This is a training module developed in the European project SESEC. More information and the full training can be found here: www.sesec-training.eu
The SESEC project is designed to address the energy efficiency needs of the EU clothing industry. The Consortium relies on outstanding competences of the partners, spread over 6 countries (Bulgaria, Romania, Portugal, Italy, Germany, Belgium) to provide the missing energy efficiency benchmarks and ready-to-use solutions for the large number of SMEs as well as larger companies. The SESEC project has 4 major objectives:
• To develop, test and offer an Energy Efficiency tool for clothing production, made up of guidelines and web-based applications, suitable for SMEs and large companies
• To transfer the project results to the sector, EURATEX members and interested companies
• To offer training and support to companies to implement energy-saving measures considering cost-effectiveness
• To improve opportunities for energy-efficiency for the whole European clothing industry
1. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung 1
2. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Überblick
Einführung
Energiesparmaßnahmen anwenden
Methode: Messung und Verifizierung (M&V)
Theorie
Definition
Messbasis
Kalkulation
Optionen
Übungen
Geschäftsfall
Beispiel
2Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
3. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Einführung.
3Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
4. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Measurement and
Verification (M&V)
You perform an energy conservation measure
(ECM).
An ECM can be:
Installation of insulation
Replacing windows
Replacing light bulbs
Modernisation of heating system
Modernisation of machinery
…
Introduction - Theory - Exercises - Business Case - Summary 4
5. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Messung und Verifikation (M&V)
Sie führen Energieeinsparmaßnahmen (englisch:
(Energy Conservation Measure, ECM) durch.
Ein ECM kann sein:
Installation von Isolierungen
Austauschen der Fenster
Austauschen der Glühbirnen
Modernisierung der Heizungsanlage
Modernisierung der Maschinen
…
5Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
6. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Wenn Sie Energiesparmaßnahmen durchführen,
kommen folgende Fragen auf:
Wie viel Energie spart man?
Wie kann man die Einsparungen kalkulieren, wenn
sich die Produktion oder Umstände verändern?
Nach der Einführung des ECM: stellen Sie mehr
oder weniger Produkte her?
Ihre Produktion läuft auf eine andere Art?
Sie müssen also:
Ihren Energieverbrauch systematisch messen und
einen detaillierten Überblick über Ihre
Energieströme entwickeln.
[2]
6Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
Messung und Verifikation (M&V)
7. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Die M&V Methode hilft Ihnen
Die von der ECM gelieferten Energieeinsparungen
einzugrenzen
Die Energieeinsparungen zu evaluieren.
Um genau zu sein:
M&V ist das Verfahren, um Energieeinsparungen zu
quantifizieren.
Eine gängige und international verwendete
Methode, um dies zu tun, ist das Internationale
Protokoll für Leistungsmessung und –überprüfung
(IPMVP). Das IPMVP wurde von der Efficiency
Valuation Organization (EVO) entwickelt. Wenn wir
von M&V sprechen, beinhaltet das auch das IPMVP.
[1, 2, 3]
7Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
Messung und Verifikation (M&V)
8. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Messung und
Verifikation hilft Ihnen
Energieeinsparungen zu
identifizieren und zu
kalkulieren.
8Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
9. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Theorie.
9Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
10. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
10Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
11. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Wie viel sparen wir
und sind die
Einsparungen
nachhaltig?
Wichtige Fragen
11Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
12. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
M&V eignet sich für alle Arten von Energie.
Esko Strom – ein südafrikanisches Stadtwerk
sagt:
“Das Grundprinzip von M & V ist es den
gemessene Stromverbrauch und den Bedarf
nach der Umsetzung mit dem was vor der
Umsetzung war zu vergleichen, um die
Auswirkungen festzustellen."
[2]
Definition
12Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
13. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Maßnahmen:
Vergleichen Sie den Energieverbrauch vor und
nach der Umsetzung einer Energiesparmaßnahme.
Schwierigkeiten:
Projektpartner sind voreingenommen; sie
vernachlässigen wichtige Schritte oder kalkulieren
zu optimistisch. Für sie kann es schwierig sein eine
objektive Bewertung abzugeben und ein
transparentes Verfahren zu gewährleisten.
Besser:
Ein unvoreingenommenes Team koordiniert das
M&V.
[3]
Vor dem Start
13Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
14. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Messbasis
Das System kann zwischen Vor-und Nach-Implementierung aufgrund von
Faktoren wie Umwelt, Kapazitätsauslastung, Arbeitszeiten usw. geändert
werden
Maßnahmen:
Der Verbrauch vor der Implementierung wird als Messbasis
angesehen (ein bekanntes System und bekannte Werte).
Wenn sich das System nicht verändert, kann der Einsatz nach der
Implementierung direkt mit der Messbasis verglichen werden.
Wenn sich das System verändert hat müssen Anpassungen kalkuliert
werden.
[3]
14Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
15. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Optionen:
Um die Maßnahmen zu überprüfen wählen Sie eine der vier M&V Optionen (auf den
folgenden Folien)
Maßnahmen:
1. Messen Sie den Energieverbrauch vor der Umsetzung
2. Setzten Sie Energiesparmaßnahmen um
3. Bestimmen Sie Anpassungen
4. Wiederholtes Messen des Energieverbrauchs
5. Kalkulieren Sie die Einsparungen
Formel:
Einsparungen = Energienutzung Vor-Implementierung
– Energienutzung Nach-Implementierung
± Anpassung [2, 3]
Handeln
15Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
16. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Optionen
M&V wird in verschiedenen Komplexitätslevel umgesetzt. Abhängig von dem
Projektumfang und der angestrebten Wirkung entstehen vier Optionen.
Option A: Partiell gemessene Isolationsnachrüstung
Verwendung wird teilweise gemessen und teilweise festgesetzt/geschätzt
Option B: Isolationsnachrüstung
Verwendung wird gemessen
Option C: Gesamtes Gebäude
Die Energienutzung eines gesamten Gebäudes wird gemessen
Option D: Kalibrierte Simulation
Computersimulation, um die Energienutzung zu prognostizieren
[2, 3, 5]
16Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
17. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Option A: Partiell gemessene
Isolationsnachrüstung
Kalkulation des Energieverbrauchs für die Messwerte über den
gesamten Untersuchungszeitraum.
Schätzung einiger Parameter
Anpassungen nach Bedarf
Geeignet für alle Anlagegrößen, am besten für einzelne Einheiten
Beispiel:
Messung des Stromverbrauchs der Beleuchtung
Abschätzung der Betriebsstunden
[2, 3, 5]
17Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
18. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Option B: Isolationsnachrüstung
Kurz-oder Langzeitmessungen wichtiger Parameter
Anpassung nach Bedarf
Geeignet für alle Anlagegrößen, am besten für einzelne Einheiten
Beispiel:
Messung der Elektrischen Leistung einer Pumpe
Wiederholte Messung nach dem Austausch der Pumpe
[3]
18Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
19. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Option C: Gesamtes Gebäude
Stromverbrauchsmessung eines ganzen Gebäudes oder einer Anlage
Wird verwendet, wenn eine Einzelmessung schwierig ist oder eine
Maßnahme sich auf mehrere Elemente einer Anlage auswirkt.
Beispiel
Erneuerung des Heizsystems und der Isolierung eines gesamten
Gebäudes.
Eine Langzeitmessung vor der Umsetzung der Energiesparmaßnahme
dient als Referenz / Messbasis.
Eine wiederholte Maßnahme wird mit der Messbasis verglichen.
[3]
19Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
20. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Option D: Kalibrierte Simulation
Einsparungen werden durch Simulation einer Anlage berechnet.
Eine Energiemessung vor der Energiemaßnahme ist nicht erforderlich. Zum Beispiel
können Abrechnungsdaten verwendet werden um den Energieverbrauch zu
bestimmen.
Kalibrierung ist notwendig, um eine Vergleichbarkeit zu schaffen. Die Kalibrierung
kann durch die Anpassung simulierter Werte an die Messwerte erfolgen.
Beispiel
Eine facettenreiche Energiemaßnahme wird umgesetzt, die sich auf das ganze
Gebäude auswirkt, aber vorher wurde kein Messgerät installiert.
Die Messbasis der Energienutzung ist simuliert.
Nach der Installation von Energiezählern kann die Simulation kalibriert werden.
Die Simulation kann mit der Messung verglichen werden. [3]
20Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
21. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Wie man eine M&V Option auswählt
In der Literatur, finden Sie Anleitungen oder Empfehlungen für die Auswahl der
Optionen A, B, C oder D.
21
[3]
Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
22. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Sind die Einsparungen dauerhaft?
Energiemaßnahmen können fehlschlagen (z. B. nur kurzfristige Einsparungen,
„Rebound-Effekt“: geringerer Energieverbrauch führt zu einer vermehrten
Systemnutzung, Beschäftigte handeln unangemessen)
Geringer Energieverbrauch in einem Bereich oder einer Anwendung kann
zu mehr Energieverbrauch in einem anderen Bereich führen
Wenn Sie Messgeräte installiert haben: Überwachung der Einsparungen.
Die Methode „Überwachung & Zielbestimmung“ (M&T) kann einem M&V
folgen.
Verwenden Sie Ihre Modelle um den Energieverbrauch zu überprüfen.
[3]
22Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
23. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Übungen.
23Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
24. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Wann verwenden Sie Messung
und Verifikation?
a. Wenn eine Energiesparmaßnahme
installiert ist.
b. Wenn der Energieverbrauch höher als
der Durchschnitt ist.
Verwendung von M&V
24Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
25. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Wann verwenden Sie Messung
und Verifikation?
a. Wenn eine Energiesparmaßnahme
installiert ist.
b. Wenn der Energieverbrauch höher als
der Durchschnitt ist.
Verwendung von M&V
25Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
26. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Lückentext
Eingabe der richtigen, fehlenden Worte.
Einsparungen = Energienutzung Vor-______________
– Energienutzung Nach-______________
± Anpassungen
Messung Simulation Implementation Verifikation
26Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
27. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Lückentext
Eingabe der richtigen, fehlenden Worte.
Einsparungen = Energienutzung Vor-______________
– Energienutzung Nach-______________
± Anpassungen
Messung Simulation Implementation Verifikation
27Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
28. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Warum benötigt man
Anpassungen bei der
Kalkulation von
Energieeinsparungen?
a. Weil Energiepreise sich während dem
M&V verändern können.
b. Weil sich die Maschinennutzung oder das
Wetter währen dem M&V verändern
können.
Anpassungen
28Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
29. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Warum benötigt man
Anpassungen bei der
Kalkulation von
Energieeinsparungen?
a. Weil Energiepreise sich während dem
M&V verändern können.
b. Weil sich die Maschinennutzung oder das
Wetter währen dem M&V verändern
können.
Anpassungen
29Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
30. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Option A: Partiell gemessene Isolationsnachrüstung
Verwendung sowohl gemessen als auch festgesetzt/geschätzt
Option B: Isolationsnachrüstung
Verwendung wird gemessen
Option C: Gesamtes Gebäude
Die Energienutzung eines gesamten Gebäudes wird gemessen
Option D: Kalibrierte Simulation
Computersimulation um die Energienutzung zu prognostizieren
Was ist anders zwischen Option A und D?
a. A ist für kleine Unternehmen, B und C für mittlere
Unternehmen, D für große Unternehmen.
b. Sie unterscheiden sich in der Messskala, simulierten und
geschätzte Daten.
Optionen
30Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
31. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Option A: Partiell gemessene Isolationsnachrüstung
Verwendung sowohl gemessen als auch festgesetzt/geschätzt
Option B: Isolationsnachrüstung
Verwendung wird gemessen
Option C: Gesamtes Gebäude
Die Energienutzung eines gesamten Gebäudes wird gemessen
Option D: Kalibrierte Simulation
Computersimulation um die Energienutzung zu prognostizieren
Was ist anders zwischen Option A und D?
a. A ist für kleine Unternehmen, B und C für mittlere
Unternehmen, D für große Unternehmen.
b. Sie unterscheiden sich in der Messskala, simulierten und
geschätzte Daten.
Optionen
31Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
32. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Denken Sie an ein System in
Ihrem Unternehmen,
welches durch M&V
analysiert werden könnte.
Virtualisieren Sie den M&V
Prozess.
Analyse
32Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
33. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Haben Sie berücksichtigt ob der
Energieverbrauch vor dem ECM
gemessen werden kann?
Haben Sie die Installation von
Messsystemen berücksichtigt?
Haben Sie eine der vier M&V
Optionen ausgewählt?
Analyse
33Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
34. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Geschäftsfall.
34Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
35. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Projekt: Verbesserung der Boiler-
Effizienz[3]
Situation:
– Ein Boileranbieter ersetzt einen Boiler
in einem Bürogebäude.
– Der Anbieter garantiert jährliche Öl-
Einsparungen von min. 25.000€.
– Der Anbieter ist verpflichtet zu einem
Bericht über die Einsparungen und
nach dem M&V Plan vorzugehen.
– Während der M&V Periode gehen
die Veränderungen am
Hauptgebäude weiter.
Praxisbeispiel
35Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
36. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Maßnahmen:
– Wahl der Option A, um den Boiler vom Rest des
Gebäudes zu isolieren.
– Systemabgrenzung rund um den Boiler: Öl-
Einspeisung und thermischer Energieausstoß
ohne elektrische Energie.
– Während der drei vordefinierten Standardtage
wird der Wirkungsgrad des Boilers nach und vor
dem Austausch gemessen.
Praxisbeispiel
36Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
37. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Einsparungen:
Gesparte Ölmenge pro Jahr: 45.700 Liter
Einsparungen pro Jahr: 31.990 € (in der Annahme, dass 0,70
€/Liter)
Vor dem
Austausch
Nach dem
Austausch
Effizienz 65,2 % 80,6 %
Ölverbrauch/Jahr 239.200 Liter 193.500 Liter
Praxisbeispiel
37Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
38. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Zusammenfassung.
38Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
39. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Es ist wichtig den Erfolg einer Energiesparmaßnahme zu
überwachen (ECM)
M&V kann dabei helfen Energieeinsparungen mit dem ECM
zu trennen und die Einsparungen zu bewerten.
Vergleichen Sie die Energienutzung vor und nach der
Umsetzung eines ECM.
Änderungen in der Anlage oder der Umwelt führen zu
Anpassungen in der Kalkulation.
Vier Optionen sind verfügbar, um die Einsparungen zu
kalkulieren.
Nach der Durchführung von M & V hilft eine
Langzeitüberwachung die Einsparungen zu erhalten.
Wiederholung
39Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
40. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
[1] Wikipedia: Measurement and Verification. URL:
http://en.wikipedia.org/wiki/Measurement_and_Verification
[2] Eskom (2010): The Measurement and Verification Guideline for Energy Efficiency and
Demand-Side Management (EEDSM) Projects and Programmes. URL:
http://www.eskom.co.za/IDM/MeasurementVerification/Documents/M_and_V_guideline_v10r
5.pdf
[3] Efficiency Valuation Organization (2012): International Performance Measurement and
Verification Protocol. URL:
http://www.evo-world.org/index.php?option=com_rsform&formId=113&lang=en
[4] U.S. Department of Energy (2008): M&V Guidelines: Measurement and Verification for
Federal Energy Projects, Version 3.0. URL:
http://www1.eere.energy.gov/femp/pdfs/mv_guidelines.pdf
[5] European Commission (2009): Reference Document on Best Available Techniques for
Energy Efficiency. URL: http://eippcb.jrc.ec.europa.eu/reference/BREF/ENE_Adopted_02-
2009.pdf
Lektüre
40Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
41. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Folie 1 – Tekke: Stromkosten steigen! – URI:
http://www.flickr.com/photos/tekkebln/8978451063/sizes/k/in/photostream / License: CC BY-ND 2.0
(http://creativecommons.org/licenses/by-nd/2.0/legalcode)
Folie 3, 22 – Florian Simeth: Arbeiten von zu Hause mit dem Laptop – URI:
http://www.flickr.com/photos/hangout-lifestyle/5865980513/sizes/o/in/photostream/ License: CC BY 2.0
(http://creativecommons.org/licenses/by/2.0/legalcode)
Folie 4, 5, 6 – dr. friendly: halogen glühlampe – URI:
http://www.flickr.com/photos/57777529@N02/5343580540/sizes/z/in/photostream/ License: CC BY-SA 2.0
(http://creativecommons.org/licenses/by-sa/2.0/legalcode)
Folie 7 – Tai Viinikka: IMG_1956: The Energy Detective – URI:
http://www.flickr.com/photos/eastpole/2087714870/sizes/l/in/photostream/ License: CC BY-NC-ND 2.0
(http://creativecommons.org/licenses/by-nc-nd/2.0/legalcode)
Folie 8 – botgirlq: EXTROVERSION CHART – URI:
http://www.flickr.com/photos/botgirlq/2541357441/sizes/o/in/photostream/ License: CC BY-NC 2.0
(http://creativecommons.org/licenses/by-nc/2.0/legalcode)
Folie 9 – Dennis Skley: *grübel* – URI: http://www.flickr.com/photos/dskley/8627475625/sizes/z/in/photostream/
License: CC BY-ND 2.0 (http://creativecommons.org/licenses/by-nd/2.0/legalcode)
Folie 10, 23, 27, 29, 31 – Bilal Kamoon: Question Mark Graffiti – URI: http://www.flickr.com/photos/bilal-
kamoon/6835060992/sizes/m/in/photostream/ License: CC BY 2.0
(http://creativecommons.org/licenses/by/2.0/legalcode)
Folie 12 – AndYaDontStop: The road of life twists and turns and no two directions are ever the same. Yet our
lessons come from the journey, not the destination......365/365 – URI:
http://www.flickr.com/photos/thenovys/3833212599/sizes/m/in/photostream/ License: CC BY 2.0
(http://creativecommons.org/licenses/by/2.0/legalcode)
Bilder -1
41Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
42. Co-funded by the Intelligent
Energy Europe Programme of
the European Union
Folie 24, 28, 30, 32 – Photocapy: ! – URI:
http://www.flickr.com/photos/photocapy/3834784192/sizes/m/in/photostream/ License: CC BY-SA 2.0
(http://creativecommons.org/licenses/by-sa/2.0/legalcode)
Folie 33 – Son of Groucho: Not Our Guide – URI:
http://www.flickr.com/photos/sonofgroucho/3855487710/sizes/z/in/photostream/ License: CC BY 2.0
(http://creativecommons.org/licenses/by/2.0/legalcode)
Folie 34 – nz_willowherb: Boilers – URI:
http://www.flickr.com/photos/willowherb/354986002/sizes/z/in/photostream/ License: CC BY-NC 2.0
(http://creativecommons.org/licenses/by-nc/2.0/legalcode)
Folie 37 – Kutchala Sutchi: Repetition, 23.03.'10, Abidjan-Yopougon (4640) – URI:
http://www.flickr.com/photos/kutchala/4469943694/sizes/o/in/photostream/ License: CC BY 2.0
(http://creativecommons.org/licenses/by/2.0/legalcode)
Bilder -2
42Einführung - Theorie - Übungen - Geschäftsfall- Zusammenfassung
Notas do Editor
Tip: There are two meanings of „measure“:
“measure” as a substantive in the meaning of action/procedure/step/method/task
“to measure” as a verb in the meaning of gauge/meter/quantify/detect