size to a cost per meter basis – we have an even more astonishing comparator. Why?? I do have some of the answers but will deal with them later. I have to say these slides only illustrate a few of the bridges I examined. I promise you the selected ones on the slides are typical and not selected to show the FRC in the worst light.
  8. AKASHI KAIKYO - This is the most expensive bridge ever built; a suspension bridge; fierce river currents and earthquake proof with huge hydraulic dampers.
  9. Lets now examine the biggest contemporary structure ever built – it is recent and European Crossing where labour/ material costs are comparable with the UK. The Øresund project. One of the Engineering Megastructure of the world. Some of you may have seen it on the BBC.
  10. ORESUND CROSSING Now let’s look at the price. I have it at £3.75 billion against the Oresund at £3.75 Billion. When I first contacted Transport Scotland they said it was not possible to compare bridges; the geology, environment etc were all so different. Later Holyrood was presented with an answer to a similar question –The major part of that response was the cost of comparative bridge.
  11. ORESUND CROSSING It’s not just me – Prof John Kay, you may have seen him on newsnight from time to time. He is even more scathing than I am - and he’s a government advisor.
  12. SEVERN- Let’s move on to the Severn Bridge- it is even more apt for a comparison. You may recall the FRC was reduced last year from a multimodal to a road only crossing with a very much reduced access road now it is a similar structure to the 2nd Severn Crossing
  13. SEVERN Here we have a UK project –similar labour material costs, identical geology and both replacement cable stayed bridges.
  14. SEVERN Before we leave it – look again at the difference in specification. Laigns built the bridge while Belfour’s did the English motorway access and Costain did the Welsh side. Again it was on time and on price and a PPP project. Its longer, its wider and access roads are 4 times longer and at a THIRD of the COST
  15. WORLD BRIDGES - I have 5 world bridges to show you – I actually have many more but these will suffice
  16. VASCO DA GAMA - The Portuguese don’t only produce good footballers. (Eusebio) and win world cups. Look at the construction time; life and wind shielding  
  17. VASCO DA GAMA - The Portuguese don’t only produce good footballers. (Eusebio) and win world cups. Look at the construction time; life and wind shielding  
  18. TUNNEL -I know some advocate a tunnel; I am looking only at cost but do have the most astonishing figure to reveal
  19. TUNNEL -This was no small project; but an in depths study of all the options to be considered for the replacement crossing. It included locations, all types of structures and costs.