MY DAM PROJECT
By Joshua
1. HOOVER DAM’S STORY
2. HOOVER DAM’S BEGINNING CONSTRUCTION
3. HOOVER DAM’S MATERIAL
4. HOOVER DAM’S CONSTRUCTION
5. HOOVER DAM’S ELECTRICITY MAKING
6. HOW HOOVER DAM’S ELECTRICITY WORKS
7. GALLERY
8. BIBLIOGRAPHY
Contents
HOOVER DAM’S STORY
HOOVER DAM’S BEGINNING CONSTRUCTION
• There were 6 big companies building and helping.
• Divert the river.
• Dynamite was used to make holes.
• Four tunnels were placed.
• Dynamite was used for 2 years.
• Work Men removed over ½ million cubic yards of blown up
remaining rubble.
• The tunnels were filled with 3 foot thick walls of concrete.
• High scalars drilled holes and packed them with dynamite.
• they would go back to the explosion area and pry rock.
• In November 1932, the Colorado River followed.
HOOVER DAM MATERIAL
• 12 miles upstream there was a good area of rock, sand, and gravel.
• A train then towed the material to a aggregate plant.
• There the sand and gravel went through a lot of tests
• Then they were screened, graded, and washed.
• Once that was done, they stock piled it.
• They shipped the material to Hoover Dam.
HOOVER DAM MATERIAL
• The material was sent to two mixing plants.
• One was located in the canyon bottom and the other located on the
Nevada rim.
• There would create concrete for the 4 ½ million cubic yards of
concrete.
• Once the concrete was finished, it was dispatched.
• Nine cable ways carried the concrete and other materials over to the
dam site.
Hoover Dam Canyon mixing plant Hoover Dam Nevada rim plant
HOOVER DAM’S CONSTRUCTION
• The first bucket con concrete was settled on June 6th 1933
• Hoover Dam then began its rise on Black Canyon.
• The cable ways lifted hundreds of buckets of concrete into the Dam format until
the dam reached its full 660 foot thick base.
• Poured in give foot layers of concrete the dam’s interlocking system moved
skyward.
• The crews made new records daily.
• The crews worked in all conditions. Hot, dry, rainy, snowy, smelly, etc.
• The workers only received 2 days off per year! Christmas and the fourth of July.
HOOVER DAM’S CONSTRUCTION
• People working at night.
• On June 1934, 1 year after the first pour, the dam had reached 2/3 of
its potential.
• Even then Hoover Dam had already reached an extremely impressive
height.
• Two spill ways were built.
• They were capable of holding 200000 cubic feet of water per second.
• On May 29th 1935 2 ½ years after the dam was built, crews started to
dump the last buckets of cement.
• The whole dam was made up of 3 ¼ cubic yard of concrete.
• Hoover Dam was completed 2 ½ years ahead of schedule!
HOOVER DAM’S ELECTRICITY MAKING.
• Hoover Dam’s Turbines needed pipes of massive size.
• 18ft-30ft in diameter and six inches in thickness.
• It was impossible to ship units of this size across country.
So they made a plant that made the steel pipes.
• The plant made and rolled the 3 miles of pipe needed for
Hoover Dam’s electricity.
• In the plant the crew needed special machines and perfect
measuring to make the piping perfect.
• After the steel pipes were made, they put it in a giant press
that rolled the steel into shape.
HOOVER DAM ELECTRICITY MAKING
• One plate was only a third of a ring.
• Three plates put together was 1 a ring.
• The rings were 18ft by 11ft.
• Two of the ring put together equaled 184 tons.
• Carts were made to carry the rings.
• A150ft cable way lifted the rings into the correct
area.
• The rings were then pulled into place by a cable way
and held together by pressure pins.
HOW HOOVER DAM’S ELECTRICITY WORKS
• Turbine pits were made to hold Hoover Dam’s 17 turbines.
• Generator were being installed in 1935.
• The first turbine named N2 was completed in October 26,
1936.
• Turbine N2 was built to serve the city of L.A.
• Generator after generators were being build because of
California, Nevada, and Arizona.
• In 1956 the last generator N8 was being made after laying
empty for over 25 years.
HOOVER DAM’S ELECTRICITY
• The turbines consisted of a 95000 Kilowatt, 60 cycle, 16500 volt
generator.
• The water is controlled by a butterfly.
• The parts for the turbines were shipped across 60 rail cars.
• They were pulled over by cable ways and lowered into the power
house.
• The parts were then lower into the turbine room.
• Then then installed the turbine and then the butterfly valve to
control the water flow.
• Once connected to the roaster, the turbine was ready to work.
• It was completed after test runs on December 1, 1961
• After N8 was made, the dam made over 1 and 1/3 million kilowatts.
• Hoover Dam had cost over 171 million dollars in total.
PICTURES OF HOOVER DAM’S TURBINES
GALLERY
• http://www.wateraid.org/news/news/if-i-had-
clean-water-there-would-be-no-sickness
• http://www.wateraid.org/news/news/if-i-had-
clean-water-there-would-be-no-sickness
• http://www.wateraidamerica.org/what_we_do/cl
ean_water_for_africa_and_asia.aspx?gclid=CJWP
6s2S9rUCFahDMgod_lcAbQ
• http://www.potterswithoutborders.com/clean-
water-in-africa/?gclid=COD-
vtWS9rUCFelaMgodzxsAFw
• http://www.actionagainsthunger.org/impact/wate
r-sanitation-hygiene
• http://www.wsafrica.org/welcome/
• http://www.google.com/search?hl=en&site=&sour
ce=hp&q=water+groups+in+africa&oq=water+gro
ups+in+africa&gs_l=mobile-gws-
hp.3...198.7985.0.8321.18.18.0.0.0.0.746.4667.7j2j1j
1j0j4j1.16.0.les%3B..0.0...1ac.1.5.mobile-gws-
hp.s5UGK5HVAeo
• http://en.wikipedia.org/wiki/Hoover_dam
BIBLIOGRAPHY

Mais conteúdo relacionado

Mais procurados

Hoover dam bypass_bridge2
Hoover dam bypass_bridge2Hoover dam bypass_bridge2
Hoover dam bypass_bridge2
George Martin
 
Pakistandams 150815052252-lva1-app6891
Pakistandams 150815052252-lva1-app6891Pakistandams 150815052252-lva1-app6891
Pakistandams 150815052252-lva1-app6891
usman ijaz
 
From beijing to lhasa
From beijing to lhasaFrom beijing to lhasa
From beijing to lhasa
tibettour
 

Mais procurados (20)

Dams%20report
Dams%20reportDams%20report
Dams%20report
 
Headworks and barrages in pakistan
Headworks and barrages in pakistan Headworks and barrages in pakistan
Headworks and barrages in pakistan
 
top 5 tunnel in india BY Mr. Mayank Oza
top 5 tunnel in india BY Mr. Mayank Ozatop 5 tunnel in india BY Mr. Mayank Oza
top 5 tunnel in india BY Mr. Mayank Oza
 
Historical development of road construction
Historical development of road constructionHistorical development of road construction
Historical development of road construction
 
Panama Canal Course Day 2 final
Panama Canal Course Day 2 finalPanama Canal Course Day 2 final
Panama Canal Course Day 2 final
 
Water reservoirs
Water reservoirsWater reservoirs
Water reservoirs
 
Hoover dam bypass_bridge2
Hoover dam bypass_bridge2Hoover dam bypass_bridge2
Hoover dam bypass_bridge2
 
Pakistandams 150815052252-lva1-app6891
Pakistandams 150815052252-lva1-app6891Pakistandams 150815052252-lva1-app6891
Pakistandams 150815052252-lva1-app6891
 
From beijing to lhasa
From beijing to lhasaFrom beijing to lhasa
From beijing to lhasa
 
The Panama Canal. Final Edition
The Panama Canal. Final EditionThe Panama Canal. Final Edition
The Panama Canal. Final Edition
 
pakistan indus basin irrigation system
pakistan indus basin irrigation system pakistan indus basin irrigation system
pakistan indus basin irrigation system
 
Three Axis Pneumatic Modern Trailer By Using Single Cylinder
Three Axis Pneumatic Modern Trailer By Using Single CylinderThree Axis Pneumatic Modern Trailer By Using Single Cylinder
Three Axis Pneumatic Modern Trailer By Using Single Cylinder
 
USBRL Railway Project Presentation
USBRL Railway Project PresentationUSBRL Railway Project Presentation
USBRL Railway Project Presentation
 
Headworks and barrages in pakistan
Headworks and barrages in pakistanHeadworks and barrages in pakistan
Headworks and barrages in pakistan
 
Panama Canal history
Panama Canal historyPanama Canal history
Panama Canal history
 
Atal Tunnel
Atal TunnelAtal Tunnel
Atal Tunnel
 
Brooklyn Bridge: A Case sudy
Brooklyn Bridge: A Case sudyBrooklyn Bridge: A Case sudy
Brooklyn Bridge: A Case sudy
 
Transatlantic Tunnel
Transatlantic TunnelTransatlantic Tunnel
Transatlantic Tunnel
 
Coal Transportation Methods
Coal Transportation Methods Coal Transportation Methods
Coal Transportation Methods
 
Transatlantic tunnel
Transatlantic tunnelTransatlantic tunnel
Transatlantic tunnel
 

Semelhante a Josh

The hoover dam 3
The hoover dam 3The hoover dam 3
The hoover dam 3
l yingling
 
The hoover dam 3
The hoover dam 3The hoover dam 3
The hoover dam 3
l yingling
 
The hoover dam 3
The hoover dam 3The hoover dam 3
The hoover dam 3
l yingling
 

Semelhante a Josh (20)

CTM_tutorial3 (1).pdf
CTM_tutorial3 (1).pdfCTM_tutorial3 (1).pdf
CTM_tutorial3 (1).pdf
 
Hoover dam ppt
Hoover dam pptHoover dam ppt
Hoover dam ppt
 
Howrah bridge ppt
Howrah bridge pptHowrah bridge ppt
Howrah bridge ppt
 
The hoover dam 3
The hoover dam 3The hoover dam 3
The hoover dam 3
 
The hoover dam 3
The hoover dam 3The hoover dam 3
The hoover dam 3
 
The hoover dam 3
The hoover dam 3The hoover dam 3
The hoover dam 3
 
Howrah bridge
Howrah bridgeHowrah bridge
Howrah bridge
 
Nuclear
NuclearNuclear
Nuclear
 
About Hoover DAM AND its construction.
About Hoover DAM AND its construction.About Hoover DAM AND its construction.
About Hoover DAM AND its construction.
 
“The History of WEHLU from Conventional to Unconventional”
“The History of WEHLU from Conventional to Unconventional”“The History of WEHLU from Conventional to Unconventional”
“The History of WEHLU from Conventional to Unconventional”
 
Panama Canal Presentation
Panama Canal PresentationPanama Canal Presentation
Panama Canal Presentation
 
Panama l.a.
Panama l.a.Panama l.a.
Panama l.a.
 
Libya great man made river project
Libya   great man made river projectLibya   great man made river project
Libya great man made river project
 
Hoover dam
Hoover damHoover dam
Hoover dam
 
Millau viaduct
Millau viaductMillau viaduct
Millau viaduct
 
The great manmade river project
The great manmade river projectThe great manmade river project
The great manmade river project
 
Transcontinental Railroad
Transcontinental RailroadTranscontinental Railroad
Transcontinental Railroad
 
Water to the angels
Water to the angelsWater to the angels
Water to the angels
 
Quebec Bridge Collapse - Case Study
Quebec Bridge Collapse - Case StudyQuebec Bridge Collapse - Case Study
Quebec Bridge Collapse - Case Study
 
Palm island Construction with Management 5 Ms
Palm island Construction with Management 5 MsPalm island Construction with Management 5 Ms
Palm island Construction with Management 5 Ms
 

Último

Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
giselly40
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 

Último (20)

A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 

Josh

  • 2. 1. HOOVER DAM’S STORY 2. HOOVER DAM’S BEGINNING CONSTRUCTION 3. HOOVER DAM’S MATERIAL 4. HOOVER DAM’S CONSTRUCTION 5. HOOVER DAM’S ELECTRICITY MAKING 6. HOW HOOVER DAM’S ELECTRICITY WORKS 7. GALLERY 8. BIBLIOGRAPHY Contents
  • 4. HOOVER DAM’S BEGINNING CONSTRUCTION • There were 6 big companies building and helping. • Divert the river. • Dynamite was used to make holes. • Four tunnels were placed. • Dynamite was used for 2 years. • Work Men removed over ½ million cubic yards of blown up remaining rubble. • The tunnels were filled with 3 foot thick walls of concrete. • High scalars drilled holes and packed them with dynamite. • they would go back to the explosion area and pry rock. • In November 1932, the Colorado River followed.
  • 5. HOOVER DAM MATERIAL • 12 miles upstream there was a good area of rock, sand, and gravel. • A train then towed the material to a aggregate plant. • There the sand and gravel went through a lot of tests • Then they were screened, graded, and washed. • Once that was done, they stock piled it. • They shipped the material to Hoover Dam.
  • 6. HOOVER DAM MATERIAL • The material was sent to two mixing plants. • One was located in the canyon bottom and the other located on the Nevada rim. • There would create concrete for the 4 ½ million cubic yards of concrete. • Once the concrete was finished, it was dispatched. • Nine cable ways carried the concrete and other materials over to the dam site. Hoover Dam Canyon mixing plant Hoover Dam Nevada rim plant
  • 7. HOOVER DAM’S CONSTRUCTION • The first bucket con concrete was settled on June 6th 1933 • Hoover Dam then began its rise on Black Canyon. • The cable ways lifted hundreds of buckets of concrete into the Dam format until the dam reached its full 660 foot thick base. • Poured in give foot layers of concrete the dam’s interlocking system moved skyward. • The crews made new records daily. • The crews worked in all conditions. Hot, dry, rainy, snowy, smelly, etc. • The workers only received 2 days off per year! Christmas and the fourth of July.
  • 8. HOOVER DAM’S CONSTRUCTION • People working at night. • On June 1934, 1 year after the first pour, the dam had reached 2/3 of its potential. • Even then Hoover Dam had already reached an extremely impressive height. • Two spill ways were built. • They were capable of holding 200000 cubic feet of water per second. • On May 29th 1935 2 ½ years after the dam was built, crews started to dump the last buckets of cement. • The whole dam was made up of 3 ¼ cubic yard of concrete. • Hoover Dam was completed 2 ½ years ahead of schedule!
  • 9. HOOVER DAM’S ELECTRICITY MAKING. • Hoover Dam’s Turbines needed pipes of massive size. • 18ft-30ft in diameter and six inches in thickness. • It was impossible to ship units of this size across country. So they made a plant that made the steel pipes. • The plant made and rolled the 3 miles of pipe needed for Hoover Dam’s electricity. • In the plant the crew needed special machines and perfect measuring to make the piping perfect. • After the steel pipes were made, they put it in a giant press that rolled the steel into shape.
  • 10. HOOVER DAM ELECTRICITY MAKING • One plate was only a third of a ring. • Three plates put together was 1 a ring. • The rings were 18ft by 11ft. • Two of the ring put together equaled 184 tons. • Carts were made to carry the rings. • A150ft cable way lifted the rings into the correct area. • The rings were then pulled into place by a cable way and held together by pressure pins.
  • 11. HOW HOOVER DAM’S ELECTRICITY WORKS • Turbine pits were made to hold Hoover Dam’s 17 turbines. • Generator were being installed in 1935. • The first turbine named N2 was completed in October 26, 1936. • Turbine N2 was built to serve the city of L.A. • Generator after generators were being build because of California, Nevada, and Arizona. • In 1956 the last generator N8 was being made after laying empty for over 25 years.
  • 12. HOOVER DAM’S ELECTRICITY • The turbines consisted of a 95000 Kilowatt, 60 cycle, 16500 volt generator. • The water is controlled by a butterfly. • The parts for the turbines were shipped across 60 rail cars. • They were pulled over by cable ways and lowered into the power house. • The parts were then lower into the turbine room. • Then then installed the turbine and then the butterfly valve to control the water flow. • Once connected to the roaster, the turbine was ready to work. • It was completed after test runs on December 1, 1961 • After N8 was made, the dam made over 1 and 1/3 million kilowatts. • Hoover Dam had cost over 171 million dollars in total.
  • 13. PICTURES OF HOOVER DAM’S TURBINES
  • 15. • http://www.wateraid.org/news/news/if-i-had- clean-water-there-would-be-no-sickness • http://www.wateraid.org/news/news/if-i-had- clean-water-there-would-be-no-sickness • http://www.wateraidamerica.org/what_we_do/cl ean_water_for_africa_and_asia.aspx?gclid=CJWP 6s2S9rUCFahDMgod_lcAbQ • http://www.potterswithoutborders.com/clean- water-in-africa/?gclid=COD- vtWS9rUCFelaMgodzxsAFw • http://www.actionagainsthunger.org/impact/wate r-sanitation-hygiene • http://www.wsafrica.org/welcome/ • http://www.google.com/search?hl=en&site=&sour ce=hp&q=water+groups+in+africa&oq=water+gro ups+in+africa&gs_l=mobile-gws- hp.3...198.7985.0.8321.18.18.0.0.0.0.746.4667.7j2j1j 1j0j4j1.16.0.les%3B..0.0...1ac.1.5.mobile-gws- hp.s5UGK5HVAeo • http://en.wikipedia.org/wiki/Hoover_dam BIBLIOGRAPHY