                            Business Problem
                            BreitBurn Energy Partners is an independent oil and gas limited
                            partnership, focused on the acquisition, exploitation and
                            development of hundreds of oil and gas properties.

                            After extensive company growth, an accounting system
                            consolidation in 2009, and rapidly changing commodity prices
                            BreitBurn was left with a P&L tool that no longer met the needs of
                            the company. The existing P&L reports were restrictive and only
                            available after hours of manual data extracts, summarization, and
“Senior management          formatting into fixed, Excel based, reports. Overall the process
had a negative feeling      was inefficient, laborious, and was not able to answer all the
towards Data                questions presented by Operations. C-Level management
Warehousing based on        requested a better, more flexible BI solution.
their prior experience
and feedback from           Mike Dominick, Manager of Systems Integration and Development,
peers. The Pragmatic        determined that a SQL Server 2008 data warehouse based BI
Works „Agile BI‟            solution would deliver the best results and provide long term
methodology helped us       benefits. But first he needed to get his team up the BI learning
show results after a        curve and show solid results to the management team early in the
week and deliver a          investment cycle for the project.
production BI solution in
under 4 months.” Mike
Dominick, BreitBurn
Energy                      Solution
                            Pragmatic Works provided a one week, onsite “Business
                            Intelligence Quick Start” engagement in late June to build a proof
                            of concept Data Warehouse, and mentor the Breitburn technical
                            team on using the Microsoft BI stack technologies.
                            During July through September the BreitBurn team continued
                            working on the project. In August the Pragmatic Works BI
                            Consultant returned for a one week “Sprint” engagement to
                            continue mentoring the team and work on the more difficult BI
                            issues. A final week of reporting assistance in September pushed
                            the project across the finish line for BreitBurn. The new Data
                            Warehouse based property P&L reports were rolled out to business
                            users in October, less than 4 months after the project started.
Page 2                                                          Win Wire – BreitBurn Energy



                                  Value
                                  Key elements of the value proposition for Breitburn Energy were:
 KEYS    TO   SUCCESS
        Pragmatic Works:                Shorter time to value
            o BI Quick Start             Lower cost to value
              for mentoring and          Flexible P&L reporting now available to users on demand
              Proof of Concept
                                         Increased level of reporting detail
            o Sprint week to             Hours of manual summarization eliminated
              drive project
              towards finish             BreitBurn team is now equipped to complete BI solutions
              line                        rapidly for additional business problems
        Microsoft Business              The project flushed out, and addressed, data and
         Intelligence                     nomenclature inconsistencies so that future projects will
         technologies:
                                          proceed even more quickly.
            o SSIS
                                         Rapid delivery of this initial BI application with C-level
            o SSAS                        visibility has established credibility for the Microsoft SQL
            o SSRS                        2008 BI stack technology and the Breitburn BI team for
                                          future projects




For additional information contact:


Sam Washburn, Technical
Director, Pragmatic Works
Consulting. +1.617.326.3846,
swashburn@pragmaticworks.com

Mais conteúdo relacionado

Semelhante a Breitburn Energy Winwire V4 (2)

Cbt storage at scale use case deck ppt pdf
Cbt storage at scale use case deck ppt pdfCbt storage at scale use case deck ppt pdf
Cbt storage at scale use case deck ppt pdf
jaswantinxero
 
Cbt storage@scale use case deck (cl) (6.8.18)
Cbt storage@scale use case deck (cl) (6.8.18)Cbt storage@scale use case deck (cl) (6.8.18)
Cbt storage@scale use case deck (cl) (6.8.18)
Anand Raj
 
Sustainability In Government - Bim Webinar
Sustainability In Government - Bim WebinarSustainability In Government - Bim Webinar
Sustainability In Government - Bim Webinar
4 All of Us
 
CV_Shilidong
CV_ShilidongCV_Shilidong
CV_Shilidong
?? ?
 
Roadmap to data driven advice michael goedhart 1v0
Roadmap to data driven advice michael goedhart 1v0Roadmap to data driven advice michael goedhart 1v0
Roadmap to data driven advice michael goedhart 1v0
BigDataExpo
 
optima-engineering-case-study
optima-engineering-case-studyoptima-engineering-case-study
optima-engineering-case-study
April Perkins
 

Semelhante a Breitburn Energy Winwire V4 (2) (20)

Cbt storage at scale use case deck ppt pdf
Cbt storage at scale use case deck ppt pdfCbt storage at scale use case deck ppt pdf
Cbt storage at scale use case deck ppt pdf
 
Cbt storage@scale use case deck (cl) (6.8.18)
Cbt storage@scale use case deck (cl) (6.8.18)Cbt storage@scale use case deck (cl) (6.8.18)
Cbt storage@scale use case deck (cl) (6.8.18)
 
Power bi proof of concept
Power bi proof of conceptPower bi proof of concept
Power bi proof of concept
 
2022 UK PC Expo Presentation slides.pdf
2022 UK PC Expo Presentation slides.pdf2022 UK PC Expo Presentation slides.pdf
2022 UK PC Expo Presentation slides.pdf
 
Leveraging Microsoft Power BI To Support Enterprise Business Intelligence
Leveraging Microsoft Power BI To Support Enterprise Business IntelligenceLeveraging Microsoft Power BI To Support Enterprise Business Intelligence
Leveraging Microsoft Power BI To Support Enterprise Business Intelligence
 
PMI-ACP Case Study
PMI-ACP Case StudyPMI-ACP Case Study
PMI-ACP Case Study
 
IBM Blockchain Labs Explained v1.0
IBM Blockchain Labs Explained v1.0IBM Blockchain Labs Explained v1.0
IBM Blockchain Labs Explained v1.0
 
Sustainability In Government - Bim Webinar
Sustainability In Government - Bim WebinarSustainability In Government - Bim Webinar
Sustainability In Government - Bim Webinar
 
Data, BI and Advanced Analytics: where Microsoft Dynamics ends and Microsoft ...
Data, BI and Advanced Analytics: where Microsoft Dynamics ends and Microsoft ...Data, BI and Advanced Analytics: where Microsoft Dynamics ends and Microsoft ...
Data, BI and Advanced Analytics: where Microsoft Dynamics ends and Microsoft ...
 
Project Experience (April 2018 to April 2019)
Project Experience (April 2018 to April 2019)Project Experience (April 2018 to April 2019)
Project Experience (April 2018 to April 2019)
 
NW BIM 2018 3 Mabey
NW BIM 2018 3 MabeyNW BIM 2018 3 Mabey
NW BIM 2018 3 Mabey
 
london-borough-of-camden-lbc-uk-casestudy-.pdf
london-borough-of-camden-lbc-uk-casestudy-.pdflondon-borough-of-camden-lbc-uk-casestudy-.pdf
london-borough-of-camden-lbc-uk-casestudy-.pdf
 
CV_Shilidong
CV_ShilidongCV_Shilidong
CV_Shilidong
 
BIM execution plan
BIM execution planBIM execution plan
BIM execution plan
 
Roadmap to data driven advice michael goedhart 1v0
Roadmap to data driven advice michael goedhart 1v0Roadmap to data driven advice michael goedhart 1v0
Roadmap to data driven advice michael goedhart 1v0
 
optima-engineering-case-study
optima-engineering-case-studyoptima-engineering-case-study
optima-engineering-case-study
 
IBM Interconnect 2017 - Maximo update
IBM Interconnect 2017 - Maximo updateIBM Interconnect 2017 - Maximo update
IBM Interconnect 2017 - Maximo update
 
Nabauspc2011
Nabauspc2011Nabauspc2011
Nabauspc2011
 
Kpi Partners
Kpi PartnersKpi Partners
Kpi Partners
 
AVEVA World Conference NA - Jim Purvis, WorleyParsons
AVEVA World Conference NA - Jim Purvis, WorleyParsonsAVEVA World Conference NA - Jim Purvis, WorleyParsons
AVEVA World Conference NA - Jim Purvis, WorleyParsons
 

Breitburn Energy Winwire V4 (2)

  • 1. Win Wire BreitBurn Energy October 2009 Business Problem BreitBurn Energy Partners is an independent oil and gas limited partnership, focused on the acquisition, exploitation and development of hundreds of oil and gas properties. After extensive company growth, an accounting system consolidation in 2009, and rapidly changing commodity prices BreitBurn was left with a P&L tool that no longer met the needs of the company. The existing P&L reports were restrictive and only available after hours of manual data extracts, summarization, and “Senior management formatting into fixed, Excel based, reports. Overall the process had a negative feeling was inefficient, laborious, and was not able to answer all the towards Data questions presented by Operations. C-Level management Warehousing based on requested a better, more flexible BI solution. their prior experience and feedback from Mike Dominick, Manager of Systems Integration and Development, peers. The Pragmatic determined that a SQL Server 2008 data warehouse based BI Works „Agile BI‟ solution would deliver the best results and provide long term methodology helped us benefits. But first he needed to get his team up the BI learning show results after a curve and show solid results to the management team early in the week and deliver a investment cycle for the project. production BI solution in under 4 months.” Mike Dominick, BreitBurn Energy Solution Pragmatic Works provided a one week, onsite “Business Intelligence Quick Start” engagement in late June to build a proof of concept Data Warehouse, and mentor the Breitburn technical team on using the Microsoft BI stack technologies. During July through September the BreitBurn team continued working on the project. In August the Pragmatic Works BI Consultant returned for a one week “Sprint” engagement to continue mentoring the team and work on the more difficult BI issues. A final week of reporting assistance in September pushed the project across the finish line for BreitBurn. The new Data Warehouse based property P&L reports were rolled out to business users in October, less than 4 months after the project started.
  • 2. Page 2 Win Wire – BreitBurn Energy Value Key elements of the value proposition for Breitburn Energy were: KEYS TO SUCCESS  Pragmatic Works:  Shorter time to value o BI Quick Start  Lower cost to value for mentoring and  Flexible P&L reporting now available to users on demand Proof of Concept  Increased level of reporting detail o Sprint week to  Hours of manual summarization eliminated drive project towards finish  BreitBurn team is now equipped to complete BI solutions line rapidly for additional business problems  Microsoft Business  The project flushed out, and addressed, data and Intelligence nomenclature inconsistencies so that future projects will technologies: proceed even more quickly. o SSIS  Rapid delivery of this initial BI application with C-level o SSAS visibility has established credibility for the Microsoft SQL o SSRS 2008 BI stack technology and the Breitburn BI team for future projects For additional information contact: Sam Washburn, Technical Director, Pragmatic Works Consulting. +1.617.326.3846, swashburn@pragmaticworks.com